PROJECT MANAGEMENT PLAN 2013

CLUSTER THE BANDARA RESIDENCE - MAROS


KEGIATAN

NO.

m3

4,000.00

m3

402.00

m2

460.50

m3

336.00

m2

1.00

unit

2,785.00

m2

18.00

m2

56.00
100.00

90.00

unit

90.00

unit

38.00

unit

37.00

unit

9.00

unit

6.00

unit

KONTRUKSI UNIT RUMAH


TYPE
TYPE
TYPE
TYPE

395.00

SARANA PER UNIT


INSTALASI AIR BERSIH/UNIT
INSTALASI LISTRIK / UNIT

JANUARI
1
2
3
4

FEBRUARI
5
6
7
8

PRASARANA DAN SARANA


PEMBUATAN TEMBOK KELILING
PONDASI BLOK
SALURAN DRAINASE+deuker
INSTALASI LISTRIK INDUK
JALAN LINGKUNGAN CLUSTER
JALAN MASUK CLUSTER
GATE CLUSTER
TAMAN DEPAN
TAMAN LINGKUNGAN

SEBELUM
2013

PENGOLAHAN LAHAN
PEMBUATAN PONDASI KELILING
PENIMBUNAN LOKASI TAHAP 1
PENIMBUNAN LOKASI TAHAP 2

VOLUME
Q
SAT

36
40
45
54

GENERAL CLEARING
SERAH TERIMA UNIT

90.00
90.00

SIRTU

MARET
APRIL
MEI
JUNI
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

TOTAL BIAYA

JUNI

JULI
AGUSTUS
SEPTEMBER
OKTOBER
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

TYPE 36

TYPE 40
TYPE 36

NOVEMBER
DESEMBER
41 42 43 44 45 46 47 48

TYPE 45+54
TYPE 40

TYPE 45+54

TYPE 36

TYPE 40

TYPE 45+54

TYPE 36

TYPE 40

TYPE 45+54

TYPE 36

TYPE 40

TYPE 45+54

TYPE 36

TYPE 40

TYPE 45+54

2000

27000

50

250

1,350,000.00

31.25