You are on page 1of 4

Zapanta, Fil Arben

Part I. Mathematics, Transportation Engg and Surveying (25 items)


Solution:
1.
2.
3.
4.
5.
6.
7.
8.

V=

4 3
r
3

4
(64 )
= 3

V = 64 cm.
9.
10
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

h=
6.6 =

R 2a2 R 2b2
R 29.252 R 216.452

R = 19.634 cm

23.

V=

h
3a2 + 3b2 + h2)
6

(6.6)
3(9.25)2 + 3(16.45)2 + 6.62)
6

V = 3843 cm3
24.

A = 2 Rh
= 2 (19.634)(6.6)
A = 814.19 cm

25.

Part II. Design and Construction (30 items)


Situation I1.
Situation 2. Pst = 83000MPa, Pal = 83-28 = 55 MPA, Pbr = 83+35-28 = 90 Mpa
4. st = 83000MPA/50mm2 = 1660 kN
5. al = 55000MPA/ 75 mm2 = 733.33 kN
6. br = 90000MPA/25mm2 = 3600kN
Situation 3.
Situation 4.
Aluminum :
Situation 5.
13. 120 N/mm2 = P/450 mm2
P = 54 kN
14. 80N/mm2 = P/600mm2
P = 48 kN
15. 140N/mm2 = P/300mm2
P = 42 kN

Situation 6.
To = wx2 / 2y = 1500 N/m(8m)2/2.2m = 24000 N
T = 24000N2 + (1500N/m)2(8m)
T = 26.83kN
35000 = w(8)2/2.2m, w = 2187.5 N/m
22. = P/A = 10N/ (2540)2 /4 = 1.97 MPa
23. Pt = t Dt = 450XX20X10 = 283 kN
24. 628318.53 = 6000000/d2
d2 = 3.09mm

You might also like