Professional Documents
Culture Documents
Unit
ETP Make-up
Fresh Make-up
NTU
6.5-8.0
10-50
7.0-8.0
<1.0
Mg/Ltr
110-170
30-90
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Counts/ml
100-150
70-110
30-45
600-900
1.5-3.0
0
0
0.2
90-150
10-15
<10
0
0.1-0.2
<100000
130-180
50-100
26-36
100-160
<0.1
0
0
0
10-20
05-10
Nil
0
0.1-0.2
<100
C/100ml
<1000
NIL
Unit
NTU
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
PCT
7.0-7.5
<30
30-90
150-400
100-300
50-100
<1000
<1.0
5.0-7.0
8.0-10
13-17
<300
TPS
7.0-7.5
<15
30-90
200-500
150-400
50-100
<1000
<1.0
5.0-7.0
8.0-10
13-17
<300
Silica
Oil
Zinc
FRC
TBC
SRB
ORP
COC
Mg/Ltr
Mg/Ltr
Mg/Ltr
Mg/Ltr
Counts/ml
C/100ml
mV
10-100
<10.0
1.0-2.0
0.2-0.5
<100000
<100
300-500
2
10-100
<10.0
1.0-1.5
0.2-0.5
<100000
<100
300-500
3
Bio fouling Monitor:- This equipment has been commissioned at return line for
Inspection of bio fouling. Differential Pressure across biofouling monitor should not
exceed more than 20% of the initial value through out the contact period.
Deposit Monitor: - This equipment has been commissioned at return line for
Inspection of deposition in cooling water systems. Deposition on heater of deposit
monitor should be loose in nature and deposition should be < 15mg/dm2/year.
3-CORROSION MONITORING OF COOLING WATER SYSTEMCorrosion coupons are installed for monitoring of corrosion in Cooling Water
system. Corrosion Rate -3 mpy max. For M.S, 0.5 mpy max for Brass.
4- TEST COOLER:This equipment has been commissioned at return line for
Inspection of overall performance of circulating water.
5- PLANT SURVEY: - Plant survey carried out to know about the performance of
critical Exchanger of the plant.