Professional Documents
Culture Documents
Date of Submission:
APPENDIX 1
GC3 The Health and Safety Practical Application
Candidate and course provider declarations:
For completion by the candidate:
I declare that the work submitted for this practical application assessment i.e. The completed
observation sheets and the report to management, is my own work. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in
the NEBOSH Malpractice policy.
Name (Print)
___________________________________
Signature
____________________________________
Date
____________________________________
____________________________________
Signature
____________________________________
Date
____________________________________
____________________________________
Signature
____________________________________
Date
____________________________________
NB: This declaration must be completed in full, submitted and retained with the candidates
script. If this declaration is not submitted the candidates result may be declared void.
APPENDIX 3
Name of assessor
Course provider
number
Student number
Course provider
name
00332912
Student name
TRIMURTHULU KAKI
Maximum
marks
available
Criteria
1
1.1
Range
and
consequences
1.2
2.1
2.2
Executive summary
3.1
15
3.2
3.3
10
4.1
15
4.2
15
outline
of
hazards
TOTAL MARKS
and
15
15
100
Assessors
marks
awarded
NEBOSH
moderated
marks
(if different)
APPENDIX 4
GC3 THE HEALTH AND
SAFETY PRACTICAL APPLICATION
Candidates observation
sheet
Sheet number
of _____
Observations
Hazards and consequence
Control measures
Immediate and longer term actions
Timescale
Immediate action:
To provide to provision of signage and
authorized peoples only.
Long term action:
To build the hydraulic shore on the
ditch of 10 feet sides to protects the
cave. And its protects the slip and trips
hazard for the employees
Immediate action:
Provision of guard rails, toe boards,
securing tools, replace the platforms.
One month
One day
One day
Regular inspections.
Long term action:
All the scaffold materials purchase by
the component person and using all
the safety for scaffold erection.
Revise the risk assessments and
permits.
One day
One week
One week
Immediate action:
Regularly
Clean up spillages
Cautions for wet floors and spillages
Pre use checks foe mobile cranes.
Long term action:
Every month
4.Severe
back
pains
and
musculoskeletal
disorders
while
workers carrying manually cement
bags, bricks and sand causing hernia,
muscle cramps and slipped disc.
1 day
One month
1 day
4 weeks
16. I am observed in a
construction site area there are
nearly 10 LPG gas cylinders are
stored. And the worker are doing
welding work on top of the cylinders.
Here the welding sparks ejected are
falling on the gas cylinders. This
may cause large fire and explosion
that leads to third degree burn
injuries, and many people may lose
their lives also. Here not only
workers, but other people such as
visitors, office workers and
surrounding living propels also
injured.
Immediate action:
Perform unloading work in open
place and then put in warehouse
Long term action:
Make warehouse spacious by
maintaining good storage methods,
and provide place for loading and
unloading work.
Immediate action:
Conduct counselling programme to
individuals.
Long term action:
Introduce and maintain zero tolerance
policy.
Check workers background during
recruitment time.
Immediate action:
To be provides a clear lighting in
the ware house so that workers can
carry out work easily.
Long term action:
To providing natural lighting
regular house keeping
and
Immediate action:
To remove the obstruction objects
from the emergency fire exit door.
Long term action:
Maintain good house keeping
And provide proper training and fire
drills.
Immediate action:
To stop the welding work
immediately and cover the area with
fire retracing materials. Take a gas
cylinders away from work site.
Long term action:
The welding activities carry out by
competent persons only.
Do the major parts of welding at
separate place and assemble can be
done at required area.
To give a training, instruction,
information and supervision properly.
1 day
3 days
1day
1week
1day
1 week
1 day
2 weeks
1 day
10days
17.
In the construction site, at the
ground floor workers are working on
to fit the lift. The work area is wet and
water also. Here the welding activity
performed in wet conditions to fix the
lift. Here the welding machine cord
and power supply cables are laying
on the wet floor can cause to
electrical shock and burns to
workers.
Immediate action:
Welding cords to be laid away from
wet conditions and to maintenance
good housekeeping.
18.
In the construction site
workers working with sand, bricks,
cement and rocks, inhalation of dust
of these materials cause respiratory
problems and also cause skin
allergies.
Immediate action:
To control the dust particles by the
water damping down. And using the
respirators.
Immediate action:
Add adjustable top guard fitted above
the blade and provide a suitable
PPE.
21
In the construction site
workers are doing excavation around
the underground drainage to be 4
feet depth has no protected by
barriers and sign boards it may
causes to falling people by slip,
topple of excavator. Peoples have
injured death to serious injury but not
limited to bone breaks or factures.
Immediate action:
To stop the excavation work
activities.
One day
Within 1 day
1 day
1 month
monthly
1 month
1 day
2 weeks
1day
1week
Immediate action:
Workers are using suitable personal
protect equipment.
Immediate action:
Make surface flat and place sole
boards
Provide with guard rails & toe boards
and make braces well fit
Long term action:
Alteration needed must be done by
competent person and do regular
inspection.
Immediate action:
In the work activity area should be
isolated and people should be
provided with face shield, coveralls.
1 day
1 month
Immediately
1 month
Immediately
1 day
Immediate action:
To be put a danger signage
boards.
1 day
1 week
Continue
APPENDIX 5
Student number_____________________________________
Location___________________________________________
Date of review
APPENDIX 5
Student number_____________________________________
Location___________________________________________
Date of review
Executive Summary
I thanks to the RUSHITA construction for giving me the opportunity to carry out the health and safety
inspection. Its appreciated that the construction site has good practices like
Drinking water facility at each floor level for employees hot and cold option according to the worker
need. Locker facility allocated for employees separately according to their needs and nearest to the
work place area workers easy to access. First aid appropriate and accessible to with workers at the
site with the complete kit. In this site each floor has minted fire fighting lines and sprinklers and smoke
detectors. Toilets have been maintained clean and tidy with all provision to the workers like soaps,
hand wash liquids etc.
In the construction site I am observed some major hazards. The management has to look and rectify
issues they are
Scaffold is not erected on the flat surface, no guard rails, braces and it is not fitted properly. Not follow
the safety rules such as toe boards have huge gaps can lead to scaffold collapse. Peoples and object
fall from height. Workers are working at high risk of the excavation of storage of fire fighting safety
(sump) here the construction of hydraulic shoring or any wood sheet and iron sheet are not at this
area. In the welders are doing her welding activities closer the LPG storage area. Which can lead to
expose and fire causes form several injuries and property damage. In the warehouse transport
peoples are not stopping at the blind corners and can lead to collision with other vehicle and workers
also. Here the no banks men. It is May cause death and property damages. In this are one of the
worker has painted outside of the building at 9th floor. He didnt have any edge protection and safety
belt. He is using only boatswains chair and brushes only.
The above observation breaches the following legal compliances Acts are:
1. Indian factory Act 1948 section 32C-subsection 3e
2. Fire prevention and fire safety Act 1986 by the government of India.
3. Scaffolding and lifting Act 1912 and regulation 1950.
4. Indian electricity Act and rules 1956 rule 29.
5. Chemical regulation 1990 (No 177).
6. Control of substances hazards to health (COSHH 2002).
7. Safety and health in construction convention (C167 ) capital ILO
Therefore I recommend the management to improve the training, information, instruction and
supervision and safe methods of working practices especially on fire, scaffold, excavation, electrical
and chemical related work activate
APPENDIX 5
Student number_____________________________________
Location___________________________________________
Date of review
APPENDIX 5
Student number_____________________________________
Location___________________________________________
Date of review
Conclusions
In this construction origination I am observed my health and safety knowledge find major problems in
this origination. In this origination major findings needs to be immediate action towards the safety of
workers from health and safety management. These are excavation falling peoples, electricity shocks
and burners, fire explosion, collision with vehicle pedestrians at warehouse by vehicles or forklifts
which can be controlled and followed the safety policy and rules.
Other safety concerns such as manual handling, vibration, noise, stress, biological effect, chemical
exposure, heat, stress, lighting and ventilation can also be controlled with suitable preventive control
measures which also recommended on the observation sheet.
The workforces were seemed to be very happily because of the origination to be followed welfare
facilities such as locker, first aid provisions, drinking water, rest room ,toilet facilities both men and
women separately and smoker zones areas. The origination is followed the health and safety policy is
maimed sufficiently.
And finally I would request to the management please takes any accidental issue may be occur in the
site take immediately action on the suitable recommendation for the good implementation of health
and safety culture. The origination people should be followed by the International labour origination
acts and minted.
APPENDIX 5
Student number_____________________________________
Location___________________________________________
Date of review
Priority
Target date
High
One month
High
1 month
1 month
Observation No:10
Painting at outside of the
building area.to be
provided with RPE,
Coveralls, Goggles
High
1 day
Observation No:17&25
Barricade the high voltage
main power supply in the
construction area.
High
1 month