Kecamatan

PERHITUNGAN VOLUME PEKERJAAN Desa


Lokasi

GOR Tanggal :

SKETSA PERHITUNGAN

01. Pekj. Galian Tanah - Galian tanah Pondasi Batu Kali

- Galian tanah untuk Pondasi Bangunan


Pjg pondasi = 16.00 + 16.00 + 10.00 + 10.00 + 11.00 = 63.00 m'
0.80 Volume Galian = 63.00 x 0.80 x 0.80

40.32 m3
0.8
Timbuna Lokasi Bangunan
Volume = 16.00 X 10.00 X 0.25 = 40.00 M3
= - M3

02. Pekj. Urugan Pasir - Urugan Pasir Bawah Pondasi Batu Kali
Pjg pondasi = 63.00 m'
Vol. Urugan Psr = 0.80 x 0.10 x 63.00 = 5.04 m3

- Urugan Kembali Tanah Pondasi Batu Kali


Pjg pondasi = 63.00 m'

Uruga n Pa s ir Vol. Urugan Tanah = 40.32 x 0.25 = 10.08 m3

03. Pekj. Urugan Pasir - Galian tanah Pondasi Telapak

- Galian tanah untuk Pondasi Bangunan


jumlah pondasi = 16 bh
Volume Galian = 16 x 1.00 x 1.00 x 1.35 21.60 m3
1.35
- Urugan Pasir Bawah Pondasi Telapak
jumlah pondasi = 16.00 bh
Vol. Urugan Psr = 1.00 x 0.1 x 16.00 = 1.60 m3

- Urugan Kembali Tanah Telapak

1 Vol. Urugan Tanah = 21.60 x 0.25 = 5.40 m3

- Beton Tumbuk dibawah Pondasi Telapak sp 1:3:5, t = 7cm


jumlah pondasi = 16.00 bh
Volume = 16.00 x 1.00 x 1.00 x 0.07 = 1.12 m3

04. Pas.Pondasi Batu Kali


0.25 - Pas.Batu Belah Bangunan = 63.00 m'
( 0.25 + 0.70 )x 0.80 x 63.00 = 23.94 m3
2
- Hamparan Batu Kosong (Anstamping) = 63.00 m'
0.80
0.70 x 0.10 x 63.00 = m3

0.10 - Pas.Batu Belah Bangunan = 0.00 m'


0.70 ( 0.25 + 0.70 )x 1.20 x 32.30 = 0.00 m3
0.90 2
- Hamparan Batu Kosong (Anstamping) = 0.00 m'

0.90 x 0.10 x 32.30 = m3

05. Pekj. Pondasi Telapak - Pas.Pondasi Telapak 100/100


jumlah pondasi = 16.00 bh
1 Volume = 16.00 0.28 x 1.00 x 1.00 = 4.48 m3

Volume =
1
Total Volume = 4.48 m3
banyaknya besi untuk 1 telapak
arah 100 P kg dia. 12
Para2 bawah = 9.94 m x 16.00 = 159.04 / 12 = 13.25333 13.25333 batang
Penutup = 7.84 m x 16.00 = 125.44 / 12 = 10.45333 10.45333 batang

arah 100 P kg dia. 12


Para2 bawah = 9.94 x 16 = 159.04 / 12 = 13.25333 13.25333 batang
Penutup = 7.84 x 16 = 125.44 / 12 = 10.45333 10.45333 batang
47.4133

KEBUTUHAN BEKISTING M2

Utk 1 telapak m2 = 16.00 x 1.20 x 1.20 = 23.04 0.0130863 m2


= 16.00 x 1.20 x 2.78 = 53.376
total = 76.416 m2
06. Pekj. Sloof
SLOOF S1 15/30
jumlah = 6 panjang = 52.00 m'
Pokok Ø 12 mm dia 12
= 52.00 x 6 = 312.0 / 12.0 = 26 26 batang
Sengkang Ø 8 mm
= 52.0 = 347.66667 x 0.78 = 271.18 m' / 12 = 22.60 22.60 batang
0.15

KEBUTUHAN BEKISTING M2 panjang = 52.00 m'


= 0.4 x 2.00 x 52.00 = 41.6 m2

SLOOF S2 15/25
jumlah = 6 panjang = 11.00 m'
Pokok Ø 10 mm dia 12
= 11.00 x 6 = 66.0 / 12.0 = 5.5 5.5 batang
Sengkang Ø 6 mm
= 11.0 = 74.333333 x 0.78 = 57.98 m' / 12 = 4.83 4.83 batang
0.15

KEBUTUHAN BEKISTING M2 panjang = 11.00 m'


= 0.4 x 2.00 x 11.00 = 8.8 m2

07. Pekj. Kolom Utama KOLOM PRAKTIS 30/30


jumlah = 10 Jumlah = 16.00 m' Tinggi = 4.8
Pokok Ø 12 mm dia 12
= 76.80 x 10 = 768.0 / 12.0 = 64 64 batang
Sengkang Ø 8 mm
= 76.8 = 513 x 1.06 = 543.78 m' / 12 = 45.32 45.32 batang
0.15

KEBUTUHAN BEKISTING M2 panjang = 76.80 m'


= 0.15 x 2.00 x 76.80 = 23.04 m2

08. Pekj. Kolom Praktis KOLOM PRAKTIS 15/15


jumlah = 4 Jumlah = 6.00 m' Tinggi = 3.5
Pokok Ø 10 mm dia 12
= 21.00 x 4 = 84.0 / 12.0 = 7 7 batang
Sengkang Ø 8 mm
= 21.0 = 141 x 0.50 = 70.50 m' / 12 = 5.88 5.88 batang
0.15

KEBUTUHAN BEKISTING M2 panjang = 21.00 m'


= 0.15 x 2.00 x 21.00 = 6.3 m2

Balok B1 20/30
jumlah = 8 panjang = 60.00 m'
Pokok Ø 12 mm dia 12
= 60.00 x 8 = 480.0 / 12.0 = 40 40 batang
Sengkang Ø 8 mm
= 60.0 = 401 x 0.82 = 328.82 m' / 12 = 27.40 27.40 batang
0.15

KEBUTUHAN BEKISTING M2 panjang = 60.00 m'


= 0.4 x 2.00 x 60.00 = 48 m2

Balok BL 15/15
jumlah = 4 panjang = 48.00 m'
Pokok Ø 10 mm dia 12
= 48.00 x 4 = 192.0 / 12.0 = 16 16 batang
Sengkang Ø 8 mm
= 48.0 = 321 x 0.50 = 160.50 m' / 12 = 13.38 13.38 batang
0.15

KEBUTUHAN BEKISTING M2 panjang = 48.00 m'


= 0.4 x 2.00 x 48.00 = 38.4 m2
Balok Balk RB 15/15
jumlah = 4 panjang = 63.00 m'
Pokok Ø 10 mm dia 12
= 63.00 x 4 = 252.0 / 12.0 = 21 21 batang
Sengkang Ø 8 mm
= 63.0 = 421 x 0.50 = 210.50 m' / 12 = 17.54 17.54 batang
0.15

KEBUTUHAN BEKISTING M2 panjang = 63.00 m'


= 0.4 x 2.00 x 63.00 = 50.4 m2

Topi Beton
Panjang = 16.4 =
Lebar = 0.8 =

Arah x = 16.32 = 108.8 x 0.72 = 78.336 6.528 7


Arah y 0.72 = 4.8 x 16.32 = 78.336 6.528 7
14
KEBUTUHAN BEKISTING M2 panjang = 16.40 m'
= 0.8 x 1.00 x 16.40 = 13.12 m2

Jumlah Besi
- Ø 16 mm = 0 batang 0 m'
- Ø 12 mm = 178.0 batang 2136 m'
- Ø 10 mm = 50.0 batang 600 m'
- Ø 8 mm = 148.0 batang 1776 m'
- Ø 6 mm = 5.0 batang 60 m'
2736 m'

Berat Jenis (kg)


- Ø 16 mm = 1.57824 = 0 kg
- Ø 12 mm = 0.88776 = 1896.255 kg
- Ø 10 mm = 0.6165 = 369.9 kg
- Ø 8 mm = 0.39456 = 700.7386 kg
- Ø 6 mm = 0.22194 = 13.3164 kg
Total = 2980.21 kg 2980.21
- Pondasi Plat Setempat = 4.48 m3
-Sloof 15x30 = 0.15 X 0.3 X 52.00 2.34 m3
-Sloof 15x25 = 0.15 X 0.25 X 11.00 0.41 m3
-Kolom 30x30 = 0.3 X 0.3 X 76.8 6.91 m3
-Kolom Praktis 15x15 = 0.15 X 0.15 X 21 0.47 m3
-Balok B1 20x30 = 0.2 X 0.3 X 60.00 3.60 m3
-Balok Bl 15x15 = 0.15 X 0.15 X 48.00 1.08 m3
-Ring Balok RB 15x15 = 0.15 X 0.15 X 63.00 1.42 m3
-Topi Beton = 16.4 X 0.8 X 0.1 1.31 m3
22.03
volume Koef. Sat.
Semen Portlend = 22.03 m3 x 371.000 kg = 8,171.83
23.94 m3 x 163.000 kg = 3,902.22
total 12,074.05 kg = 241.481 Zak

11. Pas. Batu Bata


Pekj.Pas bt.bata = Luasan dinding - Luasan Kusen 65.0 X 6.00 = 390.00
- Luasan dinding = 390.00 m2

- Luasan kusen = 53.69 m2


Luas pas.bt bata = 390.00 + - 53.69 336.31 m2

12. Pekj. Plesteran Volume Plesteran = Luasan pas.batu bata x 2


= 336.31 x 2 = 672.61 m2

13. Pekj. Acian Volume Acian = Luasan pas.batu bata x 2


= 336.31 x 2 = 672.61 m2

14. Pek. Kusen


a. Pintu entrance Jumlah = 2 Bh
Luas Kusen = 3.4 x 3.6 x 2 buah = 24.48 m2

b. Pintu Jumlah = 2 Bh
Luas Kusen = 0.9 x 2.15 x 2 buah = 3.87 m2

c. Glass Blok Jumlah = 10 Bh


Luas = 1.12 x 1.78 x 10 buah = 19.936 m2

d. Glass Blok Jumlah = 1 Bh


Luas Kusen = 2.62 x 0.86 x 2 buah = 5.41 m2
1.96 x 0.46 0.90
e. Ventilasi Jumlah = 0 Bh
Luas Kusen = 1.2 x 0.5 x 0 buah = 0 m2
53.694 m2

15. Pekerjaan Lantai


Luas Lantai = 11 x 21.3 = 97.9 m2 4.90

Volume Total : 4.90 M2

Luas Lantai Kramik 40x40 = 3x 10.5 = 31.5 m2


0.5 x 17.20 = 8.6 m2
0.5 x 7.80 = 3.9 m2
0.5 x 4.40 = 2.2 m2
1 x 22.00 = 22 m2
total 68.20 m2
ATAP
LUAS ATAP 16.65 X 8.31 138.362 m2

HARGA RANGKA

HARGA FINISING

Rp0.000 ###

PANJANG NOK 16
LEBAR BANGUNAN 10
Kemiringan atap 15
COS 30 0.96592582629
165.64 M2
344.62
GENTENG 165.64 lbr 100000
472
KANALC 110.429459244 btng 120000
RENG 132.515351092 btg 58000

SKRUP 1987.73026639 bh 500


SKRUP BAJA 3312.88378 1000
Rp0

16.62
penutup atap spandek 8.31 24 24.3 403.866

0.75 x 3 0.444444444444444 buah/m2


2x 8.31 x 24 x 0.444444444
2x 199.44 x 0.4444444444
398.88 x 0.44444444444445 = 177.28 121 lebar

16.00 8.23 6.7 30.93 61.860 185.58


10.00 10.4 20.40 40.80 total 226.38 m'
gording 8 14.78 = 118.24 m' 344.62

16. Pek. Km/Wc Pekerjaan Plafond Memasang 1 m2 Langit-langit GRC ukuran (120 x 240) cm, tebal 3 mm, 4 mm
Luas = 5.2 x 2.6 = 13.52 m2
Bahan :
GRC = 0.38 x 13.52 = 5.07 lbr
Paku tripleks = 0.03 x 13.52 = 0.41 kg
Upah kerja :
Pekerja = 0.10 x 13.52 =
Tukang Kayu = 0.10 x 13.52 =

Pekerjaan Sanitasi Memasang 1 buah Kloset Jongkok Porselen

Bahan :
Kloset Duduk Porselen ( INA ) = 1.00 x 2.00 = 2.00 bh
Semen Portland = 6.00 x 1.00 = 6.00 kg
Pasir Pasang 0.01 1.00 = 0.01 m3
Upah kerja :
Pekerja = 1.00 x 1.00 =
Tukang = 1.50 x 1.00 =

Pekerjaan Pipanisasi Memasang 1 m' pipa PVC tipe AW diameter ¾ “


Panjang = 25 m1
Bahan :
Pipa PVC = 1.20 x 25.00 = 30.00 m'
Upah kerja :
Pekerja = 0.04 x 25.00 =
Tukang = 0.06 x 25.00 =

Panjang = 5 m1 Memasang 1 m' pipa PVC tipe AW diameter 2”

Bahan :
Pipa PVC = 1.20 x 5.00 = 6.00 m'
Upah kerja :
Pekerja = 0.05 x 5.00 =
Tukang = 0.09 x 5.00 =

Panjang = 5 m1 Memasang 1 m' pipa PVC tipe AW diameter 4 ”

Bahan :
Pipa PVC = 1.20 x 5.00 = 6.00 m'
Upah kerja :
Pekerja = 0.08 x 5.00 =
Tukang = 0.14 x 5.00 =
Pasang Kran Air
Jumlah = 2 Bh Memasang 1 Bh kran air diameter ¾ “ atau ½”

Bahan :
Kran Air = 1.00 x 2.00 = 2.00 Bh
Seal Tape 0.03 x 2.00 = 0.05 Bh
Upah kerja :
Tukang = 0.10 x 2.00 =

Memasang Floor Drain


Jumlah = 2 Bh Memasang 1 Bh Floor drain

Bahan :
Floor Drain = 1.00 x 2.00 = 2.00 Bh
Upah kerja :
Tukang = 0.10 x 2.00 =

Memasang wastafel Pasang 1 buah kunci untuk kamar mandi /WC


Jumlah = 2 Bh
Bahan :
wastafel = 1.00 x 2.00 = 2.00 Bh
Upah kerja :
Tukang = 0.25 x 2.00 =

Pasir Pasang = 0.023 x #REF! = #REF! m3


Upah Kerja
Tukang = 0.15 x #REF! =
Pekerja = 0.3 x #REF! =
### Pasang Keramik 20/25 dinding km/wc dan bak
P.Kel. = #REF! m Bahan :
tinggi = 0.75 m Keramik 20/25 = 20 x 4.8 = 95.25 bh
luas = #REF! x 0.75 = 0.5625 m2 Pasir = 0.018 x 4.8 = 0.0857 m3
bak = 5.6 x 0.75 = 4.2 m2 Semen = 0.186 x 4.8 = 0.8858 zak
4.7625 m2 Upah Kerja
Tukang = 0.45 x 4.8 1=
Pekerja = 0.9 x 4.8 1=
### Pasang Keramik 20/20 dinding km/wc dan bak Keramik 20/20 = 26.5 x 11.8 = 311.43 bh
Pan = 5.2 m Pasir = 0.018 x 11.8 = 0.2115 m3
Leb = 2.3 m Semen = 0.186 x 11.8 = 2.1859 zak
luas = 5.2 x 2.26 = 11.752 m2 Upah Kerja
Tukang = 0.45 x 11.8 : 1=
Pekerja = 0.9 x 11.8 : 1=
: MALANGBONG
: CISITU
: …………………………….

Tanggal :

PERHITUNGAN VOLUME

63.00 m2
Volume =

40.32 m3

Volume =
5.04 m3

10.08

Volume =

61.92 m3

Volume =
6.64 m3

5.40

Volume =
1.12 m3

Volume =
23.94 m3

0.00 m3

Volume =

4.48
Total
besi dia 10 : 0 btg
besi dia 12 : 48 btg

volume
0 m3

Sloof 25/40
Ø 12 : 26.0 btg
Ø8 : 23.0 btg

Sloof 25/40
Ø 10 : 6.0 btg
Ø6 : 5.0 btg

Kolom 15/15
Ø 12 : 64.0 btg
Ø8 : 45.0 btg

Kolom 15/15
Ø 10 : 7.0 btg
Ø8 : 6.0 btg

Balok B1 20/30
Ø 12 : 40.0 btg
Ø8 : 28.0 btg

Balok BL 15/15
Ø 10 : 16.0 btg
Ø8 : 14.0 btg
Balok Balk RB 15/15
Ø 10 : 21.0 btg
Ø8 : 18.0 btg

Topi Beton
Ø8 : 14.0 btg
Volume :
22.03 m3

Luas Pas. Bata:


336.31 m2

23541.42

Volume :
672.61 m2

Volume :
672.61 m2
1.35 Hok

1.35 Hok

1.00 Hok

1.50 Hok

0.90 Hok

1.50 Hok

0.27 Hok

0.45 Hok

0.41 Hok

0.68 Hok

0.20 Hok
0.20 Hok

0.50 Hok

#REF! Hok

#REF! Hok

2.14 Hok

4.28625 Hok

5.29 Hok

10.5768 Hok
sudut COS SIN TAN
15 0.965926 0.258819 0.267949
20 0.939693 0.34202 0.36397
25 0.906308 0.422618 0.466308
30 0.866025 0.5 0.57735
35 0.819152 0.573576 0.700208
DAFTAR VOLUME PEKERJAAN
DESA SEKARWANGI KECAMATAN MALANGBONG KABUPATEN GARUT
TAHUN ANGGARAN 2017
Desa : SEKARWANGI Lokasi Kegiatan : ……………
Kecamatan : MALANGBONG
Kabupaten : GARUT Jenis Kegiatan : LAPANGAN BULUTANGKIS
Provinsi : JAWA BARAT Ukuran Panjang : 11 X 21,30 METER

No. Uraian Jenis Pekerjaan Volume Satuan


1 2 3
A. VOLUME KONSTRUKSI PEKERJAAN PERSIAPAN
1 Pekerjaan Pengukuran dan Pemasangan Bouplank 468.00 m2

B VOLUME KONSTRUKSI PEKERJAAN TANAH


1 Pekerjaan Galian Tanah Pondasi 61.92 m3
2 Pekerjaan Urugan Tanah Pondasi 15.48 m3
3 Pekerjaan Timbunan Lokasi Bangunan 40.00 m3
4 Pekerjaan Pemadatan Lokasi Bangunan 0.00 m2

C. VOLUME KONSTRUKSI PEKERJAAN PONDASI


1 Pekerjaan Batu Kosong ( Anstamping ) 0.00 m3
2 Pekerjaan Pondasi Batu Belah, campuran 1 PC : 4 PP 23.94 m3
3 Pekerjaan Pondasi Telapak 120x120 4.48 m3

D VOLUME KONSTRUKSI PEKERJAAN BETON


1 Pekerjaan Beton mutu K-225 22.03 m3
2 Pekerjaan Bekisting untuk Pondasi Telapak 76.42 M2
3 Pekerjaan Bekisting untuk Sloof 41.60 M2

F VOLUME KONSTRUKSI PEKERJAAN DINDING


1 Pekerjaan dinding Bata 336.31 M2
2 Pekerjaan Plesteran 672.61 M2
3 Pekerjaan acian 672.61 M2
4 Pekerjaan Pengecatan Dinding 672.61 M2
5 Pekerjaan Glass Block 25.34 m2
G VOLUME LANTAI
1 Pekerjaan Plesteran 97.90 m2
2 Pekerjaan Lantai interlock Per Paket Lapangan Ukuran 6x16 1.00 unit
3 Pekerjaan Lantai Kramik 40X40 2.00 m2

H VOLUME PLAFOND
1 Pekerjaan Rangka Hollow 40x40 24.00 m1
2 Pekerjaan Rangka Hollow 20x40 28.00 m1
3 Pekerjaan Gypsum 10.00 m2

I VOLUME ATAP
1 Pekerjaan Pemasangan atap zincalume Type U 650 tebal 0,40mm 165.64 m2
2 Pekerjaan Pemasangan nok / bubungan atap zincalume0,40mm 24.00 M'
3 Plat 12 mm (1,2mx2,4m) 2.00 Lembar
4 Plat 6 mm (1,2mx2,4m) 2.00 Lembar

J VOLUME KM/WC

J VOLUME ELEKTRIKAL
1 Box panel 1.00 set
2 Pijar 25 watt ,tempel 2.00 bh
3 SL 40 watt ,tempel 32.00 bh
4 Saklar tunggal 3.00 bh
5 Saklar ganda 6.00 bh
6 Stop kontak 200 watt 16.00 bh
7 Instalasi penerangan,kabel,conduit dan accessories 59.00 titik
8 Instalasi stop kontak,kabel,conduit dan accessories 16.00 titik

Sekarwangi, Tanggal ..................................


TIM PELAKSANA KEGIATAN
Ketua

( …………………….. )
DAFTAR ANALISA SATUAN PEKERJAAN
DESA SEKARWANGI KECAMATAN MALANGBONG KABUPATEN GARUT
TAHUN ANGGARAN 2017

Desa : SEKARWANGI Lokasi Kegiatan : ……………


Kecamatan : MALANGBONG :
Kabupaten : GARUT Jenis Kegiatan : LAPANGAN BULUTANGKIS
Provinsi : JAWA BARAT Ukuran Panjang : 11 X 21,30 METER

Uraian Jenis Pekerjaan


No. Satuan Indeks Volume
Kebutuhan Bahan / Tenaga Kerja
1 2 3 4 5

A. ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN ( RSNI T-12-2002 )

VOLUME PEKERJAAN = 468.00 m2


1 1 m2 Pengukuran dan Pemasangan Bouplank
Kaso-kaso ( 5 x 7 cm ) cm Kayu Kls II m3 0.0120 5.62
Bahan Paku biasa 2" - 5 " kg 0.0200 9.36
Kayu Papan 2/20 Albasia m3 0.0070 3.28
Pekerja Oh 0.1000 46.80
Tenaga Tukang Kayu Oh 0.1000 46.80
Kerja Kepala Tukang Kayu Oh 0.0100 4.68
Mandor Oh 0.0050 2.34

B ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH ( SNI 2835 : 2008 )


VOLUME PEKERJAAN = 15.48 m3
1 Menggali 1 m3 Tanah Biasa Sedalam 1 meter
Tenaga Pekerja Oh 0.7500 11.61
Kerja Mandor Oh 0.0250 0.39

VOLUME PEKERJAAN = 61.92 m3


2 Menggali 1 m3 Tanah Biasa Sedalam 2 meter
Tenaga Pekerja Oh 0.9000 13.93
Kerja Mandor Oh 0.0450 0.70

VOLUME PEKERJAAN = 40.00 m3


3 Mengurug Kembali 1 m3 galian
bahan Sirtu m3 1.2000 48.00
Tenaga Pekerja Oh 0.3000 4.64
Kerja Mandor Oh 0.0250 0.39

VOLUME PEKERJAAN = 32.00 m2


4 Memadatkan 1 m3 Tanah ( per 20 cm )
Alat Stemper Jam 0.0210 0.67
Tenaga Pekerja Oh 0.2500 8.00
Kerja Mandor Oh 0.0080 0.26
C. ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI ( SNI 2836 : 2008 )
VOLUME PEKERJAAN = 0.00 m3
1 Memasang 1 m3 Batu Kosong ( Anstamping )
Batu Belah 15 cm/ 20 cm m3 1.2000 -
Bahan
Pasir Urug m3 0.4320 -
Pekerja Oh 0.7800 -
Tenaga Tukang Batu Oh 0.3900 -
Kerja Kepala Tukang Batu Oh 0.0390 -
Mandor Oh 0.0390 -

VOLUME PEKERJAAN = 23.94 m3


2 Memasang 1 m3 Pondasi Batu Belah, campuran 1 PC : 4 PP
Batu Belah 15 cm/ 20 cm m3 1.2000 28.73
Bahan Semen Portland kg 163.0000 3,902.22
Pasir Pasang m3 0.5200 12.45
Pekerja Oh 1.5000 35.91
Tenaga Tukang Batu Oh 0.7500 17.96
Kerja Kepala Tukang Batu Oh 0.0750 1.80
Mandor Oh 0.0750 1.80

D ANALISA BIAYA KONSTRUKSI BETON ( SNI 2837 : 2008 )


VOLUME PEKERJAAN = 2980.21 kg
1 Pembesian 1 kg dengan besi Polos/Uril
Besi Polos/Uril kg 1.0500 3,129.22
Bahan
Kawat Beton kg 0.0150 44.70
Pekerja Oh 0.0070 20.86
Tenaga Tukang Besi Oh 0.0070 20.86
Kerja Kepala Tukang Besi Oh 0.0007 2.09
Mandor Oh 0.0004 1.19

VOLUME PEKERJAAN = 76.42 m2


2 Memasang 1 m2 Bekisting Pondasi Telapak
Kayu Albasia m3 0.0450 3.44
Bahan Paku 5 cm - 10 cm kg 0.3000 22.92
Minyak Bekisting ltr 0.1000 7.64
Pekerja Oh 0.5200 39.74
Tenaga Tukang Kayu Oh 0.2600 19.87
Kerja Kepala Tukang Kayu Oh 0.0260 1.99
Mandor Oh 0.0260 1.99

VOLUME PEKERJAAN = 50.40 m2


3 Memasang 1 m2 Bekisting Sloof
Kayu Albasia m3 0.0450 2.27
Bahan Paku 5 cm - 10 cm kg 0.3000 15.12
Minyak Bekisting ltr 0.1000 5.04
Pekerja Oh 0.5200 26.21
Tenaga Tukang Kayu Oh 0.2600 13.10
Kerja Kepala Tukang Kayu Oh 0.0260 1.31
Mandor Oh 0.0260 1.31

VOLUME PEKERJAAN = 29.34 m2


3 Memasang 1 m2 Bekisting Kolom
Kayu Albasia m3 0.0040 0.12
Bahan Paku 5 cm - 10 cm kg 0.4000 11.74
Minyak Bekisting ltr 0.2000 5.87
Balok Kayu Kelas II m3 0.0015 0.04
Pekerja Oh 0.5200 15.26
Tenaga Tukang Kayu Oh 0.2600 7.63
Kerja Kepala Tukang Kayu Oh 0.0260 0.76
Mandor Oh 0.0260 0.76

VOLUME PEKERJAAN = 86.40 m2


3 Memasang 1 m2 Bekisting Balok
Kayu Albasia m3 0.0040 0.35
Bahan Paku 5 cm - 10 cm kg 0.4000 34.56
Minyak Bekisting ltr 0.2000 17.28
Balok Kayu Kelas II m3 0.0015 0.13
Pekerja Oh 0.5200 44.93
Tenaga Tukang Kayu Oh 0.2600 22.46
Kerja Kepala Tukang Kayu Oh 0.0260 2.25
Mandor Oh 0.0260 2.25

VOLUME PEKERJAAN = 50.40 m2


3 Memasang 1 m2 Ring Bekisting Balok
Kayu Albasia m3 0.0040 0.20
Bahan Paku 5 cm - 10 cm kg 0.4000 20.16
Minyak Bekisting ltr 0.2000 10.08
Balok Kayu Kelas II m3 0.0015 0.08
Pekerja Oh 0.5200 26.21
Tenaga Tukang Kayu Oh 0.2600 13.10
Kerja Kepala Tukang Kayu Oh 0.0260 1.31
Mandor Oh 0.0260 1.31

VOLUME PEKERJAAN = 13.12 m2


3 Memasang 1 m2 Topi Beton
Kayu Albasia m3 0.0040 0.05
Bahan Paku 5 cm - 10 cm kg 0.4000 5.25
Minyak Bekisting ltr 0.2000 2.62
Balok Kayu Kelas II m3 0.0015 0.02
Pekerja Oh 0.5200 6.82
Tenaga Tukang Kayu Oh 0.2600 3.41
Kerja Kepala Tukang Kayu Oh 0.0260 0.34
Mandor Oh 0.0260 0.34
VOLUME PEKERJAAN = 22.03 M3
4 Membuat 1 m3 Beton mutu K-175
Semen Portland kg 326.0000 7,180.64
Pasir Beton m3 0.5430 11.96
Bahan
Koral Beton m3 0.7620 16.78
Air liter 215.0000 4,735.70
Pekerja Oh 1.6500 36.34
Tenaga Tukang Batu Oh 0.2750 6.06
Kerja Kepala Tukang Batu Oh 0.0280 0.62
Mandor Oh 0.0830 1.83

F ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING ( SNI 6897 : 2008 )


VOLUME PEKERJAAN = 336.31 M2
1 Memasang 1 m2 Dinding Bata Merah uk. (5x11x22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PP
Bata Merah bh 70.0000 23,541.42
Bahan Semen Portland kg 14.3700 4,832.72
Pasir Pasang m3 0.0400 13.45
Pekerja Oh 0.3000 100.89
Tenaga Tukang Batu Oh 0.1000 33.63
Kerja Kepala Tukang Batu Oh 0.0100 3.36
Mandor Oh 0.0150 5.04

VOLUME PEKERJAAN = 0.00 M2


2 0
Glass Block bh 25.0000 -
Bahan Semen Portland kg 14.3700 -
Pasir Pasang m3 0.0400 -
Pekerja Oh 0.3000 -
Tenaga Tukang Batu Oh 0.1000 -
Kerja Kepala Tukang Batu Oh 0.0100 -
Mandor Oh 0.0150 -

VOLUME PEKERJAAN = 770.51 M2


3 Membuat 1 m2 Plesteran 1 PC : 5 PP, tebal 15 mm
Semen Portland kg 5.1840 3,994.33
Bahan
Pasir Pasang m3 0.0260 20.03
Pekerja Oh 0.3000 231.15
Tenaga Tukang Batu Oh 0.1500 115.58
Kerja Kepala Tukang Batu Oh 0.0150 11.56
Mandor Oh 0.0150 11.56

VOLUME PEKERJAAN = 770.51 M2


4 Membuat 1 m2 Acian
Bahan Semen Portland kg 3.2500 2,504.16
Pekerja Oh 0.2000 154.10
Tenaga Tukang Batu Oh 0.1000 77.05
Kerja Kepala Tukang Batu Oh 0.0100 7.71
Mandor Oh 0.0100 7.71

G ANALISA BIAYA KONSTRUKSI PEKERJAAN KUSEN


VOLUME PEKERJAAN = 1.00 m1
6 Membuat dan Memasang 1 unit Kusen Alumunium ( TYPE 1 )
Profil Allumunium 4" M1 14.41 14.41
Skrup Fixer Bh 26.20 26.20
Bahan Sealant Kg 0.77 0.77
Kaca Polos 5 mm M2 - -
Pekerja Oh 6.0000 6.00
Tenaga Tukang Khusus Alumunium Oh 18.0000 18.00
Kerja Kepala Tukang Alumunium Oh 1.8000 1.80
Mandor Oh 0.3000 0.30

VOLUME PEKERJAAN = 8.10 m2


6 Memasang 1 m2 Pintu Kaca Rangka Alumunium
Fram Pintu Alumunium M1 57.64 466.95
Profil Kaca Bh 58.95 477.57
Bahan Sealant Tube 3.54 28.65
Kaca Polos 5 mm M2 14.41 116.74
Pekerja Oh 0.0850 0.69
Tenaga Tukang Khusus Alumunium Oh 0.0850 0.69
Kerja Kepala Tukang Alumunium Oh 0.0090 0.07
Mandor Oh 0.0050 0.04

VOLUME PEKERJAAN = 49.65 m2


Memasang 1 m2 Jendela Kaca Rangka Alumunium
Fram Jendela Alumunium M1 4.40 218.45
Profil Kaca Bh 4.50 223.41
Bahan Sealant Tube 0.27 13.40
Kaca Polos 5 mm M2 1.10 54.61
Pekerja Oh 0.0850 4.22
Tenaga Tukang Khusus Alumunium Oh 0.0850 4.22
Kerja Kepala Tukang Alumunium Oh 0.0090 0.45
Mandor Oh 0.0050 0.25

VOLUME PEKERJAAN = 8.00 m2


Memasang 1 m2 Pintu Rolling door Alumunium
Bahan Rolling door Alumunium m2 1.0000 8.00
Pekerja Oh 1.0000 8.00
Tenaga Tukang Las Oh 1.0000 8.00
Kerja Kepala Tukang Oh 0.1000 0.80
Mandor Oh 0.0500 0.40

ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT (SNI 2839:2008)


VOLUME PEKERJAAN = 136.49 M2
Memasang 1 m2 Langit-langit Gypsum ukuran (120 x 240) cm, tebal 9 mm
Gypsum lbr 0.3640 49.68
Bahan
Paku skrup kg 0.1100 15.01
Pekerja Oh 0.1000 13.65
Tenaga Tukang Kayu Oh 0.0500 6.82
Kerja Kepala Tukang Kayu Oh 0.0050 0.68
Mandor Oh 0.0050 0.68

VOLUME PEKERJAAN = 94.85 m1


Memasang 1 m’ list plafond gysum profil
List Gypsum m' 1.0500 99.59
Bahan
Tepung Gypsum kg 0.1500 14.23
Pekerja Oh 0.0600 5.69
Tenaga Tukang Kayu Oh 0.0600 5.69
Kerja Kepala Tukang Kayu Oh 0.0060 0.57
Mandor Oh 0.0030 0.28

VOLUME PEKERJAAN = 67.49 m1


Memasang 1 m’ List Langit-langit kayu profil
List kayu Profil 1/5 m' 1.0500 70.86
Bahan
Paku kg 0.0100 0.67
Pekerja Oh 0.0500 3.37
Tenaga Tukang Kayu Oh 0.0500 3.37
Kerja Kepala Tukang Kayu Oh 0.0050 0.34
Mandor Oh 0.0030 0.20

VOLUME PEKERJAAN = 5.33 m2


7 Pemasangan 1 m2 Tralis besi hollow
Besi Hollow 40 x 40 btng 4.0000 21.32
Besi Hollow 20 x 40 btng 8.0000 42.63
Finishing Cat minyak m2 3.3250 17.72
Pekerja Oh 0.2500 1.33
Tenaga Tukang Oh 0.2500 1.33
Kerja Kepala Tukang Oh 0.0250 0.13
Mandor Oh 0.0130 0.07

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI DAN DINDING (SNI 7395:2008)
VOLUME PEKERJAAN = 136.40 M2
8 Pemasangan 1 m2 lantai kramik 40x40
Keramik Lantai bh 6.2500 852.50
uk. 40Portland
cm x 40
Semen
cm
Kg 10.0000 1,364.00
Pasir pasang M3 0.0450 6.14
Bahan Semen warna Kg 0.5000 68.20
Pekerja OH 0.7000 95.48
Tenaga Tukang OH 0.3500 47.74
Kerja Kepala tukang OH 0.0350 4.77
Mandor OH 0.0350 4.77

VOLUME PEKERJAAN = 52.00 M2


Memasang 1 m2 lantai keramik ukuran (30 x 30) cm
Ubin keramik bh 11.8700 617.24
Semen Portland kg 10.0000 520.00
Bahan
Pasir Pasang m3 0.0450 2.34
Semen Warna kg 1.5000 78.00
Pekerja Oh 0.7000 36.40
Tenaga Tukang Batu Oh 0.3500 18.20
Kerja Kepala Tukang Batu Oh 0.0350 1.82
Mandor Oh 0.0350 1.82

VOLUME PEKERJAAN = 3.04 M2


Memasang 1 m2 lantai keramik ukuran (20 x 20) cm
Ubin keramik bh 26.5000 80.56
Semen Portland kg 10.4000 31.62
Bahan
Pasir Pasang m3 0.0450 0.14
Semen Warna kg 1.6200 4.92
Pekerja Oh 0.7000 2.13
Tenaga Tukang Batu Oh 0.3500 1.06
Kerja Kepala Tukang Batu Oh 0.0350 0.11
Mandor Oh 0.0350 0.11

VOLUME PEKERJAAN = 1.77 M2


Memasang 1 m2 dinding keramik ukuran (20 x 40) cm
Keramik bh 12.5000 22.13
Semen Portland kg 9.3000 16.46
Bahan
Bahan
Pasir Pasang m3 0.0180 0.03
Semen Warna kg 1.9400 3.43
Pekerja Oh 0.9000 1.59
Tenaga Tukang Batu Oh 0.4500 0.80
Kerja Kepala Tukang Batu Oh 0.0450 0.08
Mandor Oh 0.0450 0.08

VOLUME PEKERJAAN = 5.29 M2


Memasang 1 m2 dinding keramik ukuran (10 x 40) cm
Keramik 10 x 40 bh 25.0000 132.25
Semen Portland kg 9.3000 49.20
Bahan
Pasir Pasang m3 0.0180 0.10
Semen Warna kg 1.5000 7.94
Pekerja Oh 0.9000 4.76
Tenaga Tukang Batu Oh 0.4500 2.38
Kerja Kepala Tukang Batu Oh 0.0450 0.24
Mandor Oh 0.0450 0.24

VOLUME PEKERJAAN = 9.00 M2


1 m2 Pasangan Batu Alam
Batu Candi m2 1.1000 9.90
Bahan Pasir Pasang m3 0.0350 0.32
Semen Portland kg 11.7500 105.75
Pekerja Oh 0.7000 6.30
Tenaga Tukang Batu Oh 0.3500 3.15
Kerja Kepala Tukang Batu Oh 0.0350 0.32
Mandor Oh 0.0350 0.32

G ANALISA BIAYA KONSTRUKSI PEKERJAAN KUDA KUDA BAJA RINGAN


VOLUME PEKERJAAN = 165.64 m2
1 Memasang 1 m2 Konstruksi Atap Baja Ringan
Bahan Main Truss C-0,75 m1 2.8000 463.80
Roof Bottom/Reng R33-0.45 m1 5.1000 844.79
Selt Driling dia 6 x 20 mm ( truss Screw ) Bh 25.0000 4,141.10
Selt Driling dia 4 x 16 mm ( Roof Baten Screw ) Bh 35.0000 5,797.55
Dynabol dia 12 x 120 mm Bh 1.0000 165.64
Alat Bantu Ls 1.0000 165.64
Skrup Baja bh 20.0000 3,312.88
Tenaga Tukang Besi Profil Oh 0.1760 29.15
Kerja Kepala Tukang Besi Profil Oh 0.1170 19.38

H ANALISA BIAYA KONSTRUKSI PEKERJAAN PLAFOND


VOLUME PEKERJAAN = 10.00 M'
1 Memasang 1 m2 Konstruksi Plafond
Bahan Rangka Hollow 40x40 mm m' 0.8100 8.10
Rangka Hollow 20x40 mm m' 2.0000 20.00
Sekrup dus 0.1500 1.50
Papan Gypsum 120 X 240 mm lbr 0.3810 3.81
Tenaga Pekerja Oh 0.1500 1.50
Kerja Tukang Oh 0.2500 2.50
Kepala Tukang Oh 0.0250 0.25
Mandor Oh 0.0750 0.75

I ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP ( SNI 03-3436-1994)


VOLUME PEKERJAAN = 165.64 m2
1 Memasang 1 M2 Atap Zincalume
Atap Zincalume m2 0.4444 73.61
Bahan Screw Cteks 12-4 x 5 bh 6 993.87
Screw Cteks 10 x 16-16 bh 2 331.29
Tenaga Pekerja Oh 0.1000 16.56
Kerja Tukang Las Oh 0.0200 3.31
Mandor Oh 0.0050 0.83

VOLUME PEKERJAAN = 0.00 m1


1 M^1 Papan Lisplang GRC
Bahan Lisplank GRC m 1.050 -
Paku biasa 2" - 5" kg 0.05 -
Tenaga Pekerja Oh 0.11 -
Kerja Tukang Oh 0.22 -
Kepala Tukang Oh 0.022 -
Mandor Oh 0.005 -

VOLUME PEKERJAAN = 165.64 m2


1 M2 Peredam Panas Atap
Bahan Aluminium foil 3mm m2 1.1 182.21
Glass wool tebal 2,5 cm m2 1.1 182.21
Roofmesh Type 2215 dia 1,6mm ( 50x m2 1.1 182.21
Tenaga Pekerja Oh 0.2 33.13
Kerja Tukang Oh 0.1 16.56
Kepala Tukang Oh 0.01 1.66
Mandor Oh 0.01 1.66

J ANALISA BIAYA KONSTRUKSI PEKERJAAN ELEKTRIKAL


VOLUME PEKERJAAN = 1.00 Bh
1 TTK Pemasangan Box Panel
BOX panel PVC Bh 1.0000 1.00
Bahan MCB 6 A Bh 1.0000 1.00
Kabel NYM 3 x 2,5 mm2 m1 6.0000 6.00
Pekerja Oh 0.0500 0.05
Tenaga Tukang Listrik Oh 0.0200 0.02
Kerja Kepala Tukang Listrik Oh 0.0600 0.06
Mandor Oh 0.0010 0.00

VOLUME PEKERJAAN = 9.00 Bh


1 TTK Pemasangan Instlasi Stop Kontak
Kabel NYM 3 x 2,5 mm2 m1 6.0000 54.00
Bahan Isolasi Bh 0.5000 4.50
Klem Bh 3.0000 27.00
Pekerja Oh 0.0500 0.45
Tenaga Tukang Listrik Oh 0.0200 0.18
Kerja Kepala Tukang Listrik Oh 0.1000 0.90
Mandor Oh 0.1000 0.90

VOLUME PEKERJAAN = 28.00 Titik


1 TTK Pemasangan Instlasi Lampu
Kabel NYM 2 x 2,5 mm2 m1 6.0000 168.00
Bahan Isolasi Bh 0.5000 14.00
Klem Bh 3.0000 84.00
Pekerja Oh 0.0500 1.40
Tenaga Tukang Listrik Oh 0.0200 0.56
Kerja Kepala Tukang Listrik Oh 0.1000 2.80
Mandor Oh 0.1000 2.80

VOLUME PEKERJAAN = 3.00 Bh


1 BH Pemasangan Saklar Tunggal
Saklar Tunggal Bh 1.0000 3.00
Bahan Mangkok Listrik Bh 1.0000 3.00
Isolasi Bh 0.2500 0.75
Pekerja Oh 0.1000 0.30
Tenaga Tukang Listrik Oh 0.1000 0.30
Kerja Kepala Tukang Listrik Oh 0.0500 0.15
Mandor Oh 0.0250 0.08

VOLUME PEKERJAAN = 5.00 Bh


1 BH Pemasangan Saklar Seri
Saklar Seri Bh 1.0000 5.00
Bahan Mangkok Listrik Bh 1.0000 5.00
Isolasi Bh 0.2500 1.25
Pekerja Oh 0.1000 0.50
Tenaga Tukang Listrik Oh 0.1000 0.50
Kerja Kepala Tukang Listrik Oh 0.0500 0.25
Mandor Oh 0.0250 0.13

VOLUME PEKERJAAN = 3.00 Bh


1 BH Pemasangan Lampu SL
Lampu SL Bh 1.0000 3.00
Bahan
Isolasi Bh 0.2500 0.75
Pekerja Oh 0.1000 0.30
Tenaga Tukang Listrik Oh 0.1000 0.30
Kerja Kepala Tukang Listrik Oh 0.0500 0.15
Mandor Oh 0.0250 0.08

VOLUME PEKERJAAN = 18.00 Bh


1 BH Pemasangan Lampu TL 2 x 36 watt
Lampu TL 2x 36 watt Bh 1.0000 18.00
Bahan
Isolasi Bh 0.2500 4.50
Pekerja Oh 0.1000 1.80
Tenaga Tukang Listrik Oh 0.1000 1.80
Kerja Kepala Tukang Listrik Oh 0.0500 0.90
Mandor Oh 0.0250 0.45

VOLUME PEKERJAAN = 7.00 Bh


1 BH Pemasangan Lampu TL 22 watt
Lampu TL 22 watt Bh 1.0000 7.00
Bahan
Isolasi Bh 0.2500 1.75
Pekerja Oh 0.1000 0.70
Tenaga Tukang Listrik Oh 0.1000 0.70
Kerja Kepala Tukang Listrik Oh 0.0500 0.35
Mandor Oh 0.0250 0.18

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITASI (RSNI T-15-2002)


VOLUME PEKERJAAN = 1.00 Bh
Memasang 1 buah Kloset Jongkok Porselen
Kloset Jongkok Porselen ( INA ) bh 1.0000 1.00
Bahan Semen Portland kg 6.0000 6.00
Pasir Pasang m3 0.0100 0.01
Pekerja Oh 1.0000 1.00
Tenaga Tukang Batu Oh 1.5000 1.50
Kerja Kepala Tukang Batu Oh 1.5000 1.50
Mandor Oh 0.1600 0.16

VOLUME PEKERJAAN = 2.00 Bh


Memasang 1 buah Wastafel
Wastafel bh 1.0000 2.00
Perlengkapan (12% harga wastafel) ls 0.1200 0.24
Bahan
Semen Portland kg 6.0000 12.00
Pasir Pasang m3 0.0100 0.02
Pekerja Oh 1.2000 2.40
Tenaga Tukang Batu Oh 1.4500 2.90
Kerja Kepala Tukang Batu Oh 0.1500 0.30
Mandor Oh 0.1000 0.20

VOLUME PEKERJAAN = 1.00 Bh


Memasang 1 buah Bak Mandi Fibreglass volume 0,3 m3
Bak fibreglass bh 1.0000 1.00
Bahan
Perlengkapan (18% harga bak) ls 0.1800 0.18
Pekerja Oh 1.8000 1.80
Tenaga Tukang Batu Oh 2.7000 2.70
Kerja Kepala Tukang Batu Oh 0.5400 0.54
Mandor Oh 0.1100 0.11

VOLUME PEKERJAAN = 15.00 m1


Memasang 1 m' pipa PVC tipe AW diameter ½ “
Pipa PVC m' 1.2000 18.00
Bahan
Perlengkapan ( 35% x harga pipa ) ls 0.3500 5.25
Pekerja Oh 0.0360 0.54
Tenaga Tukang Pipa Oh 0.0600 0.90
Kerja Kepala Tukang Pipa Oh 0.0060 0.09
Mandor Oh 0.0018 0.03

VOLUME PEKERJAAN = 20.00 m1


Memasang 1 m' pipa PVC tipe AW diameter ¾ “
Pipa PVC m' 1.2000 24.00
Bahan
Perlengkapan ( 35% x harga pipa ) ls 0.3500 7.00
Pekerja Oh 0.0360 0.72
Tenaga Tukang Pipa Oh 0.0600 1.20
Kerja Kepala Tukang Pipa Oh 0.0060 0.12
Mandor Oh 0.0018 0.04

VOLUME PEKERJAAN = 0.00 m1


Memasang 1 m' pipa PVC tipe AW diameter 1 ”
Pipa PVC m' 1.2000 -
Bahan
Perlengkapan ( 35% x harga pipa ) ls 0.3500 -
Pekerja Oh 0.0360 -
Tenaga Tukang Pipa Oh 0.0600 -
Kerja Kepala Tukang Pipa Oh 0.0060 -
Mandor Oh 0.0018 -

VOLUME PEKERJAAN = 12.00 m1


Memasang 1 m' pipa PVC tipe AW diameter 2”
Pipa PVC m' 1.2000 14.40
Bahan
Perlengkapan ( 35% x harga pipa ) ls 0.3500 4.20
Pekerja Oh 0.0540 0.65
Tenaga Tukang Pipa Oh 0.0900 1.08
Kerja Kepala Tukang Pipa Oh 0.0090 0.11
Mandor Oh 0.0027 0.03

VOLUME PEKERJAAN = 0.00 m1


Memasang 1 m' pipa PVC tipe AW diameter 3 ”
Pipa PVC m' 1.2000 -
Bahan
Perlengkapan ( 35% x harga pipa ) ls 0.3500 -
Pekerja Oh 0.0810 -
Tenaga Tukang Pipa Oh 0.1350 -
Kerja Kepala Tukang Pipa Oh 0.0135 -
Mandor Oh 0.0041 -

VOLUME PEKERJAAN = 16.00 m1


Memasang 1 m' pipa PVC tipe AW diameter 4 ”
Pipa PVC m' 1.2000 19.20
Bahan
Perlengkapan ( 35% x harga pipa ) ls 0.3500 5.60
Pekerja Oh 0.0810 1.30
Tenaga Tukang Pipa Oh 0.1350 2.16
Kerja Kepala Tukang Pipa Oh 0.0135 0.22
Mandor Oh 0.0041 0.07

VOLUME PEKERJAAN = 0.00 bh


Memasang 1 Bh bak cuci piring stainless steel
Bak Cuci stainless steel bh 1.0000 -
Bahan
Water drain + asesoris set 1.0000 -
Tenaga Tukang Batu Oh 0.3000 -
Kerja Kepala Tukang Batu Oh 0.0300 -

VOLUME PEKERJAAN = 2.00 bh


Memasang 1 Bh kran air diameter ¾ “ atau ½”
Kran Air bh 1.0000 2.40
Bahan
Seal Tape bh 0.0250 0.70
Tenaga Tukang Pipa Oh 0.1000 0.20
Kerja Kepala Tukang Pipa Oh 0.0100 0.02

VOLUME PEKERJAAN = 1.00 bh


Memasang 1 Bh Floor drain
Bahan Floor Drain bh 1.0000 1.00
Tenaga Tukang Pipa Oh 0.1000 0.10
Kerja Kepala Tukang Pipa Oh 0.0100 0.01

1 Unit Septitank Uk. 2 x 1,5 x 1,5 + Rembesannya


Galian tanah m3 2.2250
Pas. Bata 1PC : 5PS m2 9.0000
Latai Kerja m3 0.2268
Plesteran 1 : 5 m2 10.5000
Plat beton penutup tb. 10 cm m3 0.1500
Bahan Pipa PVC 4" jenis AW + sambung m' 4.0000
Pipa PVC 2" jenis AW m' 2.0000
Galian tanah untuk rembesan m3 0.6000
Pas. Injuk kg 4.5000
Urugan kerikil 3,5 cm m3 0.4800
Pipa PVC 4" berlobang jenis AW m' 5.0000
Urugan kembali perataan tanah m3 1.1250
K ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN (PT. T.38-2000-C)
VOLUME PEKERJAAN = 248.08 M2
5 Membuat 1 m2 Pengecatan Tembok Dalam
Bahan Plamir Tembok kg 0.1 24.81
Cat Tembok Catylac kg 0.47 116.60
Ampelas lbr 0.5 124.04
Cat Dasar Alkali kg 0.1 24.81
Roll Cat bh 0.025 6.20
Tenaga Pekerja OH 0.06 124.04
Kerja Tukang Cat OH 0.04 6.20
Kepala Tukang Cat OH 0.004 0.99
Mandor OH 0.003 14.89

VOLUME PEKERJAAN = 248.08 M2


5 Membuat 1 m2 Pengecatan Tembok Luar
Bahan Plamir Tembok kg 0.1905 47.26
Cat Tembok Mowilex kg 0.47 116.60
Ampelas lbr 0.25 62.02
Cat Dasar Alkali kg 0.0952 23.62
Roll Cat bh 0.025 6.20
Tenaga Pekerja OH 0.06 62.02
Kerja Tukang Cat OH 0.04 6.20
Kepala Tukang Cat OH 0.004 0.99
Mandor OH 0.003 14.89

VOLUME PEKERJAAN = 10.20 M2


5 Membuat 1 m2 Pengecatan List Plank
Bahan Cat Mowilex kg 0.47 4.79
Ampelas lbr 0.25 2.55
Roll Cat bh 0.025 0.26
Tenaga Pekerja OH 0.06 2.55
Kerja Tukang Cat OH 0.04 0.26
Kepala Tukang Cat OH 0.004 0.04
Mandor OH 0.003 0.61

VOLUME PEKERJAAN = 248.08 M2


5 Membuat 1 m2 Pengecatan Plafond
Bahan Cat Vinilex kg 0.3 74.43
Ampelas lbr 0.5 124.04
Roll Cat bh 0.025 6.20
Tenaga Pekerja OH 0.06 124.04
Kerja Tukang Cat OH 0.04 6.20
Kepala Tukang Cat OH 0.004 0.99
Mandor OH 0.003 14.89

VOLUME PEKERJAAN = 4.00 M2


5 Membuat 1 m2 Pengecatan Plafond
Bahan amplas lbr 0.5000 2.00
cat besi Glotex kg 0.2500 1.00
meni besi kg 0.1670 0.67
thinner impala ltr 0.1500 0.60
kuas besar bh 0.0476 0.19
Tenaga Pekerja OH 0.0667 1.00
Kerja Tukang Cat OH 0.0333 0.19
Kepala Tukang Cat OH 0.0333 0.13
Mandor OH 0.0167 0.27
P T KT M
1392 604 88 105
Round
No. Nama Barang Satuan Volume
1 Batu Belah 15 cm / 20 cm m3 28.728 29
2 Plamir kg 72.06858 72
3 Cat Tembok Catylac kg 141.4082 141
4 Ampelas Lembar 314.6558 315
5 Roll Cat bh 18.86135 19
6 Cat Tembok Mowilex kg 145.0114 145
7 Cat Vinilex kg 74.42538 74
8 cat besi Glotex kg 1 1
9 meni besi kg 0.668 1
10 thinner impala liter 0.6 1
11 kuas besar bh 0.190476 0
12 Kawat Beton kg 44.70315 45
13 Besi Dia 12 btg 178 178
14 Besi Dia 10 btg 50 50
15 Besi Dia 8 btg 148 148
16 Besi Dia 6 btg 5 5
17 Saklar Tunggal bh 5 5
18 Saklar Ganda bh 4 4
19 Stop Kontak engkle bh 9 9
20 Stop Kontak Double bh 16 16
21 Stop Kontak AC bh 2 2
22 Lampu SL bh 3 3
23 Lampu TL 2x 36 watt bh 18 18
24 Lampu TL 22 watt bh 7 7
25 Mangkok Listrik bh 8 8
26 Balok Kayu Kls II m3 5.88489 6
27 Kayu 6/12 Kayu Kls II m3 0 0
28 Kayu Albasia m3 6.42376 6
29 Kayu Papan 2/20 Albasia m3 3.276 3
30 Minyak Bekisting kg 48.5336 49
31 Paku 5-7 cm kg 0 0
32 Paku 7 cm - 10 cm kg 109.7488 110
33 Paku Biasa 2" - 5 " kg 10.0349 10
34 Paku 12 cm kg 0
35 Besi Hollow 40 x 40 btg 4.902667 5
36 Besi Hollow 20 x 40 btg 10.43867 10
37 Finishing Cat minyak kg 17.71893 18
38 Papan Gypsum 120 X 240 mm lbr 3.81 4
39 Semen Portland zak 490.382 490
40 Pasir Beton m3 11.96039 12
41 Pasir Pasang m3 43.09243 43
42 Pasir Urug m3 48 48
43 Batu Candi m2 9.9 10
44 Koral m3 16.78419 17
45 Fram Jendela Alumunium m1 218.4486 218
46 Profil Kaca bh 223.4133 223
47 Kaca Polos 5 mm m2 54.61214 55
48 Rolling door Alumunium Unit 1 1
49 Semen warna kg 162.4936 162
50 Profil Allumunium 4" m1 481.3632 481
51 Skrup Fixer bh 26.2 26
52 Roof Bottom/Reng R33-0.45 btg 140.7976 141
53 Main Truss C-0,75 btg 77.30062 77
54 List kayu Profil 1/5 m1 70.8645 71
55 Erexson / Alat Bantu % 0
56 Selt Driling dia 6 x 20 mm ( truss Screw ) bh 4146.721 4147
57 Dynabol dia 12 x 120 mm bh 210.3473 210
58 Alat Bantu Ls 165.6442 166
59 Atap Sinkalum (spandek 6x1m) lbr 12.26871 12
60 Nok / Bubungan Sinkalum (spandek 6x1m) lbr 0
61 Screw Cteks 12-4 x 5 bh 993.8651 994
62 Screw Cteks 10 x 16-16 bh 331.2884 331
63 Sealent tube 29.42254 29
64 Aluminium foil 3mm m2 182.2086 182
65 Glass wool tebal 2,5 cm m2 182.2086 182
66 Roofmesh Type 2215 dia 1,6mm ( 50x50 mm) m2 182.2086 182
67 List Gypsum m1 99.5925 100
68 Selt Driling dia 4 x 16 mm ( Roof Baten Screw ) ) bh 5797.547 5798
69 Skrup Baja bh 3312.884 3313
70 Bata Merah bh 23541.42 23541
71 Tepung Gypsum kg 14.2275 14
72 Gypsum lbr 17.25082 17
73 Paku skrup kg 16.5139 17
74 Kramik 30x30 doz 617.24 56
75 Kramik 20x20 doz 80.56 3
76 Kramik 20x40 doz 22.125 2
77 Kramik 10x40 doz 132.25 5
78 Keramik Lantai uk. 40 cm x 40 cm doz 852.5 136
79 BOX panel PVC bh 1 1
80 MCB 6 A bh 1 1
81 Kabel NYM 3 x 2,5 mm2 m1 228 228
82 Isolasi bh 18.5 19
83 Klem bh 120 120
84 Kloset Jongkok Porselen ( INA ) bh 1 1
85 Wastafel bh 2 2
86 Perlengkapan (12% harga wastafel) % 0.24 0
87 Bak fibreglass bh 1 1
88 Perlengkapan (18% harga bak) % 0.18 0
89 Pipa Pvc 1/2" btg 4.5 5
90 Pipa Pvc 3/4" btg 6 6
91 Pipa Pvc 2" btg 3.6 4
92 Pipa Pvc 4" btg 4.8 5
93 Kran Air bh 2.4 2
94 Floor Drain bh 1 1
95 Seal Tape bh 0.7 1
96 Perlengkapan ( 35% x harga pipa ) % 22.05 22
97 Pekerja oh 1392 1392
98 Tukang oh 604 604
99 Kepala Tukang oh 88 88
100 Mandor oh 105 105
m3
kg
kg
Lembar
bh
kg
kg
kg
kg
liter
bh
kg
btg
btg
btg
btg
bh
bh
bh
bh
bh
bh
bh
bh
bh
m3
m3
m3
m3
kg
kg
kg
kg
kg
btg
btg
kg
lbr
zak
m3
m3
m3
m2
m3
m1
bh
m2
Unit
kg
m1
bh
btg
btg
m1
%
bh
bh
Ls
lbr
lbr
bh
bh
tube
m2
m2
m2
m1
bh
bh
bh
kg
lbr
kg
doz 55.53 0.09 55.5516
doz 3.24 0.04 3.2224
doz 1.76 0.08 1.77
doz 5.28 0.04 5.29
doz 136.48 0.16 136.4
bh
bh
m1
bh
bh
bh
bh
%
bh
%
btg
btg
btg
btg
bh
bh
bh
%
oh
oh
oh
oh
Selt Atap Nok / Paku Plat 12 Plat 6
Batu Belah 15 Besi d 10 Besi d 12 Besi d 16 Kawat Balok Kayu Kayu Kayu Kayu Papan Kayu Minyak Paku 5-7 Paku 7 Paku Paku 12 Pasir Pasir Pasir Semen Cat Meni Main Truss Erexson / Driling dia Dynabol Alat Sinkalum Bubungan Pengikat mm mm Angkur Baud
P T KT M 6/12 Kayu Koral #REF! #REF! #REF! #REF! #REF! Sealent #REF! #REF! #REF! #REF! #REF! #REF! #REF!
cm / 20 cm mm mm mm Beton Kls II Albasia 2/20 Albasia Papan Kls Bekisting cm cm - 10 Biasa 2" - cm Beton Pasang Urug Portland Besi C-0,75 Alat Bantu 6 x 20 mm dia 12 x Bantu (spandek Sinkalum Atap / (1,2mx2,4 (1,2mx2,4 16 mm 16mm
Kls II I cm 5" ( truss 120 mm 6x1m) (spandek Zincalume m) m) (50cm)
Screw ) 6x1m)
1,391.78 603.54 88.17 104.71 28.73 72.07 141.41 3,129.22 44.70 5.88 - 5.88 6.42 - 6.42 - 109.75 10.03 - 11.96 43.09 48.00 24,519.10 16.78 - 218.45 223.41 162.49 481.36 26.20 463.80 - 4,146.72 210.35 165.64 73.61 - 993.87 29.42 1.00 1.00 29.42 5,797.55 3,312.88 - ### 16.51 - #REF! -
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

round
1 Batu Belah 15 cm / 20 cm 28.73 m3 28.73 m3
2 Besi d 10 mm 50.00 btg 50.00 btg
3 Besi d 12 mm 178.00 btg 178.00 btg
4 Besi d 16 mm - btg - btg
5 Bata Merah 23,541.42 bh 23,541.42 bh
Baja WF 600 - kg - kg
Baja WF 400 - kg - kg
6 Baja WF 200 - kg - kg
7 Baja WF 150 - kg - kg
8 Baja WF 125 - kg - kg
9 Kawat Beton 894.06 kg 894.06 kg
10 Balok Kayu Kls II 5.88 m3 5.88 m3
11 Kayu 6/12 Kayu Kls II - m3 - m3
12 Kayu Albasia 5.88 m3 5.88 m3
13 Kayu Papan 2/20 Albasia 6.42 m3 6.42 m3
14 Kayu Papan Kls I - m3 - m3
16 Minyak Bekisting 6.42 m3 6.00 m3
17 Paku 5-7 cm - kg - kg
18 Paku 7 cm - 10 cm 109.75 kg 110.00 kg
19 Paku Biasa 2" - 5 " 10.03 kg 10.00 kg
20 Paku 12 cm - kg - kg
21 Pasir Beton 11.96 m3 12.00 m3 -
22 Pasir Pasang 43.09 m3 43.00 m3
23 Pasir Urug 48.00 m3 48.00 m3
24 Koral 16.78 m3 17.00 m3
25 Semen Portland 24,519.10 kg 24,519.00 kg
26 Cat Meni Besi 481.36 kg 481.00 kg
27 Main Truss C-0,75 844.79 m1 845.00 m1
28 Erexson / Alat Bantu - % - %
29 Selt Driling dia 6 x 20 mm ( truss Screw ) 4,141.10 Bh 4,141.00 Bh
30 Dynabol dia 12 x 120 mm 165.64 Bh 166.00 Bh
31 Alat Bantu 165.64 Ls 166.00 Ls
32 Atap Sinkalum (spandek 6x1m) 73.61 m2 74.00 m2
33 Nok / Bubungan Sinkalum (spandek 6x1m) 24.00 m' 24.00 m'
34 Paku Pengikat Atap / Zincalume 993.87 kg 994.00 kg
35 Sealent 29.42 kg 29.00 kg
36 Plat 12 mm (1,2mx2,4m) 2.00 Lembar 2.00 Lembar
37 Plat 6 mm (1,2mx2,4m) 2.00 Lembar 2.00 Lembar
38 Angkur 16 mm (50cm) 84.00 Bh 84.00 Bh
39 Baud 16mm 168.00 Bh 168.00 Bh
40 Mur Angkur 16 mm 168.00 Bh 168.00 Bh
41 Baud 5/8 x 2 inchi 252.00 Bh 252.00 Bh
42 Baud 1/2 x 1 inchi 252.00 Bh 252.00 Bh
43 Behel 16 mm 5.00 Bh 5.00 Bh
44 Behel 12 mm 5.00 Bh 5.00 Bh
45 Box panel 1.00 set 1.00 set
46 Pijar 25 watt ,tempel 2.00 bh 2.00 bh
47 SL 40 watt ,tempel 32.00 bh 32.00 bh
48 Saklar tunggal 3.00 bh 3.00 bh
49 Saklar ganda 6.00 bh 6.00 bh
50 Stop kontak 200 watt 16.00 bh 16.00 bh
51 Instalasi penerangan,kabel,conduit dan accessories 59.00 titik 59.00 titik
52 Instalasi stop kontak,kabel,conduit dan accessories 16.00 titik 16.00 titik
53 Pipa listrik 5/8” 75.00 btg 75.00 btg
54 Cat Tembok 141.41 Kg 141.00 Kg
55 Plamir 72.07 #REF! 72.00 #REF!
56 #REF! #REF! #REF! #REF! #REF!
57 #REF! #REF! #REF! #REF! #REF!
58 #REF! #REF! #REF! #REF! #REF!
59 #REF! #REF! bh #REF! bh
60 #REF! #REF! m2 #REF! m2
61 Glassblok - bh - bh
62 Skrup 1,989.23 bh 1,989.00 bh
63 Skrup Baja 3,312.88 bh 3,313.00 bh
64 Pintu 215x90x90 2.00 Unit 2.00 Unit
65 Pintu 215x90 3.00 Unit 3.00 Unit
66 besi hollow 84.10 btg 84.10 btg
67 Keramik Lantai uk. 40 cm x 40 cm 852.50 dooz 852.50 dooz
68 #REF! #REF! #REF! #REF! #REF!
69 #REF! #REF! #REF! #REF! #REF!
70 #REF! #REF! #REF! #REF! #REF!
71 #REF! #REF! #REF! #REF! #REF!
72 #REF! #REF! #REF! #REF! #REF!
73 Pager Hollow 17.00 m2 17.00 m2
1 pekerja 1,391.78 Oh 1,392.00 Oh
2 Tukang 603.54 Oh 604.00 Oh
3 Kepala Tikang 88.17 Oh 88.00 Oh
4 Mandor 104.71 Oh 105.00 Oh
P1 Jumlah
Panjang = 2.58 2.58 0.4 = 5.56 1=
Lebar = 1.48 1.48 = 2.96 1=

P2 Jumlah
Panjang = 2.58 2.58 0 = 5.16 1=
Lebar = 0.88 0.88 = 1.76 1=

P3 Jumlah
Panjang = 2.58 2.58 0 = 5.16 1=
Lebar = 0.78 0.78 = 1.56 1=

J1 Jumlah
Panjang = 2.15 2.15 2.15 = 6.45 1=
Lebar = 1.52 1.52 1.52 = 4.56 1=

J2 Jumlah
Panjang = 2.15 2.15 2.15 2.15 = 8.6 9=
Lebar = 2.26 2.26 2.26 2.26 = 9.04 9=

J3 Jumlah
Panjang = 2.15 2.15 0 0= 4.3 1=
Lebar = 1.08 1.08 1.08 0= 3.24 1=

B1 Jumlah
Panjang = 0.48 0.48 0 0= 0.96 1=
Lebar = 0.68 0.68 0 0= 1.36 1=
Jumlah

Besi Hollow
BV1 Jumlah
Panjang = 0.73 0.73 0.73 0.73 = 2.92 1=
Lebar = 3.65 3.65 0 0= 7.3 1=
Besi Hollow
BV2 Jumlah
Panjang = 0.73 0.73 0.73 0.73 = 2.92 2=
Lebar = 3.65 3.65 0 0= 7.3 2=
5.56 m1
2.96 m1 3.8184 m2

5.16 m1
1.76 m1 2.2704 m2

5.16 m1
1.56 m1 2.0124 m2
8.1012 m2

6.45 m1
4.56 m1 3.268 m2

77.4 m1
81.36 m1 43.731 m2

4.3 m1
3.24 m1 2.322 m2

0.96 m1
1.36 m1 0.3264 m2
201.79 m1 49.6474 m2

2.92 m1
7.3 m1 2.6645 m2

5.84 m1
14.6 m1 2.6645 m2
5.329 m2
RENCANA ANGGARAN BIAYA
DESA SEKARWANGI KECAMATAN MALANGBONG KABUPATEN GARUT
TAHUN ANGGARAN 2018
1 BIDANG : PELAKSANAAN PEMBANGUNAN DESA
2 KEGIATAN : PEMBANGUNAN SARANA OLAH RAGA
3 WAKTU PELAKSAAN : TAHAP SATU

Desa : SEKARWANGI Lokasi Kegiatan :


Kecamatan : MALANGBONG
Kabupaten : GARUT Jenis Kegiatan :
Provinsi : JAWA BARAT Ukuran Panjang :

HARGA SATUAN
NO URAIAN VOLUME SAT
(Rp)
1 2 3 4 5
I BAHAN
1 Batu Belah 15 cm / 20 cm 29.00 m3 150,000
2 Plamir 72.00 kg 65,000
3 Cat Tembok Catylac 141.00 kg 25,000
4 Ampelas 315.00 Lembar 1,000
5 Roll Cat 19.00 bh 15,000
6 Cat Tembok Mowilex 145.00 kg 25,000
7 Cat Vinilex 74.00 kg 25,000
8 cat besi Glotex 1.00 kg 17,500
9 meni besi 1.00 kg 17,500
10 thinner impala 1.00 liter 8,000
11 kuas besar 1.00 bh 10,000
12 Kawat Beton 45.00 kg 25,000
13 Besi Dia 12 178.00 btg 80,000
14 Besi Dia 10 50.00 btg 66,000
15 Besi Dia 8 148.00 btg 56,000
16 Besi Dia 6 5.00 btg 46,000
17 Saklar Tunggal 5.00 bh 25,000
18 Saklar Ganda 4.00 bh 35,000
19 Stop Kontak engkle 9.00 bh 20,000
20 Stop Kontak Double 16.00 bh 25,000 ###
21 Stop Kontak AC 2.00 bh 20,000 ###
22 Lampu SL 3.00 bh 50,000
23 Lampu TL 2x 36 watt 18.00 bh 230,000
24 Lampu TL 22 watt 7.00 bh 130,000
25 Mangkok Listrik 8.00 bh 25,000
26 Balok Kayu Kls II 6.00 m3 800,000
27 Kayu 6/12 Kayu Kls II - m3 800,000
28 Kayu Albasia 6.00 m3 800,000
29 Kayu Papan 2/20 Albasia 3.00 m3 800,000
30 Minyak Bekisting 49.00 kg 12,500
31 Paku 5-7 cm - kg 15,000
32 Paku 7 cm - 10 cm 110.00 kg 15,000
33 Paku Biasa 2" - 5 " 10.00 kg 15,000
34 Paku 12 cm - kg 15,000
35 Besi Hollow 40 x 40 5.00 btg 125,000
36 Besi Hollow 20 x 40 10.00 btg 125,000
37 Finishing Cat minyak 18.00 kg 35,000
38 Papan Gypsum 120 X 240 mm 4.00 lbr 125,000
39 Semen Portland 490.00 zak 55,000
40 Pasir Beton 12.00 m3 175,000
41 Pasir Pasang 43.00 m3 150,000
42 Pasir Urug 48.00 m3 100,000
43 Batu Candi 10.00 m2 150,000
44 Koral 17.00 m3 175,000
45 Fram Jendela Alumunium 218.00 m1 5,000
46 Profil Kaca 223.00 bh 4,000
47 Kaca Polos 5 mm 55.00 m2 80,000
48 Rolling door Alumunium 8.00 m2 450,000
49 Semen warna 162.00 kg 5,000
50 Profil Allumunium 4" 481.00 m1 1,500
51 Skrup Fixer 26.00 bh 5,000
52 Roof Bottom/Reng R33-0.45 141.00 btg 40,000
53 Main Truss C-0,75 77.00 btg 105,000
54 List kayu Profil 1/5 71.00 m1 5,000
55 Erexson / Alat Bantu - % 25,000
56 Selt Driling dia 6 x 20 mm ( truss Screw ) 4,147.00 bh 500
57 Dynabol dia 12 x 120 mm 210.00 bh 500
58 Alat Bantu 166.00 Ls 5,000
59 Atap Sinkalum (spandek 6x1m) 12.00 lbr 285,000
60 Nok / Bubungan Sinkalum (spandek 6x1m) - lbr -
61 Screw Cteks 12-4 x 5 994.00 bh 1,000
62 Screw Cteks 10 x 16-16 331.00 bh 1,000
63 Sealent 29.00 tube 8,000
64 Aluminium foil 3mm 182.00 m2 30,000
65 Glass wool tebal 2,5 cm 182.00 m2 15,000
66 Roofmesh Type 2215 dia 1,6mm ( 50x50 mm) 182.00 m2 25,000
67 List Gypsum 100.00 m1 45,000
68 Selt Driling dia 4 x 16 mm ( Roof Baten Screw ) ) 5,798.00 bh 500
69 Skrup Baja 3,313.00 bh 1,000
70 Bata Merah 23,541.00 bh 500
71 Tepung Gypsum 14.00 kg 25,000
72 Gypsum 17.00 lbr 65,000
73 Paku skrup 17.00 kg 1,000
74 Kramik 30x30 56.00 doz 55,000
75 Kramik 20x20 3.00 doz 45,000
76 Kramik 20x40 2.00 doz 45,000
77 Kramik 10x40 5.00 doz 45,000
78 Keramik Lantai uk. 40 cm x 40 cm 136.00 doz 65,000
79 BOX panel PVC 1.00 bh -
80 MCB 6 A 1.00 bh -
81 Kabel NYM 3 x 2,5 mm2 228.00 m1 15,000
82 Isolasi 19.00 bh 5,000
83 Klem 120.00 bh 5,000
84 Kloset Jongkok Porselen ( INA ) 1.00 bh 120,000
85 Wastafel 2.00 bh 120,000
86 Perlengkapan (12% harga wastafel) 2.00 % 14,400
87 Bak fibreglass 1.00 bh 250,000
88 Perlengkapan (18% harga bak) 1.00 % 45,000
89 Pipa Pvc 1/2" 5.00 btg 25,000
90 Pipa Pvc 3/4" 6.00 btg 35,000
91 Pipa Pvc 2" 4.00 btg 100,000
92 Pipa Pvc 4" 5.00 btg 350,000
93 Kran Air 2.00 bh 15,000
94 Floor Drain 1.00 bh 25,000
95 Seal Tape 1.00 bh 5,000
96 Perlengkapan ( 35% x harga pipa ) 1.00 % 8,750
Sub Total 1)
II ALAT
1 Sendok Tembok 2.00 Bh 30,000 ###
2 Cangkul 1.00 Bh 160,000 ###
3 Sekop 1.00 Bh 140,000 ###
4 Roda Dorong 1.00 Bh 600,000 ###
5 Ember 10.00 Bh 15,000 ###
6 Benang 5.00 Bh 5,500
7 Selang Waterpass 1.00 Bh 50,000
8 Papan Proyek 60x80 cm 1.00 Ls 275,000 ###
9 Prasasti 40x60 cm 1.00 Ls 600,000 ###
Sub Total 2)
III UPAH
1 Pekerja 1,392.0 Oh 75,000
2 Tukang 604.0 Oh 90,000
3 Kepala Tukang 88.2 Oh 100,000
4 Mandor 104.7 Oh 100,000

Sub Total 3)
Jumlah Total 1)+2)+3)
TOTAL BIAYA KONSTRUKSI
OPERASIONAL TPK
TOTAL BIAYA KOMULATIF
DIBULATKAN

Sekarwangi, Tanggal ....................................


Disetujui/Mengesahkan TIM PELAKSANA KEGIATAN
Kepala Desa Ketua

( …………………….. ) ( …………………….. )

Cara pengisian :
1. Bidang diisi dengan kode rekening berdasarkan klasifikasi kelompok belanja desa.
2. Kegiatan diisi dengan kode rekening sesuai dengan urutan kegiatan dalam APBDesa.
3. kolom 1 diisi dengan nomor urut
4. kolom 2 diisi dengan uraian berupa rincian kebutuhan dalam kegiatan.
5. kolom 3 diisi dengan volume dapat berupa jumlah orang/barang.
6. kolom 4 diisi dengan harga satuan yang merupakan besaran untuk membayar orang/barang
7. kolom 5 diisi dengan jumlah perkalian antara kolom 3 dengan kolom 4.
RENCANA ANGGARAN BIAYA
NGI KECAMATAN MALANGBONG KABUPATEN GARUT
TAHUN ANGGARAN 2018

……………

LAPANGAN BULUTANGKIS
11 X 21,30 METER

JUMLAH BIAYA
6

4,350,000
4,680,000
3,525,000
315,000
285,000
3,625,000
1,850,000
17,500
17,500
8,000
10,000
1,125,000
14,240,000
3,300,000
8,288,000
230,000
125,000
140,000
180,000
400,000
40,000
150,000
4,140,000
910,000
200,000
4,800,000
-
4,800,000
2,400,000
612,500
-
1,650,000
150,000
-
625,000
1,250,000
630,000
500,000
26,950,000
2,100,000
6,450,000
4,800,000
1,500,000
2,975,000
1,090,000
892,000
4,400,000
3,600,000
810,000
721,500
130,000
5,640,000
8,085,000
355,000
-
2,073,500
105,000
830,000
3,420,000
-
994,000
331,000
232,000
5,460,000
2,730,000
4,550,000
4,500,000
2,899,000
3,313,000
11,770,500
350,000
1,105,000
17,000
3,080,000
135,000
90,000
225,000
8,840,000
-
-
3,420,000
95,000
600,000
120,000
240,000
28,800
250,000
45,000
125,000
210,000
400,000
1,750,000
30,000
25,000
5,000
8,750
204,469,550
60,000
160,000
140,000
600,000
150,000
27,500
50,000
275,000
600,000
2,062,500

104,400,000
54,360,000
8,817,213
10,470,890

178,048,103
384,580,153
384,580,153
10,892,800
395,472,953
395,472,000

Sekarwangi, Tanggal ....................................


TIM PELAKSANA KEGIATAN
Ketua

( …………………….. )

sifikasi kelompok belanja desa.


n urutan kegiatan dalam APBDesa.

an dalam kegiatan.
orang/barang.
n besaran untuk membayar orang/barang
3 dengan kolom 4.
REKAPITULASI RENCANA ANGGARAN BIAYA
DESA SEKARWANGI KECAMATAN MALANGBONG KABUPATEN GARUT
TAHUN ANGGARAN 2018

1 BIDANG : PELAKSANAAN PEMBANGUNAN DESA


2 KEGIATAN : PEMBANGUNAN SARANA OLAH RAGA
3 WAKTU PELAKSAAN : TAHAP SATU

Lokasi Kegiatan : ……………


Jenis Kegiatan : LAPANGAN BULUTANGKIS
Volume : 11 X 21,30 METER

No Uraian Satuan Total Biaya Bobot


1 2 3 4 5

I BAHAN Ls Rp 204,469,550 51.7%

II PERALATAN Ls Rp 2,062,500 0.5%

III UPAH KERJA


Upah Kerja Konstruksi Ls Rp 178,048,103 45.0%

IV OPERASIONAL TPK Ls Rp 10,892,800 2.8%

TOTAL BIAYA Rp 395,472,953 100%


DIBULATKAN Rp 395,472,000 100%

Sekarwangi, Tanggal ............................


Menyetujui TIM PELAKSANA KEGIATAN
Kepala Desa Ketua

( …………………….. ) ( ………………….. )
GAMBAR No

1
a

5.

5.

5.

5.
3

5.

6.

7.

8.

8.

9.
TULANGAN UTAMA TULANGAN PEMBAGI

Ø Panjang Panjang Panjang Jarak Jumlah btg. Panjang unit Jlh. Unit
JENIS PEKERJAAN
(mm) (cm) (m) (m) (m) (m) Btg

PEMBESIAN
PONDASI POER 120x120
Arah 120
Para Para Bawah 12.000 141 1.410 1.410 0.100 12 16.920 20
Penutup 12.000 130 1.300 1.410 0.100 12 15.600 20

Arah 120
Para Para Bawah 12.000 141 1.410 1.410 0.100 12 16.920 20
Penutup 12.000 130 1.300 1.410 0.100 12 15.600 20

Tulangan Utama 16.000 1384 13.840 13.840 1 13.840 20


Tulangan Bantu 12.000 248 2.480 2.480 1 2.480 20
Begel 10.000 170 1.700 2.210 0.100 22.1 48.841 20

SLOOF 20X30 P= 66,17 meter


Tul.Utama 12.000 6617 66 66 0.000 7 463 1
Begel 8.000 94 0.940 66.170 0.150 441.133333 414.665 1

SLOOF 25X40 P= 75,60 meter


Tul.Utama 12.000 7560 76 76 0.000 8 605 1
Begel 8.000 124 1.240 75.600 0.150 504 624.960 1

BALK 20X20 (P=21,3M)


Tul.Utama 12.000 2130.000 21.300 21.300 0.000 5 106.500 1
Begel 10.000 74.000 0.740 21.300 0.150 142 105.080 1

BALK 20X30 (P=73,12M)


Tul.Utama 12.000 7312.000 73.120 73.120 0.000 5 365.600 1
Begel 10.000 74.000 0.740 73.120 0.150 487.466667 360.725 1

BALK 25X50 (P=11M)


Tul.Utama 16.000 1100.000 11.000 11.000 0.000 4 44.000 1
Tul.Bantu 12.000 1100.000 11.000 11.000 0.000 10 110.000 1
Begel 10.000 144.000 1.440 11.000 0.150 73.3333333 105.600 1

RING BALK 20X30 (P=36,62M)


Tul.Utama 12.000 3662.000 36.620 36.620 0.000 5 183.100 1
Begel 10.000 74.000 0.740 36.620 0.150 244.133333 180.659 1
KOLOM UTAMA 30X40 T = 7 meter
Tul.Utama 16.000 400.000 4.000 4.000 0.000 8 32.000 20
Begel 10.000 150.000 1.500 1.500 0.150 26.6666667 40.000 20

KOLOM PRAKTIS 15X15 T = 3,5 meter


Tul.Utama 12.000 350.000 3.500 3.500 0.000 4 14.000 10
Begel 8.000 50.000 0.500 0.500 0.150 23.3333333 11.667 10

RINGBALK 15X25 (P=60M)


Tul.Utama 12.000 6000.000 60.000 60.000 0.000 5 300.000 1
Begel 10.000 70.000 0.700 60.000 0.150 400 280.000 1

PLAT LANTAI 10X20


Tul.Utama 10.000 1000.000 10.000 10.000 0.150 66.6666667 666.667 1
Tul.sengkang 10.000 2000.000 20.000 20.000 0.150 133.333333 2666.667 1

TANGGA
Tul. Utama Atas 10.000 724.000 7.964 1.200 0.150 8 63.712 1
Tul.sengkang Atas 10.000 120.000 1.320 7.964 0.150 53.0933333 70.083 1
Tul. Utama Bawah 10.000 820.000 9.020 1.200 0.150 8 72.160 1
Tul.sengkang Bawa 10.000 120.000 1.320 0.000 0.000 48 63.360 1
TULANGAN DAK 10.000 400.000 4.400 0.400 0.100 4 17.600 1

PLAT SEPTICKTANK
Tul.Utama 10.000 200.000 2.200 1.000 0.150 6.66666667 14.667 1
Tul.sengkang 10.000 100.000 1.100 2.200 0.150 14.6666667 16.133 1

Plat Lantai arah X


Type A 12.000 3288.00 32.880 14 460.320
Type B 12.000 1936.00 19.360 7 135.520
Type C 12.000 1936.00 19.360 7 135.520

KOLOM TIANG PEMBATAS 12 x 12


Tul.Utama 12.000 102.00 1.020 4 4.080
Tul.sengkang 12.000 44.00 0.440 6 2.640
0.000

TABEL BERAT JENIS BESI

kg/m' dia
0.006165 x 6 ^2 0.22194 kg/m'
0.006165 x 8 ^2 0.39456 kg/m'
0.006165 x 10 ^2 0.6165 kg/m'
0.006165 x 12 ^2 0.88776 kg/m'
0.006165 x 16 ^2 1.57824 kg/m'
0.006165 x 18 ^2 1.99746 kg/m'
Panjang Total Berat Jenis Berat Total Jlh. Btg. VOL
Jlh. Btg. BERAT BERAT
(Pembulat BIDANG
(bersih) BESI UNIT BESI / M3
an) (m3)
(kg/m') (Kg)

338.40 0.888 300.42 29 28.20 338.40 300.42 15.02


0.2 144.35
312.00 0.888 276.98 27 26.00 13.85

338.40 0.888 300.42 29 28.20 15.02


0.2 2,874.06
312.00 0.888 276.98 27 26.00 13.85

276.80 1.578 436.86 24 23.07


49.60 0.888 44.03 5 4.13
976.82 0.617 602.21 82 81.40
28.87

463 0.888 411.20 39 38.60 411.20


0.18 3,193.40
414.67 0.395 163.61 35 34.56 163.61

605 0.888 536.92 51 50.40 536.92


624.96 0.395 246.58 53 52.08 246.58

106.50 0.888 94.55 9 8.88 94.55


105.08 0.617 64.78 9 8.76 64.78

365.60 0.888 324.57 31 30.47 324.57


360.73 0.617 222.39 31 30.06 222.39

44.00 1.578 69.44 4 3.67 69.44


110.00 0.888 97.65 10 9.17
105.60 0.617 65.10 9 8.80 65.10

183.10 0.888 162.55 16 15.26 162.55


180.66 0.617 111.38 16 15.05 111.38

574.81
640.00 1.578 1010.07 54 53.33 50.50
0.28 268.44
800.00 0.617 493.20 67 66.67 24.66
75.16

140.00 0.888 124.29 12 11.67 12.43


0.42 40.55
116.67 0.395 46.03 10 9.72 4.60
17.03

300.00 0.888 266.33 26 25.00 266.33


1.64 267.65
280.00 0.617 172.62 24 23.33 172.62
438.95

666.67 0.617 411.34 56 55.56 411.34


1.64 1,254.09
2666.67 0.617 1645.36 223 222.22 1,645.36
2,056.70

63.71 0.617 39.31


70.08 0.617 43.24
72.16 0.617
63.36 0.617
17.60 0.617 82.55

14.67 2 1.33
16.13 2 1.47

0.00 0.888 0.00 - 408.99


0.00 0.888 0.00 - 120.41 10.332 62.89
0.00 0.888 0.00 - 120.41
649.81

0.00 0.888 0.00 - 3.63


0.2 29.85
0.00 0.888 0.00 - 2.35
BERAT TOTAL BESI 8977.85 kg 5.97
BESI 6 #REF!
BESI 8 #REF! Btg
BESI 10 #REF! Btg BESI 12 242.98
BESI 12 #REF! Btg BESI 16 #REF!
BESI 16 #REF! Btg
9.77

9.77
#REF!
GAMBAR RENCANA

Porovinsi Jawa barat


Kabupaten Garut
Kecamatan Malangbong
Desa
Sekarwangi
PERKEBUNAN JENIS PRASARANA
LOKASI KEGIATAN Gedung Olah Raga
PEMBANGUNAN GEDUNG OLAH RAGA
LOKASI

Kp. Cimuncang
KATOR DESA

PEMUKIMAN PERKEBUNAN JUDUL GAMBAR


DENAH & POTONGAN
JALAN DESA

Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)

PEMUKIMAN PERKEBUNAN
PEMUKIMAN ……………………..
Diperiksa dan Disetujui Oleh :
Pendamping Teknis

Sandrela Mulya
Diketahui Oleh :
Kepala Desa

………………………………….
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

2200
Porovinsi Jawa barat
Kabupaten Garut
Kecamatan Malangbong
Desa
Sekarwangi
JENIS PRASARANA

LOKASI

Kp. Pasir Jambu

JUDUL GAMBAR
DENAH & POTONGAN

1050
Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)

……………………..
Diperiksa dan Disetujui Oleh :
Pendamping Teknis

...........................
DENAH EXISTING Diketahui Oleh :
Skala 1:100
Kepala Desa

Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA
2200

440 440 440 440 440 Porovinsi Jawa barat


300
Kabupaten Garut
Kecamatan Malangbong
Desa

200
Sekarwangi
350

350
JENIS PRASARANA

LOKASI

Kp. Pasir Jambu

EL ± 0.60
1050

1050
350

350
JUDUL GAMBAR
DENAH & POTONGAN

EL ± 0.00 Digambar Oleh :


Pelaksana Kegiatan (Kader Teknik)
350

350
……………………..
Diperiksa dan Disetujui Oleh :
Pendamping Teknis
TERAS
EL - 0.05

...........................
440 440 440 440 440
Diketahui Oleh :
2200 Kepala Desa
DENAH
Skala 1:100
Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

Porovinsi Jawa barat


Kabupaten Garut
Kecamatan Malangbong
Desa
Sekarwangi
JENIS PRASARANA

LOKASI

Kp. Pasir Jambu

JUDUL GAMBAR
DENAH & POTONGAN

Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)

……………………..
TAMPAK DEPAN
Skala 1:100 Diperiksa dan Disetujui Oleh :
Pendamping Teknis

...........................
Diketahui Oleh :
Kepala Desa

Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

Porovinsi Jawa barat


Kabupaten Garut
Kecamatan Malangbong
Desa
Sekarwangi
JENIS PRASARANA

LOKASI

Kp. Pasir Jambu

JUDUL GAMBAR
DENAH & POTONGAN

TAMPAK BELAKANG Digambar Oleh :


Skala 1:100 Pelaksana Kegiatan (Kader Teknik)

……………………..
Diperiksa dan Disetujui Oleh :
Pendamping Teknis

...........................
Diketahui Oleh :
Kepala Desa

Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

Porovinsi Jawa barat


Kabupaten Garut
Kecamatan Malangbong
Desa
Sekarwangi
JENIS PRASARANA

LOKASI

Kp. Pasir Jambu

JUDUL GAMBAR
DENAH & POTONGAN

Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)

……………………..
Diperiksa dan Disetujui Oleh :
Pendamping Teknis

...........................
Diketahui Oleh :

TAMPAK SAMPING KIRI Kepala Desa


Skala 1:100
Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

+ 928
Porovinsi Jawa barat
Kabupaten Garut

328
Kecamatan Malangbong
Desa
+ 600 Sekarwangi
JENIS PRASARANA

300
LOKASI
+ 300
Kp. Pasir Jambu

300
JUDUL GAMBAR
DENAH & POTONGAN

Digambar Oleh :

241
Pelaksana Kegiatan (Kader Teknik)
-241

440 440 440 440 440


……………………..
Diperiksa dan Disetujui Oleh :
2200
Pendamping Teknis
POTONGAN MEMANJANG
Skala 1:100

...........................
Diketahui Oleh :
Kepala Desa

Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA
+ 928

Porovinsi Jawa barat

328
Kabupaten Garut
Kecamatan Malangbong
Desa
+ 600
Sekarwangi
JENIS PRASARANA
300

LOKASI

Kp. Pasir Jambu


+ 300

JUDUL GAMBAR
DENAH & POTONGAN
300

Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)
241

……………………..
Diperiksa dan Disetujui Oleh :
-241
Pendamping Teknis

350 350 350


...........................
1050
Diketahui Oleh :

POTONGAN MELINTANG Kepala Desa


Skala 1:100

Popon Hasanah
Lembar 01 Dari 02 lembar
2200 GAMBAR RENCANA

440 440 440 440 440


300 Porovinsi Jawa barat
Kabupaten Garut
Kecamatan Malangbong

200
Desa

350
350

Sekarwangi
JENIS PRASARANA

LOKASI

Kp. Pasir Jambu


1050

1050
350

350
JUDUL GAMBAR
DENAH & POTONGAN

Digambar Oleh :
350

350
Pelaksana Kegiatan (Kader Teknik)

……………………..
Diperiksa dan Disetujui Oleh :
Pendamping Teknis
440 440 440 440 440

2200 ...........................
Diketahui Oleh :
RENCANA PONDASI TELAPAK
Skala 1:100 Kepala Desa

Popon Hasanah
Lembar 01 Dari 02 lembar
2200 GAMBAR RENCANA

440 440 440 440 440


300 Porovinsi Jawa barat
Kabupaten Garut
Kecamatan Malangbong
A

200
Desa
350

350
Sekarwangi
JENIS PRASARANA

B LOKASI

Kp. Pasir Jambu


1050

1050
350

350
JUDUL GAMBAR
DENAH & POTONGAN

Digambar Oleh :
350

350
Pelaksana Kegiatan (Kader Teknik)

……………………..
Diperiksa dan Disetujui Oleh :
C
Pendamping Teknis
440 440 440 440 440

2200 ...........................
RENCANA PONDASI BATU KALI Diketahui Oleh :
Skala 1:100
Kepala Desa

Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

2200
Porovinsi Jawa barat
440 440 440 440 440
300 Kabupaten Garut
Kecamatan Malangbong
Desa
SLOOF 20X40 SLOOF 20X40 SLOOF 20X40 SLOOF 20X40 SLOOF 20X40

200
Sekarwangi
350

350
JENIS PRASARANA

SLOOF 15X30
LOKASI
SLOOF 20X40

SLOOF 15X30

SLOOF 15X30

SLOOF 15X30

SLOOF 15X30

SLOOF 20X40
Kp. Pasir Jambu
1050

1050
JUDUL GAMBAR
350

350
DENAH & POTONGAN

Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)
SLOOF 15X30
350

350
……………………..
Diperiksa dan Disetujui Oleh :
SLOOF 20X40 SLOOF 20X40 SLOOF 20X40 SLOOF 20X40 SLOOF 20X40
Pendamping Teknis

...........................
440 440 440 440 440
Diketahui Oleh :
2200
Kepala Desa
RENCANA SLOOF
Skala 1:100
Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

2200
Porovinsi Jawa barat
440 440 440 440 440 Kabupaten Garut
300
Kecamatan Malangbong
Desa
BALK BAJA WF 150 BALK BAJA WF 150 BALK BAJA WF 150
Sekarwangi

200
JENIS PRASARANA
350

350
RB 15X30
LOKASI

BALK BAJA WF 150


Kp. Pasir Jambu
BALK BAJA WF 150

JUDUL GAMBAR
1050

1050
350

350
DENAH & POTONGAN

Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)
350

350
RB 15X30 ……………………..
Diperiksa dan Disetujui Oleh :
BALK BAJA WF 150 BALK BAJA WF 150 BALK BAJA WF 150 Pendamping Teknis

...........................
440 440 440 440 440
Diketahui Oleh :

2200 Kepala Desa

RENCANA BALK
Skala 1:100
Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

2200
Porovinsi Jawa barat
440 440 440 440 440 Kabupaten Garut
300
Kecamatan Malangbong
Desa
RB BAJA WF 125 RB BAJA WF 125 RB BAJA WF 125 Sekarwangi

200
JENIS PRASARANA
350

350
LOKASI
RB BAJA WF 125

RB BAJA WF 125
Kp. Pasir Jambu

JUDUL GAMBAR
1050

1050
350

350
DENAH & POTONGAN

Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)
350

350
……………………..
Diperiksa dan Disetujui Oleh :
RB BAJA WF 125 RB BAJA WF 125 RB BAJA WF 125 Pendamping Teknis

...........................
440 440 440 440 440 Diketahui Oleh :

2200
Kepala Desa

RENCANA RING BALK


Skala 1:100 Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA
120

Porovinsi Jawa barat


30 Kabupaten Garut

Ø 12 - 10
120

Kecamatan Malangbong
Ø 12 - 10

30
Desa
Ø 12 - 10

Ø 12 - 10
Sekarwangi
PAS.BATU BATA
pt1 P O N D AS I TE LAP AK TYP E P T 1
JENIS PRASARANA

60
BAJA WF 200 BAJA WF 200
Balok Sloof 20/40 LOKASI

Kp. Pasir Jambu


50

30
-50

10 10
JUDUL GAMBAR
10

DENAH & POTONGAN

60
Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)
207

20
……………………..

10
Diperiksa dan Disetujui Oleh :
10

30
Pendamping Teknis
20

70
10 7

90
-257
pt1
30
...........................
Diketahui Oleh :
D ETAIL P O N D AS I P LAT S E TE M P AT
SKALA 1 : 20 Kepala Desa

Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

Porovinsi Jawa barat


Kabupaten Garut
Kecamatan Malangbong
Desa
Sekarwangi
JENIS PRASARANA

PAS.BATU BATA PAS.BATU BATA LOKASI

60
BAJA WF 200 BAJA WF 200
Kp. Pasir Jambu

JUDUL GAMBAR

30
30
DENAH & POTONGAN

10 10
10 10
Digambar Oleh :

60
60

Pelaksana Kegiatan (Kader Teknik)


20

20
……………………..
10

10
Diperiksa dan Disetujui Oleh :
Pendamping Teknis

...........................
Diketahui Oleh :
Kepala Desa

Popon Hasanah
Lembar 01 Dari 02 lembar

TYPE (Uk.) KP-01 30X30 )


LETAK TUL.
KOLOM

TULANGAN UTAMA 4Ø 16
TULANGAN BANTU
8Ø12
TULANGAN SAMPING
Ø10 - 15
BEGHEL

SELIMUT BETON (D) 40

TYPE (Uk.) SL - 01 (20/40) SLx - 02 dan SLy - 02 (15X30)


LETAK TUL. TUMPUAN LUAR LAPANGAN TUMPUAN DALAM TUMPUAN LAPANGAN
20 20 20
3 Ø 12 2 Ø 12 2 Ø 12
BALOK SLOOF

15 15
2 Ø 12 2 Ø 12

Ø 8 - 15 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12
40
40

40

Ø 8 -1 0 Ø 8 -1 0
30

30

2 Ø 12 Ø 8 - 15 Ø 8 - 15
D D
2 Ø 12 2 Ø 12
2 Ø 12 2 Ø 12 3 Ø 12

TULANGAN ATAS 3Ø12 2Ø12 2Ø12 2Ø 12 2 Ø 12

TULANGAN BAWAH 2Ø12 2Ø12 3Ø12 2 Ø 12 2 Ø 12

TULANGAN SAMPING 2Ø12 2Ø12 2Ø12 2Ø12 2Ø12

BEGHEL Ø8 - 10 Ø8 - 15 Ø8 - 10 Ø8 - 10 Ø8 - 15

SELIMUT BETON (D) 40 40 40 35 35

TYPE (Uk.) RBx - 01 dan RBy - 01 (15X30)


LETAK TUL. TUMPUAN LAPANGAN

15 15
RINK BALOK

2 Ø 12 2 Ø 12

2 Ø 12 2 Ø 12

Ø 8 -1 0 Ø 8 -1 0
30

30

D D
2 Ø 12 2 Ø 12

TULANGAN ATAS 2Ø 12 2 Ø 12
DETAILPENULANGANSLOOF, KOLOMBALOK&RINKBALOK
Skala 1: 25
TULANGAN BAWAH 2 Ø 12 2 Ø 12

TULANGAN SAMPING 2Ø12 2Ø12

BEGHEL Ø8 - 10 Ø8 - 15

SELIMUT BETON (D) 35 35


TYPE (Uk.) KP-01 30X30 )
LETAK TUL.
GAMBAR RENCANA

Porovinsi Jawa barat


KOLOM

Kabupaten Garut
Kecamatan Malangbong
TULANGAN UTAMA
4Ø 16 Desa
TULANGAN BANTU
8Ø12
TULANGAN SAMPING
Sekarwangi
Ø10 - 15
BEGHEL JENIS PRASARANA
SELIMUT BETON (D) 40

TYPE (Uk.) SL - 01 (20/40) SLx - 02 dan SLy - 02 (15X30) LOKASI


LETAK TUL. TUMPUAN LUAR LAPANGAN TUMPUAN DALAM TUMPUAN LAPANGAN
20
3 Ø 12
20
2 Ø 12
20
2 Ø 12 Kp. Pasir Jambu
BALOK SLOOF

15 15
2 Ø 12 2 Ø 12

Ø 8 - 15 2 Ø 12 2 Ø 12 2 Ø 12 2 Ø 12

JUDUL GAMBAR
40
40

40
Ø 8 -1 0 Ø 8 -1 0

30

30
2 Ø 12 Ø 8 - 15 Ø 8 - 15

2 Ø 12 2 Ø 12 3 Ø 12
D
2 Ø 12
D
2 Ø 12 DENAH & POTONGAN
TULANGAN ATAS 3Ø12 2Ø12 2Ø12 2Ø 12 2 Ø 12

TULANGAN BAWAH 2Ø12 2Ø12 3Ø12 2 Ø 12 2 Ø 12

TULANGAN SAMPING 2Ø12 2Ø12 2Ø12 2Ø12 2Ø12


Digambar Oleh :
BEGHEL Ø8 - 10 Ø8 - 15 Ø8 - 10 Ø8 - 10 Ø8 - 15 Pelaksana Kegiatan (Kader Teknik)
SELIMUT BETON (D) 40 40 40 35 35

TYPE (Uk.) RBx - 01 dan RBy - 01 (15X30) ……………………..


LETAK TUL. TUMPUAN LAPANGAN
Diperiksa dan Disetujui Oleh :
15 15
Pendamping Teknis
RINK BALOK

2 Ø 12 2 Ø 12

2 Ø 12 2 Ø 12

Ø 8 -1 0 Ø 8 -1 0
30

30

D D
2 Ø 12 2 Ø 12
...........................
DETAILPENULANGANSLOOF, KOLOMBALOK&RINKBALOK
TULANGAN ATAS 2Ø 12 2 Ø 12
Diketahui Oleh :
Skala 1: 25
TULANGAN BAWAH 2 Ø 12 2 Ø 12

TULANGAN SAMPING 2Ø12 2Ø12


Kepala Desa
BEGHEL Ø8 - 10 Ø8 - 15

SELIMUT BETON (D) 35 35


Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

2200 Porovinsi Jawa barat


Kabupaten Garut
440 440 440 440 440
300 Kecamatan Malangbong
Desa
Sekarwangi

200
JENIS PRASARANA
350

350
LOKASI
P2
Kp. Pasir Jambu

JUDUL GAMBAR
EL ± 0.60
1050

1050
350

350
DENAH & POTONGAN

Digambar Oleh :

EL ± 0.00 P2 Pelaksana Kegiatan (Kader Teknik)


350

350
……………………..
P1
P1 Diperiksa dan Disetujui Oleh :
Pendamping Teknis

TERAS
EL - 0.05 ...........................
Diketahui Oleh :
440 440 440 440 440
Kepala Desa
2200
RENCANA KUSEN Popon Hasanah
Skala 1:100

Lembar 01 Dari 02 lembar


82 GAMBAR RENCANA
3 10 5 19 5 5 5 19 5 10 3

11
8

5 80 5
71 71 Porovinsi Jawa barat
5 4 10 5 14 5 5 5 13 5 10 10 5 13 5 5 5 14 5 10 4 5

P O T. 2 Kabupaten Garut

11

11
11
KO S EN KAYU B ES I 6 /1 2
70 6 3
5 5 9 5 14 5 5 5 13 5 10 10 5 13 5 5 5 14 5 9 5 5 Kecamatan Malangbong

11
8

160

5 5 80 5 5
Desa
KAC A R YB EN 5 m m 11 2 Sekarwangi

4
5
A 11 JENIS PRASARANA

10
9
8 1

5
5

6 3
1 LOKASI

33

33
Kac a Ribe n
40

30
(5 m m)

Kp. Pasir Jambu


4 6
4
15

JUDUL GAMBAR
5

DENAH & POTONGAN

40

40
64

214

214
Digambar Oleh :
5

5
5

5
5

5
Pelaksana Kegiatan (Kader Teknik)
5
6
5

200
211

11

48 ……………………..
5
6
5

73

73

Diperiksa dan Disetujui Oleh :


Pendamping Teknis
64

...........................
15

15
5

Diketahui Oleh :
P O T. 3
15

10

P AP AN KAYU LIN G G U A Kepala Desa


D E TAIL KO S E N P 2 , 2 Bh .
P2
SKALA 1 : 25 D ETAIL KO S E N P 1 , 2 B h .
P1
SKALA 1 : 20 Popon Hasanah
Lembar 01 Dari 02 lembar
2200 GAMBAR RENCANA

440 440 440 440 440


300
Porovinsi Jawa barat
Kabupaten Garut
Kecamatan Malangbong

200
Desa
350

350
Sekarwangi
JENIS PRASARANA

LOKASI

1050
1050

350

350
Kp. Pasir Jambu

JUDUL GAMBAR
DENAH & POTONGAN
350

350
Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)

……………………..
440 440 440 440 440
Diperiksa dan Disetujui Oleh :
2200 d af t ar Pendamping Teknis
RENCANA INSTALASI LISTRIK
Skala 1:100 N O . S YMB O L KETERAN G AN J U MLAH AR MATU RE

1 P IJ AR 1 8 Wa t t - Te mpe l
2 DL 1 8 Wa t t 1 ...........................
Te mpe l
3 S L 2 5 Wa t t 2 Te mpe l Diketahui Oleh :
4 S L 4 0 Wa t t 24 Te mpe l
5 S AKLAR GANDA 6 Te mpe l Kepala Desa
6 S AKLAR TUN GGAL 2 Te mpe l
7 S TO P KO N TAK 2 0 0 Wa t t 12 Te mpe l
8 P AN EL P E NE RANGAN 1 Te mpe l
9 KWh KILO WATT H O UR 1 Popon Hasanah
10 KAB EL N YM 3 x 2 . 5 MM
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

Porovinsi Jawa barat


Kabupaten Garut
Kecamatan Malangbong
Desa
Sekarwangi
JENIS PRASARANA

LOKASI

Kp. Pasir Jambu

JUDUL GAMBAR
DENAH & POTONGAN

Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)

……………………..
Diperiksa dan Disetujui Oleh :
Pendamping Teknis
RENCANA ATAP
Skala 1:100
...........................
Diketahui Oleh :
Kepala Desa

Popon Hasanah
Lembar 01 Dari 02 lembar
GAMBAR RENCANA

Porovinsi Jawa barat


Kabupaten Garut
Kecamatan Malangbong
Desa
Sekarwangi
JENIS PRASARANA

LOKASI

Kp. Pasir Jambu

JUDUL GAMBAR
DENAH & POTONGAN

Digambar Oleh :
Pelaksana Kegiatan (Kader Teknik)

……………………..
1050 Diperiksa dan Disetujui Oleh :
Pendamping Teknis

KUDA KUDA KK1, 11 BH ...........................


Skala 1:20 Diketahui Oleh :
Kepala Desa

Popon Hasanah
Lembar 01 Dari 02 lembar