You are on page 1of 1

SALES QUOTATION

CLIENT: COLORSTEEL HOLDINGS INC.


ADDRESS: Brgy. Mansilingan, Bacolod City, Negros Occidental
PROJECT: Proposed Warehouse
DATE: 04 January 2023

PHILIPPINE STEELFRAMING CORPORATION IS PLEASED TO SUBMIT ITS PROPOSAL FOR THE CONSTRUCTION OF THE PROPOSED
WAREHOUSE WITH TWO-STOREY OFFICE WITH AN ESTIMATED FLOOR AREA OF 1,746 SQM.

1.0 GENERAL REQUIREMENTS


1.1 MOBILIZATION & DEMOBILIZATION
1.2 MATERIAL TESTING (NDT, FDT & SLUMP TEST)
1.3 SAFETY REQUIREMENTS, PLANS & PERMITS
1.4 SITE SECURITY & WATER & ELECTRICAL CONSUMPTION DURING CONSTRUCTION
1.5 TEMPORARY FENCE (front area only) & TEMPORARY FACILITY
1.6 EQUIPMENT MOBILIZATION AND DEMOBILIZATION
2.0 EARTHWORKS
2.1 LAYOUT AND STAKING
2.2 EXCAVATION
2.3 4" GRAVEL BEDDING
2.4 BACKFILLING & COMPACTION
3.0 CIVIL WORKS
3.1 CONCRETING
3.1.1 FOUNDATION, WALL FOOTING, COLUMNS AND BEAMS (3000 psi)
3.1.2 200mm & 150mm THICK SLAB (2500 & 3000 psi)
3.2 MASONRY
3.2.1 5" CHB WITH 12mm THICK PLASTERING (BOTH SIDES) -EXTERIOR WALLS
3.2.2 4" CHB WITH 12mm THICK PLASTERING (BOTH SIDES) -INTERIOR WALLS
3.3 REINFORCEMENTS
3.3.1 GRADE 40 STRUCTURAL REINFORCEMENTS FOR SIZES 16mmø AND ABOVE
3.3.2 GRADE 33 STRUCTURAL REINFORCEMENTS FOR SIZES BELOW 16mmø
3.4 STEEL WORKS
3.4.1 SUPPLY AND INSTALLATION OF STRUCTURAL STEEL COLUMN, BOLTS AND BASE PLATES
3.4.2 SUPPLY AND INSTALLATION OF STRUCTURAL STEEL BEAMS, BOLTS AND PLATES
3.4.3 SUPPLY AND INSTALLATION OF SIDING FRAMES
3.4.4 SUPPLY AND INSTALLATION ROOF FRAMING SYSTEM
4.0 ARCHITECTURAL WORKS
4.1 ROOFING WORKS
4.1.1 SUPPLY AND INSTALLATION OF 0.500mm THK. RIBTYPE ROOFING (COLORSTEEL-SUPREME)
4.1.2 SUPPLY AND INSTALLATION OF 0.500mm THK. BENDED ACCESSORIES (GUTTER, RIDGE ROLL, END FLASHING & WALL FLASHING)
4.1.3 SUPPLY AND INSTALLATION OF METALIZED SINGLE BUBBLE DOUBLE FOIL INSULATION WITH CHICKEN WIRE
4.2 SIDING WORKS
4.2.1 SUPPLY AND INSTALLATION OF 0.500mm THK. SUPREME PANEL
4.2.2 SUPPLY AND INSTALLATION OF 0.500mm THK. CORNER FLASHING
4.3 PAINTING WORKS
4.2.1 SEMIGLOSS PAINT FOR PLASTERED SURFACES
4.2.2 2 COATS OF EPOXY PRIMER FOR STRUCTURAL STEEL FRAMES
5.0 ELECTRICAL WORKS
5.1 ELECTRICAL WIRING & FIXTURES
6.0 SANITARY/PLUMBING WORKS
6.1 SEPTIC TANK & CATCH BASIN
6.2 WATER & SANITARY LINES
EXCLUSIONS:
* GENSET UNIT, TRANSFORMERS AND CABLES
* COMMERCIAL SPACE
* REQUIRED FEES DURING PERMIT APPLICATION
* ROADWORK NETWORK
* LAND DEVELOPMENT
* ALL OTHER ITEMS NOT SPECIFIED ABOVE
TOTAL PROJECT COST 26,000,000.00

NOTE:
1.0 SCHEDULE OF DELIVERY IS 30 WORKING DAYS AFTER DOWN PAYMENT
2.0 THE QUOTED PRICE IS GOOD FOR ONE WEEK FROM DATE HEREOF
3.0 TERMS OF PAYMENT: SUBJECT TO NEGOTIATION

CONFORME:
Very truly yours,
PHILIPPINE STEELFRAMING CORP.

Signature of Owner / Authorized representative above printed name By: Engr. Robby V. Teresa
Date: January 04, 2023
SQ No.: 2023-0055