You are on page 1of 1
ELEMENTARY SURVEYING THREE-WIRE LEVELING To determine the elevation of a point come distance away by the three-wire method of differential leveling. LAB EXERCISE OUTLINE INSTRUMENTS & ACCESSORIES : Enginger's Level or Automatic Level equipped with stadia hairs, Range Poles, Hubs or Pegs, Leveling Rod, Mallet or Hammer, and Chalk or Marking Crayons, PROCEDURE 1. Designate the initial or reference point of the level route as BM- 1 and the final or terminal point as BM-2, The elevation of BM-2 is to be determined and the elevation of BM-1 must be known ot assumed, 2. At @ convenient location just beyond BM-1 and along the general Gesigneted route of the level line, set up the instrument and level its line of eight. 3. Take and record s backsight on 8M-1 and note the upper, middle, ‘and lower cross-hair readings. Direct the rodman to move forward along the general route (not Necessarily in a straight line joining BM-1 and the next point) and establish TP-1. 5. With the leveling rod held plumb on TP-1, take a foresight on it ‘and record the upper, middle, end lower erose-hair readings. Fig. 46. Threewire leveling. Leveling Rog ‘upper stadia noir reading lower stole noir reading i, a 83,

You might also like