You are on page 1of 1

metro.

net

Train Testing Update


Expo Line trains have begun testing. Bulletins will be issued
to keep you informed of the dates, times and frequency of
movement through the community.
Testing schedules are dynamic and updates will be sent
accordingly. If you are posting to your website or other
distribution, please note the date and time of issuance
to ensure it is the most recent.

Current Testing Schedule

In conjunction with the Cities of Los


Angeles and Santa Monica and the Expo
Construction Authority, Metro will be
conducting a headway (frequency of train
service) test to verify that the train control
system can meet headways established by
Metro. This test is necessary as we lead up
to full train service (Spring 2016).
SUNDAY - SATURDAY
JANUARY 10 - 16, 2016
7:00 a.m. to 7:00 p.m.

> Please obey all warning signs and traffic signals


when crossing the tracks.
> Always look both ways before crossing any street.
> Never walk on railroad tracks.
> Watch for trains from both directions.
> Use the crosswalks. Do not jaywalk across the tracks.

DATES AND TIMES ARE SUBJECT TO


CHANGE.
It is necessary to obey ALL traffic signs and
signals at ALL times.
Thank you for your attention and
cooperation.

Issued January 8, 2016

15-1741bg 2015 lacmta

Safety Tips

Along Expo Line tracks from


National/Palms Station to the Downtown
Santa Monica Station (4th St./Colorado)

You might also like