Professional Documents
Culture Documents
WORK ACTIVITY/TASK
The school’s machine shop has a lathe that can be controlled by a start-stop station near the
lathe and an emergency stop button near the teacher’s workstation. You are required to
demonstrate your competence in connecting such systems by connecting a start-stop station
and remote stop station to control a three-phase induction motor located in the electrical
workshop. In this activity, physical location of control stations and motor is not critical.
1. PLANNING
Line diagram of control circuit created.
Schematic diagram of power circuit created.
Locations for control stations and motor identified.
Appropriate tools, equipment and PPE selected.
Safe methods and procedures identified.
2. PROCESS
Control circuits connected appropriately.
Power circuit connected appropriately.
Safety practices observed when connecting all circuitry.
3. PRODUCT
Start-stop station controls motor.
Remote stop station controls motor.