MINISTRY OF IRRIGATION AND WATER RESOURCES MANAGEMENT

ENGINEERS UNIT RATES


FOR

CONSTRUCTION WORKS

New Rates are applicable from


01 January 2012

Rates Committee ;
Ministry of Irrigation and Water Resources Management,
No. 500, T.B. Jayah Mawatha,
Colombo -10,
Sri Lanka.

ABBREVIATIONS

A
ac
avg
C.I.
CIF
CT
cu
cu.ft
cu.yd
cwt
D-Box
dia.
DPC
ft.
G.I.
gl
gpm
ha
HP
hrs
kg
kVA
lb
l
m
m2
m3
max.
mm
M.S.
Nos.
PVC
RCC
r/f
Rs.
sq
sq.ft
W
yd

Ampere
Acres
Average
Cast iron
Cost, Insurance and Freight
Crawler Tractor
Cube (100 cubic feet)
Cubic feet
Cubic yard
Hundredweight
Distribution box
Diameter
Damp Proof Coarse
Feet
Galvanized Iron
Gallon
Gallons per minute
Hectare
Horse Power
Hours
Kilo gramme
Kilo Volt Ampere
Pound
Litre
Metre
Square metre
Cubic metre
Maximum
Milli metre
Mild steel
Numbers
Poly Vinyl Chloride
Reinforced Cement Concrete
Reinforcement
Rupees
Square (100 square feet)
Square feet
Watt
Yard

-1-

PREAMBLE
1. SCOPE
The rates listed here are to enable preparation of "Engineer's Estimates" for irrigation and
settlement projects. The total specifications for the rates herein are described in "Technical
Specifications".

2. CONSTRUCTION AGENCIES
As purchase of Machinery and equipment will be made by State or Private sector and as Sri
Lankan labour will be employed, the basic unit rates are applicable for domestic construction
Agencies in the Public sector and Private sectors, according to the classification given below.
Class A -

Large firms bound by "Collective Agreement" and State Corporations operating


on a commercial basis.

Class B -

Medium firms not bound by "Collective Agreement" generally executing with


casual labour except for permanent operators for heavy equipment and small scale
contractors with earth moving machinery.

Class C -

Government Departments & non-commercial State Corporations executing on


force account with casual labour except for permanent operators for heavy
equipment and Small Scale Contractors largely supplying casual labour.

3. ASSIGNMENT OF WORKS
It is recommended that Machinery intensive jobs be assigned to Class "A" and labour intensive
works to Class "C" construction agencies respectively.
Class "B" construction agencies may be assigned jobs requiring less Machinery power and
more manpower.
Conversion Factors
1m

3.2808 ft

1 ft

0.3048 m

1 Kg

2.2046 lb

1 lb

0.4536 kg

1 ha

2.47 ac

1 ac

0.4048 ha

1 cu.m

0.353 cu

1 cu

2.833 cu.m

1 sq.m

0.1076 sq

1 sq

9.2937 sq.m

1 M.ton

0.9842 ton

1 ton

1.016 M.ton

1 lit

0.22 gl

1 gl

4.54 lit

1 bushel

1.2844 cu.ft

1 cu.ft

0.7786 bushel

-2-

4. OVERHEADS AND PROFIT FACTOR (OH & PF)


The overheads and profit factor by which the Basic Unit Rate is multiplied to obtain the Unit
Rates for the above classes of construction agencies is as follows.
CLASS OF

OVERHEADS & PROFIT FACTOR

CONSTRUCTION
AGENCY

Civil Works (Canals, Roads etc)

Building
Works

A
B
C

1.23
1.17
1.14

1.36
1.18
1.18

Note:
(i)
(ii)
(iii)

VAT is not included in the overheads & profit factor.


The rates are based on basic prices prevalent in January 2012.
The calculated unit rates have been rounded off as follows:
When Unit Rate amount is,
Between
0 to Rs. 100, to nearest 5 cts.
Over
Rs. 100 to Rs. 500, to nearest 25, 50, 75 cts.
Over
Rs. 500 to Rs.1000, to nearest 50 cts

5 VALUE ADDED TAX (VAT)


VAT has not been included in the unit rates, in order to avoid complications arising from the
fact that only contractors who have registered themselves at the Department of Inland
Revenue for VAT are eligible for claims on VAT.
To include VAT in the Engineers estimate, it could be added as a sum (12% of the estimate
without VAT) to the estimate prepared based on the appropriate unit rates.

-3-

Engineer's Unit Rates - Applicable from 01 January 2012

LABOUR WAGES USED IN THE ANALYSIS OF RATES


No.

Category

Wages per 9 hrs day (Rs.)

Unskilled labour

660.00

2
3
4

Semi-skilled labour
Skilled (ordinary)
Skilled (carpenters, masons)

725.00
900.00
1,050.00

Skilled (heavy equipment operators)

1,100.00

Mechanics, electricians and welders

1,075.00

PRICES OF CONSTRUCTION MATERIALS FOR CIVIL WORKS USED IN THE


ANALYSIS OF RATES
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Item
Lanka Auto diesel
Lanka Petrol
Gelignite 60-80%
Electric detonators
Jumper steel, 7/8" dia.(2.5 lb/ft)
Set Exploder, Ohm meter & Hand siren
Bitumen 80/100
R/F bars, mild steel (all sizes)
R/F bars, tor steel (all sizes)
Class II shuttering planks, 1"x12"
Wire nails
4" dia.Round timber for scaffolding (0.2 cu.ft/ft.)

Unit

Price (Rs.)

12" dia.Polythene displacer with sawdust & tie rods

l
l
lb
each
ft
10000cu
gl
lb
lb
m
kg
ft
each
each
each
each
each
each
each
each
each
each
each
per beam

84.00
137.00
338.00
98.21
125.00
322,000.00
460.00
49.61
50.41
114.00
352.00
12.50
660.00
126,000.00
93,000.00
84,500.00
73,000.00
62,000.00
46,000.00
40,700.00
31,000.00
24,000.00
21,000.00
2,250.00

25

3"x1/2" Neoprene pad and Dowels

per beam

1,130.00

26
27

Kerb slab 3'x91.64 Kg

each
each

1,200.00
2,700.00

each

2,200.00

each

1,450.00

each
each

1,500.00
200.00

lb
each

120.00
24,438.00

each
each
each

26,800.00
46,058.00
52,786.00

28
29
30
31
32
33
34
35
36

Portland cement - 50 kg bags


Pre-stressed conc. Bridge Beam 53'x5.07 ton
-do44'x4.22 t
-do40'x3.80 t
-do35'x2.86 t
-do32'x2.59 t
-do23'x2.26 t
-do20'x2.08 t
-do17'x1.57 t
-do14'x1.13 t
-do11'x0.89 t

Fascia slab 1 1/2"x3'x4'x105.89 Kg with tie wires


-do- 1 1/2"x2'x4'x46.32 Kg with tie wires
Upright for hand rail 3'3"x71.93 Kg
Hand rail 3"dia.x7' 8 1/2"x 84.37 Kg
Rainwater channel 3"x6"x24"x 14.25 Kg
Steel plates & anchors in expansion joints
9" dia.C.I gate & screw lift hoist with spindles
12" dia.
-do15" dia.
-do18" dia.
-do-4-

Engineer's Unit Rates - Applicable from 01 January 2012

No.
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Item

Unit
each
each
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
ft
each
each
each
each
each
each
each
each
each
each
each

24" dia.
-do30" dia.
-do6" dia. RCC spun pipes
9" dia.
-do12" dia.
-do15" dia.
-do18" dia.
-do24" dia.
-do30" dia.
-do36" dia.
-do42" dia.
-do48" dia.
-do54" dia.
-do6" Collar for RCC pipes
9" dia.
-do12" dia.
-do15" dia.
-do18" dia.
-do24" dia.
-do30" dia.
-do36" dia.
-do42" dia.
-do48" dia.
-do54" dia.
-do-

Price (Rs.)
72,490.00
120,253.00
362.50
525.00
625.00
737.50
868.75
1,100.00
1,343.75
1,700.00
2,182.00
2,550.00
2,915.00
325.00
400.00
550.00
600.00
750.00
900.00
975.00
1,150.00
1,550.00
1,800.00
2,200.00

PRICES OF CONSTRUCTION MATERIALS FOR BUILDING WORKS USED IN THE


ANALYSIS OF RATES
No.
Item
1 Burnt Clay Bricks 8 5/8" x 4 1/8" x 2 5/8"
2 Slaked lime (wt= 50 lb/cu.ft)
3 Portland cement ( 50 kg bags)
4

DPC tar

150x150mm Glazed wall tiles


200x200mm .floor tiles

6
7
8
9
10
11
12
13
14
15

300x300 Floor tiles


Class 1 timber 4"x3"
-do3"x1"
-do9"x1"
-do4"x1"
-do4"x2"
-do6"x1"
-do12"x3/4" Planks
Ordinary Plywood door 2'9"x6'9"

Unit
1000 Nos.

Price (Rs.)
6500.00

cu ft
each

450.00
660.00

gl

757.10

each

42.00

each

65.00

each
m
m
m
m
m
m
m
each

116.00
738.00
246.00
750.00
328.00
505.00
500.00
625.00
2200.00

16 PVC Toilet door including door frames


17 Brass butt hinges 4"x3" or 4"x2 1/2"

each

4950.81

each

130.00

18
19

each
each

25.00
260.00

each

240.00

each

160.00

20
21

Hold fasts 9"x1"x1/8"


Brass barrel bolts 10"
-do6"
-do-

4"
-5-

Engineer's Unit Rates - Applicable from 01 January 2012

No.
Item
22 Nickel door handle
23 Mortice door lock
24 Brass screws, assorted sizes in 100/pkt
25 3 mm thick figured glass sheet
26 Brass centre pivot (Hinge), 2 1/2"
27 Door rings
28 Hasp & staple, GI 4"
29 Pad lock, Brass 2"(Viro)
30 Brass casement stays, 10"
31 Brass casement fastners 4"
32 Brass window rings
33 Panel pins (3/4")
34 Brass fanlight catch
35 G.I.(2"x2") Welded mesh (12'x7')
36 Class 1 timber 6"x2"
-do4"x4"
37
-do6"x4"
38
-do5"x4"
39
-do5"x3"
40
-do2"x1" (Reepers)
41
-do2"x2"
42
-do- 10"x1"
43
-do8"x1"
44
45 Lunumidella ceiling planks 8"x3/4"
46 1 1/2"x3/8" Beading
47 1 1/4"x3/4" Moulding
48 Wood preservative, clear
49 Calicut pattern tiles - Gr.1
50 Calicut ridge tiles
51 Corrugated Asbestos sheets 10'x3'7"
52 Corrugated Asbestos Ridge sheet
53 4 1/2" GI roofing nuts, bolts & washers
54 6" dia. halfround, country tiles
55 Boiled lime (wt 50 lb/cu.ft)
56 Flat Asbestos sheets 4'x4'
57 Aluminium Plain sheet (gauge 17)
58 6" dia.half round/4 1/2" square PVC eaves gutter.
59 PVC gutter joiners
60 PVC gutter end caps
61 Gutter brackets
62 3 1/2" dia.PVC down pipe (in 12' length)
-doelbow
63
-dojoiners
64
Down
pipe
clips (straps)
65
66 Roll Plugs to fix screws
67 4 1/2" PVC running gutter head
68
-do- gutter box
69 Glue for binding lime/samara

-6-

Unit
each
each
pkt
sq.ft
each
each
each
each
each
each
each
100 g
each
sheet
m
m
m
m
m
m
m
m
m
m
m
m
l
each
each
sheet
pair
50 Nos.
each
cu.ft
sheet
sq ft
ft
each
each

Price (Rs.)
175.00
3900.00
660.00
50.00
60.00
85.00
110.00
550.00
130.00
100.00
75.00
190.00
120.00
3125.00
853.00
1150.00
1805.00
1250.00
875.00
75.00
135.00
830.00
558.00
165.00
91.86
137.80
290.00
38.00
50.00
1665.00
600.00
400.00
20.00
680.00
460.00
45.00
73.33
111.00
92.00

each
ft

24.00
51.00

each
each
each
each
each
each

156.00
115.00
24.00
1.50
256.00
609.00

kg

150.00

Engineer's Unit Rates - Applicable from 01 January 2012

No.
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89

Item

Unit

Coir brush for cleaning ext. walls


3 knot wash brush for lime/samara
Wall filler
Weather shield
Emulsion paint
Sand paper sheets (assorted sizes)
Distemper brush 5"
Enamel paint
Floor paint
Thinner
Paint brush (3")
Varnish (external)
Aluminum paint
4" dia. PVC pipes (type 400)
-do- bends
-do- pipe junction
Ceramic low level commode with all fittings
Ceramic squatting pan (large) with "P"/"S" trap
Foot rests
Plastic High level cistern & down pipe

Price (Rs.)

each
each
kg
4l
4l
each
each
4l
l
4l
each
4l
4l
ft
each
each
each
each
pair
each

65.00
100.00
135.00
3360.00
2600.00
45.00
620.00
3142.00
964.00
760.00
420.00
3265.00
3152.00
166.00
1280.00
1553.00
12860.00
1850.00
450.00
2150.00

90 1000x500mm s/s kitchen sink complete with flushing


plug & strainer

each

2925.00

91 22"x15" Ceramic wash basin with tap, flushing plug &


strainer
92 Solvent cement for joining PVC
93 1/2" PVC pipe
94
-doelbow
95
-do- faucet socket
96 3/4" PVC pipe
97
-doelbow
98
-dofaucet socket
99 1" PVC pipe
100
-do- elbow
101
-do- faucet socket
102 1 1/2" PVC pipe
103
-doelbow
104
-dofaucet socket
105 2" PVC pipe
106
-do- elbow
107
-do- faucet socket
108 PVC shower rose 1/2"
109 PVC valve socket 1/2"
110 1/2" globe valve, PVC
111 1/2" bib cock , brass
112 3/4" globe valve, PVC
113 3/4" bib cock, brass
114 1" globe valve, PVC
115 1 1/2" gate valve, brass

each

3200.00

g
ft
each
each
ft
each
each
ft
each
each
ft
each
each
ft
each
each
each
each
each
each
each
each
each
each

2.25
12.92
16.00
22.00
36.38
30.00
31.00
57.23
43.00
40.00
70.76
95.07
75.10
124.58
148.84
115.16
110.00
22.00
154.00
420.00
235.00
800.00
315.00
1700.00

-7-

Engineer's Unit Rates - Applicable from 01 January 2012

No.
116
117
118
119
120
121
122

Item
2" gate valve, brass
Ceramic urinal pan
Roll plugs
Chromium plated soap holder
Chromium plated tooth brush holder
Chromium plated towel holder (pair)
Bathroom mirror, size 500x400 mm.

Unit
each
each
each
each
each
each
each

Price (Rs.)
2400.00
2400.00
1.50
325.00
550.00
1200.00
1990.00

123 Nikel plated Glass tray holders (pair)


124 5 mm thick glass tray (16"x5")

each
each

500.00
650.00

125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151

Chromium plated 6"x6" toilet paper holder


Ceramic 4"x4" robe hook
6"x6" PVC grating
PVC gulley
2" dia.,6' long, PVC pipes , 400
4" dia.,6'
-doFixing brackets 2" - PVC
-do4" - PVC
2" dia. pipe clips
4" dia. PVC pipe (type 400)
4" dia. pipe clips
Copper wiredome for vent pipe
Electric cable 1/044 EPL-single
5/8" conduit
Wiring clips 1 1/4" to 2" in 100/pkt
Panel pins 3/4"
Round blocks
Embedded mounting box (Plastic)
Brass screws
Surface switch
Lamp shade - plastic
60 W electric bulb (230 V)
Batten lamp holder
Ceiling rose
Pendant lamp holder
Electric cable 14/0076 twin - (2 core cable)
-do7/044 twin - service mains

each
each
each
each
each
each
each
each
each
ft
each
each
m
ft
pkt
kg
each
each
pkt
each
each
each
each
each
each
m
m

1200.00
1250.00
150.00
575.00
425.00
995.00
60.00
100.00
29.00
166.00
110.00
250.00
19.85
6.30
25.00
190.00
20.00
20.00
930.00
125.00
120.00
71.00
80.00
60.00
60.00
48.66
290.63

152
153
154
155

6-way MCB encloser


Electric cable 7/029 single (earth)
5A,3 pin plug base with switch
10-way MCB encloser

each
m
each
each

375.00
66.00
295.00
375.00

156 6A MCBs

each

183.04

157
158
159
160

10A MCBs
16A MCBs
20A MCBs
32A MCBs

each
each
each
each

183.04
183.04
183.04
183.04

161 40A MCBs

each

183.04

-8-

Engineer's Unit Rates - Applicable from 01 January 2012

No.
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195

Item
12-way MCB encloser
63A Isolator (2 Pole)
40A Isolator (2 Pole)
8-way MCB encloser
40A 30mA 2 Pole RCD (ELCB)
63A 30mA 2 Pole RCD (ELCB)
Roll plugs
2" dia. G.I. pipe for earth electrode
G.I. bracket with insulator etc. (3")
Swan neck holder
Ceiling lamp fittings (without bulb)
Suspension chains
Hooks & eyes (set)
Florescent lamp fittings 2' (set)
-do4' (set)
Florescent lamp tube (20 W)
-do(40 W)
15 A, 3 pin plug base with switch
Ceiling fan with regulator
Hook to hang ceiling fan 3/4" dia. T.S.
Electric bell
4-way MCB encloser
Bell push
Lamp ballast
125W Mercury bulb
40/0076 Flexible cable (2 core)
3/4" G.I. pipe
G.I. bracket with insulator etc. ( 3/4")
Aluminium connectors
13 A, Squire pin plug base with switch
6"x8"x15" cement blocks
River Sand
Electric cable 7/0036 Twin
Electric cable 7/0029 Twin

Unit
each
each
each
each
each
each
each
ft
each
each
each
m
each
each
each
each
each
each
each
each
each
each
each
each
each
m
ft
each
each
each
each
Cu
m
m

Price (Rs.)
758.92
776.79
656.25
450.00
2205.36
2366.07
1.50
140.00
420.00
125.00
550.00
105.00
35.00
550.00
625.00
90.00
80.00
430.00
4500.00
110.00
295.00
375.00
285.00
285.00
187.50
78.00
60.00
300.00
65.00
330.36
48.00
4500.00
199.20
126.40

HOURLY PLANT RATES


Plant
Machinery/Equipment
RN
1A Crawler tractor 180-200 HP (10000 hrs Dep.)
2A CT 300 HP (10000 hrs Dep.)
3A Straight blade dozer attachment for CT (10000hrs Dep.)
4A Ripper attachment to CT (10000 hrs Dep.)
5 Pusher cap attachment (10000 hrs Dep.)
6 SFR attachment, twin drum(10000 hrs Dep.)
7 Motorized scraper, 14/20 cu.yd
8 Motor grader, 120-150 HP
10 Back-Hoe cum hydraulic excavator (1 cu.yd)
11A Rear Dumper - 15 t (working)
11B
-do(idle)
13 Water bowser with sprinkler attachment (1200 gal)
14A Mobile crane 10 t, wheel mounted (working)
-9-

Hourly Plant
Rate (Rs.)
11,772.03
19,518.46
638.18
446.72
223.36
325.60
9,540.35
6,603.02
5,666.01
3,461.45
765.37
2,481.81
19,606.33

Engineer's Unit Rates - Applicable from 01 January 2012

14B
16
17
18
24
25A
25B
26
27
29
30A
30B
30C
31A
31B
31C
32A
32B
32C
33A

-do(idle)
Air compressor (600 cfm)
-do(300 cfm)
Pneumatic jack hammer (1 1/2" bit,50 lb) or Rock drill (w/o AC)
Secondary stone crusher (15 t/hr)
Front end loader 1.5-2.5 cu.yd
-do2.5-3.5 cu.yd
Concrete mixer 14/10 cu.ft
-do5/3 cu.ft
Pneumatic vibrator - 2" dia. (without AC)
Tractor(60 HP) & trailer (without load)
-do(with load)
-do(idle)
Lorry - 5 t (without load)
-do(with load)
-do(idle)
Explosives van - 3 t (without load)
-do(with load)
-do(idle)
35 t Low Bed Trailer with prime mover (without load)

9,182.13
2,289.61
1,610.10
213.11
5,463.18
5,040.22
5,781.62
597.27
391.72
102.36
1,873.34
2,302.79
412.97
1,924.87
2,354.32
732.24
1,647.42
1,933.02
642.70
7,938.56

33B
33C
37
38
43
44
45

-do(with load)
-do(idle)
Road roller (10-15 t)
4" dia. centrifugal pump (450 gpm)
Dump truck - 5 cu.yd (working)
-do(idle)

8,891.96
2,637.58
2,941.24
496.66
2,962.94
586.29
9,771.30

220 HP crawler excavator (2-3m )

Note: The above hourly plant rates are used in the analysis of rates in this report. These are
not meant to be used for hiring of plants. But these plant rates can be used to prepare estimates for
evaluation of Tenders or Quotations for hiring of plants on hourly basis.
However, under special cases where m/c & equipment has to be hired on hourly basis such as
very urgent needs & where works cannot be quantified, these plant rates could be used with
the prior approval of the head of the organization.

- 10 -

Lorry

each

each

each

12 Tiles

13 C.I.Gates 9"

14 C.I.Gates 12,15,18"

gl

ton

ton

21 Bitumen

22 Heavy Loads

23

cu.ft

24 Asbestos sheets

25 Other construction materials

-do-

ft

gl

ft

18 RCC Pipes over 24 upto 36" dia.

20 Water for construction

ft

17 RCC Pipes over 15 upto 24" dia.

19 RCC Pipes over 36 upto 54" dia.

Lorry

ft

16 RCC Pipes upto 15" dia.

Lorry

Low Bed Trailer

Low Bed Trailer

Lorry

Lorry

Lorry

Lorry

Lorry

15 C.I.Gates 24,30" & Wooden Gates each

Lorry

Lorry

Lorry

Lorry

200

900

24

48

88

224

18

37

75

2500

4000

220

5000

100

130

(Units)

7086.63

28.40

1064.94

532.47

290.44

114.10

1419.91

690.77

340.78

4.53

1.25

44.26

44.14

255.58

196.60

(Rs.)

Cost

Tractor Trailer

150

127.79

M/C

- 11 -

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Explosives Van

Tractor Trailer

Rear Dumper+Front End Loader

Rear Dumper+Front End Loader

100

520

700

16

32

48

126

11

21

42

125

100

2.5

2.2

2.3

0.6

0.7

56

60

(Units)

Capacity

Local Transport

Rear Dumper+Front End Loader

Tractor Trailer

Tractor Trailer

Tractor Trailer

(loading & unloading by Crane )

200

150

150

150

150

150

150

150

150

60

20

50

200

150

150

(Miles)

Capacity Distance

Main Transport

Explosives Van

each

lb

sq

11 Bricks

Turf in 3" sods

Explosives

cu

Lorry

Lorry

M/C

cu.ft

Rubble & Rip-Rap over 9"

cu

cu

cu

cu

cwt

bag

Unit

10 Sawn timber

Sand, Gravel

Metal, Rubble

Metal, Rubble

Sand, Gravel

Cement (50 kg Bags)

R/F Steel

Material

No.

Transport & Loading/Unloading Costs of Construction Materials

1.5

15

(Miles)

Distance

37.46

7.20

2.42

179.46

89.73

59.82

22.79

261.03

136.73

68.37

22.97

0.94

390.85

1,302.06

1,156.87

991.63

2,154.72

1,846.91

51.27

47.86

(Rs.)

Cost

244.46

165.25

138.16

7,086.63

35.60

2.42

1,244.41

622.20

350.26

136.89

1,680.95

827.50

409.15

4.53

1.25

67.23

45.07

390.85

1,302.06

1,156.87

991.63

2,154.72

1,846.91

306.86

201.08

negligible

negligible

1.38

0.92

41.25

20.63

10.31

4.58

82.50

41.25

20.63

0.55

0.55

6.60

0.09

330.00

1,031.25

1,031.25

16.50

10.31

Cost (Rs.)

labour

Transport
Cost (Rs.)

Unloading

Total

Loading/

366.33

Cost )

Material

(25% of the

36.98

3.34

1,285.66

642.82

360.57

141.47

1,763.45

868.75

429.77

5.08

1.80

73.83

45.17

720.85

1,302.06

1,156.87

991.63

3,185.97

2,878.16

323.36

254.77

(Rs.)

Load/UnLoad)

(Transport +

Total Cost

Engineer's Unit Rates - Applicable from 01 January 2012

Description of Work

Earth excavation or borrow and spoil to waste or fill material, cut 03 ft lift upto 3ft, spread 100ft.

As in Rate 3.1A but cut 3-5', lift upto 5', spread 100'
As in Rate 3.1A but cut 5-10', lift upto 10', spread 100'
As in Rate 3.1A but cut 10-15', lift upto 15', spread 100'
As in Rate 3.1A but cut 15-20', lift upto 20', spread 100'
As in Rate 3.1A but cut 20-25', lift upto 25', spread 100'

As in Rate 3.1A but cut 25-30', lift upto 30', spread 100'
As in Rate 3.1A but cut 30-35', lift upto 35', spread 100'
As in Rate 3.1A but cut 35-40', lift upto 40', spread 100'
As in Rate 3.1A but cut 40-45', lift upto 45', spread 100'
As in Rate 3.1A but cut 45-50', lift upto 50', spread 100'
As in Rate 3.1A but cut 50-55', lift upto 55', spread 100'
As in Rate 3.1A but cut 55-60', lift upto 60', spread 100'
Haul earth 1/4 mile
Haul earth 1/2 mile
Haul earth 3/4 mile

3.1A

3.1
3.2
3.3
3.4
3.5

3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.25
3.26
3.27

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Rear Dumper

Rear Dumper

Rear Dumper

-do-

-do-

-do-

-do-

-do-

-do-

-do-

B-Hoe/ Rear
Dumper

-do-

-do-

-do-

- 12 -

280.00
286.50
293.00
307.75
313.50
320.75
327.75
77.00
97.55
118.75

185.75
189.50
194.25
198.75
274.75

80,273.00

8,884.00

-do-

Ripping, levelling and forming SCB in farms

2.5

m3
m3
m3
m3
m3

ha

Forming soil conservation bunds in farms

2.4

16,595.00

185.75

CT200HP
CT300HP &
CT200HP

ha

Land levelling of farms

B-Hoe

-do-

ha

2.3

107,204.00

54,793.00

81,741.00

m3

-do-

(3) EARTH EXCAVATION

CT300HP

ha
ha

Ripping and cross-ripping for land levelling of farms

2.2

30,653.00

-do-

2.1

61,306.00

-do-

ha

(2) RIPPING, CROSS RIPPING, LAND LEVELLING & SOIL


CONSERVATION BUNDS
Ripping for land levelling of farms

Light Jungle

CT200HP

ha
ha

-do-

1.4

Medium Jungle

-do-

113,798.00

CT300HP

ha

120,695.00

Basic Unit
Rate(Rs.)

ha

Principal M/C

Secondary Growth Jungle clearing

-do-

1.3

Common Jungle

Unit

1.5

-do-

(1) CLEARING AND GRUBBING


Clearing and Grubbing Heavy Jungle

1.2

1.1

Rate
No.

217.50
221.75
227.25
232.50
321.50
327.75
335.25
343.00
360.00
366.75
375.25
383.50
90.10
114.00
139.00

228.50
233.00
238.75
244.25
338.00
344.50
352.50
360.50
378.50
385.75
394.50
403.25
94.70
119.75
146.00

93,920.00

98,736.00

217.50

10,395.00

10,928.00

228.50

19,416.00

20,412.00

35,864.00

37,703.00

64,108.00

71,728.00

75,406.00

125,429.00

95,637.00

100,542.00

67,395.00

133,144.00

131,861.00

141,213.00

139,972.00

Class-B

Unit Rate (Rs.)

148,455.00

Class-A

Machinery

319.25
326.75
334.25
351.00
357.50
365.75
373.75
87.80
111.00
135.25

211.75
216.00
221.25
226.50
313.25

211.75

91,512.00

10,128.00

18,919.00

122,212.00

62,464.00

34,944.00

69,889.00

93,185.00

129,730.00

137,592.00

Class-C

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

1,131.00
1,165.00
1,210.00
1,254.00
-

613.00
971.50
1,001.00
1,037.00
1,079.00

517.50

30,653.00

61,306.00

Basic Unit
Rate(Rs.)

1,391.00
1,433.00
1,489.00
1,542.00
-

754.00
1,195.00
1,232.00
1,275.00
1,327.00

637.00

37,703.00

75,406.00

Class-A

1,323.00
1,363.00
1,416.00
1,467.00
-

717.50
1,137.00
1,172.00
1,213.00
1,263.00

605.50

35,864.00

71,728.00

Class-B

Unit Rate (Rs.)

Manual

1.3

1.2

1.1

Rate
No.

2.5

2.4

2.3

2.2

2.1

1,289.00
1,328.00
1,380.00
1,429.00
-

699.00
1,108.00
1,142.00
1,182.00
1,230.00

3.27

3.26

3.25

3.12

3.11

3.1

3.9

3.8

3.7

3.6

3.5

3.4

3.3

3.2

3.1

590.00 3.1A

34,944.00 1.5

69,889.00 1.4

Class-C

Engineer's Unit Rates - Applicable from 01 January 2012

Haul earth 1 mile


Haul earth 1/4 mile in each step beyond 1mile(Addl. to Rate
Number 3.28)

Haul Earth 100 ft in each step upto maximum of 300 ft


(4) COMMON EXCAVATION

Common excavation and spoil to waste or fill material, cut 0-3 ft, lift
upto 3 ft, spread 100 ft.

As in Rate 4.1A but cut 3-5', lift upto 5', spread 100'

As in Rate 4.1A but cut 5-10', lift upto 10', spread 100'
As in Rate 4.1A but cut10-15', lift upto 15', spread 100'
As in Rate 4.1A but cut15-20', lift upto 20', spread 100'
As in Rate 4.1A but cut 20-25', lift upto 25', spread 100'
As in Rate 4.1A but cut 25-30', lift upto 30', spread 100'
As in Rate 4.1A but cut 30-35', lift upto 35', spread 100'
As in Rate 4.1A but cut 35-40', lift upto 40', spread 100'
As in Rate 4.1A but cut 40-45', lift upto 45', spread 100'
As in Rate 4.1A but cut 45-50', lift upto 50', spread 100'
As in Rate 4.1A but cut 50-55', lift upto 55', spread 100'
As in Rate 4.1A but cut 55-60', lift upto 60', spread 100'
Haul common excavation

Common excavation and spoil to waste or fill material, cut 0-5 ft, lift
5 ft, haul 1/4 mile.

As in Rate 4.26, but haul 1/2 mile

As in Rate 4.26, but haul 3/4 mile

As in Rate 4.26, but cut 5-10', lift 10', haul 1/4 mile

As in Rate 4.26, but cut 5-10', lift 10', haul 1/2 mile

As in Rate 4.26, but cut 5-10', lift 10', haul 3/4 mile

As in Rate 4.26, but cut 10-15', lift 15', haul 1/4 mile

As in Rate 4.26, but cut 10-15', lift 15', haul 1/2 mile

As in Rate 4.26, but cut 10-15', lift 15', haul 3/4 mile

As in Rate 4.26, but cut 15-20', lift 20', haul 1/4 mile

As in Rate 4.26, but cut 15-20', lift 20', haul 1/2 mile

As in Rate 4.26, but cut 15-20', lift 20', haul 3/4 mile

3.43

4.1A

4.1

4.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
4.10
4.11
4.12
4.25

4.26

4.27

4.28

4.29

4.30

4.31

4.32

4.33

4.34

4.35

4.36

4.37

Description of Work

3.28
3.29

Rate
No.

211.25
216.25
221.50
299.25
304.75
311.75
319.25
334.50
340.75
348.25
356.25

-do-

236.25
306.25
171.25
241.75
313.25
175.25
247.50
320.50
179.50
253.25
328.25

-do-do-do-do-do-do-do-do-do-do-do-

m3
m3
3

- 13 -

167.50

Scraper

Rear Dumper

-do-

-do-

-do-

-do-

-do-

-do-

B-Hoe/ Rear
Dumper
-do-

-do-

-do-

207.00

-do-

m3
m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

207.00

138.75
19.95

Basic Unit
Rate(Rs.)

B-Hoe

Rear Dumper

Rear Dumper

Principal M/C

m3

m3

m3
m3

Unit

247.00
240.75
1,284.00
1,044.00
253.00
246.50
1,320.00
1,073.00
259.00
252.50
1,364.00
1,109.00
350.00
341.00
1,416.00
1,151.00
356.75
347.50
1,480.00
1,203.00
364.75
355.50
1,522.00
1,237.00
373.50
363.75
1,578.00
1,283.00
391.25
381.25
1,631.00
1,326.00
398.50
388.25
407.50
397.00
417.00
406.25
As in Rate 3.25 to 3.29 & Rate 3.43
196.00
276.50
358.25
200.50
282.75
366.50
205.00
289.50
375.25
210.00
296.50
384.25

206.00
290.75
376.75
210.75
297.25
385.25
215.50
304.25
394.50
220.75
311.75
403.75

374.25

288.75

204.50

365.50

282.00

199.75

357.25

275.50

195.25

349.00

269.25

191.00

685.50

843.00

716.50

259.75
266.00
272.50
368.00
375.00
383.50
392.50
411.25
419.00
428.50
438.25

236.00

582.50

242.25

236.00

254.75

159.25

Class-A
-

242.25

129.25

254.75

Class-C
158.25
22.75

Basic Unit
Rate(Rs.)

Class-B
162.25
23.35

Unit Rate (Rs.)

1,221.00
1,256.00
1,297.00
1,347.00
1,408.00
1,447.00
1,501.00
1,551.00
-

802.00

681.50

151.25

Class-B
-

Unit Rate (Rs.)

Manual

Class-A
170.75
24.55

Machinery

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

3.29

3.28

Rate
No.

1,190.00
1,224.00
1,264.00
1,312.00
1,371.00
1,410.00
1,462.00
1,512.00
-

4.37

4.36

4.35

4.34

4.33

4.32

4.31

4.3

4.29

4.28

4.27

4.26

4.25

4.12

4.11

4.1

4.9

4.8

4.7

4.6

4.5

4.4

4.3

4.2

781.00 4.1

664.00 4.1A

147.50 3.43

Class-C
-

Engineer's Unit Rates - Applicable from 01 January 2012

As in Rate 4.26, but cut 20-25', lift 25', haul 1/4 mile

As in Rate 4.26, but cut 20-25', lift 25', haul 1/2 mile

As in Rate 4.26, but cut 20-25', lift 25', haul 3/4 mile

As in Rate 4.26, but cut 25-30', lift 30', haul 1/4 mile

As in Rate 4.26, but cut 25-30', lift 30', haul 1/2 mile
As in Rate 4.26, but cut 25-30', lift 30', haul 3/4 mile
As in Rate 4.26, but cut 30-35', lift 35', haul 1/4 mile
As in Rate 4.26, but cut 30-35', lift 35', haul 1/2 mile
As in Rate 4.26, but cut 30-35', lift 35', haul 3/4 mile
As in Rate 4.26, but cut 35-40', lift 40', haul 1/4 mile
As in Rate 4.26, but cut 35-40', lift 40', haul 1/2 mile
As in Rate 4.26, but cut 35-40', lift 40', haul 3/4 mile
As in Rate 4.26, but cut 40-45', lift 450', haul 1/4 mile
As in Rate 4.26, but cut 40-45', lift 450', haul 1/2 mile
As in Rate 4.26, but cut 40-45', lift 450', haul 3/4 mile
As in Rate 4.26, but cut 45-50', lift 50', haul 1/4 mile
As in Rate 4.26, but cut 45-50', lift 50', haul 1/2 mile
As in Rate 4.26, but cut 45-50', lift 50', haul 3/4 mile
(5) GRAVEL EXCAVATION

Gravel excavation and spoil to waste or use as construction material,


cut 0-3 ft, lift upto 5 ft, spread 100 ft.

As in Rate Number 5.1A but cut 3-5', lift upto 5', spread 100'

As in Rate Number 5.1A but cut 5-10', lift upto 10', spread 100'

As in Rate Number 5.1A but cut 10-15', lift upto 15', spread 100'
As in Rate Number 5.1A but cut 15-20', lift upto 20', spread 100'
As in Rate Number 5.1A but cut 20-25', lift upto 25', spread 100'
As in Rate Number 5.1A but cut 25-30', lift upto 30', spread 100'
As in Rate Number 5.1A but cut 30-35', lift upto 35', spread 100'
As in Rate Number 5.1A but cut 35-40', lift upto 40', spread 100'
As in Rate Number 5.1A but cut 40-45', lift upto 45', spread 100'
As in Rate Number 5.1A but cut 45-50', lift upto 50', spread 100'
As in Rate Number 5.1A but cut 50-55', lift upto 55', spread 100'

4.39

4.40

4.41

4.42
4.43
4.44
4.45
4.46
4.47
4.48
4.49
4.50
4.51
4.52
4.53
4.54
4.55

5.1A

5.1

5.2

5.3
5.4
5.5
5.6
5.7
5.8
5.9
5.10
5.11

Description of Work

4.38

Rate
No.

193.25
272.50
353.75
195.50
276.50
358.50
200.75
283.25
368.25
209.50
295.50
383.75
212.25
299.50
389.25
215.25
215.25
219.00
223.75
228.00
308.50
313.75
320.25
326.75
344.50
350.25
357.75

Scraper
-do-

B-Hoe
-do-do-do-

m3
m3
m3
3

m
m3
m3
m3
m3
m3
m3
m3
m3

m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

- 14 -

345.00

-do-

-do-

265.75

-do-

m3
m

188.25

Basic Unit
Rate(Rs.)

-do-

Principal M/C

m3

Unit
Class-B
220.25
311.00
403.50
226.00
319.00
414.00
229.00
323.50
419.50
235.00
331.50
430.75
245.00
346.00
449.00
248.50
350.50
455.25
251.75
251.75
256.25
261.75
267.00
360.75
367.00
374.75
382.25
403.00
410.00
418.50

326.75
424.25
237.50
335.25
435.25
240.75
340.00
441.00
247.00
348.50
452.75
257.75
363.75
472.00
261.25
368.50
478.75
264.75
264.75
269.50
275.25
280.50
379.25
386.00
394.00
402.00
423.75
431.00
440.00

Unit Rate (Rs.)


Class-A
231.75

Machinery

255.00
260.00
351.50
357.75
365.25
372.50
392.75
399.50
407.75

249.75

245.25

245.25

310.75
403.50
223.00
315.25
408.75
229.00
323.00
419.75
238.75
337.00
437.50
242.00
341.50
443.75

220.25

393.25

303.00

Class-C
214.75

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

1,073.00
1,109.00
1,151.00
1,203.00
1,237.00
1,283.00
1,326.00
-

1,044.00

685.50

582.50

Basic Unit
Rate(Rs.)

1,320.00
1,364.00
1,416.00
1,480.00
1,522.00
1,578.00
1,631.00
-

1,284.00

843.00

716.50

Class-A
-

1,256.00
1,297.00
1,347.00
1,408.00
1,447.00
1,501.00
1,551.00
-

1,221.00

802.00

681.50

Class-B
-

Unit Rate (Rs.)

Manual

4.55

4.54

4.53

4.52

4.51

4.5

4.49

4.48

4.47

4.46

4.45

4.44

4.43

4.42

4.41

4.4

4.39

4.38

Rate
No.

1,224.00
1,264.00
1,312.00
1,371.00
1,410.00
1,462.00
1,512.00
-

5.11

5.1

5.9

5.8

5.7

5.6

5.5

5.4

5.3

1,190.00 5.2

781.00 5.1

664.00 5.1A

Class-C
-

Engineer's Unit Rates - Applicable from 01 January 2012

Haul Gravel

5.13

As in Rate Number 6.1 but cut 10-15', lift upto 15', spread 100'

As in Rate Number 6.1 but cut 15-20', lift upto 20', spread 100'

As in Rate Number 6.1 but cut 20-25', lift upto 25', spread 100'

As in Rate Number 6.1 but cut 25-30', lift upto 30', spread 100'

As in Rate Number 6.1 but cut 30-35', lift upto 35', spread 100'

As in Rate Number 6.1 but cut 35-40', lift upto 40', spread 100'

As in Rate Number 6.1 but cut 40-45', lift upto 45', spread 100'

As in Rate Number 6.1 but cut 45-50', lift upto 50', spread 100'

As in Rate Number 6.1 but cut 50-55', lift upto 55', spread 100'

As in Rate Number 6.1 but cut 55-60', lift upto 60', spread 100'

Haul soft rock

6.3

6.4

6.5

6.6

6.7

6.8

6.9

6.10

6.11

6.12

6.13

Additional rate for cut 5-10', lift upto 10'

Additional rate for cut 10-15', lift upto 15'

Additional rate for cut 15-20', lift upto 20'

Additional rate for cut 20-25', lift upto 25'

Additional rate for cut 25-30', lift upto 30'

Additional rate for cut 30-35', lift upto 35'

7.4

7.5

7.6

7.7

7.8

-do-

Rock excavation and spoil to waste/quarry products, cut 0-5 ft, lift
upto 5 ft.

7.3

7.2

7.1

As in Rate Number 6.1 but cut 05-10', lift upto 10', spread 100'

6.2

(7) ROCK EXCAVATION

Soft rock excavation & spoil to waste, cut 0-5', lift upto 5', spread
100'

6.1

(6) SOFT ROCK EXCAVATION

As in Rate Number 5.1A but cut 55-60', lift upto 60', spread 100'

Description of Work

5.12

Rate
No.

321.75
327.50
333.75
424.00
431.25
439.00
447.50
471.00
479.00
487.25
496.75

-do-do-doB-Hoe/ Rear
Dumper
-do-do-do-do-do-do-doRear Dumper

m3
m3
3

m3
3

38.85
42.65
45.80
48.85
51.80
54.40

{-do- + Rear
Dumper}
-do-do-do-do-do-

m3
m3
3

m3

- 15 -

691.50

-do-

m3
3

968.50

{Air Compressor+
Jack Hamer+Dozer+
FEL}

m3

m3

316.50

364.50

Basic Unit
Rate(Rs.)

B-Hoe

Rear Dumper

-do-

Principal M/C

m3

m3

Unit
Class-C
415.75
-

Basic Unit
Rate(Rs.)

376.50
383.00
390.50
496.25
504.50
513.50
523.50
551.00
560.00
570.00
581.00

396.00
402.75
410.50
521.50
530.50
539.50
550.50
579.50
589.00
599.50
611.00

566.00

555.50

546.00

537.00

510.00

500.00

491.75

483.50

380.50

373.25

367.00

360.75

1,700.00

1,657.00

1,611.00

1,577.00

1,525.00

1,483.00

1,447.00

1,418.00

1,059.00

1,133.00

809.50
45.50
49.95
53.60
57.15
60.65
63.65

1,191.00

851.00
47.80
52.50
56.35
60.05
63.75
66.90

62.00

59.05

55.70

52.25

48.65

44.30

788.50

1,104.00

552.00

517.50

466.00

423.75

388.25

358.50

1,137.00

1,592.00

As in Rate Nos. 3.25 to 3.29 & RN 3.43

370.25

As in Rate Nos. 3.25 to 3.29 & 3.43

Class-B
426.75

Unit Rate (Rs.)

389.25

Class-A
448.50

Machinery

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

678.50

637.00

573.00

521.00

477.75

441.00

1,398.00

1,958.00

2,091.00

2,038.00

1,982.00

1,940.00

1,876.00

1,824.00

1,780.00

1,744.00

1,303.00

Class-A
-

645.50

605.50

545.00

495.75

454.25

419.50

1,330.00

1,862.00

1,989.00

1,938.00

1,885.00

1,845.00

1,784.00

1,735.00

1,694.00

1,659.00

1,239.00

Class-B
-

Unit Rate (Rs.)

Manual

5.13

5.12

Rate
No.

6.13

6.12

6.11

6.1

629.00 7.8

590.00 7.7

531.00 7.6

483.00 7.5

442.75 7.4

408.75 7.3

1,296.00 7.2

1,814.00 7.1

1,938.00 6.9

1,889.00 6.8

1,837.00 6.7

1,798.00 6.6

1,739.00 6.5

1,690.00 6.4

1,650.00 6.3

1,616.00 6.2

1,207.00 6.1

Class-C
-

Engineer's Unit Rates - Applicable from 01 January 2012

245.00
259.50
273.75
288.25

Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper

m
m3
3

m
m3

7.17A Haul rock 1 1/4 mile

Haul rock 1 1/2 mile

7.18A Haul rock 1 3/4 mile

Haul rock 2 mile

Haul rock 100 ft in each step upto maximum of 300 ft

7.18

7.19

7.20

Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 1/2
mile

Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 3/4
mile.

Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 1 mile.

Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 1 1/4
mile.

8.7

8.8

8.9

8.10

8.1
8.2
8.3
8.4
8.5
8.6

(8) EARTHFILL IN EMBANKMENTS AND AROUND


STRUCTURES
Stripping top soil, haul 1/4 mile
Stripping top soil, haul 1/2 mile
Stripping top soil, haul 3/4 mile
Stripping top soil, haul 1 mile
Stripping top soil, haul 100 ft.
Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 1/4
mile

305.00
361.75
326.50

-do-doStone Crusher/BHoe+Rear Dumper

m3
m3
m3

- 16 -

234.75

-do-

m3

-do-

-do-

-do-

Scraper

Scraper

151.25
213.75
277.00
328.75
166.50

m3
m3
m3
m3
m3
m3

230.75

Rear Dumper

m3

Haul rock 1 mile

7.17

216.25

Rear Dumper

Haul rock 3/4 mile

202.00

Rear Dumper

Haul rock 1/2 mile

7.16

7.15

187.75

Rear Dumper

m3

Haul rock 1/4 mile

7.14

66.00

-do-

Additional rate for cut 55-60', lift upto 60'

7.13

63.90

-do-

m
3

Additional rate for cut 50-55', lift upto 55'

7.12

61.70

-do-

Additional rate for cut 45-50', lift upto 50'

7.11

m3

Additional rate for cut 40-45', lift upto 45'

7.10
59.55

Additional rate for cut 35-40', lift upto 40'

7.9
-do-

Basic Unit
Rate(Rs.)

m3

Principal M/C

57.15

Unit

-do-

Description of Work

m3

Rate
No.

72.20
74.80
77.25
219.50
236.25
253.25
270.00
286.75
303.50
320.50
337.25

75.90
78.60
81.20
230.75
248.50
266.25
283.75
301.50
319.25
336.75
354.50

177.00
250.00
324.00
384.50
194.75
274.75
356.75
423.25
382.00

186.25
262.75
340.50
404.25
204.75
289.00
375.00
445.00
401.50

69.65

73.20

Class-B
66.85

Unit Rate (Rs.)


Class-A
70.30

Machinery

372.25

412.50

347.50

267.75

172.50
243.75
315.75
374.75
189.75

328.50

312.25

295.75

279.50

263.00

246.75

230.25

214.00

75.25

72.85

70.35

67.85

Class-C
65.15

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

517.50
-

129.25

640.50

597.50

Basic Unit
Rate(Rs.)

637.00
-

159.25

788.00

Class-A
735.00

605.50
-

151.25

749.50

Class-B
699.00

Unit Rate (Rs.)

Manual
Rate
No.

7.19

7.18A

7.18

7.17A

7.17

7.16

7.15

7.14

7.13

7.12

7.11

590.00
-

8.1

8.9

8.8

8.7

8.6

8.5

8.4

8.3

8.2

8.1

147.50 7.2

730.50 7.1

Class-C
681.00 7.9

Engineer's Unit Rates - Applicable from 01 January 2012

204.25
264.75
314.50

128.00

100.50
76.60
48.15

Scraper
-do-do-do-

Sheep Foot Roller +


Water Bowser
-doSheep Foot Roller

m3
m3
m3
m3
m3
m3

m3
m3
m3

Borrow earth from Spoil Dump, cut 0-10' lift upto 10', haul 1/4 mile.

Borrow earth from Spoil Dump, cut 0-10' lift upto 10', haul 1/2 mile.

Borrow earth from Spoil Dump, cut 0-10' lift upto 10', haul 3/4
mile.

Borrow earth from Spoil Dump, cut 0-10' lift upto 10', haul 1 mile.

Borrow earth from Spoil Dump, cut 0- 5 ft, lift upto 5 ft, haul 200 ft.

Placing & compacting earth in dam including watering (water haul


1.5 mile)

Placing & compacting earth in canal/backfill including watering


(water haul 1.5 mile)

Placing & compacting earth in canal/backfill excluding watering.


Placing & compacting earth in landfill excluding watering.

8.14

8.15

8.16

8.17

8.18

8.19

8.20

8.21
8.22

1,309.00

1,588.00

{Air Compressor+
Jack Hammer+
Manual}
-do-

m3

m3

(10) PRODUCTION OF RIP-RAP, RUBBLE AND METAL


INCLUDING ROCK BLASTING
Rock blasting & production of 18" size rip-rap.

Rock blasting & production of 12" size rip-rap.

10.1

10.2

- 17 -

403.75

B-Hoe

m3

Quarrying gravel, cut 0-5'

9.2

141.25

Quarrying natural river/pit sand, cut 0-5'.

9.1

B-Hoe

m3

(9) QUARRYING SAND, GRAVEL

144.75

m3

Borrow earth from borrow areas, cut 0-5 ft, lift upto 5 ft, haul 200
ft.

8.13

-do-

360.50

-do-

m3

Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 2 mile.

8.12
-

386.50

B-Hoe + Rear
Dumper

m3

8.11

8.11A Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 1 3/4
mile.

Basic Unit
Rate(Rs.)
343.50

Principal M/C
B-Hoe + Rear
Dumper

Unit

m3

Description of Work

Borrow earth from borrow areas, cut 0-10' lift upto 10', haul 1 1/2
mile.

Rate
No.

421.75

443.25

310.00
368.00

325.75
387.00

1,531.00

1,859.00

1,610.00

1,954.00

472.50

496.75

89.60
56.35

94.20
59.25

165.25

117.75

123.75

173.50

149.75

157.50

239.00

251.25

169.25

178.00

452.00

475.25

Class-B
401.75

Unit Rate (Rs.)


Class-A
422.50

Machinery

1,811.00

1,492.00

460.25

161.00

87.30
54.90

114.75

145.75

358.50

302.00

233.00

165.00

410.75

440.50

Class-C
391.50

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

1,588.00

1,309.00

403.75

141.25

132.75

205.75

256.00

495.75

582.50

Basic Unit
Rate(Rs.)

1,954.00

1,610.00

496.75

173.50

163.25
-

253.00

1,859.00

1,531.00

472.50

165.25

155.25
-

240.75

299.50

580.00

609.50
315.00

681.50

716.50
-

Class-B
-

Class-A
-

Unit Rate (Rs.)

Manual

8.12

8.11A

8.11

Rate
No.

8.17

8.16

8.15

8.14

1,811.00 10.2

1,492.00 10.1

460.25 9.2

161.00 9.1

151.25 8.21
8.22
-

234.50 8.2

292.00 8.19

565.00 8.18

664.00 8.13

Class-C
-

Engineer's Unit Rates - Applicable from 01 January 2012

2,008.00

2,684.00
2,877.00
3,205.00
3,514.00
4,054.00

{Air Compressor+
Jack Hammer+
Stone Crusher}
-do-do-do-do-do-

m3

m3
m3
3

m3

10.3A Rock blasting & production of 4" metal.

Rock blasting & production of 2" metal.

Rock blasting & production of 1.5" metal.

Rock blasting & production of 1" metal.

Rock blasting & production of 3/4" metal.

Rock blasting & production of 1/2" metal

10.4

10.5

10.6

10.7

10.8

Furnishing, placing & compacting sand in filters excluding haul.

Furnishing, placing & compacting 1/2" metal in filters excluding


haul.

Furnishing, placing & compacting 3/4" metal in filters excluding


haul.

Furnishing, placing & compacting 1 1/2" metal in filters excluding


haul.

Furnishing, placing & compacting 6-9" rubble in filters/toe drains,


excluding haul.

Haul sand for filter, 0.5 mile including loading.

Haul sand for filter, 1 mile including loading.

Haul sand for filter, 1.5 mile including loading.

Haul sand for filter, 2 mile including loading.

Haul sand for filter, 2.5 mile including loading.

Haul sand for filter, 3 mile including loading.

Haul sand for filter, 3.5 mile including loading.

Haul sand for filter, 4 mile including loading.

Haul sand for filter, 4.5 mile including loading.

Haul sand for filter, 5 mile including loading.

11.1

11.2

11.3

11.4

11.5

11.6

11.7

11.8

11.9

11.10

11.11

11.12

11.13

11.14

11.15

(11) FILTERS FOR DAM EMBANKMENTS

3,759.00
3,091.00
2,056.00
256.75
336.75
416.50
496.50
576.00
656.00
736.00
816.00
895.50
975.50

-do-do-doTractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer
Tractor Trailer

m3
m3
m3
m3
m3
m3
3

m3
3

m3
m3

- 18 -

4,327.00

{Air Compressor
+Jack Hammer+CT
+ Manual}

m3

1,725.00

B-Hoe + CT

m3

1,891.00

Rock blasting & production of 6-9" size rip-rap/rubble.

-do-

10.3

m3

Unit
Basic Unit
Rate(Rs.)

Description of Work
Principal M/C

Rate
No.

3,617.00
2,406.00
300.50
394.00
487.50
581.00
674.00
767.50
861.00
954.50
1,048.00
1,141.00

3,802.00
2,529.00
316.00
414.25
512.50
610.50
709.00
807.00
905.50
1,003.00
1,102.00
1,200.00

4,743.00

4,987.00

4,399.00

4,111.00

4,322.00

4,624.00

3,750.00

3,942.00

5,062.00

3,366.00

3,539.00

5,322.00

3,141.00

3,302.00

2,018.00

2,349.00

2,470.00

2,122.00

Class-B
2,213.00

Unit Rate (Rs.)


Class-A
2,327.00

Machinery

1,112.00

1,021.00

930.00

839.00

748.00

657.00

566.00

475.00

383.75

292.75

2,344.00

3,524.00

4,286.00

4,933.00

1,967.00

4,622.00

4,006.00

3,654.00

3,280.00

3,060.00

2,289.00

Class-C
2,156.00

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

2,173.00

3,207.00

3,876.00

4,443.00

293.75

4,054.00

3,514.00

3,205.00

2,877.00

2,684.00

2,008.00

1,891.00

Basic Unit
Rate(Rs.)

2,672.00

3,945.00

4,768.00

5,465.00

361.50

4,987.00

4,322.00

3,942.00

3,539.00

3,302.00

2,470.00

Class-A
2,327.00

2,542.00

3,753.00

4,535.00

5,199.00

343.75

4,743.00

4,111.00

3,750.00

3,366.00

3,141.00

2,349.00

Class-B
2,213.00

Unit Rate (Rs.)

Manual
Rate
No.

11.15

11.14

11.13

11.12

11.11

11.1

11.9

11.8

11.7

11.6

2,477.00 11.5

3,657.00 11.4

4,419.00 11.3

5,065.00 11.2

335.00 11.1

4,622.00 10.8

4,006.00 10.7

3,654.00 10.6

3,280.00 10.5

3,060.00 10.4

2,289.00 10.3A

Class-C
2,156.00 10.3

Engineer's Unit Rates - Applicable from 01 January 2012

228.50
253.00
277.25
301.75
326.25
350.75
299.75
392.75
486.00
579.00
672.50
765.50
858.50
952.00
1,045.00
1,138.00
178.25

Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Tractor Trailer

m
m3
m3
3

m
m3
3

11.9A As in Rate Number 11.9

11.10A As in Rate Number 11.10

11.11A As in Rate Number 11.11

11.12A As in Rate Number 11.12

11.13A As in Rate Number 11.13

11.14A As in Rate Number 11.14

11.15A As in Rate Number 11.15

255.25
280.75
306.50
332.25
357.75
383.50
409.25

Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper
Rear Dumper

m3
3

m
m3
m3
3

m
m3

11.19A As in Rate Number 11.19

11.20A As in Rate Number 11.20

11.21A As in Rate Number 11.21

11.22A As in Rate Number 11.22

11.23A As in Rate Number 11.23

11.24A As in Rate Number 11.24

11.25A As in Rate Number 11.25

- 19 -

229.50

Rear Dumper

m3

11.18A As in Rate Number 11.18

203.75

Rear Dumper

11.17A As in Rate Number 11.17

Rear Dumper

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3

Tractor Trailer

204.00

Rear Dumper

m3

11.8A As in Rate Number 11.8

Haul metal/rubble/rip-rap for filter, 0.5 mile including loading


Haul metal/rubble/rip-rap for filter, 1 mile including loading
Haul metal/rubble/rip-rap for filter, 1.5 mile including loading
Haul metal/rubble/rip-rap for filter, 2 mile including loading
Haul metal/rubble/rip-rap for filter, 2.5 mile including loading
Haul metal/rubble/rip-rap for filter, 3.0 mile including loading
Haul metal/rubble/rip-rap for filter, 3.5 mile including loading
Haul metal/rubble/rip-rap for filter, 4.0 mile including loading
Haul metal/rubble/rip-rap for filter, 4.5 mile including loading
Haul metal/rubble/rip-rap for filter, 5.0 mile including Loading
As in Rate Number 11.16

179.50

Rear Dumper

11.16
11.17
11.18
11.19
11.20
11.21
11.22
11.23
11.24
11.25
11.16A

155.25

Rear Dumper

11.7A As in Rate Number 11.7

130.75

Basic Unit
Rate(Rs.)

Principal M/C
Rear Dumper

Unit

m3

Description of Work

11.6A As in Rate Number 11.6

Rate
No.
Class-B
153.00
181.50
210.00
238.75
267.25
296.00
324.50
353.25
381.75
410.25
350.75
459.75
568.50
677.50
786.50
895.50
1,004.00
1,113.00
1,222.00
1,331.00
208.50
238.50
268.50
298.50
328.50
358.50
388.75
418.75
448.75
478.75

190.75
221.00
251.00
281.00
311.00
341.25
371.25
401.25
431.50
368.50
483.25
597.50
712.50
827.00
941.50
1,056.00
1,171.00
1,285.00
1,400.00
219.25
250.75
282.25
313.75
345.50
377.00
408.50
440.25
471.75
503.00

Unit Rate (Rs.)


Class-A
160.75

Machinery

466.50

437.25

408.00

378.75

349.50

320.25

291.00

261.75

232.25

341.75
447.75
554.00
660.00
766.50
872.50
979.00
1,085.00
1,191.00
1,297.00
203.00

399.75

372.00

344.00

316.25

288.25

260.50

232.50

204.75

176.75

Class-C
149.00

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

Basic Unit
Rate(Rs.)

Class-A
-

Class-B
-

Unit Rate (Rs.)

Manual

Class-C
-

Engineer's Unit Rates - Applicable from 01 January 2012

11.25A

11.24A

11.23A

11.22A

11.21A

11.20A

11.19A

11.18A

11.17A

11.16A

11.25

11.24

11.23

11.22

11.21

11.20

11.19

11.18

11.17

11.16

11.15A

11.14A

11.13A

11.12A

11.11A

11.10A

11.9A

11.8A

11.7A

11.6A

Rate
No.

Furnishing & placing 6-9" rubble/rip-rap excluding haul.

Furnishing & placing12" rip-rap excluding haul.


Furnishing & placing18" rip-rap excluding haul.
Haul turf for slope protection, 0.5 mile including loading.
Haul turf for slope protection, 1 mile including loading.
Haul turf for slope protection, 1.5 mile including loading.
Haul turf for slope protection, 2 mile including loading.
Haul turf for slope protection, 2.5 mile including loading.
Haul turf for slope protection, 3 mile including loading.
Haul gravel for slope protection.

Haul 6"-9" rubble / rip-rap for slope protection.

Haul rip-rap over 9" for slope protection, 0.5 mile including loading.
Haul rip-rap over 9" for slope protection, 1.0 mile including loading.
Haul rip-rap over 9" for slope protection, 1.5 mile including loading.
Haul rip-rap over 9" for slope protection, 2.0 mile including loading.
Haul rip-rap over 9" for slope protection, 2.5 mile including loading.
Haul rip-rap over 9" for slope protection, 3.0 mile including loading.
Haul rip-rap over 9" for slope protection, 3.5 mile including loading.
Haul rip-rap over 9" for slope protection, 4.0 mile including loading.
Haul rip-rap over 9" for slope protection, 4.5 mile including loading.
Haul rip-rap over 9" for slope protection, 5.0 mile including loading.
(13) GRAVEL/TARMAC SURFACING FOR ROADWAY

Furnishing & placing gravel Wearing Surface(WS), excluding haul.

Furnishing placing & compacting gravel sub base excluding haul.

12.1
12.2

12.3

12.4
12.5
12.6
12.6A
12.7
12.7A
12.8
12.8A
12.9

12.10

12.11
12.12
12.13
12.14
12.15
12.16
12.17
12.18
12.19
12.20

13.1

13.2

Description of Work

(12) SLOPE PROTECTION FOR EARTH WORK


Furnishing, planting & watering turf excluding haul
Furnishing & placing gravel bedding excluding haul.

Rate
No.

1,718.00
1,425.00
94.30
116.50
139.00
161.25
183.75
206.00

-do-

m3
m3
m2
m2
m2
m2
m2
m2
m3

456.50
480.75

B-Hoe+CT
do-+Sheep Foot
Roller

m3
m3

Rear Dumper

Rear Dumper

Rear Dumper

Rear Dumper

Rear Dumper

Rear Dumper

Rear Dumper

Rear Dumper

- 20 -

202.00
230.75
259.50
288.25
317.00
345.75
374.25
403.00
431.75
460.50

Rear Dumper

m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Rear Dumper

Tractor Trailer &


Rear Dumper

m3

Tractor Trailer &


Rear Dumper

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

Tractor Trailer

-do-

2,036.00

456.50

Basic Unit
Rate(Rs.)

(Air Compressor
+Jack Hammer+CT}

B-Hoe +CT

Principal M/C

m3

m2
m3

Unit

2,603.00

236.25
270.00
303.50
337.25
370.75
404.50
438.00
471.75
505.00
538.50

534.00
562.50

248.50
283.75
319.25
354.50
389.75
425.25
460.50
495.75
531.00
566.50

561.50
591.00

548.00

520.00

230.25
263.00
295.75
328.50
361.25
394.00
426.75
459.50
492.25
525.00

569.50

517.00

700.50

636.00

As in Rate Nos. 11.16 to 11.25 & 11.16A to 11.25A

2,117.00

2,010.00
1,959.00
2,221.00
1,805.00
1,667.00
1,624.00
1,882.00
1,530.00
110.25
107.50
136.50
133.00
162.50
158.50
188.75
184.00
215.00
209.25
241.00
234.75
As in Rate Nos. 11.6 to 11.15 & 11.6A to 11.15A

2,322.00

2,114.00
1,752.00
116.00
143.50
171.00
198.50
226.00
253.50

92.80
636.00

2,383.00

75.45
517.00

Class-A

2,505.00

520.00

Class-C

Basic Unit
Rate(Rs.)

534.00

Class-B

Unit Rate (Rs.)

666.50

605.00

2,112.00
1,791.00
-

2,476.00

88.30
605.00

Class-B

Unit Rate (Rs.)

Manual

561.50

Class-A

Machinery

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES


Rate
No.

12.20

12.19

12.18

12.17

12.16

12.15

12.14

12.13

12.12

12.11

12.10

12.9

12.8A

12.8

12.7A

12.7

12.6A

12.6

12.5

12.4

649.50 13.2

589.50 13.1

2,058.00
1,745.00
-

2,413.00 12.3

86.05 12.1
589.50 12.2

Class-C

Engineer's Unit Rates - Applicable from 01 January 2012

254.25
159.25

B-Hoe+Road
Roller
-do-

m3
m2

Furnishing & placing 1 st bitumen Wearing Surface including sand


blinding excluding haul.
Furnishing & placing 2 nd bitumen Wearing Surface including sand
blinding excluding haul.

Haul sand/gravel for roadway surfacing.


Haul rubble/metal for road surfacing.

13.6

13.8
13.9

3,029.00
4,051.00
5,761.00
297.50
186.25

3,184.00
4,259.00
6,056.00
312.75
195.75

- 21 -

m2

As in Rate Number 15.5 but for rise over 40ft. upto 60ft.

15.7

m2

As in Rate Number 15.5 but for rise over 20 ft.upto 40 ft.

15.6

m2

Erection and dismantling scaffold for each 0-5 ft lift in rise 10'-20'
(each of 10 uses of scaffold).

15.5

m2

Furnishing & making formwork for each of 3 uses including fixing


& removing same once.

15.4

m
m2

Fixing & removing formwork once.


Furnishing & making formwork for each 3 uses.

15.2
15.3

m2

(15) FORMWORK IN TIMBER AND SCAFFOLDING


Making formwork for each of 3 uses.

181.50

290.00

5,613.00

3,947.00

2,951.00

Class-C
2,812.00

As in Rate 11.16 to 11.25 & 11.16A to 11.25A

15.1

Kg

Lift reinforcement in each step 0-5 ft.

Kg

14.5

Kg

As in Rate Number 14.3 but fo Tor steel.

Kg

14.4

Kg

Furnishing, cutting, bending & placing mild steel reinforcement, lift


0-5 ft, haul 150 miles Lorry & 8 miles Tractor-trailor.

(14) REINFORCEMENT
Cutting, bending & placing mild steel reinforcement, lift 0-5 ft. haul
150 miles Lorry and 8 miles Tractor Trailer.
As in Rate Number 14.1 but for Tor steel.

-do-

14.3

14.2

14.1

13.7

Class-B
2,886.00

Unit Rate (Rs.)


Class-A
3,034.00

Machinery

TT & Rear Dumper As in Rate 11.6 to 11.15 & 11.6A to 11.15A

4,924.00

-do-

m3

Furnishing placing & compacting 1/2" metal in voids excluding


haul.

13.5

m2
m3

3,462.00

-do-

m3

Furnishing placing & compacting 2" metal excluding haul.

13.4

Furnishing placing & compacting 6"-9" rubble base excluding haul.

2,589.00

13.3
2,466.00

Basic Unit
Rate(Rs.)

m3

Principal M/C

13.3A Furnishing placing & compacting 4" metal base excluding haul.

Unit

{Air Compresso
+Jack
Hammer+Road
Roller}
-do-

Description of Work

m3

Rate
No.

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

76.85

61.45

45.70

1,677.00

397.00
1,280.00

184.00

0.45

162.75

160.75

32.65

32.55

146.00

241.00

4,924.00

3,462.00

2,466.00

2,466.00

Basic Unit
Rate(Rs.)

1,963.00
53.50
71.90
89.90

2,063.00
56.20
75.60
94.50

0.50

0.55

464.50
1,498.00

190.50

200.25

488.50
1,575.00

188.25

197.75

215.25

38.20

40.15

226.25

38.10

170.75

282.00

5,761.00

4,051.00

2,886.00

Class-B
2,886.00

40.05

179.50

296.50

6,056.00

4,259.00

3,034.00

Class-A
3,034.00

Unit Rate (Rs.)

Manual
Rate
No.

87.60 15.7

70.05 15.6

52.10 15.5

1,912.00 15.4

452.75 15.2
1,460.00 15.3

209.75 15.1

0.50 14.5

185.50 14.4

183.25 14.3

37.20 14.2

37.15 14.1

13.9

13.8

166.50 13.7

274.75 13.6

5,613.00 13.5

3,947.00 13.4

2,812.00 13.3A

Class-C
2,812.00 13.3

Engineer's Unit Rates - Applicable from 01 January 2012

1:2:4(1 1/2") ct. conc. excluding formwork as in Rate Number 16.1


1:2:4(1") ct. conc. excluding formwork as in Rate Number 16.1

1:2:4(3/4") ct. conc. excluding formwork as in Rate Number 16.1


1:1 1/2:3(3/4") ct. conc. excluding formwork as in Rate Number
16.1.
Additional
for formwork for 1:3:6 ct. concrete.

Additional for formwork for 1:2:4 ct. concrete.

Additional for formwork for 1:1 1/2:3 ct. concrete.


Additional for lift of concrete over 5ft. upto 10 ft.
Additional for lift of concrete over 10ft. upto 15ft.
Additional for lift of concrete over 15ft. upto 20ft.
Additional for lift of concrete over 20ft. upto 25 ft.
Additional for lift of concrete over 25ft. upto 30ft.
Additional for lift of concrete over 30ft. upto 35ft.
Additional for lift of concrete over 35ft. upto 40ft.
Additional for lift of concrete over 40ft. upto 45ft.
Additional for lift of concrete over 45ft. upto 50ft.
Additional for lift of concrete over 50ft. upto 55ft.
Additional for lift of concrete over 55ft. upto 60ft.
Additional for haul of concrete mix in each 100ft. step (max.300ft).
6"-9" random rubble masonary in 1:5 ct. mt., lift 0-5 ft, haul mortar
mix and materials as in Rate Number 16.1.
1/2" thick rough ct. plastering in 1:3 ct. mortar for rubble masonary
faces for all lifts.
Additional for lift of rubble masonary.

16.5
16.6

16.7
16.8
16.9

16.10

16.11
16.12
16.13
16.14
16.15
16.16
16.17
16.18
16.19
16.20
16.21
16.22
16.23
16.24

16.26

16.25

1:3:6(1 1/2") ct. conc.excluding formwork as in Rate Number 16.1


1:3:6(1") ct. conc. excluding formwork as in Rate Number 16.1

(16) CONCRETE AND RUBBLE MASONARY


1:4:8(2") ct. concrete excluding formwork, lift 0-5', haul mix. 100',
cement 158 miles (150 mls Lorry & 8 miles T-T), aggregate 5 mls.
& water 1.5 mls.
1:4:8(1'1/2") ct. conc. excluding formwork as in Rate Number 16.1

Description of Work

16.3
16.4

16.2

16.1

Rate
No.

7,400.00

m3
3

m3

m2

m
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
(Air
Compressor+Jack
Hammer
Manual)
(B-Hoe ++ Manual)

-do-

- 22 -

343.25

12,546.00
13,754.00
-

-do-

m3
m3
m3

-do-

-do-

11,935.00
12,250.00

m3
m3

m
m3

-do-

10,196.00

9,972.00

Basic Unit
Rate(Rs.)

10,930.00
11,287.00

{Air
Compressor+Jack
Hammer+Concrete
Mixture +Vibrator+
-do-

Principal M/C

-do-

m3

m3

Unit

11,667.00

11,929.00
12,788.00
13,206.00
13,964.00
14,333.00
14,679.00
16,092.00
8,658.00
401.75

12,541.00
13,444.00
13,884.00
14,681.00
15,068.00
15,432.00
16,917.00
9,102.00
422.25

Class-B

Unit Rate (Rs.)

12,265.00

Class-A

Machinery

318.50

2,752.00
460.75
489.00
508.50
569.50
581.00
586.00
593.50
647.00
651.50
685.00
718.00
169.50
6,879.00

4,403.00

13,566.00
14,774.00
3,302.00

12,955.00
13,270.00

11,950.00
12,307.00

11,216.00

10,992.00

Basic Unit
Rate(Rs.)

3,220.00
539.00
572.00
595.00
666.50
679.50
685.50
694.50
757.00
762.50
801.00
840.00
198.25
8,048.00

3,385.00
566.50
601.50
625.50
700.50
714.50
721.00
730.00
796.00
801.50
842.50
883.50
208.25
8,461.00

372.75

5,152.00

5,416.00

392.00

15,873.00
17,285.00
3,864.00

15,158.00
15,526.00

13,981.00
14,400.00

13,122.00

12,860.00

16,687.00
18,172.00
4,062.00

15,935.00
16,322.00

14,698.00
15,138.00

13,795.00

13,520.00

Class-B

Unit Rate (Rs.)

Manual

Class-A

As in Rate Number 16.12 to 16.22

391.50

8,436.00

14,303.00
15,679.00
-

13,606.00
13,965.00

12,460.00
12,868.00

11,623.00

11,368.00

Class-C

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES


Rate
No.

16.24

16.23

16.22

16.21

16.20

16.19

16.18

16.17

16.16

16.15

16.14

16.13

16.12

16.11

16.26

363.25 16.25

3,137.00
525.00
557.50
579.50
649.50
662.50
668.00
676.50
737.50
742.50
780.50
818.50
193.00
7,842.00

5,020.00 16.10

15,466.00 16.7
16,842.00 16.8
3,765.00 16.9

14,769.00 16.5
15,128.00 16.6

13,623.00 16.3
14,030.00 16.4

12,786.00 16.2

12,531.00 16.1

Class-C

Engineer's Unit Rates - Applicable from 01 January 2012

3" thick insitu lining in 1:3:6(1") ct. conc., excluding forms, lift 0-5
ft haul as in Rate Number 16.1.

As in Rate Number 17.2 including formwork.

9" thick pitching in 6"-9" rubble in 1:5 ct. mt., lift 0-5 ft, haul as in
Rate Number 16.1.

1/2" thick rough ct. plastering in 1:3 ct. mt., on rubble pitching
faces.

17.2

17.3

17.4

17.5

61,294.00
49,684.00

-do-do-do-do-do-do-do-

Each
Each
Each
Each
Each
Each
Each

18.7A As in Rate Number 18.1 but for bridge beam 17x 1.57 t.

18.7B As in Rate Number 18.1 but for bridge beam 14x 1.13 t.

18.7C As in Rate Number 18.1 but for bridge beam 11x 0.89 t.

Furnish & install kerb slab 3'x1.08 cwt.,transport 200 miles,


installation crane travel 200 miles.

As in Rate Number 18.8 but for facia slab of 1 1/2"x3'x4'x2.08


cwt.

As in Rate Number 18.8 but for facia slab of 1 1/2"x2'x4'x0.91


cwt.

As in Rate Number 18.8 but for upright for hand rails of 3'3"x1.09
cwt.

18.8

18.9

18.10

18.11

As in Rate Number 18.1 but for bridge beam 20x 2.08 t.

- 23 -

2,842.00

3,503.00

4,580.00

2,514.00

44,169.00

76,337.00

83,523.00

-do-

18.7

-do-

As in Rate Number 18.1 but for bridge beam 23x 2.26 t.

18.6
Each

97,722.00
89,315.00
71,714.00
58,130.00
51,678.00
2,942.00
5,359.00
4,099.00
3,325.00

102,734.00
93,895.00
75,391.00
61,111.00
54,328.00
3,093.00
5,633.00
4,309.00
3,496.00

120,488.00

126,667.00

102,981.00

Each

As in Rate Number 18.1 but for bridge beam 32'x 2.59 t.

18.5

Each

136,667.00

143,676.00

-do-

161,646.00

169,935.00

116,810.00

-do-

138,159.00

-do-

As in Rate Number 18.1 but for bridge beam 35'x 2.86 t.

18.4

Each

As in Rate Number 18.1 but for bridge beam 40'x 3.80 t.

18.3

Each

176,739.00

185,803.00

1,961.00

2,062.00

151,059.00

-do-

Each

As in Rate Number 18.1 but for bridge beam 44'x 4.22 t.

18.2

1,124.00

1,181.00

225,769.00

1,006.00

1,057.00

237,347.00

Low Bed Trailer


+CR

Furnish and install bridge beam 53'x 5.07 t, transport 200 miles,
installation crane travel 200 miles.

18.1

Class-B

Unit Rate (Rs.)

Class-A

Machinery

192,965.00

1,676.00

(Air
Compressor+Jack
Hammer+ Manual)

m2

(B-Hoe+ Manual)

960.50

-do-

m2

m2

860.00

Basic Unit
Rate(Rs.)

(Air Compressor+
Jack Hammer+CM+
V+Manual)

Principal M/C

m2

m2

Unit

Each

(18) PRE-STRESSED / PRE-CAST BRIDGE DECK

2" thick lining in 1:8 ct. sand pre-cast slabs in 1:5 ct. mt. with 1/8"
float for internal surfaces, lift 0-5 ft, haul as in Rate Number 16.1.

(17) LINING AND PITCHING

Description of Work

17.1

Rate
No.

1,557.00

1,038.00

937.50

614.00

Basic Unit
Rate(Rs.)

3,240.00

3,994.00

5,221.00

2,866.00

50,353.00

56,639.00

69,875.00

87,025.00

95,217.00

117,398.00

133,163.00

157,501.00

172,207.00

219,980.00

As in Rate Number 16.25

1,911.00

1,095.00

980.50

Class-C

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

1,915.00

1,277.00

1,153.00

755.50

Class-A

1,822.00

1,215.00

1,097.00

718.50

Class-B

Unit Rate (Rs.)

Manual
Rate
No.

18.11

18.10

18.9

18.8

18.7C

18.7B

18.7A

18.7

18.6

18.5

18.4

18.3

18.2

18.1

17.5

1,775.00 17.4

1,183.00 17.3

1,069.00 17.2

700.00 17.1

Class-C

Engineer's Unit Rates - Applicable from 01 January 2012

As in Rate Number 18.8 but for rain water channel of 3" dia x
6"x24"x0.28 cwt.

Furnish & install steel expansion joint.

18.13

18.14

As in Rate Number 21.1 but for 12" dia. size as in Type Plan No.
C501-2-6D.

As in Rate Number 21.1 but for 15" dia. size as in Type Plan No.
C501-2-6D.

As in Rate Number 21.1 but for 18" dia. size as in Type Plan No.
C501-2-6D.

As in Rate Number 21.1 but for 24" dia. size as in Type Plan No.
C501-2-6D.

As in Rate Number 21.1 but for 30" dia. size as in Type Plan No.
C501-2-6D.

21.2

21.3

21.4

21.5

21.6

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

22.4

22.5

22.6

22.7

22.8

22.9

22.10

5.00'x4.75'

4.25'x5.17/5.00'x4.50'.

4.25'x5.00'

4.00'x5.00'/4.25'x4.75'/4.50'x4.50'.

4.50'x4.00'

4.00'x4.00'

4.00'x3.75'

5.00'x2.75 '

As in Rate Number 22.1 but for size 3.50'x3.50'/5.00'x2.50'.

22.2

22.3

Install in regulator 3.00'x3.25' wooden gates and hoist as in Type


Plan No. C503-2-6D.

22.1

(22) LIGHT DUTY WOODEN GATES FOR REGULATORS

Furnish & install in turnout 9" dia. cast iron gate & hoist complete
with spindle, handle etc. as per type plan No.C501-2-6D transport
200 mls.

21.1

(21) LIGHT DUTY CAST CAST IRON GATES FOR


TURNOUTS

As in Rate Number 18.8 but for hand rails of 3" dia x 7' 8 1/2"
x0.94 cwt.

Description of Work

18.12

Rate
No.

Each
Each
Each
Each
Each
Each
Each

- 24 -

Each

Each

Each

Each

Each

Each

765.50

2,818.00

Basic Unit
Rate(Rs.)

Each

Each

-do-

Each

Each

-do-

Principal M/C

Each

Unit

895.50

941.50
-

Class-B
3,297.00

Unit Rate (Rs.)


Class-A
3,466.00

Machinery

872.50

Class-C
3,212.00

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

5,272.00

4,942.00

4,777.00

4,612.00

3,855.00

3,360.00

3,195.00

2,700.00

2,370.00

2,040.00

128,537.00

78,929.00

57,203.00

48,600.00

29,342.00

26,290.00

11,663.00

Basic Unit
Rate(Rs.)

3,159.00
3,738.00
3,931.00
4,510.00
5,396.00
5,589.00
5,782.00
6,168.00

3,929.00
4,132.00
4,741.00
5,673.00
5,876.00
6,079.00
6,485.00

150,388.00

158,100.00

3,321.00

92,347.00

97,083.00

2,772.00

66,927.00

70,360.00

2,915.00

56,862.00

59,778.00

2,386.00

34,330.00

36,091.00

2,509.00

30,759.00

13,646.00

14,345.00

32,336.00

Class-B
-

Class-A
-

Unit Rate (Rs.)

Manual

18.13

18.12

Rate
No.

6,010.00 22.10

5,634.00 22.9

5,446.00 22.8

5,258.00 22.7

4,394.00 22.6

3,830.00 22.5

3,642.00 22.4

3,078.00 22.3

2,701.00 22.2

2,325.00 22.1

146,532.00 21.6

89,979.00 21.5

65,211.00 21.4

55,404.00 21.3

33,450.00 21.2

29,970.00 21.1

13,296.00 18.14

Class-C
-

Engineer's Unit Rates - Applicable from 01 January 2012

-do-

-do-

22.12

22.13

5.75'x5.50/5.58'x5.67'.

5.17'x5.58'

5.50'x4.50/5.25'x4.75'.

Description of Work

-do-

-do-

-do-

-do-

-do-

-do-

-do-

-do-

23.5

23.6

23.7

23.8

23.9

23.10

23.11

54" dia.

48" dia.

42" dia.

36" dia.

30" dia.

24" dia.

18" dia.

15" dia.

12" dia.

Earth excavation 0 - 5 ft

Gravel excavation 0 - 5 ft

Soft Rock excavation 0 - 5 ft

Earth excavation 5 - 10ft

Gravel excavation 5 - 10ft

Soft Rock excavation 5 - 10ft

Gravel excavation 10 -15ft

Soft Rock excavation 10 -15ft

Hard Rock excavation 10 -15ft

Gravel excavation 15 -20ft

Wet Gravel excavation 15 -20ft

24.1

24.2

24.3

24.4

24.5

24.6

24.7

24.8

24.9

24.10

24.11

(24) EXCAVATION OF WELLS

-do-

23.4

As in Rate Number 23.1 but for size in 9" dia.

23.2

23.3

Furnish, lay & joint 6"dia. RCC spun pipe including trenching and
back fill, haul pipes 150 mls lorry & 8 mls T-T, other materials as in
Rate Number 16.1.

23.1

(23) RCC SPUN PIPES AND COLLARS IN STRUCTURES

-do-

22.11

Rate
No.

m
m
m
m
m
m
m
m
m

m3
3

m3
m3
3

- 25 -

m3
m

m3

Each

Each

Basic Unit
Rate(Rs.)

Principal M/C

Each

Unit

Class-B
-

Unit Rate (Rs.)

Class-A
-

Machinery

Class-C
-

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

1,464.00

1,331.00

1,754.00

1,665.00

1,235.00

1,531.00

1,127.00

1,049.00

1,059.00

685.50

613.00

21,061.00

18,536.00

16,750.00

11,567.00

9,737.00

7,185.00

5,989.00

4,315.00

3,919.00

3,233.00

2,412.00

5,932.00

5,602.00

5,437.00

Basic Unit
Rate(Rs.)

1,319.00
1,791.00
1,445.00
1,948.00
2,052.00
1,557.00
1,713.00

1,883.00
1,519.00
2,048.00
2,158.00
1,637.00
1,801.00

24,641.00

25,905.00

1,386.00

21,687.00

22,799.00

1,228.00

19,598.00

20,603.00

1,239.00

13,533.00

14,227.00

1,291.00

11,392.00

11,976.00

1,303.00

8,406.00

8,837.00

802.00

7,007.00

7,366.00

843.00

5,049.00

5,308.00

717.50

4,586.00

4,821.00

754.00

3,783.00

3,977.00

6,941.00

7,296.00

2,822.00

6,554.00

6,891.00

2,967.00

Class-B
6,361.00

Class-A
6,688.00

Unit Rate (Rs.)

Manual
Rate
No.

1,669.00 24.11

1,517.00 24.1

2,000.00 24.9

1,898.00 24.8

1,407.00 24.7

1,745.00 24.6

1,285.00 24.5

1,196.00 24.4

1,207.00 24.3

781.00 24.2

699.00 24.1

24,009.00 23.11

21,131.00 23.10

19,096.00 23.9

13,186.00 23.8

11,100.00 23.7

8,191.00 23.6

6,827.00 23.5

4,920.00 23.4

4,468.00 23.3

3,686.00 23.2

2,750.00 23.1

6,763.00 22.13

6,386.00 22.12

Class-C
6,198.00 22.11

Engineer's Unit Rates - Applicable from 01 January 2012

Wet Soft Rock excavation 15 -20ft

Hard Rock excavation 15 -20ft

Gravel excavation 20 -25ft

Wet Gravel excavation 20 -25ft

Soft Rock excavation 20 -25ft

Wet Soft Rock excavation 20 -25ft

Hard Rock excavation 20 -25ft

Gravel excavation 25 -30ft

Wet Gravel excavation 25 -30ft

Soft Rock excavation 25 -30ft

Wet Soft Rock excavation 25 -30ft

Hard Rock excavation 25 -30ft

24.13

24.14

24.15

24.16

24.17

24.18

24.19

24.20

24.21

24.22

24.23

24.24

Desilting in canals and spoil to waste, haul 100'

Weeding in canals / bunds.

25.1

25.2

(25) DESILTING AND WEEDING

Soft Rock excavation 15 -20ft

Description of Work

24.12

Rate
No.

m3
3

m3
m3
3

m3
3

m3
-

m3
m2

- 26 -

m3

Basic Unit
Rate(Rs.)

Principal M/C

m3

Unit

Class-B
-

Unit Rate (Rs.)


Class-A
-

Machinery

Class-C
-

CIVIL WORKS - SUMMARY OF BASIC RATES & UNIT RATES

2.55

466.00

2,151.00

2,255.00

2,050.00

1,720.00

1,564.00

2,004.00

2,097.00

1,906.00

1,583.00

1,439.00

1,873.00

1,957.00

1,779.00

Basic Unit
Rate(Rs.)

2,191.00
1,684.00
1,852.00
2,231.00
2,454.00
2,344.00
1,830.00
2,013.00
2,399.00
2,639.00
2,517.00

2,304.00
1,770.00
1,947.00
2,345.00
2,580.00
2,465.00
1,924.00
2,116.00
2,522.00
2,774.00
2,646.00

3.15

3.00

545.00

2,290.00

2,408.00

573.00

Class-B
2,082.00

Class-A
2,189.00

Unit Rate (Rs.)

Manual
Rate
No.

2.90 25.2

531.00 25.1

2,452.00 24.24

2,571.00 24.23

2,337.00 24.22

1,961.00 24.21

1,783.00 24.2

2,284.00 24.19

2,391.00 24.18

2,173.00 24.17

1,805.00 24.16

1,641.00 24.15

2,135.00 24.14

2,231.00 24.13

Class-C
2,029.00 24.12

Engineer's Unit Rates - Applicable from 01 January 2012

Placing and compacting fill under floor including watering

34.3

1:3:6 (40mm) cement concrete with forms in foundation.

150mm deep 115mm wide lintol in 1:2:4 (20mm) ct. concrete reinforced with 2 Nos. 10 mm dia. Tor Steel Bars.

150mm deep 225mm wide lintol in 1:2:4 (20mm) ct. concrete reinforced with 2 Nos. 12 mm dia. Tor Steel Bars.

150mm deep 225mm wide lintol in 1:2:4 (20mm) ct. concrete reinforced with 3 Nos.12 mm dia.Tor Steel Bars.

225mm deep 225mm wide lintol in 1:2:4 (20mm) ct. concrete reinforced with 3 Nos. 12 mm dia. Tor Steel Bars.

300mm deep 225mm wide lintol in 1:2:4 (20mm) ct.concrete reinforced with 4 Nos.12 mm dia.Tor Steel Bars.

75mm thick RCC Slab for hoods, Sunshades, Flat Roofs etc. in 1:2:4(20mm) ct. concrete rainforced with 10mm dia.
Tor Steel Bars at 225mm c/c both ways.

75mm thick 1:3:6 (40mm) ct. concrete in floors, ramps etc. finished with 16mm thick 1:3 ct. mortar smooth
rendering
(36) STONE MASON AND BRICKLAYOR

Random Rubble Masonry in 1:5 ct. mortar in foundation.

Random Rubble Masonry in 1:5 ct. mortar in super structure (average height 4.5m.)

Brick masonry in 1:5 ct. mortar in foundation.

Brick masonry in 1:5 ct. mortar in super structure (average height 4.5m).

115mm thick brick masonry in 1:5 ct. mortar in super structure (average height 4.5m).

115mm thick Honeycomb brick work in 1:5 ct. mortar in superstructure (average height 4.5m)

150mm thick block work in 1:5 cement mortar.

75mm thick pre-cast grille in 1:3 ct. mortar in superstructure (average height 4.5m).

75mm thick brick paved floor/ramp in 1:5 ct. mortar, finished with 16mm thick 1:3 ct. mortar smooth rendering.

35.1A

35.2

35.3

35.3A

35.4

35.5

35.6

35.7

36.1

36.2

36.3

36.4

36.5

36.6

36.6A

36.7

36.8

- 27 -

1:3:6 (40mm) cement concrete without forms in foundation.

35.1

(35) CONCRETER

Borrow earth for filling under floor

Common excavation & spoil to waste and/or backfilling in foundation

(34) EXCAVATOR

Description of Work

34.1
34.2

Rate
No.

BUILDING WORKS

582.50
205.75

3,694.00
1,403.00
6,879.00
7,339.00
8,717.00
9,177.00
1,133.00
785.50
1,012.00
985.00
1,209.00

3
3
3
3
2
2
2
2
2

2,859.00

2,240.00

1,766.00

1,621.00

1,123.00

15,253.00

m
m

11,950.00

685.50

Basic Unit
Rate(Rs.)

m3

Unit

1,644.00

1,339.00

1,376.00

1,068.00

1,540.00

12,480.00

11,855.00

9,981.00

9,355.00

1,908.00

5,023.00

3,888.00

3,046.00

2,401.00

2,204.00

1,527.00

20,744.00

16,252.00

279.75

792.00

932.00

Class-A

1,427.00

1,162.00

1,194.00

927.00

1,337.00

10,829.00

10,286.00

8,661.00

8,117.00

1,656.00

4,359.00

3,374.00

2,644.00

2,084.00

1,913.00

1,325.00

17,998.00

14,101.00

242.75

687.50

808.50

Cl-B & C

Unit Rate (Rs.)

Engineer's Unit Rates - Applicable from 01 January 2012

36.8

36.7

36.6A

36.6

36.5

36.4

36.3

36.2

36.1

35.7

35.60

35.5

35.4

35.3A

35.3

35.2

35.1A

35.1

34.3

34.2

34.1

Rate
No.

200 x 200mm Floor tiling.

300 x 300mm Floor tiling

150mm - 225mm wide copying on brick walls with 1:2 ct. mortar, finished smooth.

37.14

37.15

37.16

- 28 -

150 x 150mm glazed wall tiling (white or colour).

20mm thick, 1:2 mix, finished smooth.

37.13

do

37.8

20mm thick, 1:2 mix, finished rough.

100mm x 20mm plain skirting in 1:2 cement mortar, finished smooth.

do

37.7

20mm thick, 1:3 mix, finished smooth.

37.12

do

37.8A

20mm thick, 1:3 mix, finished rough.

20mm thick Damp Proof Course in 1:2 ct. mortar, finished rough with two coats of Hot tar blinded with sand.

do

37.7A

16mm thick, 1:2 mix, finished smooth.

37.11

do

37.6

16mm thick, 1:2 mix, finished rough.

Cement & lime mortar plastering with 16mm thick, 1:1:5 mix, finished smooth.

do

37.5

16mm thick, 1:3 mix, finished smooth.

37.10

do

37.4

16mm thick, 1:3 mix, finished rough.

Cement & lime mortar plastering with 16mm thick, 1:1:5 mix, finished rough.

do

37.3

12mm thick, 1:3 mix, finished smooth.

37.9

do

Cement mortar plastering with 12mm thick, 1:3 mix, finished rough.

37.2

37.1

300mm T x 150mm R double step in brick masonry in 1:5 ct. mortar, finished with 16mm thick, 1:3 ct. mortar
smooth rendering.

36.11

(37) PLASTERER AND PAVIOR

300mm T x 150mm R single step in brick masonry in 1:5 ct. mortar, finished with 16mm thick, 1:3 ct. mortar
smooth rendering.

36.10

383.25
493.00
407.50
517.50
423.50
533.00
456.50
566.00
449.00
612.00
564.50

m2
2

m2
2
2
2
2
2
2

m2
2

2,995.00
2,177.00

2
2

m
m

200.50

2,792.00
m

66.90

453.00

343.25

2,171.00

902.00

1,331.00

Basic Unit
Rate(Rs.)

Unit

150mm av. deep, 225mm wide drain in brick masonry in 1:5 ct. mortar, with 115mm thick side walls & invert,
finished with 16mm thick 1:3 ct. mortar smooth rendering.

Description of Work

36.9

Rate
No.

BUILDING WORKS

272.50

2,960.00

4,073.00

3,797.00

90.95

767.50

832.00

610.50

769.50

620.50

724.50

575.50

703.50

554.00

670.00

521.00

616.00

466.75

2,952.00

1,226.00

Class-A
1,810.00

236.75

2,568.00

3,534.00

3,295.00

78.90

666.00

722.50

530.00

668.00

538.50

629.50

499.75

610.50

481.00

581.50

452.00

534.50

405.25

2,562.00

1,064.00

Cl-B & C
1,570.00

Unit Rate (Rs.)

Engineer's Unit Rates - Applicable from 01 January 2012

37.16

37.15

37.14

37.13

37.12

37.11

37.10

37.9

37.8

37.7

37.8A

37.7A

37.6

37.5

37.4

37.3

37.2

37.1

36.11

36.10

36.90

Rate
No.

PVC Toilet Door in 804x2060mm size with PVC door frame inclunding 2 Nos. butt hinges, 2 Nos. Barrel Bolts and
quality lock with keys in duplicate, all complete to working order.

Door in 100x75mm frame with a fully glazed fanlight on top (thickness of glass to be 3mm) with center pivot
arrangement & locking device, ordinary plywood sash, Brass fittings including 3 Nos. Butt hinges, 2 Nos. Barrel
Bolts & quality mortice lock with keys in duplicate, all complete to working order.

As in Rate No. 38.3 but with marine (water proof ) plywood sash.

Door in 100x75mm frame without slats or fanlight and with ordinary plywood sash, brass fittings including 3 Nos.
butt hinges, 2 Nos. Barrel Bolts and quality mortice lock with keys in duplicate, all complete to working order.

As in Rate No. 38.5 but with marine (water proof) plywood sash.

Door in 100x75mm frame, without slats or fanlight and with 25mm thick ledged, braced & battened sash, brass
fittings incl. 3 Nos. Butt Hinges, 2 Nos. Barrel Bolts and quality mortice lock with keys in duplicate (A 150mm
hasp & staple and 50mm Viro padlock with keys may be provided in place of mortice lock where applicable), all
complete to working order.

Garage door in 100x50mm frame, panalled sash comprising 30mm thick rails & styles and 12mm thick panels,
brass fittings including 12 Nos. Butt hinges, 6 Nos. Barrel Bolts (for a 10'x8' door) 1 No.150mm hasp & staple and 1
No.50mm Quality Padlock with keys all complete to working order.

Window in 100x75mm frame with 75x25mm slats, 25mm thick sash comprising 3 mm thick glass, brass fittings
including 2 Nos. butt hinges, 2 Nos. Barrel Bolts, 1 No. Casement stay and 1 No. Casement Fastener for each sash
all complete to working order.

Window in 100x75mm frame with glazed fanlight on top comprising centre pivot arrangement and locking device,
25mm thick sash comprising 3mm thick glass, brass fittings including 2 Nos. butt hinges, 2 Nos. Barrel Bolts, 1 No.
casement stay and 1 No. casement fastener for each sash all complete to working order.

Window in 100x75mm frame without slats/fan light, with 25mm thick sash comprising 3mm thick glass, brass
fittings including 2 Nos. Butt hinges, 2 Nos. Barrel Bolts, all complete to working order.

38.2

38.3

38.4

38.5

38.6

38.7

38.8

38.9

38.10

38.11

- 29 -

Door in 100x75mm frame with 75x25mm slats, ordinary plywood sash, brass fittings incl. 3 Nos. butt hinges, 2
Nos. Barrel Bolts and quality mortice lock with keys in duplicate, all complete to working order.

(38) CARPENTER, JOINER AND GLAZIER

Description of Work

38.1

Rate
No.

BUILDING WORKS

8,567.00
9,879.00

11,422.00
9,859.00
11,622.00
13,197.00

6,610.00

10,919.00

10,836.00

10,641.00

m2
m2

2
2

m2

10,067.00

Basic Unit
Rate(Rs.)

Unit

14,471.00

14,736.00

14,849.00

8,989.00

17,947.00

15,805.00

13,408.00

15,533.00

13,435.00

11,651.00

13,691.00

Class-A

12,556.00

12,786.00

12,884.00

7,800.00

15,573.00

13,714.00

11,634.00

13,478.00

11,658.00

10,109.00

11,879.00

Cl-B & C

Unit Rate (Rs.)

Engineer's Unit Rates - Applicable from 01 January 2012

38.11

38.10

38.9

38.8

38.7

38.6

38.5

38.4

38.3

38.2

38.10

Rate
No.

38.12

Rate
No.

- 30 -

Window in 100x75mm frame without slats/fanlight, with 25mm thick ledged, braced & battened sash, brass
fittings including 2 Nos. butt/parlimentary hinges, 2 Nos. Barrel Bolts, 1 No. Casement stay & 1 No. Casement
fastener for each sash, all complete to working order.

Description of Work

BUILDING WORKS

Unit
12,365.00

Basic Unit
Rate(Rs.)
Class-A
16,816.00

Cl-B & C
14,590.00

Unit Rate (Rs.)

Engineer's Unit Rates - Applicable from 01 January 2012

38.12

Rate
No.

Trellis work in 900x900mm frame work of 100x50mm timber, with 44mm battens fixed to framework at 75mm c/c
bothway.

50x50mm Galvanized iron welded mesh fixed to 900x900mm frame work of 100x50mm timber, by means of
38x12mm beadings.

38.14

38.15
2,995.00

Half round single tile covering on Corrugated Asbestos Roof (Asbestos roof paid separately).

20mm Thick Lunumidella plank ceiling fixed to roof rafters, including application of wood preservative in 2 coats.

20mmThick flat Lunumidella ceiling, fixed to sawn timber frame work, including application of wood
preservative in 2 coats.

Flat Asbestos ceiling, fixed to sawn timber frame work, including application of wood preservative in 2 coats.

Asbestos ceiling fixed to roof rafters, including application of wood preservative in 2 coats.

200x 25mm valance & barge boards fixed to roof rafters with brass screws including application of wood
presavative in 2 coats.

As in Rate No. 39.7, but for 250x25mm valance & barge board.

Valley gutter in Aluminium sheet, fixed to 25mm thick planks treated with 2 coats of wood preservative.

150mm half round or 115mm square PVC eaves gutter fixed to valance board with aluminium brackets & brass
screws.

90mm dia. PVC down pipes inclusive of bends, joiners etc. fixed to wall with embedded plugs & PVC straps and
with proper connection to eaves gutters.

39.2A

39.3

39.4

39.5

39.6

39.6A

39.7

39.7A

39.8

39.9

39.10

- 31 -

Corrugated Asbestos Roof on sawn timber frame treated with 2 coats of wood preservative, including ridge
plates, wall plates, purlins, beams, struts, rafters fixed at an interval of 4 ft and reepers etc.
Corrugated Asbestos ridging.

39.2

1,165.00
1,996.00
1,818.00
992.50

2
2

m2

m
m

596.50

485.75

9,443.00

1,128.00

830.00

1,064.00
m

708.00

2,199.00

508.00

Calicat Pattern Ridge Tiles bedded in cement lime mortar 1:1:5 mix.

39.1A

Calicut Tile roof on sawn timber frame, treated with 2 coats of wood preservative, including ridge plates, wall
plates, purlins, beams, struts, rafters fixed at an interval of 600mm, reepers etc.
m

2,981.00

5,783.00

m2

13,359.00

Basic Unit
Rate(Rs.)

Unit

39.1

(39) ROOFER

Isolated Fanlight in 100x75mm frame with 32mm thick sash comprising 3mm thick glass, brass fittings including 2
Nos. Center pivots & 2 Nos. fanlight catches, all complete to working order.

Description of Work

38.13

Rate
No.

BUILDING WORKS

811.00

660.50

12,842.00

1,534.00

1,128.00

1,349.00

2,472.00

2,714.00

1,584.00

1,447.00

962.50

2,990.00

690.50

4,054.00

4,073.00

7,864.00

Class-A
18,168.00

704.00

573.00

11,143.00

1,332.00

979.50

1,171.00

2,145.00

2,355.00

1,374.00

1,256.00

835.00

2,595.00

599.50

3,518.00

3,534.00

6,824.00

Cl-B & C
15,764.00

Unit Rate (Rs.)

Engineer's Unit Rates - Applicable from 01 January 2012

39.10

39.9

39.8

39.7A

39.7

39.6A

39.6

39.5

39.4

39.3

39.2A

39.2

39.1A

39.1

38.15

38.14

38.13

Rate
No.

Furnishing & fixing PVC Gutter Head Box for eaves gutter.

39.12

Application of Wall filler including preparation of surface.

Application of two coats of Weathersheild of approved tint & quality including preparation of surface.

Application of two coats of grey cement wash to plinth in two coats including preparation of surface.

Application of two coats of Emulsion Paint of approved tint & quality including preparation of surface.

Application of two coats of Enamal Paint of approved tint & quality including preparation of surface.

Application of two coats of Varnish of approved quality including preparation of surface.

Application of two coats of Aluminium paint of approved quality including preparation of surface

40.2

40.3

40.4

40.5

40.6

40.7

40.8

189.50
45.05
163.75
218.75
227.00
198.00

2
2
2
2
2

each

Furnishing & installing ceramic low leval suit complete with ceramic cistern, lid, control valve, syphon, plastic
seat & cover, trap, syphon lever etc. with necessary connections to sewage & water supply systems.

Furnishing & installing ceramic squatting pan (standerd size) complete with cast iron cistern, lid, control valve,
syphon, trap, down pipe, foot rests, syphon lever & chain etc. with necessary connections to sewage & water
supply system.

41.3

41.4

- 32 -

each

Furnishing, laying & jointing 110mm dia. PVC pipes including trenching & backfill with necessary bends etc.

6,417.00

16,930.00

1,146.00

144.50
2

68.15
2

1,188.00

605.00

Basic Unit
Rate(Rs.)

each

each

Unit

41.2

(41) PLUMBER

Application of two coats of white wash in lime, including preparation of surface.

40.1

Louvers with slats = 3.00 and Windoor with glazed sash = 1.25.

Door with fanlight & plywood sash = 2.15, Trellis work with frame = 2.50, Window with slats & glazed sash =
2.40, G.I. wire mesh with frame = 1.50, Window with fanlight & glazed sash = 2.10,

NOTE: Multiply door/ window areas (opening in wall) by the painting coefficients given below to obtain painting
areas for which following unit rates are applicable. The coefficients include the painting of both sides of door/
window.

(40) DECORATOR

Furnishing & fixing PVC running head for eaves gutters.

Description of Work

39.11

Rate
No.

BUILDING WORKS

8,727.00

23,024.00

7,572.00

19,977.00

1,352.00

1,558.00

233.75

268.00

258.25

193.25

53.15

223.50

170.50

80.40

1,402.00

Cl-B & C
713.50

269.25

308.50

297.50

222.50

61.25

257.50

196.50

92.65

1,615.00

Class-A
822.50

Unit Rate (Rs.)

Engineer's Unit Rates - Applicable from 01 January 2012

41.4

41.3

41.2

40.8

40.7

40.6

40.5

40.4

40.3

40.2

40.1

39.12

39.11

Rate
No.

m
m

Furnishing & installing 20mm dia. PVC pipe line for internal water service including all necessary bends, sockets,
tees etc.

As in Rate No. 41.7, but for 25mm dia. PVC pipe line.

As in Rate No. 41.7, but for 32mm dia. PVC pipe line.

As in Rate No. 41.7, but for 40mm dia. PVC pipe line.

As in Rate No. 41.7, but for 50mm dia. PVC pipe line.

Furnishing & installing 20mm PVC shower rose and 1/2" brass control valve with necessary valve & Faucet
sockets
etc. & installing 20mm brass bibcock with necessary Faucet sockets.
Furnishing

Furnishing & installing 25mm brass stop valve with necessary sockets.

Furnishing & installing 32mm brass stop valve with necessary sockets.

Furnishing & installing 40mm brass gate valve with necessary sockets.

Furnishing & installing 50mm brass gate valve with necessary sockets.

Furnishing & installing 20mm brass stop valve with necessary sockets.

Furnishing & installing 25mm brass bibcock with necessary sockets.

Furnishing & installing ceramic Urinal pan with lead-away pipe.

Furnishing & installing ceramic soap holder.

Furnishing & installing 200x100mm half round ceramic Tooth Brush Holder.

Furnishing & installing Chromium plated Towel Rail with ceramic Brackets.

Furnishing & installing 500x400mm (Rectangular or oval shape) Bathroom Mirror with 5mm thick 400x380mm
plate glass shelf fixed to wall with Tray Holders.

41.7

41.8

41.9

41.10

41.11

41.12

41.14

41.15

41.16

41.17

41.18

41.19

41.20

41.21

41.22

41.23

41.24

- 33 -

each

Furnishing & installing 550x380mm ceramic wash basin waste water pipe & with necessary connection to water
supply system.

41.6

41.13

each

Furnishinig & installing 1000x500mm s/s kitchen sink complete with strainer, flushing plug, PVC waste water
pipe etc

41.5

each

each

each

each

each

each

each

each

each

each

2,232.00

1,770.00

957.50

676.00

4,036.00

1,469.00

934.00

4,827.00

3,606.00

1,781.00

1,230.00

796.50

each
each

757.00

822.50

560.00

470.25

194.75

81.75

4,947.00

4,603.00

3,730.00

Basic Unit
Rate(Rs.)

each

each

Unit

Furnishing & installing ceramic squatting pan with trap, foot rests & necessary connection to sewage system,
excluding cistern.

Description of Work

41.4A

Rate
No.

BUILDING WORKS

3,035.00

2,407.00

1,302.00

919.00

5,488.00

1,997.00

1,270.00

6,564.00

4,904.00

2,422.00

1,672.00

1,083.00

1,029.00

1,118.00

761.50

639.50

264.75

111.00

6,727.00

6,260.00

Class-A
5,072.00

2,633.00

2,088.00

1,129.00

797.50

4,763.00

1,733.00

1,102.00

5,696.00

4,255.00

2,102.00

1,451.00

939.50

893.50

970.50

661.00

554.50

229.75

96.45

5,837.00

5,431.00

Cl-B & C
4,401.00

Unit Rate (Rs.)

Engineer's Unit Rates - Applicable from 01 January 2012

41.24

41.23

41.22

41.21

41.20

41.19

41.18

41.17

41.16

41.15

41.14

41.13

41.12

41.11

41.10

41.9

41.8

41.7

41.6

41.5

41.4A

Rate
No.

Furnishing & installing 100x100mm ceramic Robe Hook.

Providing Waste water Catch pit with 150x150mm PVC Grating and PVC Lead-away pipe.

Providing Segmental open channel (75mm wide) on concrete or brick paved floor.

Providing 100mm dia. PVC Gulley with "P" or "S" trap and 150x150mm PVC Grating.

Furnishing and installing 50mm dia. PVC Vent pipe, fixed to wall with brackets.

As in Rate No. 41.30 but for 100mm dia. PVC Vent pipe.

Furnishing and installing 50mm dia. PVC Vent pipe, fixed to wall with brackets.

Furnishing and installing 100mm dia. (Type 400) PVC Vent pipe, fixed to wall with brackets.

Furnishing and installing Coper Wire Dome for Vent pipe.

Construction of 750x750x900mm Man Hole (internal dimensions) in Brick work with 2" thick RCC cover slab.

41.26

41.27

41.28

41.29

41.30

41.31

41.32

41.33

41.34

41.35

each
each

each
each

Providing 5 A. Switched Socket outlet with concealed/semi-concealed Wiring, connections to the main circuit &
Earth leakage system, complete in all respect.

Providing concealed/semi-concealed type Wiring with connections to the main circuit, for Ceiling Fan &
Regulator, including suspension hook, round blocks, switch etc. (Supplying and fixing of Ceiling Fan & Regulator
not included).

Providing 1m long Earth electrode (Copper) with necessary Wiring and Connection to Earth Leakage Circuit
Breaker.

Supplying & installing single phase 2 way D-Panel with necessary connections to main & branch circuits.

As in Rate No. 42.6A but for 4 way distribution Panel.

As in Rate No. 42.6A but for 6 way distribution Panel.

42.3

42.4

42.5

42.6A

42.6B

42.6C

- 34 -

each

As in Rate No. 42.1 but for Pendent Lamp.

42.2

each

each

each

Providing Batten Lamp with concealed/semi-concealed Wiring, connections to main circuit, Switch, Holder,
Shade & Bulb and complete in all respect.

each

each

each

each

each

each

Unit

42.1

(42) ELECTRICIAN

Furnishing & installing 150x150mm ceramic Toilet Paper Holder.

Description of Work

41.25

Rate
No.

BUILDING WORKS

2,797.00

2,246.00

1,788.00

3,233.00

3,668.00

4,658.00

3,509.00

3,368.00

12,474.00

353.75

1,087.00

791.00

1,072.00

628.00

2,148.00

163.75

1,197.00

1,832.00

1,770.00

Basic Unit
Rate(Rs.)

3,803.00

3,054.00

2,431.00

4,396.00

4,988.00

6,334.00

4,772.00

4,580.00

16,964.00

481.00

1,478.00

1,075.00

1,457.00

854.00

2,921.00

222.50

1,627.00

2,491.00

Class-A
2,407.00

3,301.00

2,650.00

2,110.00

3,814.00

4,328.00

5,497.00

4,141.00

3,974.00

14,719.00

417.25

1,283.00

933.50

1,265.00

741.50

2,534.00

193.50

1,413.00

2,162.00

Cl-B & C
2,088.00

Unit Rate (Rs.)

Engineer's Unit Rates - Applicable from 01 January 2012

42.6C

42.6B

42.6A

42.5

42.4

42.3

42.2

42.1

41.35

41.34

41.33

41.32

41.31

41.30

41.29

41.28

41.27

41.26

41.25

Rate
No.

each
each
each
each

Supplying & installing 40 A Single phase Isolator with necessary connections to main circuit

As in Rate No.42.7A but for 63 A. Isolator.

Supplying & installing 40 A. Single Phase Earth Leakage Circuit Breaker with necessary connections to main
circuit & Earth Electrode etc.

As in Rate No. 42.8A but for 63 A Earth Leakage Circuit Breaker.

Furnishing 7/044 Electric Cables, 75mm dia. G.I. pipe for intermediate post, G.I brackets with insulators & other
necessary materials and providing Service connection from main supply.

Providing Bracket Lamp with concealed or semi concealed type Wiring, connection to the main circuit, switch,
holder, shade, Bulb etc. and complete in all respect.

As in Rate No. 42.10 but for Ceiling Lamp with round or square type Plastic cover.

As in Rate No. 42.10 but for 20 W, 2 ft long Daylight type Fluorescent lamp.

As in Rate No. 42.10 but for 40 W, 4 ft long Daylight type Fluoerescent lamp.

Providing 15 A Switched Socket Outlet with conealed or semi-concealed type wiring (using 7/036 cables) and
connections to main circuit & Earth Leakage system complete in all respect.

Supplying and installing 56" Sweep Ceiling Fan & Regulator (excluding wiring).

Furnishing and installing Electric Bell & Bell Push, with necessary wiring (concealed or semi-concealed type) and
connection to main circuit.

Furnishing and installing Street Lamp complete with 125 W Mercury Vapour Bulb, Lamp Ballast, 40/0076
connecting cables and 20mm dia. G.I. pipe fixed to lamp post with G.I. brackets

Providing 13 A Square pin Socket Outlet with conealed or semi-concealed type wiring (using 7/029 cables) and
connections to main circuit & Earth Leakage system complete in all respect.

42.7A

42.7B

42.8A

42.8B

42.9

42.10

42.11

42.12

42.13

42.14

42.15

42.16

42.17

42.18

References:

each

As in Rate No. 42.6A but for 12 way distribution Panel.

42.6F

- 35 -

1. Data for Costing - 1980 : Rates sub Committee appointed by Secretary , Ministry of Mahaweli Development.
2. Unit Rates for Construction Works- Augest 2001 : Ministry of Mahaweli Development.

each

each

each

each

each

each

each

each

each

each

As in Rate No. 42.6A but for 10 way distribution Panel.

42.6E

each

Unit

As in Rate No. 42.6A but for 8 way distribution Panel.

Description of Work

42.6D

Rate
No.

BUILDING WORKS

7,559.00

2,853.00

4,140.00

5,838.00

8,751.00

4,705.00

4,123.00

3,775.00

3,484.00

479.75

3,926.00

3,725.00

1,789.00

1,939.00

4,556.00

4,099.00

3,161.00

Basic Unit
Rate(Rs.)

10,280.00

3,880.00

5,630.00

7,939.00

11,901.00

6,398.00

5,607.00

5,134.00

4,738.00

652.00

5,339.00

5,066.00

2,433.00

2,637.00

6,196.00

5,574.00

Class-A
4,298.00

8,920.00

3,366.00

4,885.00

6,889.00

10,326.00

5,552.00

4,865.00

4,455.00

4,111.00

566.00

4,633.00

4,396.00

2,111.00

2,289.00

5,376.00

4,836.00

Cl-B & C
3,730.00

Unit Rate (Rs.)

Engineer's Unit Rates - Applicable from 01 January 2012

42.18

42.17

42.16

42.15

42.14

42.13

42.12

42.11

42.10

42.9

42.8B

42.8A

42.7B

42.7A

42.6F

42.6E

42.6D

Rate
No.

Supply and fix Ceramic Sink, 24"x15"x7" complete with mono type, chromium plated long neck
type sink tap - (Momali, Huai or equivalent) - including all necessary fittings.
Supply and fix Angle valve (Momali, Huai or equivalent)
Supply and fix Chromium plated flexible cable (Momali, Huai or equivalent), length 12" or 18".

44

Supply and install 65x65x6 mm angle iron, service bracket, D bracket and Insulator with
necessary nuts and bolts for main wire fixed to wall or roof frame including two coats of
anticorrosive paint and enamel paint- Single Phase
Supply and fix Aluminum window Fixed type, beading stick with silicon gum Brown/Silver
Aluminum members complete to the accepted Engineering standards
Supply and fix Aluminium window Fixed type, beading stick with silicon gum Powder coated
Aluminum members complete to the accepted Engineering standards
Supply and fix Aluminum Casement window with 5mm float glass, rubber beading stick with
silicon gum Brown/Silver Aluminum members complete to the accepted Engineering standards

48

- 35 -

Supply and fix Aluminum Door with 5mm float glass on top and PVC coated 5mm plywood
board at bottom, rubber beading stick with silicon gum Brown/Silver Aluminum members with
lock, stainless steel hingers, stainless steel door handle, door closer and all accessories.
Supply and fix Aluminum Door with 5mm float glass on top and PVC coated 5mm plywood
board at bottom, rubber beading stick with silicon gum Powder coated Aluminum members with
lock, stainless steel hingers, stainless steel door handle, door closer and all accessories.

53

54

Supply and fix Aluminum Casement window with 5mm float glass, rubber beading stick with
silicon gum Powder coated Aluminum members complete to the accepted Engineering standards

52

51

50

49

Manhole with internal dimension 450x450x600mm deep, 150mm thick 1:3:6(40mm) concrete
foundation, 225mm thick brick work in 1:5 ct. sand, 12mm thick cement sand rendering in 1:2 with
forming cannels and 75mm thick R.C.C. slab as per Drawings

47

45
46

Supply and fix Iron grill with 20x6 mm flat iron outer frame and horizontal bracings at 300 mm
intervals complete with 12x6 mm flat iron verticals at 75 mm c/c as instructed including two coats
of anticorrosive paint and enamel paint.

Description of Work

43

Rate
No.

m2

m2

m2

m2

m2

m2

No.

15,584.17

11,342.50

12,822.50

9,620.83

6,214.17

6,510.00

2,936.67

7,833.33

21,194.00

15,425.00

17,438.00

13,084.00

8,451.00

8,853.00

3,993.00

10,653.00

1,026.00

755.00

No.

No.

9,941.00
1,717.00

6,950.00

Class-A

18,389.00

13,384.00

15,130.00

11,352.00

7,332.00

7,681.00

3,465.00

9,243.00

890.50

8,625.00
1,489.00

6,030.00

Cl-B & C

Unit Rate (Rs.)

7,310.00
1,262.50

5,110.83

Basic Unit
Rate(Rs.)

No.
No.

m2

Unit

54

53

52

51

50

49

48

47

45
46

44

43

Rate No.

Engineer's Unit Rates - Applicable from 1 January 2012

Supply and fix 2.1m height Aluminum Partition using 76x23mm sections with 5mm float glass on
top and PVC coated 5mm plywood board at bottom, rubber beading stick with silicon gum
Brown/Silver Aluminum members complete to the accepted Engineering standards

56

57

- 36 -

Supply and fix Aluminum Partition using 76x23mm sections with 5mm float glass rubber beading
stick with silicon gum Powder coated Aluminum members complete to the accepted Engineering
standards
References: Unit Rates of Provisional Engineering Department - North Central Province

Supply and fix Aluminum Door with 5mm float glass on top and 0.47 mm Zn-Al covered plywood
board at bottom, rubber beading stick with silicon gum Powder coated Aluminum members with
lock, stainless steel hingers, stainless steel door handle, door closer and all accessories.

Description of Work

55

Rate
No.

m2

m2

m2

Unit

7,397.50

4,537.50

17,359.17

Basic Unit
Rate(Rs.)

10,060.00

6,171.00

23,608.00

Class-A

8,729.00

5,354.00

20,483.00

Cl-B & C

Unit Rate (Rs.)

57

56

55

Rate No.

Engineer's Unit Rates - Applicable from 1 January 2012