You are on page 1of 2

RATE ANALYSIS FOR BRICKWORK

Downloaded from TheConstructor.Org

Wall Dimensions

Length

Width

Height

Area m2

Half Brick Wall

0.0 m

0.0 m

1.0 m

0.0

Full Brick Wall

1.0 m

1.0 m

1.0 m

1.0

C/S Mortar Ratio


Dry Mortar Qty

1 :4
0.36

MATERIAL
Bricks
Cement Bags
Sand m3

LABOUR With Hand Mixing of Mortar


MASON
LABOUR
BAHISHTI (Water Carrier)

Prime Cost

3867.90

Scafolding
@2% of prime cost

Sundries
@3% of prime cost

CONTRACTOR PROFIT
Contractor Profit
TOTAL COST (Rs.)

RICKWORK

nstructor.Org
Vol. m3
0.000
1.000

Qty. Rs. /Unit

AMT (Rs.)

494

1976.00

3.27

250

818.44

0.45

900

408.96

SUBTOTAL
(Rs.)

3203.40
Days
0.94

300

282

1.37

250

343

0.20

200

40
664.50

Amount
77.36
77.36
Amount
116.04
116.04
15 %

609.19
4,670.49