PERFECT ENGINEERING AND TRADING COMPANY

19/3-Temple Road, Ground Floor, Behind Farid Tower, Lahore.


Phone: 0345-9225313, Cell: 0300-6734529, E-mail: Perfectengg@hotmail.com

M/S: Scandic Green Energy


C/O Unilever PC Factory,
Rahim Yar Khan.

Attn: MR. Tanveer Ahmed (Boiler Engineer)

Water Testing Report of Biomass Boiler (Dated: 11-02-2022)


Parameters Boiler Drum Water Status Limits for
Feed Water (Boiler Blow Down) Drum Water
TDS mg/l 85 1760 OK 3000
pH 7.8 10.4 Low 10.5 to 11.5
Iron (mg/l) 0.00 0.03 OK <0.1
Color of Water Clear Light Reddish OK Light Reddish
Total Hardness mg/l 35 85 High 0 to 50
Phosphate mg/l Nil <5 Low 40 to 60
Sulphite mg/l Nil 5 Low 30 to 50
M-Alkalinity (HCO3) mg/l 5 130 Low 300 to 600
P-Alkalinity (CO3) mg/l 0 70 Low 200 to 300
Chloride (as Cl) mg/l 21 374 OK 500

Observations & Recommendations:


Sulphite and Phosphate levels are very low in drum water which indicates an improper dosing of
chemicals. Remember that a continuous low concentration of phosphate and sulphite causes
scales and corrosion in the boiler. To maintain these parameters ensure dosing of chemicals (TH-
440 & TH-707) with a continuous dosing system and according to the given quantity.
Moreover Drum water Hardness is also still high; this should be in the range of 0 to 5 ppm. You
must use soft water or pure RO product of zero Hardness for the boiler feed.
To maintain the Alkalinity and pH level of Boiler, dose some caustic (NaOH) in boiler feed tank.

Chemical Dosing Schedule


Parameters Chemical Quantity Dosing
For Phosphate TH-707 2.5 kg Per 24 hours by dosing apparatus
For Sulphite TH-440 3.0 kg Per 24 hours by dosing apparatus
Amines BPS-920 3.0 kg Per 24 hours by dosing apparatus

Done By:
Muhammad Ahmed