Professional Documents
Culture Documents
Brick Masonry Rate Analysis
Brick Masonry Rate Analysis
Wall Dimensions
Length
Width
Height
Area m2
0.0 m
0.0 m
1.0 m
0.0
1.0 m
1.0 m
1.0 m
1.0
1 :4
0.36
MATERIAL
Bricks
Cement Bags
Sand m3
Prime Cost
3867.90
Scafolding
@2% of prime cost
Sundries
@3% of prime cost
CONTRACTOR PROFIT
Contractor Profit
TOTAL COST (Rs.)
RICKWORK
nstructor.Org
Vol. m3
0.000
1.000
AMT (Rs.)
494
1976.00
3.27
250
818.44
0.45
900
408.96
SUBTOTAL
(Rs.)
3203.40
Days
0.94
300
282
1.37
250
343
0.20
200
40
664.50
Amount
77.36
77.36
Amount
116.04
116.04
15 %
609.19
4,670.49