Required Information or Questions on Drawings:

LAST UPDATED 3/8/2016

Typical Section
o Three Sections
Typical Bridge Section
Typical Full Depth Road Replacement Section
Transition Section from Proposed to Existing
Do we need a section for areas where we dont need to remove the full road?
o Need to verify with Ron if section with base under lanes but not shoulders is ok.
o How think can binder?
o How long of a transition section is need to transition from propose to existing
lane/shoulder slopes?
o Should we install 8 shoulders in areas where the existing is less than 8?
o Do we need to add a ditch on the SE side of the bridge?
There is no existing ditch
May not be enough room to slope down and keep ditch on ROW
Structure Plan and Details
o Need to verify the bridge unit widths and layout with Kistner
o Need to verify the wingwall layout
How close can the new waterline be to the footing?
Flared wingwalls may push the footing too close to new waterline
In order to prevent the bridge rail from being on the U-Walls, can be move the U
Walls out past the shoulder break with the closure pour?
o Need to verify footing dimensions and pile cap thickness
Proposed Profile
o Need to verify the proposed CL elevation of road
o Can I have a constant grade between the limits of paving or do I need to incorporate
vertical curves to transition?
Proposed Plan
o Need to add the water valve to the west side of the bridge
o Need to design the new bridge rail, transition rail, and guide rail
What kind of end assemblies do we want to use?
o Need to confirm the TE area
o Are we adding a storm water pipe to the SE side of bridge?
Need to confirm if there is an existing pipe there
o Required areas of rip rap
o Update cut-fill lines