Professional Documents
Culture Documents
Pavement Layers f5 of Rig
Pavement Layers f5 of Rig
1
SALAM
GOHALAN
4
5
N
6
D
7
11.70
TRACK
9
10
11
12
15
2
0
21
22
2
3
ROAD FURNITURE
19
8.25
1
8
R/B WALLS
17
120.65
District: Baramulla
Block: Uri
& COST
EARTHEN SHOULDERS
SURFACE
14.47
IN KMS
DETAILS OF ITEMS
15.79
EXISTING
20 MM O.G.P.C
LENGTH
45.26
TACK COAT
3.62
1
6
TYPE
114.56
58.23
14
12.20
1
3
P/L OF W.B.M-II
ASSESSED
FACILITY
P/L OF G.S.B
A/B/C/D
214.80
TO
7.74
FROM
CUTTINGEARTH WORK IN
SITE CLEARANCE
S.NO
172.99
2.49
Formate-5
TOTAL
TOTAL
892.32
Executive Engineer
JKRRDA
PMGSY Division Baramulla