GC3 – THE HEALTH AND Candidate’s observation

SAFETY PRACTICAL APPLICATION sheet

Sheet number of _____

Student name_______________________________________ Student number __________________

Place inspected: Date of inspection ___ / _____ / _____

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

Observation no:13

In the ware house of the Perform unloading work in open place and 1 day
construction site Workers performing then put in warehouse.
iron pipes unloading work in a
awkward position, this may cause Make warehouse spacious by maintaining 4 days
back pain, prolapsed discs, injuries good storage methods, and provide place for
cuts etc. loading and unloading work

Observation no:14
Suitable personal protect equipment are to 1 day
In the construction site area, a big be provided for the Workers
generator realises lot of smoke.
Here the workers are affected by the Provide a smoke exist fans and using local
smoke, inhalation of smoke causes exhaust ventilation by using filters and by 2 weeks
respiratory problems, high blood using smoke chimney or ducts. Good
pressure. servicing maintenance of generator

Observation no:15

In the work site workers are painting Make the surface flat and place sole boards Immediately
outside of the building by using Provide with guard rails & toe boards and
scaffold. I observed that the scaffold make braces well fit.
is not erected on the flat surface. Provide PPE’s to the workers 1 day
Guard rails, bracing is not well fitted.
There is no toe board. Here the Alteration needed must be done by 3 days
hazard is collapsing the scaffold due competent person and do regular inspection
to improper fitting and may falls from
objects cause. The workers are not
using even PPE also.