Rate Analysis
Rate Analysis
Note: Labour Constants have been taken from IS: 7272 (Part I)
1 Excavation and Earth Works
a) Excavation over areas (Hard/dense soil ), depth up to I.5 m and removal
( up to one metre from edge )
10 m3
Quantity Considered
Sr. No
1
a)
b)
Labour/Material/Others
Labour
Mate
Mazdoor
Sum
2 Water @
Sum
3 Contractor's Profit @
Total For 10m3
3
Therefore, Per m
Day
earthwork
3
Quatity/10m Rate Per
1
1
0.6
6.2
162 day
166 day
1.50%
10%
Amount in Rs.
97.38
1030.13
1127.51
16.91
1144.42
114.44
1258.86
126.00
Quantity Considered
Sr. No Labour/Material/Others
a)
Amount in Rs.
Mazdoor
Bhistie
182 day
181.80
166 day
162 day
3539.00
1136.10
a)
Materials
Cement bags
34.34
11290.99
b)
Sand
4.77
329 bag
3
437 m
c)
1
1
1
21.3
7
Calculation of Materials
For 10 m dry concrete =
15.5 m3 wet concrete
Therefore, cement required = 15.5 / (1 +
4+
3
1 Labour
Mason
b)
c)
Day
concrete
Coarse Aggregates
Sum
3 Water @
4 Tools and Machinery
9.54 1071 m
1.50%
Lump sum
Sum
2083.54
10217.34
28448.77
426.73
500.00
29375.50
Sand Required =
Coarse Aggregates Reqd. =
Page 1 of 6
1.19
1440
1.19
1717
m
kg/m3
x 1440
kg
50 kg
1717 / 50
34.34 bags
3
4.77 m
3
9.54 m
8)
5 Contractor's Profit @
Total For 10m3
Therefore, Per m3
10%
2937.55
32313.05
3232.00
3 Concrete
Reinf. cement concrete
1 : 1.5 : 3 insitu in foundations, concrete footings
bases tor columns, etc excluding form work and reinforcement
10 m3
Quantity Considered
Sr. No Labour/Material/Others
1 Labour
a)
b)
c)
d)
e)
f)
2
Mason
Mazdoor
Bhistie
Mixer Operator
Mixer
Vibrator
Day
concrete
Quatity/10m3 Rate Per
1
1
1
1
1
1
1.7
20
9
0.7
0.7
0.7
182
166
162
182
182
182
Amount in Rs.
day
day
day
day
day
day
309.06
3323.00
1460.70
127.26
127.26
127.26
329 bag
26685.41
Materials
a)
Cement bags
81.16
b)
Sand
4.23
c)
Coarse Aggregates
Sum
3 Water @
4 Tools and Machinery
Sum
5 Contractor's Profit @
Total For 10m3
3
Therefore, Per m
437 m
1847.66
8.45 1071 m
9049.95
43057.56
645.86
500.00
44203.42
4420.34
1.50%
Lump Sum
10%
Sr. No Labour/Material/Others
Cement =
Density of Cement =
Cement Required =
Therefore, Cement Required =
1 bag of cement =
No. of Cement bags reqd. =
No. of Cement bags reqd. =
2.82
1440
2.82
4058
50
4058
81.16
3)
m
kg/m3
x 1440
kg
kg
/ 50
bags
Sand Required =
4.23 m3
8.45 m3
48623.76
4863.00
Calculation of Materials
3
For 10 m dry concrete =
15.5 m wet concrete
Therefore, Cement required = 15.5 / (1+
1.5 +
3
10 m3
Day
brickwork
Quatity/10m3 Rate Per
Calculation of Materials
Size of Modular brick is
20 x
10 X
In
1 m3, no of bricks =
1 / 0.2
/
Amount in Rs.
Page 2 of 6
In
m3, no of bricks =
500
nos
In
10 m3, no of bricks =
5000
nos
10 cms
0.1 / 0.1
1
a)
b)
c)
2
a)
b)
Labour
Mason
Mazdoor
Bhistie
1
1
1
Materials
Bricks
Cement bags
c)
Sand
Sum
9.4
18
2
182 day
166 day
162 day
1708.92
2990.70
324.60
5000
20.08
5.8 nos
329 bag
3
437 m
29000.00
6602.30
2.79
3 Water @
1.50%
Sum
42472.88
4 Contractor's Profit @
Total For 10m
Therefore, Per m3
1218.67
41845.20
627.68
10%
4247.29
46720.17
4673.00
5 External Plastering:
Cement plaster
mixing of mortar
Assume: Bottom Layer
in cement mortar
the top Layer being
in cement mortar
Quantity Considered
Sr. No
1
a)
b)
c)
2
Labour/Material/Others
Labour
Mason
Mazdoor
Bhistie
Materials
a)
Cement bags
On
c.m.
c.m.
Add
Add
10 mm thick
1 : 5 and
5 mm thick
10 m2
Day
1
1
1
182 day
166 day
162 day
181.80
166.15
162.30
1.23
329 bag
404.42
Page 3 of 6
500
0.77
1
0.23
0.25
9x
x 0.19
m3
- 0.77
m3
m3
9 cms
0.09 x
0.09
0.28 m3
10 x
0.28 m3 of cement mortar
2.79 m3 of cement mortar
3
12.5 m wet mortar
3
2.5 m
2.79
0.7
1440
1004
50
20.08
x 2.5
/ 10
m3 of cement
kg/m3
kg
kg
bags
3
2.79 m
Calculation of Materials
10 m2, the quantity of cement mortar in bottom layer,
in bottom Layer=
10 x
0.01
in bottom Layer=
0.1 m3
10% for undulations =
0.11 m3
10% for wastage, etc. =
0.12 m3
1: 3
19 x
x 2.083 / 10
m3 of cement
kg/m3
kg
kg
bags
3
0.13 m
b)
Sand
Sum
0.18
3 Water @
3
437 m
1.50%
Sum
4 Contractor's Profit @
10%
78.62
993.29
14.90
1008.19
100.82
On
c.m.
c.m.
Add
Add
1109.01
3
For 10 m dry mortar =
For 10 m3 of c.m, Cement =
For 0.06 m3 of c.m. =
For 0.06 m3 of c.m. =
Density of Cement =
Cement Required =
1 bag of cement =
No. of Cement bags reqd. =
111.00
Quantity Considered
10 m
Sr. No
1
a)
b)
c)
d)
e)
2
Labour/Material/Others
Labour
Mason
Mazdoor
Bhistie
Mazdoor
Machine
Materials
a)
Tiles
b)
c)
m2, no of tiles =
75 nos
12000.00
Cement bags
0.87
286.06
Sand
Sum
0.12
329 bag
3
437 m
1.50%
Sum
10%
182
166
162
166
182
Amount in Rs.
160
1.2
2
1
5
4
Rate Per
In
218.16
332.30
162.30
830.75
727.20
4 Contractor's Profit @
Total For 10m2
Calculation of Materials
250 x
250
day
day
day
day
day
1
1
1
1
1
x 3.125 / 10
m3 of cement
kg/m3
kg
kg
bags
10 mm
In
1 m2, no of tiles =
In
10 m2, no of tiles =
Volume of c. m. over 1 m2 =
Volume of cement mortar =
Add 10% for undulations =
Add 10% for wastage =
For 10 m2 of terrazo tiling =
For 10 m2 of terrazo tiling =
3
For 10 m dry mortar =
3 Water @
Day
m3 wet mortar
m3
0.05 m
Sand Required =
6 Flooring:
Precast terrazo tile flooring
20 mm thick laid over
thick cement mortar:
1: 4
including Laying, cutting, grinding and polishing
12.5
3.13
0.056
0.017
1440
25
50
0.5
52.42
14609.18
219.14
14828.32
1482.83
16311.15
Page 4 of 6
1 /
0.25
0.25
16
160
1
0.010
0.011
0.012
10
0.12
nos
nos
x 0.01
m3
m3
m3
x 0.012 m3 of cement mortar
m3 of cement mortar
3
12.5 m wet mortar
3
2.5 m
0.12
0.03
1440
43.6
50
0.87
x 2.5
/ 10
m3 of cement
kg/m3
kg
kg
bags
Therefore, Per m2
Following has been assumed:
1632.00
Labour
Mate
Mason
Mazdoor
Bhistie
Mixer Operator
Mixer
Vibrator
Machine Operator
Rate/day
162.3
181.8
166.15
162.3
181.8
181.8
181.8
181.8
3
0.12 m
Sand Required =
Material Rate Per Unit
Cement
Sand
Coarse Aggregates
Bricks
Terrazo Tiles
Rate
329 bag
437 m3
1071 m3
5.8 no
75 no