Dimensions (dashed line =NGL)

Bending Schedule
Description
Top & Front

52.000

Shape
Code
35

Shape
a

Bottom & Back

Links
100

No. Off
7

Dia
mm
Y12

Length
mm
1550

Bend Dimensions
a
b
1300

35

Y12

1550

1300

60

R12

2550

638

538

78.129

2600

Pricing Parameters
Steel
Weight

Concrete
Volume

Excavation
volume

(kg)
32.36

(m3)
0.68

(m3)
2.37

Excavation Link plate


s. area
& cleats

(m2)
11.57

Factored
Design
Load

(kg)
74.39

(kN)
327.60

750

Quantities are based on dimensions of design drawings


Allowances have been made for material wastage or overbreak:

Excavation sides:
0 mm
Excavation bottom:
0 mm
Note:
1 Diagrams are not to scale
2 All design data and Construction to Specification TRMSCAAC1 Rev 3

1400
650

3 Concrete strength: 25MPa minimum at 28 days


Bottom link distance from block front edge =485 mm

4 This is a single cast foundation. No construction joints are allowed.


5 Link plate to be encased in concrete with min 50mm cover

LINK PLATE
150 min

(see separate drawing for link plate detail)

NATURAL GROUND LEVEL (NGL)


LARGE PVC PIPE FILLED WITH CONCRETE
TO PROTECT LINK PLATE AGAINST COROSION

150

4 Y12 TOP FACE BARS @ 179 mm c/c

2600

7 R12 STIRRUPS @ 217 mm c/c

Disclaimer:
While due care has been applied in the design of this foundation, the contractor is required to verify that this
design is fit for purpose considering preferred construction methodolgies, geotechnical and structural
requirements required at the point of application.

750

3 Y12 FRONT FACE BARS @ 213 mm c/c


52.000
Revision Description

By

Date

Rev No

EARTH BOND BETWEEN LINK AND REINF.

3 Y12 BOTTOM FACE BARS @ 179 mm c/c


2 Y12 BACK FACE BARS @ 213 mm c/c
485
650

Deadman Anchor Foundation for Guy


for Type 529A Guy Tower
Type 1 Soil
Eskom - Masa - Medupi 1 & 2 400kV Line
Designed:

Checked:
S DUBAZANA

W COMBRINCK

Revision:
Rev 0

Date:

Drawing No:

12-Jul-2012 0.69-U.TX201.035-529A-10-T1-025