BILL OF QUANTITY (BOQ)

DIESEL TANK
PT AIR LIQUIDE INDONESIA
TAHUN 2015

NO

VOLUME

URAIAN

Q'TY

REMARKS
UNIT

V85 DIESEL TANK (Vertical Cone Roof)


Main Material : ASTM A36 (JIS 3101-GR.SS400)
Nozzle

A
1
2

Manhole Std.
Flange DN50 ANSI 150# 2"

3
4
5

Flange DN20 3/4" NPT Female


Flange DN50 ANSI 150# 3"
Flange DN50 ANSI 150# 4"

2
3
1
8
1

Accessories

B
1
2
3

Ladder
Railing
Manual lever indicator

1
2

Finishing
Inside epoxy coated
Outside primer paint

TOTAL TANGKI

1 of 19

Pcs.
Pcs.
Pcs.
Pcs.
Pcs.

Top & Side bottom


Instrument & Outlet (drain)
Thermowell Connector
Gauge hatch

MATERIAL

TOTAL PRICE
LABOR

PROYEK UPGRADING FASILIT


T

NO

I.
II.
A.

URAIAN

GENERAL REQUIREMENT
FUEL FACILITY
TANKI
Standard API 650 Edisi 2007
Material plat shell : ASTM A 573 Gr. 70
Material plat roof, rectangular & annular bottom : ASTM A 283 Gr C
a. Tanki HOMC/Gasoline kap 50.000 KL , Internal Floating Roof
Ukuran : 60,11 m ID x 20,4 m height,
1 Plat ring 1 : 2438 x 6096 x 28 mm
2 Plat ring 2 : 2438 x 6096 x 24 mm
3 Plat ring 3 : 2438 x 6096 x 22 mm
4 Plat ring 4 : 2438 x 6096 x 18 mm
5 Plat ring 5 : 2438 x 6096 x 14 mm
6 Plat ring 6 : 2438 x 6096 x 12 mm
7 Plat ring 7-9 : 1828 x 6096 x 10 mm
8 Rectangular bottom Plate : 1828 x 6096 x 8 mm
9 Annular bottom plate : 1828 x 6096 x 12 mm
10 Roof plate : 1828 x 6096 x 6 mm
11 Top curb angle, siku 100 x 100 x 10 mm, @ 6 m panjang, ASTM A-36
12 Rafter & bracing, ASTM A-36
13 Gusset, rib, pad, girder, ASTM A-36
14 Melubangi roof framing, pengadaan & pemasangan mur/baut
b. Accessories
1 Inlet nozzle, 150# 32", include flange 32" SO-RF
2 Outlet nozzle, 150# 32", include flange 32" SO-RF
3 Product drain nozzle 150# 6" incl. pipa & ass. (elbow,flange,support)
4 Water drain nozzle 150# 4" incl. pipa & ass (elbow,flange,support)
5 Venting Valve nozzle, 150# 12"
6 Shell Manhole 24", unit lengkap + mur-baut
7 Shell Manhole 30", unit lengkap + mur-baut
8 Roof Manhole 20", unit lengkap + mur-baut
9 Gauge Hatch nozzle, 150# 10"
10 Roof nozzle for ATG, dia. 8" (c/w stilling well, dilas dengan stand
profil pada shell plate dan pipa dilubangi pada beberapa tempat
lengkap dengan flange dan blind flange
11 Foam nozzle, 150# 10"
12 Level Switch (LL, HH) nozzle
13 PV Valve 12", setting 2,5" WG (vacuum), 8,5" WG (pressure)

14 Shell spiral stairway (tapakan dari grating galvanis tebal 3 mm,


rangka handrail besi siku 40-40-5, rangka tangga pasangan plat tebal
10 mm, dudukan tangga besi siku 40-40-5, support tangga pada shell
10 titik dari siku 60-60-5.
15 Slot Dipping device, 10" branded
16 Earth Lug, material stainless steel
17 Name Plate, standard API 650 tanks
18 Center drain sump diameter 20", thickness 10mm, oval type fabricated
19 Ready packing klingrit type 1000, incl. material
20 Pressure relief valve 3/4" (flanged type, cast steel) c/w 2 ball/stop
valve dan jalur release ke inlet pipe
21 Roof handrail, besi siku 40-40-5, sisi atas dan bawah
22 Cable tray, incl. cover, lebar 20 cm tebal 1,2 mm, galvanis, di tangga
MANPOWER
Site Manager
Construction Manager
Project Control Engineer
QA/QC
Safety Coordinator
Admin
Supervisor
Erection Foreman
Welding Foreman
Fitter
Welder
Painting Foreman
Painter
Electrict
Warehouse
NDE Technician
Rigger
Scaffolder

c.

Internal Floating Roof/IFR


Pengadaan dan pemasangan internal floating roof, material
alumunium (pontoon & sheeting structure), type pontoon, complete
with anti-static, anti-rotation, manway, condensate drains, gauge pole
well, Primary seal, secondary seal, support legs, all bolt and nut :
allumunium
IFR dapat beroperasi baik pada tanki yang memiliki supporting
kolom, tiap tiap jalur lintasan IFR pada kolom dilengkapi dengan
sealing sehingga tidak terdapat uap BBM yang keluar, dan material
seeling merupakan material anti static, konstruksi termasuk
supervisi dari vendor

C.

Dia. IFR : 60 meter ; Panjang Maksimum Per Pontton : 7.4 meter


All design IFR, should be comply with API Std. 650, Appendix H,
11th edition , 2007, And NFPA 12
d. Coating Tangki
1 Surface Preparation seluruh permukaan luar & dalam tanki (ring I dan bottom plate) dengan metode San
sampai
standar
SA-2bagian
1/2 dalam tanki (DFT total : 300 Micron), termasuk Ring-I
Epoxy base
Coatmencapai
tahan minyak
Bottom
2 Blasting
3 Coating Shell & Roof Plate, min DFT : 250 micron (Primer = 100 micron, Intermediate = 100 micron, Fin
50 micron)
(incld.
Semua
Roof
Opening)
coating,
internal
roof
framing
(besi(warna
profile putih)
penyokong atap), min DFT 100 micron, (Preparation de
4 Primer
machine
tools/power
tools)
5 Coating Bottom plate Bagian bawah dengan Coaltar Epoxy Base Coat (Bitumious Coating/Anti Corrosion
1.000 Micron
Tank DFT
identification
Number & Pertamina Logo
6 Total
7 Coating Handrail & Tangga, Bordes dan asesoris lainnya, min DFT : 150 micron (Primer = 50 micron,
Intermediate = 50 micron, Finish = 50 micron),
(Preparation dengan machine tools/power tools)
SUB-TOTAL
MODIFICATION EXISTING TANK @ 10.000 kl (5 UNIT), CONE ROOF
Tidak termasuk pekerjaan tank cleaning
1 Inlet Flange 18"
2 Outlet Flange 24"
3 Breather Valve 10" w/ flame arrester
4 Level switch (LL & HH)
5 Re-painting (incl. inspection and test)
6 Blind flange 12"
7 Blind flange 10"
8 Tank identification Number & Pertamina Logo
SUB-TOTAL
TOTAL TANGKI

10

12

11

13

14.00

BILL OF QUANTITY (BOQ)


ROYEK UPGRADING FASILITAS PENIMBUNAN GASOLINE INCLUDE FASILITAS BLENDING
TERMINAL BBM TANJUNG UBAN
TAHUN 2013

VOLUME
Q'TY

UNIT

UNIT PRICE
MATERIAL
(X Rp. 1000)

Qty

31
31
31
31
31
31
93
189
67
259
2

4.00

unit

10,886,665,500

101,267
86,800
79,567
65,100
50,634
43,400
81,354
132,264
69,254
133,856
286
20,406
5,300
150

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

14,000
14,000
14,000
14,000
14,000
14,000
14,000
11,250
11,250
11,250
10,500
10,500
10,500
10,500

4.00
4.00
4.00
4.00
8.00
4.00
4.00
8.00
4.00
4.00

set
set
set
set
unit
unit
unit
unit
unit
unit

8,000,000
8,000,000
4,500,000
4,000,000
6,000,000
12,000,000
14,500,000
11,000,000
6,000,000
16,000,000

24.00
4.00
8.00

unit
set
unit

6,800,000
3,000,000
6,500,000

15,088.96

kg

13,000

4.00
12.00
4.00
4.00
4.00
4.00

set
set
set
set
set
set

9,500,000
2,500,000
5,000,000
25,000,000
16,500,000

4,853.60
152.00

kg
meter

2.00
1.00
1.00

Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org

4.00

set

12,500
900,000

1,442,640

om plate) dengan metode Sand


00 Micron), termasuk Ring-I
ntermediate = 100 micron, Finish =
T 100 micron, (Preparation dengan
umious Coating/Anti Corrosion)

micron (Primer = 50 micron,


ne tools/power tools)

31,931.15
13,119.29
26,351.68
2,048.00
11,309.73
4.00
326.00
4.00

5.00
5.00
10.00
5.00
1.00
5.00
5.00
5.00
5.00

m2
m2
m2
m2
m2
set
m2
EA

unit
unit
unit
pasang
ls
unit
unit
set
EA

110
125
120
110
250
500
95
167,343,200

10,300
11,000
9,050
8,500
6,500
6,000
5,000
56,350
167,399,550

16.00

#REF!

#REF!

UNIT PRICE

TOTAL PRICE

LABOR
(X Rp. 1000)

MATERIAL
(X Rp. 1000)

LABOR
(X Rp. 1000)

18,228,514.10

43,546,662,000

72,914,056

21
21
21
21
21
21
21
21
21
21
20
21
15
9

1,417,738,000
1,215,200,000
1,113,938,000
911,400,000
708,876,000
607,600,000
1,138,956,000
1,487,970,000
779,107,500
1,505,880,000
3,003,000
214,264,050
55,650,000
1,575,000

2,126,607
1,822,800
1,670,907
1,367,100
1,063,314
911,400
1,708,434
2,777,544
1,454,334
2,810,976
5,720
428,528
79,500
1,350

10
10
10
10
10
10
10
10
10
10

32,000,000
32,000,000
18,000,000
16,000,000
48,000,000
48,000,000
58,000,000
88,000,000
24,000,000
64,000,000

40
40
40
40
80
40
40
80
40
40

10
10
10

163,200,000
12,000,000
52,000,000

240.00
40.00
80.00

10

196,156,480

150,889.60

10
10
10
10

38,000,000
30,000,000
20,000,000
100,000,000
66,000,000
-

40.00
120.00
40.00
40.00
-

10
10

60,670,000
136,800,000

48,536.00
1,520.00

10

5,770,560

40.00

12.50
12.50
12.50
12.50
12.50
12.50
12.50

3,512,426
1,639,911
3,162,202
225,280
2,827,433
2,000
30,970
44,866,659,263

399,139.35
163,991.14
329,395.99
25,600.00
141,371.67
50.00
4,075.00
74,179,745

2,500
2,500
2,500
2,500

51,500.00
55,000.00
90,500.00
42,500.00
32,500.00
30,000.00
25,000.00
327,000

12,500.00
12,500.00
25,000.00
12,500.00
12,500.00
12,500.00
12,500.00
100,000

44,866,986,263

74,279,745

2,500
2,500
2,500

44,941,266,007.65

ratio factor
1

1100
13420
1.457337884
2,200.00

27,500,000.00
1,653,025,000.00

11143488
-

5009.166667
928394775.7
30469.57131
2876954205

FABRICATION AND ERECTION MANP


SITE MANPOWER
NO.

CATEGORY

INDIRECT MANPOWER
1

PROJECT MANAGER

SITE MANAGER

CONSTRUCTION MANAGER

SSr. Superintendent

QA/QC Manager

Erection Supervisor

Welding Supervisor

QA/QC COORDINATOR

QA/QC INSPECTOR

SAFETY COORDINATOR

SUB-TOTAL

SUB-TOTAL

GRAND TOTAL

DIRECT MANPOWER
1

Erection Foreman

Erection Leadman

Welding Foreman

Welder 1st class

Welder 1st class + 6G

Fitter

HELPER

PAINTING Foreman

PAINTING BLASTING

ESTIMATED
RATE MANPOWER
PROJECT MANAGER

Salary
Rp/Hour

Food/Allow
Rp/Day

SITE MANAGER
CONSTRUCTION MANAGER
Sr. Superintendent
QA/QC Manager
QA/QC COORDINATOR

0
0
0
0
0

0
0
0
0
0

0
0
13000
15000
0
15000
12000
0
0
10000
12000

0
0
20000
20000
0
20000
20000
0
0
20000
20000

8000
15000
10000

20000
20000
20000

QA/QC INSPECTOR
SAFETY COORDINATOR
Erection Supervisor
Welding Supervisor
PAINTING SUPV
Erection Foreman
Erection Leadman
Welding Foreman
Welder 1st class
Welder 1st class + auto
Welder 1st class + 6G
PAINTING BLASTING
Fitter
FITTER 1ST CLASS
FITTER 2ND CLASS
Tr.FITTER 2ND CLASS
HELPER
ELECTRIC 2ND CLASS
SAFETY MAN
NDE TECHNICIAN
GRINDER
HRD
DRAFTMAN
MATERIAL CONTROL
SITE.ADM
RIGER
SCAFOLDER

ECTION MANPOWER SCHEDULE PLAN


WEEKS
10 11 12

13

14

15

16

17

18

19

20

21

STANDARD
Salary
Rp/Hour

Food/Allow
Rp/Day

35000

30000

REMARK

35000
35000
35000
0
0
15500
15500
0
0
22000
16000
14000
16000
15500
0
0
12000
13500
12500
8000
7000
6000
6500
0
12000
7000
8000
14000
7000
6000
6000
6000

30000
30000
30000
0
0
30000
30000
0
0
30000
30000
30000
20000
20000
0
0
10000
0
20000
20000
20000
20000
20000
0
20000
20000
30000
20000
20000
20000
20000
20000

13500-14500

10000-11500

8000-10500
7000-8000

11500-13000
5000-7000

8000-12500
7000-9000

1DAY/HOUR
11.5

Total Cost

Rp

4
46
15.3333333333