Operation Department Conducted Lematang River Sand Dredging Project
In order to fully ensure the supply of water to power plant, we have
been conducting the sand dredging project of Lematang River especially the location near our pump boat. The reason of this project is because during dry season the level of Lematang River decreased to 1.1 m near the inlet pipe of water intake pump. If we dont take measure immediately the supply of water to power plant will be disturbed. This project categorized as medium risk of job. The potential risks that can happen are drowning, floating off, bitten by animal, irritation of eye and skin because the bad quality of Lematang river. This project directly hired the three experienced divers who have the experiences handle this kind of project before. In order to ensure their safety and health, we obligated them to wear safety protection equipment such as goggles, respiratory mask, life vest, life jacket, helm, and safety belt. This project needs around 1 week for completion. Stability of operation is our main target, so keep the water supply stable is our main responsibility.