You are on page 1of 6

RATE ANALYSIS

Note: Labour Constants have been taken from IS: 7272 (Part I)
1 Excavation and Earth Works
a) Excavation over areas (Hard/dense soil ), depth up to I.5 m and removal
( up to one metre from edge )
10 m3

Quantity Considered
Sr. No
1
a)
b)

Labour/Material/Others
Labour
Mate
Mazdoor
Sum
2 Water @
Sum
3 Contractor's Profit @
Total For 10m3
3
Therefore, Per m

Day

earthwork
3
Quatity/10m Rate Per

1
1

0.6
6.2

162 day
166 day

1.50%
10%

Amount in Rs.
97.38
1030.13
1127.51
16.91
1144.42
114.44
1258.86

126.00

2 Plain Cement Concrete


Unreinforced concrete
1 : 4 : 8 in foundations including mixing, pouring,
consolidating and curing:
1) Hand mixed cement concrete
3
10 m

Quantity Considered
Sr. No Labour/Material/Others
a)

Quatity/10m3 Rate Per

Amount in Rs.

Mazdoor
Bhistie

182 day

181.80

166 day
162 day

3539.00
1136.10

a)

Materials
Cement bags

34.34

11290.99

b)

Sand

4.77

329 bag
3
437 m

c)

1
1

1
21.3
7

Calculation of Materials
For 10 m dry concrete =
15.5 m3 wet concrete
Therefore, cement required = 15.5 / (1 +
4+
3

1 Labour
Mason

b)
c)

Day

concrete

Coarse Aggregates
Sum
3 Water @
4 Tools and Machinery

9.54 1071 m
1.50%
Lump sum

Sum

2083.54

Therefore, cement required =


Density of Cement =
Cement Required =
Therefore, Cement Required =
1 bag of cement =

10217.34
28448.77

No. of Cement bags reqd. =


No. of Cement bags reqd. =

426.73
500.00
29375.50

Sand Required =
Coarse Aggregates Reqd. =

Page 1 of 6

1.19
1440
1.19
1717

m
kg/m3
x 1440
kg

50 kg
1717 / 50
34.34 bags
3
4.77 m
3
9.54 m

8)

5 Contractor's Profit @
Total For 10m3
Therefore, Per m3

10%

2937.55
32313.05

3232.00

3 Concrete
Reinf. cement concrete
1 : 1.5 : 3 insitu in foundations, concrete footings
bases tor columns, etc excluding form work and reinforcement
10 m3

Quantity Considered
Sr. No Labour/Material/Others
1 Labour
a)
b)
c)
d)
e)
f)
2

Mason
Mazdoor
Bhistie
Mixer Operator
Mixer
Vibrator

Day

concrete
Quatity/10m3 Rate Per

1
1
1
1
1
1

1.7
20
9
0.7
0.7
0.7

182
166
162
182
182
182

Amount in Rs.

day
day
day
day
day
day

309.06
3323.00
1460.70
127.26
127.26
127.26

329 bag

26685.41

Materials

a)

Cement bags

81.16

b)

Sand

4.23

c)

Coarse Aggregates
Sum
3 Water @
4 Tools and Machinery
Sum
5 Contractor's Profit @
Total For 10m3
3
Therefore, Per m

437 m

1847.66

8.45 1071 m

9049.95
43057.56
645.86
500.00
44203.42
4420.34

1.50%
Lump Sum
10%

Sr. No Labour/Material/Others

Cement =
Density of Cement =
Cement Required =
Therefore, Cement Required =
1 bag of cement =
No. of Cement bags reqd. =
No. of Cement bags reqd. =

2.82
1440
2.82
4058
50
4058
81.16

3)

m
kg/m3
x 1440
kg
kg
/ 50
bags

Sand Required =

4.23 m3

Coarse Aggregates Reqd. =

8.45 m3

48623.76

4863.00

4 Brick work ( Straight Walls)


a) Brick work in walls exceeding one brick thick, in
cement mortar
1: 4
Quantity Considered

Calculation of Materials
3
For 10 m dry concrete =
15.5 m wet concrete
Therefore, Cement required = 15.5 / (1+
1.5 +
3

10 m3
Day

brickwork
Quatity/10m3 Rate Per

Calculation of Materials
Size of Modular brick is
20 x
10 X
In
1 m3, no of bricks =
1 / 0.2
/
Amount in Rs.
Page 2 of 6

In

m3, no of bricks =

500

nos

In

10 m3, no of bricks =

5000

nos

10 cms
0.1 / 0.1

1
a)
b)
c)
2
a)
b)

Labour
Mason
Mazdoor
Bhistie

1
1
1
Materials
Bricks
Cement bags

c)

Sand
Sum

9.4
18
2

182 day
166 day
162 day

1708.92
2990.70
324.60

5000
20.08

5.8 nos
329 bag
3
437 m

29000.00
6602.30

2.79

3 Water @

1.50%
Sum

42472.88

4 Contractor's Profit @
Total For 10m
Therefore, Per m3

1218.67
41845.20
627.68

10%

4247.29

46720.17

4673.00

Size of Actual Brick is


For
1 m3,
Actual volume of by bricks=
Actual volume of by bricks=
Volume of cement mortar =
Volume of cement mortar =
Add 10% for undulations =
Add 10% for frogs, wastage =
For 10 m3 of brickwork =
For 10 m3 of brickwork =
3
For 10 m dry mortar =
For 10 m3 of c.m, Cement =
For 2.79 m3 of c.m. =
For 2.79 m3 of c.m. =
Density of Cement =
Cement Required =
1 bag of cement =
No. of Cement bags reqd. =
Sand Required =

5 External Plastering:
Cement plaster
mixing of mortar
Assume: Bottom Layer
in cement mortar
the top Layer being
in cement mortar
Quantity Considered
Sr. No
1
a)
b)
c)
2

Labour/Material/Others
Labour
Mason
Mazdoor
Bhistie
Materials

a)

Cement bags

15 mm thick over brick walls ( exterior ) including

On
c.m.
c.m.
Add
Add

10 mm thick
1 : 5 and
5 mm thick

10 m2
Day
1
1
1

surface area, over which plaster is applied.


Quatity/10m3 Rate Per Amount in Rs.
0.6
1
1

182 day
166 day
162 day

181.80
166.15
162.30

1.23

329 bag

404.42
Page 3 of 6

500
0.77
1
0.23
0.25

9x

x 0.19
m3
- 0.77
m3
m3

9 cms
0.09 x

For 10 m3 of c.m, Cement =


For 0.12 m3 of c.m. =
For 0.12 m3 of c.m. =
Density of Cement =
Cement Required =
1 bag of cement =
No. of Cement bags reqd. =
Sand Required =

0.09

0.28 m3
10 x
0.28 m3 of cement mortar
2.79 m3 of cement mortar
3
12.5 m wet mortar
3
2.5 m

2.79
0.7
1440
1004
50
20.08

x 2.5
/ 10
m3 of cement
kg/m3
kg
kg
bags
3
2.79 m

Calculation of Materials
10 m2, the quantity of cement mortar in bottom layer,
in bottom Layer=
10 x
0.01
in bottom Layer=
0.1 m3
10% for undulations =
0.11 m3
10% for wastage, etc. =
0.12 m3

For 10 m dry mortar =

1: 3

19 x

12.5 m wet mortar


3
2.08 m
0.12
0.03
1440
36.3
50
0.73

x 2.083 / 10
m3 of cement
kg/m3
kg
kg
bags

3
0.13 m

b)

Sand
Sum

0.18

3 Water @

3
437 m

1.50%
Sum

4 Contractor's Profit @

10%

Total For 10m


Therefore, Per m2

78.62
993.29
14.90
1008.19
100.82

On
c.m.
c.m.
Add
Add

1109.01

3
For 10 m dry mortar =
For 10 m3 of c.m, Cement =
For 0.06 m3 of c.m. =
For 0.06 m3 of c.m. =
Density of Cement =
Cement Required =
1 bag of cement =
No. of Cement bags reqd. =

111.00

10 m2, the quantity of cement mortar in top layer,


in top Layer=
10 x 0.005
in top Layer=
0.050 m3
1% for undulations =
0.051 m3
10% for wastage, etc. =
0.056 m3

Quantity Considered

10 m

Sr. No
1
a)
b)
c)
d)
e)
2

Labour/Material/Others
Labour
Mason
Mazdoor
Bhistie
Mazdoor
Machine
Materials

a)

Tiles

b)
c)

Size of a Terrazo tile is

surface area, over which flooring is laid.


Quatity/10m

m2, no of tiles =

75 nos

12000.00

Cement bags

0.87

286.06

For 10 m3 of c.m, Cement =

Sand
Sum

0.12

329 bag
3
437 m

1.50%
Sum
10%

182
166
162
166
182

Amount in Rs.

160

1.2
2
1
5
4

Rate Per

In

218.16
332.30
162.30
830.75
727.20

4 Contractor's Profit @
Total For 10m2

Calculation of Materials
250 x
250

day
day
day
day
day

1
1
1
1
1

x 3.125 / 10
m3 of cement
kg/m3
kg
kg
bags

10 mm

In
1 m2, no of tiles =
In
10 m2, no of tiles =
Volume of c. m. over 1 m2 =
Volume of cement mortar =
Add 10% for undulations =
Add 10% for wastage =
For 10 m2 of terrazo tiling =
For 10 m2 of terrazo tiling =
3
For 10 m dry mortar =

3 Water @

Day

m3 wet mortar
m3

0.05 m

Sand Required =

6 Flooring:
Precast terrazo tile flooring
20 mm thick laid over
thick cement mortar:
1: 4
including Laying, cutting, grinding and polishing

12.5
3.13
0.056
0.017
1440
25
50
0.5

52.42
14609.18
219.14
14828.32
1482.83
16311.15
Page 4 of 6

For 0.12 m3 of c.m. =


For 0.12 m3 of c.m. =
Density of Cement =
Cement Required =
1 bag of cement =
No. of Cement bags reqd. =

1 /

0.25

0.25

16
160
1
0.010
0.011
0.012
10
0.12

nos
nos
x 0.01
m3
m3
m3
x 0.012 m3 of cement mortar
m3 of cement mortar
3
12.5 m wet mortar
3
2.5 m
0.12
0.03
1440
43.6
50
0.87

x 2.5
/ 10
m3 of cement
kg/m3
kg
kg
bags

Therefore, Per m2
Following has been assumed:

1632.00
Labour
Mate
Mason
Mazdoor
Bhistie
Mixer Operator
Mixer
Vibrator
Machine Operator

Rate/day
162.3
181.8
166.15
162.3
181.8
181.8
181.8
181.8

3
0.12 m

Sand Required =
Material Rate Per Unit
Cement
Sand
Coarse Aggregates
Bricks
Terrazo Tiles

Rate
329 bag
437 m3
1071 m3
5.8 no
75 no

Austin S. Rodrigues, Lecturer, Government


Polytechnic Panaji

Page 5 of 6

Page 6 of 6