SUMMARY OF BORLOG

N
o.
1
2
3

Type Soil,
Penetration, N-SPT
GWL (meter)
Sand, (elevation, meter)
Depth (meter)
N-SPT
Sand, (elevation, meter)
Depth (meter)
N-SPT
Sand, (elevation, meter)

Depth (meter)
N-SPT

BH.01

BH.02

0.00 5.00
5.00
39
5 10
5.00
11 27
10.00
18.00
8.00
28 30/4

0.00
22.00
22.00
10 64

BH 01
BH 02

SUMMARY OF BORLOG
No
.
1

Type Soil, Penetration,


N-SPT

BH.01

BH.02

0.00 4.00

Depth (meter)

4.00

N-SPT

12

Sand, (elevation, meter)

4 18

Depth (meter)

14.00

N-SPT

3 38

Sand, (elevation, meter)

0.00 6.50

Depth (meter)

6.50

N-SPT

5 21

18.00
22.00

4.00

52 27/5

Sand, (elevation, meter)

6.50 14.00

Depth (meter)

7.50

N-SPT

39 25/3

GWL (meter)
Sand, (elevation, meter)

Sand, (elevation, meter)


5

Depth (meter)
N-SPT

PROFIL GEOLOGY LAPISAN TANAH

DASAR SUNGAI - 1.000

MUKA TANAH HULU +0.000

PONDASI DAM DI HULU - 4.000

MAR + 1.000

MAT + 4.000

MAB + 5.000

KEDALAMAN TIRAI REMBESAN -10.500

TIRAI PAPAN PENYEKAT REMBESAN

TIMBUNAN TANAH PADAT

PROFIL TUBUH DAM AIR BAKU

LEMBAR GEOTEXTILE PENAHAN BEBAN

TIMBUNAN INTI KEDAP

TIMBUNAN TANAH PADAT

PUNCAK DAM + 6.500

PAVING BLOCK 20 CM

JALAN INSPEKSI

PONDASI DAM DI HILIR -4.500

DASAR SUNGAI HILIR - 2.000

MLS - 2.000

MUKA TANAH HILIR - 0.500

MAR + 0.000