INFORMATION CENTRE
ELEMENTAL COST ANALYSIS - FORM 1
JOB TITLE : Cadangan Membina dan Menyiapkan Sebuah Dewan Serbaguna, Asrama dan CLIENT :
Pejabat Serta Kerja-kerja Berkaitan Dengannya di Kompleks Perhutanan Bukit
Bakar, Jajahan Machang, Kelantan. (Dewan Serbaguna)
LOCATION : Machang, Kelantan Darul Naim
TENDER DATE :
3 - Administrative Buildings
A - 2 - 1089
Government
October/05
COMPETITIVE
Type of Contract :
Basis of Tender :
Bills of Quantities
Cost Fluctuation:
Yes
Int (JV)/L
/
4,546,550.87
4,280,494.30
1,997,464.55
3,899,071.45
3,789,000.00
No
/
Open / Selected
Competition
/
Government
Negotiated
Private
Provisional Sums
RM
RM
Schedule of rates /
Spec. & Drawings
Serials
28 weeks
Preliminaries
RM
28 weeks
Contigencies
RM
32
Contract Sum
RM
25
350,000.00
177,157.15
3,931,663.80
92
760
237
1089
m
m
m
m
Usable Area
Circulation Area
Ancillary Area
Internal Division
Gross Floor Area
612
173
291
14
1089
m
m
m
m
m
199 m
Roof Area :
(Structural and Plant Rooms)
1172 m
Brief Cost
Contract sum
RM
1,997,464.55
Provisional Sums
RM
350,000.00
RM
Preliminaries
RM
Contigencies
RM
RM
612
Design / Shapes
Percentage of Gross Floor Area
910
1089
0.84
(b) Single-Storey
Construction
(c) Two-storey
Construction
100
Storey Heights:
Av. Below Ground Floor
1.52 m
At Ground Floor
3.05 m
3.96 m
1,997,464.55
(e) 20-storey
Construction
177,157.15
being
being
9.73
% of remainder
% Contract Sum
RM
N/A
N/A
2,508.64 per m2
e Buildings
Int (JV)/L
L
L
L
L
L
per m2
3 - Administrative Buildings
A - 2 - 1089
SUMMARY OF ELEMENT COSTS
1,089
Total Cost
of Element
RM
1. Substructure
1A Piling
1B Work Below Lowest Floor
Finish
m
Cost per m2
GFA
RM
118,016.30
108.37
118,016.30
108.37
2 Superstructure
2A Frame
2B Upper Floor
2C Roof
2D Stairs
2E External Wall
2F Windows & External Doors
2G Internal Walls & Partitions
2H Internal Doors
88,793.60
7,754.20
137,900.00
9,413.20
28,337.50
27,769.50
10,690.00
8,452.50
81.54
7.12
126.63
8.64
26.02
25.50
9.82
7.76
319,110.50
293.03
3. Finishes
3A Internal Wall Finishes
3B Internal Floor Finishes
3C Internal Ceiling Finishes
3D External Finishes
40,852.00
113,459.50
46,112.00
51,608.60
37.51
104.19
42.34
47.39
252,032.10
184.04
85,360.00
78.38
12,090.00
43,775.00
11.10
40.20
100,089.00
91.91
384,382.50
42,038.45
352.97
38.60
582,374.95
534.78
1,356,893.85
1,198.61
322,342.10
62,765.25
296.00
57.64
78,306.20
71.91
463,413.55
425.54
Preliminaries
177,157.15
162.68
1,997,464.55
1,786.83
5. Services
5A Sanitary Appliances
5B Plumbing Installation
5C Refuse Disposal
5D Air-conditioning & Ventilation
System
5E Electrical Installation
5F Fire Protection Installation
5G Lift & Conveyor Installation
5H Communication Installation
5J Special Installation
5K Builder's Profit & Attendance
on Services
5L Builder's Work in Connection
With Services
Group Element Total :
Sub-total excluding External Works,
Preliminaries and Contingencies
6. External Works
6A Site Work
6B Drainage
6C External Services
6D Ancillary Buildings
6E Recreational Facilities
759
m2
155.49
0.70
1,089
237
1,347
m
m
m
81.54
32.72
102.38
1.00
0.22
1.24
910
125
391
47
m
m
m
m
31.14
222.16
27.34
179.84
0.84
0.11
0.36
0.04
1,836
1,090
1,308
m
m
m
22.25
104.14
35.25
242.38
7,113.00
242.38
7,113.00
121.00
16.13
4.00
11.00
14,366.00
22.00
152.13
14,910.00
522.00
0.02
0.10
0.03
P.C.Sums Allowed
83
Nos
145.66
0.08
(RM)
trative Buildings
9
DATE : October-05
Formwork
m2
704.20
704.20
1,163.00
111.40
32.00
58.00
1,364.40
Tendered
Sums (RM)
Superstructure
Frame
2B
2C
Upper Floors
Roof
2D
Staircase
2E
2F
External Walls
Windows & External Doors
2G
2H
Internal Doors
3
3A
Finishes
Internal Wall finishes
3B
3C
3D
External Finishes
5
5A
Services
Sanitary Appliances
5B
5C
5D
Plumbing Installation
Refuse disposal
Air-Conditioning & Ventilation
System
Electrical Installation
5E
5F
5G
5H
5J
5K
5L
6
6A
External Works
Site Works
6B
Drainage
6C
6D
6E
External Services
Ancillary Building
Recreation Facilities
Reinforced concrete for pad footings, ground beams, column stumps and groud slab. Also
reinforced concrete for apron and walkaway.
Alkali resisting primer and emulsion paint with glazed ceramic tiles finished to wall and columns.
Homogenous tiles to floor and non-slip homogenous tiles to toilets.
"Ekowood" solid laminated timber boarding to the hall area including skirting.
Skim coating to concrete soffit.
UAC Superflex asbestos free ceiling and emulsion paint to the asbestos ceiling sheet.
Cement and sand to apron and homogenous tiles to walkaway slab.
Cement and sand plaster with weathershield paint to external wall and column.
UAC Superflex asbestos free ceiling with weathershield paint.
Lecture chair sittings, rectangular banquet table, moveable magnetic white board, velvet notice
board for hall area.
Rectangular 4 sides curved confrenced table and moveable magnetic white board for meeting
room.
4-seater and 3-seater waiting chairs, media tower, newspaper rack, velvet notice board and Lshaped one side curved information counter at lobby area.
Double sides workstation, executive table, full leather chair and cabinet at office.
For VIP room both sides curved showcase.
Generally, "Johnson Suisse" glazed vitreous china of sanitary wares, 3 tap-hole counter top vanity
basin and "DOE" range of tap fittings.
Cold water and sanitary plumbing.
Air cooled split unit system, air cooled packaged, electrical wiring and mechanical ventilation
system.
Complete electrical services, telephone, sound reinforcement system, stage curtain system, visual
projection system and stage lighting system.
Hose reel system, fire alarm system and portable fire extinguisher system.
Site preparation and earthworks and all slope protection works including turfing.
Roadworks and car parks, fencing and gates, stainless steel sliding gate and bridgeworks.
Stormwater drainage systems, foul drainage system and water reticulation system which include all
the fittings and accessories.
Pump House, Guard House and Water Tanks.
ITEM
Location
Nos
ANCILLARY AREA
UTILITIES
Length
TOTAL :
5.31
Width
17.26
Sub Total
91.72
Total
91.72
91.72
Ground Floor
ITEM
Location
USABLE AREA
Nos
Length
Width
Sub Total
Total
Less
HALL AREA
30.37
18.17
551.82
STAGE
1.83
13.60
24.87
576.70
2
ANCILLARY AREA
AHU Room
1.54
3.92
6.05
WC
Near Door
Sink
Opening
3
1
1
1
0.95
0.95
2.02
1.22
1.71
2.32
2.32
0.12
4.89
2.21
4.69
0.14
WC
Sink
Opening
1
1
1
0.95
0.95
0.91
1.71
2.32
0.12
1.63
2.21
0.11
WC
Sink
Near Door
Opening
4
1
1
1
0.95
3.09
0.95
1.22
1.71
2.32
2.32
0.12
6.52
7.17
2.21
0.14
CHANGING ROOM
Male & Female
2.32
2.63
12.21
VIP Room
4.09
4.15
17.00
TOILET (Female)
VIP Toilet
TOILET (Male)
67.19
CIRULATION AREA
HALLWAY
4.15
4.15
17.24
ENTRANCE HALL
13.30
4.27
56.74
1
1
2
1.10
2.44
0.91
11.77
8.11
0.12
13.00
19.79
0.21
BACKSTAGE
A
B
Opening A
106.97
Ground Floor
ITEM
Location
Nos
Length
Width
Sub Total
Total
INTERNAL DIVISION
Backstage
2
2
1
1.83
0.91
8.11
0.12
0.12
0.12
0.42
0.21
0.93
2.32
0.12
0.53
Hallway
1
1
4.15
4.27
0.12
0.12
0.48
0.49
Toilet (Male)
2
3
1
4.15
1.71
1.22
0.12
0.12
0.12
0.96
0.59
0.14
Toilet (Female)
2
3
1
1
4.15
1.71
2.32
1.16
0.12
0.12
0.12
0.12
0.96
0.59
0.27
0.13
VIP room
1
1
4.09
4.27
0.12
0.12
0.47
0.49
AHU room
1
1
1.54
4.15
0.23
0.23
0.35
0.95
Changing Room
(F&M)
8.97
TOTAL :
REF :
1 ' = 0.3048m
1 " = 0.0254m
Brickwall A = 4 1/2" thk brickwall
Brickwall B = 9" thk brickwall
Brickwall A = 0.1143
Brickwall B = 0.2286
759.83
GFA
Upper Floor
ITEM
Location
USABLE AREA
Office Area
Nos
Length
Width
Sub Total
Total
Less
1
5.82
5.98
34.81
34.81
ANCILLARY AREA
MEETING ROOM
12.08
9.03
109.04
AUDIO ROOM
3.54
2.93
10.39
1
2
1
2.93
1.71
1.10
2.02
1.10
2.32
5.92
3.78
2.57
131.70
CIRULATION AREA
LOBBY AREA 1
A
B
C
Opening
LOBBY AREA 2
1
1
1
1
8.42
5.98
2.93
0.91
3.05
1.52
4.57
0.12
25.66
9.12
13.41
0.11
4.15
4.15
17.24
65.53
INTERNAL DIVISION
Office Area
1
1
5.98
6.10
0.12
0.12
0.69
0.70
Audio Room
2.93
0.12
0.34
Meeting Room
12.08
0.12
1.39
3
1
1
1
2.93
4.69
1.71
2.32
0.12
0.12
0.12
0.12
1.01
0.54
0.20
0.27
5.13
TOTAL :
237.18
Upper Floor
GFA
GFA
Not Enclosed
ITEM
Location
APRON
Nos
Length
Width
Sub Total
Total
Less
Front
35.47
1.83
64.87
Left A
1
1
1.22
2.44
4.27
3.05
5.20
7.43
Right
1.83
22.67
41.46
Back
34.25
1.83
62.64
Left B
1
1
5.49
1.83
1.83
2.74
10.03
5.02
Left C
1.10
0.91
2.02
TOTAL :
198.68
Not Enclosed
GFA
GFA
Roof
ITEM
Location
Nos
ROOF
Length
Width
Sub Total
Total
Less
Overall
41.45
29.87
1,238.21
3.66
4.57
16.72
3.66
4.27
15.61
15.85
1.83
28.99
4.27
0.61
5.20
1,238.21
66.52
1,171.69
TOTAL :
Pitch
12
25
30
45
Pitch 30
1.149425
Cos
0.98
0.91
0.87
0.71
1/Cos
1.02
1.10
1.15
1.41
1,172.00
REF :
Eaves = 2'
Overhang = 4'
=
=
1,347.13
1347
Roof
GFA
GFA
Door / Window
ITEM
Location
INTERNAL DOOR
Type D4
Nos
Length
Width
Sub Total
Less
4
2.13
0.91
7.80
Type D5
10
2.13
0.76
16.26
Type D1a
2.44
3.96
9.66
FD2
2.13
0.91
3.90
FD1
2.13
1.52
3.25
Type D3
2.13
1.52
6.50
TOTAL :
GFA
Door / Window
ITEM
Location
EXTERNAL DOOR
Type D1
Nos
Length
Width
Sub Total
Less
19
2.44
1.52
70.61
Type D2
2.44
0.91
11.15
Type FD1
2.13
1.52
3.25
Type W1
1.52
2.44
7.43
Type TH1
0.91
1.22
1.11
Type TH2
0.61
1.22
3.72
Type TH3
14
0.91
1.83
23.41
Type FG1
1.83
2.44
4.46
WINDOW
TOTAL :
Door / Window
Total
47.38
GFA
GFA
Door / Window
Total
85.01
40.13
125.14
BILL NO.
DESCRIPTION
PRELIMINARIES
BUILDING WORKS
AMOUNT (RM)
177,157.15
a) ASRAMA
603,339.90
701,248.90
201,350.00
EXTERNAL WORKS
926,827.90
971,739.95
PROVISIONAL SUMS
350,000.00
TOTAL AMOUNT
3,931,663.80