0% found this document useful (0 votes)
64 views79 pages

Rincian Pekerjaan Konstruksi

This document provides information on the volumes of various construction materials and elements needed for a building project. It includes volumes for items like excavation, foundation, concrete columns and beams, rebar, formwork, and masonry walls. For each construction element, it specifies the dimensions and calculates the volume based on the length, width, height and number of elements. The total volumes are provided for excavation, backfill, foundation, concrete, rebar and other materials.

Uploaded by

liaverina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
64 views79 pages

Rincian Pekerjaan Konstruksi

This document provides information on the volumes of various construction materials and elements needed for a building project. It includes volumes for items like excavation, foundation, concrete columns and beams, rebar, formwork, and masonry walls. For each construction element, it specifies the dimensions and calculates the volume based on the length, width, height and number of elements. The total volumes are provided for excavation, backfill, foundation, concrete, rebar and other materials.

Uploaded by

liaverina
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

NO.

ITEM PEKERJAAN
1 Perkejaan Persiapan
a.Pembersihan Lahan

b.Pekerjaan pengurukan dan pemadatan tanah t = 50cm

c.Bowplank

VOLUME

Panjang
Lebar

=
=

5
5

m
m

Volume

=
=

5
25

x
m2

Panjang
Lebar
Tinggi

=
=
=

5
5
0.5

m
m
m

Volume

=
=

5
12.5

x
m3

Panjang
Lebar

=
=

5
5

m
m

Volume

=
=

5
20

+
m

0.5

NO.

ITEM PEKERJAAN
1 Perkejaan Tanah
a.Galian Tanah

b.Pasir Urug

c.Anstanting (Pasangan Batu Kosong)

d.Urugan Kembali

VOLUME

Tinggi
Lebar A
Lebar B

=
=
=

0.85 m
1.2 m
0.8

Luas

1.2

0.8

0.9

+
2
0.85 m2

2.5

2.5

2.5

2.5

2.5

2.5

+
m

2.5

2.5

2.5

1.5

2.5
30

Volume

=
=

0.85 x
25.5 m3

Tinggi
Lebar A
Lebar B

=
=
=

0.15 m
0.87 m
0.8 m

Luas

0.8

0.87

0.15

Panjang

30

+
2
0.13 m2

2.5

2.5

2.5

2.5

2.5

2.5

+
m

2.5

2.5

2.5

1.5

2.5
30

Volume

=
=

0.13 x
3.76 m3

Tinggi
Lebar A
Lebar B

=
=
=

0.1 m
0.87 m
0.92 m

Luas

0.1

Panjang

0.87

+
2
0.09 m2

30

0.92

Panjang

Volume

Volume
Volume
Volume
Volume
Volume

2.5

2.5

2.5

2.5

2.5

2.5

+
m

2.5

2.5

2.5

1.5

2.5
30

=
=

0.09 x
2.69 m3

3.76

2.69

8.1

Galian
Urugan Pasir
Anstanting
Pondasi
Sloof

Volume Urugan Kembali

30

=
=
=
=
=

25.5 m3
3.76 m3
2.69 m3
8.1 m3
0.9 m3

=
=

25.5
10.1 m3

2.5

2.5

0.9

2.5

NO.

ITEM PEKERJAAN
1 Pekerjaan Pondasi

VOLUME

Tinggi
Lebar A
Lebar B

=
=
=

Luas

=
=

Panjang

Volume

0.6 m
0.6 m
0.3 m
0.6

+
2
0.27 m2

0.3

0.6

2.5

2.5

2.5

2.5

2.5

2.5

+
m

2.5

2.5

2.5

1.5

2.5
30

=
=

0.27 x
8.1 m3

30

2.5

NO.

ITEM PEKERJAAN
1 Pekerjaan Beton
a.Sloof

b.Kolom

c.Ring Balk

VOLUME

Tinggi
Lebar

=
=

0.2
0.15

m
m

Luas

=
=

0.2
0.03

x
m2

0.15

Panjang

2.5

2.5

2.5

2.5

+
m

2.5

2.5

2.5

2.5
30

Volume

=
=

0.03
0.9

x
m3

30

Panjang
Lebar
Tinggi

=
=
=

0.15
0.15
3.4

m
m
m

12

Volume

=
=

0.15
0.918

x
m3

3.4

12

Tinggi
Lebar

=
=

0.2
0.15

m
m

Luas

=
=

0.2
0.03

x
m2

0.15

Panjang

2.5

2.5

2.5

2.5

+
m

2.5

2.5

2.5

2.5
30

=
=

0.03
0.9

x
m3

30

Volume

0.15

2.5

2.5

1.5

2.5

2.5

1.5

2.5

2.5

NO.

ITEM PEKERJAAN
1 Perkerjaan Pembesian
a.Sloof

b.Kolom

c.Ringbalk

VOLUME

a. 4D10
Panjang

2.5

2.5

2.5

+
m

2.5

2.5

2.5
30

Volume (n)

=
=

30
120

x
m

Berat

0.62

kg/m

Kebutuhan Besi

=
=

0.62
74.4

*
kg

Panjang
Lebar
Selimut Beton

=
=
=

0.2
0.15
0.04

m
m
m

Panjang 1 Sengkang

2
2

x
x

0.2
0.15

(
(

2
2

Bengkokan

=
=

6D
0.096

x
m

Panjang 1 Sengkang + Bengkokan


=
0.096
=
0.636

+
m

0.54

Jumlah Sengkang
a.
Panjang Sloof
b.
Jarak Tulangan
c
Jumlah Sengkang

m
m
+

120

b. Sengkang P8-100

Kebutuhan Besi

=
=
=
=

30
0.1
30
0.1
301

buah

0.636

301

a.

b.

191.4

Berat Besi P8

0.393 kg/m

Kebutuhan Besi (kg)

=
=

191.4
75.23

4 D 10
Tinggi Kolom
Jumlah Kolom
Tulangan yang digunakan

=
=
=

x
kg

0.393

3.4 m
12 buah
4 D 10

Volume Besi Utama

=
=

3.4
163.2

x
m

Berat

0.62

kg/m

Kebutuhan Besi

=
=

0.62
101.2

*
kg

Sengkang P8-100
Panjang
Lebar
Selimut Beton

=
=
=

0.15
0.15
0.04

m
m
m

Panjang 1 Sengkang

2
2

x
x

0.15
0.15

Bengkokan

=
=

6D
0.096

x
m

Panjang 1 Sengkang + Bengkokan


=
0.096
=
0.536

+
m

0.44

Jumlah Sengkang
a.
Panjang Kolom
b.
Jarak Tulangan
c
Jumlah Sengkang

d.
Jumlah Kolom
Kebutuhan Besi

=
=
=
=
=
=
=

3.4
m
0.1
m
3.4
+
0.1
35
buah
12
buah
0.536
x
225.1 m

12

(
(

12

163.2

35

2
2

a.

Berat Besi P8

0.393 kg/m

Kebutuhan Besi (kg)

=
=

225.1
88.47

4D10
Panjang Ringbalk
Jumlah Ringbalk
Tulangan yang digunakan
Volume Besi Utama

b.

=
=
=

x
kg

0.393

5 m
3 buah
4 D 10

=
=

Berat

0.62

kg/m

Kebutuhan Besi

=
=

0.62
37.2

*
kg

Sengkang P8-100
Panjang
Lebar
Selimut Beton

=
=
=

0.15
0.2
0.04

m
m
m

Panjang 1 Sengkang

2
2

x
x

0.15
0.2

Bengkokan

=
=

6D
0.096

x
m

Panjang 1 Sengkang + Bengkokan


=
0.096
=
0.636

+
m

0.54

Jumlah Sengkang
a.
Panjang Ringbalk
b.
Jarak Tulangan
c
Jumlah Sengkang

=
=
=

60

x
m

d.
Jumlah Kolom
Kebutuhan Besi

=
=
=
=

5
m
0.1
m
3.4
+
0.1
35
buah
12
buah
0.636
x
267.1 m

Berat Besi P8

0.393 kg/m

(
(

12

60

35

2
2

Kebutuhan Besi (kg)

=
=

267.1
105

x
kg

0.393

2.5

2.5

2.5

2.5

2.5

1.5

x
x

0.04
0.04

)
)

=
=

0.32
0.22
0.54

x
x

0.04
0.04

)
)

=
=

0.22
0.22
0.44

x
x

0.04
0.04

)
)

=
=

0.22
0.32
0.54

NO.

ITEM PEKERJAAN
1 Pekerjaan Lantai
a.Pasangan Lantai Kerja Screeding T=5cm

b.Lantai Keramik

c. Pasir Pasang

d. Rabat

e. Spesi

VOLUME

Luasan
a.Kamar
Panjang
Lebar
Luas

=
=
=

2.5
2.5
6.25

m
m
m2

b.Ruang Tamu
Panjang
Lebar
Luas

=
=
=

2.5
2.5
6.25

m
m
m2

c.Mushola
Panjang
Lebar
Luas

=
=
=

2.5
1.5
3.75

m
m
m2

d.Ruang Keluarga
Panjang
Lebar
Luas

=
=
=

2.5
2.5
6.25

m
m
m2

=
=
=
=
=

2.5
1
2.5
25
0.05

m
m
m2
m2
m2

1.25

m3

e. Teras
Panjang
Lebar
Luas
Luas Total
Tinggi
Volume

Luas Total
Ukuran Keramik
Luas keramik per kotak
Keramik cadangan

=
=
=
=

Jumlah Keramik yang dib


Jumlah keramik yang seha

=
=
=
=

25
30 x 30
1
m2
3
%
25

Kotak
25
x
25.75 Kotak
24
Kotak

103

tebal
volume pasir pasang

=
=
=

10
25
2.5

cm
x
m3

tebal

=
=
=
=

5
0.05
25
1.25

cm
m
x
m3

=
=
=

0.04
25
1

m
x
m3

Volume timbunan rabat

Tebal spesi
Volume timbunan spesi

0.1

0.05

0.04

VOLUME

100

NO.

ITEM PEKERJAAN
1 Perkerjaan Dinding
a.Pasangan Dinding Bata

b. Plesteran

c. Pengecatan

d. Acian

VOLUME

Panjang
Lebar
Tinggi
Asumsi Tanpa
Volume

=
30
m
=
0.15 m
=
3.4
m
Jendela dan pintu
=
30
x
=
15.3 m3

Dengan Pintu Jendela


Luas
=
30
=
102

3.4

x
m2

3.4

1.58
2.465
2
+
4.55
1.052

x
m2
x
(
m2
m3

1.56

b. Tampak samping kanan


Kusen d=
1.58
=
2.465
Ventilas=
0.56
=
0.459
Jumlah =
0.439

x
m2
x
m2
m3

1.56

0.82

x
m2
m3

1.58

Luasan
a. Tampak Depan
Kusen d=
=
Pintu J =
=
Jumlah =

c. Tampak samping kiri


Kusen d=
1.56
=
1.279
Kusen d=
1.56
=
2.465
Jumlah =
0.562

d. Tampak Belakang
Pintu d =
(
2.32
=
3.182 m2
Jumlah =
0.477 m3

(
0.5

0.15

0.485 x
x
0.25

1.56
x

)
+
3.142 x

0.82

0.82

Volume total pasangan dinding batu bata

0.82

=
=

15.3 12.77 m3

Luas pasangan dinding batu bata


=
12.77 /
=
85.14 m2

Tebal Plesteran=
=
Luas Plesteran=
=
Volume Plester=
=

2
0.02
85.14
170.3
170.3
3.405

Kebutuhan cat=
=

85.14 x
170.3 m2

Tebal acian

0.2
0.002
170.3
0.341

=
=
Volume Acian =
=

cm
m
x
x
m3

cm
m
x
m3

0.15

2
0.02

0.002

1.052 +

0.439 +

0.562

(
0.92

1.38
x

x
0.92

1.56

1.96
)

0.477 )

NO.

ITEM PEKERJAAN
1 Perkerjaan Bekasting
a.Sloof 15/20

b.Kolom

c.Ring Balk

d.Balok Cantilever Canopy

e.Ring Balk pada Cantilever Canopy

VOLUME

Panjang
Lebar
Tinggi

=
=
=

30
0.15
0.2

Kebutuhan Bekasting

=
=

30
12

x
m2

0.2

Kayu Kelas 3
Paku 5-10cm
Minyak Bekasting
Balok Kayu Kelas 2
Plywood

=
=
=
=
=

dimensi
Tinggi
Jumlah

=
=
=

Kebutuhan bekisting

=
=

12
12.24

x
m2

0.15

Dimensi
panjang

=
=

20
30

15

Kebutuhan bekisting

=
=

0.2
12

Dimensi
panjang

=
=

30
2

x
m

15

Kebutuhan bekisting

=
=

(
1.8

(
m2

0.3

Dimensi
panjang
Kebutuhan bekisting

=
=
=
=

15
3
(
2.1

x
m
(
m2

20

30

0.36
m3
4.8
kg
1.8
liter
0.18
m3
4.2 lembar
15
x
3.4 m
12 buah

15

0.15

3.4

0.15

)x2

0.2

)x3

NO.
1

ITEM PEKERJAAN
Pekerjaan Atap
a. Gording

a. Atap 1

b. Atap 2

b. Nok

a. Atap 1

b. Atap 2

c. Usuk

a. Atap 1

b. Atap 2

d. Reng

a. Atap 1

b. Atap 2

VOLUME

a. Atap 1
Dimensi Penampang Gord

Tritisan dari kolom terluar


Panjang Gording
Jumlah Gording
Kebutuhan Gording
Volume

b. Atap 2
Dimensi Penampang Gord

Panjang Gording
Jumlah gording
Kebutuhan Gording
Volume
Volume total
a. Atap 1
Dimensi penampang nok

Panjang nok
Jumlah nok
Kebutuhan nok
Volume

b. Atap 2
Dimensi penampang nok

=
=
=
=
=
=
=
=
=
=

=
=
=
=
=
=
=
=
=

=
=
=
=
=
=
=
=

=
=

8
0.08

x
x

80
5
+
6.75
m
4
buah
6.75
x
27
m
0.08
x
0.2592 m3

8
0.08

x
x

1.5
m
2
buah
1.5
x
3
m
0.08
x
0.0288 m3
0.288 m3

8
0.08
6.75
2
6.75
13.5
0.08
0.1296

8
0.08

x
x
m
buah
x
m
x
m3

x
x

12
0.12

0.15

cm
m
cm
+

1.6

4
0.12

12
0.12

Kayu balok 8 x 12 cm
x
27

cm
m

2
0.12

12
0.12

Kayu balok 8 x 12 cm
x
3

cm

2
0.12

12
0.12

Kayu balok 8 x 12 cm
x
13.5

cm

Panjang nok
Jumlah nok
Kebutuhan nok
Volume
Volume total

a. Atap 1
Dimensi penampang kolo
1 baris panjang usuk
Jumlah usuk
Kebutuhan usuk
Volume

b. Atap 2
Usuk
1 baris panjang usuk
Jumlah usuk
Kebutuhan usuk
Volume
Volume total

a. Atap 1
Dimensi Penampang Reng

Panjang 1 baris Reng


Jumlah Reng
Kebutuhan Reng
Volume

=
=
=
=
=
=
=

1.5
m
1
buah
1.5
x
1.5
m
0.08
x
0.0144
m3
0.144 m3

1
0.12

=
=
=
=
=
=
=
=
=

5
0.05
2.165
7.06
6
7.06
42.36
0.05
0.1483

x
x
+
m
baris
x
m
x
m3

7
0.07
1.365

=
=
=
=
=
=
=
=
=
=

5
0.05
1.275
3.28
3
3.28
9.84
0.05
0.0344
0.1827

x
x
+
m
baris
x
m
x
m3
m3

7
0.07
1.23

=
=

2
0.02

=
=
=
=
=

6.75
15
(
202.5
0.02

x
x
m
baris
6.75
m
x

Kayu balok 8 x 12 cm
x
1.5

cm
m
+

1.365

6
0.07

Usuk 5 x 7 cm
x
42.36

cm
m
+

0.775

3
Usuk 5 x 7 cm
0.07 x
9.84

3
0.03

x
0.03

cm
m

15
)
Reng 2 x 3 cm
x
202.5

b. Atap 2
Dimensi Penampang Reng

Panjang 1 baris Reng


Jumlah Reng
Kebutuhan Reng
Volume

Volume total

0.1215

=
=

2
0.02
1.5
3

m3

x
x

=
=
=
=
=
=

9
0.02
0.0054

m
baris
1.5
m
x
m3

0.1269

m3

3
0.03

x
0.03

cm
m

3
)
Reng 2 x 3 cm
x
9

2.165

NO.

ITEM PEKERJAAN
1 Pekerjaan Persiapan
a.Pembersihan Lahan
b.Pekerjaan pengurukan dan pemadatan tanah t = 50cm
c.Bowplank

2 Pekerjaan Tanah
a. Galian Tanah
b. Pasir urug
c. Anstanting
d. Urugan kembali

3 Pekerjaan Pondasi

4 Pekerjaan beton
a. Sloof

b. Kolom

c. Ringbalk

5 Pekerjaan Pembesian
a. Sloof

b. Kolom

c. Ringbalk

6 Pekerjaan Lantai
a. Pasangan lantai kerja
b. Lantai keramik
c. Pasir pasang
d. Rabat
e. Spesi
7 Pekerjaan dinding

a. Pasang dinding bata


b. Plesteran
c. Pengecatan
d. Acian
8 Becasting
a. Sloof 15/20
b. Kolom
c. Ring Balk
d. Balok cantilever canopy
e. Ring balk pada cantilever canopy
9 Pekerjaan Atap
a. Gording
b. Nok
c. Usuk
d. Reng

Satuan

VOLUME

Uraian

Satuan

m2

25

m3

12.5

20

Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor

Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari

Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor
Pekerja
Mandor

Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari

Jumlah

m3

25.5

m3

3.7575

m3

2.685

m3

10.0575
Jumlah

m3

8.1

Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah

Orang/hari
Orang/hari
Orang/hari
Orang/hari

m3

0.9

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah

Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari

m3

0.918

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari

Jumlah
m3

0.9

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Jumlah Keseluruhan

Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari

120

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah

Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari

163.2

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah

Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari

60

Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Jumlah Keseluruhan

Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari
Orang/hari

m3

1.25

m3
m3
m3

2.5
1.25
1

m3
m3

12.7702829667
3.4054087911

m3

0.3405408791

m2
m2
m2
m2
m2

m3
m3
m3
m3

0.288
0.144
0.1827
0.1269

Harga Satuan

Harga

Rp
Rp
Rp
Rp
Rp
Rp

42,000.00
80,000.00
42,000.00
80,000.00
42,000.00
80,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,050,000.00
2,000,000.00
525,000.00
1,000,000.00
840,000.00
1,600,000.00
7,015,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

42,000.00
80,000.00
42,000.00
80,000.00
42,000.00
80,000.00
42,000.00
80,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,071,000.00
2,040,000.00
157,815.00
300,600.00
112,770.00
214,800.00
422,415.00
804,600.00
5,124,000.00

Rp
Rp
Rp
Rp

42,000.00
65,000.00
75,000.00
80,000.00

Rp
Rp
Rp
Rp
Rp

340,200.00
526,500.00
607,500.00
648,000.00
2,122,200.00

Rp
Rp
Rp
Rp
Rp
Rp

42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

37,800.00
63,000.00
63,000.00
63,000.00
72,000.00
76,500.00
375,300.00

Rp
Rp
Rp
Rp
Rp
Rp

42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00

Rp
Rp
Rp
Rp
Rp
Rp

38,556.00
64,260.00
64,260.00
64,260.00
73,440.00
78,030.00

Rp
Rp
Rp
Rp
Rp
Rp

42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00

Rp
Rp
Rp
Rp
Rp
Rp

42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00

Rp
Rp
Rp
Rp
Rp
Rp

42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00

Rp
Rp
Rp
Rp
Rp
Rp

42,000.00
70,000.00
70,000.00
70,000.00
80,000.00
85,000.00

Rp

382,806.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

37,800.00
63,000.00
63,000.00
63,000.00
72,000.00
76,500.00
375,300.00
1,133,406.00

DAFTAR HARGA MATERIAL


Uraian
Batu Bata
Pasir Mundu
Semen Tiga Roda
Paku kayu 5 cm
Paku Kayu 7 cm
Paku Kayu 10 cm
Kayu Reng "Kamper"
Kayu Usuk "Kamper"
Kayu balok "Kamper"
Keramik Lantai Arwana Put
Kawat Beton
Kayu papan terentang (bah
Pasir Urug
Kayu dolken (tiang bekisti

Satuan
buah
m3
50 kg
kg
kg
kg
batang
batang
batang
kotak
kg
m3
m3
batang

Harga Satuan
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

500.00
270,000.00
63,000.00
14,000.00
14,000.00
14,000.00
17,000.00
70,000.00
210,000.00
30,000.00
27,700.00
2,279,000.00
181,000.00
31,000.00

You might also like