NO.
ITEM PEKERJAAN
1 Perkejaan Persiapan
a.Pembersihan Lahan
b.Pekerjaan pengurukan dan pemadatan tanah t = 50cm
c.Bowplank
VOLUME
Panjang
Lebar
=
=
5
5
m
m
Volume
=
=
5
25
x
m2
Panjang
Lebar
Tinggi
=
=
=
5
5
0.5
m
m
m
Volume
=
=
5
12.5
x
m3
Panjang
Lebar
=
=
5
5
m
m
Volume
=
=
5
20
+
m
0.5
NO.
ITEM PEKERJAAN
1 Perkejaan Tanah
a.Galian Tanah
b.Pasir Urug
c.Anstanting (Pasangan Batu Kosong)
d.Urugan Kembali
VOLUME
Tinggi
Lebar A
Lebar B
=
=
=
0.85 m
1.2 m
0.8
Luas
1.2
0.8
0.9
+
2
0.85 m2
2.5
2.5
2.5
2.5
2.5
2.5
+
m
2.5
2.5
2.5
1.5
2.5
30
Volume
=
=
0.85 x
25.5 m3
Tinggi
Lebar A
Lebar B
=
=
=
0.15 m
0.87 m
0.8 m
Luas
0.8
0.87
0.15
Panjang
30
+
2
0.13 m2
2.5
2.5
2.5
2.5
2.5
2.5
+
m
2.5
2.5
2.5
1.5
2.5
30
Volume
=
=
0.13 x
3.76 m3
Tinggi
Lebar A
Lebar B
=
=
=
0.1 m
0.87 m
0.92 m
Luas
0.1
Panjang
0.87
+
2
0.09 m2
30
0.92
Panjang
Volume
Volume
Volume
Volume
Volume
Volume
2.5
2.5
2.5
2.5
2.5
2.5
+
m
2.5
2.5
2.5
1.5
2.5
30
=
=
0.09 x
2.69 m3
3.76
2.69
8.1
Galian
Urugan Pasir
Anstanting
Pondasi
Sloof
Volume Urugan Kembali
30
=
=
=
=
=
25.5 m3
3.76 m3
2.69 m3
8.1 m3
0.9 m3
=
=
25.5
10.1 m3
2.5
2.5
0.9
2.5
NO.
ITEM PEKERJAAN
1 Pekerjaan Pondasi
VOLUME
Tinggi
Lebar A
Lebar B
=
=
=
Luas
=
=
Panjang
Volume
0.6 m
0.6 m
0.3 m
0.6
+
2
0.27 m2
0.3
0.6
2.5
2.5
2.5
2.5
2.5
2.5
+
m
2.5
2.5
2.5
1.5
2.5
30
=
=
0.27 x
8.1 m3
30
2.5
NO.
ITEM PEKERJAAN
1 Pekerjaan Beton
a.Sloof
b.Kolom
c.Ring Balk
VOLUME
Tinggi
Lebar
=
=
0.2
0.15
m
m
Luas
=
=
0.2
0.03
x
m2
0.15
Panjang
2.5
2.5
2.5
2.5
+
m
2.5
2.5
2.5
2.5
30
Volume
=
=
0.03
0.9
x
m3
30
Panjang
Lebar
Tinggi
=
=
=
0.15
0.15
3.4
m
m
m
12
Volume
=
=
0.15
0.918
x
m3
3.4
12
Tinggi
Lebar
=
=
0.2
0.15
m
m
Luas
=
=
0.2
0.03
x
m2
0.15
Panjang
2.5
2.5
2.5
2.5
+
m
2.5
2.5
2.5
2.5
30
=
=
0.03
0.9
x
m3
30
Volume
0.15
2.5
2.5
1.5
2.5
2.5
1.5
2.5
2.5
NO.
ITEM PEKERJAAN
1 Perkerjaan Pembesian
a.Sloof
b.Kolom
c.Ringbalk
VOLUME
a. 4D10
Panjang
2.5
2.5
2.5
+
m
2.5
2.5
2.5
30
Volume (n)
=
=
30
120
x
m
Berat
0.62
kg/m
Kebutuhan Besi
=
=
0.62
74.4
*
kg
Panjang
Lebar
Selimut Beton
=
=
=
0.2
0.15
0.04
m
m
m
Panjang 1 Sengkang
2
2
x
x
0.2
0.15
(
(
2
2
Bengkokan
=
=
6D
0.096
x
m
Panjang 1 Sengkang + Bengkokan
=
0.096
=
0.636
+
m
0.54
Jumlah Sengkang
a.
Panjang Sloof
b.
Jarak Tulangan
c
Jumlah Sengkang
m
m
+
120
b. Sengkang P8-100
Kebutuhan Besi
=
=
=
=
30
0.1
30
0.1
301
buah
0.636
301
a.
b.
191.4
Berat Besi P8
0.393 kg/m
Kebutuhan Besi (kg)
=
=
191.4
75.23
4 D 10
Tinggi Kolom
Jumlah Kolom
Tulangan yang digunakan
=
=
=
x
kg
0.393
3.4 m
12 buah
4 D 10
Volume Besi Utama
=
=
3.4
163.2
x
m
Berat
0.62
kg/m
Kebutuhan Besi
=
=
0.62
101.2
*
kg
Sengkang P8-100
Panjang
Lebar
Selimut Beton
=
=
=
0.15
0.15
0.04
m
m
m
Panjang 1 Sengkang
2
2
x
x
0.15
0.15
Bengkokan
=
=
6D
0.096
x
m
Panjang 1 Sengkang + Bengkokan
=
0.096
=
0.536
+
m
0.44
Jumlah Sengkang
a.
Panjang Kolom
b.
Jarak Tulangan
c
Jumlah Sengkang
d.
Jumlah Kolom
Kebutuhan Besi
=
=
=
=
=
=
=
3.4
m
0.1
m
3.4
+
0.1
35
buah
12
buah
0.536
x
225.1 m
12
(
(
12
163.2
35
2
2
a.
Berat Besi P8
0.393 kg/m
Kebutuhan Besi (kg)
=
=
225.1
88.47
4D10
Panjang Ringbalk
Jumlah Ringbalk
Tulangan yang digunakan
Volume Besi Utama
b.
=
=
=
x
kg
0.393
5 m
3 buah
4 D 10
=
=
Berat
0.62
kg/m
Kebutuhan Besi
=
=
0.62
37.2
*
kg
Sengkang P8-100
Panjang
Lebar
Selimut Beton
=
=
=
0.15
0.2
0.04
m
m
m
Panjang 1 Sengkang
2
2
x
x
0.15
0.2
Bengkokan
=
=
6D
0.096
x
m
Panjang 1 Sengkang + Bengkokan
=
0.096
=
0.636
+
m
0.54
Jumlah Sengkang
a.
Panjang Ringbalk
b.
Jarak Tulangan
c
Jumlah Sengkang
=
=
=
60
x
m
d.
Jumlah Kolom
Kebutuhan Besi
=
=
=
=
5
m
0.1
m
3.4
+
0.1
35
buah
12
buah
0.636
x
267.1 m
Berat Besi P8
0.393 kg/m
(
(
12
60
35
2
2
Kebutuhan Besi (kg)
=
=
267.1
105
x
kg
0.393
2.5
2.5
2.5
2.5
2.5
1.5
x
x
0.04
0.04
)
)
=
=
0.32
0.22
0.54
x
x
0.04
0.04
)
)
=
=
0.22
0.22
0.44
x
x
0.04
0.04
)
)
=
=
0.22
0.32
0.54
NO.
ITEM PEKERJAAN
1 Pekerjaan Lantai
a.Pasangan Lantai Kerja Screeding T=5cm
b.Lantai Keramik
c. Pasir Pasang
d. Rabat
e. Spesi
VOLUME
Luasan
a.Kamar
Panjang
Lebar
Luas
=
=
=
2.5
2.5
6.25
m
m
m2
b.Ruang Tamu
Panjang
Lebar
Luas
=
=
=
2.5
2.5
6.25
m
m
m2
c.Mushola
Panjang
Lebar
Luas
=
=
=
2.5
1.5
3.75
m
m
m2
d.Ruang Keluarga
Panjang
Lebar
Luas
=
=
=
2.5
2.5
6.25
m
m
m2
=
=
=
=
=
2.5
1
2.5
25
0.05
m
m
m2
m2
m2
1.25
m3
e. Teras
Panjang
Lebar
Luas
Luas Total
Tinggi
Volume
Luas Total
Ukuran Keramik
Luas keramik per kotak
Keramik cadangan
=
=
=
=
Jumlah Keramik yang dib
Jumlah keramik yang seha
=
=
=
=
25
30 x 30
1
m2
3
%
25
Kotak
25
x
25.75 Kotak
24
Kotak
103
tebal
volume pasir pasang
=
=
=
10
25
2.5
cm
x
m3
tebal
=
=
=
=
5
0.05
25
1.25
cm
m
x
m3
=
=
=
0.04
25
1
m
x
m3
Volume timbunan rabat
Tebal spesi
Volume timbunan spesi
0.1
0.05
0.04
VOLUME
100
NO.
ITEM PEKERJAAN
1 Perkerjaan Dinding
a.Pasangan Dinding Bata
b. Plesteran
c. Pengecatan
d. Acian
VOLUME
Panjang
Lebar
Tinggi
Asumsi Tanpa
Volume
=
30
m
=
0.15 m
=
3.4
m
Jendela dan pintu
=
30
x
=
15.3 m3
Dengan Pintu Jendela
Luas
=
30
=
102
3.4
x
m2
3.4
1.58
2.465
2
+
4.55
1.052
x
m2
x
(
m2
m3
1.56
b. Tampak samping kanan
Kusen d=
1.58
=
2.465
Ventilas=
0.56
=
0.459
Jumlah =
0.439
x
m2
x
m2
m3
1.56
0.82
x
m2
m3
1.58
Luasan
a. Tampak Depan
Kusen d=
=
Pintu J =
=
Jumlah =
c. Tampak samping kiri
Kusen d=
1.56
=
1.279
Kusen d=
1.56
=
2.465
Jumlah =
0.562
d. Tampak Belakang
Pintu d =
(
2.32
=
3.182 m2
Jumlah =
0.477 m3
(
0.5
0.15
0.485 x
x
0.25
1.56
x
)
+
3.142 x
0.82
0.82
Volume total pasangan dinding batu bata
0.82
=
=
15.3 12.77 m3
Luas pasangan dinding batu bata
=
12.77 /
=
85.14 m2
Tebal Plesteran=
=
Luas Plesteran=
=
Volume Plester=
=
2
0.02
85.14
170.3
170.3
3.405
Kebutuhan cat=
=
85.14 x
170.3 m2
Tebal acian
0.2
0.002
170.3
0.341
=
=
Volume Acian =
=
cm
m
x
x
m3
cm
m
x
m3
0.15
2
0.02
0.002
1.052 +
0.439 +
0.562
(
0.92
1.38
x
x
0.92
1.56
1.96
)
0.477 )
NO.
ITEM PEKERJAAN
1 Perkerjaan Bekasting
a.Sloof 15/20
b.Kolom
c.Ring Balk
d.Balok Cantilever Canopy
e.Ring Balk pada Cantilever Canopy
VOLUME
Panjang
Lebar
Tinggi
=
=
=
30
0.15
0.2
Kebutuhan Bekasting
=
=
30
12
x
m2
0.2
Kayu Kelas 3
Paku 5-10cm
Minyak Bekasting
Balok Kayu Kelas 2
Plywood
=
=
=
=
=
dimensi
Tinggi
Jumlah
=
=
=
Kebutuhan bekisting
=
=
12
12.24
x
m2
0.15
Dimensi
panjang
=
=
20
30
15
Kebutuhan bekisting
=
=
0.2
12
Dimensi
panjang
=
=
30
2
x
m
15
Kebutuhan bekisting
=
=
(
1.8
(
m2
0.3
Dimensi
panjang
Kebutuhan bekisting
=
=
=
=
15
3
(
2.1
x
m
(
m2
20
30
0.36
m3
4.8
kg
1.8
liter
0.18
m3
4.2 lembar
15
x
3.4 m
12 buah
15
0.15
3.4
0.15
)x2
0.2
)x3
NO.
1
ITEM PEKERJAAN
Pekerjaan Atap
a. Gording
a. Atap 1
b. Atap 2
b. Nok
a. Atap 1
b. Atap 2
c. Usuk
a. Atap 1
b. Atap 2
d. Reng
a. Atap 1
b. Atap 2
VOLUME
a. Atap 1
Dimensi Penampang Gord
Tritisan dari kolom terluar
Panjang Gording
Jumlah Gording
Kebutuhan Gording
Volume
b. Atap 2
Dimensi Penampang Gord
Panjang Gording
Jumlah gording
Kebutuhan Gording
Volume
Volume total
a. Atap 1
Dimensi penampang nok
Panjang nok
Jumlah nok
Kebutuhan nok
Volume
b. Atap 2
Dimensi penampang nok
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
8
0.08
x
x
80
5
+
6.75
m
4
buah
6.75
x
27
m
0.08
x
0.2592 m3
8
0.08
x
x
1.5
m
2
buah
1.5
x
3
m
0.08
x
0.0288 m3
0.288 m3
8
0.08
6.75
2
6.75
13.5
0.08
0.1296
8
0.08
x
x
m
buah
x
m
x
m3
x
x
12
0.12
0.15
cm
m
cm
+
1.6
4
0.12
12
0.12
Kayu balok 8 x 12 cm
x
27
cm
m
2
0.12
12
0.12
Kayu balok 8 x 12 cm
x
3
cm
2
0.12
12
0.12
Kayu balok 8 x 12 cm
x
13.5
cm
Panjang nok
Jumlah nok
Kebutuhan nok
Volume
Volume total
a. Atap 1
Dimensi penampang kolo
1 baris panjang usuk
Jumlah usuk
Kebutuhan usuk
Volume
b. Atap 2
Usuk
1 baris panjang usuk
Jumlah usuk
Kebutuhan usuk
Volume
Volume total
a. Atap 1
Dimensi Penampang Reng
Panjang 1 baris Reng
Jumlah Reng
Kebutuhan Reng
Volume
=
=
=
=
=
=
=
1.5
m
1
buah
1.5
x
1.5
m
0.08
x
0.0144
m3
0.144 m3
1
0.12
=
=
=
=
=
=
=
=
=
5
0.05
2.165
7.06
6
7.06
42.36
0.05
0.1483
x
x
+
m
baris
x
m
x
m3
7
0.07
1.365
=
=
=
=
=
=
=
=
=
=
5
0.05
1.275
3.28
3
3.28
9.84
0.05
0.0344
0.1827
x
x
+
m
baris
x
m
x
m3
m3
7
0.07
1.23
=
=
2
0.02
=
=
=
=
=
6.75
15
(
202.5
0.02
x
x
m
baris
6.75
m
x
Kayu balok 8 x 12 cm
x
1.5
cm
m
+
1.365
6
0.07
Usuk 5 x 7 cm
x
42.36
cm
m
+
0.775
3
Usuk 5 x 7 cm
0.07 x
9.84
3
0.03
x
0.03
cm
m
15
)
Reng 2 x 3 cm
x
202.5
b. Atap 2
Dimensi Penampang Reng
Panjang 1 baris Reng
Jumlah Reng
Kebutuhan Reng
Volume
Volume total
0.1215
=
=
2
0.02
1.5
3
m3
x
x
=
=
=
=
=
=
9
0.02
0.0054
m
baris
1.5
m
x
m3
0.1269
m3
3
0.03
x
0.03
cm
m
3
)
Reng 2 x 3 cm
x
9
2.165
NO.
ITEM PEKERJAAN
1 Pekerjaan Persiapan
a.Pembersihan Lahan
b.Pekerjaan pengurukan dan pemadatan tanah t = 50cm
c.Bowplank
2 Pekerjaan Tanah
a. Galian Tanah
b. Pasir urug
c. Anstanting
d. Urugan kembali
3 Pekerjaan Pondasi
4 Pekerjaan beton
a. Sloof
b. Kolom
c. Ringbalk
5 Pekerjaan Pembesian
a. Sloof
b. Kolom
c. Ringbalk
6 Pekerjaan Lantai
a. Pasangan lantai kerja
b. Lantai keramik
c. Pasir pasang
d. Rabat
e. Spesi
7 Pekerjaan dinding
a. Pasang dinding bata
b. Plesteran
c. Pengecatan
d. Acian
8 Becasting
a. Sloof 15/20
b. Kolom
c. Ring Balk
d. Balok cantilever canopy
e. Ring balk pada cantilever canopy
9 Pekerjaan Atap
a. Gording
b. Nok
c. Usuk
d. Reng
Satuan
VOLUME
Uraian
Satuan
m2
25
m3
12.5
20
Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Jumlah
m3
25.5
m3
3.7575
m3
2.685
m3
10.0575
Jumlah
m3
8.1
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Orang/hari
Orang/hari
Orang/hari
Orang/hari
m3
0.9
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
m3
0.918
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Jumlah
m3
0.9
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Jumlah Keseluruhan
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
120
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
163.2
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
60
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Jumlah Keseluruhan
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
m3
1.25
m3
m3
m3
2.5
1.25
1
m3
m3
12.7702829667
3.4054087911
m3
0.3405408791
m2
m2
m2
m2
m2
m3
m3
m3
m3
0.288
0.144
0.1827
0.1269
Harga Satuan
Harga
Rp
Rp
Rp
Rp
Rp
Rp
42,000.00
80,000.00
42,000.00
80,000.00
42,000.00
80,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,050,000.00
2,000,000.00
525,000.00
1,000,000.00
840,000.00
1,600,000.00
7,015,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
42,000.00
80,000.00
42,000.00
80,000.00
42,000.00
80,000.00
42,000.00
80,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,071,000.00
2,040,000.00
157,815.00
300,600.00
112,770.00
214,800.00
422,415.00
804,600.00
5,124,000.00
Rp
Rp
Rp
Rp
42,000.00
65,000.00
75,000.00
80,000.00
Rp
Rp
Rp
Rp
Rp
340,200.00
526,500.00
607,500.00
648,000.00
2,122,200.00
Rp
Rp
Rp
Rp
Rp
Rp
42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
37,800.00
63,000.00
63,000.00
63,000.00
72,000.00
76,500.00
375,300.00
Rp
Rp
Rp
Rp
Rp
Rp
42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00
Rp
Rp
Rp
Rp
Rp
Rp
38,556.00
64,260.00
64,260.00
64,260.00
73,440.00
78,030.00
Rp
Rp
Rp
Rp
Rp
Rp
42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00
Rp
Rp
Rp
Rp
Rp
Rp
42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00
Rp
Rp
Rp
Rp
Rp
Rp
42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00
Rp
Rp
Rp
Rp
Rp
Rp
42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00
Rp
382,806.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
37,800.00
63,000.00
63,000.00
63,000.00
72,000.00
76,500.00
375,300.00
1,133,406.00
DAFTAR HARGA MATERIAL
Uraian
Batu Bata
Pasir Mundu
Semen Tiga Roda
Paku kayu 5 cm
Paku Kayu 7 cm
Paku Kayu 10 cm
Kayu Reng "Kamper"
Kayu Usuk "Kamper"
Kayu balok "Kamper"
Keramik Lantai Arwana Put
Kawat Beton
Kayu papan terentang (bah
Pasir Urug
Kayu dolken (tiang bekisti
Satuan
buah
m3
50 kg
kg
kg
kg
batang
batang
batang
kotak
kg
m3
m3
batang
Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
500.00
270,000.00
63,000.00
14,000.00
14,000.00
14,000.00
17,000.00
70,000.00
210,000.00
30,000.00
27,700.00
2,279,000.00
181,000.00
31,000.00