You are on page 1of 5

UNIVERSITI KUALA LUMPUR

MALAYSIAN INSTITUTE OF AVIATION TECHNOLOGY


PRACTICAL WORKSHEET
___________________________________________________________________________
TITLE: ELECTRICAL SYSTEM MOCK-UP TROUBLE SHOOTING ( CO 3 )
Subject Code:

AKD 10102

Subject Name:

ELECTRICAL FUNDAMENTAL 1

AAB 10302
Project Code:

DCAM 66
Module:

ATA Chapter:
3

DCAM 66
Sub-module:

1. Reference Data:
1. Wiring Diagram
2.

2. Required Tools & Equipment:


1.
2.
3.
4.

Electrical System Mock-Up : Mock Up No ______


Crimping Tools
Philip Screw Driver
Multimeter

3. Required Materials
1. Wires
2. Terminal Lugs
3. Circuit Diagram

4. Required Manpower
1. Two (qty 02) students per mock-up

Prepared by:

Approved by:

Sign/Date
Name:
Designation:
Control No:

Sign/Date
Name:
Designation:
Revision

Assoc. Prof.. Dr. Mohamad Khir Harun


Deputy Dean Academic
Date

UNIVERSITI KUALA LUMPUR


MALAYSIAN INSTITUTE OF AVIATION TECHNOLOGY
PRACTICAL WORKSHEET
___________________________________________________________________________

Prepared by:

Approved by:

Sign/Date
Name:
Designation:
Control No:

Sign/Date
Name:
Designation:
Revision

Assoc. Prof.. Dr. Mohamad Khir Harun


Deputy Dean Academic
Date

UNIVERSITI KUALA LUMPUR


MALAYSIAN INSTITUTE OF AVIATION TECHNOLOGY
PRACTICAL WORKSHEET
___________________________________________________________________________
Procedure:
1. Read and understand the circuit diagram (refer attachment)
2. Locate the components and verify step-by-step connection of the followings;
S/N Component / Equipment

Terminal

DC 1 (from source to terminal strips)

DC1-A1 -> A17

DC 2 (Fan Circuit)

DC2-B1 -> B4

DC 3 (Navigation Light)

DC3-C1 -> C12

DC 4 (Strobe Light Circuit)

DC4-D1 -> D4

DC 5 (Solenoid Circuit)

DC5-E1 -> E4

3. Conduct a Functional Test for all of the components.


4. Record your findings. ( Functional / Malfunction )
5. Carry out a troubleshoot procedure to find the reason for the
circuit/component malfunction.
6. Rectify the problem.
7. Write a report.
Report must include:
a. Objective
b. List of tools and equipments
c. Reference/Schematic Diagram
d. Safety Precaution
e. Trouble Shooting procedure
f. Result
g. Discussion
h. Conclusion
Signature

Instructor Name
Date

:
:

UNIVERSITI KUALA LUMPUR


MALAYSIAN INSTITUTE OF AVIATION TECHNOLOGY
PRACTICAL WORKSHEET
___________________________________________________________________________

UNIVERSITI KUALA LUMPUR


MALAYSIAN INSTITUTE OF AVIATION TECHNOLOGY
PRACTICAL WORKSHEET
___________________________________________________________________________

You might also like