Professional Documents
Culture Documents
11/1/96 KRW
5. Intermediate Pinion
a. Attach a long 1/2" eye bolt to the top of
the Vertical Drive Shaft.
b. Remove fasteners from Intermediate
Pinion Retainer and lower the Vertical
Drive Shaft.
c. Loosen set screw to remove Pinion.
7. Drive Case
a. Tighten Upper Turret Hub Clamp Screw.
b. Remove Cap Guide Section Outer and
Discharge Rail Shaft Support Bracket.
Upper Bearing
Retainer
Spindle Drive
Gear
11/1/96 KRW
Seaming Spindle
Knockout Rod
Seaming Spindle
Bearing Retainer
11/1/96 KRW
3. Upper Turret
a. Split to install Seaming Spindle Drive
Gear, Ball Bearing & Snap Ring.
b. Install Upper Bearing Retainers.
c. Install Seaming Spindles.
d. Install Knockout Springs, Spacers and
Bearings into the Upper Bearing
Retainers.
e. Install Turret Assembly onto Lower Turret
Hollow Shaft.
4. Seaming Cam
a. Align grease ports between the Seaming
Cam Bearing Retainer and Upper Turret.
11/1/96 KRW
5. Drive Case
a. Position over Columns to start Elevator
Screws into Column Threaded Inserts.
First turn the Elevator crank handle
counterclockwise until the ends of
Elevator Screws have located into the
Inserts.
Turn the Handle clockwise to engage
threads.
b. Level Drive Case to within .005" between
all three columns.
c. Lower the Drive Case using the Elevator
System, pregrease the Seaming Cam Oil
Seal, permatex mating surfaces between
Cam Hub and Drive Case to install
fasteners.
6. Vertical Drive Shaft and Intermediate
Drive Pinion.
a. Use a 1/2 eyebolt and over head lift to
lower the Drive Shaft through the Upper
Turret down through the Lower Turret
Hollow Shaft, align splines and block up
from the floor so not to bottom splines
out in the Lower Chuck Drive Gear.
b. Install the Intermediate Drive Pinion.
10
9. Motor
a. Install Motor, Sheave and Driven Pulley.
b. Install Motor Guard.
11
11/1/96 KRW
12
11/1/96 KRW
13
11/1/96 KRW
14
Filler Drive/Seamer
Safety Clutch Assembly