ABAN II
RIG DESIGN: Bethlehem Steel Corp . JU-250MS
CONSTRUCTION: Bethlehem Steel Corp .. Sparrows Point. Md. 1981.
ABAN Ill
RIG DESIGN: Marathon LeTourneau
CONSTRUCTION: Marathon LeTourneau Offshore
ARABDRILL 8
Pte. Ltd., Singapore, 1974, Modified to cantilever
RIG DESIGN: Baker Marine Hull 150
1984.
CONSTRUCllON: Promet Pvt. ltd., Singapore, 1982.
PERFORMANCE: Water depth-300'; Drilling
depth-20,000'.
PERFORMANCE: Water depth-150'; Drilling
depth-20,000'.
QUARTERS: 94 persons.
QUARTERS:
80 persons.
HULL: LeTourneau design 230' x 200' x 26'.
HULL: 174' x 162.6' x 18'.
HELIPORT: 60' dia.
VARIABLE LOAD: 2,308 kips.
STORAGE: Mud & Cmt Bulk-8,000 cf+5,000
sks; Liquid Mud-1,400 bbl; Water for DrillingHELIPORT: 65' x 65'.
8,500 bbl; Potable Water-1,400 bbl.
STORAGE: Mud & Cmt Bulk-7,000 cf; Liquid
DRILLING EQUIPMENT: Drawworks-Nat'I 1320;
Mud-1,316 bbl; Fuel-1,576 bbl; Water for
Pumps-two Nat'l 12-P-160 Triplex, 1,600 hp; Prime
Drilling-3,400 bbl; Potable Water-1,230 bbl.
movers-five Cat. D-399; Rotary Table-37~".
DRILLING EQUIPMENT: Drawworks-Nai'i 1_10
BOP SYSTIEM: 11 ", 15,000-psi BOP and manifold.
UE: Pumps-two Gardner Denver PZ9JC; Prime
i movers-four Cat. D 398; Rotary Table-Nat'!
CRANES: Three LeTourneau; 45-ton@ 25'.
! C375: Top Drive-Varco.
MOORING: Four 10,000-lb It anchors; four electric
motor driven winches rated at 50,000-lb pull each. I DERRICK: Pyramid 147'; 800,000 lb hook load
capacity.
POSITIONING: Thruster assist.
BOP SYSTEM: Cameron U 13%' x 5,000 x 3:
SEA STATE; Operating draft-30'; Survivaf-wave
Hydril GK 13%" x 5,000; Hydril MSP 21 Yo' x 3,000:
height 50'.
Shaffer LWS 201" x 3,000, Cameron U n1,, x
REMARKS: Purchased from Atwood, 1976. For10,000 x 3, Hydril GK 7)(oX 10,000; Cameron U
merly Chickamauga and lie D' Amsterdam.
double/single 13%', 5,000; Kearney unrt 21 bottles
&
remote controls.
WORK AREA: India.
CRANES: Two BMC 1,000, 40 tons x 25'.
MOORING: Two 10-ton, one 5-ton anchor w/1 /
Amidco
PHOTO NOT
AVAILABLE
wire rope.
: REMARKS: Sedco Forex is a partner in Arabian
; Drilling Co ..
WORK AREA: Arabian Gulf.
AMAZONE
RIG DESIGN: IHC Gusto Engineering, Holland
CONSTRUCTION: Aker Stord Yard, Norway, 1982.
PERFORMANCE: Water depth-168': Drilling
depth-14.000'.
QUARTERS: 68 persons.
HULL: 164' x 121' x 19'.
VARIABLE LOAD: 4,760 kips.
HELIPORT: 33' dia.
STORAGE: Mud & Cmt Bulk-7,120 cf; Liquid
Mud-203 mt; Fuel-2, 160 bbl; Water for
Drilling-2,400 bbl; Potable Water-700 bbl.
DRILLING EQUIPMENT: Drawworks-ldeco H900; Pumps-PUMPS: two ldeco 1.000 hp,
7'x10' Triplex; Prime movers-three 12 cyl. SACM
900 kw each; Rotary Table-ldeco LR-275-K.
DERRICK: Superior. 142'.
BOP SYSTEM: Hydril, two annular, 21 r. 2,000 psi
RIG DESIGN: Marathon LeTourneau 82-SC-C
and 13%" 5,000 psi; one double ram. 13%' 5,000 psi .
. CONSTRUCllON: Davie Shipbuilding, Canada. 1981.
CRANES; Two MAN, HDK 600 HM, HDK 260 HM.
; PERFORMANCE: Water depth-250': Drilling
WORK AREA: Gabon.
depth-20.000'.
! QUARTERS: 76 persons
HULL: 207' x 176' x 20'.
. VARIABLE LOAD: 1.775
: HELIPORT: 65' diameter.
j STORAGE: Mud & Cmt Bulk-8,500 cf; Liquid
, Mud-1,490 bbl; Fuel-2.254 bbl; Water 'or
, Dnlling-6,612 bbl; Potable Water-983 bbl.
: DRILLING EQUIPMENT: Drawworks-Nat'l 1320
~ UE: Pumps-two Nat'! 12-P-160; Prime movers: four Cat. D-399; Ro1ary Table-Nat'I C-375; Too
. Drive-Varco.
: DERRICK: 147' x 30'; 1,000.000 lb hook load.
! BOP SYSTEM: Two double 13%", 10,000 psi wp:
: one 13W'. 5.000 psi wp annular.
. CRANES: Three LeToumeau, PCM-120 AS wt1CO
' boorn. 50 short tons @ 2 4 '.
REMARKS: Formerly Glomar High Island 'ii
i Sedco Forex 1s a partner ln Arabian Dnlling Cc .
. WORK AREA: Arabian Gulf.
87
Atwood Oceanics
Chiles Offshore
BOHAI NO. 5
VICKSBURG
RIG DESIGN; Marathon Le Tourneau Class 84,
converted extended reach cantilever.
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss, 1975, modified 1998.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 88 persons.
HULL: 238' x 209' x 26' (410' leg length).
VARIABLE LOAD: 2,500 t.
HELIPORT: 72' diameter.
STORAGE: Mud & Cmt Bulk-9,500 sks; Liquid
Mud-2,100 bbl; Water for Drilling-8,500 bbl;
Potable Water-1,724 bbl.
DRILLING EQUIPMENT: Drawworks--Emsco C2,
2,000 hp; Pumps--Emsco FA-1600 Triplex; Prime
movers-Four Cat. Model 3516, 1,855 hp each;
Top Drive-Varco TDS-4S.
TOWING REQUIREMENTS: 10,000-hp tug; 5
knots in calm seas.
DERRICK: 160'; 1,300,000-lb static hook load.
BOP SYSTEM: Hydril 21 X', 2,000 psi; Hydril 13%',
5,000 psi; two Cameron U double 10,000 psi.
CRANES: Three Le Toumeau, 100' booms rated
45t@ 25'.
MOORING: Four 10,000-lb anchors; Four electric
motor driven winches rated at 50,000 lb pell each.
WORK AREA: India.
CHILES MAGELLAN
BOHAI NO. 7
88
BOHAI NO. 10
RIG DESIGN: Cantilever
CONSTRUCTION: Marathon Le Tourneau, Singapore, 1980.
OTHER DATA: Same as Bohai No. 8.
WORK AREA: China Sea.
BOHAIN0.9
RIG DESIGN: Bohai 011 Design Co., VHT 905.
CONSTRUCTION: Dalian Shipyard, 1984.
OTHER DATA: Same as Bohai No. 7.
BOHAIN0.4
BOHAI NO. 6
anchors.
WORK AREA: Middle East.
QUARTERS: 48 persons.
HULL: 114' x 85' x 10'.
VARIABLE LOAD: 3,550 kips.
HELIPORT: 34' dia.
STORAGE: Mud & Cmt. Bulk-3,000 sks; Liquid
Mud-390 bbl; Fuel-178.5 bbl; Water for
Drilling-393 bbl; Potable Water-393 bbl.
DRIWNG EQUIPMENT: Drawworks-1deco H-35D; Pumps-Two Gardner Denver PA8K; Prime
Movers-Two Cat. 3406; Rotary Tabl<r-ideco 1l'A'.
BOP SYSTEM: Two Cameron U type, 11 ', 5,000
psi; one Hydril 11 .
CRANES: One Link Belt 78.
REMARKS: Formerly Well Services (Marine) Ltd.
Marine 2.
WORK AREA: Point Fortin, Trinidad.
QUARTERS: 75 persons.
HULL: 146' x 100' x 13'6".
VARIABLE LOAD: 2,962 kips, operating.
HELIPORT: 55' x 50', S-61 or equiv.
STORAGE: Mud & Cm! Bulk-6,000 cf: Liquid
Mud-1,108 bbl; Fuel-1,187 bbl; Water for
Drilling-4,619 bbl; Potable Water-500 bbl.
DRILLING EQUIPMENT: Drawworks-Oilwell E
300E: Pumps-Three Oilwell 1700 PT triplex: Prime
movers-Two EMD16 645E8, one EMD12 645E8,
each with 1,500 kw generators: Rotary Table-Gardner Denver 37\i"; Top Drive-Varco TDS-3.
DERRICK: DSI 160', 1,000,000 lb hook load.
BOP SYSTEM: CIW 13%", 10,000 psi; Shaffer
13%", 10,000 psi.
CRANES: Two FMC Link-Belt ABC-138A, 80'
' boom, 43 I at 40'.
. REMARKS: Formerly Broughton I, Viking Rig II,
Southwestern 110 and Southwestern Marine IV.
I WORK AREA: Trinidad.
PHOTO NOT
AVAILABLE
CLIFFS DRILLING 101
RIG DESIGN: MODU
CONSTRUCTION: McDermott Shipyard, 1973.
PERFORMANCE: Water Depth-10'-80'.
er system.
rotruy 35' from stern; 7'6" transverse rotary movement either side of hull center line.
WORK AREA: Gulf of Mexico.
89
>"-''.
booms.
TOWING REQUIREMENTS: 7,200-hp tug.
MOORING: Three 7,500 lb anchors, 1 X' wire rope.
REMARKS: Managed by Foramer. Formerly
Ocean Magallanes.
WORK AREA: Gulf of Mexico.
Crosco Ltd.
LABIN
max. cap.
90
/'J'J.\'
'
"
OCEAN SOVEREIGN
CONSTRUCTION: Far East Levingston Shipyard
Singapore, 1981.
'
REMARKS: Formerly Arethusa Sovereign.
BOP SYSTEM: One 21\1', 2,000' psi annular
diverter.
DRILLING EQUIPMENT: Top Drive-Varco ms-3.
OTHER DATA: Same as Heritage.
WORK AREA: Indonesia.
PAN ON
RIG DESIGN: Levingston Class Ill
CONSTRUCTION: Rhine-Schelde-Veroime, Rotterdam, Holland, 1977.
PERFORMANCE: Water depth-300'; Drilling
depth-20,000'.
VARIABLE LOAD: 1,700 mt.
HULL: 207.58' x 177.88' x 22.22'.
QUARTERS: 70 persons.
HELIPORT: Accommodates.S-61, Mf-8.
STORAGE: Mud & Cmt Bulk--6,300 cf; Liquid
Mud-1,189 bbl; Fuel-4,176 bbl; Water for
Drilling--5,562 bbl; Potable Water-906 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'I. 1320
UE, 2,CXXJ hp; Pumps-two Nat'I. 12-P-160, 1,600 hp;
P!ime movera--five Cat 0-399, one Cat. 3508; Rotary
Table--Nat'I. 37W; Top Drive-Varco ms 3-S.
DERRICK: 147'; 900,000 lb hook load.
CRANES: Two Nat'I. OS-215 units w/140' boom.
MOORING: Two 1.J. Muiden B.V. single drum; one
double drum; four Had Bar anchors.
BOP SYSTEM: Hydril MSP 29W, 500 psi diverter,
Hydril 21X' bag type, 2 K; Shaffer LWS 21 X", 2 K
dbl.; Hydril GK 13%', 10 K; Shaffer 13%", 10 K
single & dbl.
REMARKS: Zero discharge.
WORK AREA: Ad1iatic.
Diamond Offshore
Drilling, Inc.
OCEAN CHAMPION
RIG DESIGN: Bethlehem, 250-MS (photo typical)
CONSTRUCTION: Bethlehem Steel Corp., Singapore, 1975, Rebuilt, 1982; Modernized 1985.
PERFORMANCE: Water depth-250'; Drilling
depth-25,000'.
QUARTERS: 7 4 persons, plus 3-man sick bay.
HULL: 166' x 109' x 16'.
HELIPORT: 83' x 83'.
STORAGE: Mud & Cmt Bulk-6,030 cf; Sack
storage--3,000 sks: Liquid Mud-1,800 bbl;
Fuel-1,719 bbl; Water for Drilling--4,575 bbl;
Potable Water--474 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1625
DE, three 1,000 hp motors; Pumps-two Nat'I
12-P-160 triplex, 1,600 hp; Prime movers-two
EMO 16-645-E8 & one 8-645-E8, 5,500 hp: Rotary
Table-Nat'I 37W, 800 hp.
DERRICK: 147': 1,300,000-lb hook load capacity.
BOP SYSTEM: One 27%' nom. Regan KFDJ
diverter: One Shaffer spherical annular. 13%".
5,000 psi; One double and one single Cameron
"U" units, 13%", 10,000 psi.
CRANES: Two LeTourneau PCM-120-AS wi100'
boom.
92.
OCEAN KING
RIG DESIGN: Modified Marathon LeToumeau, 116C.
CONSTRUCTION: Marathon LeTourneau, 1973,
Rebuilt, 1982; modernized 1990.
PERFORMANCE; Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 88 persons, plus 6-man sick bay.
HULL: 230' x 200' x 26'.
HELIPORT: S61, 70'.
STORAGE: Mud & Cm! Bulk-7,280 cf; Cmt2,600 sks; Liquid Mucl-1,466 bbl; Fuel-3,000
bbl; Water for Drilling-10,371 bbl; Potable
Water-1,000 bbl.
Drawworks-Nat'I
DRILLING EQUIPMENT:
1625DE; Pumps-two Emsco FB-1300 Triplex;
Prime movers-three FM #3808)<;, one EMO 16645; Rotary Table-37W'; Pipe Handling System-Varco Iron Roughneck; Top Drive-Varco ms-3.
DERRICK: 160' Lee C. Moore; 1,000,000-lb load
capacity.
BOP SYSTEM: One 27Y," nom. Regan KFDJ
diverter, one Hydril GK 13%", 5,000 psi; Two Shaffer 13%", 10,000 psi double.
CRANES: Three LeTourneau PCM-120 AS.
OCEAN SUMMIT
RIG DESIGN: Modified Levingston Class Ill
CONSTRUCTION: 1972; Upgrade and cantllever
conversion in 1991.
CRANES: One Sea King Series 62, 50! w/100'
boom: One Skagit Model 353, 40! w/80' boom.
OTHER DATA: Same as Ocean Nugget, except
Varco SDS-1 side drive.
WORK AREA: Gulf of Mexico.
OCEAN SPARTAN
OCEAN TITAN
OCEAN SPUR
CONSTRUCTION: Swedeyards Gotaveli<en, Arendal, Sweden, 1981.
OTHER DATA: Same as Ocean Spartan.Top
Drive-Varco TDS-3.
WORK AREA: Gulf of Mexico.
OCEAN SCOTIAN
RIG DESIGN: Mitsui Ocean Development & Engineering, Japan, 200 C-45
CONSTRUCTION: Mitsui Ocean Development &
Engineering (MODEC), 1981.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
QUARTERS: 80 persons.
HULL: 203'6' x 190'3' x 21 '.
VARIABLE LOAD: 1,800 mt.
HELIPORT: Rounded 70' diameter.
STORAGE: Mud & Cmt Bulk-9,000 cf; Liquid
Mud-1,886 bbl; Water for Drilling-3,361 bbl:
Potable Water-2, 174 bbl.
DRIWNG EQUIPMENT: Drawworks-Oilwell 2000
hp; Pumps-two Oilwell A-1700P; Prime
movers-four CAT 399 TC; Rotary Table--37:>':
Top Drive-Varco TDS-4H.
DERRICK: 162'; 1,300,000-lb hook load.
CRANES: One 80-ton, one 50-ton, Nat' I.
MOORING: Four 10,000 lb US LWT anchors.
REMARKS: 357' legs.
WORK AREA: Gulf of Suez.
SNEFERU
CONSTRUCTION: Mitsui, 1980.
PERFORMANCE: Water Depth-225'; Drilling
Depth-25,000'
DRIWNG EQUIPMENT: Top Drive-Varco TDS-3.
OTHER DATA: Same as Senusret except for 328' legs.
WORK AREA: Mediterranean Sea.
OCEAN TOWER
RIG DESIGN: Class 53
CONSTRUCTION: Marathon LeTourneau, 1972.
QUARTERS: 56 persons, plus 3-man sick bay.
STORAGE: Mud & Cmt Bulk-6,300 cf; Sack
Storage-5,000 sks; Liquid Mud-1,635 bbl;
Fuel-3,230 bbl; Water for Drilling-5,550 bbl;
Potable Water---850 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1625DE; Pumps-two Nat'I 12-P-160 Triplex 1,600
hp, one Nat'I 9-P-100 1,000 hp Triplex: Prime
movers-three EMO SR-16 diesel engines; Rotary
Table--Nat'I C-375; Pipe Handling System-Varco
IR-2000, Top Drive-Varco TDS-3.
DERRICK: Lee C. Moore 160'. 1,000,000 lb.
BOP SYSTEM: 21 X", 2,000 psi WP Hydril MSP
w/21X" spool, two 12" ANSI: 13%" Sm Shaffer
spherical annular, 13%' IOM CIW type U double
and single.
OTHER DATA Same as Ocean Titan.
WORK AREA: Gulf of Mexico.
KAMOSE
RIG DESIGN: Levingston 111-C
CONSTRUCTION: Verolme Estaleros Reunidos
Brazil, 1987.
PERFORMANCE: Water depth-300'; Drilling
depth-20,000'.
QUARTERS: 80 persons.
HULL: 203' x 190' x 23'.
VARIABLE LOAD: 1,322 mt.
HELIPORT: 72' diameter.
STORAGE: Mud & Cmt Bulk-7,200 cf; Liquid
Mud-1,580 bbl; Fuel-2,600 bbl; Water for
Drilling---8,500 bbl; Potable Water-2.400 bbl.
DRILLING EQUIPMENT; Drawworks-ldeco E2100; Pumps-three ldeco T-1600; Prime
Movers-five Cat D-399: Rotary Table-Oilwell
37!0''; Top Drive-Varco IDS.
DERRICK: Dreco 147'; 1,000,000 lb.
BOP SYSTEM: Shaffer 13%', 10,000 psi: Reagan
30". 1,000-psi diverter.
CRANES: One Monarch Setrax 6024. 50 t. 130'
boom; two American Tena 16 t, 11 O' boom.
REMARKS: Formerly Norbe V.
WORK AREA: Gulf of Suez.
93
ENSCO 55
ENSCO 50
RIG DESIGN: Friede & Goldman L-780 Mod II
CONSTRUCTION: Daewoo Shipbuilding, South
Korea, 1983: Refurbished in 1998.
PERFORMANCE: Water depth-20-300'; Drilling
depth-25,000'.
QUARTERS: 92 persons.
HULL: 180' x 175' x 25'.
VARIABLE LOAD: 4,200 kips.
HELIPORT: 70' polygon.
STORAGE: Mud & Cmt Bulk-9,344 cf; Liquid
Mud-1,518 bbl; Fuel-2,360 bbl; Water for
Drilling-5,588 bbl; Potable Water-1,323 bbl.
DRILLING EQUIPMENT: Drawworks-Dilwell E2000; Pumps-Two Oilwell A-1700 PT; Prime
movers-three EMO 16-645-E8; Rotary Table-Oilwell B 37!4"; Top Drive-Varco TDS-4H.
DERRICK: Draco 1,300,000 lb.
BOP SYSTEM: 29\i', Hydril MSP-500; 2rn",Shaffer annular & dbl; 13%" Koomey ann. 5 K & CIW 10
K dbl & single.
CRANES: FMC Link Belt API 238A & 218, 25/22 t
at 50'.
REMARKS: 40' x 1O' cantilever; formerly Dual
Rig 38; zero discharge.
WORK ARE.'\: S.E. Asia.
ENSCO 52
CONSTRUCTION: Daewoo Shipbuilding, South
Korea, 1983.
DRILLING EQUIPMENT: Top Drive-Varco TDS3.
DERRICK: Draco 160', 1,300,000 lb.
OTHER DATA: Typical ENSCO 50.
REMARKS: Formerly Dual Rig 42.
WORK AREA: S.E. Asia.
ENSCO 53
RIG DESIGN: Friede & Goldman L-780 Mod II.
CONSTRUCTION: Ingalls Shipyard, Pascagoula,
Miss., 1982; Refurbished in 1998.
QUARTERS: 92 persons.
STORAGE: Bulk-8,675 cf; Liquid Mud-1,750
bbl; Fuel-2,470 bbl; Water for Drilling-5,200
bbl; Potable Water-1,350 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1825
DE; Pumps-Nat'! 12 P 160; Prime Movers-five
Cat. 0-399; Rotary table-Nat'! C 375; Top
Drive-Varco TDS-4H.
BOP SYSTEM: 21X", 2,000 psi Hydril MSP; 13%",
5 K Hydril ann. & CIW 10 K dbl & dbl.
CRANES: Two Nat'l OS 105, 40 t; one Nat'I OS
215, 55 t.
OTHER DATA: Typical ENSCO 50.
REMARKS: Zero discharge. Formerly Glomar
Main Pass Ill and Dual Rig 88.
WORK AREA: S.E. Asia
ENSCO 54
RIG DESIGN: Friede & Goldman L-780 Mod II.
CONSTRUCTION: China Shipbuilding, Taiwan.
1982; Refurbished in 1997.
QUARTERS: 84 persons.
HELIPORT: Sikorsky S61.
STORAGE: Mud & Cmt Bulk-8,064 cf+5,000 sks:
Liquid Mud-2,000 bbl; Fuel-2,580 bbl; Water
for Drilling-6,315 bbl; Potable Water-1,171 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco C2;
Pumps-Emsco FB 1600: Prime movers-three
EMO 12-645-E: Rotary Table-Emsco T3750; Top
Drive-Varco TDS-4H.
DERRICK: Draco 1.000,000-lb static hook load.
BOP SYSTEM: 2n". 2,000 psi ann.; Shaffer 13~".
5.000 psi ann.; CIW U 13T. 10 K single & dbl.
OTHER DATA: Typical ENSCO 50.
94
ENSCO 57
RIG DESIGN: Friede & Goldman Ltd., L-780
(Mod II)
CONSTRUCTION: Ingalls Shipbuilding, Pascagoula. Miss. 1982.
QUARTERS: 100 persons.
HELIPORT: 62' polygon.
DRILLING EQUIPMENT: Drawworks-Midco U1220 EB; Pumps-GD PZ-11; Prime moversfive Cat. 0-398 TA; Rotary Table-Gardner-Denver
37!4'; Top Drive-Varco TDS-3.
DERRICK: Branham 165'; 1.400,000 lb.
CRANES: Two Seaking D-1700, 20 tat 20'.
OTHER DATA: Typical ENSCO 51.
WORK AREA: S.E. Asia.
ENSCO 56
RIG DESIGN: Friede & Goldman. Ltd., L-780
MODll
CONSTRUCTION: Ingalls Shipbuilding, Pascagoula, Miss, 1983.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 82 persons.
HULL: 180' x 175' x 25'.
HELIPORT: 70' dia.
RIG DESIGN: Marathon LeTourneau, Class 84
STORAGE: Mud & Cmt Bulk-8,690 cf; Liquid
Slot Type
Mud-1,600 bbl; Water for Drilling-5,200 bbl;
CONSTRUCTION: Marathon LeTourneau. ClydePotable Water-1,348 bbl.
bank, Scotland, 1976.
DRILLING EQUIPMENT: Drawworks-Nat'l 1625
PERFORMANCE: Water depth-380'; Drilling
DE: Pumps-two Nat'l 12-P-160; Prime moversdepth-30,000'.
five Cat. D-399; Rotary Table-C-375 IRD, Top
QUARTERS: 72 persons.
Drive-Varco TDS-4S.
RIG DESIGN: Levingston; 111-C
HULL: 247' x 227' x 26'.
DERRICK: OSI 150', 1,300,000-lb hook load
CONSTRUCTION: Levingston Shipbuilding, 1981.
capacity.
VARIABLE LOAD: 7,574,000 lb.
PERFORMANCE: Water depth-300'; Drilling
BOP SYSTEM: Hydril 21W, 2,000 MSP; two CIW
HELIPORT: 70.5' diameter, S-61.
depth-25,000'.
double 13%", 10,000-psi rams; Hydril 13%", 5,000. STORAGE: Mud & Cmt Bulk-6,240 cf; Liquid
QUARTERS: 58 persons.
psi GK annular.
' Mud-1,600 bbl; Fuel-4,828 bbl; Water for
HULL: 200' x 186' x 22'11:>'.
CRANES; Three Link Belt w/100' booms.
Drilling-10,539 bbl; Potable Water-1,294 bbl.
VARIABLE LOAD: 3,600,000 lb.
MOORING: 1.500' of 1%' dia wire.
DRILLING EQUIPMENT: Drawworl<s-Nat'l 1320UE, 2.000 hp; Pumps-two Nat'l 12-P-160 Triplex:
HELIPORT:
S-61
or
equiv.
REMARKS: Formerly Bonito II and Clementine;
Prime movers-three EMO 18-645E-8, 2,200 hp
zero discharge.
STORAGE: Mud & Cmt Bulk-6,000 cf; Liquid
each;
Top Drive-TDS-4H.
WORK AREA: Australia.
1 Mud-1.142 bbl; Fuel-4,295 bbl; Water for
DERRICK: 160' x 30' T-leg; 1,000,000-lb hook load.
Drilling-5,670 bbl; Potable Water-933 bbl.
BOP SYSTEM: Hydril MSP 21 Y.', 2 K; Shaffer
DRILLING EQUIPMENT: Drawworks-Nat'I 1320
13%", 5 K: Shaffer 13%". 10 K SL single & dbl.
UE, electric G.E. SCR system; Pumps-two Nat'I
12-P-160: Prime movers-two EMO 16E8, one
CRANES: Three LeTourneau PCM-120 AS.
, EMO 12E8: Rotary Table-Nat'! C-375. 3n". Top
POSITIONING: LeTourneau winch w/10,000-lb
' Drive-Varco TDS-3.
anchors and 2,500' of 1:>"wire rope.
i DERRICK: OSI 160'; 1,000,000-lb hook load.
REMARKS: Formerly Penrod 67 and ENCO 01;
BOP SYSTEM: Regan KFDJ. 36\i'', 500 psi divert- 1 zero discharge.
er; Shaffer ann., 13%", 5 K; CIW U 13%". 10 K
WORK AREA: Mexico and Gulf of Mexico.
single & dbl.
CRANES: Two Link Belt 25-ton.
ENSCO 68
REMARKS: Formerly Sonat-OF 87 and Dual Rig
87: zero discharge.
CONSTRUCTION: Marathon LeTourneau. Vicksburg, Miss., 1976.
1 WORK AREA: Mexico and Gulf of Mexico.
PERFORMANCE: Water depth-350'; Drilling
depth-30,000'.
QUARTERS: 77 persons.
VARIABLE LOAD: 5,566,540 lb.
HELIPORT: 70' dia.
DRILLING EQUIPMENT: No Top Drive.
DERRICK: 147' x 30', 1,000,000 lb.
ENSCO 51
, OTHER DATA: Typical of ENSCO 67.
RIG DESIGN: Friede & Goldman, ltd., L-780
REMARKS: Formerly Penrod 68.
(Mod II). Cantilever skid-off capability
WORK AREA: Gulf of Mexico.
CONSTRUCTION: Ingalls Shipyard, Pascagoula,
Miss, 1981.
PERFORMANCE: Water depth-300'; Drilling
ENSCO 69
depth-25,000'.
CONSTRUCTION: Marathon LeTourneau, VicksQUARTERS: 58 persons.
burg, Miss., 1976.
HULL: 180' x 175' x 25'.
PERFORMANCE: Water depth-380'; Drilllng
depth-30,000'.
VARIABLE LOAD: 4,253 kips.
VARIABLE
LOAD: 7,574 kips.
HELIPORT: 60' x 60'. S-81 or equiv.
DERRICK: 170', 2,000.000 lb.
STORAGE: Mud & Cmt Bulk-7,200 cf; Liquid
Mud-2.003 bbl; Fuel-2,481 bbl; Water for
OTHER DATA: Typical of ENSCO 67.
ENSCO 64
Drilling-5.200 bbl; Potable Water-1.348 bbl.
REMARKS: Formerly Penrod 69.
DRILLING EQUIPMENT: Drawworks-Midco URIG DESIGN: Marathon LeTourneau, Class 53. Slot.
WORK AREA: Gulf of Mexico.
1220 EB: Pumps-GD PZ-10; Prime moversCONSTRUCTION: Marathon Le Tourneau. Clyae
five Cat. D-398 TA: Rotary Table-Oilwell
Bank, Scotland, 1973.
R109B-143; Top Drive-Varco TDS-3.
PERFORMANCE: Wafer depth-21 O': Drilling
DERRICK: 160': 1.000.000-lb hook load capacity.
depth-25.000'.
QUARTERS: 74 persons.
ENSCO 70
ENSCO 80
ENSCO 81
ENSCO 83
ENSCO 71
RIG DESIGN: Hitachi 300 NS-C.
CONSTRUCTION: Hitachi Zosen, Japan, 1981.
DRILLING EQUIPMENT: Drawworks-Nat'I 1320UE: Pipe Handling-Varco AR 3000 Iron Roughneck.
BOP SYSTEM: Regan 27'/,", 2 K, KFDJ; Hydril
131"'. C-K. 5K; Hydril 13%', 10 K single & dbl.
OTHER DATA: Typical ENSCO 70.
REMARKS: Formerly Lauritzen's Dan Earl.
WORK AREA: North Sea.
ENSCO 84
ENSCO 82
ENSCO 85
ENSCO 72
RIG DESIGN: Hitachi 300 NS-C.
CONSTRUCTION: Hitachi. Japan, 1981.
HELIPORT: 82' octagon. S61.
STORAGE: Mud & Cmt Bulk-10,000 cf; Liquid
Mud-3,514 bbl; Fuel-2,399 bbl; Water for
Drilling-5,367 bbl; Potable Water-1,213 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1320
UE: Pumps-two Nat'l 12-P-160; Pipe Handling
System-MH Iron roughneck; Top Drive-MH
DDM HY 500.
DERRICK: DSI 147': 1,000,000-lb.
BOP SYSTEM: Regan 29~". KFDJ, 2 K: Hydril
21~'.", MSP. 2 K; Hydnl 13%", GK, 5K.
CRANES: Two Nat'I OS-215. 20' t.
OTHER DATA: Typical ENSCO 70.
REMARKS: Formerly Ocean Benarmin, Benarmin
Explorer and Ross Exolorer.
WORK AREA: North Sea.
96
ENSCO 89
ENSCO 90
RIG DESIGN: Marathon LeTourneau 82 SD-C.
CONSTRUCTION: Marathon LeTourneau,
Brownsville, Texas, 1982,
ENSCO 94
ENSCO 93
RIG DESIGN: Marathon LeTourneau 82 SD-C.
CONSTRUCTION: Marathon LeTourneau, Singapore, 1982.
PERFORMANCE: Drilling depth---25,000'.
VARIABLE LOAD: 3,7 46,020 lb.
OTHER DATA: Typical of ENSCO 83.
REMARKS: Formerly Penrod 93.
WORK AREA: Gulf of Mexico.
ENSCO 97
RIG DESIGN: Marathon LeTourneau, 82-SD-C
CONSTRUCTION: Marathon LeTourneau,
Brownsville, Texas, 1981.
PERFORMANCE: Water depth-250'; Drilling
depth---25,000'.
QUARTERS: 92 persons.
STORAGE: Mud & Cmt Bulk-9,600 cf; Liquid
Mud-1,530 bbl; Fuel-3,079 bbl; Water for
Drilling-5,000 bbl; Potable Water-1,000 bbl.
DRILUNG EQUIPMENT: Drawworks-Emsco C2,
2,000 hp; Pumps-Emsco FEH600; Prime moVf'&three EMO MD 12E8 w/1050 KW A.C. 'gens. and
Ross Hill SCA; Rotary Table-Emsco T-3750, Top
Drive-Varco TDS-3.
DERRICK: Emsco 160'. 1,000,000 GNC.
BOP SYSTEM: Shaffer ann. 21 y.", 2 K; Shaffer
ann. 13%", 5 K; CIW U 13%", 10 K, single/dbl.
CRANES: Three LeTourneau PCM 120 AS, 25 t.
REMARKS: Formerly Keyes 250, Manne 250 and
Dual Rig 86; zero discharge.
OTHER DATA: Typical ENSCO 83.
WORK AREA: Middle East.
ENSCO 95
extension.
WORK AREA: West Africa.
GLOMAR ADRIATIC II
RIG DESIGN: Marathon LeTourneau 116-C.
CONSTRUCTION: Marathon LeTourneau.
Brownsville, Texas, 1981.
PERFORMANCE: Water Depth-328'.
QUARTERS: 88 persons.
BOP SYSTEM: One single/one double 13%"
10,000 psi rams; one 13%", 5,000-psi wp annular
Foresight Drilling
ENSCO 96
ENSCO 99
RIG DESIGN: Marathon LeToumeau Class 82-SD-C.
CONSTRUCTION: Built by Marathon, Brownsville,
Texas, 1985.
PERFORMANCE; Water depth-250'; Drilling
depth-30,000'.
DRILLING EQUIPMENT: Drawworks-Nat'I. 1625
DE; Pumps-two Nat'I. 12-P-160; Prime Moversthree EMO MD 12 645 E9B; Rotary Table-Nat'I.
D-375; Top Drive-TDS 5.
DERRICK: 160'; 1,348,000 lb hook load.
BOP SYSTEM: Hydril MSP 21'h", 2 K; Shaffer
13%", 5 K; CIW U 13%". 10 K, two singles & dbl.
CRANES: Three LeTourneau RD 120 AS.
OTHER DATA: Typical ENSCO 86.
REMARKS: Zero discharge rig. Formerly Penrod 99.
WORK AREA: Gulf of Mexico (Mobile Bay).
ENSCO 101
RIG DESIGN: Keppel Fels enhanced moc. V
CONSTRUCTION: Keppel Fels, Singapore. To be
completed late 199~arly 2000.
PERFORMANCE: Water Depth-350'; Drilling
Depth-30,000'.
QUARTERS: 100 persons.
HULL: 228' x 222' x 30'.
VARIABLE LOAD: 8,300 t.
DRIULING EQUIPMENT: Drawworks-Nat'l 1625DE, 3,000 hp; Pumps-Three Nat'I 14-P-220,
2,200 hp; Prime Movers-Six Cat. 3516 B; Rotary
Table-Nat'I 29W'; Top Drive-Varco TDS-4H.
DERRICK: 170' x 40' x 40'; 1,960,000-lb hook
load cap.
BOP SYSTEM: 18.750", 15,000 psi.
CRANES: Three Draco 72.
REMARKS: Zero discharge; North Sea standard,
70' 30' high-capacity cantilever, on center line,
2, 100 kips @ 70'.
MOORING: Four 2,300' x 2" wire.
WORK AREA: Worldwide, under construction.
ENSCO 98
RIG DESIGN: Mara1hon LeTourneau. Vicksburg,
Miss., Class 82-SD-C
CONSTRUCTION: Marathon LeTourneau, 1977.
PERFORMANCE: Water depth-250'; Drilling
depth-25,000'.
VARIABLE LOAD; 3,485.950 lb.
DRILUNG EQUIPMENT: Top Drive-Varco TDS-3.
DERRICK: 160'; 500-ton hook load capacity.
OTHER DATA: Typical ENSCO 83.
REMARKS: Cantilever expansion. 7'. Formerly
Penrod 63 and ENSCO 63.
WORK AREA: Gulf of Mexico.
preventer.
FORESIGHT DRILLER V
PHOTO NOT
AVAILABLE
! ENSCO 100
RIG DESIGN: Marathon LeTourneau 150-88-C
Enhanced Gorilla.
i
!
i
1
GLOMAR ADRIATIC IV
RIG DESIGN: Marathon LeTourneau 116-C.
CONSTRUCTION: Marathon LeTourneau. Singapore, 1983.
VARIABLE LOAD: 2,588 st.
HELIPORT: 73' dia.
REMARKS: Zero discharge. Unit available w/ 7'
cantilever extension.
OTHER DATA: Typical G/omar Adriatic I.
WORK AREA: North Sea.
97
GLOMAR ADRIATIC V
RIG DESIGN: Marathon LeToumeau 116-C.
CONSTRUCTION: Marathon LeToumeau, Singapore, 1979.
QUARTERS: 76 persons.
VARIABLE LOAD: 2, 782 st.
HELIPORT: 72' dia.
STORAGE: Mud & Cmt Bulk-9,250 ct; liquid
Mud-1,942 bbl; Fuel-3,000 bbl; Water tor
Drilling-13,226 bbl; Potable Water-1,282 bbl.
DRILLING EQUIPMENT: Prime Movers-Three
GM EMO 16-645.
HYDRll..; Hydril 21 W, 2,000 psi; Hydril 131'', 5,000
psi; CIW U single/double 13%', 10,000 psi.
REMARKS: Formerly Transocean 5. Unit available w/ 7' cantilever extension.
OTHER DATA: Typical G/omar Adriatic /.
WORK AREA: West Africa.
GLOMAR ADRIATIC VI
RIG DESIGN: Marathon LeTourneau 116-C.
CONSTRUCTION: Marathon LeTourneau, Singapore, 1981.
PERFORMANCE: Water depth-300' (21 O' North
Sea operation); Drilling depth-20,000'.
QUARTERS: 82 persons.
HULL: 243' x 200' x 26'.
VARIABLE LOAD: 2,410 st.
HELIPORT: 72' dia.
STORAGE: Mud & Cmt Bulk-9,100; Liquid
Mud-1,896 bbl; Fuel-3,070 bbl; Water for
Drilling-11,540 bbl: Potable Water-1,282 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco
C-3 Type II; Pumps-Two Emsco FB-1600
triplex; Prime Movers-Three GM EMO 16-645;
Rotary Table-C. Emsco T 3750; Top Drive-Varco TDS-3.
DERRICK: 160'; 1,040,000-lb static hook load.
BOP SYSTEM: Hydril 13%', 5,000 psi; CIW U single/double 13%', 10,000 psi.
CRANES: Three LeTourneau PCM-120. two w/
120' booms, one w/ 100' boom, 50 st@24'.
REMARKS: Formerly Transocean 6.
WORK AREA: North Sea.
GLOMAR ADRIATIC X
RIG DESIGN: Marathon LeToumeau 116-C.
CONSTRUCTION: UIE Shipbuilding (Scotland)
Ltd., Clyde Bank, 1982.
QUARTERS: 98 persons.
VARIABLE LOAD: 3, 162 st.
REMARKS: Formerly Chichen /tza.
OTHER DATA: Typical Glomar Adriatic IX.
WORK AREA: West Africa.
GLOMAR ADRIATIC XI
RIG DESIGN: Marathon LeTourneau 116-C.
CONSTRUCTION: UIE Shipbuilding (Scotland), 1982.
PERFORMANCE: Water depth-300' (200' in
North Sea operations); Drilling depth-25,000'.
QUARTERS: 100 persons.
HULL.; 243' x 200' x 26'.
VARIABLE LOAD: 2,404 st.
HELIPORT: 72' dia.
STORAGE: Mud & Cmt Bulk-9,480 ct; liquid
Mud-1,988 bbl; Fuei-6,400 bbl; Water tor
Drilling-7,718 bbl; Potable Water-2,790 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'l 1625
DE; Pumps-Nat'l 12P160; Prime movers-;-five
Cat D-399; Rotary Table-Nat'I D 495; Top DnveVarco TDS-4S.
DERRICK: 160', 1,375,000-lb static hook load.
BOP SYSTEM: 13%", 10,000 psi; 15,000 psi C&K
manifold.
CRANES: Three LeTourneau PCM-120; one Nat'I
08435; BOP bridge crane.
REMARKS: 60' cantilever; enclosed cellar deck;
formerly Bay Driller.
WORK AREA: UK North Sea.
GLOMAR ADRIATIC IX
RIG DESIGN: Marathon LeTourneau 116-C.
98
GLOMAR BALTIC I
UE.
OTHER DATA: Typical Glomar High Island/.
WORK AREA: West Africa.
GLOMAR LABRADOR I
RIG DESIGN: CFEM T-2005-C
CONSTRUCTION: CFEM, Dunkerque, Frarce, 1983.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 90 persons.
HULL: 265' x 301' x 24'6".
VARIABLE LOAD: 2,263 t.
HELIPORT: 73' dia.
STORAGE: Mud & Cmt Bulk-10.456 cf; liquid
Mud-1,975 bbl; Fuel-3,275 bbl; Base oil-1,200
bbl; Water for Drilling-4,450 bbl; Potable Water1,990 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'l 1625DE; Pumps-two Nat'I 12-P-160; Prime moversfive Cat D-399; Rotary Table-Nat'! C-495; Top
Drive-Varco.
DERRICK: Joseph Paris; 160'; 1,300,000-lb static hook load.
BOP SYSTEM: Two double 13%', 15,000 psi rams.
one 13%', 10,000 psi annular preventer.
CRANES: lWo Nat'I OS-215; 50 t.
WORK AREA: Argentina.
QUARTERS: 84 persons.
HULL: 180' x 175' x 25'.
VARIABLE LOAD: 1, 785 st.
HEU PORT: 70' diameter.
STORAGE: Mud & Cmt Bulk-8,685 cf; Uquid
Mud-1,800 bbl; Fuef-2,470 bbl; Base oil-1.800
bbl; Water for Drilling-3,392 bbl; Potable Water1,348 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'l 1625DE; Pumps-two Nat'l 12-P-160; Prime movers-five Cat 0-399; Rotary Table-Nat'I C-375; Top
Drive-Varco TDS-3.
DERRICK: 160'; 1,250,000-lb static hook load.
BOP SYSTEM: Two double 13%", 10,000 psi rams,
one 13%", 5,000 psi annular preventer.
CRANES: Two Nat' I, OS-105 wrth 100' booms, 40
st @ 25'; one Nat'I OS-215 wrth 120' boom, 55 st
@30'.
REMARKS: Unit equipped with 1O' cantilever
extension.
WORK AREA: Gulf of Mexico.
HERCULES 11
HERCULES 14
mo
WORLD OIL
DECE.\IBER /'NS
Hitech Drilling
Services India Ltd.
Maersk Contractors
Drilling Division
SAGADRIL I
RIG DESIGN: MHI; MDJ-300E
CONSTRUCTION: Mitsubishi Heavy Industries,
Japan, 1984.
PERFORMANCE: Water depth-300': Drilling
depth-20,000'.
QUARTERS: 99 persons.
HULL: 193'7" x 183'9" x21'7".
VARIABLE LOAD: 2,800 mt.
STORAGE: Mud & Cmt Bulk-9,200 cf+5,000 sks;
Liquid Mud-2,132 bbl; Fue/-2,654 bbl: Water
for Drilling-4,321 bbl: Potable Water-1,679 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'I 1320
UE; Pumps-two EMSCO FB, 1600 triplex; Prime
movers-four Daihatsu 6DV 22A, 1,900 hp; Rotary
Table-Emsco T 3750; Top Drive: Varco IDS-3H.
DERRICK: 157'; 1,333 kips GNC.
BOP SYSTEM: Shaffer 30", 1,000 psi; CIW 21 %"
2,000 psi: Hydril 13%", 2,000 psi; CIW 13%" 10,000
psi; Shaffer 13%" 5,000 psi.
CRANES: Two Mitsubishi 66 kips@ 39' w/115' boom.
MOORING: Four single drum winches, 1112",
2, 130' anchor wires w/15,400 lb anchor.
REMARKS: Reportedly owned by Sagadrill; formerly Hakuryu 9.
WORK AREA: Middle East.
Lukoil, International
; HAKURYU 8
RIG DESIGN: MD-T-76J
CONSTRUCTION: Mitsubishi Heavy Industries.
Hiroshima, Japan. 1981.
101
STORAGE: Mud & Cmt Bulk-14, 700 cu ft; Liquid Mud-5,300 bbl; Brine-1,700 bbl; Fuel4,400 bbl; Base oil-1,700 bbl; Water for
Drilling-14,000 bbl; Potable-1,900.
DRILLING EQUIPMENT: Drawworks-Emsco C3
11, 3,000 hp; Pumps-Emsco FC 2200, three x
2,200 hp; Prime movers-five Cat. 3516 TA; Pipe
Handling System-Varco PHM3. Varco PLS-1 :
Top Drive-Varco TDS-6.
DERRICK: 160'; 40' x 40' base; 2,000,000 lb hook
load capacity.
MAERSK EXERTER
CONSTRUCTION: CFEM. Dunkerque. France, 1982.
OTHER DATA: Same as Enhancer, plus MOS system.
REMARKS: Formerly Trident XI.
WORK AREA: North Sea.
OTHER DATA: Data acquisition, Sidrill drilling computer, Hitech driller's control, Procon chemical
mixing system, PC network, ABB rig automation.
REMARKS: Suited for harsh environments. Special HP/HT features.
WORK AREA: North Sea.
102
Maraven, S.A.
MAERSK GIANT
RIG DESIGN: Hitachi, Giant Class
CONSTRUCTION: Hitachi Zosen, Ariake, Japan,
1986.
PERFORMANCE: Water depth-350': Drilling
depth-25,000'.
QUARTERS: 94 persons.
HULL: 277' x 295' x 31 '.
VARIABUE LOAD: 5,000 mt plus 4 x 50 mt tensioning. i
HELIPORT: 83' dia.
STORAGE: Mud & Cmt Bulk-13,500 bbl; Liquid Mud-2,000 bbl; Fue\-4.500 bbl; Water for
Drilling-21, 158 bbl; Potable Water-3,044 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1320UE 2,000 hp; Pumps-three Nat'l 12-P-160 triplex;
Prime movers-five Cat. 3516 DITA: Rotary
Table-one Nat'! C-495: Pipe Handling SystemVarco PHM: Top Drive-Varco TDS-3.
DERRICK: 160': 1,000,000-lb hook load.
GP-19
BOP SYSTEM: One Regan diverter 500 psi; One
RIG DESIGN: Baker Marine Corp., 150-H Can21 ;; spherical; two single Shaffer ram units 2,000
tilever
psi: One Shaffer spherical 13%". 5.000 psi; Four
CONSTRUCTION: Baker Marine Corp., Ingleside,
Koomey ram preventers 13%". 15.000 psi.
Texas, 1981, Refit 1987.
CRANES: One Nat'I OS-435, 50 mt; two Nat'\ 1
OS-215, 45 and 25 mt.
' PERFORMANCE; Water depth-150': Drilling
depth-25,000'.
TOWING REQUIREMENTS: Ocean tow. two tugs.
QUARTERS: 48 persons.
20,000 bhp total.
HULL: 173' x 161' x 18'.
MOORING: Four Nippon/Pusnes electric anchor
winches w/four 8 t anchors.
VARIABLE LOAD: 4,200 st.
REMARKS: Has 50,000 bopd production hanHELIPORT: 60' x 60'.
dling system for drill./prod. capability.
STORAGE: Mud & Cmt Bu\k-6,000 cf: Liquid
WORK AREA: North Sea.
Mud-1,300 bbl: Fue\-1,500 bbl; Water for
Drilling-3,360 bbl; Potable Water-1.080 bbl.
DRILLING EQUIPMENT: Drawworks-Midco UMAERSK GUARDIAN
1220 EB: Pumps-GD PZ-11 Triplex; Prime
OTHER DATA: Typical of Maersk Giant. Except
movers-four Cat D-398 TA: Rotary Table-GardVarco TDS-3 top drive, block retract system. Not
ner-Denver 37:.f"; Top Drive-Varco.
drill prod. equipped
DERRICK: Dreco 160'; 1.300,000-lb static hook
WORK AREA: North Sea.
load capacity.
BOP SYSTEM: Hydril 13%'', 5.000 psi: three CIW
13%".10,000 psi rams.
CRANES: Baker Marine Corp. 80-ton.
REMARKS: Formerly Charger II and Ensco Ill:
sold to Maraven 3/90.
WORK AREA: Venezuela.
l.1
MAERSK VALIANT
MARINE 3
RIG iCESIGN: Bethienem JU 250 MS.
PERFORMANCE: Water depth-262': Drilling
deoth-25.000'.
CONSTRUCTION: Bethlehem Steel Corp., Beaumont. Texas. 1974.
DRILLING EQUIPMENT: Drawworks-Nat'l 1625M: Pumps-Nat'! 12-P-160 triplex.
OTHER DATA: Typical Marine 225.
REMARKS: Formerly J. Storm 3.
WORK AREA: Gulf of Mexico.
MARINE 4
RIG DESIGN: Bethlehem MS 250
CONSTRUCTION: Bethlehem Steel Corp, 1975.
PERFORMANCE: Water depth-250': Drilling
, deoth-25,000'.
, DRILLING EQUIPMENT: Drawworks-Nat'l 1625GP-20
M powered by three PTD-8 Supenor engines:
RIG DESIGN: Baker Manne Corp .. BMC 200 l.C
Purnos-two Nat'l 12-P-160 triplex powered b\
CONSTRUCTION: Baker Marine Corporation.
16-567 EMO engines; Pnme movers-two :-co' Alexandria. Egypt. 1982.
kW gen. powered by 12-567 EMO engines: Rotarv
Table-Nat'! C-375.
MARINE 16
RIG DESIGN: Bethlehem MS 250
CONSTRUCTION: Bethlehem Steel Corp, 1981,
upgraded 1995.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
HULL: 176' x 132' x 16'.
DRIWNG EQUIPMENT: Drawworks--Nat'l 1320M powered by two D-399 Cat engines; Pumps-two Nat 'I 12-P-160 triplex powered by variable
speed hyd. drive; Prime movers-two 750 >Ml gen.
powered by 12-567 EMD engines; Rotary TableNat'I C-375; Top Drive-Maritime Hydraulics.
s:::~~ew~%~~~ ~~;~~~:lgn:
20 1 radius.
MARINE200
MARINE 18
RIG DESIGN: Bethlehem MC cantilever
CONSTRUCTION: Bethlehem Steel Corp., 1982.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
HULL: 166' x 145' x 20'.
HELIPORT: 60' x 70'.
STORAGE: Mud & Cmt Bulk--8, 100 cf; Liquid
Mud-1,509 bbl; Fuel--2,093 bbl; Water for
Drilling-6, 145 bbl; Potable Water-1,064 bbl.
DRIWNG EQUIPMENT: Drawworks--Nat'l 1320M powered by two D-399 Cat. engines; Pumps-two Nat'! 12-P-160 triplex powered by 16-567
EMD engines; Prime movers-two 750 kW gen.
powered by 12-567 EMD engines.
CRANES: Two Link Belt 138-A rated 65 tons.
REMARKS: Cantilever design allows placement of
rotary 45' astern of platform.
OTHER DATA: Typical Marine 4.
WORK AREA: Gulf of Mexico.
MARINE 15
RIG DESIGN: Baker Manne MS 250 jack-up
CONSTRUCTION: Baker Marine Corp, 1981.
PERFORMANCE: Water depth-250'; Drilling
depth-25,000'.
QUARTERS: 44 persons.
HULL: 191' x 132' x 16'.
STORAGE: Mud & Cmt Bulk-7,150 cf; Liquid
Mud-1,258 bbl; Fuel--1,222 bbl; Water for
Drilling-4,922 bbl; Potable Water-773 bbl.
DRIWNG EQUIPMENT: Drawworks--Nat'I 1625M powered by three D-399 Cat. engines; Pumps-two Nat'! 12-P-160 triplex powered by 16-567
EMD engines; Prime movers-two 750-kW gen.
powered by 12-567 EMD engines; Rotary Table-Nat'! C-375; Top Drive-Mantime Hydraulics.
BOP SYSTEM: One 21*", 2,000-psi Hydril annular; One Shaffer 13%", 5,000-psi annular; One
Cameron U 13%", 10,()()(J..psi double; one CIW
U, 13%", 10,000 psi single.
CRANES: One LeTour~eau PCM-120-AS, 100',
98.400 lb at 24'; One Link Belt ABS 108-B, 90',
45,700 lb at 20'.
TOWING REQUIREMENTS: 12,000 hp.
WORK AREA: Gulf of Mexico.
104
MARINE 201
RIG DESIGN: Bethlehem MC 200
CONSTRUCTION: Bethlehem Shipyard, Beaumont, Texas, 1981.
PERFORMANCE: Water depth-200'; Drilling
depth-20,000'.
QUARTERS: 88 persons.
HULL: 157' x 132' x 18': Mat 200' x 185' x 10'.
VARIABLE LOAD: 4,290 kips.
HELIPORT: 80' x 75'.
STORAGE: Mud & Cmt Bulk-9,220 cf; Liquid
Mud-1,687 bbl; Fuel-2,028 bbl; Water for
Drilling-5,962 bbl: Potable Water-1,053 bbl.
DRILLING EQUIPMENT: Drawworks--MidContinent V1220-EB; Pumps-Gardner Denver-P211 triplex; Prime Movers--EMD 12-645E; Rotary
Table--Oilwell 37:."; Top Drive--M-H DDM 500.
DERRICK: Branham 4E 147'; 1,392,000 lb.
BOP SYSTEM: Shaffer 21 W, 2,000 psi annular;
Shaffer 13%', 5,000 psi annular; CIW 13%', 10,000
psi double: CIW 13%", 10,000 psi single.
CRANES: Two Seal<ing Mariner 100'. 66 and 40 kips.
REMARKS: Formerly Griffen Alexander 1 and
Nordic Explorer.
WORK AREA: India.
MARINE300
MARINE304
CONSTRUCTION: Marathon
Brownsville, Texas, 1976.
QUARTERS: 75 persons.
HULL: 180' x 175' x 25'.
VARIABLE LOAD: 4,450 kips.
HELIPORT: 65' diameter.
STORAGE: Mud & Cmt Bulk-2,024 ct, Liquid
Mud-1,874 bbl; Fuel-2,481 bbl; Water for
Driiling-5,200 bbl; Potable Water-1,300 bbl.
DRIWNG EQUIPMENT: Drawworks--Emsco cm.
3,000 hp wrth two 7838 brakes; Pumps--Emsco
FB-1600; Prime movers-three EMD MD 12E8
w/1,050 KW AC. gens. and Ross Hill SCR; Rotary
Table--Emsco T-3750; Top Drive--Maritime
Hydraulics.
DERRICK: Emsco 160' modified, 1,300,000 lb.
BOP SYSTEM: One NL Shaffer 13%', 10,000 psl SL;
one 13"' NL double; one 13"', NL 5,000 psi annular.
CRANES: Two FMC Link Belt 218A, w/100' booms.
REMARKS: Cantilever structure can extend rotary
40' from stem and 1O' transverse movement each
side of center line. Formerly Keyes 300. Zero discharge rig.
WORK AREA: Gulf of Mexico.
LeTourneau
'
6~~~~;!~";;~~~ers--five
psi, Cameron.
'
'
'
MARINE 301
CONSTRUCTION: Ingalls Shipbuilding, Pascagoula,
Miss, 1981.
PERFORMANCE: Water depth-300'.
QUARTERS: 50 persons.
DRIWNG EQUIPMENT: Drawwork&-Emsco Cll
2,000 hp w/7838 brakes.
DERRICK: 1,400,000-lb GNC.
OTHER DATA: Typical of Marine 300; Top Drive-Varco TDS-3.
WORK AREA: Gulf of Mexico.
MARINE303
CONSTRUCTION: Ingalls Shipbuilding, Pascagoula,
Miss, 1982.
PERFORMANCE: Water depth-300'.
QUARTERS: 50 persons.
STORAGE: Mud & Cmt Bulk-7,925 cf.
DERRICK: 1, 700,000 GNC.
BOP SYSTEM: Two NL double 10,000 psl: One NL
annular 5,000 psi; One NL spherical 2,000 psi.
MARINE305
RIG DESIGN: Levingston 111-C
CONSTRUCTION: Mitsui Shipbuilding, Japan.
1975. Upgraded 1997.
PERFORMANCE: Water depth-300'; Drilling
depth-20,000'.
QUARTERS: 98 persons.
HULL: 207' x 177' x 23'.
VARIABLE LOAD: 2,160 t.
HELIPORT: 62' x 66', S-61 N.
STORAGE: Mud & Cmt Bulk-9,600 d+8,000
sks: Liquid Mud-1,900 bbl; Fuel--3,660 bbl:
Water for Drilling-4,836 bbl; Potable Water1,862 bbl.
DRIWNG EQUIPMENT: Drawworks--Nat'l 1625
DE; Pumps-Nat'! 12-P-160 Triplex: Prime
movers--3 GM EMD@ 1,977 hp; Rotary Table-Nat'! C-37:."; Top Drive--Varco IDS-4.
DERRICK: 160'; 1,000,000 lb GNC.
BOP SYSTEM: Shaffer 21 X' ram, 2,000 psi; 21 X"
shear, 2,000 psi; 21 X' annular, 2,000 psi; Hydril
29)>' annular, 5,000 psi; CIW 13%' U double ana
single, 10,000 psi.
CRANES: Two Sumrtomo, TC-4187J; 20 t@ 39'
w/100' boom.
REMARKS: Formerly Hakuryu IV, Venturer.
Pa/awan Princess, Port Princess and Odin
Princess. Cantilever extends rotary 50' from stem.
1O' each side of center.
WORK AREA: S.E. Asia.
Nabors Drilling
International Inc.
RIG DESIGN: DT II
CONSTRUCTION: Gonzales Marine Enterprises
Port Bienville, Miss, 1982.
'
PERFORMANCE: Water depth-13'-100';
Workover/comp.-20,000'; Drilling depth-NIA.
QUARTERS: 36 persons.
HULL: 92' x 120'.
VARIABLE LOAD: 1,400 kips.
HELIPORT: Bell 212.
STORAGE: Mud & Cmt Bulk-1,600 sks; Liquid
Mud-410 bbl; Fuel-1,000 bbl; Water for
Drilling--1,000 bbl; Potable Water-710 bbl.
DRIWNG EQUIPMENT: Drawworks--Nat'l 610-E;
Pumps-Ellis Williams W-440 Triplex; Prime
movers-Four Cat D379TA thru IPS 1500 m;
Rotary Table-Nat'I C-205.
DERRICK: DSI 136'; 600,000 lb static hook load.
BOP SYSTEM: Cameron type U, 11 ', 10,000 psi.
CRANES: One Nat'I OS-45.
TOWING REQUIREMENTS: One 3,000 hp tug;
position assisted.
REMARKS: Cantilever reach-30'; capable of skidoffs. Operated by Sundowner Offshom Services
Inc., Nabors Industries, Inc. Formerly Dolphin
Trtan's Rig 105.
WORK AREA: Gulf of Mexico.
DOLPHIN 111
CONSTRUCTION: General Dynamics & Service
Machine, 1982.
PERFORMANCE: Water depth-115'; Drilling
depth--16,000'.
QUARTERS: 51 persons.
HULL: 82' x 102'.
VARIABLE LOAD: 3,000,000 lb.
HELIPORT: 60' dia.
STORAGE: Mud & Cmt Bulk--3,800 cf; Liquid
Mud-1,200 bbl; Water for Drilling--3,532 bbl;
Potable Water-1,000 bbl.
DRILLING EQUIPMENT: Drawwarks-U-914;
Pumps-Gardner Denver P Z1 O; Prime moversthree EMD 5,000 hp; Rotary Table-37:>" Pipe
Handling System--12,<XXl' 9%' csg., 20,00J'
DP.
DERRICK: 1,300,000 lb gross load capacity.
BOP SYSTEM: 10,000 psi, 13%' Cameron stack.
CRANES: Two 30 t @ 30' reach.
REMARKS: Formerly Bob Warner, Nealwe/111.
WORK AREA: Gulf of Mexico.
4!f'
DOLPHIN 106
CONSTRUCTION: Gonzales Marine Enterprises,
Port Bienville, Miss, 1982.
OTHER DATA Same as Dolphin 105. Operated by
Sundowner Offshore Services Inc., Nabors Industries, Inc.
REMARKS: Formerly Dolphin Tltan's Rig 106.
WORK AREA: Gulf of Mexico.
wire rope.
WORK AREA: Arabian Gulf.
DOLPHIN 110
RIG DESIGN: N/A
CONSTRUCTION: General Dynamics & Service
Machine, 1982.
PERFORMANCE: Water depth--11 '-115'; Drilling
depth-NIA: Workover depth 16,000'.
QUARTERS: 48 persons.
HULL: 130' x 82' x 14'.
VARIABLE LOAD: 3,000 kips.
HELIPORT: Bell 212 on Sikorsky S-76.
STORAGE: Mud & Cmt Bulk--4,200 cf; Liquid
Mud-1,127 bbl; Fuel-1,385 bbl; Water for
drilling-4, 100 bbl; Potable Water-995 bbl.
DRILLING EQUIPMENT: Drawworks-Mid Cont.
U914EC: Pumps-two GD PZ10: Prime moversthree EMD 12-645E8@ 1,600 hp; Rotary table- ;
Oilwell 37'.f".
AL ITTIHAD
RIG DESIGN: Marathon LeToumeau; Class 82-S.
CONSTRUCTION: Marathon Shipbuilding Co.
(UK) Ltd., Clydebank, Scotland, 1975.
PERFORMANCE: Water depth-150'; Drilling
depth--20,000'.
VARIABLE LOAD: 3,800 kips.
STORAGE: Mud & Cmt Bulk--8,000 cf; Liquid
Mud-1,200 bbl; Fuel-3,000 bbl; Water for
Drilling-4,350 bbl; Potable Water--850 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'l 1320
UE; Pumps--Nat'I 12-P-160; Prime movers-five
Cat. D-399 w/two 1,900 kW and one 1,050 kW
gen.; Rotary Table-Nat'! C-375.
CRANES: Three LeTaumeau MPG, 120 AS.
REMARKS: Designed for the Arabian Gulf; joint
venture of Arabian/Scottish interests.
OTHER DATA: Typical of Al Ghallan.
WORK AREA: Arabian Gulf.
105
DIVINA
RIG DESIGN: Hitachi cantilever type
CONSTRUCTION: Hitachi Zosen Shipbuilding,
Tokyo, 1979.
OTHER DATA: Typical of Al Yasat. Nat'I Power
Swivel; Denick-160'.
WORK AREA: Arabian Gulf.
JUNANA
RIG DESIGN: Hitachi sJot type
CONSTRUCTION: Hitachi Zosen Shipbuilding,
Tokyo, 1980.
PEFORMANCE: Water depth-150'.
HULL 254' x 200' x 21'.
VARIABLE LOAD: 7,920 kips.
CRANES: Two LeTourneau MPG, 120 AS.
DERRICK: 160', 1,392 kips.
BOP SYSTEM: 131'', 5,000 psi.
OTHER DATA: Typical of Al Yasat except with Top
Drive, Varco TDS-4; Denick-160'.
WORK AREA: UAE.
ALMARIYAH
RIG DESIGN: Baker Marine BMC-160ll. cantilever.
CONSTRUCTION: Nippon Kokan, Yokohoma,
Japan, 1982.
PERFORMANCE: Water depth-12'-110'; Drilling
depth-18,000'.
QUARTERS: 80 pernons
HULL 151' x 156' x 18'.
VARIABLE LOAD: 3,500 kips.
HELIPORT: 70' dia
STORAGE: Mud & Cmt Bulk-3,000 & 4,000 cf;
Liquid Mud-1,550 bbl; Fuel--2, 162 bbl; Water for
DriUing--4,650 bbl; Potable Water-2, 100 bbl.
MOORING: Four 12,000 lb anchors w/1,500' of
1l!' wire rope.
OTHER DATA: Typical BrakBh.
REMARKS: Formerly Ocean Master IV.
WORK AREA: Arabian Gulf.
SHAHID MODARRES
BEYOU NA
RIG DESIGN: Baker Marine BMC-160ll. cantilever.
CONSTRUCTION: Built by Noibaa SA, Brazil; 1983.
PERFORMANCE: Water depth-12'-150'; Drilling
depth-18,000'.
QUARTERS: 88 persons
HULL151' x 156' x 18'.
HELIPORT: 70' dia
MOORING: Four 5,000 kg anchors w/2,000' of 1W
wire rope.
OTHER DATA: Typical BrakBh.
REMARKS: Formerly Ocean Master VII.
WORK AREA: Arabian Gulf.
YEMILAH
National Iranian
Drilling Co. (NIDC)
IRANKHAZAR
1968.
BRAKAH
RIG DESIGN: Baker Marine BMC-16011_, cantilever.
CONSTRUCTION: Nobara S.A., Brazil, 1983.
PERFORMANCE: Waterdepth-12'-150'; Drilling
depth-18,000'.
QUARTERS: 88 persons.
HULL: 151' x 156' x18'.
VARIABLE LOAD: 3,035 kips.
HELIPORT: 70' dia.
STORAGE: Mud & Cmt Bulk-7,700 cf; Liquid
Mud-1,468 bbl; Fuel--2,219 bbl; Water for
Drilling-4,635 bbl; Potable Water-2, 126 bbl.
DRIWNG EQUIPMENT: Drawworks-Mid-Cont.
U 914-EC; Pumps-two FB 1600; Prime moversfour Cat D-399; Rotary Table-Ernsco 37W.
DERRICK: Lee C. Moore, 147', 1,000,000 lb hook
load capacity.
BOP SYSTEM: 131'", 5.000 psi.
CRANES: Two Baker Marine 900.
MOORING: Four 5,000 kg anchors w/2,000', 1W
wire rope.
REMARKS: Formerly Ocean Master VI.
WORK AREA: Arabian Gutt.
DELMA
RIG DESIGN: Baker Marine BMC-16011_, cartilever.
CONSTRUCTION: Nobara S.A. Brazil, 1983.
VARIABLE LOAD: 3,311 kips.
OTHER DATA: Typical Brakah.
REMARKS: Formerly Ocean Master V.
WORK AREA: Arabian Gulf.
106
NOBLE-BILL JENNINGS
RIG DESIGN: Marathon LeTourneau. Class 84
conversion extended reach cantilever.
CONSTRUCTION: Marathon LeToumeau, Clydebank, Scotland, 1975. Conversion 1997.
NOBLE-GENE ROSSER
RIG DESIGN: Levingston, Class 111-C.
CONSTRUCTION: Levingston Shipbuilding Co ..
Orange, Texas, 1977. Cantilever conversion, 1996.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 80 persons.
HULL: 208' x 178' x 22'.
VARIABLE LOAD: 6,000 kips.
HELIPORT: 70' x 70'.
STORAGE: Mud & Cm! Bulk-6,000 cf & 1,760
sks; Liquid Mud-1,200 bbl; Fuel-4,000 bbl;
Water for Drilling-5,400 bbl; Potable Water900 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'l 1625
DE, three GE 752 engines; Pumps-two Nat'I 12P-160; Prime movers-two EMD 16E8, 1400 kW &
one EMD 8EB, 700 kW; Rotary Table-Nat'I C-375
Cascade Mud System; Top Drive-Varco-mS3.
DERRICK: 160' x 30'; 1,392,000 lb GNC.
BOP SYSTEM: 13%' 10,000 psi BOP trimmed for
H,S.
CRANES: Two Nat'I OS 215 x 65 tons.
MOORING: One Nat' I winch driven by 50 hp AC
motor.
NOBLE-LEONARD JONES
RIG DESIGN: Marathon LeTourneau, Class 53
conversion extended reach cantilever.
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss, 1972. Conversion 1997.
PERFORMANCE: Water depth-390'; Drilling
depth-25,000'.
QUARTERS: 79 persons.
HULL: 247' x 200' x 26'.
VARIABLE LOAD: 7,500 kips.
HELIPORT: 70.5' diameter.
STORAGE: Mud & Cmt Bulk-6,500 cf; Liquid
Mud-1,700 bbl; Fuel-8.700 bbl; Water for
Drilling--4,600 bbl; Potable Water--<l88 bbl.
DRIWNG EQUIPMENT: Drawworks--Nat'l 1320
UE, 2,000 hp; Pumps-Three Emsco F-1600;
Prime movers-three EMD 16-645 EB, 1,950 hp
each; Rotary Table--Emsco 37:4'; Cascade mud
system; Top Drive-Varco TDS-4S.
DERRICK: 160' x 30', 1,500,000 lb GNC.
CRANES: Three LeTourneau; 45 tons@ 25'.
REMARKS: Formerly Penrod 62 and Coral Sea.
WORK AREA: Gulf of Mexico.
NOBLE-GUS ANDROES
RIG DESIGN: Levingston 111 C.
CCNSTRUCTION: Verolrne Estaleiros Reunidos do
Brasil SA, Rio de Janeiro, Brazil 1982. Refurbished in 1996.
PERFORMANCE: Water depth-300'; Drilling
depth-20,000'.
QUARTERS: 84 persons.
HULL: 208' x 178' x 20.5'.
VARIABLE LOAD: 6,236 kips.
HELIPORT: 75' x 75'.
STORAGE: Mud & Cmt Bulk-210 cum; Liquid
Mud-222 cum; Water for Drilling-777 cum;
Potable Water-372 cu m.
DRIWNG EQUIPMENT: Drawworks-Oilwell E3000; Pumps-Oilwell 1700 PT; Prime moversthree EMD-MD 16E8; Rotary Table--Oilwell 37W;
Top Drive-Varco mS-3H.
DERRICK: Pyramid; 1,280,000 lb hook load
capacity.
BOP SYSTEM: One Hydril 29W. one double 21 W
Shaffer, one 13%' x 10,000 Shaffer.
CRANES: Two ABS 218 A FMC Link Belts with
100' and 120' booms; one LeToumeau PCM 120
with 120' boom.
REMARKS: Formerly Norbe II and Excelsior I and
Odin Explorer.
WORK AREA: Middle East.
NOBLE-ED HOLT
RIG DESIGN: Levingston Shipbuilding Co .. Class
111-C.
CONSTRUCTION: Levingston Shipbuilding Co.,
Orange, Texas. 1981; Refurbished 1998.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 80 persons.
HULL: 200' x 186' x 22'11 '.
VARIABLE LOAD: 4,600 kips.
HELIPORT: 62' x 69'.
STORAGE: Mud & Cmt Buik-6,300 cf: Liquid
Mud-1.420 bbl; Water 'or Drilling-5,670 bbl;
Potable Water-933 bbl.
108
NOBLE-LEWIS DUGGER
RIG DESIGN: Levingston, Class 111-C.
CONSTRUCTION: Levingston Shipbuilding Co.,
Orange, Texas, 1976. Cantilever conversion, 1996.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 81 persons.
HULL: 208' x 178' x 22'.
VARIABLE LOAD: 6,000 kips.
HEU PORT: 66' x 62'.
STORAGE: Mud & Cmt Bulk-6,000 cf; Liquid
Mud-1,060 bbl; Fuel-4,000 bbl; Water for
Drilling-5,400 bbl; Potable Water-900 bbl.
DRIWNG EQUIPMENT: Drawworks--Nat'l 1625
DE, three GE-752 engines 3 x 900 hp; Pumpstwo Nat'I 12-P-160; Prime movers-two EMD
MD 16E8, one EMD 8 EB; Rotary Tabl~at'I
C-375 Cascade Mud solids control; Top Drive-Nat'I PS-1.
DERRICK: 160' x 30', 1,000,000 lb GNC.
BOP SYSTEM: Shaffer 13%', 10,000 psi.
CRANES: Two Nat'I OS 215, 65 tons.
REMARKS: Formerly Maya Dan. Formerly owned
by PROTEXA, Maya.
WORK AREA: Bay of Campeche.
NOBLE-SAM NOBLE
RIG DESIGN: Levingston 111-C
CONSTRUCTION: Levingston Shipbuilding Co ..
Orange, Texas, 1982.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 84 persons.
HULL: 208' x 186' x 23'.
VARIABLE LOAD: 4,500 kips.
HELIPORT: 66' x 62'.
STORAGE: Mud & Cmt Bulk--ti,780 cf; Liquid
Mud-1,020 bbl; Fuel-4.495 bbl; Water for
Drilling-5,670 bbl; Potable Water-819 bbl.
DRIWNG EQUIPMENT: Drawwcxks--Oilwell E-300l;
Pumps-Two Oilwell A1700 PT; Prime moversThree EMD 16-645-E8, 1,950 hp ea.: Rotary TableOilwell 49~'; Top Drive-Varco IDS-3.
DERRICK: Lee C. Moore 160' x 30'; 1,250,000 lb
GNC.
BOP SYSTEM: 21 \I.' Hydril MSP, 2,000 psi ann.;
13%' stack; one Shaffer 5,000 psi ann.; one
Cameron U, 10,000 psi single; one Cameron U,
10,000 psi dbl.
CRANES: Two FMC Link Belt ABS-21 BA w/ 100'
booms.
NOBLE-BYRON WEWVER
RIG DESIGN: CFEM 2005C
NOBLE-AL WHITE
RIG DESIGN: CFEM T-2005 C
CONSTRUCTION: C.F.E.M Dunkerque, France,
1982; refurbished 1997.
PERFORMANCE: Water depth-360'; Drilling
depth-25,000'.
QUARTERS: 80 persons.
HULL: 245' x 283 x 24'7'.
VARIABLE LOAD: 3.400 mt.
HELIPORT: 82' dia.
STORAGE: Mud & Cmt Bulk-12,355 cf; Liquid
Mud-2,000 bbl; Fuel-2,375 bbl; Water for
Drilling--4,500 bbl; Potable Water-1,985 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'I 1625
DE 2,000 hp; Pumps-three Nat'l 12-P-160 1,600
hp; Prime movers-four SACM 2,300 hp; Rotary
Table-Nat'I C-375 37:4'; Pipe Handling System-Maritime Hydraulics Iron roughneck; Top Drive:MH DDM-650.
DERRICK: Joseph Paris 147'; 1,000,000-lb hook
load.
BOP SYSTEM: Cameron 13%". 15,000 psi;
Cameron 207I' x 3,000 psi wp; Regan diverter.
CRANES: Two Nat'I OS 215, 45 I.
MOORING: Brissoneau and Lotz; two 2,300' x
2X" wire w/9-t Vicinay anchors.
REMARKS: Formerly Neddrill Trigon.
WORK AREA: North Sea.
NOBLE-GEORGE MCLEOD
NOBLE-TOMMY CRAIGHEAD
1BLE-KENNETH DELANEY
DESIGN: Friede & Goldman L-780, Mod 11
>TRUGTION: Ingalls Shipbuilding, Pascagoula,
1983; refurbished 1998.
)RMANCE: Water depth-300'; Drilling
-25,000'.
ERS: 82 persons.
80' x 175' x 25'.
E LOAD: 4,200 kips.
TT: 73' dia. rated for Sikorsky S-61.
~: Mud & Cmt Bulk-8,685 cf; Liquid
00 bbl; Water for Drilling-5, 198 bbl;
ater-1,348 bbl.
:QUIPMEm Drawworkor-Nat'l 1625-Two Nat'I 12-P-160 triplex; Prime
.
'D-399 Cal 1,175 ea; RotaryTableJ h'; Top Drive-Varco TDS-3H.
DERRICK: Lee C. Moore, 2,000,000-lb GNC.
BOP SYSTEM: One CIW 13%', 10,000 U single,
one CIW 13%' U double: one Shaeffer 13%' 5,000
spherical; Hydril 21 X' MSP 2000 diverter.
CRANES: Two FMC Link Belt ABS-238A; one
FMC Link Belt ABS-218A ..
REMARKS: Formerly Miss Kitty.
WORK AREA: Middle East.
NOBLE-PERCY JOHNS
RIG DESIGN: Friede & Goldman. Ltd.; L-780
Mod II
CONSTRUCTION: Far East Levingston-Singapore, 1981.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 84 persons.
HULL: 180' x 175' x 25'.
VARIABLE LOAD: 3,119 kips.
HELIPORT: 73' dia.. S-61.
STORAGE: Mud & Cmt Bulk-7,726 cf+5,000
sks: Liquid Mud-1,826 bbl; Water for Drilling6,37 4 bbl; Potable Water-1, 156 bbl.
DRIWNG EQUIPMENT: Drawworks-Emsco C3;
Pumps-two FB-1600 Emsco; Prime moversthree EMO 16-645E8; Rotary Table-Emsco T3750;
Top Drive-Varco TDS-4S.
DERRICK: 160' x 30'; 1,050,000 lb GNC.
BOP SYSTEM: One Cameron single "U" 13%',
10,000 psi; One double "U" 13%", 10,000 psi;
One Shaffer spherical 13%'. 5.000 psi; One Shaffer MSP 21 !.", 2,000 psi.
CRANES: Two FMC Link Belt ABS-238A w/ 120'
boom; one FMC Link Bert ABS-218A w/ 100' boom.
REMARKS: Formerly Western Apollo I.
WORK AREA: West Africa.
NOBLE-ROY BUTLER
RIG DESIGN: Friede & Goldman L-780, Mod II.
CCNSTRUGTION: China Shipbuiiding, Taiwan, 1982.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 96 persons.
HULJ..: 180' x 175' x 25'.
VARIABLE LOAD: 3, 128 kips.
HELIPORT: Sikorsky S61.
STORAGE: Mud & Cmt Bulk-8,000 cf+5,000
sks: Liquid Mud-2,000 bbl; Water for Drilling6,315 bbl; PotableWater-1,171 bbl.
DRIWNG EQUIPMENT: Drawworks-Emsco C3
Type II; Pumps-Emsco FB 1600; Prime
movers-three EMO 12-645-E; Rotary TableEmsco T3750: Top Drive-Nat' I PS.
DERRICK: Cont. Emsco 157' x 30'; 1,000,000 lb
GNC.
BOP SYSTEM: 13%' Shaffer ann., 5,000 psi; 13%'
Cameron U, 10,000 psi single/dbl; Hydril MSP
29\0', 500 psi diverter.
CRANES: Two Link Belt ABS 238A w/120' boom
(50 t@30'); ABS 218 w/100' boom (55 t@55').
REMARKS: Formerly Western Apollo IV.
WORK AREA: West Africa.
NOBLE-JIMMY PUCKETT
RIG DESIGN: Friede and Goldman L780 Mod 11
CONSTRUC110N: Ingalls Shipyard, Mississippi, 1982.
'z-645-
NOBLE-CHARLES COPELAND
RIG DESIGN: Marathon LeToumeau 82-SD-C.
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss., 1979.
PERFORMANCE: Water depth-250" Drilling
depth-20,000'.
'
QUARTERS: 90 persons.
HULJ..: 207' x 176' x 20'.
HELIPORT: Sikorsky S-61.
VARIABLE LOAD: 2,881 kips.
STORAGE: Mud & Cmt Bulk-7,660 cf & 3 000
sks; Liquid Mud-1,294 bbl; Fuel-2, 119 bbl; Water
for Drilling-6,600 bbl; Potable Water-928 bbl.
DRIWNG EQUIPMENT: Drawworks-Emsco C2,
1,600 hp; Pumps-two Emsco FB 1600; Prime
movers-three EMO 16-645-E8; Rotary TableEmsco T3750, 37\i'; Top Drive-Varco TDS-4S.
g~~~ICK: Cont. Emsco 160' x 30', 1,400,000 lb
NOBLE-KOLSKAYA
RIG DESIGN: Gusto Engr. B.V
CONSTRUCTION: Rauma Repola, Finland, 1985.
PERFORMANCE: Water depth-327'; Drilling
depth-25,000'.
QUARTERS: 80 persons.
HULL: 69.25 m x 80 m.
VARIABLE LOAD: 2,500 mt.
HELIPORT: Octagonal 25.3 m x 25.2 m.
STORAGE: Mud & Cmt Bulk-520 mt; Liquid
Mud-291 cu m: Fuel-646 cu m; Water for
Drilling-737 cum; Potable Water-160 cum.
DRILLING EQUIPMENT: Drawworks-Oilwell E3000; Pumps-three Oilwell A-1700; Prime
movers-four Wartsila 8R-22, one 12V-200; Rotary
Table-Cilwell 49W; Pipe Handling System-270
t capacity; Top drive-MH DDM-500.
DERRICK: 147'; 1,330,000 lb hook load.
BOP SYSTEM: Cameron 13%', 10,000 psi & 21 X',
3,000 psi; Reagan diverter.
CRANES: Two Liebherr BOS 20/50, 35 t and 50 t.
REMARKS: Formerly USSR's Kolskaja. Formerly in
accommodation mode.
WORK AREA: North Sea.
NOBLE-CHUCK SYRING
RIG DESIGN: Marathon LeTourneau; 82-C.
CONSTRUCTION: Marathon LeTourneau, Singapore, 1976. Refurbished 1996.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
QUARTERS: 90 persons.
HULL: 203' x 168' x 22'.
VARIABLE LOAD: 4,000 kips.
HELIPORT: Sikorsky S-61.
STORAGE: Mud & Cmt Bulk-6,650 cf; Liqu10
Mud-1,705 bbl; Fuel-2,899 bbl; Water for
Drilling-6,600 bbl; Potable Water-1,568 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1320
UE: Pumps-two Nat'l 12-P-160; Prime moversone EMO 12-B45-E8. two EMO 16-645-E8; Rotarv
Table-NIA: Top Drive-Varco TDS-3.
.
DERRICK: Pyramid 160' x 30'; 1,392,000 lb GNC.
CRANES: Three LeTourneau PCM-120-AS w/
120' booms.
REMARKS: Formerly Western Oceanics' Western
Triton II and Qatar General Petroleum Corp. 's Dana.
WORK AREA: State of Qatar. Arabian Gulf.
109
NOBLE-EARL FREDERICKSON
RIG DESIGN: Marathon LeToumeau; 82-SD-C
CONSTRUCTION: Marathon LeTourneau,
Brownsville, Texas, 1979.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
QUARTERS: 87 persons.
HULL: 207' x 176' x 20'.
VARIABLE LOAD: 3,881 kips.
HELIPORT: Sikorsky S-61.
STORAGE: Mud & Cmt Bulk-7,660 cf & 3,000
sks; Liquid Mud-1,294 bbl; Fuel--2, 119 bbl; Water
for Drilling-Q,600 bbl; Potable Water-983 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'l 1320UE, 1,600 hp; Pumps-two Nat'l 12-P-160; Prime
movers-three EMO 16-645-E8; Rotary TableNat'I C-375, 371'"; Top Drive-Varco TDS-4.
DERRICK: Skytop Brewster 147' x 30'; 1,000,000
lbGNC.
BOP SYSTEM: Cameron single and double13%"
10,000 psi WP; Shaffer 13%", 5,000 psi WP; Shaffer Spherical 21 X' 2,000 psi WP.
CRANES: Three LeToumeau PCM-120 AS, two w/
120' booms, one w/ 100' boom.
REMARKS: Fomnerty Western Triton//. Shallow
draft capability; zero discharge.
WORK AREA: Venezuela.
NOBLE-ED NOBLE
RIG DESIGN: Marathon LeToumeau 82-SD-C.
CONSTRUCTION: Marathon Le Tourneau,
Brownsville, Texas, 1984.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
QUARTERS: 88 persons.
HULL: 207' x 176' x 20'.
VARIABLE LOAD: 3,523 kips.
HELIPORT: S-61.
STORAGE: Mud & Cmt Bulk-7,700 cf; Liquid
Mud-1,368 bbl; Fuel-2,059 bbl; Water for
Drilling-B,631 bbl; Potable Water-983 bbl.
DRIWNG EQUIPMENT: Drawworks--Nat'l 1320UE, 2,000 hp; Pumps-two Nat'I 12-P-160; Prime
movers-three EMD, 12-645-E9B; Rotary Table-Nat'! C-375, 37!0"; Top Drive-Varco TDS-4.
DERRICK: Cont Emsco 147', 1,050,000 lb GNC.
BOP SYSTEM: Hydril "GL" 13%", 5,000 psi ann.;
Cameron U 13%", 10,000 psi single/dbl.
CRANES: Three LeToumeau PCM 120-AS, two
100' booms, one 120' boom.
REMARKS: Formerly Penrod 98 and Midway.
Shallow draft capability.
WORK AREA: West Africa
110
NOBLE-TOM JOBE
RIG DESIGN: Marathon LeToumeau, 82-SD-C
CONSTRUCTION: Marathon LeTourneau,
Brownsville, Texas, 1982.
PERFORMANCE: Water depth-250'; Drilling
depth-25,000'.
QUARTERS: 82 persons.
HULL: 207' x 176' x 20'.
VARIABLE LOAD: 4,000 kips.
HELIPORT: 65' diameter, polygon.
STORAGE: Mud & Cmt Bulk--8, 100 cf; Liquid
Mud-1,200 bbl; Fuel-2.400 bbl; Water for
Drilling--7,000 bbl; Potable Water-1,700 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'l 1625DE 3,000 hp; Pumps-two Nat'I 12-P- 160, 1600
hp ea; Prime movers-three EMO 16 cy. MD16E8,
2,200 hp ea; Rotary Table--Nat'I C-375, 37W;
Cascaded mud system; Top Drive-Varco TDS-3S.
DERRICK: Draco 160'; 1,300,000 lb GNC.
BOP SYSTEM: Four Cameron 13%" 10,000 psi WP
ram preventers; Shaffer 13%" 10,000 psi WP annular preventer; Hydril MSP 21 W, 2,000 psi diverter.
CRANES: Three LeTourneau PCM-120-AS 50 ton
@25'.
REMARKS: Modified for "zero" pollution discharge.
Formerly Sioux, Johnnie Hoffman and Seabee.
Shallow draft capability.
WORK AREA: Gulf of Mexico.
NOBLE-LYNDA BOSSLER
NOBLE-JOHNNIE HOFFMAN
RIG DESIGN: Baker Marine Corp., BMC-300-IC.
CONSTRUCTION: Baker Marine, Ingleside, Texas,
1976, Modified 1988. Refurbished 1993.
PERFORMANCE: Water depth-300'; Drilling
depth--25,000'.
QUARTERS: 68 persons.
HULL: 234' x 210' x 26'.
VARIABLE LOAD: 5,200 kips.
HELIPORT: 70' dia. circular.
STORAGE: Mud & Cmt Bulk-7,680 ct & 5,000
sks; Liquid Mud--1,600 bbl; Fuel-{j,023 bbl; Water
for Drilling--7,043 bbl; Potable Water--906 bbl.
DRILLING EQUIPMENT: Drawworks-Dilwell E3000 w/disc brakes; Pumps-Oilwell A-1700 PT;
Prime movers-three GM EMO 12-645; Rotary
Table-Oilwell A-37W; Top drive-Varco TDS 3.
DERRICK: Lee C. Moore 160' x 30'; 1,500,000 lb
GNC.
BOP SYSTEM: 21~ Hydril MSP-2000; 13%" w/one
Hydril GL 5,000-psi WP, one Cameron U single,
one Cameron U double ram 10,000-psi WP.
CRANES: Two FMC Link Belt ABS-218.
REMIARKS: Zero discharge; fomnerly Transworld 64.
OTHER DATA: 52' cantilever.
WORK AREA: Gult of Mexico.
NORAM 252
SAGAR UDAY
SAGAR RATNA
bay, 1990.
OTHER DATA: Same as Sagar Kiran.
WORK AREA: India.
no Top
NOBLE-DON WALKER
RIG DESIGN: Baker Marine Corp., BMC-150-IC.
CONSTRUCTION: Armadah, S. Africa, 1982.
PERFORMANCE: Water depth-8'-150'; Drilling
depth-20,000'.
QUARTERS: 88 persons.
HULL: 174' x 162'6" x 18'.
VARIABLE LOAD: 3,546 kips.
HELIPORT; Sikorsky S-61.
STORAGE: Mud & Cmt Bulk-6,000 cf+3.000
sks; Liquid Mud-1,322 bbl; Fuel-1,591 bbl;
Water for Drilling-3,373 bbl; Potable Water1, 186 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco C2
Type II; Pumps-Emsco FB-1300; Prime
movers-three EMD 12-645-E8; Rotary TableEmsco T3750; Top Drive-Varco TDS-4S.
DERRICK: Cont. Emsco 160' x 30', 1,000,000 lb
GNC.
BOP SYSTEM: Shaffer 13%" spherical w/three
Cameron 13%" "U" rams 10,000 psi.
CRANES: Two Baker Marine Corp 900, 25 t, plus
one LeTourneau RC-120-AC.
REMARKS: Formerly Western Nike I. Shallow
draft capability.
WORK AREA: West Africa.
EDNASTAR
RIG DESIGN: NIA
CONSTRUCTION: TODECO, Japan, 1977.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 90 persons.
HULL: 236' x 212'.
STORAGE: Mud & Cmt Bulk-B,000 cf; Liquid
Mud-2,200 bbl; Fuel-5,000 bbl; Water for
Drilling-5,200 bbl; Potable Water-1,200 bbl.
DRILLING EQUIPMENT: Drawworks-one Nat'I
1320 UE; Pumps-Nat'l 10-P-130 Triplex; Prime
movers-five Cat. D-399 TA.
DERRICK: 147'; Pyramid.
BOP SYSTEM: NIA.
SEA STATE: Fonmerly JU 5. Fonmerty owned by
Robray Offshore.
REMARKS: Available.
SAGAR PRAGATI
SAGAR JYOTI
SAGAR SAMRAT
SAGAR SHAKTI
NORAM 253
RIG DESIGN: Bethlehem Steel Corp., JU-250 MS
CONSTRUCTION: Bethlehem Steel, Singapore, 1979.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
QUARTERS: 78 persons.
HULL: 166' x 132' x 16'.
VARIABLE LOAD: 4,500 kips.
HELIPORT: 60' x 60'.
STORAGE: Mud & Cmt Bulk-B,600 cf+3,000 sks;
Liquid Mud-1,500 bbl; Fuel-2, 100 bbl; Water
for Drilling-4,850 bbl; Potable Water-870 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1320
UE: Pumps-two Nat'l 12-P-160; Prime moverstwo 16 cyl EMD. one 8 cyl EMO; Rotary TableNat'I C-375.
DERRICK: Branham 147'; 1,044.000-lb hook load.
BOP SYSTEM: Two NL Sl1affer 13%'' 10.000 psi,
double & single; one NL Shaffer 13~'" 5.000 psi.
CRANES: Two FMC Unk Belt ABS-218 wi100' boom.
MOORING: Single drum wincl1 w/10,000-lb anchor.
REMARKS: Formerly Monrreal Ill Corwer1ing to
cantilever.
WORK AREA t I/A.
112
WORLD OIL
:!CU.'.1/11-ii /'!YI
SAGAR KIRAN
RIG DESIGN: Baker Marine Corp., IC 300 (M) class
CONSTRUCTION: Mazagaon Dock Ltd.,Bombay, 1987.
PERFORMANCE: Water depth-300'; Drilling
depth-20,000'.
QUARTERS: 93 persons.
HULL: 212' x 210' x 26'.
VARIABLE LOAD: 3,765 t.
H ELI PO RT: 84' diameter.
STORAGE: Mud & Cmt Bulk-4,840 cf ea; Liquid
Mud-1,800 bbl; Fuel-3,982 bbl; Water for
Drilling-3,007 bbl; Potable Water-1,830 bbl.
DRILLING EQUIPMENT: Drawworks-Oilwell E2000; Pumps-Oilwell A-1700 PT; Prime moversCat. D-399; Rotary Table-Oilwell B 37W.
DERRICK: 147'; 1,392.000-lb hook load.
BOP SYSTEM: 13%" Cameron. 5,000 psi.
CRANES: Two BMC 1000 series.
WORK AREA: India.
Perforadora Central,
S.A. de C.V.
DRIWNG EQUIPMENT: Drawworks-Nat'l 1625UDBE disk brakes, 3,000 hp; Pumps-Three Nat'I
14P-220, 2,200 hp; Prime Movers-Ru Cat. 3606
TA, 2,548 hp; Rotary Table-Nat'I PS-2 650-650.
DERRICK: Dreco 170'; 1,928,571 lb.
BOP SYSTEM: One single/one double Cameron
13%", 15,000 psi; one Cameron DL 13%", 10,000
psi annular.
CRANES: llvee L.eToumeau PCM-120SS, 45.36 t
REMARKS: 70' cantilever reach.
WORK AREA: NIA.
Perforaciones Maritimas
Mexicanas (PROTEXA)
USUMACINTA
RIG DESIGN: Bethlehem JU-200MC
CONSTRUCTION: Bethlehem Steel Corp., Singapore, 1982.
PERFORMANCE: Water depth-200'; Drilling
depth-25,000'.
QUARTERS: 80 persons.
HULL: 157' x 132' x 18'.
VARIABLE LOAD: 4,500,000 lb.
HELIPORT: 60' x 70'.
STORAGE: Mud & Cmt Bulk-<l,000 cf+3,000 sks;
Liquid Mud-1,500 bbl; Fuel-2,184 bbl; Water
for Drilling-5,992 bbl; Potable Water-1,060 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'l 1320
UE; Pumps-Nat'I 12-P-160 Triplex; Prime
movers-Detroit Diesels 16V149 Tl; Rotary
Table-Nat'I C-375; Top Drive-PS 3501500
Power Swivel National.
DERRICK: 160'; 1,400,000 lb.
BOP SYSTEM: One single, one double Cameron
13%" 10,000 psi ram; One Shaffer 13%' 5,000 psi
annular.
CRANES: One ABS-218 Link Belt, 75 ton; One
ABS-138B Link Belt, 43 ton.
REMARKS: Cantilever capability to maximum of
45'. Formerly Sabine V.
WORK AREA: Gulf of Mexico, Mexico.
PHOTO NOT
AVAILABLE
TO BE NAMED
RIG DESIGN: LeTourneau Super 116 C.
CONSTRUCTION: IDI Halter; to be completed
second-quarter 1999.
PERFORMANCE: Water Depth-350'; Drilling
Depth-30,000'.
QUARTERS: 94 persons.
HULL: 243' x 206' x 26'.
VARIABLE LOAD: 5,100 kips.
HELIPORT: 73' octagonal.
STORAGE: Mud & Cmt. Bulk-4,000 sks; Liquid
Mud-2,490 bbl; Fuel-2,798 bbl; Water for
Drilling-13,145 bbl; Potable Water-1,201 bbl.
114
NAHUATL
RIG DESIGN: Marathon L.eToumeau Class 82SD-C.
CONSTRUCTION: Marathon LeTourneau, 1978.
PERFORMANCE: Water Depth-250'; Drilling
Depth-20,000''
QUARTERS: 86 persons.
HULL: 207' x 176' x 20'.
VARIABLE LOAD: 1,800 t.
HELIPORT: 65' dia
STORAGE: Mud & Cmt. Bulk--il,339 cf; Liquid
Mud-1,308 bbl; Fuel-2,287 bbl; Water for
Drilling--il,694 bbl; Potable Water-996 bbl.
DRIWNG EQUIPMENT: Drawworks-Mid Continent U-1200 BE 1,600 hp; Pumps-Two Gardner
Denver PZ-11 triplex (SA); Prime Movers-Four
Cat. D-399; Rotary Table-37'4" Oilwell; Top
Drive-Varco TDS-11 S, 500 t.
DERRICK: Draco 147'; 1, 100,000-lb hook load.
BOP SYSTEM: Koomey Mod. 80, 3,000-psi aocumulator; one 29Jf" Hydril GK; one set 1~ (annular, double, single); one set 13%" (annular, double,
single).
CRANES: Three LeTourneau PCM-120, 45.3 t,
100' boom.
MOORING: 10,000-lb anchor.
WORK AREA: Bay of Campeche, Mexico.
TOTONACA
RIG DESIGN: Friede & Goldman, Ltd., L-780.
CONSTRUCTION: Gotaverken Arendal, Sweden,
1981.
HULL: 180' x 175' x 25'.
VARIABLE LOAD: 2, 114 t.
HELIPORT: 62' dia.
STORAGE: Mud & Cmt. Bulk-B,000 cf; Liquid
Mud-1,805 bbl; Fuel-2,050 bbl; Water for
Drilling-5,452 bbl; Potable Water-1, 197 bbl.
DRILi.iNG EQUIPMENT: Drawworl<s-Mid Continent U-1220 BE, 2,000 hp.
CRANES: Link Belt 218 and 238.
OTHER DATA: Typical of Nahuatl.
WORK AREA: Bay of Campeche, Mexico.
Petrobaltic
SATURN
CONSTRUCTION: Galatz ~. Rommia, 1987.
OTHER DATA: Typical of Atlas.
WORK AREA: Black Sea
Petro mar
PETROBRAS IV
PETROBRAS XI
Petroleos Mexicanos
(PEMEX)
HOLKAN
RIG DESIGN: Modec 300-C
CONSTRUCTION: Mitsui Ocean Development
Co. ltd., Japan, 1982.
PERFORMANCE: Water Depth-300'; Drilling
Depth-25,000'.
QUARTERS: 81 persons.
HULL: 219' 10"x 190' 3' x 24.4'.
VARIABLE LOAD: 1,800 t.
HELIPORT: 70' dia.
STORAGE: Mud & Cmt Bulk-7,078 cf & 3,000
sks; Liquid Mud-2, 172 bbl; Fuel-2,822 bbl; Water
for Drilling-5,447 bbl; Potable Water-2,225 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'l 1625DE, 3,000 hp, powered by three GE-752AJR, 1,000
hp each; Pumps-Two Nat'l 12-P-160, tnplex, 7W
x 12", 1,600 hp each; Prime Movers-NIA; Rotary
Table-Nat'I C-375, 37:1", powered by GE-752-AJR,
1,000 hp each; Top Drive-Tesco, 1,000 hp.
DERRICK: Branham Industries Inc., 147' x 30' x
30'; 1,000,000 lb (12 lines).
BOP SYSTEM: 21 Y.'-2m, 13%'-10m, 7>1.'-15m,
Ross Hill control system.
ATLAS
RIG DESIGN: Sonat Offshore Co., Orion type,
Class A 1, seil-eievating jackup
CONSTRUCTION: Galatz Shipya'd, Romania, 1985.
PERFORMANCE: Water deplh-295.2'; Drilling
depth-14,760'.
QUARTERS: 80 persons.
HULL: 172' x 134' x21'.
VAJRIABLE LOAD: 1,820 mt.
HELIPORT: 80' x 80'.
STORAGE: Mud & Cmt Bulk-9,900 cf; Liquid
Mud-1,610 bbl; Fuel-1,600 bbl; Water for
Drilling-1,600 bbl; Potable Water-1,333 bbl.
DRIWNG EQUIPMENT: Drawworks-UpetromTFM 38 E 2,300 hp; Pumps-two Upetrom 2 PN
1600 duplex, 1,600 hp; Prime movers-three
Resita 12LDSR 2,500 hp ea; Rotary TableUpetrom MRL-375 37W.
DERRICK: TD-320/43 R, 144.5'; 320 t.
BOP SYSTEM: Two Upetrom "DF" 13%', 10,000psi double; One Upetrom "VH" 13%", 5,000 psi.
CRANES: Two IMT 50 torui.
MOORING: Two Hall type anchors 4,500 kg ea;
two anchor winches.
WORK AREA: Black Sea
RIG53
JUPITER
CONSTRUCTION: Galatz Shipyard, Romania, 1987.
OTHER DATA: Typical of Atlas.
WORK AJREA: Black Sea
ORIZONT
RIG DESIGN: Class 1DO AS seil elevating
CONSTRUCTON: GaJatz Shipyard, Romania, 1982.
CRANES: Two Link Belt 218 ABS 75 ton.
OTHER DATA: Typical of Atlas.
WORK AREA: Turkey.
PROMETEU
CCNSTRUCTION: GaJatz Shipyard, Romania. 1984.
OTHER DATA: Typical of Atlas.
WORK AREA: Black Sea.
RIG54
RIG DESIGN: Mat supported, 4-leg jack-up cantilever w/propulsion assist
CONSTRUCTON: Amardah, Durban South Africa.
1983.
PERFORMANCE: Water depth-16'-90'; Drilling
depth-12,000'.
QUARTERS: 40 persons.
115
POOL-RANGER V
RIG DESIGN: Bethlehem Steel Corp., JU-70CW
CONSTRUCTION: Bethlehem Steel Corp., Beaumont, Texas, 1981.
PERFORMANCE: Water depth-1~73'; Drilling
depth-10,000'.
QUARTERS: 32 pernons.
HULL: 115' x 74' x 8'.
STORAGE: Mud & Cmt Bulk-820 cf; Liquid
Mud-300 bbl; Water for Drilling-400 bbl;
Potable Water-300 bbl.
DRILLING EQUIPMENT: Drawworks-GD 700800 hp; Pumps-two GD PZ 8 Triplex; Prime
movers-Two Detroit Diesel 12V-149; Rotary
Table-GD RT 27~'.
DERRICK: Branham 131'; 327,000 lb hook load
capacity.
BOP SYSTEM: One 11' 5,000 psi Shaffer spherical bag; Two 11' 5,000 psi Shaffer LWS rams;
10,000 psi C & K manifold.
CRANES: One SeaKing with 70' boom.
REMARKS: Self-propelled mat-supported jack-up
barge. Formerly Arapaho, formerly owned by
Temple Marine Drilling Co. Previously Houtech I
and Ranger V.
WORK AREA: U.S. Guif Coast.
PRIDE ALASKA
RIG DESIGN: Bethlehem; JU-250 MC
CONSTRUCTION: Bethlehem Steel Shipbuilding,
Beaumont, Texas, 1982.
PERFORMANCE: Water depth-25'-250'; Drilling
depth-25,000'.
QUARTERS: 54 persons.
HULL: 166' x 145' x 20'.
VARIABLE LOAD: 4,500 kips.
HELIPORT: 60' x 70'.
STORAGE: Mud & Cmt Bulk-9,460 ct, Liquid
Mud-1,476 bbl; Fuel-2,093 bbl; Water for
Drilling-B, 150 bbl; Potable Water-1,064 bbl.
DRIWNG EQUIPMENT: Drawwori<s-U-1220 EB
Pumps-two GD PZ-11, 1,600 hp; Prime
movers-three 12 cylinder EMD w/6 EMO 097
generators, 645 kW DC; Rotary Table---37W.
DERRICK: 147', 1,044,000 lb.
BOP SYSTEM: Two Cameron 131'", 10,000 psi
double type u rams; Shaffer 13%"' 5,000 psi annular; Hydril 21 W, 2,000 psi diverter.
CRANES: Two Sea-King Model 1400 w/ 100' booms.
REMARKS: Fonmerty Griffin-Alexander 1111, Constitution and Noble-Marvin Winters; 1,000,000 lb
rated cantilever load.
WORK AREA: Gulf of Mexico.
POOL-RANGER VI
RIG DESIGN: Bethlehem JU-70 MOW
CONSTRUCTION: Bethlehem Steel Corp., Beaumont, Texas, 1981.
PERFORMANCE: Water depth-1 ~
VARIABLE LOAD: 385,000 lb.
HELIPORT: 40' x 40'.
STORAGE: Mud & Cmt Bulk-850cf+1,000 sks;
Liquid Mud-300 bbl; Fu-192 bbl: Water for
Drilling--400 bbl; Potable Water-300 bbl.
DRIWNG EQUIPMENT: Drawworks-Oilwell 660,
1,000 hp; Pumps-two Gardner Denver PZ-8,
750 hp; Prime movers-two Cat. 3408; Rotary
Table--Oilwell 27~'; Pipe Handling SystemManual 2%'x21'" tubing.
BOP SYSTEM: 11" Stack, one single, one double
Cameron 10,000 psi.
CRANES: One SeaKlng wf70' boom.
REMARKS: Formeriy Temple Marine's Navajo.
Previously Houtech II and Ranger 111.
WORK AREA: U.S. Gulf Coast.
RIG 145
CONSTRUCTION: Far East Levingston Shipbuilding, Singapore, 1982.
PERFORMANCE: Water depth-150'; Drilling
depth-15,000'.
QUARTERS: 80 persons.
HULL: 154' x 132' x 15'9".
STORAGE: Mud & Cmt Bulk-4,520 ct, Liquid
Mud-1,500 bbl; Fuel-1.729 bbl; Water for
Drilling-3,036 bbl; Potable Water-2,506 bbl.
DRILLING EQUIPMENT: Drawworks-ldeco
E1200; Pumps-two Gardner Denver PZ9; Prime
movers-four Cat D-399 w/1050 kW generators;
Rotary Table-37W.
DERRICK: Pool designed, 139'; 850 kip capacity.
BOP: NIA.
CRANES: Two Baker Marine Corp. 900, 35-ton
w/100' boom.
WORK AREA: Arabian Gulf.
PRIDE COLORADO
RIG DESIGN: Bethlehem; JU-200 MC.
CONSTRUCTION: Bethlehem Steel Shipbuilding,
Sparrows Pt., MD, 1982.
PERFORMANCE: Water depth-200'; Drilling
depth-25,000'.
QUARTERS: 53 persons.
HULL: 157' x 132' x 18'.
VARIABLE LOAD: 3,500 kips.
HELIPORT: 60' x 70'.
STORAGE: Mud & Cmt Bulk-7,025 cf; Liquid
Mud-1,595 bbl; Water for Drilling-5,592 bbl;
Potable Water-1,050 bbl.
DRIWNG EQUIPMENT: Drawworks-OilweU E2500; Pumps-two Oilwell A-1700 PT; Prime
movers-three EMO 12-645 EB; Rotary Table-Oilwell B-37U".
DERRICK: Pyramid 147' x 30'; 1,044,000 lb.
BOP SYSTEM: 13%' Cameron, 10,000 psi.
CRANES: Two Skagit 343w/100' booms.
REMARKS: Fomnerty Cheyenne and Noble-Rea
McCarty.
WORK AREA: Gulf of Mexico.
PRIDE ALABAMA
RIG DESIGN: Bethlehem, JU-200 MC.
CONSTRUCTION: Bethlehem Steel, Sparrows
Point, MD. 1982
OTHER DATA: Typical Pride New Mexico.
REMARKS: Formeriy Griffin-Alexander VI, Independence and Noble-Mac McCoy.
WORK AREA: Gulf of Mexico.
116
PRIDE ARKANSAS
RIG DESIGN: Bethlehem, JU-200 MC.
CONSTRUCTION: Bethlehem Steel, Beaumont,
Texas, 1982.
PERFORMANCE: Water Depth-23'-200'; Drilling
Depth-20,000'.
VARIABLE LOAD: 4,290 kips.
OTHER DATA: Typical Pride New Mexico.
REMARKS: Fonnerty Griffin-Alexander V. Enter-
PRIDE CALIFORNIA
RIG DESIGN: Bethlehem Steel Corp.; JU-250-MS
CONSTRUCTION: Bethlehem, Singapore, 1976.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
QUARTERS: 84 persons.
HULL: 166' x 109' x 16'.
VARIABLE LOAD: 4,070 kips.
HELJPORT: Sikorsky S-61.
STORAGE: Mud & Cmt Bulk-7,500 cf & 3,000
Noble-Frank Reiger.
WORK AREA: Gulf of Mexico.
PRIDE KANSAS
PRIDE TEXAS
RIG DESIGN: Bethlehem Steel Corp., JU-300 MS
CONSTRUCTION: Bethlehem Steel Corp., Beaumont, Texas, 1974.
PERFORMANCE: Water depth-300'; Drilling
depth-20,000'.
QUARTERS: 86 persons.
HULL: 166' x 109' x 20'.
VARIABLE LOAD: 4,966 kips.
HELJPORT: 65' x 60'.
STORAGE: Mud & Cmt Bulk-4,080 cf & 2,500 cf;
Liquid Mud-1,500 bbl; Fuel--2,000 bbl; Wat.er for
Drilling-5,000 bbl; Potable Water-900 bbl.
DRIWNG EQUIPMENT: Drawworks-Emsco C3 Type II: Pumps--Three Emsco FB-1600, Prime
movers-Five Cat. 3512 Type B engines rated@
1, 176 hp ea.; Rotary Table---Emsco T-3750; Top
Drive-Nat'! Oilwell PS 2 650/650.
DERRICK: 147'; 1,050,000-lb hook load capacity,
BOP SYSTEM: 13%' w/one 5,000-psi WP Hydril GK,
one Cameron U single, one Cameron U 10,000-psi
WP double; 21 X" 2,000psi WP Hydril MSP annular.
CRANES: one Link Belt, 221 @ 40'; one Clyde, 40
t@60'.
REMARKS: Formerly Transworld 62 and
Noble-Cecil Forbes.
WORK AREA: Gulf of Mexico.
PRIDE WYOMING
RIG DESIGN: Bethlehem JU-250MS, mat slot
CONSTRUCllON: Bethlehem Steel, Beaumont, 1976.
PERFORMANCE: Water depth-250'; Drilling
depth-25,000'.
QUARTERS: 56 persons.
HULL: 166' x 132' x 16'.
VARIABLE LOAD: 4.500 kips.
HELJPORT: 60' x 70'.
STORAGE: Mud & Cmt Bulk-6.030 cf: Liquid
Mud-1,500 bbl; Fuel-1,796 bbl; Water for
Drilling-4.702 bbl; Potable Water-472 bbl.
DRIWNG EQUIPMENT: Drawworks--Mid Continent
U-1220 BE. 2.000 hp; Pumps-two Gardner Denver
PZ-11; Prime movers-four Detrurt diesel 16V149
Tl, 1,600 hp; Rotary Table-Cont' I. Emsco 370'.
DERRICK: Pyramid 147' x 30'. 1,000,000 lb GNC.
CRANES: Two Bucyrus-Erie Model MK-60. one
w/120' boom. one w/ 100' boom.
PRIDE OKLAHOMA
RIG DESIGN: Bethlehem Steel Corp., JU-250 MS
CONSTRUCTION: Bethlehem Steel Corp., Singapore, 1975. Refurbished 1992.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
QUARTERS: 68 persons.
HULL: 166' x 109' x 16'.
VARIABLE LOAD: 4,500 kips.
HEU PORT: 60' x 60'.
STORAGE: Mud & Cmt Bulk-6,580 cf & 3,000
sks; Liquid Mud-1,500 bbl; Fuel--1,796 bbl; Wat.er
for Drilling-4,234 bbl; Potable Water-900 bbl.
DRIWNG EQUIPMENT: Drawworks--Emsco C3 Type II; Pumps-two Emsco FB-1600, Prime
movers-three GM EMO 12-645; Rotary TableEmsco T-3750.
DERRICK: Lee C. Moore 147' x 30'; 1,050,000 lb
GNC.
BOP SYSTEM: 20" 2,000 psi WP Hydril; 13%" 10,000
psi WP w/one Hydril & three Cameron U rams.
CRANES: Two FMC Link Belt ABS-218 w/ 100'
booms.
REMARKS: Formerly Transworid Rig 63 and
Noble-Jack Clark.
WORK AREA: Gulf of Mexico.
ILE DU LEVANT
RIG DESIGN: Hitachi Drill Hope C-150.
CONSTRUCTION: Hitachi Zosen, 1981.
PERFORMANCE: Water Depth-270'; Drilling
Depth-20,000'.
QUARTERS: 80 persons.
HULL: 193' x 174' x 21'.
VARIABLE LOAD: 2,000 t (drilling).
HEU PORT: 65' dia, S-61 N.
STORAGE: Mud & Cm!. Bulk-9.040 cf; Liquid
Mud-1,700 bbl; Fuel-2,390 bbl; Water for
Drilling-2,673 bbl; Potable Water-1 ,635 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1320
UE, 2.000 hp; Pumps-Two Nat'l 12-P-160 triplex.
1,600 hp; Prime Movers-Five Cat. D-399-TA.
1,215 hp, driving Kato 600 V AC 900-kW generators; Rotary Table---Nat'I C-375, 37:., electric
drive; Top Drive-Varco TDS-100.
DERRICK: Pyramid 158'; 1,300,000-lb GNC.
BOP SYSTEM: One 20", 2,000 psi Hydril annular;
one 13%", 5,000 psi Cameron D annular; one srngle/one double 13%", 10,000 psi Cameron Uram.
CRANES: Two Skagit D 343.
MOORING: Four BLM winches; two w1re/charn.
1,500' x 1 :~ dia wire; two 15,000-lb anchors.
REMARKS: Drills in skid off mode. Cantilever
extends to 40". Zero discharge.
WORK AREA: Lake Maracaibo.
P. T. Patra Drilling
Nob/e-Unn Richanison.
WORK AREA: Gulf of Mexico.
PRIDE LOUISIANA
RIG DESIGN: Bethlehem JU-250 MS
CONSTRUCTION: Bethlehem Steel Corp., Singapore, 1981.
PERFORMANCE: Water depth-250'; Drilling
depth-25,000'.
QUARTERS: 76 persons.
HULL: 166' x 132' x 16'.
VARIABLE LOAD: 4,500 kips.
HELJPORT: 60' x 60'.
STORAGE: Mud & Cm! Bulk-6,600 cf; Liquid
Mud-1,500 bbl; Fuel-1,800 bbl; Water for
Drilling-4,850 bbl; Potable Water-900 bbl.
DRILLING EQUIPMENT: Drawworks-Cont.
Emsco C-3 Type II; Pumps-Two Cont. Emsco
FB-1600; Prime movers-Three EMO 12-645;
Rotary Table-Cont. Emsco T-3750.
DERRICK: Cont. Emsco 147' x 30'; 1,000,000 lb
GNC.
BOP SYSTEM: 13%", Cameron, 10,000 psi; Diverter-Hydril MSP, 21 W, 2,000 psi.
CRANES: Two FMC Link Belt ABS-218, w/ 100'
booms.
REMARKS: Formerly Transwor/d Rig 71 and
Nobie-Jim Bawcom.
WORK AREA: Gulf of Mexico.
PRIDE PENNSYLVANIA
RIG DESIGN: Marathon LeTourneau Class 53-C.
CONSTRUCTION: Built by Marathon LeToumeau,
Vicksburg, Miss.; 1973. Upgraded to cantilever
1990-91.
PERFORMANCE: Water deptih-30-300'; Drrlling
depth-20,000'.
QUARTERS: 76 persons.
BARUNAV
HULL: 231' x 200' x 26'.
RIG DESIGN: Bethlehem: JU-200 MC
VARIABLE LOAD: 1,397 mt.
CONSTRUCTION: Bethlehem. Singapore, 1980.
HELJPORT: 70' x 70'.
PERFORMANCE: Water depth-200'; Drilling
STORAGE: Mud & Cmt Bulk-9,500 cf; Liquid
depth-21.000'.
Mud-1,423 bbl; Fuel-2,860 bbl; Water for ; QUARTERS: 100 persons.
Drilling-12,577 bbl; Potable-1,017 bbl.
HULL: 157' x 132' x 18'.
DRIWNG EQUIPMENT: Drawworks-Emsco C-3,
VARIABLE LOAD: 2,035 t.
2,000 hp; Pumps-Emsco F-1600; Prime Movers-HELIPORT: S-61.
five Cat. D-399; Rotary Table-Emsco 37~'; Top
Drive-IDS MS.
STORAGE: Mud & Cmt Bulk-6.040 cf; Liqurd
Mud-1.500
bbl; Fuel-2, 180 bbl; Water for
DERRICK: Lee C. Moore 147' 1,000,000.' w/30' base.
Drilling-5.990 bbl; Potable Water-,-1,060 bbl.
BOP SYSTEM: Cameron 13%" double and single
DRILLING EQUIPMENT: Drawworks-Nat'I 1320
bag; 20" single+ bag; Hydril 29" bag.
UE; Pumps-two Nat'I 12-P-160; Prime moversCRANES: MLT PCM x 3.
two EMD 16-645 ES. one EMO 8-645 EB; Rotary
MOORING: Four MAT Electric winches with ~
Table-Nat'! C-375; Varco IDS-1.
wireline.
DERRICK: Pyrnmrd 147'; 1.330.000 lb.
TOWING REQUIREMENTS: 9,000 hp.
BOP SYSTEM: 131.<', 10,000 psi, Shaffer, one
double, one single; one Shaffer 5.000 psi spherical:
REMARKS: Formerly Andrade Gutierrez VI, and
one 21 '.~" DBL ram; one 21 ;.:;" Hydril annular.
Fonesight Driller Ill. Rig equipped w/410' legs.
CRANES: Two Nat' I OS-105.
WORK AREA: Worldwide.
MOORING: 1'.vo 16.000 lb. one 10.000 lb anchors
single drum ~1ec. "v1nches.
REMARKS: Formerly Sedneth Luanda.
WORK AREA: inoonesra.
WORLD OIL
117
FALRIG 18
CONSTRUCTION: Bethlehem Steel, 1978.
STORAGE: Mud & Cmt Bulk--6,480 cf; Liquid
Mud-1,450 bbl; Fuel-1,796 bbl; Water for
Drilling-4,324 bbl; Potable--402 bbl.
DRIWNG EQUIPMENT: Drawworks-Mid Continent Model U 1220 EB; Pumps-two Gardner
Denver PZ-11, 1,600 hp; Prime Movers-four
EMO SR12E1 W, 1,600 hp; Rotary Table-Emsco
T-3750; Top Drive-Nat'I PS 500.
CRANES: Two Link Belt, ABS-218 Seamaster
W/90' boom, 49.35 t @ 20'.
OTHER DATA: Typical of Fa/rig 17 except PS-500
top drive.
REMARKS: Formerly Teledyne 18 and Falcon 18.
WORK AREA: Gutt of Mexico.
FALRIG 19
ACHILLES
RIG DESIGN: Baker Marine Corp., BMC 250 MS
CONSTRUCTION: Baker Marine Corp., 1981.
PERFORMANCE: Water depth-150'; Drilling
depth-25,000'.
QUARTERS: 52 persons.
HULL: 191' x 132'.
VARIABLE LOAD: 3,490,000 lb.
HELIPORT: 60' x 60'.
STORAGE: Mud & Cmt Bulk-7,500 cf; Liquid
Mud-1,143 bbl; Fuel-1,222 bbl; Water for
Drilling-4,922 bbl; Potable Water-773 bbl.
DRILLING EQUIPMENT: Drawworks-Gardner
Denver 21 OOE; Pumps-two Gardner Denver PZ11; Prime movers-lour EMO 12-645 EB; Rotary
Table-Gardner Denver RT 37W.
DERRICK: 147'; 1,300,000 lb hook load.
BOP SYSTEM: Koomey Type 80.
CRANES: Two BMC 900, 30 ton.
TOWING REQUIREMENTS: 3 x 3,600 hp.
REMARKS: Formeriy Mr. Demp, Loosbrock Sun
and Songa Sun.
WORK AREA: Gutt of Mexico.
FALRIG 20
CONSTRUCTION: Bethlehem Steel Shipbuilding
Corp, 1982.
STORAGE: Mud & Cmt Bulk--6,480 ct, Liquid
Mud-1,665 bbl; Water for Drilllng-4,693 bbl;
Potable Water-724 bbl.
DRILUNG EQUIPMENT: Drawworks-Emsco
C-3, Type II, 3,000 hp; Pumps-Emsco Triplex,
two FB-1600; Prime movers-3-EMD SR12E1W.
1,620 hp each; ONGM 16V92-GDT, 835 hp;
Rotary Table-Emsco T-3750, Nat'I 2-speed
gearbox.
CRANES: Two Link Belt ABS-21BA Seamaster
w/90' boom, 51.45 t @ 20'.
OTHER DATA: Typical of Falng 17.
REMARKS: Formerly Teledyne 20 and Falcon 20.
WORK AREA: Gulf pf Mexico.
RIG83
FALRIG85
FALRIG 86
FALRIG 17
RIG DESIGN: Bethlehem Steel Corp., 250-MS,
slot 50' x 50'
CONSTRUCTION: Bethlehem Pvt. Ltd., Singapore, 1974.
PERFORMANCE: Water depth-250'; Drilling
depth-25,000'.
QUARTERS: 50 persons.
HULL: 166' x 109' x 16'.
VARIABLE LOAD: 4,500 kips, drilling.
HELIPORT: 60' x 70'.
STORAGE: Mud & Cmt Bulk--6, 150 cf; Cmt-3,450
cf; Liquid Mud-1,560 bbl; Fuel-1, 796 bbl; Water
for Drilling-4,386 bbl; Potable Water-472 bbl.
DRIWNG EQUIPMENT: Drawworks-Emsco C3 Type II, 3,000 hp; Pumps-two Emsco F-1600
Triplex; Prime movers-two EMO 16-645E1; 2,200
hp, two Cat. D-399TA, 1, 115 hp each; Rotary
Table-Emsco T-3750.
DERRICK: Emsco 147'; 1,400,000 lb API gross.
BOP SYSTEM: Cameron, one 13%" 10,000 psi
single, one 131'" 10,000 psi dual, Hydril, one 131'"
5,000 psi GK, Koomey closing unit 26160-3S
5,000 psi & 10,000 psi choke manifold.
CRANES: One Link Belt, AB8-1088 Seamaster w/80'
boom, 31.25 t@ 17.5'; oneABS-238 w/100' boom.
REMARKS: Formerly Teledyne 17 and Falcon 17.
WORK AREA: Gulf of Mexico.
118
FALRIG 82
RIG DESIGN: BMC
CONSTRUCTION: Baker Marine Corp., Ingleside,
Texas, 1978, Upgraded 1983.
PERFORMANCE: Water depth-200'; Drilling
depth-20,000'.
QUARTERS: 58 persons plus 2-man sick bay.
HUU; 191' x 132' x 14'.
HELIPORT: 60' x 60'.
STORAGE: Mud & Cmt Bulk-6,780cf+1,000 sks;
Liquid Mud-1,415 bbl; Fuel-2,566 bbl; Water
for Drilling-4,400 bbl; Potable Water-500 bbl.
DRIWNG EQUIPMENT: Drawworks-Emsco, C-2
Type II; Pumps-two CE, FB-1600; Prime moverafour KATO 1,000 kW AC generators driven by four
Cat. D-399; Rotary Table-CE Type T-3750.
DERRICK: Emsco 147'; 1,000,000-lb hook load.
BOP SYSTEM: One 131'", 5,000 psi Shaffer spherical; One 131'" 10,000 psi single Cameron "U";
One Cameron "U" 131'", 10,000 psi double.
CRANES: One Nat'l 35 t, 100' boom; one SeaKing
75 t, 100' boom.
REMARKS: Formerly Ocean Conquest.
WORK AREA: Gutt of Mexico.
FALCON SEAHAWK
RIG DESIGN: Bethlehem JU-250MS.
CONSTRUCTION: Built by Bethlehem Steel Corp.
Beaumont, Texas; 1976.
PERFORMANCE: Water depth-250'; Drilling
depth-25,000'.
QUARTERS: 50 persons.
HULL: 166' x 109' x 16'.
STORAGE: Mud & Cmt Bulk--6,150 cf & 3,000
sks; Liquid Mud-1,500 bbl; Fuel-1,796 bbl:
Water for Drilling-4,324 bbl; Potable-895 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'I. 1625
UE; Pumps-Nat'!. 12-P-160 (1,600 hp) Triplex:
Prime movers-four Cat. D-399; Rotary TableNat'I. 375.
DERRICK: 147'; 1-million-lb capacity.
CRANES: Two Nat'I. 30-ton w/100' boom.
REMARKS: Formerty Nordrill Seahawk.
WORK AREA: Gutt of Mexico.
PHOENIX IV
FALRIG TAURUS
RIG DESIGN: Bethlehem JU-250MS
CONSTRUCTION: Bethlehem Singapore Pie. Lid,
1976.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
QUARTERS: 60 persons..
HULL: 166' x 109' x 16'.
VARIABLE LOAD: 4,200 short t.
HEU PORT: 83' x 83'.
STORAGE: Mud & Cmt Bulk-7,450 bbl; Liquid
Mud-1,500 bbl; Fuel-1,796 bbl; Water for
Drilllng-4, 709 bbl; Potable Water--850 bbl.
DRIWNG EQUIPMENT: Drawwori<s-Mid Cont. U
1200 w/two EMO D-79 motors; Pumps-Nat'I
12-P-160 Triplex w/two EMO D-79 motors; Prime
movers-four Detroit Diesels 16V 149; Rotary
Table-Nat'I 37W.
DERRICK: Pyramid; 147'; 1,392,000 lbs GNC.
BOP SYSTEM: GK 131''. 5,000 psi; two annular
Hydril units, 21 W, 2,000 psi; 131'', 5,000 psi; Two
Cameron ram units, single/double 131'', 10,000 psi.
CRANES: Two Link Belt ABS 138 w/80' boom.
REMARKS: Formerly Sonat's Offshore Taurus.
WORK AREA: U.S. Gu~ of Mexico.
PHOENIX I
RIG DESIGN: Bethlehem JU-200MS
CONSTRUCTION: Bethlehem Steel Corp.; Beaumont, Texas, 1981.
PERFORMANCE: Water depth-200'; Drilling
depth-25,000'.
QUARTERS: 52 persons.
HULL: 220' x 185' x 10'.
VARIABLE LOAD: 4,200 kips.
HELIPORT: 60' x 70'.
STORAGE: Mud & Cmt Bulk-7,280 cf; Liquid
Mud-1,500 bbl; Water for Drilling-4,200 bbl;
Potable Water-1,000 bbl.
DRIWNG EQUIPMENT: Drawworks-Continental
Emsco C-2; Pumps-Continental Emsco FB1600; Prime movers-EMDSR-16; Rotruy TableEmsco T-4950; Top Drive-Nat'I PS-500.
DERRICK: 147'; 1,000,000 lb hook load capacity.
BOP SYSTEM: Koomey Model 220.
CRANES: Two FMC Link-belt 218-A.
REMARKS: Formerly Nordrill Oiler.
WORK AREA: Gulf of Mexico.
D.R. STEWART
RIG DESIGN: Bethlehem 200 MC.
REMARKS: Former1y Nordrill Slee/er.
120
RANDOLPH YOST
RIG DESIGN: Marathon LeTourneau 116-C.
CONSTRUCTION: Marathon LeTourneau,
Brownsville, Texas, 1979.
VARIABLE LOAD: 3,265 kips.
STORAGE: Mud & Cmt Bulk--8,000 cf + 4,000 cf
sks; Liquid Mud-1,692 bbl; Water for Drilling5,300 bbl; Potable Water-3, 120 bbl.
DRILLING EQUIPMENT: Prime Movers-three
EMO 16-645 ES; Rotary Table-Ci_lwell A375; Top
Drive-Varco TDS-3.
BOP SYSTEM: 131!', 10,000 psi; 2rn. 2,000 psi.
CRANES: Four LeTourneau PCM-120AS, 50 t.
MOORING: 7,500 kg anchors.
OTHER DATA: Typical of D.R. Stewarl.
WORK AREA: Angola.
RON TAPPMEYER
PHOENIX II
PHOENIX Ill
ROGER W. MOWELL
RIG DESIGN: Friede & Goldman L-780, Mod II.
CONSTRUCTION: Far East Levingston Shipyard,
Singapore, 1982.
QUARTERS: 88 persons.
VARIABLE LOAD: 3,926 kips normal, 5,426 kips
temp.
STORAGE: Mud & Cmt Bulk-6,000 cf+ 3,400 cf
sks; Liquid Mud-1,410 bbl; Fuel-2,436 bbl.
DRIWNG EQUIPMENT: Pumps-two Ensco FB1600; Rotary Table-Cilwell B 37~'; Top DriveVarco TDS-4H.
DERRICK: Draco 160', 1,392,000 lb. GNC.
BOP SYSTEM: 13l'', 10,000 psi; 2Dl'', 3,000 psi.
OTHER DATA: Typical of George H. Galloway.
WORK AREA: Indonesia.
J. T. ANGEL
RIG DESIGN: Friede & Goldman L-780, Mod II.
CONSTRUCTION: Astilleros Corrientes S.Al.C.,
Argentina, 1982.
VARIABLE LOAD: 3, 127 kips normal, 4,465 kips
temp.
STORAGE: Fuel-2,436 bbl; Liquid Mud-1,742
bbl.
DRIWNG EQUIPMENT: Drawworl<&-Nat'l 1625DE, two @ 1,000 hp.
DERRICK: 160', 1,044,000 lb. Static hook load.
BOP SYSTEM: 13l'', 10,000 psi; 21 \4', 2,000 psi.
OTHER DATA: Typical of George H. Galloway;
except Top Drive-TDS-4H.
REMARKS: Formerly W. B. Tyson.
WORK AREA: India.
HARVEY H. WARD
RIG DESIGN: Friede & Goldman L-780, Mod II.
CONSTRUCTION: Far East Levingston Shipyard,
Singapore, 1981.
VARIABLE LOAD: 3,926 kips normal, 5,426 kips
temp.
STORAGE: Mud & Cmt Bulk--8,000 cf+ 3,400 cf
sks; Liquid Mud-1,921 bbl; Fuel-2,394 bbl.
DRIWNG EQUIPMENT: Pumps-two Ensco FB
1600; Rotary Table-Cilwell 37~'; Top DriveVarco TDS-4H.
DERRICK: 160', 1,044,000 lb. Static hook load.
BOP SYSTEM: 13l'', 10,000 psi; 20'A', 3,000 psi.
OTHER DATA: Typical of George H. Galloway.
WORK AREA: Indonesia.
C.E. THORNTON
RIG DESIGN: Marathon LeTourneau 53.
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss, 1974. Major upgrade, 1984.
QUARTERS: 88 persons.
VARIABLE LOAD: 5,212 kips.
STORAGE: Mud & Cmt Bulk-7,280 cf & 3,000 cf
sks; Liquid Mud-1,411 bbl; Water for Drilling11,054 bbl.
DERRICK: 147' Lee C. Moore, 1,000,000 GNC.
CRANES: Three LeTourneau RD120, 45 t; one
Unit Mariner 480 H, 22 t.
OTHER DATA: Typical of F.G. McC/intock.
WORK AREA: West Africa (Nigeria).
CECIL PROVINE
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss, 1982.
DRILLING EQUIPMENT: Pumps-two Nat'I 12P-160; Prime movers-five D-399.
OTHER DATA: Typical of Arch Rowan.
WORK AREA: North Sea.
w.Jer
CHARLES ROWAN
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss, 1981.
OTHER DATA: Typical of Arch Rowan.
WORK AREA: Gulf of Mexico.
GILBERT ROWE
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss, 1981.
OTHER DATA: Typical of Arch Rowan.
WORK AREA: Gulf of Mexico.
ROWAN HALIFAX
CONSTRUCTION: Marathon LeTourneau,
Brownsville, 1982.
DRILLING EQUIPMENT: Pumps-two Nat'I 12P-160; Prime movers-five D-399.
OTHER DATA: Typical of Arch Rowan.
WORK AREA: North Sea.
QUARTERS: 80 persons.
HULL: 297' x 292' x 30'.
VARIABLE LOAD: 3,200 t.
HELIPORT: 93' x 90' dia., Boeing 234 Chinook.
STORAGE: Mud & Cmt Bulk-7,925 cf ea plus
for
5,400 sq ft sk stg; Liquid Mud-2,475 bbl;
Drilling-17, 135 bbl; Potable Water-1,455 bbl.
DRILLING EQUIPMENT: Drawworks--Nat'l 1625
DE; Pumps-PUMPS: three Nat'l 12-P-160; Prime
movers-seven Cat. 0-399 turbo charged diesels:
Rotary Table-Nat'I C-495; Top Drive-Varco.
DERRICK: Lee C. Moore, 160'; 1.250,000-lb hook
load.
BOP SYSTEM: 21X", 5,000 psi; CIW 13W 10,000
psi; 2,000 psi diverter system.
CRANES: Three 50 ton PCM-120 electric, two
60 ton PCM 350.
POSITTONING: Two 11' dia. propellers w/6,800 hp
total.
WORK AREA: North Atlantic Nova Scotia.
ROWAN-ALASKA
RIG DESIGN: Marathon LeTourneau Class. 116-S,
slotted jackup; also known as Marathon Class 84.
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss, 1975.
PERFORMANCE: Water depth-350'; Drilling
depth-25,000'.
QUARTERS: 78 persons.
HULL: 247' x 200' x 26'.
VARIABLE LOAD: 2,600 t.
HELIPORT: Sikorskly S-61,
STORAGE: Mud & Cmt Bulk-5,400 cf & 5,400 cf,
plus sack stg; Liquid Mud-1,400 bbl; Fuel3, 700 bbl; Water for Drilling-6,600 bbl; Potable
Water-1, 100 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1625
DE, two GE 752 hp; Pumps-PUMPS: two Nat'I
12-P-160; Prime movers-four Cat. D-399 diesel
electric, 5,400 hp; One Cat D.
DERRICK: 160'; 1,250,000-lb load capacity.
BOP SYSTEM: CIW, 10,000 psi.
CRANES: Four PCM 120, 50 t@ 25' w/100' boom.
TOWING REQUIREMENTS: 6,000-8,000 hp.
POSITTONING: Thruster system, two Baylor 1,000 hp.
REMARKS: 476' legs, 50' wide x 41' long drill
slot. Has skid-off capability.
WORK AREA: Gulf of Mexico.
ROWAN GORILLA IV
RIG DESIGN: Enhanced Gorilla class
CONSTRUCTION: Marathon LeTourneau, Vicksburg, 1986.
DERRICK: 160'; 2,000,000-lb hook load.
REMARKS: For North Sea, rated to 328' water
w/504' legs; for Gulf of Mexico, rated to 450'
water w/605' legs: Drilling Depth-30,000'.
OTHER DATA: Typical of Gorilla II.
WORK AREA: North Sea.
ROWAN ODESSA
ARCH ROWAN
RIG DESIGN: Marathon LeTourneau: 116-C, North
Sea type w/bow mounted heliport
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss, 1981.
PERFORMANCE: Water depth-300'; Drilling
depth--25,000'.
QUARTERS: 78 persons.
HULL: 243' x 200' x 26'.
VARIABLE LOAD: 2,600 t.
HELIPORT: 73' dia. Sikorsky S-61.
STORAGE: Mud & Cmt Bulk-5,400 cf each +
1,500 sq ft sk; Liquid Mud-1,400 bbl; Fuel3,000 bbl; Water for Drilling-11,000 bbl; Potable
Water-1,000 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1625
DE, two GE 752 hp; Pumps-PUMPS: three Nat'I
12-P-160; Prime movers-six Cat D-399 turbocharged; Top Drive-Varco.
DERRICK: 160'; 1,250,000-lb load capacity.
BOP SYSTEM: CIW 13%", 10,000 psi, 2,000 psi
diverter.
CRANES: Four PCM 120, 50 t@ 25' w/100' boom.
TOWING REQUIREMENTS: 8,000-12,000 hp.
POSITIONING: Two, 1,000 hp thrusters.
REMARKS: Rigs carry 410' legs, additional lengths
avail. for 350' water.
WORK AREA: North Sea.
ROWAN CALIFORNIA
CONSTRUCTION: Marathon LeTourneau, Singapore, 1984.
DRILLING EQUIPMENT: Pumps-two Nat'I 12P-160; Prime movers-five D-399.
OTHER DATA: Typicat of Arch Rowan.
REMARKS: Formerly California.
WORK AREA: North Sea.
122
RIG DESIGN: Marathon LeTourneau 116-C, cantilevered jack-up, side mounted heliport
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss, 1978.
PERFORMANCE: Water depth-350'; Drilling
depth-25,000'.
QUARTERS: 78 persons.
HULL: 243' x 200' x 26'.
VARIABLE LOAD: 2,400 t.
HELIPORT: Sikorsky S-61.
STORAGE: Mud & Cmt Bulk-5,400 cf & 5,400 cf
plus 1,500 sq ft sk: Liquid Mud-1,400 bbl; Fuel3,000 bbl; Water for Drilllng-5,000 bbl; Potable
Water-740 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1625
DE, two GE 752 hp; Pumps-PUMPS: two Nat'I
12-P-160; Prime movers-five D-399, SCR: Top
Drive-Varco.
DERRICK: 160': 1,250,000-lb load capacity.
BOP SYSTEM: CIW 13%" 10,000 psi w/2,000 psi
diverter.
CRANES: Four PCM 120, 50 t@25' w/100' boom.
TOWING REQUIREMENTS: 8,000-12,000 hp.
POSITIONING: Thrusters-Two, 1,000 hp.
REMARKS: Leg lengths-4 76'.
WORK AREA: Gulf of Mexico.
ROWAN JUNEAU
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss, 1977. Rennovated 1991 .
PERFORMANCE: Water depth-350'; equipped
w/41 O' legs.
BOP SYSTEM: CIW, 15,000 psi.
OTHER DATA: Typical of Rowan-Alaska.
WORK AREA: Gulf of Mexico.
ROWAN-LOUISIANA
CONSTRUCTION: Marathon LeTourneau, 1975.
OTHER DATA: Typical of Rowan-Alaska, except for
Varco Top Drive.
WORK AREA: Gulf of Mexico.
ROWAN MIDDLETOWN
CONSTRUCTION: Marathon LeTourneau: Vicksburg, Miss, 1980.
DRILLING EQUIPMENT: Pumps-Three 12-P160; Prime Movers-Six P-399.
OTHER DATA: Typical of Rowan Ft. Worth.
WORK AREA: Gulf of Mexico.
ROWAN PARIS
CONSTRUCTION: Marathon LeTourneau, Vicksburg, Miss, 1980.
REMARKS: Leg lengths-41 O'.
OTHER DATA: Typical of Rowan Ft. Worth, except
four 0399 Prime movers.
WORK AREA: Gulf of Mexico.
ROWAN GORILLA V
RIG DESIGN: LeTourneau Inc., Enhanced Gorilla
class.
CONSTRUCTION: Vicksburg, Mississippi, 1998.
PERFORMANCE: Water depth-400'; Drilling
depth-35,000'.
QUARTERS: 112 persons.
HULL: 306' x 300' x 36'.
VARIABLE LOAD: 12,500 kips plus combined
hood, setback and pipe tension.
HELIPORT: 90' x 94' dia.
STORAGE: Mud & Cmt Bulk-20,000 cf; Liquid
Mud-5,800 bbl (inc'I sand traps); Base Oil-1.680
bbl; Water for Drilling-20,704 bbl: Fuel-7,870
bbl; Potable Water-1.600 bbl.
DRILLING EQUIPMENT: Drawworks--2,000,000
lb, 3 x 3,300 hp motors: Mud pumps-Four:
Prime movers-Four 5,000 hp; Rotary table49W: Top Drive; Skid-off capability.
DERRICK: 170'; 2,500,000 lb.
BOP SYSTEM: 15.000 psi.
CRANES: Four 60 t. one 50 t.
REMARKS: Newbuilding, construction started.
WORK AREA: North Sea.
ROWAN GORILLA VI
RIG DESIGN: LeTourneall Inc., Enhanced Gorilla
ROWAN GORILLA II
RIG DESIGN: Marathon LeTourneau 150-88-C
Gorilla Class, 45' x 52' Slotilever w/605' legs
CONSTRUCTION: Marathon LeTourneau, Singapore, 1984.
PERFORMANCE: Water depth-450'; Drilling
depth-25.000'.
class.
CONSTRUCTION: Vicksburg, Mississippi; to be
completed second-quarter 2000.
OTHER DATA: Typical of Rowan Gorilla V.
Saipem
ROWAN-TEXAS
RIG DESIGN: Marathon LeTourneau Class 52;
mod. for cantilever 1995.
CONSTRUCTION: Marathon LeTourneau, 1972.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
QUARTERS: 78 persons.
HULL: 203' x 168' x 22'.
VARIABLE LOAD: 1,500 t.
HELIPORT: 60' dla.; Sikorsky S-61.
STORAGE: Mud & Cmt Bulk-5,000 cf & 1,500
sks; Liquid Mud-1,250 bbl; Fuel-3,100 bbl;
Water for Drilling-3,840 bbl; Potable Water630 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1320
UE; Pumps-two Nat'l 10-P-130; Prime movers-six Cat. D-398 TAC, 1,000 hp each; Top Drive-Varco.
DERRICK: L.C. Moore, 147', 1,100 kips.
BOP SYSTEM: CIW 10,000 psi.
CRANES: Four PCM-120, 50 t@ 25' w/100' boom.
TOWING REQUIREMENTS: 6,000-8,000 hp.
POSmONING: Thruster system, two Baylor 750 hp.
REMARKS: 323' legs, 50' wide x 41' long drill slot;
Slotilever conversion coming to Texas.
WORK AREA: Gulf of Mexico.
RIG 105
CONSTRUCTION: Marathon LeTourneau, Singapore, 1975.
QUARTERS: 88 persons.
VARIABLE LOAD: 3,250 kips plus 1,000 kips
drilling load.
STORAGE: Mud & cmt bulk 8,800 cf; reserve
mud 800 bbl.
DRIWNG EQUIPMENT: Pumps-Ernsco FB-130C
DERRICK: Emsco 160'.
OTHER DATA: Typica of Rig 103 except Varco Toe
Drive and 13%", 5,000-psi BOP.
WORK AREA: Gulf of Suez.
ROWAN-HOUSTON
CONSTRUCTION: Marathon LeToumeau, 1969.
DRIWNG EQUIPMENT: Pumps-PUMPS: two Nat'I
12-P-160; Prime movers-five Cat. D-398 TAC.
OTHER DATA: Typical of Rowan- Texas.
WORK AREA: Gulf of Mexico.
ROWAN-NEW ORLEANS
CONSTRUCTION: Marathon LeToumeau, 1971.
REMARKS: Skid-Off capabilities. Dual purpose
crane/rig unit
OTHER DATA: Typical of Rowan-Texas. Dual purpose crane/rig unit.
WORK AREA: Gulf of Mexico.
PERRO NEGRO 3
RIG DESIGN: Friede & Goldman Ltd. L-780-Mod. II
CONSTRUCTION: Arsenals Triestino, S. Marco.,
Trieste, Italy, 1983.
PERFORMANCE: Water depth-300'; Drilling
depth-20,000'.
QUARTERS: 88 persons.
HULL: 180' x 175'.
VARIABLE LOAD: 1,905 mt.
HELIPORT: 73' dia.
STORAGE: Mud & Cmt Bulk-6,700 cf; Liquid
Mud-1,600 bbl; Fuel-5,600 bbl; Water for
Drilling-5,000 bbl; Potable Water-1, 100 bbl.
DRILLING EQUIPMENT: Drawwori<s--1deco E2100;
Pumps-PUMPS: two ldeco T-1600; Prime moversfive GMT B 230.6; Rotary Table-ldeco 37W'.
DERRICK: Dreco 147'; 1,350.000-lb API capacity.
BOP SYSTEM: Cameron-WV.", 3,000-psi and
21W', 2,000-psi double; 13%". 10,000-psi single
and double rams.
MOORING: Four BLM winches 44,000-lb line pull;
four 6, 700-lb anchors.
WORK AREA: India.
RIG 124
RIG DESIGN: MODEC Model 200 C-45
CONSTRUCTION: Mitsui, Japan, 1980.
PERFORMANCE: Water depth-250'; Drillir
depth-20,000'.
QUARTERS: 100 persons.
HULL; 203' x 190' x 21'.
VARIABLE LOAD: 5,733 kips plus 1,000 k:
i drilling load.
1 HELIPORT: 70' dia.
STORAGE: Mud & Cmt Bulk-7.200 cf; Lie_
Mud-1,570 bbl; Water for Drilling-3,379 c:
Potable Water-1,497 bbl.
12
GALAXY II
RIG DESIGN: Friede & Goldman, Universe Class
(L-780 MOD Vij
CONSTRUCTION: Keppel FELS, Singapore, 1998.
DRILLING EQUIPMENT: Prime Movers-Four,
total 10,000 hp; Top Drive-Varco IDS-4S; Pipe
Handling-Varco PRS-31, AR3200C.
CRANES: Three SeaTrax 6032.
OTHER DATA: Similar to Galaxy I.
WORK AREA: Canada.
GALAXY Ill
RIG DESIGN: Keppel FELS, Universe Class,
(L-780 MOD VQ
RIG 127
RIG DESIGN: Friede & Goldman L-780
CONSTRUCTION: China Shipbuilding Corp., Taiwan, 1981.
PERFORMANCE: Water depth-250'; Drilling
depth-20,000'.
QUARTERS: 100 persons.
HULL: 180' x 175' x 25'.
VARIABLE LOAD: 4,371 kips plus 1,000 kips
drilling load.
HELIPORT: 70' dla.
STORAGE: Mud & Cmt Bulk-6,080 cf; Liquid
Mud-2,000 bbl; Water for Drilling-5,486 bbl;
Potable Water-1,156 bbl.
DRILLING EQUIPMENT: Drawworks-Nal'l 1320
UE; Pumps-two Emsco FB1600 triplex; Prime
movers-four Cat. D-399; Rotary Table-Nat'I C375; Top Drive-Varco TDS-3.
DERRICK: Emsco 160'; 1,000,000-lb hook load
capacity.
BOP SYSTEM: 291>', 500 MSP diverter 21v.',
2,000 psi annular and double ram: 13%', 10,000
psi ram: 13%', 5,000 psi annular.
CRANES: Two American Aero with 100' boom,
rated at 90,000 lb @ 20'.
WORK AREA: Arabian Gulf, Qatar.
COMPACT DRILLER
RIG DESIGN: Marathon LeToumeau 116-C (Hull 216)
CONSTRUCTION: Marathon LeToumeau Marine
Co., Vicksburg, Miss., 1991.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 96 persons.
HULL: 243' x 200' x 26'.
VARIABLE LOAD: 4,687 kips drilling.
HELIPORT: 73' dia.
STORAGE: Mud & Cmt Bulk-10,880 cf + 1,300 sq ft
stg; Liquid Mud-1,950 bbl; Fue!-2,800 bbl; Water
for Drilling-5,000 bbl; Potable Water-1,500 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'l 1625DE, 3,000 hp; Pumps-two Nat'I 12-P-160;
Prime movers-four Cat. Model-3516, 1,615-hp
each; Rotary Table-Nat'I D-375; Top DriveNat'I PS2-500.
DERRICK: 1,500,000-lb capacity.
BOP SYSTEM: 21 W, 2,000 psi ann/diverter; two
13%', 10 K doubles: 13%', 5 Kann.
CRANES: Three LeToumeau, PCM-120 AS.
REMARKS: Fonmerly owned by Brobekk NS and
K/S Compact Drilling, unnamed newbuilding.
WORK AREA: West Africa
RIG 134
CONSTRUCTION: China Shipbuilding Corp., Taiwan, 1982.
VARIABLE LOAD: 4,304 kips plus 1,250 kips
drilling load.
HELIPORT: 60' polygon, S-61.
DRILLING EQUIPMENT: Pumps-two Nat'I IOP-130.
DERRICK: Emsco 160'.
CRANES: Two SeaKing 1700, 11 O' booms, 28 1.
OTHER DATA: Typical of Rig 127.
WORK AREA: SE Asia.
RIG 136
RIG DESIGN: Friede & Goldman L780 Mod II
CONSTRUCTION: China Shipbuilding Corp.,
Kaohsiung, Taiwan, 1982.
QUARTERS: 84 persons.
VARIABLE LOAD: 4063 kips plus 1,000 kips
drilling load.
PERFORMANCE: Water depth-300'; Drilling
depth-20,000'.
QUARTERS: 84 persons.
DRILLING EQUIPMENT: Pumps-CE FB-1600;
Top Drive-Varco TDS-3.
DERRICK: Emsco 160'.
CRANES: Three 30 t SeaKing, 1700B.
OTHER DATA: Typical of Rig 127.
WORK AREA: MediterraneanfTunisia.
BRITANNIA
RIG DESIGN: Breit & Garcia, Breit No. D-221
CONSTRUCTION: Constructed by Norsmec, 1968.
PERFORMANCE: Water depth-200' (250'
w/existing leg extensions); Drilling depth-20,000'.
QUARTERS: 92 persons.
HULL: 224' x 200' x 25'.
VARIABLE LOAD: 5,200 kips, including drilling load.
HELIPORT: 73' dia.
STORAGE: Mud & Cmt Bulk-7,800 cf; Liquid
Mud-2,846 bbl+2, 100 bbl oil based; Fuel-1,070
bbl; Water for Drilling-4, 130 bbl; Potable Water670 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco C2
Type 2; Pumps-three Emsco FB-1600; Prime
movers-eight Cat. D-398 TA; Rotary TableNat'I C-375; Top Drive-Varco TDS-3H.
DERRICK: Brown Services; 160': 1.1-million-lb
hook load.
BOP SYSTEM: 29112", 500 psi KFDJ diverter;
13%', 10,000 psi rams.
GALAXY I
RIG DESIGN: Friede & Goldman, Universe Class,
(L-780 MOD VI)
CONSTRUCTION: Far East Levingston, Singapore, 1991.
PERFORMANCE: Water depth-400'; Drilling
depth-30,000'.
QUARTERS: 100 persons.
HULL: 237' x 250' x 35'.
VARIABLE LOAD: Up to 14,900 kips, inc. 2,600
kips drilling load.
HELIPORT: 83' dia. Accommodates S-61.
STORAGE: Mud & Cmt Bulk-18,200 cf; Liquid
Mud-5,000 bbl; Base Oil-1,627 bbl; Brine Storage-1,627 bbl; Potable Water-4,451 bbl.
DRILLING EQUIPMENT: Drawworks-3,000 hp;
Pumps-Three 2,000 hp; Prime movera-.Fou~ Cat.
3606, 10,000 hp; Rotary Table-49W; Top DnveVarco TDS4H; Pipe handling-Varco PHM-31.
DERRICK: 170'; 2,000,000 GNC.
BOP SYSTEM: 21X' 5,000 psi BOP, 13%' 15,000
psi BOP: Dril-Quip 500 psi fixed diverter.
CRANES: Three Manitex 4,800, 28 tat 65'.
REMARKS: Drill floor and substructure can skid off
to platform.
WORK AREA: North Sea.
KEY GIBRALTAR
CONSTRUCTION: Marathon LeTourneau, Scotland, 1975, upgraded to CL, 1996.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 100 persons.
HULL: 239' x 200' x 26' triangular.
VARIABLE LOAD: 10,000 kips drilling.
HELIPORT: 71' dia.
STORAGE: Mud & Cmt Bulk-13,240 cf; Liquid
Mud-1,891 bbl; Fuel-3,681 bbl; Water for
Drilling-?, 754 bbl; Potable Water-1, 724 bbl.
DRILLING EQUIPMENT: Drawworks-Oilwell E
2000; two GE-752; Pumps-three Oilwell A-MODPT
Prime movers-We Cat. D-399, 1,200 hp; one 0353
TA Cat. (6,355 total hp); Top Drive-Varco TDS-3.
DERRICK: Pyramid 160' x 30' x 7' 11 " top base
"T" leg derrick; 1,000,000-lb hook load.
BOP SYSTEM: 13%", 5,000 psi annular; 13%',
10,000 psi single/double ram.
CRANES: Three LeToumeau 45-ton capacity 100'
booms.
124
KEY SINGAPORE
RIG DESIGN: Marathon LeTourneau 116C
CONSTRUCTION: Marathon LeTourneau, Singapore, 1982.
PERFORMANCE:Water depth-350' (upgraded
1995); Drilling depth-25,000'.
QUARTERS: 100 persons.
VARIABLE LOAD: 4,610 kips drilling; plus 1,250
kips drilling load.
HELIPORT: 65' dia.
STORAGE:Mud & Cmt Bulk-8,000 cf; Liquid
rnud-2,260 bbl; Water for drilling-10,800 bbl;
Potable water-1,300 bbl.
DRILLING EQUIPMENT:Pumps-Two Nat'I 12P-160, One Emsco FB 1600; Pipe handlingVarco AR 300 Iron Roughneck.
BOP SYSTEM: 30' KFDJ fixed diverter (Vetco).
OTHER DATA: Same as Key Manhattan.
WORK AREA: Mediterranean.
126
v,
KEY HAWAII
Saudi Aramco
TRIDENT 8
Sedco Forex
TRIDENT4
CONSTRUCTION: Marathon LeTourneau,
Brownsville, Texas, 1980.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
VARIABLE LOAD: 2,221 t operating.
BOP SYSTEM: 13%', 10,000 psi.
OTHER DATA: Typical of Trident 3.
WORK AREA: West Africa.
Schahin Cury
TRIDENT 6
RIG DESIGN: MODEC; 300C-35.
CONSTRUCTION: Mitsui, Japan, 1981.
PERFORMANCE: Water depth-250'; Drilling
depth-21,000'.
QUARTERS: 101 persons.
HULL: 219' x 200' x 24'.
VARIABLE LOAD: 2,600 st.
STORAGE: Mud & Cmt Bulk-9.000 cf; Liquid
Mud-2.400 bbl; Fuel-3, 158 bbl; Water for
Drilling-5,030 bbl; Potable Water-4,231 bbl.
DRILLING EQUIPMENT: Drawworks-GD 1500E,
2,000 hp; Pumps-two GD PZ11, 1,600 hp; Prime
movers-four Cat D-399, 1,250 hp each; Rotary
Table-37\l"; Top Drive-Varco TDS-3.
DERRICK: 147'; 1,330,000-lb GNC.
BOP SYSTEM: One 20" stack w/diverter and
2,000-psi annular; 13%", 10,000-psi stack w/annular, single and double ram.
CRANES: Three Fukishima. 45 t@ 24'.
MOORING: Four lines. 2, 100' of wire and 15.000lb anchor.
WORK AREA: West Africa.
TRIDENT 9
RIG DESIGN: MODEC; 400C
CONSTRUCTION: Mitsui Toyo VVorks, Japan, 1982.
PERFORMANCE: Water depth-400'; Drilling
depth-21,000'.
QUARTERS: 103 persons.
HULL: 250' x 246' x 29'.
VARIABLE LOAD: 2,694 st.
STORAGE: Mud & Cmt Bulk-9,600 cf; Liquid
Mud-2,400 bbl; Fuel-4,240 bbl; Water for
Drilling-9,800 bbl; Potable Water-4,000 bbl.
DRIWNG EQUIPMENT: Drawworks-Gardner Denver 1500 E; Pumps-two GD PZ 11; Prime mcversfour Cat D-399, 1,200 hp each; MDS system.
DERRICK: 147'; 1,330,000-lb GNC.
BOP SYSTEM: 131'", 10,000 psi.
CRANES: Fukushima 30C-45-13-4, 45 t@ 44'.
MOORING: 15,000-lb anchors.
WORK AREA: S.E Asia.
environment
CONSTRUCTION: Nippon Kokan K.K., Tsu Shipyard, Japan, 1982.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 88 persons.
HULL: 212' x 210' x 26'.
VARIABLE LOAD: 4,950 kips.
STORAGE: Mud & Cmt Bulk-7,500 cf; Liquid
Mud-1,400 bbl; Fuel-4,890 bbl; Water for
Drilling-5,270 bbl; Potable Water-1,490 bbl.
DRILLING EQUIPMENT: Drawworks-Oilwell E2000 Pumps-Oilwell PT-1700; Prime movers-five Cat. 0-399; Rotary Table-Oilwell 37:1o"
independent; Top Drive-Varco TIDS-3H.
DERRICK: Emsco RD-20 147'; 1,400,000 lb GNC.
BOP SYSTEM: One single, one double Shaffer NL
13%', 10,000 psi WP; One Hydril 13~' 5,000 psi
annular; One Hydril MSP 1,000, 30 x 1,000-psi
diverter; MOS system.
CRANES: One Baker Marine Corp. 900, 1oo
booms; three FMC 218A, 34 t@ 35'.
REMARKS: Formerly J.F.P. Three.
WORK AREA: South East Asia.
127
TRIDENT 16
Smedvig a.s.
TRIDENT 17
CONSTRUCTION: Mitsui Ocean Development &
Engineering Co., Japan, 1983.
BOP SYSTEM: One 21!4', 2,000 psi; one 13%',
10,000 psi.
OTHER DATA: Typical of Trident 15. Formeriy
Maersk Vanguard.
WORK AREA: South East Asia
TRIDENT 19
TRIDENT 14
RIG DESIGN: Baker Marine BMC 300, cantilever
CONSlRUCTION: Promet Pvt Lid., Singapore, 1982.
PERFORMANCE: Water depth-300'; Drilling
depth-20,000'.
QUARTERS: 92 persons.
HULL: 212'6' x 210' x 26'.
VARIABLE LOAD: 4, 750 kips.
HELIPORT: S-61.
STORAGE: Mud & Cmt Bulk-9,000 cf; Liquid
Mud-2,036 bbl; Fuel-5,596 bbl; Water for
Drilling-5,430 bbl; Potable Water-1,000 bbl.
DRILLING EQUIPMENT: Drawworks-Gardner
Denver 2100 E; Pumps-two Gardner Denver PZ
11 ; Prime movers-lour Cat. D-399 TA W & four
KATO 600 V 1500 KVA AC generators; Rotruy
Table-Gardner Denver 371>'; Top Drive.
DERRICK: Pyramid 147', 1,392,000 lb GNC.
BOP SYSTEM: One 29W, 500 psi diverter; One
21 W, 2,000 psi stack w/ 1 bag & 2 rams; One
13%', 10,000 psi stack w/ 1 bag & 3 rams; One 3',
10,000 psi choke manifold.
CRANES: Three Baker Marine Corp., 900, 100'
booms, 25 t.
REMARKS: Formerly Andros.
WORK AREA: West Africa.
TRIDENT 15
RIG DESIGN: Modec 300 C-38
CONSTRUCTION: Mitsui Ocean Development &
Engineering Co., Japan, 1982.
PERFORMANCE: Water depth-300'; Drilling
depth-25,000'.
QUARTERS: 82 persons.
HULL: 219'10' x 190'3' x 25'7'.
VARIABLE LOAD: 1,800 mt, plus 450 mt drill. load.
HELIPORT: 70' dia.
STORAGE: Mud & Cmt Bulk-9,000 cf; Liquid
Mud-2, 17 4 bbl; Water for Drilllng-5,367 bbl;
Potable Water-2,270 bbl.
DRILLING EQUIPMENT: Drawworks--Oilwell E2000; Pumps-two Oilwell A-1700 pt; Prime
movers-four Cat D-399 TA diesel; Rotary Tabl&Oilwell 49W; Pipe Handling Systern--jron Roughneck: Top Drive-Varco TDS-3.
DERRICK: Draco, 160', 1,000,000-lb hook load.
BOP SYSTEM: Regan diverter, 500 psi: One NL
Shaffer 5,000 psi; Two NL Shaffer 10,000 psi.
CRANES: One Nat'I OS 215: one Nat'I OS 435 hd.
REMARKS: Legs strengthened for moves w/full
leg length. Formerly Maersk Venturer.
WORK AREA: South East Asia.
128
Victory.
WORK AREA: Australia, S, E. Asia.
DHABI 2
WEST EPSILON
Shanghai Offshore
Petroleum Bureau
(CNSPC)
E.G. Thomson
(Bulk Carriers) Ltd.
BEN NEVIS
CONSTRUCTION: Scotland. Aquired by Odee(
1971. Modernized to cantilever 1985,
PERFORMANCE: Water depth-250'; Drillln(
depth-20,000',
QUARTERS: 72 persons.
HULL: 286' x 130' x 22'.
HELIPORT: 80' x 80'.
STORAGE: Mud & Cmt Bulk-<l,700 cf + 5,00(
sl<s; Liquid Mud-1,600 bbl; Fuel--9,900 bbl; Wais
for Drilling-3,470 bbl; Potable Water-7 40 bbl.
DRIWNG EQUIPMENT: Drawworks-Nat'l 132(
UE 2,200 hp; Pumps-two Nat'l 12-P-160 Triplex
1,600 hp; Prime movers-four Alco Mod. 12-25'
engines; Rotruy Table-Nat'! 37\i', 800 hp; Pip<
Handling System---&J Spintorc; Top Drive-Varcc
TDS-3.
DERRICK: 140', 1,000,000-lb hook load.
BOP SYSTEM: One Hydril GK, 13%', 5,000 psi
One single, one double, 13%', 10,000 psi.
CRANES: Three SeaKing w/100' booms.
TOWING REQUIREMENTS: Self-propelled, 8,000 hf'
REMARKS: Formerly Ocean 7ide.
WORK AREA: Gulf of Suez.
129
Semi-submersibles
Listings for this rig category continue to increase, with this
year's total up 18 units from one year ago, to 165 rigs. This
excludes those owned by companies of the Former Soviet
Union. The earlier rush to deep water, particularly in the
Gulf of Mexico, spurred contractors to both convert nondrilling units and build new semis. Even with the oil price
downturn, dayrates for 4th generation semis in late 1998 have
held up at $175,000+ in the Gulf of Mexico, and $190,000 or
higher in the North Sea, according to Offshore Data Services.
Notable addditions include six Amethyst newbuilds plus
one conversion for the Petrodrill (Pride-Foramer) group, to
work in Brazil. Ocean Rig ASA is building four new Bingo
9000 units; and Sedco Forex is adding three Express rigs to
its fleet. Newbuildings and acquisition of an FSU rig have
added one listing each to Global Marine, Noble, RB Falcon,
Ensco and Ilion LLC. One rig, the Spirit of Columbus, was
converted to non-drilling mode in Campos basin. Several
ownership changes are also reflected in the listings; and
the three largest contractors remain Diamond Offshore,
Sedco Forex and Transocean, with 30, 23 and 18 semisubmersibles, respectively.
According to the Offshore Rig Locator, 123 of 151 total
semis in the worldwide fleet were working in October; and
the competitive fleet of 135 rigs was 93% utilized. The North
Sea had 42 of its 48 units working; the U.S. Gulf, 26 of 34
rigs; Brazil 17 of 18; and West Africa, 13 of 14. S.E. Asia, the
Far East and Australia reported 11 of a total 19 rigs working;
two of seven rigs were active in the Caspian area.
Actinia Corp.
Atwood Oceanics
ATWOOD HUNTER
CONSTRUCTION: Alabama Maritime Corp.,
Mobile, Ala, 1981 (enhanced 1997).
PERFORMANCE: Water depth-3,500'; Drilling
depth-30,000'.
QUARTERS: 88 persons plus 5 bed hospital.
HUliL: 290' x 200' x 95'.
VARIABLE LOAD: 3,500 t.
HELIPORT: 83' x 83',
STORAGE: Mud & Cm! Bulk-10,000 ct+5,120
sks: Liquid Mud-2,782 bbl; Fue/-6,358 bbl:
Water tor Drilling-15,842 bbl; Potable Water1,040 bbl; Base Oi/-3,304 bbl.
DRILLING EQUIPMENT: DrawworkS-Ollwell E3000; Pumps-three Oilwell A-1700PT triplex:
Prime Movers-two EMD-16E-9, 3,070 hp; one
EMD-16E-8, 2,200 hp; Rotary Table-Qi/well A
49W; Top Drive-Varco TDS 4.
DERRICK: 185', 1,000,000 lb hook load capacity.
BOP SYSTEM: Two Shaffer 18W, 5,000 psi annular: Two Cameron "U" double 18*' 10,000 psi
Rams; Regan KFDH dlverter.
CRANES: One Link Belt APl-238A, 20 t One BMC
2250, 58 t with 140' booms.
MOORING: C.E. Skagrt winches wrth 7,000' of
3X' wire, 4,000' of 2*' chain.
WORK AREA: U.S. Gulf of Mexico.
ATWOOD FALCON
CONSTRUCTION: Alabama Maritime Corp ..
Mobile, Alabama, 1983; upgraded 1988.
QUARTERS: 88 persons.
HULL: 226' x 325'.
VARIABLE LOAD: 4,000 st.
STORAGE: Mud & Cm! Bu/k-10,000 cf & 5,120
sks; LiqukJ Mud-2,500 bbl; Fuel-6,432 bbl; Water
tor Drilling-16,906 bbl; Potable Water-1,621 bbl.
BOP SYSTEM: Regan KFDH diverter; two Shaffer
18Y." 5,000 annular; two Cameron U double 18W
10,000 rams.
CRANES: One BMC 2250 w/ 140' boom: one
Seatrax 8032 w/ 140' boom.
MOORING: Amc/yde combination mooring winches with 7,000' of 3W wire and 400' of 3" chain.
OTHER DATA: Same as Atwood Hunter.
WORK AREA: S.E. Asia.
Arcade Drilling as
BOP SYSTEM: Two Shaffer 18"', 5,000 psi annular; Two Cameron "U" double 18"' 10,000 rams;
Regan KFDH diverter.
CRANES: Two Unk Belt APl-238A, 50 t w/120'
booms.
131
QUARTERS: 90 persons.
HULL: 260' x 158' x 95'.
VARIABLE LOAD: 2,500 t.
HELIPORT: 75' octagonal.
STORAGE: Mud & Cmt Bulk-9,420 cf; Liquid
Mud-1,500 bbl; Fuel-5,030 bbl; Water for
Drilling--6,430 bbl; Potable Water-750 bbl.
DRILLING EQUIPMENT: Drawworks-Oilwell E2000; Pumps-Two Oilwell A-1700-PT; Prime
movers-Three EMD-16E8, one EMD-12EB; Rotary
Table-Nat'I 49U'; Top Drive-Nat'I Oilwell PS2.
DERRICK: 182'; 1,000,000-lb hook load.
BOP SYSTEM: Two Hydril 1BY<', 5,000 psi annulars; two Shaffer double 18.', 1O K; Regan 49:.
KFDJ diverters.
CRANES: One FMC 238 w/120' boom 20 t @
30'; Manitex ML4800 w/120' boom, 30 t@ 35'.
MOORING: Eight 7-tonne Stevpris anchors, eight
anchor lines 3,000 x 2W wire rope, plus eight
4,000' of 2ll' chain.
WORK AREA: Australia
Brasoil
PETROBRAS XVI
RIG DESIGN: UIE-CFEM; TH 2800.
CONSTRUCTION: Union lndustrialle de Entreprise,
France, 1984.
PERFORMANCE: Water Depth-1,500'; Drilling
Depth-25,000'.
QUARTERS: 100 persons.
HULL: 302' x 226' x 128'.
VARIABLE LOAD: 2,534 t.
HELIPORT: 75.4' x 65.6', 10 t; S-61.
STORAGE: Mud & Cmt Bulk-14,700 cf & 200-t
sl<s: Uquid Mud-2,516 bbl; Fuel-5,600 bbl; Wffier
for Drilling--14,466 bbl; Potable Water-7,095 bbl.
DRILLING EQUIPMENT: Drawworks-Oilwell E3000 w/ Baylor Elmagco 7838 brake system;
Pumps-Two Oilwell A-1700-PT, triplex; Prime
Movers-Three EMD 16-645-EB, 2,200 hp, 900
rpm; Rotary Table-Oilwell A 49W; Pipe Handling System-lamb LKG-2-26-18 BGM; Top
Drive-Varco TOS-4S.
DERRICK: Dreco 160' x 40' x 40'; 1,320,000 lb.
BOP SYSTEM: Shaffer 18.", 10,000 psi.
CRANES: Two American 9750, 60 t (24' radius).
MOORING: Eight LWT anchors, 37,000 lb; four
Skagit DMW 275 winches.
REMARKS: Managed by Braspetro Oil Services
Co.-Brasoil (subsidiary of Petrobras). Under contract with Cabinda Gulf Oil Co. Ltd.
WORK AREA: Angola.
PETROBRASX
132
PETROBRAS XVII
CONSTRUCTION: Compagnie Fran9ais D'Enterprise Metaliques, France, 1984.
PERFORMANCE: Water Oepth-2,300'.
QUARTERS: 120 persons.
STORAGE: Mud & Cmt Bulk-11,020 cf & 180-t
sks; Fuel-11,196 bbl; Water for Drilling--17,455
bbl; Potable Water-4, 107 bbl.
DRILLING EQUIPMENT Top Drive-Varco TDS-3.
DERRICK: Dreco 160' x 40' x 40'; 1,000,000 lb.
MOORING: Eight Danforth anchors. 37,000 lb;
four Skagit DMW 275 winches.
OTHER DATA: Typical Petrobras XVI.
WORK AREA: Campos basin. Brazil.
Diamond Offshore
Drilling, Inc.
OCEAN VALIANT
RIG DESIGN: Odyssey class
CONSTRUCTION: Hyundai; So. Korea, 1988.
PERFORMANCE: Water depth-5,000'.
OTIHER DATA: Same as Ocean America.
WORK AREA: North Sea/U.S, Gulf of Mexico.
Crosco Ltd.
OCEAN QUEST
RIG DESIGN: Fourth generation configuration,
Victory class.
CONSTRUCTION: Mitsubishi Heavy Industries,
Hiroshima, Japan, 1973; Upgraded 1996.
PERFORMANCE: Water depth-3,500'; Drilling
depth-25,000'.
QUARTERS: 83 persons.
HULL: 320' x 320'.
HELIPORT: 83' x 83', for S-61.
STORAGE: Mud & Cmt Bulk-12,000 cf; Sack
Storage-140 t; Liquid Mud-3. 100 bbl; Fuei6,972 bbl; Water for Drilling-7,420 bbl; Potable
Water-738 bbl; Completion Fluid-3,000 bbl;
Base Oil-3,000 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco C3
Type II, 3,000 hp; Pumps-Three Nat'l 12-P-160;
Prime movers-Five CAT 3516, 1,815 hp ea.;
Rotary Table-49W; Top Drive-Varco TDS-4S.
DERRICK: Pyramid 180' cantilever, 1,000,000 lb.
BOP SYSTEM: Two Hydril GX annulars 1BW',
10,000 psi; two Hydril doubles, 181'', 15,000 psi.
CRANES: Two Seatrax w/140' booms; one Clyde
CP-96, 11 O' boom.
MOORING: Four AmClyde dual traction winches;
3,000', 314' chain; 8,600 3W wire; Bruce 10 mt,
MK-4 anchors.
REMARKS: Formerly Ocean Kokuei.
WORK AREA: Gulf of Mexico.
ZAGREB I
RIG DESIGN: IFP-F. Neptune-Pentagone 91.
CONSTRUCTION: Dunkerque Shipyard, France,
1977.
PERFORMANCE: Water Depth-1,500'; Drilling
Depth-20,000'.
QUARTERS: 88 persons.
HULL: 326' x 338' x 341 '.
VARIABLE LOAD: 2,100 mt.
HELIPORT: Sikorsky S-61.
STORAGE: Mud & Cmt Bulk-12,000 cf & 3,229
cf sks; Liquid Mud-2,390 bbl; Fuei-5,057 bbl;
Water for Drilling-5,057 bbl; Potable Water3,434 bbl.
DRIWNG EQUIPMENT: Drawworks--Garcner Denver 3000 E: Pumps-Three Emsco triplex FB 1600;
Prime Movers-Five Cat. 3516 DI; Rotary TableNat'I C-495, 49W'; Top Drive-Varco TDS-4S.
DERRICK: UIE 185'; 1,045,000 lb.
BOP SYSTEM: 18.", 10 M Cameron w/ Regan
KFDS 49%' diverter.
CRANES: Two Haulotte Type H-450, one 30 t, 10 m
& 16 t, 16 m; two HaulotteType H-75, 10 t & 10 m.
MOORING: Ten 2%' lines, anchors wiring, w/ 1O
Slevin anchors. 12.5 mt each.
REMARKS: Contracted to Agip.
WORK AREA: Libya, Italy.
134
Countess.
WORK AREA: U.S. Gulf of Mexico.
OCEAN VICTORY
RIG DESIGN: V!ciocy class, 4th gen. configuration.
CONSTRUCTION: Avondale Shipyards, inc., New
Orleans, La, 1972; upgrade 1996.
PERFORMANCE: Water depth-5,000'; Drilling
depth-25,000'.
QUARTERS: 104 persons.
HULL: 323' x 266'.
VARIABLE LOAD: 5,000 It.
HELIPORT: Sikorsky S-61,
STORAGE: Mud & Cmt Bulk-13,800 cf; Liquid
Mud-3,100 bbl.; Fuel-6,900 bbl; Water for
Drilllng-14,341 bbl; Potable Water-810 bbl.
DRILLING EQUIPMENT: Drawworks-CE C-3,
3,000 hp; Pumps-Three CE FB1600; Prime
movers-Five CAT 3516, 1,815 hp ea.; Rotary
Table-Nat'! 49W.
DERRICK: Dreco180'; 1,400,000-lb boom load.
BOP SYSTEM: Two each Shaffer 18.', 15K SLX
doubles; two each Shaffer 18%', 10 K spherical.
CRANES: Three Seatrax, 140' boom.
MOORING: Eight Am Clyde CIW 350/52 windlass; eight, 8,800' 3%' wire; eight 4,200' 3X' chain;
10 mt Bruce anchors.
WORK AREA: Gulf of Mexico.
OCEAN BARONESS
RIG DESIGN: Victory class.
CONSTRUCTION: Avondale Shipyards, New
Orleans, 1973.
PERFORMANCE: Water depth-1,200'; Drilling
depth-25,000'.
QUARTERS: 82 persons.
HULL: 320' x 266' x 128'.
VARIABLE LOAD: 2,800 t.
HELIPORT: 83' x 83'.
STORAGE: Mud & Cmt Bulk-9,600 cf; Liquid
Mud-1,700 bbl; Fuel-6,942 bbl; Water for
Drilling-7,376 bbl; Potable Water--3,800 bbl.
DRIWNG EQUIPMENT: Oilwell E-3000; Pumpstwo Oilwell A-1700 PT; Prime movers-two EMD16645-E9, two EMD12-645-E9; Rotary Table-Oilwell
49%'; Top Drive-Maritime Hydraulics.
DERRICK: Pyramid 177'; 1,300,000 lb.
BOP SYSTEM: Shaffer 18%' 10,000 psi.
CRANES: One Aker hydraulic; one Manitowoc
40mt.
MOORING: 8 point, 3' chain.
REMARKS: Formerly Dan Baroness.
WORK AREA: Brazil.
OCEAN AMERICA
RIG DESIGN: Odyssey class
CONSTRUCTION: Hyundai, South Korea, 1988.
PERFORMANCE: Water depth-5,000'; Drilling
depth-30,000'.
QUARTERS: 102 persons.
HULL: 390' x 233'.
VARIABLE LOAD: 5,465 It, at 100 kt aper. criteria.
HELIPORT: 89' x 89'; Rated for Chinook, twin rotor.
STORAGE: Mud & Cmt Bulk-24.000 ft; Liquid
Mud-3,994 bbl; Base Oil-2,000 bbl: Fuel19, 173 bbl; Brine-2,000 bbl; Water for Drilling16,350 bbl; Potable Water-1,260 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco C-3
Type II, 3,500 hp; Pumps-Three Emsco FB-1600,
1, 750 hp; Prime movers-Six Wartsila Vasa 6R32
18, 120 hp; Rotary Table-Emsco 49!f", 800 hp;
Pipe Handling System-BJ racking arm & Varco
Iron Roughneck; Top Drive-Varco TDS-4S.
DERRICK: Branham, 185': 1.8 million lb static
hook load.
BOP SYSTEM: Two Cameron D annulars, 18W,
10,000 psi; Two Cameron T units, 18W, 15,000 psi.
CRANES: Three Nat'I. 435 w/120' booms.
TOWING REQUIREMENTS: Self-propelled by 4
x 2,700 hp propulsion units.
OCEAN STAR
RIG DESIGN: Fourth generation configuration,
Victory class. Upgrade 1996.
CONSTRUCTION: Avondale Shipyards, New
Orleans, 1974, upgrade 1996.
PERFORMANCE: Water Depth-4,500 ft; Drilling
Depth-25,000 ft.
QUARTERS: 102 persons.
HULL: 320' x 293'
VARIABLE LOAD: 5,100 It.
HELIPORT: 83' x 83' for S-61.
STORAGE: Mud & Cmt Bulk-18,100 cf; Sack
storage-8,000 sks; Liquid Mud-3,351 bbl;
Fuel-6,877 bbl; Water for Drilling-14,341 bbl;
Potable Water-815 bbl; Base Oii-3,265 bbl.
DRILLING EQUIPMENT: Drawworks-Oilwell E3000; Pumps-Three Nat'I 12-P160, 1,600 hp;
Prime movers-Two EMD 16-645 E9, Two EMD
12-645 E9-6; Rotary table-Nat'! 49!f"; Top
Drive-Varco TDS-4S.
DERRICK: Pyramid 177' cantilever.
BOP SYSTEM: Shaffer15 K.
venters, 18%.
CRANES: One Nat'/. w/120' boom; Two LinkBelt,
fwd w/120' boom, aft w/130' boom.
TOWING REQUIREMENTS: Two 3,500-hp propulsion units installed.
MOORING: Eight 40,000-lb anchors w/5,500' of
3W chain.
REMARKS: Three Thule VSM-100 shakers. Formerly owned by Odeco. Able to sit on seabed.
WORK AREA: West Africa/S.E. Asia/Australasia.
OCEAN PROSPECTOR
OCEAN ENDEAVOR
RIG DESIGN: Victory class
CONSTRUCTION: Transfield Pty. Ltd., Australia,
1975.
PERFORMANCE: Water depth-2,000'; Drilling
depth-25,000'.
QUARTERS: B2 persons, plus 3-man hospital.
HULL: 323' x 266'.
HELIPORT: B3' x B3'.
STORAGE: Mud & Cm! Bulk-9,600 cf+ 125 t
sack stg.; Liquid Mud-1.B30 bbl; Fuel-6,972
bbl; Water for Drllling-14,320 bbl; Potable
Water-3B4 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco C3; Pumps-Two Emsco FB-1300 triplex; Prime
movers-Four EMO S16-645-EB; Rotary TableEmsco 49W; 1,000 hp; Pipe Handling SystemBJ lower racking arm & Varco Iron Roughneck;
Top Drive-Varco TDS-4S.
DERRICK: 162'; 1.400.000-lb load capacity.
BOP SYSTEM: Two Hydril GL, 1BW, 5,000 psi
annulars; Two double Shaffer units, 1B7i", 5,000,
10,000 psi.
CRANES: Two Favco w/120' booms.
MOORING: Eight 30,000-lb anchors w/5,300' of 3"
chain each.
WORK AREA: Gulf of Mexico.
sion units.
MOORING: Eight 30,000-lb anchors w/5,200' of
2.M chain each.
WORK AREA: Gulf of Mexico.
OCEAN ROVER
RIG DESIGN: Victory class
CONSTRUCTION: Avondale Shipyards, Inc, 1973,
Modernized 19B5.
PERFORMANCE: Water depth-2,000': Drilling
depth-25.000'.
QUARTERS: 7B persons. plud 3-man hospital.
DRILLING EQUIPMENT: Drawworks-Emsco C-3;
Pumps-Two FB-1300 triplex; Prime moversFour EMOS 16-645-E1, 7,800 hp; Rotary TableNat'I 49W', 1,000 hp; Pipe Handling System-BJ
lower racking arm; Top Drive-Varco TDS-4.
DERRICK: 1B2'; 1,300,000-lb load capacity.
BOP SYSTEM: One Vetco 1Bo/.", 15,000 psi; Two
Hydril 1BW' 15,000 psi w/double MPL.
CRANES: Two Clyde, One 27 t, One 40 t w/120'
boom.
MOORING: Eight 30,000-lb anchors w/5,300' of 3'
136
radius.
MOORING: Eight Vicinay Offdrill 40,000-lb anchors
w/eight 2,250' 2." steel stud chain and eight
4,500' 2W wire rope. Four Skagit double-drum
wildcat windlasses rated @ 450,000-lb tension.
REMARKS: Formerly Zapata Concord, Arethusa
Concord.
WORK AREA: Gulf of Mexico.
OCEAN LEXINGTON
CONSTRUCTION: Avondale Shipyards, 1976.
PERFORMANCE: Water depth-2,500'.
REMARKS: Formerly Arethusa Lexington.
OTHER DATA: Same as Concord.
WORK AREA: Gulf of Mexico.
OCEAN SARATOGA
CONSTRUCTION: Avondale Shipyards, 1976.
VARIABLE LOAD: 2,B50 t.
REMARKS: Formerly Arethusa Saratoga.
OTHER DATA: Same as Concord, except 8 Bruce
anchors.
WORK AREA: Gulf of Mexico.
OCEAN YORKTOWN
CONSTRUCTION: Avondale Shipyards, 1976.
PERFORMANCE: Water depth-2,B50'.
DRIWNG EQUIPMENT: Top Drive-Varco. IDS-3.
REMARKS: Formerly Arethusa Yorktown.
OTHER DATA: Same as Concord.
WORK AREA: Brazil.
chain each.
OCEAN CONCORD
OCEAN AMBASSADOR
RIG DESIGN: Bethlehem; SS-2000
CONSTRUCTION: Bethlehem Steel Corp., Beaumont, Texas, 1975.
PERFORMANCE: Water depth-1, 100'.
QUARTERS: 74 persons, plus 3-man hospital.
HULL: 330' x 205' x 23'.
OCEAN EPOCH
RIG DESIGN: New Era class.
CONSIBUCTION: Alabama Drydock, Mobile, 1977.
PERFORMANCE: Water depth-1,200'; Drilling
depth-NIA.
QUARTERS: BB persons.
HULL: 290' x 200' x 95'.
VARIABLE LOAD: 1,575 It.
HELIPORT: B3' x B3'.
STORAGE: Mud & Cmt Bulk-9,200 cf; Liquid
Mud-1,548 bbl; Fuel-6,412 bbl; W3ter for
Drilling-15,B42 bbl; Potable Water-755 bbl.
DRIWNG EQUIPMENT: Drawworks--Oilwell E-3000:
Pumps-Two Oilwell A-1700-PT triplex; Prime
movers-Two EMO 16E-9 d.,,,.., 3,070 hp; one EMO
16E-8 diesel, 2,200 hp; Top Drive-Varco TDS-4.
DERRICK: 1B5', 1,000,000 lb.
BOP SYSTEM: Regan KFDH diverter; Two 1Bl''
5,000-psi annular; Two Cameron U double 1Bo/.'
10,000-psi ram.
CRANES: Two Link Belt ABS 238, 50 t w/120'
booms.
MOORING: Eight-point system w/4 Bendix Skagit dual windlasses w/4,800' of 27i' AP! stud link
chain & 10-t Stevpris anchors w/2 t ballast.
REMARKS: Formerly Diamond M Epoch. Bottom
sitting capability.
WORK AREA: N. W. Australia.
OCEAN GENERAL
RIG DESIGN: New Era class.
CONSIBUCTION: Alabama Drydock, Mobile, 1976.
PERFORMANCE: Water Oepth-1,500': Drilling
Depth-25,000'.
QUARTERS: 100 persons.
VARIABLE LOAD: 2,512 st.
BOP SYSTEM: Regan KFDH diverter: one 1BY."
5,000 psi ann.: two CIW U 1BY.' 10 K doubles.
sion units.
WORK AREA: West Africa.
OCEAN WINNER
OCEAN GUARDIAN
sen es
OCEAN YATZ'f
OCEAN PRINCESS
OCEAN LIBERATOR
RIG DESIGN: Aker H-3
CONSTRUCTION: Aker Group of Norway, 1974.
PERFORMANCE: Water depth-600': Drilling
depth-25.000'.
QUARTERS: 84 persons.
HULL: 355' x 221'
VARIABLE LOAD: 1.860 It.
HELIPORT: Octagonal 83' dia.
STORAGE: Mud & Cmt Bulk-17.360 cf ond
2.300 sq ft sks: Liquid Mud-1.657 bbl: Base
011-2.08<1 bbl: Bnne-2.084 bbl: Fuel-12.767
bbl; Water for Onllina-11.180 bbl; Potable
Water-3,466 bbl:.
-
anchors.
137
HELIPORT: S-61 .
STORAGE: Mud & Cmt Bulk-18,870 cf; Liquid
Mud-240 cu m; Fuel-2,297 cu m; Water for
Drilling-2,295 cum; Potable Water-53 cu m.
DRILLING EQUIPMENT: Drawworks-Emsco C3; Pumps-two Nat'! 14-P-220; Prime moversFour Wartsila 200 V12; Rotary Table-Emsco
T-4950; Top Drive-Varco TDS-4; Shaffer crownmounted compensator.
DERRICK: 160', 1,250,000 lb cap.
BOP SYSTEM: Cameron 18W, 10,000-psi.
CRANES: Two Aker, hydraulic.
MOORING: Twelve-point system.
REMARKS: Formerly Femstar. Operated by Dolphin Drilling Ltd.
WORK AREA: North Sea & Falklands.
BIDEFORD DOLPHIN
RIG DESIGN: Enhanced Aker H-3
CONSTRUCTION: Aker, Bergen, 1975. Being rebuilt
PERFORMANCE: Water depth-1,618'; Drilling
depth-20,000'.
QUARTERS: 88 persons.
HULL: 354' x 222' x 120'.
VARIABLE LOAD: 3,500 mt.
HELIPORT: S-61.
STORAGE: Mud & Cmt Bulk-17,800 cf; Liquid
Mud-240 cu m; Fuel-2,687 cu m; Water for
Drilling-2,280 cum; Potable Water-50 cu m.
DRILLING EQUIPMENT: Drilling Package-MH
RamRig (400 mt derrick); Pumps-Three Emsco
FA-1800.
BOP SYSTEM: Cameron 18l4", 10,000-psi.
REMARKS: Being rebuilt for long term contract in
Norway. Operated by Dolphin AS.
WORK AREA: Norway.
138
WORLD OIL
ENSCO 7500
!>F:CE.\IBER JW8
BORGSTEN DOLPHIN
BORGLAND DOLPHIN
ASTERIE
RIG DESIGN: Forex Neptune, Pentagone
CONSTRUCTION: C.F.E.M., Le Havre, France, 1974.
PERFORMANCE: Water depth-660'; Drilling
depth-20,000'.
QUARTERS: 74 persons.
HULL: 338' x 325' x 317'.
VARIABLE LOAD: 4,350 t.
HELIPORT: 6,461 sq ft; S-61 or Super Frelon.
STORAGE: Mud & Cmt Bulk-13,160 cf; Liquid
Mud-2,440 bbl; Water for Drilling-4,700 bbl;
Potable Water-2,440 bbl.
DR!WNG EQUIPMENT: Drawwork&-Gardner Denver, 3,000 CV; Pumps-Two Gardner Denver PZ
11, 1,600 CF each; Prime movers-Six Cat. 0-399.
DERRICK: 160', U.!.E.; base 36' x 36'; 1,000,000 lb.
CRANES: Two Richier G90, 120' boom, 40 t@
29W; Two Richier G80, 12 t @ 29%'.
DIVING EQUIPMENT: Sub Sea Oil Service, Fiveman system for 660'.
MOORING: Ten winches.
POSITIONING: Honeywell.
REMARKS: Formerly Offshore Drilling lnc.'s
Medusa (Pentagone 87).
WORK AREA: W. Africa.
Pacesetter
CONSTRUCTION: Rauma Repo!a Oy, Finland, 1983.
PERFORMANCE: Water depth-3,000'; Drilling
depth-25,000'.
QUARTERS: 106 persons.
HULL: 217' x 164' x 116'.
VARIABLE LOAD: 3.000 It.
HELIPORT: 85' x 87'.
Mexico.
GLOMAR ARTIC IV
RIG DESIGN: Friede & Goldman, L 907, Enhanced
Pacesetter
CONSTRUCTION: Daewoo Shipbuilding and
Heavy Machinery Ltd., Korea, 1983.
PERFORMANCE: Water depth-2,000': Drilling
depth-25,000'.
QUARTERS: 100 persons.
HULL: 280'8" x 206'8" x 116'.
HELIPORT: 89' x 73'.
STORAGE: Mud & Cmt Bulk-1,054 mt; Liquid
Mud-2,000 bbl: Fuel-1,550 mt: Water for
Drilling-3.210 mt; Potable Water-170 mt.
DRILLING EQUIPMENT: Drawworks-Nat'I. 1625
DE; Pumps-Nat'I. 12P 160; Prime movers-Four
Ruston 12RKCZ; Rotary Talble-Nat'I. C 495; Pipe
Handling System-B.J: Iron Roughneck-MH:
Top Drive-MH DOM 650 HY.
DERRICK: OSI 175', 1,400,000 lb hook load
capacity.
BOP SYSTEM: Cameron 183'4" x 15 m, annular, 4
Rams; certified for HP/HT work.
CRANES: Three Nat'I. OS-435, Caterpillar 3408
diesel engines.
MOORING: Four Norw1ncn type 2A-76-2 double
hydraulic winches. Eight point chain system 6,000'
3" Grade 4.
REMARKS: Formerly Benreoch and Stena Forth.
WORK AREA: North Sea.
140
JUTLANDER
RIG DESIGN: Friede & Goldman, L-907 Enhanced
Pacesetter
HAKURYU Ill
MATA REDONDA
HAKURYU V
Korea Petroleum
Development Corp.
MARINE 700
DOO SUNG
RIG DESIGN: Friede & Goldman, L-907 Enhanced
Pacesetter
CONSTRUCTION: Daewoo Shipbuilding Heavy
Machinery Ltd., Okpo, Korea, 1984.
PERFORMANCE: Water depth-1,500'; Drilling
depth-25,000'.
QUARTERS: 92 persons.
HULL: 295' x 228' x 116'.
VARIABLE LOAD: 3,067 It.
HELIPORT: Boeing Chinook 234.
STORAGE: Mud & Cmt Bulk-1,800 cf, 8,000
sks; Liquid M_ud-2,065 bbl; Fuel-9,300 bbl;
Water for Dnlling-17,000 bbl; Potable Water3,400 bbl.
DRILLING EQUIPMENT: Drawworks-One Oilwell E-3000; Pumps-Two Oilwell A-1700 pt;
.Prime movers-Four Wartsila 12V 22HF: Rotary
Table-One Oilwell A 49:<:; Pipe Handling System-Maritime Hydraulics; Top Drive-MH DDM650-HY.
DERRICK: Branham 160': 1,000,000 lb.
BOP SYSTEM: 18W 10,000 psi wp.
CRANES: Two 48 t w/120' boom: One 78 t w/80'
boom.
Marine Drilling
Companies, Inc.
KS Right Viking
TOR VIKING
RIG DESIGN: IFP Pentagone
CONSTRUCTION: Marathon LeTourneau, Brownsville. Texas: 1973
"l:'l'l:.\f/if.'/i /'''"
NOBLE-SHELF 6
Odfjell Drilling
Petrodrill (Pride-Foramer)
NOBLE-JIM THOMPSON
RIG DESIGN: Noble, EVA-4000.
CONSTRUCTION: Ingalls Shipbuilding Corp.,
Pascagoula, Miss., 1982. Ham Marine,
Pascagoula, Miss., 1999.
REMARKS: Formerly Transworld 72 and NobleJim Thompson submersible.
OTHER DATA: Typical of Noble-Paul Romano.
WORK AREA: Gulf of Mexico.
NOBLE-MAX SMITH
RIG DESIGN: Noble EVA-4000.
CONSTRUCTION: Chicago Bridge & Iron, Ingleside, Texas, 1980. Ham Marine, Pascagoula,
Miss., 1999.
REMARKS: Formerly Transworld 68 and NobleMax Smith submersible.
OTHER DATA: Typical of Noble-Paul Romano.
WORK AREA: Gulf of Mexico.
NOBLE-PAUL WOLFF
RIG DESIGN: Noble EVA-4000
CONSTRUCTION: Ingalls Shipbuilding Corp.,
Pascagoula, Miss. 1982. Upgraded 1988. TOI,
Sabine Pass, Texas, 1998.
PERFORMANCE: Water Depth-8,900'; Drilling
Depth-30,000'.
QUARTERS: 107 persons.
VARIABLE LOAD: 4,700 t.
HELIPORT: 83' octagonal.
STORAGE: Mud & Cm! Bulk-18,260 cf; Liquid
Mud-8,350 bbl; Fuel-20,000 bbl; Water for
Drilling-8,616 bbl; Potable Water-2,764 bbl.
DRILLING EQUIPMENT: Prime Movers-Seven
Cat. 3616@ 6,200-hp each.
CRANES: Two Dreco, 160' booms, 55 t@ 70'.
REMARKS: Formerly Transworld 70 and NoblePaul Wolff submersible.
MOORING: Dynamically positioned w/six 5,000hp thrusters DP Class II.
OTHER DATA: Typical of Noble-Paul Romano.
WORK AREA: Brazil.
NOBLE-AMOS RUNNER
RIG DESIGN: Noble EVA-4000.
CONSTRUCTION: Ingalls Shipbuilding Corp.,
Pascagoula, Miss., 1982. Upgraded 1998. Ham
Marine, Pascagoula, Miss., 1999.
PERFORMANCE: Water Depth--6,600'; Drilling
Oepth-30,000'
QUARTERS: 107 persons.
HULL: 328' x 297'.
HELIPORT: 71' x 50', S-61.
REMARKS: Formerly Transworld 76 and NobleAmos Runner submersible.
OTHER DATA: Typical of Noble-Paul Romano.
WORK AREA: Gulf of Mexico.
PHOTO NOT
AVAILABLE
NOBLE-HOMER FERRINGTON
RIG DESIGN: Friede & Goldman 9500 Enhanced
DEEPSEA BERGEN
BINGO 9000 1
RIG DESIGN: DNV IAI column-stabilized drilling
unit for deepwater and harsh environments.
CONSTRUCTION: Dalian New Shipyard, Friede
Goldman Offshore, to be delivered in late 1999.
PERFORMANCE: Water Depth--9,843'; Drilling
Depth-NIA.
QUARTERS: 120 persons.
HULL: 361' x 246' x 148'.
VARIABLE LOAD: 7,000 mt.
HELIPORT: N/A.
STORAGE: Cmt Bulk-14,410 cf; Barite/Bentonite-13,350 cf; Liquid Mud---11,650 bbl; Fuel-26, 140 bbl; Water for Drilling--13,210 bbl; Potable
Water--4,070 bbl.
DRILLING EQUIPMENT: Drawworks--Continental
Emsco Electrohoist Ill, 3,000 hp; Pumps-Three
Continental Emsco FC-2200, 2,200 hp, 7,500 psi
(additional dedicated pump for riser boost); Prime
Movers-Six Wartsila Vasa 18V32, 7,500 kW.
10,200 hp, low No, diesel engines; six ABB ASG
900 XUB generators, 7 ,300 kW/9, 125 kVA; Rotary
Table-Varco BJ RST 60lf', 1,000 mt; Pipe Handling System-Hydralift Hydra-Racker, Iron
Roughneck; Top Drive-Hydralitt HPS 750 2E,
electric drive (AC).
DERRICK: Hydralift 170', 40' x 40'.
BOP SYSTEM: Cameron 183", 15k H2S services
CRANES: Two Hydrallft WOMCVC 3447, 75 mt@
16.5m.
MOORING: Four Ulstein Brattvag single drum
windlasses, 84-mm chain, (can be upgraded to
eight-point mooring system).
WORK AREA: N/A.
ancnors.
waters.
AMETHYST IV
BINGO 9000 3
DEEPSEA TRYM
BINGO 9000 4
RIG DESIGN: DNV IAI column-stabilized drilling
unit for deepwater and harsh environments.
CONSTRUCTION: Dalian New Shipyard, Friede
Goldman Offshore, to be delivered in late 1999.
OTHER DATA: Typical of Bingo 9000 1.
AMETHYST Ill
BINGO 9000 2
Pacesetter
AMETHYSTV
RIG DESIGN: Self propelled, semi-submersibie
Class OU 100A + LMC. UMS DP
CONSTRUCTION: Daewoo, TOI-Halter, projected
completion 1999-2000.
OTHER DATA: Typical of Amethyst fl.
WORK AREA: Brazil (Petrobras).
AMETHYST VI
RIG DESIGN: Self propelled, semi-submersible
Class OU 100A + LMC, UMS DP
CONSTRUCTION: Daewoo, TOI-Halter, projected
completion 1999-2000.
OTHER DATA: Typical of Amethyst fl.
WORK AREA: Brazil (Petrobras).
, AMETHYST VII
RIG DESIGN: Self propelled, semi-submersible
Class OU 100A + LMC, UMS DP
CONSTRUCTION: Daewoo. TOI-Halter. projected
completion 1999-2000.
OTHER DATA: Typical of Amethyst II.
WORK AREA: Brazil (Petrobras).
WORLDOIL!DECEMBE/i/"48
143
AMETHYST I
RIG DESIGN: Self propelled, semisubmersible
Class OU 1OOA + LMC, UMS DP
CONSTRUC110N: B.V. Scheepswerf De Hoop, 1987.
PERFORMANCE: Water Depth-3,280'; Drilling
Depth-16.400'.
QUARTERS: 124 persons.
HULL: 254.2' x 200. 7' x 68.7'.
VARIABLE LOAD: 1,355 mt w/GM 1.80 MTR.
HELIPORT: Designed for helicopter up to 72.8';
S-61N.
STORAGE: Mud & Cmt. Bulk-2,000 sks; Liquid
Mud-2,280 bbl; Fuel-6,250 bbl; Water for
Drilling-1,250 bbl; Potable Water-1,250 bbl;
Completion Fluld-2,280 bbl.
DRILLING EQUIPMENT: Drawworks-Oilwell
760E Pumps-Two Continental Emsco F 1000,
1 000 @ 140 spm; Prime Movers-Six M.A.N.
12V25/30 @ 2.400 kW each; Rotary Table--Oilwell
A 49 1/2; Top Drive-Canrig AC 1165 E.
DERRICK: Bailey 14 7' clear height; 950,000-lb
gross nominal capacity.
BOP SYSTEM: 16Y.-, 5,000 psi, Cameron single
and double ram; Shaffer annular.
CRANES: Two Huisman-30 t@ 95'.
MOORING: Two Bratvaag 170 t, 65 t with 2 ",
2,200 M anchor lines.
WORK AREA: Brazil (Petrobras).
144 WORLD
Queiroz Galvao
Perfuracoes S.A.
ATLANTIC STAR
JIM CUNNINGHAM
FALCON 100
RIG DESIGN: Friede & Goldman Pacesetter
CONSTRUCTION: Avondale Shipyards, Inc., New
Orleans, La, 197 4.
PERFORMANCE: Water depth-2,500'; Drilling
depth-25,000'.
QUARTERS: 114 persons.
HULL: 260' x 190' x 111'.
VARIABLE LOAD: 3,000 t.
HELIPORT: S-61.
STORAGE: Mud & Cmt Bulk-9,000 cf & 6,000
sks: Drilling Mud-1.710 bbl: Fuel-6,958 bbl;
Potable Water-1,322 bbl; Ballast-46,616 bbl.
DRILLING EQUIPMENT: Drawworks-Continental
Emsco C-3 Type II; Pumps-Two Continental
Emsco FB-1600 with FA upgrade: Top Drive-Varco TDS-4S.
DERRICK: 152'; 1,000,000 lb.
BOP SYSTEM: CIW 15,000 psi.
CRANES: Three Anclyde. each rated at 108,000
lb: two Lee C. Moore, rated at 100-t each.
TOWING REQUIREMENTS: Self-propelled. 6,000
hp.
MOORING: Eight 8 mt Stevpris anchors.
REMARKS: Formerly Western Pacesetter Ill and
Pacesetter Ill.
WORK AREA: Idle.
JACK BATES
RIG DESIGN: Friece & Goldman L-1020 Trendsetter
CONSTRUCTION: lshikawajima-Harima Heavy
Ind., 1986, upgrade 1996.
PERFORMANCE: Water depth-5,400'; Drilling
depth-30,000'.
QUARTERS: 120 persons.
HULL: 370' x 255' x 140'.
VARIABLE LOAD: 6, 114 It.
HELIPORT: S-61.
STORAGE: Mud & Cmt Bulk-29, 760 cf+ 10,000
sks; Liquid Mud-4,000 bbl; F~6.109 bbl; Water
for Drilling-21,000 bbl; Potable Water-3,500 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco C3, 3,000 hp; Pumps-Three Oilwell A1700PT;
Prime movers-Two Wartsila 12V32 + two Wartsila
8R32; Pipe Handling System-Maritime
Hydraulics; Top Drive-Varco TDS4H.
DERRICK: 185'; 2,000,000 lb.
BOP SYSTEM: 18*' 15,000 psi.
CRANES: Two Liebherr, 120' booms, 50 t; one
Landel gantry, 30 t.
MOORING: Eight point 10,000' 95 mm wire &
3,000' 90 mm ORO chain; 15 mt Bruce anchors.
REMARKS: Formerly Zane Barnes.
WORK AREA: North Sea.
J. W. MCCLEAN
RIG DESIGN: Zapata, SS-3000.
CONSTRUCTION: Bethlehem Steel, Beaumont,
Texas; 1974. Upgraded 1991-2 and 1996.
PERFORMANCE: Water depth-1,250'; Drilling
depth-25,000'.
QUARTERS: 94 persons.
HULL: 367' x 210' x 140'.
VARIABLE LOAD: 3,968 t.
HELIPORT: 83' dia, S-61.
STORAGE: Mud & Cmt Bulk-20,700 cf & 4,000
sks; Liquid Mud-3,178 bbl; Fuel-10,000 bbl; Water
for Drilling-8,000 bbl; Potable Water-2, 700 bbl.
DRIWNG EQUIPMENT: Drawworks-OW E-3000,
2,000 hp; Pumps-Two OWS 1700 PT triplex;
Prime movers-Four GM Model 16-645-EB, 8,000
hp; Rotary Table-Oilwell A-495; Pipe Handling
System-BJ Hughes: Top Drive-Varco TDS-4S
with PIT 85 and RBS; Hi Torque GE 752 motor.
DERRICK: LCM 180', 1,300,000 GNC.
BOP SYSTEM: Cameron 18*', 10,000 psi stack,
15,000 psi C&K system.
CRANES: Two Nat'I. Marine; 41t@25'.
MOORING: Tan 4,000 lengths 3" chain; 15 mt
Stevpris anchors.
REMARKS: Formerly Zapata Ugland, Treasure
Driller. Eddie Delahoussaye (MOPU) and Rig 42.
WORK AREA: North Sea.
146
WORLD OIL
DECDlllER /'!'!8
DRILLING EQUIPMENT: Drawworks--Nat'I 1625DE: Pumps-Two Nat'l 12-P-160: Prime movers-Four Bergen diesels: Rotary Table-Nat'I C495;
Top Drive-Varco TDS-4H.
DERRICK: Emsco 185'; 1,000,000 GNC.
BOP SYSTEM: 18*", 10,000 psi.
CRANES: One Nat'I OS-435, 150' boom, 52 t @
30'; one Seatrax 6032, 150' boom, 56 t@ 40'.
MOORING: Eight point, comb. 5,000' x 3' ORO,
5,000' 3' wire.
REMARKS: Formerly Atlantic 1, Benvrackie and
Rig41.
WORK AREA: Gulf of Mexico.
RBSSD
RIG DESIGN: Reading & Bates/IHI; ultradeepwater 5"' generation.
CONSTRUCTION: Hyundai Heavy Industries,
Korea, 2000.
HULL: 396' x 256' x 28'.
VARIABLE LOAD: 8,820 t.
REMARKS: Other data typical of RBSBM. Special
DP system for exploration work.
MOORING: Dynamic Positioning-8 x 5,000 kW
thrusters, DP-3 class., 6 x 7,000 kW AC generators, 6 engine rooms/switchboards. Optional provision to install 8-point chain or wire system.
WORK AREA: NIA.
HELIPORT: 25 m x 25 m, S-61.
STORAGE: Mud & Cmt Bulk-17 ,360 cf + 2,200
sq ft sks; Liquid Mud-1,857 bbl; Fuel-13,700
bbl: Water for Drilllng-11,000 bbl; Potable
Water-3,400 bbl.
DRILLING EQUIPMENT: Drawworks-Gardner
Denver 3000E, 3,000 hp; Pumps-three GD PZ-11
triplex, 1,600 hp; Prime Movers-Four Bergen
KVGB-12, 2,200 hp; Rotary Table-Oilwell type A,
49W; Pipe Handling System-MH wNMW lower
arm: Top Drive-Varco TDS-4S w/RBS backup.
DERRICK: Emsco 185' x 40' x 40', 1,000,000 lb.
BOP SYSTEM: 18*" x 10 K, subsea stack.
CRANES: One Aker hyd., 40 t@ 40', one Seatrax
6020.
REMARKS: Formerly Treasure Searcher. Managed by Sedco Forex.
MOORING: Conventional.
WORK AREA: Eastern Canada.
Rowan Companies
Saipem
SCARABEO 4
PERFORMANCE: Water depth-1.800'; Drilling
depth-25,000'.
CRANES: One Manrtex ML 4800, 36 t@ 50'; One
Unit Mariner 26 t@ 20': One Nat'I. 77 t@ 30'.
OTHER DATA: Same as Scarabeo 3.
WORK AREA: West Africa.
Santa Fe
International Corp.
RIG 140
CONSTRUCTION: Daewoo Shipbuilding & Heavy
Machinery Ltd., Okpo, South Korea, 1983.
PERFORMANCE: Water depth-2,400'.
HULL: 285' x 231' x 116'.
STORAGE: Mud & Cmt Bulk-18,050 cf.
DRILLING EQUIPMENT: Top Drive-Varco TDS4H (Two speed).
BOP SYSTEM: 18W, 15,000 psi.
MOORING: Comb., 7,000', 31" wire, 245', 41"
chain; 45,000 lb Delta Flipper anchor.
OTHER DATA: Typical Rig 135.
WORK AREA: Gulf of Mexico.
~~~~}~~";;,Uebherr, two 30 t
20 m; one
Sedco Forex
ALEUTIAN KEY
SCARABEO 6
RIG DESIGN: Friede and Goldman L-907.
Enhanced Pacesetter.
CONSTRUCTION: Rauma Repola Oy, Fir>and, 1984.
PERFORMANCE: Water depth-3,281 '; Drilling
depth-25,000'.
QUARTERS: 93 persons.
HULL: 260' x 208' x 116'.
VARIABLE LOAD: 3,650 mt.
HELIPORT: 85' x 87'.
STORAGE: Mud & Cmt Bulk-15,250 cf; Liquid
Mud-2, 150 bbl; Fuel-9,845 bbl; Water for
Drilling-13,760 bbl; Potable Water-1,670 bbl;
Base Oil -2,150 bbl.
DRILLING EQUIPMENT: Drawworks-Oilwell E3000; Pumps-Three Oilwell A-1700; Prime
movers-Four EMO diesels; Rotary Table-Oilwell
49W'; Top Drive-MH DDM-650; high torque; Top
Crown compensator, MH Angle CBS 270-20; Pipe
handling-MH 7767C.
DERRICK: 160'; 1,800.000-lb static hook load.
BOP SYSTEM: One 18l'." spherical, 10,000 psi;
two 18Ji:', 15,000 psi doubles; one 18', 15,000 psi
HC well connector.
CRANES: Two 120' boom, 70 mt; One 80' boom,
80mt.
MOORING: Eight 26,500-lb anchors; eight 5, 100'
of 3" chain, NV K4.
REMARKS: Formerly Maersk Highlander.
WORK AREA: North Sea (Norway).
PHOTO NOT
AVAILABLE
SCARABEO 7
A CTI NIA
RIG DESIGN: Friede & Goldman Enhanced
Pacesetter.
CONSTRUCTION: Hitachi Zosen, Ariake Works,
Japan, 1982.
PERFORMANCE: Water depth-1,500'; Drilling
depth-25,000'.
QUARTERS: 96 persons.
HULL: 82.30 x 50.96 x 35.6 m.
VARIABLE LOAD: 3,200 mt.
HELIPORT: 25 x 25 m.
STORAGE: Mud & Cm! Bulk-16,000 cf; Liquid
Mud-400 cu m; Water for Drilllng-1,540 cu m:
Potable Water-500 cu m.
DRILLING EQUIPMENT: Drawworks-Nat'I. 1625
DE; Pumps-Nat'!. 12-P-150 triplex; Prime
movers-Two EMO 12645 E9, Two E-8; Rotary
Table-Nat' I. C-495 ;Top Drive-Varco TDS 4H.
DERRICK: J. Paris 160', 1,000,000 lb static load.
BOP SYSTEM: Two Cameron double U 18%'
10,000 psi.
CRANES: Three Nat'I. 75 t@ 90'; 45 t@ 100'; 70 t
@120'.
MOORING: Four Brissonneau-Lotz double windlasses for 3 chain.
WORK AREA: Southeast Asia.
SEDCO 601
RIG DESIGN: Earl & Wright Sedco 600
CONSTRUCTION: Promet Private Ltd., Singapore,
1983.
PERFORMANCE: Water depth-1,800'; Drilling
depth-21,000'.
DRILLING EQUIPMENT: Top Drive-TDS-4H.
OTHER DATA: Typical of Sedco 600.
WORK AREA: Sou1heast Asia.
RIG 135
RIG DESIGN: Friede & Goldman 9500 series
Enhanced Pacesetter
CONSTRUCTION: Daewoo Shipbuilding & Heavy
Machinery Ltd., Okpo, Korea, 1983.
PERFORMANCE: Water depth-2,800'; Drilling
depth-25,000'.
QUARTERS: 96 persons.
HULL: 270' x 203' x 116'.
VARIABLE LOAD: 4,000 t.
HELIPORT: 93' x 93'.
STORAGE: Mud & Cmt Bulk-18,991 cf; Liquid
Mud-4,000 bbl; Base Oil-2,000 bbl; Fuel6,300 bbl; Brine--2,000 bbl; Water for Drilling16, 138 bbl; Potable Water-10,000 gal;.
DRILLING EQUIPMENT: Drawworks-3,000 hp;
Pumps-Three Oilwell A 1700 PT; Top DriveVarco TDS-5H.
DERRICK: 180', 1,500,000 lb hook load.
BOP SYSTEM: 18W, 10,000psi; 13%" 15,000psi.
MOORING: Eight 45,000 lb anchors.
OTHER DATA: Propulsion assist.
WORK AREA: North Sea.
147
SEDNETH 701
RIG DESIGN: Earl & Wright Sedco 700
CONSTRUCTION: Built in Halifax, 1973.
PERFORMANCE: Water depth-1,500'; Drilling
depth-25,000'.
QUARTERS: 99 persons,
HULL: 295' x 245' x 130'.
HELIPORT: Boeing. 234; Chinook; S-61.
STORAGE: Mud & Cmt Bulk-17,325 cf; Liquid
Mud-5,050 bbl; Fuel-6,627 bbl; Water for
Drilling-B,700 bbl; Potable Water-1,335 bbl.
DRIWNG EQUIPMENT: Drawworks-OWS E3000;
Pumps-Three OWC 1700 PT; Prime movers-3
EMO AD 16-645E9, 8,625 hp ttl; Rotary Table-OW 49li"; Top Drive-Varco TDS-4S.
DERRICK: L.C. Moore. 160', 1,330,000 lb GNC.
BOP SYSTEM: Hydril 18l'", 15,000 psi wp; two
doubles, one NL Shaffer 21 X'', 5,000-psi annular.
CRANES: Two Nat'!. 55 t@ 30'.
MOORING: Eight 4,500', 3' chain and 30,000-lb
anchors.
POSmONING: Thrusters-4, Baylor, 1,600 hp each.
SEA STATE: Operating-BO'; Survival-70'-90'.
WORK AREA: West Africa.
SEDCO 707
SEDCO 709
RIG DESIGN: Earl & Wright Sedco 700 series
CONSTRUCTION: Hawker Siddley, Halifax, 1977.
PERFORMANCE: Water depth-6,000'; Drilling
depth-25,000'.
HULL: 295' x 245' x 112'.
VARIABLE LOAD: 2,950 t.
STORAGE: Mud & Cmt Bulk-21,680 cf; Liquid
Mud-4,282 bbl; Fuel-12,393 bbl; Water for
Drilling-5,808 bbl; Potable Water-1, 189 bbl.
DRILLING EQUIPMENT: Prime movers-8-EMD
MD 645E, total 27,150 hp.
BOP SYSTEM: CIW 13%", 15,000 psi, two double;
CIW 16.", 10,000 psi, two double.
MOORING: Dynamically stationed.
POSITIONING: Eight 3,000-hp thrusters,
OTHER DATA: Typical of Sedco 700.
WORK AREA: West Africa.
SOVEREIGN EXPLORER
RIG DESIGN: GVA 4000
CONSTRUCTION: Gammell Laird, UK, 1984.
PERFORMANCE: Water depth-3,500'; Drilling
depih-25,000'.
QUARTERS: 100 persons.
HULL: 308' x 246' x 134'.
VARIABLE LOAD: 3,900 t.
HELIPORT: Octagonal 83'.
STORAGE: Mud & Cmt Bulk-23,920 cf; Liquid
Mud-2,300 bbl; Fuee---2,400 cu m; Water for
Drilling-2,800 cum; Potable Water-380 cum,
DRILLING EQUIPMENT: Drawworks-Nat'I. 1625,
3,000 hp; Pumps-Three Nat'I. 12-P-160; Prime
movers-Four Nohab 7,200 kW; Rotary TableNat'I. C-495; Top Drive-Varco TOS-4; Pipe Handling System-BJ automatic drilling system.
DERRICK: 190'; 1,400,000 lb hook load.
BOP SYSTEM: NL-Shaffer 18.", 15,000 psi.
CRANES: Two Mann. Bectro-Hydraulic, 55 t @66'.
DIVING EQUIPMENT: ROV by Sub Sea.
MOORING: Eight Hepburn winches w/3' chain &
3W wire rope,
REMARKS: Former owner Dow Chemical Co.
(Reading & Bates). HPHT equipped.
WORK AREA: North Sea,
SEDCO 712
SEDCO 714
SEDCO 703
SEDCO 710
SEDCO 711
RIG DESIGN: Earl & Wright Sedco 711
CONSTRUCTION: Hyundai Heavy Industries,
Ulsan, Korea, 1982.
PERFORMANCE: Water depth-2,000'; Drilling
depth-25,000'.
QUARTERS: 100 persons.
HULL: 295' x 249' x 130',
VARIABLE LOAD: 3,900 t.
HELIPORT: 89' x 74', Boeing B234, Chinook &
Sikorsky,
STORAGE: Mud & Cmt Bulk-18,720 cf; Liquid
Mud-1,962 bbl; Fuel-7,442 bbl; Water for
Drilling-9,484 bbl; Potable Water-1,286 bbl,
DRILLING EQUIPMENT: Drawworks-Oilwell
3000; Pumps-Three EMSCO 1600 FB; Prime
movers-3 EMO MD 645, total 9,960 hp; Rotary
T~ble--OW 49~'; Top Drive-Varco; Pipe Handling System-VMW racking arm.
DERRICK: Dreco 185', 1,300 kips GNC.
BOP SYSTEM: 21 X" 5,000 psi and 13%' 15 000
psi Cameron.
'
CRANES: Bucyrus Erie MK 100, 68 t@ 30'.
MOORING: 8-5,500', 3" chain, 45,000 lb anchors.
POSITIONING: Four 1,600-hp thrusters.
WORK AREA: North Sea.
148
SEDCO 708
RIG DESIGN: Earl & Wright Sedco 700 series
CONSTRUCTION: Kaiser Steel; California, 1977.
PERFORMANCE: Water depth-2,000'; Drilling
depth-25,000'.
STORAGE: Mud & Cm! Bulk-15,630 ct. Water for
Drflling-12,660 bbl.
DRILLING EQUIPMENT: Top Drive--TDS-4H.
OTHER DATA: Typical of Sedco 700.
WORK AREA: West Africa.
SEDCO 702
QUARTERS: 96 persons.
HULL: 355' x 221' x 120'.
VARIABLE LOAD: 2,400 It.
HELIPORT: Certified for S-61.
STORAGE: Mud & Cmt Bulk-17,360 & 350 It;
Liquid Mud-400 It; Fuel-2,200 It; Water for
Dnllmg-1,480 It; Potable Water-570 It.
DRILLING EQUIPMENT: N/A; Top Drive--MH
DDM-650-H.
MOORING: Eight 76 mm ORO chains each
4,100',
SEDCO ENERGY
RIG DESIGN: Sedco Express
CONSTRUCTION: DCN, France; to be completed
1999.
BOP SYSTEM: Cameron 18%", 15,000 psi; two
5,000 psi annular; four 15,000 psi rams.
RISER TENSIONERS: 12 doubles total 2.4 MM lb;
risers-Vetco MR10.
OTHER DATA: Typical of Sedco Express.
WORK AREA: Gulf of Mexico.
CAJUN EXPRESS
RIG DESIGN: Sedco Express
CONSTRUCTION: Promet, Singapore; to be completed in 2000.
PERFORMANCE: Water Depth-8,500' (working);
Drilling Depth-35,000'.
DRILLING EQUIPMENT: Pumps-Four Nat'l
140P-220, 2,200 hp, 7,500 psi; Prime MoversSeven Cat. 3616 (4.4 MW each).
BOP SYSTEM: Cameron 18Y.', 15,000 psi; two
5,000 psi annular; four 15,000 psi rams.
RISER TENSIONERS: 16 doubles, total 3.2 MM lb;
Riser-Vetco MR1 o.
MOORING SYSTEM: Eight winches, 600 MT Stall,
300 MT holding capacities
OTHER DATA: Typical of Sedco Express.
REMARKS: Rig is equipped with four Mermaid
pod thrustera, 7 MW each. Capable of travel up to
12 kt.
WORK AREA: Gulf of Mexico.
Smedvig a.s.
WEST DELTA
RIG DESIGN: Modified Ocean Ranger
f~~~TRUCTION: Rauma Repola, 1981; upgrade
WEST VANGUARD
STENA DEE
RIG DESIGN: Mitsubishi; MD 602
CONSTRUCTION: Mitsubishi Heavy Industries.
Hiroshima Shipyard, Japan, 1984.
PERFORMANCE: Water depth-1,500'; Drilling
depth-25,000'.
QUARTERS: 98 persons.
HULL: 367' x 223' x 112'.
VARIABLE LOAD: 2,800 mt.
HELIPORT: Chinook & Sikorsky S-61.
STORAGE: Mud & Cmt Bulk-21,200 cf; Liquid
Mud-3,094 bbl; Fuel-9,430 bbl; Water for
Drilling-10,611 bbl; Potable Water-2,516 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco 300
hp; Pumps-Three Emsco FB-1600 triplex; Prime
movers-Two 4-stroke diesels, 3,060 bhp ea.+
two 4-stroke 4,060 bhp diesel; Pipe Handling
System-MH 1988 Iron Roughneck, automatic;
Top Drive-MH DDM 650; MH active heave comp.
DERRICK: Maritime Hydraulics, 180'; 1,250,000lb static hook load.
~~~,~~STEM: Cameron 18Y.', 15,000 psi, Two
STENA DON
WEST FUTURE II
WEST ALPHA
RIG DESIGN: Ultra Yatzy
CONSTRUCTION: NKK, Japan, 1986.
PERFORMANCE: Water depth-2,500'; Drilling
depth-25,000'.
QUARTERS: 100 persons.
HULL: 89 m x 70 m x 33.5 m.
VARIABLE LOAD: 5,000 mt.
HELIPORT: Suitable for S-61.
STORAGE: Mud & Cmt Bulk-558 cu m +5,000
sacks; Liquid Mud-467 cum; Fuel-1,278 cu m;
Water for Drilling-932 cu m: Potable Water424 cu m; Oil Base Mud-285 cm.
DRILLING EQUIPMENT: Drawworks-Wirth GH
3000E; Pumps-Three Wirth TPK7; Prime
movers-Six Hedemora, 17,538 bhp total; Rotary
Table-Wirth RTSS 495: Pipe Handling SystemMH; Top Drive-MH DDM 650.
DERRICK: MH 174', 1,300,000-lb hook load;
Active crown block motion compensator.
BOP SYSTEM: Cameron 18%", 15,000 psi.
CRANES: Two Brattvaag, 55 mt.
MOORING: Eight point, 9-t Bruce anchors, 76
mm x 2,000 m K4 chains.
REMARKS: Formerly Dyvi Alpha.
OTHER DATA: Fully winterized.
WORK AREA: North Sea.
RIG DESIGN: CS 30
CONSTRUCTION: Kvaerner Warnow, Restock;
to be completed 2001 .
PERFORMANCE: Water Depth-1,650'; Drilling
Depth-30,000'.
QUARTERS: 102 persons.
HULL 253' x 220'.
VARIABLE LOAD: 3,700 t.
HELIPORT: 90' dia, EH 102.
STORAGE: Mud & Cmt-71 0 mt, bulk-580 cm;
Liquid Mud-2,439 bbl; Fuel-17,090 bbl; Water
for Drilling-5,600 bbl; Potable Water-3, 192 bbl;
Completion Fluid-4,706 bbl.
DRILLING EQUIPMENT: Drawworks-Hydraulic
ram rig; Pumps-Two Continental Emsco FC2200 hp, 9' x 15"; Prime Movers-Nine@ 3,500
kW; Rotary table-49W; Pipe Handling SystemHydralift Hydra racker; Top Drive-Two-speed
HydraliftAC.
DERRICK: Hydralift ram rig.'
BOP SYSTEM: Cameron 15,000 psi.
CRANES: Hydralift knuckle boom.
MOORING: Dynamic positioning system DNV
"Dynpos."
WORK AREA: Worldwide operation; environmental conditions like North Sea.
STENA CLYDE
RIG DESIGN: Aker H-3
CONSTRUCTION: Rauma Repola Oy, Pori, Finland, 1977.
PERFORMANCE: Water depth-1,6fi0'; Drillin('
depth-25,000'.
QUARTERS: 100 persons.
HULL: 355' x 221' x 120'.
VARIABLE LOAD: 3,220 mt.
HELIPORT: 86' x 86'.
STORAGE: Mud & Cmt Bulk-17,360 cf; Cmt2,300 sq. ft; Liquid Mud-2,786 bbl; Fuel-16,90C
bbl; Water for Drilling-14,400 bbl; Potable
Water-3,500 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'I. 162:
DE; Pumps-Nat'!. 12-P160; Prime movers-Fou
Ruston 12-RKCZ; Rotary Table-Nat'I. C-495
49W; Top Drlve-MH DDM 500 DC.
DERRICK: Pyramid 160', 1,200.000 lb cap.
BOP SYSTEM: CIW 18Y.", 15 K.
CRANES: Two Nat'I. 435.
TOWING REQUIREMENTS: Two 3.400-hp propu
sion units.
MOORING: Eight 30,000-lb anchors w/4.000 ft c
3" chain.
TRANSOCEAN 97
RIG DESIGN: Pentagone 86, column stabilized.
propulsion assisted.
CONSTRUCTION: Rauma Repola Oy Pori Finland, 1997.
'
'
QUARTERS: 94 persons.
VARIABLE LOAD: 2, 100 mt.
HELIPORT: 72' x 81 '; S-61.
STORAGE: Mud & Cmt. Bulk-14,488 cf Fuel5,090 bbl; Water for Drilling--5,030 bbl; Potable
Water-3,650 bbl.
DRIWNG EQUIPMENT: Drawworks--Contlnental
Emsc,o C-111, Type 2, 1 ~ drill line; Pumps-Three
Continental Emsco F-1600 triplex; Prime
Movers-Seven Cat. D-399 diesel engines driving
930-kW AC generator.
CRANES: Two American Holst & Derrick diesel,
two 130; booms, 35 t @26' radius two 100'
'
booms, 7.5 t@ 12' radius.
STENA SPEY
RIG DESIGN: Friede and Goldman L-907
CONSTRUCTION: Daewoo Shipyard, Korea, 1983;
Upgrade in progress.
PERFORMANCE: Water depth-1,500'; Drilling
depth-20,000'.
QUARTERS: 104 persons.
HULL: 72 m x 63.4 m.
VARIABLE LOAD: 3,500 mt.
HELIPORT: 73' dia.
STORAGE: Mud & Cmt Bulk-19,000 cf; Liquid
Mud-2,300 bbl; Water for Drilling-12,500 bbl;
Potable Water-2, 100 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'I. 1625
DE; Pumps-Three mud pumps, 12-P; active
heave compensator; Prime movers-Four Bergen
diesels; Rotary Table--Nat'I. 49!>'': Top Drive-MH DOM 650.
DERRICK: 1,400,000 lb hook load capacity.
BOP SYSTEM: 18Jol" 15 K, HPHT.
CRANES: Three Nat'I. OS 435 55 mt w/ two 120',
one 80' booms.
MOORING: Four double hydraulic windlasses;
eight point system.
REMARKS: Formerly High Seas Driller.
WORK AREA: UK North Sea.
151
TRANSOCEAN DISCOVERER
TRANSOCEAN WINNER
RIG DESIGN: GVA 4000.
CONSTRUCTION: Gotaverken Arendal, Gothenburg, Sweden, 1983.
PERFORMANCE: Water Depth-1,509': Drilling
Depth-25,000'.
QUARTERS: 100 persons.
HULL: 230' x 246' x 138'.
VARIABLE LOAD: 3,556 t.
HELIPORT: 79' x 79': S-61 or Super Puma.
STORAGE: Mud & Cmt. Bulk-11,724 cf: Fuel90,512 ct: Water for Drilling-100,364 ct: Potable
Water-13,914 cf.
DRILUNG EQUIPMENT: Drawworks-Nat'l 1625DE w/ 1W drill line; Pumps-Three Nat'l 12-P-160
(1,600 hp): Prime Movers-Four Nohab diesels
(3,060 hp) driving 2,200-kW generators; Pipe
Handling System-BJ semi-automatic 2-arm racking system, MH Iron RN; Top Drive-Varco TDS4B, 590 It.
DERRICK: UIE 1571 x 39' x 39': 570-lt nominal
cap., crown 590 It.
BOP SYSTEM: Hydril 18r.' stack, 15,000 psi: two
Hydril double ram 15,000 psi: one Hydril annular
10,000 psi.
CRANES: Two Uebherr, BOS 50, 141' boom, 50 It
@39'.
POSITIONING: Anchor.
REMARKS: Formerly Treasure Saga.
WORK AREA: North Sea.
Transocean Seeker.
l9t;8
TRANSOCEAN SEARCHER
RIG DESIGN: Trosvik Bingo 3000 self propelled.
CONSTRUCTION: Kaldnes Mek Versted, Tonsberg, Norway, 1983; upgraded 1988.
PERFORMANCE: Water Depth-1,476'; Drilling
Depth-24,934'.
QUARTERS: 100 persons.
HULL: 246' x 207' x 43'.
VARIABLE LOAD: 2,952 t.
HELIPORT: 83' x 83'; S-61.
STORAGE: Mud & Cmt. Bulk-1,080 mt; Fuel32,843 cf; Water for Drilling-1,180 mt; Potable
Water-386 mt.
DRILLING EQUIPMENT: Drawworks-Oilwell
E-3000, 1h' drill line and Elmagco brake; Pumps-Two Oilwell A-1700 PT (1,600 hp); One Continental
Emsco FB-1600; Prime Movers-Five Bergen
diesels (2.580 hp) driving 2,625kW generators;
Pipe Handling System-Maritime Hydraulics 3 arm
system; Maritime Hydraulics Iron Roughneck; Top
Drive-Maritime Hydraulics DDM-650-HY, 590 It.
DERRICK: Maritime Hydraulics 160' x 40' x 40';
650 It nominal cap.; crown-650 It.
BOP SYSTEM: 18W, 15,000 psi; two double U-11
Diamond Offshore
Drilling, Inc.
OCEAN CLIPPER
CONSTRUCTION: Converted by Mitsubishi Heavy
Industries, Kobe, Japan, 1977.
PERFORMANCE: Water depth-7,500'; Drilling
depth-25,000'.
QUARTERS: 116 persons.
HULL: 528' x 109' x 40'.
VARIABLE LOAD: 10,165 It.
HELIPORT: 70' x 70'.
STORAGE: Mud & Cmt Bulk-15,400 cf+ 15,000cf
sks: Liquid Mud---5,227 bbl; Fuel-15, 125 bbl; Water
for Drilling-44,000 bbl; Potable Water-3,200 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'I. 1625
DE, 2,400 hp; Pumps-three Nat'!. 12-P-160; Prime
movers-seven EMO MD20-645-E9, 3,000 hp ea.;
Pipe Handling System-Varco PRS-3.
DERRICK: 180', 1,400,000-lb capacity.
CRANES: One Bucyrus Erie MK-35 w/80' booms;
two Seatrax 6032 w/ 100' booms.
POSITIONING: DP; 5 each 2,325 hp tunnel
thrusters; one 2,500 hp azimuthing thrusters; two
7,500 hp main screws.
REMARKS: Formerly Wodeco IX.
WORK AREA: Gulf of Mexico.
Discover ASA
PHOTO NOT
AVAILABLE
TRANSOCEAN MARIANAS
RIG DESIGN: Earl & Wright Sedco 700 Series
enhanced, eight columns, propulsion assisted,
CONSTRUCTION: FELS (conversion), Singapore.
PERFORMANCE: Water Depth-7,000'; Drilling
Depth-25,000'.
QUARTERS: 150 persons.
HULL: 332' x 266' x 122'.
HELIPORT: 72' x 72'; S-61.
STORAGE: Mud & Cmt. Bulk-15,600 cf; Fuel18,500 bbl; Water for Drilling-10,900 bbl; Potable
Water-3,000 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'l 1625
UDBE. 3.000 hp, 1W drill line; Pumps-Three FB
2200; Prime Movers-Six GM EMD MD-20-E9,
3,600 hp, driving 2,500-kW generator; Pipe Handling System-MH racking arm, Iron Roughneck;
Top Drive-Varco TDS-~.
DERRICK: Pyramid; 174' x 40' x 40'; 1.5-mm
nominal cap.
BOP SYSTEM:. Two 18il", 15,000 psi Hydril double rams w/ 18'1"', 10,000 spherical annular.
CRANES: Two Bucyrus Erie w/ 120' booms, 75 t
@ 30 degree radius.
POSITIONING: Simrad.
REMARKS: Formerly Tharos and Polyportia.
WORK AREA: Gulf of Mexico.
DEEPWATER PATHFINDER
DEEPWATER FRONTIER
RIG DESIGN: Conoco/Reading & Bates, based on
double-hull tanker.
CONSTRUCTION: Samsung Heavy industries, Koje
City, Korea, 1998/1999, est.
OTHER DATA: Same as Deepwater Pathfinder.
WORK AREA: Gulf of Mexico. planned.
DEEPWATER MILLENIUM
RIG DESIGN: Conoco/Reading & Bates. based on
double-hull tanker.
154
DISCOVERER 1
RIG DESIGN: Sonat Offshore Drilling Discoverer
Class, Turret moored
CONSTRUCTION: Mitsui, Japan, 1977.
PERFORMANCE: Water depth-100'-1,500':
Drilling depth-20,000'.
QUARTERS: 108 persons.
HULL: 380' x 70' x 26'.
VARIABLE LOAD: 5,965 short tons.
HELIPORT: 70' x 70', CS-61.
STORAGE: Mud & Cmt Bulk-9,460 cf; Liquid
Mud-1,548 bbl; Fuel-9,632 bbl; Water for
Drilling-10,386 bbl; Potable Water-841 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco C2, Type II w/2,800-hp DC motors; Pumps-two
Emsco FA-1600, 2 @ 800 hp each wlDC mot~rs:
Prime movers-four EMD w/9,400 total hp; Pipe
Handling System-Byron Jackson V-3A-FB-185.
DERRICK: 170' Pyramid; 1,330,000-lb GNC.
BOP SYSTEM: Two Shaffer annular, 18W' 5,000 psi:
Two Shaffer Ram unrts, LWS double 18%", 10,000 psi.
MOORING: Turret moored with four double drum
winches w/300,000-lb line pull; eight 30,000-lb
anchors W/1,940' of 2:i" cable and 2,000', 2~" cham.
REMARKS: Formerly lnterocean Discoverer and
Essar Discoverer. lPC bareboat charter.
WORK AREA: Bay of Campeche.
ENSCO Drilling
(Caribbean) Ltd.
ENSCO I
RIG D~SIGN: Lake Maracaibo type over-the-stem
drillind barge.
CONSTRUCTION: TOI Halter: delivery Feb. 1999.
PERfORMANCE: Water Depth-15'-120'; Drilling
Depth-25,000'.
QUARTERS: 80 persons.
HULL: 210' x 110' x 18'.
t ARIABLE LOAD: 2,000 mt.
HELIPORT: On top of living quarters.
STORAGE: Mud & Cmt. Bulk-9,000 cf & 2,300
sks: Liquid Mud---4,000 bbl:
Fuel-1,500 bbl; Water for Drilling-5,000 bbl:
Potable Water-500 bbl: Completion Fluicl-1,500
bbl.
DRILLING EQUIPMENT: Drawworks-Nat'I 1320
UE, 2,000 hp; Pumps-Three Nat'l 12-P-160; Prime
Movers-Five Cat. 3512 8, 1,465 hp; Rotary
Table-Nat'! D-375; Top Drive-Varco TDS-4H.
DERRICK: Dreco 170' x 30' x 30': 1,000,000-lb
hook toad.
BOP SYSTEM: 13 5/8', 5,000 psi.
CRANES: Two Dreco 48.
MOORING: Four Amclyde 12-S, double drum w/
1~ wireline.
REMARKS: Photo typical of Ensco V.
WORK AREA: Lake Maracaibo.
ENSCO II
RIG DESIGN: Maracaibo type over-the-stem drilling
barge.
CONSTRUCTION: TOI Halter, delivery first-quarter
1999.
STORAGE: Mud & Cmt. Bulk---4,500 cf & 2,300
sks.
OTHER DATA: Typical of Ensco I.
WORK AREA: Lake Maracaibo.
ENSCO Ill
RIG DESIGN: Maracaibo type over-the-stern drilling
barge.
CONSTRUCTION: TOI Haiter; delivery first-quarter
1999.
STORAGE: Mud & Cmt. Buik---4,500 cf & 2.300
sks.
BOP SYSTEM: 11 ". 5,000 psi.
OTHER DATA: Typical of Ensco I.
WORK AREA: Lake Maracaibo.
ENSCO VI
Drilling Equipment: Drawworks-Midcon U-1220EB; 2,000 hp: Pumps-two Gardner Denver PZ-10
triplex Prime Movers-three Cat 3512 TA engines
w/1,535 kW generators; Rotary Table-Nat'[ Oilwell C-275.
DERRICK: Pyramid, 147', 1,044,000 lb GNC.
BOP SYSTEM: 21X" ann. (diverter); 13%', 3,000 psi
stack.
CRANES: One Dreco 42-DNS-80 (30 t@ 25').
MOORING: Two AmClyde four-drum winches (8 x
1,500' x 1:4' cable).
WORK AREA: Lake Maracaibo, Venezuela.
Global Marine
Drilling Co.
ENSCO XII
RIG DESIGN: Lake Maracaibo type over-the-stern
drilling barge.
CONSTRUCTION: Texas Drydock, Inc., Orange,
Texas, 1994.
OTHER DATA: Same as ENSCO XI.
WORK AREA: Lake Maracaibo, Venezuela.
ENSCO XIV
RIG DESIGN: Lake Maracaibo type over-the-stem
drilling barge.
CONSTRUCTION: Texas Drydock, Inc., Orange,
Texas, 1994.
DRILLING EQUIPMENl: Drawwor1<s-Nat'I Oilwell
1320-E, 2,000 hp; Pumps-two Nat'I Oilwell 12P160 triplex.
OTHER DATA: Same as ENSCO XI.
WORK AREA: Lake Maracaibo, Venezuela.
ENSCO VII
RIG DESIGN: Lake Maracaibo type over-the-stern
drilling barge.
CONSTRUCTION: Texas Drydock, Inc., Orange,
Texas: January, 1993.
PERFORMANCE: Water depth-125'; Drilling
depth-15,000';
Quarters: 16 persons.
Hull: 200' x 85' x 14'
VARIABLE LOAD: 2,000 tons.
HELIPORT: 38' x 38'; Bell A206B.
STORAGE: Mud & Cmt Bulk-2,000 cf; liquid
Mud-4,091 bbl: Fuel-1,960 bbl; Water for
Drilling-none: Potable Water-160 bbl.
DRILLING EQUIPMENT: Orawworks-Nat'I. Oilwell 840E; Pumps-two Nat'!. Oilwell A1400 PT
w/2 EMO D79 MB DC motors: Prime Moversthree Cat. 3512 DITA engines w/KATO 1535 KW
600 VAC generators: Rotary Table-ldeco 27\f''.
DERRICK: Pryamid, 147'; 900,000-lb GNC.
BOP SYSTEM: 13%", 3,000-psi WP double type U
unit; 13%", 3,000-psi annuar: 21Y.', 2,000-psi Hydril
MSP diverter.
CRANES: One Dreco 42-DNS-80.
MOORING: Eight point w/two Amclyde 4-drum
back-to-back mooring winches.
WORK AREA: Lake Maracaibo. Venezuela.
ENSCO XV
RIG DESIGN: Lake Maracaibo type over-the-stern
drilling barge.
CONSTRUCTION: Texas Drydock, Inc., Orange,
Texas, 1994.
DRILLING EQUIPMENl: Drawwor1<s-Nat'I Oilwell
1320-E, 2,000 hp; Pumps-two Nat'! Oilwell 12P160 triplex.
OTHER DATA: Same as ENSCO XI.
WORK AREA: Lake Maracaibo.
Ghana National
Petroleum Corp.
ENSCO VIII
RIG DESIGN: Lake Maracaibo type over-the-stern
drilling barge.
CONSTRUCTION: Texas Orydock Inc., Orange,
Texas, 1993.
DRILLING EOUIPMENl: Drawwor1<s-1700E !deco
w/two GE 75R DC motors: Pumps-two T-1300
!deco w/two GE 752R DC motors.
OTHER DATA: Typical of ENSCO VII.
WORK AREA: Lake Maracaibo. Venezuela.
Mexico.
ENSCO IX
RIG DESIGN: Lake Maracaibo type over-the-stem
drilling barge.
CONSTRUCTION: Texas Drydrock, Inc., Orange,
Texas: March. 1993.
OTHER DATA: Typical of ENSCO VII.
WORK AREA: Lake Maracaibo, Venezuela.
ENSCOV
RIG DESIGN: Lake Maracaibo type over-the-stern
dnllino barge.
CONSTRUCTION: McDermott Shipyard, Morgan
City, Louisiana, 1982.
PERFORMANCE: Water depth-125'; Drilling
depth-15,000'.
QUARTERS: 12 persons.
HULL: 200' x 80' x 14'.
VARIABLE LOAD: 2,000 tons.
HELIPORT: 38' x 38'.
STORAGE: Mud & Cmt Bulk-2.000 cf; Liquid
Mud-3,085 bbl: Fuel-1,960 bbl; Water for
Drilling-none: Potable Water-1,384 bbl.
DRILLING EQUIPMENT: Drawworks-Gardner
Denver 11 OOE: Pumps-two Gardner Denver PZ1O: Prime movers-three Cat 0399; Rotary TableGardner Denver 27'.1".
DERRICK: Superior. 750,000 lb.
BOP SYSTEM: 21'!." ann. (diverter): 11" x 3.000
psi stack.
ENSCO X
RIG DESIGN: Lake Maracaibo OiP over-the-stern
drilling barge.
CONSTRUCTION: Texas Orydrock, Inc .. Orange,
Texas: March, 1993.
OTHER DATA: Typical of ENSCO VII.
WORK AREA: Lake Maracaibo, Venezuela.
ENSCO XI
RIG DESIGN: Lake Maracaibo type over-the-stern
drilling barge.
CONSTRUCTION: Texas Drydock. Inc .. Orange,
Texas, 1994.
PERFORMANCE: Water depth-125'; Drilling
depth-20,000':
Quarters: 40 persons.
Hull: 200' x 85' x 14'
VARIABLE LOAD: 2,000 t.
HELIPORT: 38' x 38'; Bell A206B.
STORAGE: Mud & Cmt Bulk-2.000 cf; Liquid
Mud-4.091 bbl; Fuel-1.960 bbl: Water for
Drilling-none; Potable Water-157 bbl.
GLOMAR EXPLORER
RIG DESIGN: Global Marine Drilling Co.
CONSTRUCTION: Sun Shipbuilding, 1973: conversion 1997.
PERFORMANCE: Water depth-7.800'; Drilling
depth-30.000'.
QUARTERS: 140 persons.
HULL: 619' x 116' x 51'.
VARIABLE LOAD: 23,533 It.
HELIPORT: 76' x 76'.
STORAGE: Mud & Cmt Bulk-47.160 cf: Liquid
Mud-6.320 bbl: Fuei-49,500 bbl; Water for
Drilling-50,600 bbl: Potable Water-2.530 bbl.
/9Gfl.
155
JSL Drilling
C-333
MAERSK RIG 11
RIG DESIGN: Cantilever drilling barge.
CONSTRUCTION: Modified by Amfels l1rownsv1lle, Texas, 1994.
'
REMARKS: Formerly APMC Rig 11.
OTHER DATA: Typical of Maersk Rig 12.
WORK AREA: Lake Maracaibo.
C-334
Mexico.
MAERSK RIG 52
RIG DESIGN: Cantilever drilling barge.
CONSTRUCTION: Modified by Amfels, Brownsville, Texas, 1994.
PERFORMANCE: Water depth-150" Drilling
depth-20,000'.
'
QUARTERS: 40 persons.
HULL: 190' x 100' x 14'.
VARIABLE LOAD: 3,609 st.
HELIPORT: 46' x 50'.
STORAGE: Mud & Cmt Bulk-7,500 cf; Liquid
Mud-3,000 bbl; Fuel-1,140 bbl; Water for
Drilling-3,532 bbl; Potable Water-1,225 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'I 1320
UE; Pumps-two Nat' I 1O-P-130; Prime moversfour Cat. 0-399; Rotary Table-Nat' I 275.
DERRICK: 147'; 30' x 30', 1,000,000 lb.
~OP SYSTEM: Hydril 13%", 5,000 psi spherical;
single and double 13%", 10,000 psi Cameron type U.
CRANES: Superior 30 t.
MOORING: Eight Marathon W-1500 winches, 1li'
wire, 10,000 lb anchors.
L-336
CONSTRUCTION: Converted by owner, 1967
Sank in 1978; rebuilt 1980.
'
PERFORMANCE: Water depth-100'; Drilling
depth-10,000'.
HULL: 180' x 70' x 11W.
DRILLING EQUIPMENT: Drawworks-Nat'I. 55:
Pumps-two Emsco DB-700; Prime movers-GM
Twin 6-100.
DERRICK: 140'; 467 tons.
SEA STATE: Operating-4'.
RIG DESIGN: Norwegian Rig Consultants
L-401
CONSTRUCTION: Wiley Mfg., Port Deposit. Md.;
Outfitted by Hutchison-Hayes lnt'I, Houston,
Texas, 1979.
PERFORMANCE: Water depth-110'; Drilling
depth-15,000'.
HULL: 200' x 78' x 13'.
STORAGE: Mud & Cmt Bulk-1,800 sks barite:
Liquid Mud-2, 100 bbl; Fuel-1,500 bbl: Water
for Drilling-Lake; Potable Water-300 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco C1
Type 11: Pumps-2F1000; Prime movers-Cat.
399 Diesel elec; Rotary Table--27W.
CRANES: Unit Mariner 500.
TOWING REQUIREMENTS: one tug.
MOORING: Moors to 7-10,000 lb anchors and buoys.
REMARKS: Operated by Lagoven.
WORK AREA: Lake Maracaibo.
MAERSK RIG 61
RIG DESIGN: Amfels LM20, cantilever workover
barge.
CONSTRUCTION: Amfels, Brownsville, Texas, 1994.
PERFORMANCE: Water depth-150'; Drilling
depth-20,000'.
QUARTERS: 40 persons.
HULL: 190' x 100' x 15'.
VARIABLE LOAD: 3,609 t.
HELIPORT: S-62.
STORAGE: Mud & Cmt Bulk-2,000 sks mud, cmt
NIA: Liquid Mud--3,000 bbl; Fuel-2,000 bbl; Water
for Drilling-2,500 bbl; Potable Water-1,000 bbl.
DRILLING EQUIPMENT: Drawworks-Oilwell E2000; Pumps-Oilwell; Prime movers-Three cat,
1,090 hp each; Rotary table-Oilwell A 20W.
DERRICK: LCM 147'x 30' x 30', 1,000,000 lb.
BOP SYSTEM: Shaffer 5,000 psi, double ram, plus
one each 11" and 7Xo".
CRANES: One 30 t Nautilus, 100'.
MOORING: Amclyde double winches, 4 x 2.
WORK AREA: Lake Maracaibo, Venezuela.
L-402
CONSTRUCTION: Wiley Mfg.; Outfitted by Hutchison-Hayes. 1980.
REMARKS: Same as L-401.
L-403
DATA: Same as L-401.
Lagoven, S.A.
(Filial de Petroleos
De Venezuela)
Maersk Contractors,
Drilling Division
PHOTO NOT
AVAILABLE
MAERSK RIG 62
RIG DESIGN: Amfels LM20, cantilever workover
barge.
CONSTRUCTION: Amfels, Brownsville, Texas, 1994.
HULL: 200' x 85' x 15'.
OTHER DATA: Typical of Maersk Rig 61.
WORK AREA: Lake Maracaibo, Venezuela.
C-94
RIG DESIGN: N/A
CONSTRUCTION: Converted by owner, 1982.
PERFORMANCE: Water depth-11 O'; Drilling
depth-7.500'.
QUARTERS: 4 persons.
HULL: 180' x 70' x 11'.
HELIPORT: Accommodates Bell Jet Ranger II.
STORAGE: Water for Drilling-Lake.
DRILLING EQUIPMENT: Drawworks-ldeco H-40;
Pumps-one Emsco 0-700, one Gardner Denver
PA-8: Prime movers-two GMC Twin 6-110/1-8V71.
DERRICK: 140': 476 tons.
WORK AREA: Lake Maracaibo.
C-201
BADRINATH
RIG DESIGN: FELS
CONSTRUCTION: Far East Levingston. Singapore. 1973.
PERFORMANCE: Water depth-600'; Drilling
depth-20,000'.
QUARTERS: 80 persons.
HULL: Ship-shape: 348' x 70' x 22'.
VARIABLE LOAD: 6.000 It.
HELIPORT: 80' x 70'.
STORAGE: Mud & Cmt Bulk-9.600 cf & 12.000
sks: Liquid Mud-2,000 bbl: Water for Dnlling10.000 bbl: Potable Water-950 bbl.
DRILLING EQUIPMENT: Drawworks-Nat'I. 1320
UE: Pumps-two Nat'I. 12-P-160 Triplex 1,600 hp:
Prime movers-four Cat. D-399. 5.300 hp: Pipe
Handling System-Byron Jackson hydraulic.
156
C-226
RIG DESIGN: Converted by owner
PERFORMANCE: Water depth-11 O'; Drilling
depth-10,000'.
HULL: 180' x 70' x 11/.'.
DRILLING EQUIPMENT: Drawworks-Nat'I 55:
Pumps-two Emsco DB-700-1 GD PA-8; Prime
movers-GM 12-6-110.
DERRICK: 140'; 476-ton capacity.
SE.4 STATE: Operating-4'
MAERSK PATHFINDER
! RIG DESIGN: Cantilever drilling barge.
! CONSTRUCTION: Amfels, 1998.
MAERSK RIG 12
RIG DESIGN: Cantilever drilling barge.
CONSTRUCTION: Modified by Amfels, Brownsville, Texas, 1994.
PERFORMANCE: Water depth-120': Drilling
depth-20.000'.
QUARTERS: 40 persons.
HULL: 210' x 100' x 40'.
VARIABLE LOAD: 2,632 st.
HELIPORT: 50' x 50'.
STORAGE: Mud & Cmt Bulk-4,000 cf: Liquid
Mud-3,000 bbl: Fuel-2,000 bbl; Water for
Drilling-5,700 bbl: Potable Water-900 bbl.
DRILLING EQUIPMENT: Drawworks-Oilwell E2000; Pumps-two oilwell A1700 PT: Prime
movers-three Cat. D-399 w/1,030 kW generator,
one Cat. D379; Rotary Table-Oilwell A 371;2 ".
DERRICK: 147'; 30' x 30'.1.000.000 lb.
BOP SYSTEM: Shaffer spherical 13%", 5.000 psi:
one single. one double Cameron U, 13');", 10,000 psi.
CRANES: One SeaKing 15 t. one Nautilus 30 t.
MOORING: Eight Marathon W-1500 winches. 1~"
wire. 10.000 lb anchors.
MAERSK PIONEER
RIG DESIGN: Cantilever drilling barge.
CONSTRUCTION: Amfels. 1998.
OTHER DATA: Typical of Maersk Pathfinder.
WORK AREA: Lake Maracaibo. Venezuela.
Maraven S.A.
PHOTO NOT
AVAILABLE
GP-9
RIG DESIGN: N.V. Werf "Gusto' B.V. the Netherlands
CONSTRUCTION: Converted, 1967.
PERFORMANCE: Water depth-120'; Drilling
depth--15,000'.
HULL: 199' x 991" x 10'.
VARIABLE LOAD: 1,500 t.
HELIPORT: 30.48 m x 14.02 m.
STORAGE: Mud & Cmt Bulk-12,500 bbl; Uquid
Mud--2,594 bbl; Fue!--2, 705 ~ Potable Water-889.
DRILLING EQUIPMENT: Drawworks--Nat'I 1320
UE; Pumps-two !deco Oweco G-1,000 B, one
!deco Oweco 5-0700; Prime movers-four Paxman 8 YLC DC.
DERRICK: 140'.
CRANES: two Figee-12-t, 5-ton.
SEA STATE: Operating-4': survival-8'.
WORK AREA: Lake Maracaibo.
HELIPORT: N/A
STORAGE: Mud & Cmt. Bulk-NIA; Liquid MudFuef-N/A; Water for Drilting-1,800 bbl; Potable
Water-NIA; Completion Fluid-3,100 bbl.
DRILLING EQUIPMENT: Drawworks-7,000 hp,
active heave compensated; Pumps-Four 2,000hp mud pumps; Prime Movers-Three Azimuth
trusters forward and two aft, 4,000 hp; Rotary
Table-NIA: Pipe Handling System-NIA; Top
Drive-NIA.
DERRICK: NIA.
BOP SYSTEM: NIA.
CRANES: 80-t deck crane; two knuckle-boom
pipe-handling cranes.
MOORING: N/A.
WORK AREA: NIA.
GP-10
DATA: Same as GP-9.
PHOTO NOT
AVAILABLE
NOBLE-MURAVLENKO
GP-11
RIG DESIGN: Marine Consultants (Marcon) B.V
CONSTRUCTION: Rotterdam Dockyards Co., the
Netherlands, 1982.
PERFORMANCE: Water depth-120'; Drilling
depth-15,000'.
QUARTERS: 13 persons.
HULL: 200' x 100' x 13'.
VARIABLE LOAD: 2,632 mt.
HELIPORT: 12mx12 m.
STORAGE: Mud & Cmt Butk-4Q cu m; Liquid Mud-2, 130 bbl: Fuef-1,430 bbl; Potable Water-900 bbl.
DRILLING EQUIPMENT: Drawworks-C-Emsco
C-1 electric: Pumps-two F-1000; Prime movers--four Cat. D-398, G.E. 1600 amp SCR system;
Rotary Tabte-Emsco 2n'.
DERRICK: Dynamic C-L 147'
BOP SYSTEM: Three Cameron ram type 13%'
5,000 psi WP: one Hydril 13%".
CRANES: Two Unit Mariner 280-H.
MOORING: Eight anchors. 10 ton each.
REMARKS: Company owned.
WORK AREA: Venezuela.
GP-12
DATA: Same as GP-11.
GP-15
DATA: Same as GP-11.
NOBLE-LEO SEGERIUS
RIG DESIGN: IHC Gusto design
CONSTRUCTION: RSV Gusto, Holland; completed
by Boele Bolnes, Holland, 1981.
PERFORMANCE: Water depth-100'-1,700'
anchored, 4.250-4,950' in DP mode; Drilling
depth--25,000'.
QUARTERS: 95 persons.
HULL: 488' x 88' x 41 '.
VARIABLE LOAD: 6,899 mt.
HELIPORT: 83', accommodates S61-N.
STORAGE: Mud & Cmt Bulk-21,200 cf; Liquid
Mud-3,500 bbl; Fuel-24,000 bbl; Water for
Drilling-4,600 bbl; Potable Water-4,500 bbl.
DRILLING EQUIPMENT: Drawworks--Nat'l 1625DE; Pumps-Two Nat'I 12-P-160 plus one Nat'I 8P-80 triplex; Prime movers-seven 15,600 KW;
Rotary Table---Nat'I C-495; Pipe Handling System-8-J, Type V-3; Top Drive-Varco TDS-3;
Compensator-Shaffer 600 kips CMC.
DERRICK: 160' Pyramid, 1,000,000-lb.
BOP SYSTEM: Shaffer 18%", 10 K wlmultiplex
control system: Marine riser-Vetco HMF 18%"
w/booster line.
CRANES: IHC Gusto, 1 x 40 t/1 x 60 t Bailey electric.
MOORING: Cegelec DP system and 4,200' wiretine
w/30,000-lb Delta Flipper anchors.
REMARKS: Formerly Kingfisher, Boss Vishwa and
Neddri/11.
GP-16
NORTHERN EXPLORER II
RIG DESIGN: Donheiser Marine, Super Class 1AA
CONSTRUCTION: Todd Shipyard, Galveston,
Texas, 1976.
PERFORMANCE: Water Depth-600';Drilling
Depth-20,000'.
QUARTERS: 102 persons.
HULL: 377' x 100' x 28' 7".
VARIABLE LOAD: 6,387 st.
HELIPORT: 63' x 65'; Sikorsky S-61 N.
STORAGE: Mud & Cmt. Bulk-18,600 cf & 12,500
sks; Liquid Mud--3,840 bbl; Fuef-6,980 bbl; Water
for Drilllng-4,090 bbl; Potable Water-I, 150 bbl.
DRIWNG EQUIPMENT: Drawwork&-!deco Model
21 DO; Pumps-Two Nal'I 12P-160 triplex; Prime
Movers-Four GE 752R to single screw, 3,000
bhp; Rotary Table---ldeco Model LR-375; Pipe
Handling System-BJ Type V-3A-F8-21 O; Top
Drive--Vanco TDS-3, max torque-36,700 ft-lb.
DERRICK: Pyramid 185'; 1,000,000 lb.
BOP SYSTEM: 18%' NL Shaffer 10,000 psi w/
four rams; eight dual 5,000 psi annular.
CRANES: Two Uebherr BOS, 35 t 80 t; one Skagit 343, SWL 32 t.
MOORING: Eight-point wire mooring; four Skagit DMW-150 double drum winches.
REMARKS: Formerly Canmar Explorer II and
Explorer II; managed by Frigstad Offshore P.L.
WORK AREA: S.E. Asia, worldwide.
Navis ASA
NAVIS EXPLORER I
RIG DESIGN: Navis class drillship.
CONSTRUCTION: Samsung Yard, Korea, to be
completed March 2000.
PERFORMANCE: Water Depth-10,000';Drilling
Depth-36,000'.
QUARTERS: 130 persons.
HULL: 655' x 130' x 63'
VARIABLE LOAD: N/A
158
PRIDE II
RIG DESIGN: Maracaibo type cantilever over-thebow drilling barge; drilling and workover.
CONSTRUCTION: Texas Drydock, 1994.
OTHER DATA: Typical of Pride/.
REMARKS; Contracted through 2004 for PDVSA.
WORK AREA: Lake Maracaibo.
ooo
RIG42
RIG DESIGN: Cantilevered drilling barge.
CONSTRUCTION: McDermott Shipyard Morgan
City, Louisiana, 1994.
'
DRIWNG EQUIPMENT: Drawworks-Nat'l 1625:
Pumps-two Nat'l 12P-160; no top drive.
BOP SYSTE~: Cameron 11 ", 5,000 psi single/
double U: 11 , 5,000 lb. Cameron annular.
REMARKS: Under contract to Maraven, S.A.
OTHER DATA: Same as Rig 40.
WORK AREA: Lake Maracaibo.
PRIDE AFRICA
PRIDE ANGOLA
RIG DESIGN; Gusto 10,000
CONSTRUCTION: Hyundai, Mipo Dockyard, Korea,
to be completed third-quarter 1999.
. OTHER DATA: Typical of Pride Africa.
REMARKS: X-mas tree handling: contracted
through 2006 to Elf Angola.
WORK AREA: Worldwide.
1,000 bbl.
DRIWNG EQUIPMENT: Drawworks--Oilwell 3
Pumps-two Nat'l 1O-P-130; Prime Movers-'.-two
EMO 1-16V-71, GM Ross Hill SCA; Rotruy TableOilwell 37'h"; Top Drive-Varco TDS-3S.
DERRICK: Pyramid; 1,500,000-lb.
BOP SYSTEM: Cameron 131'", 5,000 single/double type U: 131'', 5,000 Cameron annular.
GRANES: Two unit 30 t.
REMARKS: Under contract to Maraven, S.A
WORK AREA: Lake Maracaibo.
PEREGRINE I
RIG DESIGN: Gusto Engineering, Ice-class.
CONSTRUCTION: Rauma-Repola Oy, Pori, Finland, 1982. Upgrade 1996.
PERFORMANCE: Water depth-7,223': Drilling
depth-25,000'.
QUARTERS: 116 persons.
HULL:149.1'x24mx12.6m.
VARIABLE LOAD: 7,500 t.
HELIPORT: 72' x 72'.
STORAGE: Mud & Gmt Bulk-552 cm; Liquid
Mud-495 cm: Fuel-3,000 t; Water for Drilling610 t; Potable Water-491 t.
! DRILLING EQUIPMENT: Drawworks-Oilwell E3000: Pumps-Three Oilwell A-1700-PT: Prime
movers-six Wartsila Vasa 16V22B, 2, 140 KW
each: Rotary Table-Oilwell A-49.,,; Pipe Handling
System-Byron Jackson; Top Drive-Varco IDS4S RBS 650!.
DERRICK: 175': 1,000.000 lb. hook load capacity.
I BOP SYSTEM: Cameron 16.", 10,000 lb.
GRANES: Two Liebherr 25 & 40!.
. TOWING REQUIREMENTS: Self-propelled.
MOORING: Dynamic positioned.
REMARKS: Formerly Former Soviet Union's MikhBJ/
Mirchink.
POSITIONING: Dynamic Kongsberg Vaapenfabrik A/S.
WORK AREA: Worldwide.
I
I
159
Schahin Cury
PEREGRINE VII
PEREGRINE II
RIG DESIGN: IHC
CONSTRUCTION: Scotts Shipbuilding, Greenock,
Scotland, 1979.
PERFORMANCE: Water depth-4,500'; Drilling
depth-25,000'.
QUARTERS: 99 persons.
HULL: 505.3' x 77.2' x 41 '.
VARIABLE LOAD: 7 ,487 metric tons.
HELIPORT: S-61.
STORAGE: Mud & Cmt Bulk-19,200 cf & 4,500
sks; Liquid M~2,995 bbl; Fuel-18, 760 bbl; Water
for Drilling-18,500 bbl; Potable Water-4, 717 bbl.
DRILLING EQUIPMENT: Drawworks-Emsco C-3;
Pumps-two Oilwell A-1700-PT triplex; Prime
movers-5 x Pielstick 3,600 hp each. Rotary
Table-Emsco 49W'; Pipe Handling System-Byron
Jackson; Top Drive-Varco TDS-4S.
DERRICK: Pyramid 160'; 1,000,000 lb.
BOP SYSTEM: Two Shaffer double ram 16W',
10,000 psi; two Hydril GL 16'X".
CRANES: Two Clarke Chapman; one 40 ton and
one 25 ton.
MOORING: Dynamically positioned.
REMARKS: Formerly UME Drilling's Pacnorse I.
WORK AREA: Worldwide.
Santa Fe
International Corp.
Sedco Forex
PRISA 102
RIG DESIGN: Sedco Forex Lake Maracaibo type
CONSTRUCTION: TOI, 1998.
OTHER DATA: Typical of Prisa 101
REMARKS: Modem Lake Maracaibo drilling barge
with modular design,
WORK AREA: Lake Maracaibo, Venezuela.
Smedvig/Navion
PHOTO NOT
AVAILABLE
PEREGRINE IV
RIG DESIGN: Rauma Repola.
CONSTRUCTION: KhersorvRauma Repola late 1997.
PERFORMANCE: Water Depth-10, 178', upgradable to 11.000'. Drilling Depth-30,000'.
QUARTERS: 130 persons.
160
WEST NAVION I
RIG DESIGN: Statoil MST.
CONSTRUCTION: Samsung Heavy Industries,
Kyugnam, Korea. 1998.
PERFORMANCE: Water Depth-8,200'; Drilling
Depth-33,000'.
QUARTERS: 120 persons.
HULL: 830' x 137.8'.
VARIABLE LOAD: 14,500 mt.
HELIPORT: S-61.
STORAGE: Mud & Cmt Bulk-840 cm; Liquid
Mud-1.200 cm: Fuel-3.250 cm: Water for
Drilling-1,800 cm: Potable Water-1.000 cm:
Crude Oil-85.100 cm.
DRIWNG EQUIPMENT: Drawworks-RamRig system; Pumps-Three 2,200 hp, Nat'I 14P200; Pnme
Movers-Six each 5,600 kW; Rotary Table-Two
Varco BJ 60~"; Pioe Handling System-MH; Top
Drive-Two 750 st. 1,088 hp. 5,700 ft lb. 240 rpm.
162
WDRLDO/LiDECE.\JIJERJ99R
Listings in this section comprise mobile offshore pontoontype drilling units capable of drilling in open waters generally
70 to greater than 100 ft deep. Listings do not include
posted barges designed to work in shallow inland/protected
waters. Noble Drilling's major move last year to convert
five of its submersible units to semi-submersible status
and sale of Molikpaq to the Sakhalin Energy Investment
Co. reduced this rig category to nine listings. No further
changes have been reported.
The three Arctic drilling vessels, G/omar Beaufort Sea /,
SDC/SOC// and Kullu (see Drillships and Barges), are
reportedly stacked in far-northern locations. For the
submersible rigs, according to the October Offshore Rig
Locator, Noble Drilling has three rigs stacked ready or on
standby, and its Fri Radii is reportedly a candidate for future
conversion to semi status. R&B Falcon's three rigs are
working in the U.S. Gulf, as is Atwood Oceanic's Richmond.
Atwood Oceanics
Submersibles
DISCOVERER SPIRIT
RIG DESIGN: Transocean Offshore Discoverer
Class Enhanced, double hull. dual drilling activity.
CONSTRUCTION: Astana. Spain; to be completed
1999.
PERFORMANCE: Water Depth-8,500';Drilling
Depth-35.000'.
HULL: 835' x 125' x 39'.
DRILLING EQUIPMENT: Prime Movers-Four
Warts1la 18V32 LNE, 9,772 hp; two 12V32 LNE.
6,515-hp Wartsila engines: four 7,000 kW, two
4.700-kW generators.
BOP SYSTEM: 18%", 15.000 psi, 5 ram.
OTHER DATA: Typical of Discoverer Enterprise.
WORK AREA: Gulf of Mexico.
Global Marine
Drilling Co.
Noble Drilling
International, Inc.
NOBLE-JOE ALFORD
RIG DESIGN: Pace Marine; Pace 85G
CONSTRUCTION: Vemar Shipyard, Houston, Tex,
1982. Refurbished 1997.
PERFORMANCE: Water depth-85'; Drilling
depth-30,000'.
QUARTERS: 58 persons.
HULL: 186' x 180'.
VARIABLE LOAD: 2,000 t.
STORAGE: Mud & Cmt Bulk-9,600 cf & 3,360
sks; Liquid Mud-1,452 bbl; Fuel-Diesel Oil
2,843 bbl; Water for Drilling-5.496 bbl; Potable
Water-1,138 bbl.
DRILLING EQUIPMENT: Drawworks-.~at'I 1320
UE; Pumps-Two Nat'I 12-P-160 triplex; Prime
movers-Two EMO MD-12-E9 diesels; Rotary
Table-Nat'l 37~".
DERRICK: OSI 149', 1,670 kip GNC.
CRANES: Two Marathon LeTourneau PC120AS,
45 tons @25', 120' boom length.
BOP SYSTEM: Cameron 13%', 10,000 psi; Diverter-Hydril MSP 21 Y.', 2,000 psi.
REMARKS: Formerly Penrod 202.
WORK AREA: Gulf of Mexico.
NOBLE-LESTER PETTUS
RIG DESIGN: Pace Marine; Pace 85G
CONSTRUCTION: Vemar Shipyard, Houston, Tex,
1982. Refurbished 1997.
BOP SYSTEM: Cameron U 13%", 10.000 psi double and single; Cameron 13%", 5,000 psi annular;
Shaffer 21 W' 2,000 psi annular.
OTHER DATA: Same as Noble-Joe Alford.
REMARKS: Formerly Penrod 201.
WORK AREA: Gulf of Mexico.
163
Rig
ABAN 11 ....................................... 87
ABAN Ill .........................................87
ACHILLES ............................................118
ACTINIA ..........................................147
AL GHALLAN ...............................105
AL ITIIHAD ....................................105
AL MARIYAH .................................106
AL YASAT .....................................105
ALASKAN STAR .........................144
ALEUTIAN KEY ......................... 147
AMAZONE ............................................. 87
AMETHYST 1........................................ 144
AMETHYST II .............................. 143
AMETHYST 111 ..................................143
AMETHYST IV..........................143
AMETHYSTV ............................ 143
AMETHYST Vl.. ......................... 143
AMETHYSTVll ............................... 143
ARABDRILL 8 .................................. 87
ARABDRILL 17 ........................................ 87
ARCH ROWAN .................................122
ASTERIE .........................................138
ATLANTIC STAR ..............................144
ATLAS ........................................115
ATWOOD EAGLE ..................................131
ATWOOD FALCON ..................... 131
ATWOOD HUNTER ......................... 131
ATWOOD SOUTHERN CROSS ............ 131
BADRINATH .............................156
BALTIC BETA ................................114
BARUNAV ............................................ 117
BENNEVIS ........................................... 128
BEYOUNA ........................................ 106
BIDEFORD DOLPHIN ............................ 138
BINGO 9000 1 ................................... 143
BINGO 9000 2....................................... 143
BINGO 9000 3 ................................. 143
BINGO 9000 4 ........................................143
BOHAI NO. 4 ........................................... 88
BOHAI NO. 5....................................... 88
BOHAI NO. 6 ............................................ 88
BOHAI NO. 7 ............................................ 88
BOHAI NO. 8 ............................................ 88
BOHAI NO. 9 ............................................ 88
BOHAI NO. 10 .......................................... 88
BOHAI 12 ................................................ 88
BORGLAND DOLPHIN .......................... 138
BORGNY DOLPHIN ..............................138
BORGSTEN DOLPHIN .......................... 138
BRAKAH ................................................ 106
BRITANNIA ............................................124
BYFORD DOLPHIN .............................. 138
C. KIRK RHEIN. JR ............................... 146
C.E. THORNTON ...............................122
C-94 ...................................................... 156
C-201 .................................................... 156
C-226 ....................................................156
C-333 .................................................... 156
C-334 .................................................... 156
CAJUN EXPRESS ..................................150
CECIL PROVINE .................................... 122
CHARLES ROWAN ................................122
CHILES COLUMBUS .............................. 88
CHILES MAGELLAN ...............................88
CLIFFS DRILLING 100 ....................... 89
CLIFFS DRILLING 101 ........................... 89
CLIFFS DRILLING 110 ............................ 89
CLIFFS DRILLING 150 ......................... 89
CLIFFS DRILLING 151 ........................... 89
CLIFFS DRILLING 152 ........................ 89
CLIFFS DRILLING 153 ........................... 89
CLIFFS DRILLING 154 ............................ 89
CLIFFS DRILLING 155 ............................ 90
CLIFFS DRILLING 156 ............................ 90
CLIFFS DRILLING 160 ............................ 90
CLIFFS DRILLING 180 ............................ 90
CLIFFS DRILLING 200 ............................ 90
CLIFFS DRILLING 201 ............................ 90
CLIFFS DRILLING 202 ........................... 90
CLIFFS DRILLING LA SALLE .................. 89
COMPACT DRILLER ............................ 124
D.R. STEWART ...................................... 120
DEEP SEA MATDRILL ......................... 101
DEEPSEA BERGEN ............................ 143
DEEPSEA TRYM .................................... 143
DEEPWATER FRONTIER .................... 154
DEEPWATER MILLENIUM .................... 154
DEEPWATER PATHFINDER .................. 154
DELMA .................................................. 106
DHABI 2 ................................................ 128
DISCOVERER 1 ................................... 154
DISCOVERER 511 ................................ 155
DISCOVERER 534 ................................ 162
DISCOVERER DEEP SEAS .................. 162
DISCOVERER ENTERPRISE ................ 162
DISCOVERER SEVEN SEAS ................ 162
DISCOVERER SPIRIT ............................ 162
DIVINA .................................................. 106
DOLPHIN 105 ........................................ 105
DOLPHIN 106 ........................................ 105
164
WORLD OIL
/JEC'E.HRER /WS
i ~~~~:g ~~
i FALRIG 85
::::::::::::::::::::::; ~
.................................... 118
; FALRIG 86 ........................................ 118
. FALRIG TAURUS .................................. 120
: FORESIGHT DRILLER V ........................ 97
, FORTUNA .............................................. 115
FPS BILL SHOEMAKER ........................ 146
. FPS LAFFIT PINCAY ............................ 146
! GALAXY I .............................................. 124
i GALAXY 11 .............................................. 124
GALAXY Ill ............................................ 124
' GALAXY DRILLER ................................138
; GALVESTON KEY .................................. 1 24
' GEORGE H. GALLOWAY ...................... 120
GILBERT ROWE .................................... 122
GLOMAR ADRIATIC I .............................. 97
I GLOMAR ADRIATIC II ............................ 97
: GLOMAR ADRIATIC Ill ............................ 97
' GLOMAR ADRIATIC IV ........................... 97
GLOMAR ADRIATIC V ............................ 98
GLOMAR ADRIATIC VI ............................ 98
1 GLOMAR ADRIATIC VII .......................... 98
: GLOMAR ADRIATIC VIII .......................... 98
GLOMAR ADRIATIC IX ............................ 98
GLOMAR ADRIATIC X ........................... 98
GLOMAR ADRIATIC Xl. ........................... 98
GLOMAR ARCTIC I .............................. 138
GLOMAR ARCTIC Ill ............................ 140
GLOMAR ARCTIC IV ........................... ."140
GLOMAR BALTIC I .................................. 98
GLOMAR BEAUFORT SEA I ................ 162
GLOMAR C.R. LUIGS ............................ 155
;
\
'
i
:
;
i
'
1
i
'
i
I
I
:
.
:
! l:ft.~1~::::::::::::::::::::::::::::::::::::::::::::::::::::~.~~
NAHUATL ..............................................114
NAN HAI NO. 1 ........................................89
NAN HAI NO. 2 ......................................132
NAN HAI NO. 4 .............. 89
NAN HAI NO. 5 ......................................132
NAN HAI NO. 6 ................... 134
NAVIS EXPLORER I ..... 158
NOBLE-AL WHITE ................................108
NOBLE-AMOS RUNNER ...143
NOBLE-BILL JENNINGS ......................106
NOBLE-BYRON WELLIVER ..................108
NOBLE-CARL NORBERG ...109
NOBLE-CHARLES COPELAND 109
NOBLE-CHUCK SYRING .... 109
NOBLE-DICK FAVOR ............................11 O
NOBLE-DON WALKER. .........................112
NOBLE-EARL FREDERICKSON ..........110
NOBLE-ED HOLT ..................................108
NOBLE-ED NOBLE ..............................110
NOBLE-EDDIE PAUL ............................106
NOBLE-FRI RODLI ................................163
NOBLE-GENE ROSSER ... 108
NOBLE-GEORGE McLEOD .109
NOBLE-GEORGE SAUVAGEAU ............ 11 O
NOBLE-GUS ANDROES ......................108
NOBLE-HOMER FERRINGTON ..... 143
NOBLE-JIM THOMPSON ......................143
NOBLE-JIMMY PUCKETI .....109
NOBLE-JOE ALFORD ........... 163
NOBLE-JOHN SANDIFER ..... 108
NOBLE-JOHNNIE HOFFMAN . 11 O
NOBLE-KENNETH DELANEY ... 109
NOBLE-KOLSKAYA ............ 109
NOBLE-LEO SEGERIUS .......158
NOBLE-LEONARD JONES ......... 108
NOBLE-LESTER PETIUS .................... 163
NOBLE-LEWIS DUGGER .............. 108
NOBLE-LLOYD NOBLE ........................ 110
NOBLE-LYNDA BOSSLER .......... 110
NOBLE-MAX SMITH ......... 143
NOBLE-MURAVLENKO ..... 158
NOBLE-PAUL ROMANO .......... 142
NOBLE-PAUL WOLFF ........... 143
NOBLE-PERCY JOHNS ........................ 109
NOBLE-PIET VAN EDE ........110
NOBLE-ROGER EASON ...... 158
NOBLE-RONALD HOOPE ............... 110
NOBLE-ROY BUTLER .......................... 109
NOBLE-SAM NOBLE .......... 108
NOBLE-SHELF 6 ..................................143
NOBLE-TOM JOBE .............................. 110
i, NOBLE-TOMMY CRAIGHEAD .......109
NOBLE-TON VAN LANGEVELD ............ 142
NORAM 252 ................................112
NORAM 253 ...............................112
NORTH STAR I ......................... 127
NORTHERN EXPLORER II ............ 158
NORTHERN EXPLORER Ill .............. 158
NYMPHEA .................................144
i OCEAN ALLIANCE ...................... 134
' OCEAN AMBASSADOR ................ 136
: OCEAN AMERICA ....................... 134
I OCEAN BARONESS .................. 134
1
OCEAN BOUNTY .........................134
: OCEAN CENTURY ................. 136
' OCEAN CHAMPION .................... 92
OCEAN CLIPPER ....................... 154
: OCEAN COLUMBIA .... ,...................92
OCEAN CONCORD ................ 136
OCEAN CONFIDENCE .............138
OCEAN CRUSADER .......................... 92
OCEAN DRAKE ..................... 92
OCEAN ENDEAVOR .................. 136
OCEAN EPOCH ......................... 136
. OCEAN GENERAL ......................... 136
OCEAN GUARDIAN ...................... 137
OCEAN HERITAGE .................................. 92
I OCEAN KING .......................................... 92
I OCEAN LEXINGTON ...................136
. OCEAN LIBERATOR ..............................137
: OCEAN MASTER VIII ............................105
OCEAN NEW ERA ......................... 137
OCEAN NOMAD ....................................137
, OCEAN NUGGET ................................92
i OCEAN PRINCESS .......................... 137
; OCEAN PROSPECTOR ..................... 136
' OCEAN QUEST .................................134
, OCEAN ROVER ....................................136
I OCEAN SARATOGA ........................ 136
OCEAN SCOTIAN .................................... 93
OCEAN SOVEREIGN .....................92
' OCEAN SPARTAN .................................. 93
i OCEAN SPUR .............................. 93
' OCEAN STAR ..................................... 134
OCEAN SUMMIT ............................... 93
j OCEAN TITAN .......................................... 93
OCEAN TOWER ................................... 93
: OCEAN VALIANT .............................134
' OCEAN VICTORY .............................134
i OCEAN VOYAGER ........................... 136
, OCEAN WARWICK ............................... 93
' OCEAN WHITIINGTON ........................ 137
OCEAN WINNER ..................................137
, OCEAN WORKER ..................................137
i OCEAN YATZY ......................................137
; OCEAN YORKTOWN ............................136
ODIN NEPTUNE .................................... 142
ODIN STAR ............................................ 105
i
1
Chiles Offshore
11200 Westheimer Road, Suite 410
Houston, Texas 77042
Tel: 713 339 3777
Fax: 713 339 3888
Amidco
(Address unknown)
Arabian Drilling Co.
Box 708; 31421 Dammam
Saudi Arabia
Tel: 966 3 857 6080
Fax: 966 3 857 7144
(See also Sedco Forex)
Arcade Drilling
!See R&B Falcon Corp.)
Atwood Oceanics
15835 Park Ten Place Drive
PO Box 218350
Houston, Texas 77218
Tel: 281 492 2929
Fax: 281 578 3253
Brasoil
1see Petrobras)
Catleia Oil Co.
(See Petrobrasl
Crasco Integrated Drilling & Well Services Co., Ltd. ! Egyptian Drilling Co.
1
Ulica Grada Vukovara 18
KM 17.5 Cairo. Suez Road
10000 Zagreb, Croatia
PO Box 8071
Tel: 385 1 352 233
Nasr City Housing 11371
Fax: 385 1 455 1543
Cairo, Egypt
E-mail: marketing2@sts-ina.tel.hr
Tel: 20 2 417 6701
Fax: 20 2 417 6730
Deepwater Drilling, LLC
(See R&B Falcon Corp.)
ENSCO International, Inc.
2700 Fountain Place: 1445 Ross Ave.
Diamond Offshore Drilling Corp.
Dallas, Texas 75202-2792
15415 Katy Freeway, Suite 100
Tel: 214 922 1500
PO Box 4558
i Fax: 214 855 0080
Houston, Texas 77210
Tel: 281 492 5300
Fax: 281 492 5316
Discoverer ASA
(See Industrial Pertoradora de Campeche)
Dolphin Drilling Ltd.
Howe Moss Drive
Kirkhill Industrial Estate
Dyce, Aberdeen AB2 OGL. Scotland
Tel: 441224 411 411
Fax: 44 1224 723 267
E.G. Thomson (Bulk Carriers) Ltd.
Suite 7, Bonnington Bond
2 Anderson Place
Edinburgh EH6 5NP. Scotland
Tel: 44 131 555 5222
Fax: 44 131 557 4742
Foresight Drilling
Foresight House
6 Elder Street
London E1 6BT. England
Tel: 44 171 377 5755
Fax: 44 171 247 2700
Fred Olsen Drilling AS
(See Dolphin Drilling Ltd.)
Fred Olsen Drilling AS (Borgny Offshore AS)
(See Dolphin Drilling Ltd.)
' Fred Olsen Drilling AS (Borgsten Assoc. AS)
[See Dolphin Drilling Ltd.)
'For additional information and personnel listings see the !ADC Membership Directoty, IADC, Houston,
Tel: 281 578 7171, Fax: 281 578 0589; and The Oil & Gas Directory, Houston, Tel: 713 529 8789, Fax: 713 529 3646.
WORLD OIL I DECE.\/BER /998
165
166
Maraven, S.A.
(See Petroleos de Venezuela)
Petrobaltic
Stary Dwor Street 9
80-958 Gdansk, Poland
Tel: 48 58 313 061
Fax: 48 58 314 311
Petrodrill (Pride-Foramer)
(See Pride International, Inc.)
Navis ASA
PO Box 156, Svanholmen 2
4033-Forus, Norway
Tel: 47 51 815 757
Fax: 47 51 815 777
Noble Drilling Corp.
10370 Richmond Avenue, Suite 400
Houston, Texas 77042
Tel: 713 974 3131
Fax: 713 260 0302
Petromar
Port Constanta, Dana 34
8700, Constanta, Romania
Tel: 40 41 583 031
Fax: 40 41 694 204