You are on page 1of 1986

CHAPTER NO.

BRICK WORK
DESCRIPTION OF ITEM:
Item No. 1

Pucca brick work in mud mortar in building.


(i)

In foundation and plinth.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1 Bricks 9" x 4" x 3"
1350.00 Nos.
2 Good earth or stiff clay for mud master
35.00 Cft
Total
Contractor's Profit & Ov
Total

20

Nos.
% Cft

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

1.50 Nos.
2.00 Nos.
0.13 No

per day
per day
per day

0.67 No.
0.33 No

per day
per day

For Mud Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Page 1

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 1

Pucca brick work in mud mortar in building.


(ii)

In ground floor.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1 Bricks 9" x 4" x 3"
1350.00 Nos.
2 Good earth or stiff clay for mud master
35.00 Cft
Total
Contractor's Profit & Ov
Total

20

Nos.
% Cft

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

2.00 Nos.
3.00 Nos.
0.13 No.

per day
per day
per day

0.67 No.
0.33 No

per day
per day

For Mud Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 2

DESCRIPTION OF ITEM:
Item No. 2

Add extra labour in item No.1 for brick work in

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


First Floor
1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
Second Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.75 No.
2.00 Nos.
10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say

Page 3

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


Third Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.25 Nos.
3.00 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
4th & Subsequent Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

2.25 Nos.
4.50 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per cum

Rs.
Rs.

Page 4

Say
Say

DESCRIPTION OF ITEM:
Item No. 3

Pucca brick work in mud mortar other than building.


(i)

Upto 20 ft. (6 metre) high.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1 Bricks 9" x 4" x 3"
2 Good earth or stiff clay
Total
Contractor's Profit & Ov
Total

1350.00 Nos.
35.00 Cft

20

Nos.
% Cft

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

2.00 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.33 No

per day
per day

For Mud Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 5

DESCRIPTION OF ITEM:
Item No. 3

Pucca brick work in mud morter other than building:


(ii)

Extra labour for every 5.0' (1.5 metre) additional height


thereof.

Detail

Unit Rate (British System) per 100 Cft


Rate
Qty
Per Unit
Amount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 6

Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:2).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
8.00 bags
20.00 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

LABOUR for 125 Cft


For Cement Mortar
1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 7

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
6.00 bags
22.50 Cft

Nos.
per bags
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

LABOUR for 125 Cft


For Cement Mortar
1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 8

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.80 bags
24.00 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 9

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:5).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.00 bags
25.00 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 10

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.40 bags
25.70 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

LABOUR for 125 Cft


For Cement Mortar
1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 11

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.00 bags
26.50 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

LABOUR for 125 Cft


For Cement Mortar
1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 12

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
2.66 bags
26.67 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 13

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Cement
Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

1350.00
3.20
59.72
24.00

20

Nos.
bags
kg
Cft

Nos.
per bag
per kg
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 14

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in:


Lime cement sand mortar Ratio (1:1:7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Cement
Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

1350.00
2.85
53.00
24.78

20

Nos.
bags
kg
Cft

Nos.
per bag
per kg
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 15

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Cement
Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

1350.00
2.56
47.78
25.60

20

Nos.
bags
kg
Cft

Nos.
per bag
per kg
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 16

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:9).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Cement
Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

1350.00
2.32
43.30
26.20

20

Nos.
bags
kg
Cft

Nos.
per bag
per kg
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 17

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:10).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Cement
Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

1350.00
2.14
39.94
26.66

20

Nos.
bags
kg
Cft

Nos.
per bag
per kg
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 18

DESCRIPTION OF ITEM:
Item No. 4 (iii)

Lime, sand mortar Ratio (1:2).

Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1
Pacca brick 9" x 4" x 3"
2
Lime Slaked
3
Sand
Total
Contractor's Profit & Ov
Total

20

Rate Per UnitAmount (Rs.)

1350.00 Nos.
174.30 Kg.
23.33 Cft

Nos.
Per Kg.
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Page 19

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:2).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
8.00 bags
20.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 20

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
6.00 bags
22.50 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 21

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.80 bags
24.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 22

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:5).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.00 bags
25.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 23

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.40 bags
25.70 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 24

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.00 bags
26.50 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 25

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1 : 8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
2.66 bags
26.57 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 26

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1:1:6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
59.72
3.20
24.00

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 27

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1 : 1 : 7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
53.37
2.85
24.78

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 28

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1:1:8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
47.78
2.56
25.60

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 29

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio ( 1 : 1 : 9 ).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
43.30
2.32
26.20

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 30

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio ( 1 : 1 : 10 ).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
40.00
2.14
26.66

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 31

DESCRIPTION OF ITEM:
Item No. 5 (iii)

Lime sand mortar Ratio (1:2).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Lime
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
174.30 kg
23.33 Cft

Nos.
per kg
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 32

DESCRIPTION OF ITEM:
Item No. 6

Add extra labour in item No.5 for brick work in:-

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


First Floor
1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft

per day
per day

Rs.
Say

Labour rate per Cum

Rs.
Say

LABOUR for 125 Cft


Second Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.75 No.
2.00 Nos.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft

per day
per day

Rs.
Say

Labour rate per Cum

Rs.
Say

Page 33

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


Third Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.25 Nos.
3.00 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
4th & Subsequent Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

2.25 Nos.
4.50 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per cum

Rs.
Rs.

Page 34

Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1:2).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
8.00 bags
20.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 35

Item No. 7

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
6.00 bags
22.50 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 36

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 4).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.80 bags
24.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 37

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 5).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.00 bags
25.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 38

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.40 bags
25.70 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 39

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.00 bags
26.50 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 40

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
2.66 bags
26.67 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 41

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
59.72
3.20
24.00

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 42

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
53.00
2.85
24.78

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 43

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
47.78
2.56
25.60

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 44

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 9).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
43.29
2.32
26.20

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 45

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 10).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
39.94
2.14
26.66

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 46

DESCRIPTION OF ITEM:
Item No. 7 (iii)

Lime, sand, mortar ratio (1 : 2)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
174.30 kg
23.33 Cft

Nos.
per kg
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 47

DESCRIPTION OF ITEM:
Item No. 8

Additional extra labour in item No.7 for every 10 ft. (3 m


additional height.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Masons
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Page 48

Say
Say

DESCRIPTION OF ITEM:
Item No. 9

Extra labour for arch work in brick masonry including labo


centering and de-centering.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Masons
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.50 No.
0.50 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Page 49

Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Extra for Pacca brick work in steining of wells or any oth


circular masonry.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1

Pacca bricks
Total
Contractor's Profit & Ov
Total

82.00 No.

20

% Cft

Percent

LABOUR for 125 Cft


1

Mason
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.25 No.

10

Percent

20

Percent

per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 50

DESCRIPTION OF ITEM:
Item No. 11

Extra labour for profile and flared walls.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1

Mason
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.43 No.

10

Percent

20

Percent

per day

ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum

Rs.
Rs.

Page 51

Say
Say

DESCRIPTION OF ITEM:
Item No. 12

Extra labour for Pacca brick work in piers and abutment.


(i)

From 10 ft. (3 metre) to 20 ft. (6 metre) height.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.12 No.
0.50 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum

Rs.
Rs.

Page 52

Say
Say

DESCRIPTION OF ITEM:
Item No. 12

Extra labour for Pacca brick work in piers and abutment.


(ii)

Above 20 ft. (6 metre) height.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum

Rs.
Rs.

Page 53

Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Extra for face work (half brick thick) using special brick
of Ist class bricks.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2

Special moulded Stretcher


courses bricks
Header courses

270.00
513.00

Total
Add 5% wastage
Total

783.00
39.15
822.15

Difference in cost of special


moulded and ordinary Ist class
bricks
2

Extra cost

= 0

Contractor's Profit & Ov


Total

20

%0 Nos.

Percent

Labour rate for 100 Cft


Composit rate per Cum

Rs.
Rs.

Page 54

Say
Say

DESCRIPTION OF ITEM:
Item No. 14

Reinforced brick work in lintels of opening, laid in (1:3)


sand mortar including, all labour material forms, moulds,
and shuttering etc., but excluding cost and labour of stee
reinforcement which shall be paid for separately.

Detail

Unit Rate (British System) per Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks
Cement
Sand
Kikar wood for centring & shuttering
(10 x 1.60 x 0.2) Can be use 20 times

Total
Contractor's Profit & Ov
Total

20

10.00 No.
0.11 bag
0.41 Cft

Nos.
per bag
% Cft

0.002 Cft

Cft

0.067 No.
0.11 No.
0.023 No.

per day
per day
per day

Percent

LABOUR for 125 Cft


1
2
3

Mason
Cooly unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 55

DESCRIPTION OF ITEM:
Item No. 15 (a)

Extra for dressing or chamfering of bricks (special or


architectaral shape).

Detail

Unit Rate (British System) per 100 No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

3.00 No.
0.34 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 No.

Rs.

Page 56

Say

DESCRIPTION OF ITEM:
Item No. 15 (b)

All other purposes.

Detail

Unit Rate (British System) per 100 No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.50 No.
0.17 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 No.

Rs.

Page 57

Say

DESCRIPTION OF ITEM:
Item No. 16
(i)

Peforated Pacca brick walling 114 mm (4") thick in ground


floor in
Mud mortar.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2

Pacca bricks 9" x 4" x 3"


Good earth
Total
Contractor's Profit & Ov
Total

20

338.00 No.
8.75 Cft

Nos.
% Cft

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00 No.
1.83 Nos.
0.23 No.

10

Percent

20

Percent

per day
per day
per day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 58

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1 : 2).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
2.00 bags
5.00 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 59

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
1.50 bags
5.60 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 60

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
1.20 bags
6.00 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 61

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:5).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
1.00 bags
6.25 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 62

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:6).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
0.86 bags
6.40 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 63

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:7).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
0.75 bags
6.58 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 64

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:8).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
0.67 bags
6.67 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 65

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 6).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00
14.93
0.80
6.00

No.
kg
bags
Cft

Nos.
kg
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 66

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 7).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00
13.44
0.71
6.13

No.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 67

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 8).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00
12.32
0.64
6.40

No.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 68

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 9).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00
10.82
0.58
6.50

No.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 69

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 10).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00
10.08
0.54
6.70

No.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 70

DESCRIPTION OF ITEM:
Item No. 16 (iv)

Lime cement sand mortar Ratio (1 : 2).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 Nos.
43.67 kg
5.58 Cft

Nos.
per kg
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 71

DESCRIPTION OF ITEM:
Item No. 17

Add. extra labour on item No.15 for pacca brick work.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Sft


First Floor
1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.13 No.
0.50 No.

10

Percent

20

Percent

ITEM RATES
Labour rate for 100 Sft

per day
per day

Rs.
Say

Labour rate per Sqm

Rs.
Say

LABOUR for 125 Sft


Second Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.37 No.
1.00 No.

10

Percent

20

Percent

ITEM RATES
Labour rate for 100 Sft

per day
per day

Rs.
Say

Labour rate per Sqm

Rs.
Say

LABOUR for 125 Cft


Third Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.63 No.
1.50 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate for 100 Sft
Say
Labour rate per Sqm
Say
Page 72

LABOUR for 125 Sft


4th & Subsequent Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.12 Nos.
2.12 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate for 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 73

Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (i)

Perforated pacca brick walling 9" thick in ground floor in


Mud Mortar

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MUD MORTAR
1
2

Pacca bricks 9" x 4" x 3"


Good earth
Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
17.50 Cft

Nos.
% Cft

1.25 Nos.
2.75 Nos.
0.35 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 74

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 2)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
4.00 bags
10.00 Cft

Nos.
bags
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 75

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 3)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
3.00 bags
11.25 Cft

Nos.
bags
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 76

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 4)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
2.40 bags
12.00 Cft

Nos.
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 77

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 5)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
2.00 bags
12.50 Cft

Nos.
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 78

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 6)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
1.72 bags
12.80 Cft

Nos.
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 79

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 7)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
1.50 bags
13.13 Cft

Nos.
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 80

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 8)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
1.33 bags
13.34 Cft

Nos.
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 81

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 6)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00
29.86
1.60
12.00

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 82

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 7)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00
26.50
1.42
12.39

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 83

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 8)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00
23.90
1.28
12.80

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 84

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 9)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00
21.65
1.16
13.10

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 85

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 10)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00
20.16
1.07
13.33

Nos.
kg
bags
Cft

Nos.
per kg
per kg
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 86

DESCRIPTION OF ITEM:
Item No. 18 (iv)

Lime sand mortar Ratio (1 : 2)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Slaked lime
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
86.97 kg
11.67 Cft

Nos.
per kg
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 87

DESCRIPTION OF ITEM:
Item No. 19

Extra labour in item No.18 for per perforated pacca brick


work in

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

LABOUR
First Floor

Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

Say
Say
LABOUR
Second Floor

Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

Say
Say
LABOUR
Third Floor

Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

Say
Say
LABOUR
Fourth & Subsequent Floor

Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

Say
Say

Page 88

DESCRIPTION OF ITEM:
Item No. 20

Fire brick masonary in fire clay mortar.


(i)

Upto 20 ft.

(6 metre) height including all charges.

Detail

Unit Rate (British System) per Cft


Qty

Rate Per UnitAmount (Rs.)

Per 100 Cft


MATERIAL
1
2
3

Fire clay bricks 9" x 4" x 3"


Fire resistant Cement
Brick grinded sand

Total
Contractor's Profit & Ov
Total

20

1350.00 No.
8.80 bags
22.00 Cft

Each
per bag
per Cft

3.00 Nos.
3.00 Nos.
0.25 No.

per day
per day
per day

1.00 No.
0.25 No

per day
per day

Percent

LABOUR for 125 Cft


for masonary work
1
2
3

Mason
Coolies
Bahishti

for mortar
1
2

Cooly
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 89

DESCRIPTION OF ITEM:
Item No. 20

Fire brick masonary in fire clay mortar.


(ii)

Extra for every 1.5 metre additional height.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 90

Say
Say

DESCRIPTION OF ITEM:
Item No. 21

First class brick walling laid in (1 : 3) cement sand mort


reinforced with (1") 25 mm wide 18 gauge hoop iron.
(i)

4" (114 mm) thick walling with hoop iron bouding 6"
(150 mm) apart.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

525.00
2.40
9.00
45.00
20.41

Nos.
bags
Cft
lbs
Kg.

Nos.
per bag
% Cft
Per Kg.

1.00
1.25
0.25
0.15

No.
Nos.
No.
No.

per
per
per
per

Percent

LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 91

DESCRIPTION OF ITEM:
Item No. 21

First class brick walling laid in (1 : 3) cement sand mort


reinforced with 1" (25 mm) wide 18 gauge hoop iron.
(ii)

4" (114 mm) thick walling with hoop iron bouding


12" (300 mm) apart.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

525.00
2.40
9.00
22.50
10.20

Nos.
bags
Cft
lbs
kg.

Nos.
per bag
% Cft
Per Kg.

No.
No.
No.
No.

per
per
per
per

Percent

LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00
1.00
0.25
0.10

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 92

DESCRIPTION OF ITEM:
Item No. 21

First class brick walling laid in (1 : 3) cement sand mort


reinforced with 1" (25 mm) wide 18 gauge hoop iron.
(iii)

3" (75 mm) thick walling with hoop iron bouding 6"
(150 mm) apart.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

350.00
1.80
6.50
45.00
20.41

Nos.
bags
Cft
lbs
Kg.

Nos.
per bag
% Cft
Per Kg.

No.
No.
No.
No.

per
per
per
per

Percent

LABOUR for 125 Cft


1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.75
1.00
0.20
0.15

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 93

DESCRIPTION OF ITEM:
Item No. 21

First class brick walling laid in (1 : 3) cement sand mort


reinforced with 1" (25 mm) wide 18 gauge hoop iron.
(iv)

3" (75 mm) thick walling with hoop iron bouding 12"
(300 mm) apart.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

350.00
1.80
6.50
20.00
9.070

Nos.
bags
Cft
lbs
Kg.

Nos.
per bag
% Cft
Per Kg.

No.
No.
No.
No.

per
per
per
per

Percent

LABOUR for 125 Cft


1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.75
1.00
0.20
0.15

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 94

DESCRIPTION OF ITEM:
Item No. 22

Ghilafi work (1 brick thick wall).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2

B.B in mud ( of item No.1)


Sundried bricks ( of item No.24)

x
x

Total
LABOUR for 125 Cft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

2.00 Nos.
3.67 Nos.
0.50 No.

10

Percent

20

Percent

per day
per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 95

DESCRIPTION OF ITEM:
Item No. 23

Dry brick pitching.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1

Ist class burnt brick

Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.

Nos.

1.00 No.
2.00 Nos.

per day
per day

Percent

LABOUR
1
2

Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 96

DESCRIPTION OF ITEM:
Item No. 24

Sun dried bricks in Mud mortar.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2

Sun dried bricks


Siff clay

Total
Contractor's Profit & Ov
Total

1350.00 Nos.
35.00 Cft

20

Nos.
% Cft

Percent

LABOUR for 125 Cft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.50 Nos.
3.50 Nos.
0.25 No.

10

Percent

20

Percent

per day
per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 97

DESCRIPTION OF ITEM:
Item No. 25

Pise wall (mud walling).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2
3

Coolies skilled
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00 No.
1.50 Nos.
0.50 No.

10

Percent

20

Percent

per day
per day
per day

ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum

Rs.
Rs.

Page 98

Say
Say

DESCRIPTION OF ITEM:
Item No. 26

Providing Eave brick moulded weathered and throated with b


brick or drip course cornice in (1 : 3) cement mortar.
(i)

3" (76 mm) thick drip course.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT.)


1
2
3

Moulded brick
Cement for laying and plastering
Sand
Deduct cost of ordinary bricks
Total
Contractor's Profit & Ov
Total

20

280.00
1.50
5.00
140

Nos.
bag
Cft
Nos.

Nos.
per bag
% Cft
Nos.

1.75 Nos.
1.75 Nos.
0.25 No.

per day
per day
per day

Percent

LABOUR (FOR 125 RFT.)


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 99

DESCRIPTION OF ITEM:
Item No. 26

Providing Eave brick moulded weathered and throated with b


brick or drip cornice in (1 : 3) cement mortars.
(ii)

4" (114 mm) thick drip course cornice.

Detail

Unit Rate (British System) per


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT.)


1
2
3

Brick moulded I/C wastage


Cement for laying and plastering
Sand
Deduct cost of ordinary bricks
Total
Contractor's Profit & Ov
Total

20

420.00
1.75
6.00
210.00

Nos.
bag
Cft
Nos.

Nos.
per bag
% Cft
Nos.

2.00 Nos.
2.00 Nos.
0.25 No.

per day
per day
per day

Percent

LABOUR (FOR 125 RFT)


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per 100 Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 100

Rft

DESCRIPTION OF ITEM:
Item No. 26

Providing Eave brick moulded weathered and throated with b


brick or drip cornice in (1 : 3) cement mortar.
(iii)

4" (114 mm) thick eave brick with back brick.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT)


1
2
3
4

Brick moulded (including wastage)


Back bricks ordinary
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

465.00
465.00
1.20
5.00

Nos.
Nos.
bag
Cft

Nos.
Nos.
per bag
% Cft

1.00 No.
2.00 Nos.

per day
per day

Percent

LABOUR (FOR 125 RFT.)


1
2

Mason for laying


Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 101

DESCRIPTION OF ITEM:
Item No. 27

Providing & laying dressed or moulded brick cornice in ( 1


cement mortar, plastering or pointing complete.
(i)

One brick.

Detail

Unit Rate (British System) per


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT.)


1

2
3

Pacca bricks I/C 10% wastage


As the rate is only for the projected protion
to the brick required
60.00 Nos.
Cement for laying & plastering or pointi
1.60 bag
Sand for laying & plastering or plasteri
6.00 Cft

Total
Contractor's Profit & Ov
Total

20

Nos.
per bag
% Cft

Percent

LABOUR for 125 Rft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

2.00 Nos.
2.00 Nos.
0.25 No.

10

Percent

20

Percent

per day
per day
per day

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 102

Rft

DESCRIPTION OF ITEM:
Item No. 27

Providing & laying dressed or moulded brick cornice in ( 1


cement mortar, plastering or pointing complete.
(ii)

Two brick.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT.)


1
2
3

Pacca bricks
Cement for laying & plastering
Sand for laying & plastering

Total
Contractor's Profit & Ov
Total

20

175.00 Nos.
5.00 bags
18.00 Cft

Nos.
per bag
% Cft

3.00 Nos.
3.00 Nos.
0.25 No.

per day
per day
per day

Percent

LABOUR for 125 Rft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 103

DESCRIPTION OF ITEM:
Item No. 27

Providing & laying dressed or moulded brick cornice in ( 1


cement mortar, plastering or pointing complete.
(iii)

Three bricks.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT.)


1
2
3

Pacca bricks
Cement for laying & plastering
Sand for laying & plastering

Total
Contractor's Profit & Ov
Total

20

270.00 Nos.
8.00 bags
60.00 Cft

Nos.
per bag
% Cft

4.00 Nos.
4.00 Nos.
0.34 No.

per day
per day
per day

Percent

LABOUR for 125 Rft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 104

DESCRIPTION OF ITEM:
Item No. 27

Providing & laying dressed or moulded brick cornice in ( 1


cement mortar, plastering or pointing complete.
(iv)

Four brick.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL FOR 100 RFT.)


1
2
3

Pacca bricks
Cement for laying & plastering
Sand for laying & plastering

Total
Contractor's Profit & Ov
Total

20

580.00 Nos.
10.00 bags
37.00 Cft

Nos.
per bag
% Cft

5.00 Nos.
5.00 Nos.
0.50 No.

per day
per day
per day

Percent

LABOUR for 125 Rft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 105

DESCRIPTION OF ITEM:
Item No. 28

Cleaning brick dismentled from kacha pacca masonry.

Detail

Unit Rate (British System) per 1000 No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 1250 Nos.


1

Cooly unskilled

1.75 Nos.

Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

per day

ITEM RATES
Labour rat per 1000 No.

Rs.

Say

DESCRIPTION OF ITEM:
Item No. 29

Scraping bricks dismantled from pacca masonary.

Detail

Unit Rate (British System) per 1000 No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 1250 Nos.


1

Cooly unskilled

Total
Sundries
Total
Contractor's Profit & Ov
Total

3.30 Nos.

10

Percent

20

Percent

per day

ITEM RATES
Labour rat per 1000 No.

Rs.

Page 106

Say

DESCRIPTION OF ITEM:
Item No. 30

Supplying and filling sand under floors or plugging in wel

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1

Sand

Total
Contractor's Profit & Ov
Total

20

100.00 Nos.

% Nos.

0.50 Nos.

per day

Percent

LABOUR for 150 Cft


1

Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft.
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft.


Composite rate per Cum.

Rs.
Rs.

Say
Say

Page 107

DESCRIPTION OF ITEM:
Item No. 31

Providing and laying 2" (50 mm) thick projected tile bank
(1: 2) cement sand mortar with hoop iron 1" (25 mm) wide 1
SWG flat iron sheet 9" (225 mm) apart.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

Rate Analysis for 8 Rft


MATERIAL
1
2
3
4

Title 225 x 114 x 40 mm title


Cement
Sand
Cost of hoop iron

Total
Contractor's Profit & Ov
Total

20

43.00
0.09
0.20
3.00

Nos.
bag
Cft
Kg.

Nos.
per bag
% Cft
Per Kg.

Percent

LABOUR
1
2

Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.50 No.
0.50 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 108

DESCRIPTION OF ITEM:
Item No. 32

Ist class brick tiles (9" 4" x 1") 225 x 114 x 40 mm cla
76 mm thick laid in cement sand mortar recifered with hoop
strips placed at 2 ft. (600 mm) apart vertically.
(i)

Ratio (1 : 3).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Brick tiles 9" x 4" x 1"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

810.00
2.40
9.00
4.54

No.
bags
Cft
Kg.

Nos.
per bag
% Cft
per Kg.

No.
No.
No.
No.

per
per
per
per

Percent

LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00
1.00
0.25
0.10

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft.


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 109

DESCRIPTION OF ITEM:
Item No. 32

Ist class brick tiles (9" 4" x 1") 225 x 114 x 40 mm cla
76 mm thick laid in cement sand mortar recifered with hoop
strips placed at 2 ft. (600 mm) apart vertically.
(ii)

Ratio (1 : 4).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Brick tiles 9" x 4" x 1"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

810.00
1.92
9.60
4.54

No.
bags
Cft
Kg.

Nos.
per bag
% Cft
per Kg.

No.
No.
No.
No.

per
per
per
per

Percent

LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00
1.00
0.25
0.10

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft.
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft.


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 110

DESCRIPTION OF ITEM:
Item No. 33

Chamfering sides of head regulators and masonry wall to


increase width.

Detail

Unit Rate (British System) per Sft


Qty

Rate Per UnitAmount (Rs.)

LABOUR (FOR 30 SFT)


1
2

Mason
Cooly unskilled

Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00 No.
1.00 No.

10

Percent

20

Percent

Labour rate per Sft


Labour rate per Sqm

Rs.
Rs.

Page 111

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 34

Replacing kallar eaten bricks.

Detail

Unit Rate (British System) per Bricks


Qty

Rate Per UnitAmount (Rs.)

Assume 60 Bricks
MATERIAL
1
2
3

Bricks
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

50.00 Nos.
0.005 Bag
0.026 Cft

Nos.
Bag
% Cft.

2.00 No.
1.00 No.

per day
per day

Percent

LABOUR
1
2

Mason
Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Brick
Composit rate per Brick

Rs.
Rs.

Page 112

Say
Say

DESCRIPTION OF ITEM:
Item No. 35

Repairing corner's of bridges and other hydraulic


masoney works.

Detail

Unit Rate (British System) per No. / Assumed for 1


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Brick tiles 9" x 4" x 1"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

10.00 No.
0.08 bags
0.25 Cft

Nos.
per bag
% Cft

0.25 No.
0.25 No.

per day
per day

Percent

LABOUR for 1.5 No.


1
2

Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Each No.
Composite rate per Each No.

Rs.
Rs.

Page 113

Say
Say

DESCRIPTION OF ITEM:
Item No. 36

Extra labour for drains of bath roons etc.

Detail

Unit Rate (British System) per Lft


Qty

Rate Per UnitAmount (Rs.)

Assumed for 40 Lft


LABOUR
1

Mason

1.00 No.

Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

Labour rate per Lft


Labour rate per Meter

Rs.
Rs.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 37

Maroo corners.

Detail

Unit Rate (British System) per No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 1.25 No.


1

Mason

Total
Sundries
Total
Contractor's Profit & Ov
Total

0.20 No.

10

Percent

20

Percent

Labour rate per Each No.

Rs.

Page 114

per day

Say

CHAPTER NO. 11

SURFACE RENDERING
DESCRIPTION OF ITEM:
Item No. 1

Mud plaster on walls (excluding Gobri leeping) upto 20' (6.10 metre) height.
(a)

" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Clay
Bhoosa

6.00 Cft
7.50 kg

0.00per 100 Cft


0.00
kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahisthi

0.17 No.
0.50 No.
0.05 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 1

DESCRIPTION OF ITEM:
Item No. 1

Mud plaster on walls (excluding Gobiry leaping) upto 20' height


(6.10 metre).
(b)

1" (25 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Clay
Bhoosa

12.00 Cft
15.00 kg

0.00per 100 Cft


0.00
kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.20 No.
0.75 No.
0.07 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 2

DESCRIPTION OF ITEM:
Item No. 2

Mud plaster on floor or roof (excluding Gobri Leaping).


(a)

" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Clay
Bhoosa

6.00 Cft
7.50 kg

0.00per 100 Cft


0.00
kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.15 No.
0.45 No.
0.05 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 3

DESCRIPTION OF ITEM:
Item No. 2

Mud plaster on floor or roof (excluding Gobri Leaping).


(b)

1" (25 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Clay
Bhoosa

12.00 Cft
15.00 kg

0.00per 100 Cft


0.00
kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft) (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.15 No.
0.45 No.
0.05 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 4

DESCRIPTION OF ITEM:
Item No. 3

Cement lime plaster 1 : 7 : 12 (cemnt


(6.10 metre) height.
(a)

lime and sand) up to 20 ft.

" thick (6 mm).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Cement
Lime Slaked (ground)
Sand

0.10 bag
12.70 kg
1.40 Cft

0.00
0.00
0.00

bags
kg
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 No.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

-0.01
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

-0.01
0.00

Say
Say

Page 5

DESCRIPTION OF ITEM:
Item No. 3

Cement lime plaster 1 : 7 : 12 (cemnt


(6.10 metre) height.
(b)

lime and sand) up to 20 ft.

" thick (12 mm).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Cement
Lime Slaked (ground)
Sand

0.20 bag
25.38 kg
2.80 Cft

0.00
0.00
0.00

bags
kg
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 No.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.01
0.00

Say
Say

Page 6

DESCRIPTION OF ITEM:
Item No. 4

Cement neru plaster 1 : 2 (cement and sand) upto 20 ft. (6.10 metre).
(a)

" thick (6 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Cement
Sand
Chopped jute

0.60 bag
1.54 Cft
1.41 kg

0.00
0.00
0.00

bags
Cft
kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 No.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 7

DESCRIPTION OF ITEM:
Item No. 4

Cement neru plaster 1 : 2 (cement and sand) upto 20 ft. (6.10 metre).
(b)

" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Cement
Sand
Chopped jute

0.92 bag
3.08 Cft
2.72 kg

0.00
0.00
0.00

bags
Cft
kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 No.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 8

DESCRIPTION OF ITEM:
Item No. 5

Stucco cement plaster 2" (50 mm) thick 1 : 2 : 4 (cement sand and shingle,
upto 20 ft (6.0 m) height.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Shingle
Sand
Cement

15.00 Cft
7.40 Cft
3.70 bags

-200.00
0.00
0.00

% Cft
Cft
bags

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
4.00 Nos.
0.30 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 9

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying machine sprayed plaster " (12 mm) thick, using
cement and chips zero gauge over the existing plastered and roughened
surface, upto 20 ft height (6 metre).
(i)

Ratio 1 : 1.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Chips

1.80 bag
2.30 Cft
157.00 kg

0.00
0.00

bags
kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3
4

Mason
Cooly un-skilled
Bahishti
Spray machine

1.00 No.
0.50 Nos.
0.13 No.
L.S

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 10

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying machine sprayed plaster "12 mm thick, using cement
and chips zero gauge over the existing plastered and roughened surface,
upto 20 ft height.
(ii)

Ratio 1 : 1.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Chips

1.45 bag
2.75 Cft
187.00 kg

0.00
0.00

bags
kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3
4

Mason
Cooly un-skilled
Bahishti
Spray machine

1.00 No.
0.50 Nos.
0.13 No.
L.S

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 11

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying machine sprayed plaster "12 mm thick, using cement
and chips zero gauge over the existing plastered and roughened surface,
upto 20 ft height.
(iii)

Ratio 1 : 2.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Chips

1.25 bag
3.00 Cft
204.00 kg

0.00
0.00

bags
kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3
4

Mason
Cooly un-skilled
Bahishti
Spray machine

1.00 No.
0.50 Nos.
0.13 No.
L.S

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 12

DESCRIPTION OF ITEM:
Item No. 7

Cement plaster (1 : 2) upto 20 ft height (6.10) metre.


(i)

3/8" (10 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.96 bag
2.50 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.01
0.00

Say
Say

Page 13

DESCRIPTION OF ITEM:
Item No. 7

Cement plaster (1 : 2) upto 20 ft height (6.10) metre.


(ii)

" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

1.25 bag
3.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 14

DESCRIPTION OF ITEM:
Item No. 7

Cement plaster (1 : 2) upto 20 ft height (6.10) metre.


(iii)

" (19 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

1.92 bag
5.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.25 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 15

DESCRIPTION OF ITEM:
Item No. 8

Cement plaster (1 : 3) cement and sand upto 20 ft height (6.10 metre).


(a)

3/8" (10 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.66 bag
2.55 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 16

DESCRIPTION OF ITEM:
Item No. 8

Cement plaster (1 : 3) cement and sand upto 20 ft height (6.10 metre).


(b)

" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.88 bag
3.40 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

-0.01
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

-0.01
0.00

Say
Say

Page 17

DESCRIPTION OF ITEM:
Item No. 8

Cement plaster (1 : 3) cement and sand upto 20 ft height (6.10 metre).


(c)

" (19 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

1.32 bag
5.10 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.25 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 18

DESCRIPTION OF ITEM:
Item No. 9

Cement plaster (1 : 4) upto 20 ft. (6.10 metre) height.


(a)

3/8" (10 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.57 bag
3.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 19

DESCRIPTION OF ITEM:
Item No. 9

Cement plaster (1 : 4) upto 20 ft. (6.10 metre) height.


(b)

" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.73 bag
3.60 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 20

DESCRIPTION OF ITEM:
Item No. 9

Cement plaster (1 : 4) upto 20 ft. (6.10 metre) height.


(c)

" (19 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

1.14 bag
5.50 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.25 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 21

DESCRIPTION OF ITEM:
Item No. 10

Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slab only, upto
20 ft. (6.10 meter) height.
(a)

Ratio ( 1 : 2 ).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement for floating coat (0.20 bag)


Cemtnt (0.96 bag)
Sand

1.16 bag
2.55 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 22

DESCRIPTION OF ITEM:
Item No. 10

Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slab only, upto
20 ft. (6.10 meter) height.
(b)

Ratio ( 1 : 3 ).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement for floating coat (0.20 bag)


Cement (0.66 bag)
Sand

0.86 bag
2.55 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 23

DESCRIPTION OF ITEM:
Item No. 10

Cement plaster 3/8" (10 mm) thick under soffit of R.C.C. roof slab only, upto
20 ft. (6.10 meter) height.
(c)

Ratio ( 1 : 4 ).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement for floating coat (0.20 bag)


Cement (0.57 bag)
Sand

0.77 bag
3.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 24

DESCRIPTION OF ITEM:
Item No. 11

Cement plaster (1 : 5) upto 20 ft. (6.10 metre) height.


(a)

3/8" (10 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.50 bag
3.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 25

DESCRIPTION OF ITEM:
Item No. 11

Cement plaster (1 : 5) upto 20 ft. (6.10 metre) height.


(b)

" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.60 bag
4.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 26

DESCRIPTION OF ITEM:
Item No. 11

Cement plaster (1 : 5) upto 20 ft. (6.10 metre) height.


(c)

" (19 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

1.00 bag
6.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.25 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 27

DESCRIPTION OF ITEM:
Item No. 12

Cement plaster (1 : 6) upto 20 ft. (6.10 metre) height.


(a)

3/8" (10 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.40 bag
3.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 28

DESCRIPTION OF ITEM:
Item No. 12

Cement plaster (1 : 6) upto 20 ft. (6.10 metre) height.


(b)

" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.53 bag
4.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 29

DESCRIPTION OF ITEM:
Item No. 12

Cement plaster (1 : 6) upto 20 ft. (6.10 metre) height.


(c)

" (19 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.80 bag
6.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.25 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 30

DESCRIPTION OF ITEM:
Item No. 13

Applying floating coat of cement 1/32" (0.75 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Cement

0.40 bag

0.00

bags

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
0.25 Nos.
0.10 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 31

DESCRIPTION OF ITEM:
Item No. 14

Lime pointing flush upto 20 ft (6.10 mm) height including raking joints.
Ratio (1 : 2) lime sand mortar.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Lime slaked (ground)


Sand

13.44 kg
1.80 Cft

0.00
0.00

kg
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.50 No.
0.75 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 32

DESCRIPTION OF ITEM:
Item No. 15

Lime pointing struck joints on walls, upto 20 ft. (6.10 metre) height
including raking joints Ratio (1 : 2) lime sand mortar.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Lime slaked (ground)


Sand

13.44 kg
1.80 Cft

0.00
0.00

kg
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 33

DESCRIPTION OF ITEM:
Item No. 16

Cement pointing Flush upto 20 ft. (6.10 metre) height.


(a)

1 : 2 (cement and sand)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.72 bag
1.80 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 34

DESCRIPTION OF ITEM:
Item No. 16

Cement pointing Flush upto 20 ft. (6.10 metre) height.


(b)

1 : 3 (cement and sand)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.54 bag
2.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.75 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 35

DESCRIPTION OF ITEM:
Item No. 17

Cement pointing (1 : 2) flush on floor.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.72 bag
1.80 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

0.50 No.
0.75 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 36

DESCRIPTION OF ITEM:
Item No. 18

Cement pointing struck joints on walls upto 20 ft. (6.10 metre) height.
(a)

Ratio 1 : 2 (cement & sand).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.72 bag
1.80 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 37

DESCRIPTION OF ITEM:
Item No. 18

Cement pointing struck joints on walls.


(b)

Ratio 1 : 3 (cement & sand).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.54 bag
2.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 38

DESCRIPTION OF ITEM:
Item No. 19

Pointing flush on stone work raised.


(a)

In Lime Mortar Ratio 1 : 2 (Limet & Sand).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Lime slaked (ground)


Sand

18.66 kg
2.00 Cft

0.00
0.00

kg
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
0.50 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 39

DESCRIPTION OF ITEM:
Item No. 19

Pointing flush on stone work raised.


(b)

In Cement Mortar Ratio 1 : 3 (Cement & Sand).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.54 bag
2.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
0.50 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 40

DESCRIPTION OF ITEM:
Item No. 19

Pointing flush on stone work raised.


(c)

(i)

In Lime Mortar Ratio 1 : 2 (Lime & Sand).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Slaked lime
Sand

0.54 bag
18.66 kg
2.00 Cft

0.00
0.00

kg
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

2.00 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 41

DESCRIPTION OF ITEM:
Item No. 19

Pointing flush on stone work raised.


(c)

(ii)

In Cement Mortar Ratio 1 : 3 (Cement & Sand).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.54 bag
2.00 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

2.00 No.
1.00 Nos.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 42

DESCRIPTION OF ITEM:
Item No. 20

Raking and washing joints of stone masonry (old work).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

LABOUR (For 125 Sft)


1

Cooly (Skilled)

1.00 No.

0.00

per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

DESCRIPTION OF ITEM:
Item No. 21

Raking and washing joints of brick masonary (old work).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

LABOUR (For 125 Sft)


1

Cooly (Skilled)

0.50 No.

0.00

per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 43

0.00
0.00

Say
Say

DESCRIPTION OF ITEM:
Item No. 22

Priming coat of chalk under distemper.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Chalk

0.91 kg

0.00

kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Mason
Cooly un-skilled

0.10 No.
0.10 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.01
0.00

Say
Say

Page 44

DESCRIPTION OF ITEM:
Item No. 23

Distempering.
(a)

New surface.

(i)

One coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Distemper
Burshes (Large)
Sand Paper

0.15
1.50
0.04
0.014

gln
lbs
No.
No.

0.00
0.00
0.00

per gln
Each
Doz

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 150 Sft)


1
2

Painter
Cooly un-skilled

0.17 No.
0.08 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 45

DESCRIPTION OF ITEM:
Item No. 23

Distempering.
(a)

New surface.

(ii)

Two coats.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Distemper
Burshes (Large)
Sand Paper

0.20
2.00
0.04
0.014

gln
lbs
No.
No.

0.00
0.00
0.00

per gln
Each
Doz

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 150 Sft)


1
2

Painter
Cooly un-skilled

0.25 No.
0.12 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 46

DESCRIPTION OF ITEM:
Item No. 23

Distempering.
(a)

New surface.

(iii)

Three coats.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Distemper
Burshes (Large)
Sand Paper

0.25
2.50
0.04
0.014

gln
lbs
No.
No.

0.00
0.00
0.00

per gln
Each
Doz

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 150 Sft)


1
2

Painter
Cooly un-skilled

0.33 No.
0.16 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 47

DESCRIPTION OF ITEM:
Item No. 23

Distempering.
(b)

Old surface.

(i)

One coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Distemper
Burshes (Large)
Sand Paper

0.10
1.00
0.04
0.014

gln
lbs
No.
No.

0.00
0.00
0.00

per gln
Each
Doz

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 150 Sft)


1
2

Painter
Cooly un-skilled

0.15 No.
0.08 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 48

DESCRIPTION OF ITEM:
Item No. 23

Distempering.
(b)

Old surface.

(ii)

Two coats.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Distemper
Burshes (Large)
Sand Paper

0.10
1.00
0.04
0.014

gln
lbs
No.
No.

0.00
0.00
0.00

per gln
Each
Doz

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 150 Sft)


1
2

Painter
Cooly un-skilled

0.25 No.
0.12 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 49

DESCRIPTION OF ITEM:
Item No. 24

Colour washing.
(a)

New surface.

(i)

One coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

White lime
Rice
Colouring material

1.87
0.117
0.17
0.077

kg
kg
lbs
kg

0.00
0.00
0.00

per kg
per kg
per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Colly skilled
Cooly un-skilled

0.12 No.
0.06 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 50

DESCRIPTION OF ITEM:
Item No. 24

Colour washing.
(a)

New surface.

(ii)

Two coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

White lime
Rice
Colouring material

2.80
0.175
0.22
0.10

kg
kg
lbs
kg

0.00
0.00
0.00

per kg
per kg
per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Colly skilled
Cooly un-skilled

0.18 No.
0.09 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 51

DESCRIPTION OF ITEM:
Item No. 24

Colour washing.
(b)

Old surface.

(i)

One coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

White lime
Rice
Colouring material

1.40
0.044
0.10
0.045

kg
kg
lbs
kg

0.00
0.00
0.00

per kg
per kg
per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Colly skilled
Cooly un-skilled

0.12 No.
0.06 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 52

DESCRIPTION OF ITEM:
Item No. 24

Colour washing.
(b)

Old surface.

(ii)

Two coats.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

White lime
Rice
Colouring material

2.33
0.073
0.15
0.068

kg
kg
lbs
kg

0.00
0.00
0.00

per kg
per kg
per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

6.99
6.99
1.40
8.39

LABOUR (For 125 Sft)


1
2

Colly skilled
Cooly un-skilled

0.18 No.
0.09 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

8.39
0.90

Say
Say

Page 53

8.40
0.90

DESCRIPTION OF ITEM:
Item No. 25

White washing.
(a)

New surface.

(i)

One coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

White lime
Rice

1.87 kg
0.117 kg

0.00
0.00

per kg
per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Colly skilled
Cooly un-skilled

0.12 No.
0.06 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 54

DESCRIPTION OF ITEM:
Item No. 25

White washing.
(a)

New surface.

(ii)

Two coats.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

White lime
Rice

2.80 kg
0.175 kg

0.00
0.00

per kg
per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Colly skilled
Cooly un-skilled

0.18 No.
0.09 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 55

DESCRIPTION OF ITEM:
Item No. 25

White washing.
(a)

New surface.

(iii)

Three coats.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

White lime
Rice

3.73 kg
0.233 kg

0.00
0.00

per kg
per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Colly skilled
Cooly un-skilled

0.23 No.
0.12 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 56

DESCRIPTION OF ITEM:
Item No. 25

White washing.
(b)

Old surface.

(i)

One coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

White lime
Rice

1.40 kg
0.088 kg

0.00
0.00

per kg
per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Colly skilled
Cooly un-skilled

0.12 No.
0.06 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 57

DESCRIPTION OF ITEM:
Item No. 25

White washing.
(b)

Old surface.

(ii)

Two coats.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

White lime
Rice

2.33 kg
0.146 kg

0.00
0.00

per kg
per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Colly skilled
Cooly un-skilled

0.18 No.
0.09 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 58

DESCRIPTION OF ITEM:
Item No. 26 (a)

Gobri leeping on wall.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Mud (good earth)


Cowdung

0.25 Cft
4.00 kg

0.00
0.00

per kg
per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Mason
Bahishti

0.15 No.
0.06 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 59

DESCRIPTION OF ITEM:
Item No. 26 (b)

Gobri leeping over roofs.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Mud (good earth)


Cowdung

0.25 Cft
4.00 kg

0.00
0.00

per kg
per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Mason
Bahishti

0.12 No.
0.06 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 60

DESCRIPTION OF ITEM:
Item No. 27

Striking joints of burnt bricks in lime or cement mortar.

Detail

Unit Rate (British System) per 100 Sft


Rate
Qty
Per Unit
Amount (Rs.)

LABOUR (For 125 Sft)


1

Mason

0.25 No.

0.00

per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

DESCRIPTION OF ITEM:
Item No. 28

Extra for lime Mud or cement plaster and pointing from 20' and above (for
each Addl: 10' height).

Detail

Unit Rate (British System) per 100 Sft


Rate
Qty
Per Unit
Amount (Rs.)

LABOUR (For 125 Sft)


1
2

Mason
Cooly un-skilled

0.12 No.
0.25 No.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 61

0.00
0.00

Say
Say

DESCRIPTION OF ITEM:
Item No. 29

Caulking joint of sleeper wall with sand and coaltar.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Coaltar (Bitumen)
Sand
Fuel

4.00 kg
4.00 Cft
2.18 Kg.

0.00
0.00
0.00

per kg
per Cft
per kg.

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Cooly skilled
Cooly un-skilled

0.50 No.
0.50 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 62

DESCRIPTION OF ITEM:
Item No. 30

Caulking joint of sleepers with mud and chopped straw.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Mud
Chopped Straw

4.00 Cft
1.50 kg

0.00per 100 Cft


0.00 per kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2

Cooly skilled
Cooly un-skilled

0.50 No.
0.50 Nos.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 63

DESCRIPTION OF ITEM:
Item No. 31

Extra cost of labour and material for red oxide pigment in cement pointing
to match with the colour of bricks.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Red oxide pigment

2.50 lbs
0.25 gln

0.00 per gln.

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR

for mixing red oxide in mortar


Cooly skilled

0.25 Nos.

0.00

per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 64

DESCRIPTION OF ITEM:
Item No. 32 (i)

Providing grooved cement plaster 3/8" (10 mm) thick ratio (1 : 3) over
existing plastered and rough surface upto 20' height.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.66 bag
2.55 Cft

0.00
0.00

bags
Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.00 No.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.01
0.00

Say
Say

Page 65

DESCRIPTION OF ITEM:
Item No. 32 (ii)

" (12 mm) thick

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.88 bag
3.40 Cft

0.00
0.00

per bag
per Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 125 Sft)


1
2
3

Mason
Cooly un-skilled
Bahishti

1.00 No.
1.00 No.
0.25 No.

0.00
0.00
0.00

per day
per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Page 66

DESCRIPTION OF ITEM:
Item No. 33

Providing & fitting expanded metal edge bead for corner's with nail on
both sides of edges.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Edge bead (5" wide mesh 3/8" x "


2" wide on each side of siled
strip 1" wide T 1 No.11)

Nails

1.00 Rft.

0.012 Kg.

0.00 Per Rft.

0.00

Per Kg.

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR (For 84 Rft)


1

Skilled Cooly

1.00 No.

0.00

per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total rate for 84 Rft

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

0.00
0.00

Say
Say

Composit rate per Rft


Composite rate per R.M

Rs.
Rs.

0.00
0.00

Say
Say

Page 67

DESCRIPTION OF ITEM:
Item No. 34

Petty repair's to fire place.


(i)

Single

Detail

Unit Rate (British System) per each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Cement
Sand

0.076 Bag
0.38 Cft.

0.00
0.00

Bag
% Cft.

Total
Contractor's Profit & Ove 20.00 Percent
Total

(0.01)

LABOUR
1
2

Mason
Cooly un-skilled

0.14 No.
0.14 No.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate for each
Composit rate for each

Rs.
Rs.

Page 68

0.00

Say
Say

DESCRIPTION OF ITEM:
Item No. 34

Petty repairs to fire place.


(ii)

Double

Detail

Unit Rate (British System) per each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
Cost of cement and sand

As per item 34 (i)= Rs.

As per item 34 (

LABOUR
-

ITEM RATES
Labour rate for each
Composit rate for each

Rs.
Rs.

Page 69

0.00
0.00

Say
Say

DESCRIPTION OF ITEM:
Item No. 35

Petty repair's to main room

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.200 Bag
1.15 Cft.

0.00
0.00

Bag
% Cft.

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR
1
2

Mason
Cooly un-skilled

0.25 No.
0.34 No.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate for Each
Composit rate for Each

Rs.
Rs.

Page 70

0.00
0.00

Say
Say

DESCRIPTION OF ITEM:
Item No. 36

Petty repair's to small rooms.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.100 Bag
0.57 Cft.

0.00
0.00

Bag
% Cft.

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR
1
2

Mason
Cooly un-skilled

0.125 No.
0.17 No.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate for Each
Composit rate for Each

Rs.
Rs.

Page 71

0.00
0.00

Say
Say

DESCRIPTION OF ITEM:
Item No. 37

Petty repair's to verandah.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Cement
Sand

0.16 Bag
0.91 Cft.

0.00
0.00

Bag
% Cft.

Total
Contractor's Profit & Ove 20.00 Percent
Total

LABOUR
1
2

Mason
Cooly un-skilled

0.25 No.
0.34 No.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate for Each
Composit rate for Each

Rs.
Rs.

Page 72

0.00
0.00

Say
Say

DESCRIPTION OF ITEM:
Item No. 38

Extra labour for white washing colour washing, priming coat and
distempering etc from 20 ft. (6 metre) height and above, requiring
scaffolding for every additional 10 ft. (3 metre) height, or part thereof.

Detail

Unit Rate (British System) per 100 Sft (per coat)


Qty

Rate Per Unit

Amount (Rs.)

LABOUR (For 125 Sft)


1
2

Cooly skilled
Cooly un-skilled

0.02 No.
0.01 No.

0.00
0.00

per day
per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 73

0.00
0.00

Say
Say

CHAPTER NO. 7

BRICK WORK
DESCRIPTION OF ITEM:
Item No. 1

Pucca brick work in mud mortar in building.


(i)

In foundation and plinth.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1 Bricks 9" x 4" x 3"
1350.00 Nos.
2 Good earth or stiff clay for mud master
35.00 Cft
Total
Contractor's Profit & Ov
Total

20

Nos.
% Cft

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

1.50 Nos.
2.00 Nos.
0.13 No

per day
per day
per day

0.67 No.
0.33 No

per day
per day

For Mud Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Page 1

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 1

Pucca brick work in mud mortar in building.


(ii)

In ground floor.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1 Bricks 9" x 4" x 3"
1350.00 Nos.
2 Good earth or stiff clay for mud master
35.00 Cft
Total
Contractor's Profit & Ov
Total

20

Nos.
% Cft

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

2.00 Nos.
3.00 Nos.
0.13 No.

per day
per day
per day

0.67 No.
0.33 No

per day
per day

For Mud Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 2

DESCRIPTION OF ITEM:
Item No. 2

Add extra labour in item No.1 for brick work in

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


First Floor
1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
Second Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.75 No.
2.00 Nos.
10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say

Page 3

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


Third Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.25 Nos.
3.00 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
4th & Subsequent Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

2.25 Nos.
4.50 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per cum

Rs.
Rs.

Page 4

Say
Say

DESCRIPTION OF ITEM:
Item No. 3

Pucca brick work in mud mortar other than building.


(i)

Upto 20 ft. (6 metre) high.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1 Bricks 9" x 4" x 3"
2 Good earth or stiff clay
Total
Contractor's Profit & Ov
Total

1350.00 Nos.
35.00 Cft

20

Nos.
% Cft

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

2.00 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.33 No

per day
per day

For Mud Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 5

DESCRIPTION OF ITEM:
Item No. 3

Pucca brick work in mud morter other than building:


(ii)

Extra labour for every 5.0' (1.5 metre) additional height


thereof.

Detail

Unit Rate (British System) per 100 Cft


Rate
Qty
Per Unit
Amount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 6

Say
Say

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:2).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
8.00 bags
20.00 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

LABOUR for 125 Cft


For Cement Mortar
1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 7

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
6.00 bags
22.50 Cft

Nos.
per bags
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

LABOUR for 125 Cft


For Cement Mortar
1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 8

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.80 bags
24.00 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 9

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in:


Cement sand mortar Ratio (1:5).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.00 bags
25.00 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 10

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.40 bags
25.70 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

LABOUR for 125 Cft


For Cement Mortar
1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 11

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.00 bags
26.50 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

LABOUR for 125 Cft


For Cement Mortar
1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 12

DESCRIPTION OF ITEM:
Item No. 4 (i)

Pucca brick work in foundation & plinth in


Cement sand mortar Ratio (1:8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
2.66 bags
26.67 Cft

Nos.
per bag
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 13

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Cement
Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

1350.00
3.20
59.72
24.00

20

Nos.
bags
kg
Cft

Nos.
per bag
per kg
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 14

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in:


Lime cement sand mortar Ratio (1:1:7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Cement
Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

1350.00
2.85
53.00
24.78

20

Nos.
bags
kg
Cft

Nos.
per bag
per kg
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 15

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Cement
Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

1350.00
2.56
47.78
25.60

20

Nos.
bags
kg
Cft

Nos.
per bag
per kg
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 16

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:9).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Cement
Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

1350.00
2.32
43.30
26.20

20

Nos.
bags
kg
Cft

Nos.
per bag
per kg
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 17

DESCRIPTION OF ITEM:
Item No. 4 (ii)

Pucca brick work in foundation & plinth in


Lime cement sand mortar Ratio (1:1:10).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Cement
Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

1350.00
2.14
39.94
26.66

20

Nos.
bags
kg
Cft

Nos.
per bag
per kg
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 18

DESCRIPTION OF ITEM:
Item No. 4 (iii)

Lime, sand mortar Ratio (1:2).

Detail

Unit Rate (British System) per 100 Cft


Qty

MATERIAL
1
Pacca brick 9" x 4" x 3"
2
Lime Slaked
3
Sand
Total
Contractor's Profit & Ov
Total

20

Rate Per UnitAmount (Rs.)

1350.00 Nos.
174.30 Kg.
23.33 Cft

Nos.
Per Kg.
% Cft

2.00 Nos.
2.50 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum
Composite rate per 100 Cft
Composite rate per Cum

Page 19

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:2).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
8.00 bags
20.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 20

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
6.00 bags
22.50 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 21

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.80 bags
24.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 22

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:5).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.00 bags
25.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 23

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.40 bags
25.70 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 24

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1:7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.00 bags
26.50 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 25

DESCRIPTION OF ITEM:
Item No. 5 (i)

Pacca brick work in ground floor (including striking of jo


Cement sand mortar Ratio (1 : 8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
2.66 bags
26.57 Cft

Nos.
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 26

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1:1:6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
59.72
3.20
24.00

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 27

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1 : 1 : 7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
53.37
2.85
24.78

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 28

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio (1:1:8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
47.78
2.56
25.60

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 29

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio ( 1 : 1 : 9 ).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
43.30
2.32
26.20

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 30

DESCRIPTION OF ITEM:
Item No. 5 (ii)

Lime cement sand mortar Ratio ( 1 : 1 : 10 ).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
40.00
2.14
26.66

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 31

DESCRIPTION OF ITEM:
Item No. 5 (iii)

Lime sand mortar Ratio (1:2).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Lime
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
174.30 kg
23.33 Cft

Nos.
per kg
% Cft

2.50 Nos.
4.00 Nos.
0.25 No.

per day
per day
per day

0.83 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2
3

Mason
Coolies unskilled
Bahishti

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 32

DESCRIPTION OF ITEM:
Item No. 6

Add extra labour in item No.5 for brick work in:-

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


First Floor
1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft

per day
per day

Rs.
Say

Labour rate per Cum

Rs.
Say

LABOUR for 125 Cft


Second Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.75 No.
2.00 Nos.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft

per day
per day

Rs.
Say

Labour rate per Cum

Rs.
Say

Page 33

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


Third Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.25 Nos.
3.00 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Say
Labour rate per Cum
Say
LABOUR for 125 Cft
4th & Subsequent Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

2.25 Nos.
4.50 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per cum

Rs.
Rs.

Page 34

Say
Say

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1:2).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
8.00 bags
20.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 35

Item No. 7

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
6.00 bags
22.50 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 36

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 4).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.80 bags
24.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 37

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 5).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
4.00 bags
25.00 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 38

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.40 bags
25.70 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 39

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
3.00 bags
26.50 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 40

DESCRIPTION OF ITEM:
Item No. 7 (i)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Cement sand mortar Ratio (1 : 8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
2.66 bags
26.67 Cft

Nos.
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 41

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 6).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
59.72
3.20
24.00

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 42

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 7).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
53.00
2.85
24.78

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 43

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 8).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
47.78
2.56
25.60

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 44

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 9).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
43.29
2.32
26.20

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 45

DESCRIPTION OF ITEM:
Item No. 7 (ii)

Pacca brick work other than building including striking of


upto 10 ft. (3 metre) height.
Lime, cement, sand mortar Ratio (1 : 1 : 10).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca brick 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

1350.00
39.94
2.14
26.66

20

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 46

DESCRIPTION OF ITEM:
Item No. 7 (iii)

Lime, sand, mortar ratio (1 : 2)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca brick 9" x 4" x 3"


Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.
174.30 kg
23.33 Cft

Nos.
per kg
% Cft

2.50 Nos.
3.00 Nos.

per day
per day

1.00 No.
0.50 No

per day
per day

Percent

LABOUR for 125 Cft


For Masonry Work
1
2

Mason
Coolies unskilled

For Cement Mortar


1
2

Cooly unskilled
Bahishty
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 47

DESCRIPTION OF ITEM:
Item No. 8

Additional extra labour in item No.7 for every 10 ft. (3 m


additional height.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Masons
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Page 48

Say
Say

DESCRIPTION OF ITEM:
Item No. 9

Extra labour for arch work in brick masonry including labo


centering and de-centering.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Masons
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.50 No.
0.50 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Page 49

Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Extra for Pacca brick work in steining of wells or any oth


circular masonry.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1

Pacca bricks
Total
Contractor's Profit & Ov
Total

82.00 No.

20

% Cft

Percent

LABOUR for 125 Cft


1

Mason
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.25 No.

10

Percent

20

Percent

per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 50

DESCRIPTION OF ITEM:
Item No. 11

Extra labour for profile and flared walls.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1

Mason
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.43 No.

10

Percent

20

Percent

per day

ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum

Rs.
Rs.

Page 51

Say
Say

DESCRIPTION OF ITEM:
Item No. 12

Extra labour for Pacca brick work in piers and abutment.


(i)

From 10 ft. (3 metre) to 20 ft. (6 metre) height.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.12 No.
0.50 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum

Rs.
Rs.

Page 52

Say
Say

DESCRIPTION OF ITEM:
Item No. 12

Extra labour for Pacca brick work in piers and abutment.


(ii)

Above 20 ft. (6 metre) height.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Composit rate per Cum

Rs.
Rs.

Page 53

Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Extra for face work (half brick thick) using special brick
of Ist class bricks.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2

Special moulded Stretcher


courses bricks
Header courses

270.00
513.00

Total
Add 5% wastage
Total

783.00
39.15
822.15

Difference in cost of special


moulded and ordinary Ist class
bricks
2

Extra cost

= 0

Contractor's Profit & Ov


Total

20

%0 Nos.

Percent

Labour rate for 100 Cft


Composit rate per Cum

Rs.
Rs.

Page 54

Say
Say

DESCRIPTION OF ITEM:
Item No. 14

Reinforced brick work in lintels of opening, laid in (1:3)


sand mortar including, all labour material forms, moulds,
and shuttering etc., but excluding cost and labour of stee
reinforcement which shall be paid for separately.

Detail

Unit Rate (British System) per Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks
Cement
Sand
Kikar wood for centring & shuttering
(10 x 1.60 x 0.2) Can be use 20 times

Total
Contractor's Profit & Ov
Total

20

10.00 No.
0.11 bag
0.41 Cft

Nos.
per bag
% Cft

0.002 Cft

Cft

0.067 No.
0.11 No.
0.023 No.

per day
per day
per day

Percent

LABOUR for 125 Cft


1
2
3

Mason
Cooly unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 55

DESCRIPTION OF ITEM:
Item No. 15 (a)

Extra for dressing or chamfering of bricks (special or


architectaral shape).

Detail

Unit Rate (British System) per 100 No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

3.00 No.
0.34 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 No.

Rs.

Page 56

Say

DESCRIPTION OF ITEM:
Item No. 15 (b)

All other purposes.

Detail

Unit Rate (British System) per 100 No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.50 No.
0.17 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 No.

Rs.

Page 57

Say

DESCRIPTION OF ITEM:
Item No. 16
(i)

Peforated Pacca brick walling 114 mm (4") thick in ground


floor in
Mud mortar.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2

Pacca bricks 9" x 4" x 3"


Good earth
Total
Contractor's Profit & Ov
Total

20

338.00 No.
8.75 Cft

Nos.
% Cft

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00 No.
1.83 Nos.
0.23 No.

10

Percent

20

Percent

per day
per day
per day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 58

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1 : 2).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
2.00 bags
5.00 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 59

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:3).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
1.50 bags
5.60 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 60

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:4).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
1.20 bags
6.00 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 61

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:5).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
1.00 bags
6.25 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 62

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:6).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
0.86 bags
6.40 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 63

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:7).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
0.75 bags
6.58 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 64

DESCRIPTION OF ITEM:
Item No. 16 (ii)

Cement sand mortar Ratio (1:8).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 No.
0.67 bags
6.67 Cft

Nos.
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 65

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 6).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00
14.93
0.80
6.00

No.
kg
bags
Cft

Nos.
kg
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 66

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 7).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00
13.44
0.71
6.13

No.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 67

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 8).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00
12.32
0.64
6.40

No.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 68

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 9).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00
10.82
0.58
6.50

No.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 69

DESCRIPTION OF ITEM:
Item No. 16 (iii)

Lime cement sand mortar Ratio (1 : 1 : 10).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

338.00
10.08
0.54
6.70

No.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 70

DESCRIPTION OF ITEM:
Item No. 16 (iv)

Lime cement sand mortar Ratio (1 : 2).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Slaked lime
Sand
Total
Contractor's Profit & Ov
Total

20

338.00 Nos.
43.67 kg
5.58 Cft

Nos.
per kg
% Cft

1.25 Nos.
2.42 Nos.
0.38 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 71

DESCRIPTION OF ITEM:
Item No. 17

Add. extra labour on item No.15 for pacca brick work.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Sft


First Floor
1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.13 No.
0.50 No.

10

Percent

20

Percent

ITEM RATES
Labour rate for 100 Sft

per day
per day

Rs.
Say

Labour rate per Sqm

Rs.
Say

LABOUR for 125 Sft


Second Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.37 No.
1.00 No.

10

Percent

20

Percent

ITEM RATES
Labour rate for 100 Sft

per day
per day

Rs.
Say

Labour rate per Sqm

Rs.
Say

LABOUR for 125 Cft


Third Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.63 No.
1.50 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate for 100 Sft
Say
Labour rate per Sqm
Say
Page 72

LABOUR for 125 Sft


4th & Subsequent Floor
1
2

Masons
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.12 Nos.
2.12 Nos.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate for 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 73

Say
Say

DESCRIPTION OF ITEM:
Item No. 18 (i)

Perforated pacca brick walling 9" thick in ground floor in


Mud Mortar

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MUD MORTAR
1
2

Pacca bricks 9" x 4" x 3"


Good earth
Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
17.50 Cft

Nos.
% Cft

1.25 Nos.
2.75 Nos.
0.35 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 74

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 2)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
4.00 bags
10.00 Cft

Nos.
bags
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 75

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 3)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
3.00 bags
11.25 Cft

Nos.
bags
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 76

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 4)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
2.40 bags
12.00 Cft

Nos.
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 77

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 5)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
2.00 bags
12.50 Cft

Nos.
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 78

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 6)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
1.72 bags
12.80 Cft

Nos.
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 79

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 7)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
1.50 bags
13.13 Cft

Nos.
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 80

DESCRIPTION OF ITEM:
Item No. 18 (ii)

Cement sand mortar Ratio (1 : 8)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
1.33 bags
13.34 Cft

Nos.
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 81

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 6)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00
29.86
1.60
12.00

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 82

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 7)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00
26.50
1.42
12.39

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 83

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 8)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00
23.90
1.28
12.80

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 84

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 9)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00
21.65
1.16
13.10

Nos.
kg
bags
Cft

Nos.
per kg
per bag
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 85

DESCRIPTION OF ITEM:
Item No. 18 (iii)

Lime cement sand mortar Ratio (1 : 1 : 10)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Slaked lime
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

675.00
20.16
1.07
13.33

Nos.
kg
bags
Cft

Nos.
per kg
per kg
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 86

DESCRIPTION OF ITEM:
Item No. 18 (iv)

Lime sand mortar Ratio (1 : 2)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Pacca bricks 9" x 4" x 3"


Slaked lime
Sand

Total
Contractor's Profit & Ov
Total

20

675.00 Nos.
86.97 kg
11.67 Cft

Nos.
per kg
% Cft

1.90 Nos.
3.63 Nos.
0.55 No.

per day
per day
per day

Percent

LABOUR for 125 Sft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 87

DESCRIPTION OF ITEM:
Item No. 19

Extra labour in item No.18 for per perforated pacca brick


work in

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

LABOUR
First Floor

Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

Say
Say
LABOUR
Second Floor

Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

Say
Say
LABOUR
Third Floor

Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

Say
Say
LABOUR
Fourth & Subsequent Floor

Labour of item No.6 for 100 Cft

0.75

Labour of item No.6 per Cum

0.75

Say
Say

Page 88

DESCRIPTION OF ITEM:
Item No. 20

Fire brick masonary in fire clay mortar.


(i)

Upto 20 ft.

(6 metre) height including all charges.

Detail

Unit Rate (British System) per Cft


Qty

Rate Per UnitAmount (Rs.)

Per 100 Cft


MATERIAL
1
2
3

Fire clay bricks 9" x 4" x 3"


Fire resistant Cement
Brick grinded sand

Total
Contractor's Profit & Ov
Total

20

1350.00 No.
8.80 bags
22.00 Cft

Each
per bag
per Cft

3.00 Nos.
3.00 Nos.
0.25 No.

per day
per day
per day

1.00 No.
0.25 No

per day
per day

Percent

LABOUR for 125 Cft


for masonary work
1
2
3

Mason
Coolies
Bahishti

for mortar
1
2

Cooly
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 89

DESCRIPTION OF ITEM:
Item No. 20

Fire brick masonary in fire clay mortar.


(ii)

Extra for every 1.5 metre additional height.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2

Mason
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No.
1.00 No

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 90

Say
Say

DESCRIPTION OF ITEM:
Item No. 21

First class brick walling laid in (1 : 3) cement sand mort


reinforced with (1") 25 mm wide 18 gauge hoop iron.
(i)

4" (114 mm) thick walling with hoop iron bouding 6"
(150 mm) apart.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

525.00
2.40
9.00
45.00
20.41

Nos.
bags
Cft
lbs
Kg.

Nos.
per bag
% Cft
Per Kg.

1.00
1.25
0.25
0.15

No.
Nos.
No.
No.

per
per
per
per

Percent

LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 91

DESCRIPTION OF ITEM:
Item No. 21

First class brick walling laid in (1 : 3) cement sand mort


reinforced with 1" (25 mm) wide 18 gauge hoop iron.
(ii)

4" (114 mm) thick walling with hoop iron bouding


12" (300 mm) apart.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

525.00
2.40
9.00
22.50
10.20

Nos.
bags
Cft
lbs
kg.

Nos.
per bag
% Cft
Per Kg.

No.
No.
No.
No.

per
per
per
per

Percent

LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00
1.00
0.25
0.10

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 92

DESCRIPTION OF ITEM:
Item No. 21

First class brick walling laid in (1 : 3) cement sand mort


reinforced with 1" (25 mm) wide 18 gauge hoop iron.
(iii)

3" (75 mm) thick walling with hoop iron bouding 6"
(150 mm) apart.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

350.00
1.80
6.50
45.00
20.41

Nos.
bags
Cft
lbs
Kg.

Nos.
per bag
% Cft
Per Kg.

No.
No.
No.
No.

per
per
per
per

Percent

LABOUR for 125 Cft


1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.75
1.00
0.20
0.15

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 93

DESCRIPTION OF ITEM:
Item No. 21

First class brick walling laid in (1 : 3) cement sand mort


reinforced with 1" (25 mm) wide 18 gauge hoop iron.
(iv)

3" (75 mm) thick walling with hoop iron bouding 12"
(300 mm) apart.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Pacca bricks 9" x 4" x 3"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

350.00
1.80
6.50
20.00
9.070

Nos.
bags
Cft
lbs
Kg.

Nos.
per bag
% Cft
Per Kg.

No.
No.
No.
No.

per
per
per
per

Percent

LABOUR for 125 Cft


1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.75
1.00
0.20
0.15

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 94

DESCRIPTION OF ITEM:
Item No. 22

Ghilafi work (1 brick thick wall).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2

B.B in mud ( of item No.1)


Sundried bricks ( of item No.24)

x
x

Total
LABOUR for 125 Cft
1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

2.00 Nos.
3.67 Nos.
0.50 No.

10

Percent

20

Percent

per day
per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 95

DESCRIPTION OF ITEM:
Item No. 23

Dry brick pitching.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1

Ist class burnt brick

Total
Contractor's Profit & Ov
Total

20

1350.00 Nos.

Nos.

1.00 No.
2.00 Nos.

per day
per day

Percent

LABOUR
1
2

Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 96

DESCRIPTION OF ITEM:
Item No. 24

Sun dried bricks in Mud mortar.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2

Sun dried bricks


Siff clay

Total
Contractor's Profit & Ov
Total

1350.00 Nos.
35.00 Cft

20

Nos.
% Cft

Percent

LABOUR for 125 Cft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.50 Nos.
3.50 Nos.
0.25 No.

10

Percent

20

Percent

per day
per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 97

DESCRIPTION OF ITEM:
Item No. 25

Pise wall (mud walling).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 125 Cft


1
2
3

Coolies skilled
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00 No.
1.50 Nos.
0.50 No.

10

Percent

20

Percent

per day
per day
per day

ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum

Rs.
Rs.

Page 98

Say
Say

DESCRIPTION OF ITEM:
Item No. 26

Providing Eave brick moulded weathered and throated with b


brick or drip course cornice in (1 : 3) cement mortar.
(i)

3" (76 mm) thick drip course.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT.)


1
2
3

Moulded brick
Cement for laying and plastering
Sand
Deduct cost of ordinary bricks
Total
Contractor's Profit & Ov
Total

20

280.00
1.50
5.00
140

Nos.
bag
Cft
Nos.

Nos.
per bag
% Cft
Nos.

1.75 Nos.
1.75 Nos.
0.25 No.

per day
per day
per day

Percent

LABOUR (FOR 125 RFT.)


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 99

DESCRIPTION OF ITEM:
Item No. 26

Providing Eave brick moulded weathered and throated with b


brick or drip cornice in (1 : 3) cement mortars.
(ii)

4" (114 mm) thick drip course cornice.

Detail

Unit Rate (British System) per


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT.)


1
2
3

Brick moulded I/C wastage


Cement for laying and plastering
Sand
Deduct cost of ordinary bricks
Total
Contractor's Profit & Ov
Total

20

420.00
1.75
6.00
210.00

Nos.
bag
Cft
Nos.

Nos.
per bag
% Cft
Nos.

2.00 Nos.
2.00 Nos.
0.25 No.

per day
per day
per day

Percent

LABOUR (FOR 125 RFT)


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per 100 Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 100

Rft

DESCRIPTION OF ITEM:
Item No. 26

Providing Eave brick moulded weathered and throated with b


brick or drip cornice in (1 : 3) cement mortar.
(iii)

4" (114 mm) thick eave brick with back brick.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT)


1
2
3
4

Brick moulded (including wastage)


Back bricks ordinary
Cement
Sand

Total
Contractor's Profit & Ov
Total

20

465.00
465.00
1.20
5.00

Nos.
Nos.
bag
Cft

Nos.
Nos.
per bag
% Cft

1.00 No.
2.00 Nos.

per day
per day

Percent

LABOUR (FOR 125 RFT.)


1
2

Mason for laying


Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 101

DESCRIPTION OF ITEM:
Item No. 27

Providing & laying dressed or moulded brick cornice in ( 1


cement mortar, plastering or pointing complete.
(i)

One brick.

Detail

Unit Rate (British System) per


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT.)


1

2
3

Pacca bricks I/C 10% wastage


As the rate is only for the projected protion
to the brick required
60.00 Nos.
Cement for laying & plastering or pointi
1.60 bag
Sand for laying & plastering or plasteri
6.00 Cft

Total
Contractor's Profit & Ov
Total

20

Nos.
per bag
% Cft

Percent

LABOUR for 125 Rft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

2.00 Nos.
2.00 Nos.
0.25 No.

10

Percent

20

Percent

per day
per day
per day

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 102

Rft

DESCRIPTION OF ITEM:
Item No. 27

Providing & laying dressed or moulded brick cornice in ( 1


cement mortar, plastering or pointing complete.
(ii)

Two brick.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT.)


1
2
3

Pacca bricks
Cement for laying & plastering
Sand for laying & plastering

Total
Contractor's Profit & Ov
Total

20

175.00 Nos.
5.00 bags
18.00 Cft

Nos.
per bag
% Cft

3.00 Nos.
3.00 Nos.
0.25 No.

per day
per day
per day

Percent

LABOUR for 125 Rft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 103

DESCRIPTION OF ITEM:
Item No. 27

Providing & laying dressed or moulded brick cornice in ( 1


cement mortar, plastering or pointing complete.
(iii)

Three bricks.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL (FOR 100 RFT.)


1
2
3

Pacca bricks
Cement for laying & plastering
Sand for laying & plastering

Total
Contractor's Profit & Ov
Total

20

270.00 Nos.
8.00 bags
60.00 Cft

Nos.
per bag
% Cft

4.00 Nos.
4.00 Nos.
0.34 No.

per day
per day
per day

Percent

LABOUR for 125 Rft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 104

DESCRIPTION OF ITEM:
Item No. 27

Providing & laying dressed or moulded brick cornice in ( 1


cement mortar, plastering or pointing complete.
(iv)

Four brick.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL FOR 100 RFT.)


1
2
3

Pacca bricks
Cement for laying & plastering
Sand for laying & plastering

Total
Contractor's Profit & Ov
Total

20

580.00 Nos.
10.00 bags
37.00 Cft

Nos.
per bag
% Cft

5.00 Nos.
5.00 Nos.
0.50 No.

per day
per day
per day

Percent

LABOUR for 125 Rft


1
2
3

Mason
Coolies unskilled
Bahishti
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 105

DESCRIPTION OF ITEM:
Item No. 28

Cleaning brick dismentled from kacha pacca masonry.

Detail

Unit Rate (British System) per 1000 No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 1250 Nos.


1

Cooly unskilled

1.75 Nos.

Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

per day

ITEM RATES
Labour rat per 1000 No.

Rs.

Say

DESCRIPTION OF ITEM:
Item No. 29

Scraping bricks dismantled from pacca masonary.

Detail

Unit Rate (British System) per 1000 No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 1250 Nos.


1

Cooly unskilled

Total
Sundries
Total
Contractor's Profit & Ov
Total

3.30 Nos.

10

Percent

20

Percent

per day

ITEM RATES
Labour rat per 1000 No.

Rs.

Page 106

Say

DESCRIPTION OF ITEM:
Item No. 30

Supplying and filling sand under floors or plugging in wel

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1

Sand

Total
Contractor's Profit & Ov
Total

20

100.00 Nos.

% Nos.

0.50 Nos.

per day

Percent

LABOUR for 150 Cft


1

Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft.
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft.


Composite rate per Cum.

Rs.
Rs.

Say
Say

Page 107

DESCRIPTION OF ITEM:
Item No. 31

Providing and laying 2" (50 mm) thick projected tile bank
(1: 2) cement sand mortar with hoop iron 1" (25 mm) wide 1
SWG flat iron sheet 9" (225 mm) apart.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

Rate Analysis for 8 Rft


MATERIAL
1
2
3
4

Title 225 x 114 x 40 mm title


Cement
Sand
Cost of hoop iron

Total
Contractor's Profit & Ov
Total

20

43.00
0.09
0.20
3.00

Nos.
bag
Cft
Kg.

Nos.
per bag
% Cft
Per Kg.

Percent

LABOUR
1
2

Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.50 No.
0.50 No.

10

Percent

20

Percent

per day
per day

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 108

DESCRIPTION OF ITEM:
Item No. 32

Ist class brick tiles (9" 4" x 1") 225 x 114 x 40 mm cla
76 mm thick laid in cement sand mortar recifered with hoop
strips placed at 2 ft. (600 mm) apart vertically.
(i)

Ratio (1 : 3).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Brick tiles 9" x 4" x 1"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

810.00
2.40
9.00
4.54

No.
bags
Cft
Kg.

Nos.
per bag
% Cft
per Kg.

No.
No.
No.
No.

per
per
per
per

Percent

LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00
1.00
0.25
0.10

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft.


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 109

DESCRIPTION OF ITEM:
Item No. 32

Ist class brick tiles (9" 4" x 1") 225 x 114 x 40 mm cla
76 mm thick laid in cement sand mortar recifered with hoop
strips placed at 2 ft. (600 mm) apart vertically.
(ii)

Ratio (1 : 4).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3
4

Brick tiles 9" x 4" x 1"


Cement
Sand
Hoop iron

Total
Contractor's Profit & Ov
Total

20

810.00
1.92
9.60
4.54

No.
bags
Cft
Kg.

Nos.
per bag
% Cft
per Kg.

No.
No.
No.
No.

per
per
per
per

Percent

LABOUR
1
2
3
4

Mason
Coolies unskilled
Bahishti
Black-smith
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00
1.00
0.25
0.10

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft.
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft.


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 110

DESCRIPTION OF ITEM:
Item No. 33

Chamfering sides of head regulators and masonry wall to


increase width.

Detail

Unit Rate (British System) per Sft


Qty

Rate Per UnitAmount (Rs.)

LABOUR (FOR 30 SFT)


1
2

Mason
Cooly unskilled

Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00 No.
1.00 No.

10

Percent

20

Percent

Labour rate per Sft


Labour rate per Sqm

Rs.
Rs.

Page 111

per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 34

Replacing kallar eaten bricks.

Detail

Unit Rate (British System) per Bricks


Qty

Rate Per UnitAmount (Rs.)

Assume 60 Bricks
MATERIAL
1
2
3

Bricks
Cement
Sand
Total
Contractor's Profit & Ov
Total

20

50.00 Nos.
0.005 Bag
0.026 Cft

Nos.
Bag
% Cft.

2.00 No.
1.00 No.

per day
per day

Percent

LABOUR
1
2

Mason
Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Brick
Composit rate per Brick

Rs.
Rs.

Page 112

Say
Say

DESCRIPTION OF ITEM:
Item No. 35

Repairing corner's of bridges and other hydraulic


masoney works.

Detail

Unit Rate (British System) per No. / Assumed for 1


Qty

Rate Per UnitAmount (Rs.)

MATERIAL
1
2
3

Brick tiles 9" x 4" x 1"


Cement
Sand
Total
Contractor's Profit & Ov
Total

20

10.00 No.
0.08 bags
0.25 Cft

Nos.
per bag
% Cft

0.25 No.
0.25 No.

per day
per day

Percent

LABOUR for 1.5 No.


1
2

Mason
Coolies unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Each No.
Composite rate per Each No.

Rs.
Rs.

Page 113

Say
Say

DESCRIPTION OF ITEM:
Item No. 36

Extra labour for drains of bath roons etc.

Detail

Unit Rate (British System) per Lft


Qty

Rate Per UnitAmount (Rs.)

Assumed for 40 Lft


LABOUR
1

Mason

1.00 No.

Total
Sundries
Total
Contractor's Profit & Ov
Total

10

Percent

20

Percent

Labour rate per Lft


Labour rate per Meter

Rs.
Rs.

per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 37

Maroo corners.

Detail

Unit Rate (British System) per No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR for 1.25 No.


1

Mason

Total
Sundries
Total
Contractor's Profit & Ov
Total

0.20 No.

10

Percent

20

Percent

Labour rate per Each No.

Rs.

Page 114

per day

Say

CHAPTER NO. 6

CONCRETE
DESCRIPTION OF ITEM:
Item No. 1

Mud concrete in foundation including watering and ramming using bri


or stone ballast 1" (40 mm) gauge.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2

Brick/Stone Ballast
Earth
Total
Contractor's Profit & Overhea
Total

100.00 Cft
50.00 Cft

20

% Cft
% Cft

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.13 No.
4.00 Nos.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 1

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 2

Dry Ramming brick or stone ballast 1" to 2 (40 mm to 50 mm) gauge.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1

Brick/Stone Ballast

Total
Contractor's Profit & Overhea
Total

110.00 Cft

20

% Cft

per day

Percent

LABOUR
1

Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

3.00 Nos.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 2

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(a)

Ratio (1 : 3 : 6)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Brick/Stone ballast
Total
Contractor's Profit & Overhea
Total

20

13.00 Bags
46.00 Cft
92.00 Cft

per bag
% Cft
% Cft

0.25 No.
5.00 Nos.
0.50 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 3

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(b)

Ratio (1 : 4 : 8)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Brick/Stone ballast
Total
Contractor's Profit & Overhea
Total

20

9.60 bags
48.00 Cft
96.00 Cft

per bag
% Cft
% Cft

0.25 No.
5.00 Nos.
0.50 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 4

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(c)

Ratio (1 : 5 : 10)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total

20

7.80 bags
49.00 Cft
98.00 Cft

per bag
% Cft
% Cft

0.25 No.
5.00 Nos.
0.50 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 5

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(d)

Ratio (1 : 6 : 12)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total

20

6.50 bags
49.00 Cft
98.00 Cft

per bag
% Cft
% Cft

0.25 No.
5.00 Nos.
0.50 No.

per day
per day
per day

Say
Say

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Page 6

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(e)

Ratio (1 : 6 : 18)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total

20

5.00 bags
37.00 Cft
112.00 Cft

per bag
% Cft
% Cft

0.25 No.
5.00 Nos.
0.50 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composit rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 7

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 3

Cement concrete brick or stone ballast 1" to 2" (40 to 50 mm) gaug
foundation and plinth.
(f)

Ratio (1 : 7 : 20)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Bricks/stone ballast
Total
Contractor's Profit & Overhea
Total

20

4.40 bags
38.50 Cft
110.00 Cft

per bag
% Cft
% Cft

0.25 No.
5.00 Nos.
0.50 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composit rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 8

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 4

Extra on item No.3 above for Sedimentation tank or filter beds of P


Health Engineering Works.
(a)

in bed.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.60 No.
1.00 Nos.
0.10 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

per day
per day
per day

Say
Say

DESCRIPTION OF ITEM:
Item No. 4

Extra on item No.3 above for Sedimentation tank or filter beds of P


Health Engineering Works.
(b)

on slope.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

1.00 No.
1.40 Nos.
0.10 No.

10

Percent

20

Percent

per day
per day
per day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 9

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5

Cement concrete plain including, placing, compacting, finishing and


complete (including screening and washing of stone aggregate).
(a)

Ratio (1 : 1 : 2)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Aggregate (Stone)
Total
Contractor's Profit & Overhea
Total

20

31.50 bags
39.00 Cft
78.00 Cft

per bag
% Cft
% Cft

1.00 No.
6.00 Nos.
0.60 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 10

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5

Cement concrete plain including, placing, compacting, finishing and


complete (including screening and washing of stone aggregate).
(b)

Ratio (1 : 1 : 1)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20

31.50 bags
58.00 Cft
58.00 Cft

per bag
% Cft
% Cft

1.00 No.
6.00 Nos.
0.60 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 11

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5

Cement concrete plain including, placing, compacting, finishing and


complete (including screening and washing of stone aggregate).
(c)

Ratio (1 : 1 : 3)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20

22.50 bags
42.00 Cft
84.00 Cft

per bag
% Cft
% Cft

1.00 No.
6.00 Nos.
0.60 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 12

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5

Cement concrete plain including, placing, compacting, finishing and


complete (including screening and washing of stone aggregate).
(d)

Ratio (1 : 2 : 3)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20

21.00 bags
52.00 Cft
78.00 Cft

per bag
% Cft
% Cft

1.00 No.
6.00 Nos.
0.60 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

0.00
0.00

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

0.00
0.00

Page 13

DESCRIPTION OF ITEM:
Item No. 5

Cement concrete plain including, placing, compacting, finishing and


complete (including screening and washing of stone aggregate).
(e)

Ratio (1 : 3 : 3)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20

17.60 bags
66.00 Cft
66.00 Cft

per bag
% Cft
% Cft

1.00 No.
6.00 Nos.
0.60 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 14

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5

Cement concrete plain including, placing, compacting, finishing and


complete (including screening and washing of stone aggregate).
(f)

Ratio (1 : 2 : 4)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20

17.60 bags
44.00 Cft
88.00 Cft

per bag
% Cft
% Cft

1.00 No.
6.00 Nos.
0.60 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 15

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5

Cement concrete plain including, placing, compacting, finishing and


complete (including screening and washing of stone aggregate).
(g)

Ratio (1 : 2 : 6)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20

13.70 bags
34.00 Cft
102.00 Cft

per bag
% Cft
% Cft

1.00 No.
6.00 Nos.
0.60 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composit rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 16

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5

Cement concrete plain including, placing, compacting, finishing and


complete (including screening and washing of stone aggregate).
(h)

Ratio (1 : 3 : 6)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20

13.00 bags
46.00 Cft
92.00 Cft

per bag
% Cft
% Cft

1.00 No.
6.00 Nos.
0.60 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 17

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 5

Cement concrete plain including, placing, compacting, finishing and


complete (including screening and washing of stone aggregate).
(i)

Ratio (1 : 4 : 8)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

MATERIAL
1
2
3

Cement
Sand
Aggregate
Total
Contractor's Profit & Overhea
Total

20

9.60 bags
48.00 Cft
96.00 Cft

per bag
% Cft
% Cft

1.00 No.
6.00 Nos.
0.60 No.

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Cooly un-skilled
Bahisthi
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 18

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregate, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
(a) (i)

1-

Reinforced cement concrete in roof slab, beams, columns, lintels, g


and other structural members laid in situ or pre cast laid in posit
stressed members cast in situ complete in all respect.
Type 'A' (Nominal mix 1 : 1: 2)

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Analysis for 100 Cft


MATERIAL
1
Cement
2
Sand (Harro)
3
Bajri
4

Shuttering
Assumed size for concrete slab
14' x 20' x 5"
=
1" thick plank seperate slab 280x1/12 =
Joint (studs) for supporting planks
5 x 0.3' x 0.3' x 14' =
Props Mix. 20 x 3" x 3" x 14' =
Total
For 100 Cft 45.5 x 100 117 =
This material can be uses 24 times
For one operation 38.89 24 =
1.62 Cft @ 350.0 Cft (kail wood)
Bolts and nuts, nails
Greasing and oiling for surfacing
and shuttering
Total
Contractor's Profit & Overhea
Total

20

31.50 bags
39.00 Cft
78.00 Cft

per bag
% Cft
% Cft

1.62 Cft
3.5 Kg.

per Cft
Per Kg.

2.67 Kg.

Per Kg.

per
per
per
per
per
per

117 Cft
23.34 Cft
4.38 Cft
17.50 Cft
0.28 Cft
45.5 Cft
38.89
1.62 Cft

Percent

LABOUR
1
2
3
4
5
6

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper

Total
Sundries
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate/Cft
ITEM RATES

1.00
1.50
10.00
2.00
1.00
2.00
10

Percent

20

Percent

Nos.
Nos.
No.
No.
Nos.
Nos.

day
day
day
day
day
day

Labour rate per Cft


Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 19

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregate, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
(a) (i)

2-

Reinforced cement concrete in roof slab, beams, columns, lintels, g


and other structural members laid in situ or pre cast laid in posit
stressed members cast in situ complete in all respect.
Type 'B' (Nominal mix 1 : 1:

Detail

3).

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Analysis for 100 Cft


MATERIAL
1
2
3

Cement
Sand (Harro)
Bajri

Shuttering
Wood for shuttering detail as per
item 5-(a) (i)-1
Bolts and nuts, nails
Greasing and oiling for surfacing
and shuttering
Total
Contractor's Profit & Overhea
Total

20

22.50 bags
42.00 Cft
84.00 Cft

per bag
% Cft
% Cft

1.62 Cft
3.5 Kg.

per Cft
Per Kg.

2.432 Kg.

Per Kg.

1.00
1.50
10.00
2.00
1.00
2.00

per
per
per
per
per
per

Percent

LABOUR
1
2
3
4
5
6

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper

Total
Sundries
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate per Cft
ITEM RATES
Labour rate per Cft
Labour rate per Cum

10

Percent

20

Percent

Composite rate per Cft


Composite rate per Cum

Page 20

Nos.
Nos.
No.
No.
Nos.
Nos.

day
day
day
day
day
day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregate, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
(a) (i)

3-

Reinforced cement concrete in roof slab, beams, columns, lintels, g


and other structural members laid in situ or pre cast laid in posit
stressed members cast in situ complete in all respect.
Type 'C' (Nominal mix 1 : 2: 4).

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Analysis for 100 Cft


MATERIAL
1
2
3

Cement
Sand (Harro)
Bajri

Shuttering
Kail Wood for shuttering detail as per
item 5-(a) (i)-1
Bolts and nuts, nails
Greasing and oiling for surfacing
and shuttering
Total
Contractor's Profit & Overhea
Total

20

17.60 bags
44.00 Cft
88.00 Cft

bags
% Cft
% Cft

1.62 Cft
3.5 Kg.

per Cft
Per Kg.

2.272 Kg.

Per Kg.

1.00
1.50
10.00
2.00
1.00
2.00

per
per
per
per
per
per

Percent

LABOUR
1
2
3
4
5
6

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper

Total
Sundries
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate per Cft
ITEM RATES
Labour rate per Cft
Labour rate per Cum

10

Percent

20

Percent

Composite rate per Cft


Composite rate per Cum

Page 21

Nos.
Nos.
No.
No.
Nos.
Nos.

day
day
day
day
day
day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregate, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
(a) (ii)

1-

Reinforcement cement concrete in slab of roofs/strip foundation; ba


slab of column and retaining walls; etc., and other structural memb
other than those mentioned in 6(a) (i) above not requiring form wor
complete in all respects.
Type 'A' (Nominal mix 1 : 1 : 2).

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Analysis for 100 Cft


MATERIAL
1
2
3
4
5
6

Cement
Sand (Harro)
Bajri
Kail Wood for shuttering
Bolts, nuts & nails
Oiling, greasing, surface of shuttering
Total
Contractor's Profit & Overhea
Total

20

31.50
39.00
78.00
0.19
3.5
0.480

bags
Cft
Cft
Cft.
Kg.
Kg.

per bag
% Cft
% Cft
P. Cft
Per Kg.
Per Kg.

1.00
1.00
5.00
1.00
1.00
1.00

Nos.
Nos.
No.
No.
Nos.
Nos.

per
per
per
per
per
per

Percent

LABOUR
1
2
3
4
5
6

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper

Total
Sundries
Total
Contractor's Profit & Overhea
Total for 100 Cft
Rate per Cft

10

Percent

20

Percent

day
day
day
day
day
day

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 22

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregate, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
(a) (ii)

2-

Reinforcement cement concrete in slab of roofs/strip foundation; ba


slab of column and retaining walls; etc., and other structural memb
other than those mentioned in 6(a) (i) above not requiring form wor
complete in all respects.
Type 'B' (Nominal mix 1 : 1 : 3).

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Analysis for 100 Cft


MATERIAL
1
2
3
4
5
6

Cement
Sand (Harro)
Bajri
Kail Wood for shuttering
Bolts, nuts & nails
Oiling, greasing, surface of shuttering
Total
Contractor's Profit & Overhea
Total

20

22.50
42.00
84.00
0.17
0.5
0.560

bags
Cft
Cft
Cft.
Kg.
Kg.

per bag
% Cft
% Cft
P. Cft
Per Kg.
Per Kg.

1.00
1.00
5.00
1.00
1.00
1.00

Nos.
Nos.
No.
No.
Nos.
Nos.

per
per
per
per
per
per

Percent

LABOUR
1
2
3
4
5
6

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

10

Percent

20

Percent

day
day
day
day
day
day

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 23

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregate, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
(a) (ii)

3-

Reinforcement cement concrete in slab of roofs/strip foundation; ba


slab of column and retaining walls; etc., and other structural memb
other than those mentioned in 6(a) (i) above not requiring form wor
complete in all respects.
Type 'C' (Nominal mix 1 : 2 : 4).

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Analysis for 100 Cft


MATERIAL
1
2
3
4
5
6

Cement
Sand (Harro)
Bajri
Kail Wood for shuttering
Bolts, nuts & nails
Oiling, greasing, surface of shuttering
Total
Contractor's Profit & Overhea
Total

20

17.60
44.00
88.00
0.16
0.5
0.560

bags
Cft
Cft
Cft.
Kg.
Kg.

per bag
% Cft
% Cft
P. Cft
Per Kg.
Per Kg.

1.00
1.00
5.00
1.00
1.00
1.00

Nos.
Nos.
No.
No.
Nos.
Nos.

per
per
per
per
per
per

Percent

LABOUR
1
2
3
4
5
6

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Carpanter
Helper

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

10

Percent

20

Percent

day
day
day
day
day
day

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 24

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

(b)

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregate, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
Precast reinforced cement concrete and prestresed reinforced cement
concrete in columns, beams, lintels, stair cases, shelves etc.

1-

Type 'A' (Nominal mix 1 : 1 : 2).

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Analysis for 100 Cft


MATERIAL
1
Cement
2
Sand (Harro)
3
Bajri
4

Shuttering
Assume beam of 12' x 12" x 6" =
Wood
Planks = 2 x 12 1/6 x 13/12 x 2 1/12 =
1 x 12 1/6 x 1/12 x =
2 x 1/12 x 12/12 x 6/12 =
Studs = 2 x 5 x 1/6 x 1/12 =
Total
For 100 Cft 2.93 6 x 100 =
Can be used in 40 operation
One operation 48.73 40.0Cft
=
Nails, nuts & bolts etc.
Greasing and oiling for shuttering surface
Total
Contractor's Profit & Overhe
Total

20

31.50 bags
39.00 Cft
78.00 Cft

per bag
% Cft
% Cft

1.22 Cft
4.00 No.
2.11 Kg.

Per Cft
Each
Per Kg.

1.00
1.00
2.00
1.00
8.00

per
per
per
per
per

6 Cft
2.2 Cft
0.51 Cft
0.08 Cft
0.04 Cft
2.93 Cft
48.73 Cft
1.22 Cf

Percent

LABOUR
1
2
3
4
5

Mason
Carpanter
Coolies skilled
Bahisthi
Coolies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

10

Percent

20

Percent

ITEM RATES
Labour rate per Cft
Labour rate per Cum
Composite rate per Cft
Composite rate per Cum

Page 25

Nos.
Nos.
No.
No.
Nos.

day
day
day
day
day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregate, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
(b)

Precast reinforced cement concrete and prestresed reinforced cement


concrete in columns, beams, lintels, stair cases, shelves etc.
2-

Type 'B' (Nominal mix 1 : 1 : 3).

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Analysis for 100 Cft


MATERIAL
1
2
3

Cement
Sand (Harro)
Bajri

Shuttering
Kail Woood for shuttering as per item 5 (b) (1)
Nails, nuts & bolts etc.
Greasing and oiling etc.
Total
Contractor's Profit & Overhea
Total

20

22.40 bags
42.00 Cft
84.00 Cft

per bag
% Cft
% Cft

1.22 Cft
4.00 No.
2.11 Kg.

Cft
Each
Per Kg.

1.00
1.00
2.00
1.00
8.00

per
per
per
per
per

Percent

LABOUR
1
2
3
4
5

Mason
Carpanter
Coolies skilled
Bahisthi
Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

10

Percent

20

Percent

Nos.
Nos.
No.
No.
Nos.

day
day
day
day
day

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 26

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregate, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
(b) (i)

3-

Precast reinforced cement concrete and prestresed reinforced cement


concrete in columns, beams, lintels, stair cases, shelves etc.
Type 'C' (Nominal mix 1 : 2 : 4).

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Analysis for 100 Cft


MATERIAL
1
2
3

Cement
Sand (Harro)
Bajri

Shuttering
Kail Woood for shuttering as per item 5 (b) (1)
Nails, nuts & bolts etc.
Greasing and oiling etc.
Total
Contractor's Profit & Overhea
Total

20

17.60 bags
44.00 Cft
88.00 Cft

per bag
% Cft
% Cft

1.22 Cft
4.00 No.
1.71 Kg.

Cft
Each
Per Kg.

1.00
1.00
2.00
1.00
8.00

per
per
per
per
per

Percent

LABOUR
1
2
3
4
5

Mason
Carpanter
Coolies skilled
Bahisthi
Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

10

Percent

20

Percent

Nos.
Nos.
No.
No.
Nos.

day
day
day
day
day

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 27

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregate, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
(c)

Erecting and fixing in position, precast cement concrete or stone s


roofs or lintels, etc., lift upto 20 ft. (6.0 metre) including all

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Rate Analysis for 100 Cft


MATERIAL
1
2

Sand
Bitumen

Total
Contractor's Profit & Overhea
Total

1.00 Cft
12.73 kg
0.25 Cwt

20

% Cft
kg

per day
per day

Percent

LABOUR
1
2

Mason
Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 100 Cft
Rate per Cft

1.00 Nos.
5.00 Nos.

10

Percent

20

Percent

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 28

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying reinforced cement concrete (including pre-stre


concrete), using coarse sand and screened graded and washed
aggregated, in required shape and design, including forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing ex
surface, complete (but excluding the cost of steel reinforcement, i
fabrication and placing in position etc).
(d)

Add extra labour for R.C. concrete in 2nd and subsequent stories.

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.03 Nos.

10

Percent

20

Percent

per day

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Page 29

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 7

Providing and casting in situ bored reinforced concrete pile with t


concrete (Nominal mix 1 : 2: 4), using 10% extra cement in dry mix,
course sand including all labour and material (except the cost of s
reinforcement and its labour for bending and laying in position etc
will be paid separately, including screening and washing of shingle
curing.
(i)

18" dia (450 mm) pile.

Detail

Unit Rate (British System) per Rft


Qty

MATERIAL

Rate

Per Unit

Amount (Rs.)

Analysis for 100 Rft

Concrete

2
3
4
5
6

Cement
Sand (Harro)
Bajri
Extra cement (10%)
Cost of casing pipe
100' @
Can be used 100 times
0 100

x 100
=176.78 Cft
12 x 4

22

bags
Cft
Cft
bags

per bag
% Cft
% Cft
per bag

5.10
5.30
22.00
1.00
2.00

Nos.
Nos.
Nos.
Nos.
Nos.

per
per
per
per
per

100.00 Rft
2.50 hrs.
L.S

Rs. 0.00

Total
Contractor's Profit & Overhea
Total

31.10
77.76
155.52
3.11

Rs. 0.00

20

Percent

LABOUR
1
2
3
4
5
6
7
8
9

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 18" dia (24" dia)
Working of rig during casting
Construction of Temporary Island
Carriage of material to site of work
(Boring Material)
Total
Sundries
Total
Contractor's Profit & Overhea
on Rs. 4725.45 + 472.55
=
Total for 100 Rft

10

Percent o0.00

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M

Page 30

day
day
day
day
day

per foot
per hour

L.S

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 7

Providing and casting in situ bored reinforced concrete pile with t


concrete (Nominal mix 1 : 2: 4), using 10% extra cement in dry mix,
course sand including all labour and material (except the cost of s
reinforcement and its labour for bending and laying in position etc
will be paid separately, including screening and washing of shingle
curing.
(ii)

20" dia (500 mm) pile.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 100 Rft


MATERIAL
22
7

Concrete

2
3
4
5
6

Cement
Sand (Harro)
Bajri
Extra cement (10%)
Cost of casing pipe
100 @
Can be used 100 times
0 100

x 100
12x4

38.40
96.00
192.00
3.84

bags
Cft
Cft
bags

per bag
% Cft
% Cft
per bag

7.00
7.00
35.00
1.00
3.00

Nos.
Nos.
No.
No.
Nos.

per
per
per
per
per

100.00 Rft
2.50 hrs.
L.S

Rs. 0.00

Total
Contractor's Profit & Overhea
Total

=218.17 Cft

Rs. 0.00

20

Percent

LABOUR
1
2
3
4
5
6
7
8
9

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 20" dia (500 mm) dia
Working of rig during casting
Constructin of Temparary Island
Carriage of material at site of work
(Boring Material)
Total
Sundries
10 Percent o
Total
Contractor's Profit & Overhea
20 Percent
on Rs.
0.00 + =
Total for 100 Rft

ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M

Page 31

day
day
day
day
day

per foot
per hour

L.S

0.00

0.00

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 7

Providing and casting in situ bored reinforced concrete pile with t


concrete (Nominal mix 1 : 2: 4), using 10% extra cement in dry mix,
course sand including all labour and material (except the cost of s
reinforcement and its labour for bending and laying in position etc
will be paid separately, including screening and washing of shingle
curing.
(iii)

22" dia (550 mm) pile.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 100 Rft


MATERIAL
22
7

Concrete

2
3
4
5

Cement
Sand (Harro)
Bajri
Extra cement (10%)
Cost of casing pipe
100'.0 @
Can be used 100 times
0 100

x 100
12x4

46.46
116.15
192.00
4.60

bags
Cft
Cft
bags

per bag
% Cft
% Cft
per bag

7.00
7.00
70.00
1.00
3.75

Nos.
Nos.
Nos.
Nos.
Nos.

per
per
per
per
per

100.00 Rft
2.50 hrs.
L.S

Rs. 0.00

Total
Contractor's Profit & Overhea
Total

=264.98 Cft

Rs. 0.00

20

Percent

LABOUR
1
2
3
4
5
6
7
8
9

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 22" dia (550 mm) dia
Working of rig during casting
Constructin of Tempary Island
Carriage of material as site of work
(Boring Material)
Total
Sundries
Total
Contractor's Profit & Overhea
on Rs. 11245.00 + 1124.50 =
Total for 100 Rft

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per L.M
Composite rate per Rft
Composite rate per L.M

Page 32

day
day
day
day
day

per foot
per hour

L.S

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 7

Providing and casting in situ bored reinforced concrete pile with t


concrete (Nominal mix 1 : 2: 4), using 10% extra cement in dry mix,
course sand including all labour and material (except the cost of s
reinforcement and its labour for bending and laying in position etc
will be paid separately, including screening and washing of shingle
curing.
(iv)

24" dia (600 mm) pile.

Detail

Unit Rate (British System) per Rft


Qty

MATERIAL
1
2
3
4
5

Rate

Per Unit

Amount (Rs.)

Analysis for 100 Rft


Concrete 22
7
Cement
Sand (Harro)
Bajri
Extra cement (10%)
Cost of casing pipe
100'.0 @
Can be used 100 times
0 100

x 100
12x4

55.29
138.23
276.46
5.53

bags
Cft
Cft
bags

per bag
% Cft
% Cft
per bag

8.00
8.00
95.00
1.00
4.75

Nos.
Nos.
No.
No.
Nos.

per
per
per
per
per

100.00 Rft
2.50 hrs.
L.S

Rs. 0.00

Total
Contractor's Profit & Overhea
Total

=314.16 Cft

Rs. 0.00

20

Percent

LABOUR
1
2
3
4
5
6
7
8
9

Mason
Cooly skilled
Coolies un-skilled
Bahisthi
Fitter
Total
Boring hole 24" dia (550 mm) dia
Working of rig during casting
Constructin of Temparary Island
Carriage of material to site of work
(Boaring Material)
Total
Sundries
Total
Contractor's Profit & Overhea
on Rs. 13528.75 + 1352.88 =
Total for 100 Rft

Percent o

0.00

20

Percent
Rs.

0.00

Composite rate per Rft


Composite rate per L.M

Page 33

per foot
per hour

L.S

10

ITEM RATES
Labour rate per Rft
Labour rate per L.M

day
day
day
day
day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 8

Fabrication of mild steel reinforcement bar cage for R.C.C bored pi


including cutting bending, laying in position, welding and fastenin
including cost of binding wire and labour charges for binding of st
reinforcement (also includes removal of rust from the bars).
(a)

Plain bars.

Detail

Unit Rate (British System) per Cwt


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 48 Cwt


MATERIAL
1
2
3
4

Fabrication of steel
Welding electrode
Hire charges of plant
Working of rig during lowering of cage
Total
Contractor's Profit & Overhea
Total
Material cost per Cwt

20

2.443
(48.00
1.00
L.S
3.00

Ton
Cwt)
bundle

per ton
er bundle

hrs.

per hour

1.00 Nos.
3.00 Nos.

per day
per day

Percent

LABOUR for 2 Cwt


1
2

Welder
Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg

Rs.
Rs.

Say
Say

Composite rate per Cwt


Composite rate per 100 Kg

Rs.
Rs.

Say
Say

Page 34

DESCRIPTION OF ITEM:
Item No. 8

Fabrication of mild steel reinforcement bar cage for R.C.C bored pi


including cutting bending, laying in position, welding and fastenin
including cost of binding wire and labour charges for binding of st
reinforcement (also includes removal of rust from the bars).
(b)

Deformed bars.

Detail

Unit Rate (British System) per Cwt


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 48 Cwt


MATERIAL
1
2
3
4

Fabrication of steel
Welding electrode
Hire charges of plant
Working of rig during lowering of cage
Total
Contractor's Profit & Overhea
Total
Material cost per Cwt

20

2.443
(48.00
1.00
L.S
3.00

Ton
Cwt)
bundle

per ton
er bundle

hrs.

per hour

1.00 Nos.
3.00 Nos.

per day
per day

Percent

LABOUR for 2 Cwt


1
2

Welder
Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg

Rs.
Rs.

Say
Say

Composite rate per Cwt


Composite rate per 100 Kg

Rs.
Rs.

Say
Say

Page 35

DESCRIPTION OF ITEM:
Item No. 9

Fabrication of mild steel reinforcement for cement concrete, includ


cutting, bending, laying in position, making joints and fastenings,
cost of binding wire and labour charges for binding of steel reinfo
(also includes the removal of rust from bars).
(a)

Plain bars.

Detail

Unit Rate (British System) per


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for One Cwt


MATERIAL
1
2

55
(1.08
(0.25
0.114

M.S. bars including wastage


Binding wire

Total
Contractor's Profit & Overhea
Total

20

kg
Cwt)
lbs)
kg

per tonne
kg

0.25 Nos.
0.25 Nos.

per day
per day

Percent

LABOUR
1
2

Black Smith
Collies unskilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg

Rs.
Rs.

Say
Say

Composite rate per Cwt


Composite rate per 100 Kg

Rs.
Rs.

Say
Say

Page 36

Cwt

DESCRIPTION OF ITEM:
Item No. 9

Fabrication of mild steel reinforcement for cement concrete, includ


cutting, bending, laying in position, making joints and fastenings,
cost of binding wire and labour charges for binding of steel reinfo
(also includes the removal of rust from bars).
(b)

Deformed bars.

Detail

Unit Rate (British System) per Cwt


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for One Cwt


MATERIAL
1
2

55.00
(1.08
(0.25
0.114

M.S. bars including Wastage


Binding wire

Total
Contractor's Profit & Overhea
Total

20

kg
Cwt)
lbs)
kg

per tonne
per kg

0.25 Nos.
0.25 Nos.

per day
per day

Percent

LABOUR
1
2

Black Smith
Collies unskilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Cwt
Labour rate per 100 Kg

Rs.
Rs.

Say
Say

Composite rate per Cwt


Composite rate per 100 Kg

Rs.
Rs.

Say
Say

Page 37

DESCRIPTION OF ITEM:
Item No. 10

Pre cast cement concrete solid or face blocks (1 : 2 : 4) including


templates.

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Analysis for 100 Cft


MATERIAL
1
2
3
4

Cement
Sand
Shingle
Kail Woden planks or steel plates for moulds

Total
Contractor's Profit & Overhea
Total

20

17.60
44.00
88.00
0.40

bags
Cft
Cft
Cft

per bag
% Cft
% Cft
P. Cft.

2.00
3.00
0.50
1.00

Nos.
Nos.
No.
No.

per
per
per
per

Percent

LABOUR
1
2
3
4

Mason
Collies unskilled
Carpenter
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total for 100 Cft

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 38

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 11

Pre cast cement concrete hollow block (1 : 2 : 4) including cost of


and constructing walls thereof.

Detail

Unit Rate (British System) per Cft


Qty

Rate

Per Unit

Analysis for 100 Cft


MATERIAL
1
2
3
4

Cement
Sand
Shingle
Kail Wood for templates

Total
Contractor's Profit & Overhea
Total

20

11.20
28.00
56.00
0.40

bags
Cft
Cft
Cft

per bag
% Cft
% Cft
P. Cft.

4.50
8.00
1.50
0.50

Nos.
Nos.
No.
No.

per
per
per
per

Percent

LABOUR
1
2
3
4

Mason
Collies unskilled
Bahishti
Carpenter for template

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 39

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 12

Providing and fixing ornamental concrete cement Jali 2" (50 mm) thi
(1 : 2 : 4) without steel.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Per Unit

Analysis for 10 Sft


MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form work (Kail Wood)

Total
Contractor's Profit & Overhea
Total

0.30
0.75
1.00
0.01

20

bags
Cft
Cft
Cft

per bag
% Cft
% Cft
P. Cft.

per day
per day

Percent

LABOUR
1
2

Mason
Collies unskilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.20 No.
0.20 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composit rate per Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 40

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 13

Extra labour for laying concrete plain or reinforced.


(a)

Above 20' upto 40' (6 metre to 12 metre) height.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 125 Cft


LABOUR
1

Collies unskilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate for 100 Cft

4.00 Nos.

10

Percent

20

Percent

363.00 x 10
125

per day

Say
Say

0.00

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 13

Extra labour for laying concrete plain or reinforced.


(b)

For every additional 10' (3 metre) height.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Analysis for 125 Cft


LABOUR
1

Collies unskilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate for 100 Cft

2.50 Nos.

10

Percent

20

Percent

226.88 x 10
125

per day

Say
Say

0.00

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 41

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 14

Extra labour work of weir, rail or road bridges syphons and concret
super-structure.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 125 Cft


LABOUR
1

Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate for 100 Cft

1.00 Nos.

10

Percent

20

Percent

per day

Say
Say

0.00
125

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 15

Making reinforced cement concrete spout, including fixing in positi


(2' x 6" x 5").

Detail

Unit Rate (British System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Bajri
Steel
Wood (Kail Wood)
Total
Contractor's Profit & Overhea
Total

0.09
0.22
0.88
0.70
0.007

20

Bag
Cft
Cft
Kg.
Cft

P. Bag
% Cft.
% Cft.
P. Kg.
P. Cft

0.25 No.
0.25 No.

per day
per day

Say
Say

Percent

LABOUR
1
2

Mason
Collies un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Spout
Composit rate per Spout

Rs.
Rs.

Page 42

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 16

Making hole upto 3" (75 mm) dia 18" (450 mm) deep in cement concret
stone masonry walls and repairing.

Detail

Unit Rate (British System) per Hole


Qty

Rate

Per Unit

Amount (Rs.)

LABOUR
1
2

Mason
Collies unskilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.60 No.
0.60 No.

10

Percent

20

Percent

per day
per day

Say

ITEM RATES
Labour rate per hole

Rs.

DESCRIPTION OF ITEM:
Item No. 17

Extra labour for skipping concrete in wells.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Analysis for 150 Cft


LABOUR
1
2

Well sinker/diver
Collies unskilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Cft

1.00 No.
6.00 Nos.

10

Percent

20

Percent

750.20 x 10
150

per day
per day

Say
Say

0.00

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 43

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 18

Nicking concrete surface.


(a)

Cement concrete surface.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 125 Sft


LABOUR
1

Mason

Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft

0.50 No.

10

Percent

20

Percent

per day

Say
Say

x 100
125

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 18

Nicking concrete surface.


(b)

Lime concrete surface.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

Analysis for 125 Sft


LABOUR
1

Mason
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft

0.165 No.

10

Percent

20

Percent

per day

Say
Say

x 100
125

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 44

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 19

Preparing, watering and ramming surface for laying concrete (for he


works only).
(a)

Horizontal floor.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 125 Sft


LABOUR
1
2

Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft

0.28 No.
0.25 No.

10

Percent

20

Percent

per day
per day

Say
Say

x 100
125

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 19

Preparing, watering and ramming surface for laying concrete (for he


works only).
(b)

Glacis and crest.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

Analysis for 125 Sft


LABOUR
1
2

Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft

0.50 No.
0.25 No.

10

Percent

20

Percent

per day
per day

Say
Say

x 100
125

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 45

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 19

Preparing, watering and ramming surface for laying concrete (for he


works only).
(c)

Inverted filters.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

Analysis for 125 Sft


LABOUR
1
2

Mason
Cooly un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total
Rate per 100 Sft

0.125 No.
0.125 No.

10

Percent

20

Percent

per day
per day

Say
Say

x 100
125

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 46

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 20

Fabrication of high tensile steel prestressing cables for prestress


(post tensioned) concrete, including assembling by drawing the H.T.
through metal spacer plate, inserting in helix core and taping or t
sheathing in longitudinally welded metal corrugated sheath, positio
anchorage with male and female set of anchorage cone, forming ducts
transverse cable, stressing cables with jack at both ends as per st
schedule, maintaining stressing record and supply the same in the
approved proforma to the Engineering-in-charge, making loop at blin
including all materials required for it, grouting the cable ducts w
cutting projected ends and making good recesses, etc.,

complete in

respects.

Detail

Unit Rate (British System) 100 Kg


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
(a)

(b)
(c)

(d)

(e)

(f)

Cable having 12 Nos. wire


12 x 209.86 x 75
1000
Wastage 8%
=

188.87 lbs
15.11
203.98

Anchorage cone, set of one male and


female for 12/0.276" (7 mm dia cable)
Self coupling longitudinally welded
carrogated sheath of 1-9/16" i/d for
12/0.276" (7 mm) cable
Helical core (compressed for 10 tons)
extension for 12/0.276 (7 mm) cable
stretch length 75'/10 =

7.5 ft.

Making good recessed with type 'A'


nominal mix 1:1:2: concrete
including curing
Cement
Sand (Harrow)
Bajri
Injecting cable 12/0.276 (7 mm)
with cement grout
i) Cement for injecting cable =
making good recess
=

92.54 kg

per ton

2.00 sets

per set

75.00 ft
22.86 metre

per metre

7.50 ft
2.29 metre

per metre

0.27 Bag
0.34 Cft.
0.68 Cft.

P. Bag
% Cft.
% Cft.

per bag
% Cft
% Cft

0.38 bags
0.07 bags
0.45 ba
0.45 bag
0.97 Cf
0.97 Cft
0.194 C
0.194 Cft

ii) Sand 39 x 0.25 100


=
iii) Bajri 78 x 0.25 100
=
Total
Contractor's Profit & Overhea
20 Percent
Total
Rate for 100 Kg
0.00 x 100
85.65

Page 47

LABOUR for 4 Nos.


1
2
3
4
5

Foreman/Supervisor
Black Smith
Coolies skilled
Coolies un-skilled
Total
Hire charges of assembling bunch
cable wire cutter stressing, jack
Hydraulic pump, conce, fixer grout
injecting pump reliveable observation
and supply of recorded data of
stresses.

Total
Sundries
Total
Contractor's Profit & Overhea
Total for 4 Nos.
Rate for one cable (85.65 Kg)
Rate for 100 Kg

2.00
6.00
4.00
8.00

No.
Nos.
Nos.
Nos.

per
per
per
per

day
day
day
day

L.S

10

Percent o

20

Percent
0

0.00

=
x 100
85.65

ITEM RATES
Labour rate per 100 Kg
Composite rate per 100 Kg

Rs.
Rs.
Say

Page 48

DESCRIPTION OF ITEM:
Item No. 21

Fabrication of High Tensile steel reinforcement for prestressed


(pretensioned) concrete work, including inserting wire in moulds, p
M.S. shear bars, spacers and lift hook, male and female anchorage,
down, struts, stressing cables, maintaining stress record and suppl
same in approved proforma to the Engineer-in-charge, cutting wires
projecting ends and making good recesses, etc., complet in all resp
Detail

Unit Rate (British System) per 100 Kg


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
(a)

(b)

Cable having 5 mm dia


5 x 500 x 102.5
1000
Cable having 4 mm dia
3 x 500 x 66.6
1000

356.15 lbs or 161.55 kg


Wastage 8%
=
2

Anchorage cone
one female for
i) 5 mm dia = 4x2
ii) 4 mm dia = 3x2

4
5

5 Nos.
256.25 lbs

3 Nos.
=
99.900 lbs
356.15 lbs
161.55 kg
12.92 kg
174.47
174.47 kg

set one male and


using
= 8 sets @ = 2000 =
= 6 sets @ = 2500 =

Using 4 times
=
4
Making good recesses with type 'A'
nominal mix 1:1:2 concrete
including curing 500 15 = 33+1
= 34 x 2 =
Repair of plate for the down struts
spacers
M.S bar used for spacer reinforcement
161.55 x 20 100
=
Wastage 1%

20

Material cost for 100 Kg


0.00 x 100
161.55

per ton

each end

per ton
kg

per
per
per
per

0.00
Rs.
0.00
Rs.
Rs. 0.00
=Rs.
0.00

68 ends

68.00 ends
L.S

32.31 kg
0.32 kg
32.63 k

Binding wire lbs


Total
Contractor's Profit & Overhea
Total

32.63 kg
0.114 kg

Percent

0.00

LABOUR
1
2
3
4
5

Foreman
Black Smith
Coolies skilled
Coolies un-skilled
Total
Hire charges of wire cutter
stressing, Jack, Hydraulic pump
relievable cone, observation and
supply of recorded data of stress.
Total
Sundries (10on labour
Total
Contractor's Profit & Overhea
Total

20

0.25
1.00
1.00
1.00

No.
Nos.
Nos.
Nos.

L.S

Percent

ITEM RATES
Labour rate per 100 Kg
Composite rate per 100 Kg

Rs.
Rs.

Page 49

day
day
day
day

DESCRIPTION OF ITEM:
Item No. 22

Lifting, transporting and placing precast prestressed concrete Beam


Girder and other members (excluding battens) etc., in position on
bridge to correct alignment and level, etc., complete.
(i)

Beam upto 50 ft. (15.0 metre) length.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Assumed for 375 Cft


EQUIPMENT
1
2
3
4
5
6

(a)

LABOUR
1
2
3
4

Cost of lifting machinery including carriage


Cost of trollies
Cost of steel rope 1"
U Clamp i/c 5/8" bolts & nuts
Steel rope " (3 x 20)
Railway track 200 ft. including sleepers bolts
& nuts complete 200' x 2 = 400 Rft @
235/-P-Rft
Crow bar
Total
Assume life of machinery = 5 years
depreciation for one year
0 5 =
0.00
Contractor's Profit & Overhea
20 Percent
Total
Beam 50'.0 in length 50x2x3.75 =
The above equipment used to lift/
transport and fixing in postion
during one year
=
Cft = 200 x 375
Amount per beam
x 375
75000
For 100 Cft
x 100
375
Working team for two beams of 375 Cft

Composite rate per 100 Cft


Composite rate per Cum

Page 50

No.
Nos.
Rft
Nos.
Rft

each
each
Rft
each
Rft

400.00 Rft
6.00 Nos.

Rft
each

375 Cft

200 beams
75000 Cft
0.00
0.00

Supervisor/foreman
Colies skilled
Crane operator
Coolies un-skilled
Total
Sundries
10 Percent
Total
20 Percent
Contractor's Profit & Overhea
Total for 2 beams of 375 Cft each
Rate for 100 Cft
x
10.00
2 x 375

ITEM RATES
Labour rate per 100 Cft
Labour rater per Cum

1.00
3.00
450.00
3.00
60.00

1.00
3.00
1.00
8.00

No.
Nos.
No.
Nos.

per
per
per
per

day
day
day
day

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 22

Lifting, transporting and placing precast prestressed concrete Beam


Girder and other members (excluding battens) etc., in position on
bridge to correct alignment and level, etc., complete.
(ii)

Beam above 50 ft. upto 75 ft (15 metre to 23 metre) length.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

EQUIPMENT
As per item 22(i)
(a)

Beam 75 x 2 x 3.75 =
The equipment used to lift/
transport and fixing in postion
during one year
=
Cft = 80 x 562.5 =
Amount per beam
-

562.5 Cft

80 beams
45000 Cft
x
562
45000

0.00

LABOUR
Full shift of Labour is required for
one day as per item 22(i)
Total

ITEM RATES
Machinary + Labour required to operate the
machinary
Rate per 100 Cft

Rs.
Rs.

Rate per Cum

Rs.

Page 51

x
562.50

100

DESCRIPTION OF ITEM:
Item No. 22

Lifting, transporting and placing precast prestressed concrete Beam


Girder and other members (excluding battens) etc., in position on
bridge to correct alignment and level, etc., complete.
(iii)

Beam above 75 ft. upto 100 ft (23 metre to 30 metre) length.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

EQUIPMENT
As per item 22(i)
(a)

Beam = 100 x 2 x 3.75 =


The equipment used to lift/
transport and fixing in postion
during one year
=
Cft = 60 x 750.0 =
Amount per beam
-

750 Cft

60 beams
45000 Cft
x
750
45000

0.00

LABOUR
Full shift of Labour is required for
two days as per item 22(i)

2.00

Total

ITEM RATES
Machinary + Labour required to operate the
machinary
Rate per 100 Cft
Rate per Cum

Rs.
Rs.
Rs.

Page 52

750.00

100
Say

DESCRIPTION OF ITEM:
Item No. 22

Lifting, transporting and placing precast prestressed concrete Beam


Girder and other members (excluding battens) etc., in position on
bridge to correct alignment and level, etc., complete.
(iv)

Beam above 100 ft. upto 150 ft (23 metre to 30 metre) length.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

EQUIPMENT
As per item 22(i)
(a)

Beam = 150 x 2 x 3.75


The equipment used to lift/
transport and fixing in postion
during one year
=
Cft = 34 x 1125 =
Amount per beam 34 x 1125 =
-

1125 Cft

34 beams
38250 Cft
x
1125
38250

0.00

LABOUR
Full shift of Labour is required for
four days as per item 22(i)

4.00

Total

ITEM RATES
Machinary + Labour required to operate the
machinary
Rate per 100 Cft

Rs.
Rs.

Rater per Cum

Rs.

0.00
x 100
1,125.00
Say
Say

Page 53

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 22

Lifting, transporting and placing precast prestressed concrete Beam


Girder and other members (excluding battens) etc., in position on
bridge to correct alignment and level, etc., complete.
(v)

Beam above 150 ft. upto 175 ft (46 metre to 53 metre) length.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

EQUIPMENT
As per item 22(i)
(a)

Beam = 175 x 2 x 3.75


The equipment used to lift/
transport and fixing in postion
during one year
=
Cft = 28 x 1312.5 =
Amount per beam
-

1312.5 Cft

28 beams
36750 Cft
x
1312
36750

0.00

LABOUR
Full shift of Labour is required for
six days as per item 22(i)

6.00

Total

ITEM RATES
Machinary + Labour required to operate the
machinary
Rate per 100 Cft

Rs.
Rs.

Rater per Cum

Rs.

Say
Say

Page 54

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 23

Providing and laying foam concrete 3" (75 mm) thick, using cement s
the ratio of 1 : 2 and aluminum powder at the rate of 0.2% of the c
mix.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Per Unit

Analysis for 20 Sft


MATERIAL
1
2
3

Cement
Sand
Aluminum powder 0.2% od cement sand
mix
Total
Contractor's Profit & Overhea
Total

20

1.00
2.50
0.66
0.30

bag
Cft
lbs
kg

per bag
% Cft
per kg

per day
per day
per day

Percent

LABOUR
1
2
3

Mason
Collies unskilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.20 Nos.
0.50 Nos.
0.10 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 55

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 24

Providing and fixing 6" (150 mm) wide curved sheet of required shap
on face of the construction joint with G.I. Screw, 1.5" (40 mm) lon
construction joints vertically.
(i)

Aluminum sheet 1/16" (1.6 mm) thick.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Per Unit

Analysis for 12 Rft


MATERIAL
1

2
3

Aluminum sheet 1/16" (1.6 mm) thick 6" (150 mm)


wide 12' (3.6 metre) long = 12' x 6" = 6 Sft
6 Sft @ 0.39 kg per Sft
=
2.34 Kg
Gutties 1.5' (450 mm) c/c
Screws 1" (40 mm)

Total
Contractor's Profit & Overhea
Total

20

2.34 kg
16.00 Nos.
17.00 Nos.

per kg
each
Doz

0.125 No.
0.094 No.

per day
per day

Percent

LABOUR
Mason
For making special slope

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per L.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per L.M

Rs.
Rs.

Say
Say

Page 56

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 24

Providing and fixing 6" (150 mm) wide curved sheet of required shap
on face of the construction joint with G.I. Screw, 1.5" (40 mm) lon
construction joints vertically.
(ii)

G.I. sheet, 18 SWG.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Per Unit

Analysis for 12 Rft


MATERIAL
1
2

G.I. Sheet 12' x 6" (3.60 x 0.150 metre)


Special shape i.e V shaped 2' (600 mm)
Interval

Total
Contractor's Profit & Overhea
Total

20

6 Sft

5.77 kg

per kg

6.00 Nos.

each

6.00 Sft
6.00 Nos.
0.13 No.

Sft
each
per day

Percent

LABOUR for 15 Rft


1
2
3

Cutting of G.I Sheet in required pieces


Fixing special required Nos.
Mason

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per L.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per L.M

Rs.
Rs.

Say
Say

Page 57

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 25

Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminum str
horizontal and vertical expansion joints in walls, columns, ceiling
etc., including cost of clips/screws etc., complete in all respect
(a)

On interior surface (without mastic strip).

Detail

Unit Rate (British System) per Rft


Qty

Rate

Per Unit

Analysis for 12 Rft


MATERIAL
1
2
3

Aluminum sheet 1/8 (3 mm) thic 3" (75 mm)


wide and 12' (3.6 metre) long = 12 Rft = 3 Sft
Gutties 1.5 c/c
Screws

Total
Contractor's Profit & Overhea
Total

20

2.34 kg
16.00 Nos.
17.00 Nos.

0.13 Nos.
0.13 Nos.

per kg
each
Dozen

Percent

LABOUR for 15 Rft


1
2

Mason
Moulder/Fitter

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per L.M.

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per L.M

Rs.
Rs.

Say
Say

Page 58

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 25

Providing and fixing 1/8" (3 mm) thick 3" (75 mm) wide aluminum str
horizontal and vertical expansion joints in walls, columns, ceiling
etc., including cost of clips/screws etc., complete in all respect
(b)

On exterior surface (with mastic strip).

Detail

Unit Rate (British System) per Rft


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 12 Rft


MATERIAL
1
2
3
4

Aluminum sheet 1/8 (3 mm) thick 3" (75 mm)


wide & 12' (3.6 metre) long 3.6 metre long (3.00 Sf
Gutties 1.5'(450 mm) c/c
Screws
12 Rft (3.6 metre) mastic strip

Total
Contractor's Profit & Overhea
Total
Cost of Material/Rft

20

2.34
16.00
17.00
12.00

kg
Nos.
Nos.
Rft

0.13 Nos.
0.13 Nos.

per kg
each
P. Dozen
per Rft

Percent

LABOUR for 15 Rft


1
2

Mason
Moulder/Fitter

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per L.M.

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per L.M

Rs.
Rs.

Say
Say

Page 59

DESCRIPTION OF ITEM:
Item No. 26

Providing and fixing 1/16" (1.6 mm) thick copper flashing on expans
complete in all respects.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Per Unit

Analysis for 100 Sft


MATERIAL
1
2

Coper flashing 100 Sft (9.35 metre)


with 5% wastage (105.00 Sft)
Nail & screws etc.

Total
Contractor's Profit & Overhea
Total

20

105.00 Sft
0.50 Kg.

Per Sft
Per Kg.

Percent

LABOUR
1
2

Carpenter/Black Smith
Helper

Total
Sundries
Total
Contractor's Profit & Overhea
Total

1.00 Nos.
1.00 Nos.

10

Percent

20

Percent

ITEM RATES
Labour rate per Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 60

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 27

Providing and fixing 6" (150 mm) wide G.I. sheet 18 SWG stopper to
joint.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Per Unit

Analysis for 10 Rft


MATERIAL
1

G.I. Sheet 18 SWG (10' x 6") (5.00 Sft)

Total
Contractor's Profit & Overhea
Total

20

4.83 kg

per kg

Percent

LABOUR
1
2

Cuting of G.I sheet to required length


placing G.I sheet joint at required height
Mason

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

0.012 Nos.
0.05 Nos.

ITEM RATES
Labour rate per Rft
Labour rate per L.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per L.M

Rs.
Rs.

Say
Say

Page 61

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 28

Providing and embedding 10" (250 mm) wide 1/4" thick (6 mm) thick r
water stopper in expansion joints of R.C.C roof slab complete in al

Detail

Unit Rate (British System) per Rft


Qty

Rate

Per Unit

Analysis for 10 Rft


MATERIAL
1

Rubber water stopped 10 Rft (3.6 metre)

Total
Contractor's Profit & Overhea
Total

20

10.00 Rft

Rft

0.25 No.

per day

Percent

LABOUR
1

Mason (for couting and embedding)

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Rft
Labour rate per metre

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per metre

Rs.
Rs.

Say
Say

Page 62

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 29

Filling expansion joints with bitumen sand and sawdust in ratio (1

Unit Rate (British System)


(Per Rft length per inch width)

Detail

Qty

Rate

Per Unit

Analysis for 100 Rft length 2" width x 4" deep


MATERIAL

Contents = 100' x 1/6' x 1/3'


=
Bitumen 5.5 5
=
65 lbs/Cft @ 71.5 lbs or
32.39 kg

5.5 Cft
1.1 Cft

2
3
4

Sand
5.5 x 2 5 =
Sawdust
5.5 x 2 5 =
Wood for heating 4 seers
=

2.2 Cft
2.2 Cft
1.82 kg

Total
Contractor's Profit & Overhea
Total

20

32.39
2.20
2.20
1.82

kg
Cft
Cft
kg

per kg
% Cft
per Cft
per kg

1.00 No.

per day

Percent

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per inch/per foot
Labour rate per 25 mm/per metre

Rs.
Rs.

Say
Say

Composite rate per inch/per foot


Composite rate per 25 mm/per metre

Rs.
Rs.

Say
Say

Page 63

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 30

Filling expansion joints with bitumen.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 10 Rft


LABOUR
1

Coolies skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.65 No.

10

Percent

20

Percent

per day

Say
Say

0.00

ITEM RATES
Labour rate per Rft
Labour rater per metre

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 31

Laying asphaltic mixture in expansion joints.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Per Unit

Analysis for 10 Rft


LABOUR
1

Cooly un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.70 No.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per Rft
Labour rater per metre

Rs.
Rs.

Page 64

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 32

Providing and fixing thermopore (foamed polythene) sheet in horizon


vertical expansion joints.
(a)

1" (25 mm) thick thermopore sheet.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Per Unit

Analysis for 100 Sft


MATERIAL
1

Thermopore sheet 1" (25 mm) thick wastage 5%


(105 Sft
=
9.76 Sqm)

Total
Contractor's Profit & Overhea
Total

20

9.76 Sqm

0.40 No.
0.40 No.

per day
per day

Percent

LABOUR
1
2

Mason
Cooly un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 65

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 32

Providing and fixing thermopore (foamed polythene) sheet in horizon


vertical expansion joints.
(b)

1" (40 mm) thick thermopore sheet.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Per Unit

Analysis for 100 Sft


MATERIAL
1

Thermopore sheet 1" (40 mm) thick wastage 5%


(105 Sft
=
9.76 Sqm)

Total
Contractor's Profit & Overhea
Total

20

9.76 Sqm

0.40 No.
0.40 No.

per day
per day

Percent

LABOUR
1
2

Mason
Cooly un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

ITEM RATES
Labour rate per Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 66

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 33

Providing and laying damp proof course of cement concrete 1 2 : 4 (


cement sand and shingle) including bitumen coating.
(a)

With one coat of bitumen and one coat polythene sheet 500 gauge.
(i)

1" (40 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush

7
8

Bitumen
Polythine 105 Sft @ 1.13 kg % Sft

Total
Contractor's Profit & Overhea
Total

20

2.25
5.50
11.00
0.103
5.82
0.20
(20.00
8.88
1.18

bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg
kg

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

per kg
per kg

0.15
0.50
2.00
0.25

No.
No.
Nos.
No.

per
per
per
per

Percent

LABOUR for 150 Sft


1
2
3
4

Carpenter
Mason
Coolies un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 67

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 33

Providing and laying damp proof course of cement concrete 1 2 : 4 (


cement sand and shingle) including bitumen coating.
(a)
(ii)

With one coat of bitumen and one coat polythene sheet 500 gauge.
2" (50 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush

7
8

Bitumen
Polythine with 5% wastage

Total
Contractor's Profit & Overhea
Total

20

2.93
7.50
15.00
0.103
5.82
0.20
(20.00
8.88
1.18

bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg
kg

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

per kg
per kg

0.15
0.50
2.00
0.25

No.
No.
Nos.
No.

per
per
per
per

Percent

LABOUR for 150 Sft


1
2
3
4

Carpenter
Mason
Coolies un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 68

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 33

Providing and laying damp proof course of cement concrete 1 2 : 4 (


cement sand and shingle) including bitumen coating.
(a)
(iii)

With one coat of bitumen and one coat polythene sheet 500 gauge.
3" (75 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush

7
8

Bitumen
Polythine with 5% wastage

Total
Contractor's Profit & Overhea
Total

20

4.50
11.00
22.00
0.103
5.82
0.20
(20.00
8.88
1.18

bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg
kg

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

per kg
per kg

0.25
0.50
2.00
0.25

No.
No.
Nos.
No.

per
per
per
per

Percent

LABOUR for 150 Sft


1
2
3
4

Carpenter
Mason
Coolies un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 69

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 33

Providing and laying damp proof course of cement concrete 1 2 : 4 (


cement sand and shingle) including bitumen coating.
(b)

With 2 coats of bitumen.


(i)

1" (40 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush

Bitumen 34 lbs/100 Sft (15.34 Kg/100 Sft)

Total
Contractor's Profit & Overhea
Total

20

2.25
5.50
11.00
0.103
5.82
0.20
(34.00
15.08

bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

per kg

0.15
0.50
2.00
0.25

No.
No.
Nos.
No.

per
per
per
per

Percent

LABOUR for 150 Sft


1
2
3
4

Carpenter
Mason
Coolies un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 70

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 33

Providing and laying damp proof course of cement concrete 1 2 : 4 (


cement sand and shingle) including bitumen coating.
(b)
(ii)

With 2 coats of bitumen.


2" (50 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush

Bitumen 34 lbs/100 Sft (15.34 Kg/100 Sft)

Total
Contractor's Profit & Overhea
Total

20

2.93
7.50
15.00
0.103
5.82
0.20
(34.00
15.08

bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

per kg

0.15
0.50
2.00
0.25

No.
No.
Nos.
No.

per
per
per
per

Percent

LABOUR for 150 Sft


1
2
3
4

Carpenter
Mason
Coolies un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total for 150 Sft

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 71

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 33

Providing and laying damp proof course of cement concrete 1 2 : 4 (


cement sand and shingle) including bitumen coating.
(b)
(iii)

With 2 coats of bitumen.


3" (76 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Shingle
Depreciation charges of wooden template (Kail Wood)
Fuel
Brush

Bitumen 34 lbs/100 Sft (15.34 Kg/100 Sft)


Total
Contractor's Profit & Overhea
Total

20

4.50
11.00
22.00
0.103
5.82
0.20
(34.00
15.08

bags
Cft
Cft
Cft
Kg.
No.
lbs)
kg

per bag
% Cft
% Cft
Per Cft
Per Cft
Each

per kg

0.50
2.00
0.25
0.25

No.
Nos.
No.
No.

per
per
per
per

Percent

LABOUR for 150 Sft


1
2
3
4

Mason
Coolies un-skilled
Carpenter
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 72

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(i)
(a)

With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 4.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage

Total
Contractor's Profit & Overhea
Total

0.73
3.60
5.82
0.20
8.86
1.18

20

bags
Cft
Kg.
No.
kg
kg

per bag
% Cft
Per Cft
Each
per kg
per kg

0.50 No.
2.00 Nos.
0.25 No.

per day
per day
per day

Percent

LABOUR for 150 Sft


1
2
3

Mason
Coolies un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 73

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(i)
(b)

With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 4.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage

Total
Contractor's Profit & Overhea
Total

1.14
5.50
5.82
0.20
8.86
1.18

20

bags
Cft
Kg.
No.
kg
kg

per bag
% Cft
Per Cft
Each
kg
kg

per day
per day
per day

Percent

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 74

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(ii)
(a)

With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 3.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage

Total
Contractor's Profit & Overhea
Total

0.88
3.40
5.82
0.20
8.86
1.18

20

bags
Cft
Kg.
No.
kg
kg

per bag
% Cft
Per Cft
Each
kg
per kg

per day
per day
per day

Percent

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate fore 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 75

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(ii)
(b)

With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 3.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage

Total
Contractor's Profit & Overhea
Total

1.32
5.10
5.82
0.20
8.86
1.18

20

bags
Cft
Kg.
No.
kg
kg

per bag
% Cft
Per Cft
Each
kg
per kg

per day
per day
per day

Percent

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 76

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(iii)
(a)

With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 2.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage

1.25
3.00
3.63
0.20
9.72
1.18

Total
Contractor's Profit & Overhea
20
i.e. on Rs.
Total

Percent

bags
Cft
Kg.
No.
kg
kg

per bag
% Cft
Per Cft
Each
per kg
per kg

per day
per day
per day

on items 1, 2, 3,4 & 6

LABOUR for 150 Sft


1
2
3

Mason
Coolies un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 Nos.
0.250 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 77

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(a)
(iii)
(b)

With one coat of bitumen and one coat polythen sheet 500 gauge.
Ratio 1 : 2.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage

1.92
3.00
3.63
0.20
9.72
1.18

Total
Contractor's Profit & Overhea
20
i.e. on Rs.
Total

bags
Cft
Kg.
No.
kg
kg

per bag
% Cft
Per Cft
Each
per kg
per kg

per day
per day
per day

Percent on item 1, 2, 3, 4 & 6

LABOUR for 150 Sft


1
2
3

Mason
Coolies un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 Nos.
0.250 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 78

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(i)
(a)

With 2 coats of bitumen.


Ratio 1 : 4.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel
Brush
Bitumen

0.73
3.60
3.65
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

Percent on item 1, 2, 3 & 4

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 79

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(i)
(b)

With 2 coats of bitumen.


Ratio 1 : 4.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel
Brush
Bitumen

1.14
5.50
3.63
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on Rs.
Total

Percent

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

on item 1, 2, 3 & 4

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 80

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(ii)
(a)

With 2 coats of bitumen.


Ratio 1 : 3.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel
Brush
Bitumen

0.88
3.40
3.73
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on
Rs
Total

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

Percent in item 1, 2, 3 & 4

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 81

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(ii)
(b)

With 2 coats of bitumen.


Ratio 1 : 3.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel
Brush
Bitumen

1.32
5.10
3.73
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

Percent in item 1, 2, 3 & 4

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 82

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(iii)
(a)

With 2 coats of bitumen.


Ratio 1 : 2.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel
Brush
Bitumen

1.25
3.00
3.73
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

Percent in item 1, 2, 3 & 4

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 83

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Provding and laying damp proof course with cement sand plaster and
coating.
(b)
(iii)
(b)

With 2 coats of bitumen.


Ratio 1 : 2.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
4
5
5

Cement
Sand
Fuel
Brush
Bitumen

1.92
5.00
3.73
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

Percent in item 1, 2, 3 & 4

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 84

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(i)
(a)

With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 4.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage

0.73
3.60
3.62
0.20
9.72
1.18

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg
kg

per bag
% Cft
Per Cft
Each
per kg
per kg

per day
per day
per day

Percent on item 1, 2, 3, 4 & 6

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.250 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 85

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(i)
(b)

With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 4.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage

1.14
5.50
3.63
0.20
9.72
1.18

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg
kg

per bag
% Cft
Per Cft
Each
per kg
per kg

per day
per day
per day

Percent on item 1, 2, 3, 4 & 6

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.250 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 86

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(ii)
(a)

With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 3.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage

0.88
3.40
3.63
0.20
9.72
1.18

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg
kg

per bag
% Cft
Per Cft
Each
per kg
per kg

per day
per day
per day

Percent on item 1, 2, 3, 4 & 6

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 87

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(ii)
(b)

With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 3.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Bitumen
Polythene with 5% wastage
Fuel
Brush

1.32
5.10
9.72
1.18
3.63
0.20

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

Percent on item 1, 2,

bags
Cft
kg
kg
Kg.
No.

per bag
% Cft
per kg
per kg
Per Cft
Each

per day
per day
per day

4, 5 & 6

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 88

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(iii)
(a)

With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 2.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage

1.25
3.00
3.63
0.20
9.72
1.18

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

Percent

bags
Cft
Kg.
No.
kg
kg

per bag
% Cft
Per Cft
Each
per kg
per kg

per day
per day
per day

on item 1, 2, 3, 4 & 6

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 89

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(a)
(iii)
(b)

With one coat of bitumen & one layer of polythene sheet 500 gauge.
Ratio 1 : 2.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6

Cement
Sand
Fuel
Brush
Bitumen
Polythene with 5% wastage

1.92
5.00
3.63
0.20
9.72
1.18

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

Percent

bags
Cft
Kg.
No.
kg
kg

per bag
% Cft
Per Cft
Each
per kg
per kg

per day
per day
per day

on item 1, 2, 3, 4 & 6

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 90

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(i)
(a)

With 2 coats of bitumen.


Ratio 1 : 4.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel
Brush
Bitumen

0.73
3.60
3.63
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

Percent

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

on item 1, 2, 3 & 4

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.250 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 91

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(i)
(b)

With 2 coats of bitumen.


Ratio 1 : 4.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel
Brush
Bitumen

1.14
5.50
3.63
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

Percent on item 1, 2, 3 & 4

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 92

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(ii)
(a)

With 2 coats of bitumen.


Ratio 1 : 3.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel
Brush
Bitumen

0.88
3.40
3.63
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

Percent on item 1, 2, 3 & 4

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 93

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(ii)
(b)

With 2 coats of bitumen.


Ratio 1 : 3.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel
Brush
Bitumen

1.32
5.10
3.63
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

Percent on item 1, 2, 3 & 4

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 94

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(iii)
(a)

With 2 coats of bitumen.


Ratio 1 : 2.
" (12 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel
Brush
Bitumen

1.25
3.02
3.63
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

Percent on item 1, 2, 3 & 4

LABOUR for 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 95

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 35

Providing and laying vertical damp proof course with cement sand pl
bitumen coating.
(b)
(iii)
(b)

With 2 coats of bitumen.


Ratio 1 : 2.
" (20 mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Cement
Sand
Fuel
Brush
Bitumen

1.92
5.00
3.63
0.20
16.50

Total
Contractor's Profit & Overhea
20
i.e. on
Rs.
Total

bags
Cft
Kg.
No.
kg

per bag
% Cft
Per Cft
Each
per kg

per day
per day
per day

Percent on item 1, 2, 3 & 4

LABOUR 150 Sft


1
2
3

Mason
Cooly un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total rate for 150 Sft

0.50 No.
2.00 No.
0.25 No.

10

Percent

20

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

Say
Say

Page 96

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 36

Grouting concrete between the grooves of gates including shuttering

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

LABOUR
1
2
3
4

Mason
Carpenter
Coolies un-skilled
Bahishti

Total
Sundries
Total
Contractor's Profit & Overhea
Total

2.00
0.50
5.00
1.00

10

Percent

20

Percent

Nos.
No.
Nos.
No.

per
per
per
per

day
day
day
day

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 37

Chiesel dressing concrete surface on sides of grooves.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

LABOUR
1

Mason

Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.22 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 97

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 38

Laying and ramming dry ballast or kankar.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

3.25 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 39

Hoisting and placing in position R.C.C shelves.

Detail

Unit Rate (British System) for Each


Qty

Rate

Per Unit

LABOUR for 32 Nos.


1
2

Mason
Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

1.00 No.
2.00 Nos.

10

Percent

20

Percent

per day
per day

Say

ITEM RATES
Labour rate per No.

Rs.

Page 98

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 40

Breaking brick ballast, screaning and stacking.


(a)

2" (50 mm) ring.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

2.50 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 40

Breaking brick ballast, screaning and stacking.


(b)

1" (40 mm) ring.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

2.80 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum

Rs.
Rs.

Page 99

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 40

Breaking brick ballast, screaning and stacking.


(c)

1" (25 mm) ring.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

3.25 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Composite rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 40

Breaking brick ballast, screening and stacking.


(d)

Jhama ballast " (20 mm) ring.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

3.75 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 100

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 41

Supplying and fixing broken glasses on courtyard walls, including 1


cement concrete coping.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Per Unit

Assumed for 100 Rft


MATERIAL (for 100 Rft)
For Coping
Assume base 13" and height 4" (114 mm)
for segment angle subtended at the centre
150' (45.75 metre) = 0.43 x 100' =
Add 25%
1
2
3
4

Cement
Sand
Stone agregate
Broken glass

Total
Contractor's Profit & Overhea
Total

20

43.00 Cft
0.107 Cft
53.7 Cft
4.40
16.00
32.00
2.00
74.39

bags
Cft
Cft
mds
kg

per bag
% Cft
per Cft
% kg

0.50
2.00
0.15
5.00

No.
Nos.
No.
Nos.

per
per
per
per

Percent

LABOUR
1
2
3
4

Mason
Coolies un-skilled
Bahishti for fixing glass
Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

10

Percent

20

Percent

day
day
day
day

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Say
Say

Composite rate per Rft


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 101

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 42

Crushing stone ballast by machine.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

2.50 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 43

Breaking stone ballast screened and stacked.


(a)

2" (50 mm) ring.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

2.80 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 102

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 43

Beaking stone ballast screened and stacked.


(b)

1" (40 mm) ring.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

3.25 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 43

Beaking stone ballast screened and stacked.


(c)

1" (25 mm) ring.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

3.75 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 103

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 43

Beaking stone ballast screened and stacked.


(d)

" (12 mm) ring.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

5.00 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 43

Beaking stone ballast screened and stacked.


(e)

1/8" (3 mm) to " (6 mm) ring.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

LABOUR
1

Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

8.50 Nos.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 104

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 44

Screening and stacking stone ballast shingle or bajri etc.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

LABOUR
1

Cooly un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.80 No.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 45

Washing ballast, bajri or shingle.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

LABOUR
1

Cooly un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.80 No.

10

Percent

20

Percent

per day

Say
Say

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 105

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 46

Erecting and carting sun shades of precast R.C concrete upto 5' x 2
(1.50 x 0.760 metre).

Detail

Unit Rate (British System) per Each


Qty

Rate

Per Unit

Assume 5 Nos.
LABOUR
1
2

Mason
Coolies un-skilled

Total
Sundries
Total
Contractor's Profit & Overhea
Total

0.50 No.
1.60 Nos.

10

Percent

20

Percent

per day
per day

Say

ITEM RATES
Labour rate per No.

Rs.

Page 106

Amount (Rs.)

CHAPTER NO.4

DISMANTLING
DESCRIPTION OF ITEM:
Item No. 1

Dismantling dry stone masonry.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Cooly un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.85 No.

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 1

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 2

Dismantling stone masonry in mud

Detail

mortar.

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Cooly un-skilled

1.25 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 3

Dismantling stone masonry in lime or cement mortar.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Cooly un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

3.00 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 2

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 4 (a)

Dismantling dry stone or spawl pitching.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

1.50 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 4 (b)

Dismantling stone or spawl pitching (mud grouted).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

1.90 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 3

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 5

Dismantling stone or spawl pitching and apron in silted c

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

2.50 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 6

Dismantling stone pitching cement or lime grouted.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

4.00 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 4

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 7

Dismantling stone in crates.


(a)

Wooden Crates

Detail

Unit Rate (British System) per 100 Cft


Qty

Analysis for 125 Cft

LABOUR
1

Rate Per UnitAmount (Rs.)

Coolies un-skilled

2.00 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 7

Dismantling stone in crates.


(b)

Wire crates

Detail

Unit Rate (British System) per 100 Cft


Qty

Analysis for 125 Cft

LABOUR
1

Rate Per UnitAmount (Rs.)

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

2.50 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 5

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 8

Dismantling stone ware drain including base concrete.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

1.40 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 9

Dismantling mud/pise walling.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Cooly un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.50 No.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 6

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 10

Dismantling sundried brick masonry.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

1.25 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 11

Dismantling dry brick masonry.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.85 No.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 7

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 12

Dismantling brick work in mud mortar.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

1.75 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 13

Dismantling brick work in lime or cement mortar.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

4.25 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 8

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 14

Dismantling cement block masonry.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

3.75 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 15

Dismantling Dhajji walling.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

1.00 No.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 9

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 16

Dismantling mud concrete.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

2.00 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 17

Dismantling lime concrete.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

2.75 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 10

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 18

Dismantling lime or cement concrete under water.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

10.50 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 19 (a)

Dismantling cement concrete plain 1 : 4 : 8.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

5.50 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 11

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 19 (b)

Dismantling cement concrete plain 1 : 3 : 6.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

9.00 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 19 (c)

Dismantling cement concrete plain 1 : 2 : 4.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

11.00 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 12

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 19 (d)

Dismantling cement concrete with brick aggregate.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

3.00 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 19 (e)

Dismantling D.P.C of cement concrete 1" thick and cleari

Detail

Unit Rate (British System) per 100 Cft


Qty

Analysis for 125 Cft

LABOUR
1

Rate Per UnitAmount (Rs.)

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

1.50 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 13

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 20

Dismantling cement concrete reinforced, separating reinfo


concrete and straightening the same.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

18.00 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 21

Dismantling sirki sarkanda or thatched roofing supported


battens.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.60 No.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 14

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 22 (a)

Dismantling Ist class tile roofing.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled

1.50 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 22 (b)

Dismantling 2nd class tile roofing.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

1.25 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 15

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 23

Dismantling from any height asbestos sheet and ridge copi

Detail

Unit Rate (British System) per 100 Sft


Qty

Analysis for 125 Sft

LABOUR
1
2

Rate Per UnitAmount (Rs.)

Fitter
Coolies un-skilled

0.25 No.
0.50 No.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 24 (a)

Dismantling roof of wooden planks and battens upto any he

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Sft


LABOUR
1
2

Carpenter
Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.20 No.
0.40 No.

0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 16

0.00
0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 24 (b)

Dismantling wooden ceiling above 6 m (20' height) in diff


including lifting with care and special scaffolding along
and with machines underneath.

Detail

Unit Rate (British System) per 100 Sft


Qty

Analysis for 125 Sft

LABOUR
1
2

Rate Per UnitAmount (Rs.)

Carpenter
Cooly un-skilled

0.60 No.
1.80 Nos.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 25

Dismantling Jack arch roofing including removal of joists

Detail

Unit Rate (British System) per 100 Sft


Qty

Analysis for 125 Sft

LABOUR
1

Rate Per UnitAmount (Rs.)

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

2.00 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 17

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 26

Dismantling R.B. roof complete with mud and mud plaster i


separating reinforcement, cleaning and straightening the

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled

2.50 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 27 (a)

Stripping and stackings slates or tiles from the truss ro

Detail

Unit Rate (British System) per 100 Sft


Qty

Analysis for 125 Sft

LABOUR
1

Rate Per UnitAmount (Rs.)

Coolies unskilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

1.25 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 18

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 27 (b)

Stripping and stacking G.I. sheet roof.

Detail

Unit Rate (British System) per 100 Sft


Qty

Analysis for 125 Sft

LABOUR
1
2

Rate Per UnitAmount (Rs.)

Fitter
Cooly unskilled

0.12 No.
1.00 No.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 27 (c)

Extra for dismantling G.I. sheet roof above 6 m (20') in


position including lifting with special scaffolding alone
wires with machines under-neath.

Detail

Unit Rate (British System) per 100 Sft


Qty

Analysis for 125 Sft

LABOUR
1
2

Rate Per UnitAmount (Rs.)

Blacksmith
Cooly unskilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

1.00 No.
0.25 No.

0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 19

0.00
0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 28

Dismantling slates or tiles including battens purlines &

Detail

Unit Rate (British System) per 100 Sft


Qty

Analysis for 125 Sft

LABOUR
1

Rate Per UnitAmount (Rs.)

Coolies un-skilled

2.00 Nos.

Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 29

Dismantling brick or flagged flooring without concrete fo

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.85 No.

0.00per day

Percent

0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 20

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 30

Dismantling plank or wooden block flooring etc.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

1.25 Nos.

0.00per day

Percent

0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 21

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 31

Dis-jointing R.C.C. pipe inside the trench and dismentlin


the pipes from the trench and stacking them out side.
(a)

6" to 12" dia-metre.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Rft


LABOUR
i) For dis-jointing the pipe inside
the trench one mason will take
hour for disjointing each joint.
Day's out put is 16 joints
i.e. 100 Rft.
1
2

Mason
Cooly un-skilled

1.00 No.
1.00 No.

0.00per day
0.00per day

0.00
0.00

1.00 No.

0.00per day

0.00

ii) For dismantling the pipe line and


removal of the pipe from trench
and stacking out-side.
1

Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

NOTE:

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

1)

Bends, elbows, sluice valves etc should not be paid for e


of pipe line that is being dismantled.

2)

The rate does not include the cost of excavation and refi

Page 22

DESCRIPTION OF ITEM:
Item No. 31

(b)

Above 12

inches

to 24 inches Dia-metre.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Rft


LABOUR
i) For dis-jointing the pipe inside
the trench one mason will take
hour for disjointing each joint.
Day's out put is 16 joints
i.e. 100 Rft.
1
2

Mason
Cooly un-skilled

1.00 No.
1.00 No.

0.00per day
0.00per day

0.00
0.00

3.00 Nos.

0.00per day

0.00

ii) For dismantling the pipe line and


removal of the pipe from trench
and stacking out-side.
1

Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Page 23

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 31 (c)

Above 24

inches

to 36 inches Dia-metre.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 150 Rft


LABOUR
i) For dis-jointing the pipe inside
the trench one mason will take
hour for disjointing each joint.
Day's out put is 16 joints
i.e. 100 Rft.
1
2

Mason
Cooly un-skilled

1.50 Nos.
1.50 Nos.

0.00per day
0.00per day

0.00
0.00

4.00 Nos.

0.00per day

0.00

ii) For dismantling the pipe line and


removal of the pipe from trench
and stacking out-side.
1

Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Page 24

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 31 (d)

Above 36

inches

Dia-metre.

Detail

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 150 Rft


LABOUR
i) For dis-jointing the pipe inside
the trench one mason will take
one hour for disjointing each joint.
Day's out put is 8 joints or 50 Rft
1
2

Mason
Cooly un-skilled

2.00 Nos.
2.00 Nos.

0.00per day
0.00per day

0.00
0.00

6.00 Nos.

0.00per day

0.00

ii) For dismantling the pipe line and


removal of the pipe from trench
and stacking out-side.
1

Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per Rft
Labour rate per R.M

Rs.
Rs.

Page 25

0.00

Say
Say

0.00

DESCRIPTION OF ITEM:
Item No. 32 (a)

Removing door with chowkat.

Detail

Unit Rate (British System) per No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR
1
2
3

Cooly un-skilled
Mason
Carpenter

0.15 No.
0.10 No.
0.05 No.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day
0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATE
Labour rate per No.

0.00
0.00
0.00

Rs.

0.00

Say

0.00

DESCRIPTION OF ITEM:
Item No. 32 (b)

Removing window and sky lights with chowkat.

Detail

Unit Rate (British System) per No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR
1
2
3

Cooly un-skilled
Mason
Carpenter
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.10 No.
0.08 No.
0.05 No.

0.00per day
0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATE
Labour rate per No.

Rs.

Page 26

0.00
0.00
0.00

0.00

Say

DESCRIPTION OF ITEM:
Item No. 33

Removing ventilators and wooden sunshades etc.

Detail

Unit Rate (British System) per No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR
1
2
3

Cooly un-skilled
Mason
Carpenter

0.05 No.
0.05 No.
0.02 No.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day
0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATE
Labour rate per No.

0.00
0.00
0.00

Rs.

0.00

Say

DESCRIPTION OF ITEM:
Item No. 34 (a)

Dismantling wooden beams upto 4 m (12') in length.

Detail

Unit Rate (British System) per No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR
1

Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.25 No.

0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATE
Labour rate per No.

Rs.

Page 27

0.00

0.00

Say

0.00

DESCRIPTION OF ITEM:
Item No. 34 (b)

Dismantling wooden beams above 4 m to 7 m in length.

Detail

Unit Rate (British System) per No.


Qty

Rate Per UnitAmount (Rs.)

LABOUR
1

Cooly un-skilled

0.40 No.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATE
Labour rate per No.

0.00

Rs.

0.00

Say

0.00

DESCRIPTION OF ITEM:
Item No. 35 (a)

Dismantling wooden partition Jaffary work etc.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Rate analysis for 700 Sft


LABOUR
1
2

Carpenter
Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

1.00 No.
2.00 Nos.

0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 28

0.00
0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 35 (b)

Dismantling wooden trusses.

Detail

Unit Rate (British System) per 100 Kg


Qty

Rate Per UnitAmount (Rs.)

Rate analysis for 6 Cwt


LABOUR
1
2

Carpenter
Coolies un-skilled

0.25 No.
4.00 Nos.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
Labour rate per Cwt
ITEM RATES

0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00
0.00

Percent
Percent

Labour rate 100 Kg

0.00
0.00

Rs.

Say

0.00

DESCRIPTION OF ITEM:
Item No. 36

Dismantling wooden

Detail

pelisade fencing.

Unit Rate (British System) per Rft


Qty

Rate Per UnitAmount (Rs.)

Rate Analysis for 60 Rft


LABOUR
1
2

Carpenter
Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

1.00 No.
1.00 No.

0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per Rft
Labour rate per Metre

Rs.
Rs.

Page 29

0.00
0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 37

Dismantling iron work of trusses, sheds, water tanks etc.


cutting of rivets.

Detail

Unit Rate (British System) per 100 Kg


Qty

Rate Per UnitAmount (Rs.)

Rate Analysis for 6 Cwt


LABOUR
1
2

Carpenter
Coolies un-skilled

1.00 No.
3.00 Nos.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
Labour rate per Cwt
ITEM RATES

0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00
0.00

Percent
Percent

Labour rate per 100 Kg

0.00
0.00

Rs.

Say

0.00

DESCRIPTION OF ITEM:
Item No. 38

Dismantling rolled steel beame or iron rails etc.

Detail

Unit Rate (British System) per 100 Kg


Qty

Rate Per UnitAmount (Rs.)

Rate Analysis for 15 Cwt (762.0 Kg)


LABOUR
1

Coolies un-skilled

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
Labour rate per Cwt
ITEM RATES

5.00 Nos.

0.00per day

0.00
0.00
0.00
0.00
0.00
0.00

Percent
Percent

Labour rate per 100 kg

Rs.

Page 30

0.00

0.00

Say

0.00

DESCRIPTION OF ITEM:
Item No. 39

Dismantling iron latrine.

Unit Rate (British System) per Unit of 2 S

Detail

Qty

Rate Per UnitAmount (Rs.)

LABOUR
1
2

Fitters
Cooly un-skilled

0.40 No.
1.00 No.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATE
Labour rate per unit of two seats

0.00
0.00

Rs.

0.00

Say

0.00

DESCRIPTION OF ITEM:
Item No. 40

Dismantling tees, bends or sluice valves upto 12" bore.

Detail

Unit Rate (British System) for each per inch


Qty

Rate Per UnitAmount (Rs.)

Rate Analysis for 6 Nos. 12" bore


LABOUR
1
2

Fitters
Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total
Labour rate for 1 No. 12" bore

1.00 No.
1.00 No.

0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate for each per 1" (25mm) bore
Labour rate for each per cm bore

Page 31

0.00
0.00

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 41 (a)

Dismantling B.G. water column.

Detail

Unit Rate (British System) per Each


Qty

Rate Per UnitAmount (Rs.)

LABOUR
1
2
3

Mason
Black-smith
Coolies un-skilled

0.75 No.
0.75 No.
8.00 Nos.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day
0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate for Each

0.00
0.00
0.00

Rs.

0.00

Say

0.00

DESCRIPTION OF ITEM:
Item No. 41 (b)

Dismantling M.G. or N.G water column.

Detail

Unit Rate (British System) per Each


Qty

Rate Per UnitAmount (Rs.)

LABOUR
1
2
3

Mason
Black-smith
Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.50 No.
0.75 No.
5.00 Nos.

0.00per day
0.00per day
0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate for Each

Rs.

Page 32

0.00
0.00
0.00

Say

0.00

DESCRIPTION OF ITEM:
Item No. 42

Dismantling all types of wire fencing including rolling t


bundles and collecting material.

Detail

Unit Rate (British System) per 100 Rft


Qty

Rate Per UnitAmount (Rs.)

Rate Analysis for 250 Rft


LABOUR
1

Coolies un-skilled

1.70 Nos.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

0.00
0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Rft
Labour rate per R.M

Rs.
Rs.

0.00

Say
Say

0.00

DESCRIPTION OF ITEM:
Item No. 43

Dismantling wire netting of tennis court and frame work.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 SFt


LABOUR
1

Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.40 No.

0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 33

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 44

Dismantling cloth ceiling and supporting timber.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled

0.75 No.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 45

Dismantling and removing road metalling.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

2.00 Nos.

0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Page 34

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 46

Dismantling and removing road pavement, etc., including s


and staking of by products upto one chain lead.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Coolies un-skilled

2.67 Nos.

Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.00per day

0.00
0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 47

Removing mud Plaster from walls.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 600 Sft


LABOUR
1

Cooly un-skilled
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

1.00 No.

0.00per day

0.00
0.00
0.00
0.00
0.00

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 35

0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 48

Removing cement or lime plaster.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Rate Analysis for 300 Sft


LABOUR
1

Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

1.00 No.

10.00

Percent

20.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

0.00per day

0.00
0.00
0.00
0.00
0.00
0.00

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 49 (a)

Scrapping of white wash or colour wash.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

LABOUR
1

Coolies un-skilled
Total
Sundries
Total
Contractor Profit
Total

0.20 No.

10.00

Percent

20.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

0.00
0.00
0.00
0.00
0.00
0.00

Rs.
Rs.

Page 36

0.00per day

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 49 (b)

Scrapping ordinary distemper, oil bound distemper or pain

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Sft


LABOUR
1

Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

0.75 No.

10.00

Percent

20.00

Percent

0.00per day

0.00
0.00
0.00
0.00
0.00

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 50

Dismantling glazed or encaustic tiles etc.

Detail

Unit Rate (British System) per 100 Sft


Qty

Analysis for 125 Sft

LABOUR
1
2

Rate Per UnitAmount (Rs.)

Mason
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

1.00 No.
1.00 No.

10.00

Percent

20.00

Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rs.
Rs.

Page 37

0.00per day
0.00per day

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 51

Scraping boulders.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per UnitAmount (Rs.)

Analysis for 125 Cft


LABOUR
1

Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

3.50 Nos.

10.00

Percent

20.00

Percent

0.00per day

0.00
0.00
0.00
0.00
0.00
0.00

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 52

Cleaning lime or cement mortar of old stones to be re-use

Detail

Unit Rate (British System) per 100 Cft


Qty

Analysis for 125 Cft

LABOUR
1

Rate Per UnitAmount (Rs.)

Coolies un-skilled
Total
Sundries
Total
Contractor Profit
Total

1.75 Nos.

10.00

Percent

20.00

Percent

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

0.00
0.00
0.00
0.00
0.00
0.00

Rs.
Rs.

Page 38

0.00per day

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 53

Dismantling of light, fans & call bell point including ca


open type & making good damaged surface (building portion

Detail

Unit Rate (British System) per point


Qty

Rate Per UnitAmount (Rs.)

Rate Analysis for 30 Points


MATERIAL
1
2

Cement
Sand
Total
Contractor Profit
Total

20.00

0.02 Bag
0.11 Cft

Each B
% Cft,

0.00
0.00
0.00
0.00
0.00

1.00 No.
0.50 No.

0.00per day
0.00per day

0.00
0.00

Percent

LABOUR
1
2

Electrician
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

10.00

Percent

20.00

Percent

0.00
0.00
0.00
0.00
0.00

ITEM RATES
Labour rate per point
Composite rate for each point

Rs.
Rs.

Page 39

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 54

Dismantling plug point and making good damaged surface (b


portion).

Detail

Unit Rate (British System) per point


Qty

Rate Per UnitAmount (Rs.)

Rate Analysis for 35 Points


MATERIAL
1
2

Cement
Sand
Total
Contractor Profit
Total

20.00

0.02 Bag
0.11 Cft

Each B
% Cft,

0.00
0.00
0.00
0.00
0.00

1.00 No.
0.50 No.

0.00per day
0.00per day

0.00
0.00

Percent

LABOUR
1
2

Electrician
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

10.00

Percent

20.00

Percent

0.00
0.00
0.00
0.00
0.00

ITEM RATES
Labour rate for each point
Composite rate for each point

Rs.
Rs.

Page 40

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 55

Dismantling G.I conduit/M.S conduit/G.I Flexible/PVC Pipe


wiring etc of all sizes including making good damaged sur
portion).
(i)

On surface.

Detail

Unit Rate (British System) per foot


Qty

Rate Per UnitAmount (Rs.)

Rate Analysis for 50 Metre


MATERIAL
1
2

Cement
Sand
Total
Contractor Profit
Total

20.00

0.02 Bag
0.11 Cft

Each B
% Cft,

0.00
0.00
0.00
0.00
0.00

1.00 No.
0.50 No.

0.00per day
0.00per day

0.00
0.00

Percent

LABOUR
1
2

Electrician
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

10.00

Percent

20.00

Percent

0.00
0.00
0.00
0.00
0.00

ITEM RATES
Labour rate per Foot
Composite rate per Foot

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Labour rate per R.M


Composite rate per R.M

Rs.
Rs.

0.00

Say
Say

0.00

Page 41

DESCRIPTION OF ITEM:
Item No. 55

Dismantling G.I conduit/M.S conduit/G.I Flexible/PVC Pipe


wiring etc of all sizes including making good damaged sur
portion).
(ii)

Recessed in wall.

Detail

Unit Rate (British System) per foot


Qty

Rate Per UnitAmount (Rs.)

Rate analysis for 30 Metre


MATERIAL
1
2

Cement
Sand
Total
Contractor Profit
Total

20.00

0.02 Bag
0.11 Cft

Each B
% Cft,

0.00
0.00
0.00
0.00
0.00

1.00 No.
1.00 No.

0.00per day
0.00per day

0.00
0.00

Percent

LABOUR
1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor Profit
Total

10.00

Percent

20.00

Percent

0.00
0.00
0.00
0.00
0.00

ITEM RATES
Labour rate per Foot
Composite rate per Foot

Rs.
Rs.

Say
Say

Labour rate per R.M


Composite rate per R.M

Rs.
Rs.

Say
Say

Page 42

CHAPTER NO.3

EARTH WORK
(EXCAVATION & EMBANKMENT)
DESCRIPTION OF ITEM:

Item No. 1

Earth work excavation undressed lead upto a single throw of kassi,


Phaorah or shovel.
a)

In ashes, sand, soft soil or silt clearance.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled for digging


(including dagbelling for borrow pits)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

3.75 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 1

Say
Say

DESCRIPTION OF ITEM:
Item No. 1

Earth work excavation undressed lead upto a single throw of kassi,


Phaorah or shovel.
b)

In ordinary soil.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1

Coolies unskilled for digging


(including dagbelling for borrow pits)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.50 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 2

Earthwork excavation in ashes, sand and soft soil or silt clearance,


undressed lead upto 50 ft (15 metre).
Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Coolies un-skilled for digging, filling, lifting (including


dab belling for borrow pits
2.5 Nos.
Coolies unskilled for carrying
3.00 Nos.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 2

Say
Say

DESCRIPTION OF ITEM:
Item No. 3

Bed clearance and dressing slopes of drains to required sections


including the removal of weeds, roots, etc, disposal of excavated
materials within 50 ft (15 metre) lead.
a)

Excavated material undressed.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Coolies unskilled for digging


Coolies unskilled for carrying
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00 Nos.
3.00 Nos.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 3

Bed clearance and dressing slopes of drains to required sections


including the removal of weeds, roots, etc., disposal of excavated
materials within 50 ft (15 metre) lead.
b)

Excavated material dressed in the specified manner.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging


Coolies unskilled for carrying
Dresser
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00 Nos.
3.00 Nos.
0.55 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 3

Say
Say

DESCRIPTION OF ITEM:
Item No. 4

Borrowpit excavation undressed lead upto 100 ft. (30 metre)


a)

Ordinary Soil.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Coolies unskilled for digging and filling


Coolies unskilled for carrying

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00 Nos.
3.00 Nos.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 4

Borrowpit excavation undressed lead upto 100 ft. (30 metre).


b)

Hard Soil.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Coolies unskilled for digging and filling


Coolies unskilled for carrying
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

5.60 Nos.
3.00 Nos.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 4

Say
Say

DESCRIPTION OF ITEM:
Item No. 5

Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:
(i)

95% to 100% maximum modified AASHTO dry-density with vibratory roller.


Mixing, Moisterning earth to optimum moisture contant in layer etc.
complete with tractor complete with rotorator blade.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft (65 m)


LABOUR
1
2
3
4

Coolies unskilled for digging


Coolies unskilled for carrying
Dresser cooly skilled
Cooly unskilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00
3.00
0.125
0.142

Nos.
Nos.
No.
No.

per
per
per
per

day
day
day
day

Percent
Percent

MACHINERY (For 1000 Cft Compacted)


1
2

Tractor with rotarator blade


Vibratory Road Roller

0.25 HR
0.25 HR

per hrs.
per hrs.

Total

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 5

DESCRIPTION OF ITEM:
Item No. 5

Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:
(ii)

90% maximum modified AASHTO dry density.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3
4

Coolies unskilled for digging


Coolies unskilled for carrying
Dresser cooly skilled
Cooly Unskilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00
3.00
0.125
0.142

Nos.
Nos.
No.
No.

per
per
per
per

day
day
day
day

Percent
Percent

MACHINERY (For 1000 Cft Compacted)


1
2

Tractor with rotarator blade


Vibratory Road Roller

0.25 HR
0.20 HR

per hrs.
per hrs.

Total

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 6

DESCRIPTION OF ITEM:
Item No. 5

Earthwork in ordinary soil for embankments lead upto 100 ft. (30 metre)
including ploughing and mixing with blade grade or disc harrow or
other suitable equipment and compaction by mechanical means at
optimum moisture content and dressing to designed section, complete
in all respects:
(iii)

85% maximum modified AASHTO dry density.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3
4

Coolies unskilled for digging


Coolies unskilled for carrying
Dresser cooly skilled
Cooly Unskilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00
3.00
0.125
0.142

Nos.
Nos.
No.
No.

per
per
per
per

day
day
day
day

Percent
Percent

MACHINERY (For 1000 Cft Compacted)


1
2

Tractor with rotarator blade


Vibratory Road Roller

0.25 HR
0.15 HR

per hrs.
per hrs.

Total

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 7

DESCRIPTION OF ITEM:
Item No. 6

Regular excavation dressed.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging carrying


and dagbelling.
Dresser
Cooly skilled for dressing
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.50 Nos.
0.50 No.
0.12 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 8

Say
Say

DESCRIPTION OF ITEM:
Item No. 7

Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
i)

Ordinary

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

Kail Wood for shuttering


Total
Contractor's Profit & Ove #####
Total

0.046 Cft.

P. Cft.

Percent

LABOUR
1
2
3
4
5
6
7

Coolies unskilled
Coolies unskilled
Coolies unskilled
Coolies unskilled
Cooly un-skilled
Dresser
Skilled cooly for
under pinning

for
for
for
for

digging, filling & dagbelling


carrying
temporary diviation
removal of surplus water

4.00
1.50
0.50
0.50
1.00
1.00

Nos.
Nos.
No.
No.
No.
No.

per
per
per
per
per
per

day
day
day
day
day
day

per day

fixing and timbering

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

0.20 No.

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 9

DESCRIPTION OF ITEM:
Item No. 7

Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
ii)

Hard

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

Kail Wood for shuttering


Total
Contractor's Profit & Ove #####
Total

0.046 Cft.

P. Cft.

Percent

LABOUR
1
2
3
4
5
6
7

Coolies unskilled
Coolies unskilled
Coolies unskilled
Coolies unskilled
Cooly un-skilled
Dresser
Skilled cooly for
under pinning

for
for
for
for

digging, filling & dagbelling


carrying
temporary diviation
removal of surplus water

5.60
1.50
0.50
0.50
1.00
1.00

Nos.
Nos.
No.
No.
No.
No.

per
per
per
per
per
per

day
day
day
day
day
day

per day

fixing and timbering

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

0.20 No.

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 10

DESCRIPTION OF ITEM:
Item No. 7

Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
iii)

Very Hard

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

Kail Wood for shuttering


Total
Contractor's Profit & Ove #####
Total

0.046 Cft.

0.00 P. Cft.

Percent

LABOUR
1
2
3
4
5
6
7

Coolies unskilled
Coolies unskilled
Coolies unskilled
Coolies unskilled
Cooly un-skilled
Dresser
Skilled cooly for
under pinning

for
for
for
for

digging, filling & dagbelling


carrying
temporary diviation
removal of surplus water

7.30
1.50
0.50
0.50
1.00
1.00

Nos.
Nos.
No.
No.
No.
No.

per
per
per
per
per
per

day
day
day
day
day
day

per day

fixing and timbering

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

0.20 No.

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 11

DESCRIPTION OF ITEM:
Item No. 7

Earthwork excavation in open cutting upto 5 ft (1500 mm) depth for storm
water channels, drains, sullage drains in open areas, roads, streets, lane
including under pinning of walls and shoring to protect existing works,
shuttering and timbering the trenches, dressed to designed level and
dimensions, trimming, removal of suface water from trenches, back filling
surplus excavated material disposed of and dressed within 50 ft (15 metre)
lead.
Gravel and Shingle.

iv)

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

Kail Wood for shuttering


As per item No.7 - (i)
=
Total
Contractor's Profit & Ove #####
Total

0.046 Cft.

P. Cft.

Percent

LABOUR
1
2
3
4
5
6
7

Coolies unskilled
Coolies unskilled
Coolies unskilled
Coolies unskilled
Cooly un-skilled
Dresser
Skilled cooly for
under pinning

for
for
for
for

digging, filling & dagbelling


carrying
temporary diviation
removal of surplus water

10.00
4.50
2.00
1.00
0.50
2.00

Nos.
No.
No.
No.
No.
No.

per
per
per
per
per
per

day
day
day
day
day
day

per day

fixing and timbering

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

0.20 No.

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 12

DESCRIPTION OF ITEM:
Item No. 8

Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
i)

Ordinary soil

Detail

Unit Rate (British System) per 1000 Cft


Rate
Qty
Rate Per Unit
Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

Wood for shuttering


Total
Contractor's Profit & Ove #####
Total

0.092 Cft.

P. Cft.

Percent

LABOUR
1
2
3
4

Coolies unskilled for digging and filling


Coolies unskilled for carrying
Coolies unskilled for removing surface water
Dresser for dressing, fixing shuttering
removing and temporary shuttering
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00 Nos.
4.00 Nos.
0.50 No.

per day
per day
per day

1.00 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 13

DESCRIPTION OF ITEM:
Item No. 8

Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
ii)

Hard Soil

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

Wood for shuttering


Total
Contractor's Profit & Ove #####
Total

0.092 Cft.

P. Cft.

Percent

LABOUR
1
2
3
4

Coolies unskilled for digging and filling


Coolies unskilled for carrying
Coolies unskilled for removing surface water
Dresser for dressing, fixing shuttering
removing and temporary shuttering
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

5.60 Nos.
4.00 Nos.
0.50 No.

per day
per day
per day

1.00 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 14

DESCRIPTION OF ITEM:
Item No. 8

Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
iii)

Very Hard

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

Wood for shuttering


Total
Contractor's Profit & Ove #####
Total

0.092 Cft.

P. Cft.

Percent

LABOUR
1
2
3
4

Coolies unskilled for digging and filling


Coolies unskilled for carrying
Coolies unskilled for removing surface water
Dresser for dressing, fixing shuttering
removing and temporary shuttering
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

7.30 Nos.
4.00 Nos.
0.50 No.

per day
per day
per day

1.00 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 15

DESCRIPTION OF ITEM:
Item No. 8

Earth work excavation in open cutting 5.01 ft.(1527mm) to 10.0 ft. (3000mm
depth for storm water channels, drains sullage drains in open areas, roads
streets, lanes including under pinning of walls and shoring to protect
existing works, shuttering and timbering the trenches, dressed to disigned
level and dimensions, trimming, removal of surface water from trenches,
back filling and surplus excavated material disposal of and dressed within
100 ft. (30 metre) lead.
iv)

Gravel and Shingle

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

Wood for shuttering


Total
Contractor's Profit & Ove #####
Total

0.092 Cft.

P. Cft.

Percent

LABOUR
1
2
3
4
5

Coolies unskilled for digging


Coolies unskilled for carrying
Coolies unskilled for filling
Removing surface water
Dresser
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

9.00
6.00
4.00
1.00
2.00

Nos.
Nos.
Nos.
No.
Nos.

per
per
per
per
per

day
day
day
day
day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 16

DESCRIPTION OF ITEM:
Item No. 9

Excavation in shingle or gravel formation and rock, not, requiring


blasting, undressed lead upto 100 ft. (30 metre).
i)

Dry

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging


Coolies unskilled for filling
Coolies unskilled for carrying
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

9.00 Nos.
4.00 Nos.
6.00 Nos.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 9

Excavation in shingle or gravel formation and rock, not, requiring


blasting, undressed lead upto 100 ft. (30 metre).
ii)

Wet

Detail

Unit Rate (British System) per 1000 Cft


Rate
Qty
Per Unit
Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging


Coolies unskilled for filling
Coolies unskilled for carrying
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

10.00 Nos.
5.00 Nos.
7.00 Nos.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 17

Say
Say

DESCRIPTION OF ITEM:
Item No. 9

Excavation in shingle or gravel formation and rock, not, requiring


blasting, undressed lead upto 100 ft. (30 metre).
iii)

In flowing water

Detail

Unit Rate (British System) per 1000 Cft


Rate
Qty
Per Unit
Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging


Coolies unskilled for filling
Coolies unskilled for carrying
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

14.00 Nos.
6.50 Nos.
7.50 Nos.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Earth work excavation in irrigation channels, drains, etc., to designed


section, grades and profiles excavated material disposed off and dressed
with in 50 ft (15 metre) lead.
i)

Ordinary soil

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies
filling
Coolies
Dresser

unskilled for digging, filling


& dag belling
unskilled for carrying
(for slopes and bed)

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00 Nos.
3.00 Nos.
1.00 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 18

Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Earth work excavation in irrigation channels, drains, etc., to designed


section, grades and profiles excavated material disposed off and dressed
with in 50 ft (15 metre) lead.
ii)

Hard soil

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies
filling
Coolies
Dresser

unskilled for digging,


& dag belling
unskilled for carrying
(for slopes and bed)

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

5.60 Nos.
3.00 Nos.
1.00 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Earth work excavation in irrigation channels, drains, etc., to


designed section, grades and profiles excavated material disposed
off and dressed with in 50 ft (15 metre) lead.
iii)

Very hard soil

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies
filling
Coolies
Dresser

unskilled for digging,


& dag belling
unskilled for carrying
(for slopes and bed)

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

7.30 Nos.
3.00 Nos.
1.00 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 19

Say
Say

DESCRIPTION OF ITEM:
Item No. 10

Earth work excavation in irrigation channels, drains, etc., to


designed section, grades and profiles excavated material disposed
off and dressed with in 50 ft (15 metre) lead.
iv)

Shingle and gravel

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3
4

Coolies
filling
Coolies
Coolies
Dresser

unskilled for digging,


& dag belling
unskilled for filling
unskilled for carrying
(for slopes and bed)

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

8.00
4.00
6.00
2.00

Nos.
Nos.
Nos.
Nos.

per
per
per
per

day
day
day
day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 11

Excavation in rock dressed to designed section, grades and profiles,


excavated material disposed off within 100 ft. (30 metre) and lift upto 5
(1.5 metre).
a)

Soft rock, Slate, Shale, Schist or laterite works, with pick & crowbar.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies unskilled for digging & carrying


Dresser
Bahishti
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

14.00 Nos.
4.00 Nos.
1.00 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 20

Say
Say

DESCRIPTION OF ITEM:
Item No. 11

Excavation in rock dressed to designed section, grades and


profiles, excavated material disposed off within 100 ft. (30 metre) and
lift upto 5 ft. (1.5 metre).
b)

Medium hard rocks requiring occasional blasting.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

Cost of gun powder and fuse


(1 lbs and 1 fuse)
0.453 kg @ 14.00/kg
=
1 fuse (1 metre) @ 14/-

Contractor's Profit & Ove #####


Total

3.00 Nos.

each

6.34
14.00
20.34
Percent

LABOUR
1
2
3
4
5
6
7
8
9

Coolies skilled for boring holes with steel jumper


3.00 Nos.
Coolies skilled for tempering & fixing charges
0.13 No.
Blowman
1.00 No.
Coolies unskilled for digging
12.00 Nos.
Breaking coolies un-skilled stone and removing the spoil 9.00 Nos.
Mate (skilled cooly)
0.50 No.
Dresser
2.00 Nos.
Hammerman
1.00 No.
Blacksmith for repairing tools etc.
1.00 No
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

per
per
per
per
per
per
per
per
per

day
day
day
day
day
day
day
day
day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 21

DESCRIPTION OF ITEM:
Item No. 12 (a)

Excavation in hard rock requiring blasting, and disposal of excavated


material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.
i)

Grade-I

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

(Powder and fuse) for blasting


(1 lbs and one fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/Total
Contractor's Profit & Ove #####
Total

3.00 No.

each

Percent

LABOUR
1
2
3
4
5
6
7

Quarrymen for boring hole and fixing


etc. (skilled cooly)
Quarrymen for digging and breaking
large stone into small ones
Chiselar for dressing
Bahishti
Coolies unskilled for remaining spoil
upto 50 ft. 15 metre lead
Blacksmith
Smithy cooly
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

3.00 Nos.

per day

7.00 Nos.
1.00 No.
0.50 No.

per day
per day
per day

6.00 Nos.
0.25 No.
0.25 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 22

DESCRIPTION OF ITEM:
Item No. 12 (a)

Excavation in hard rock requiring blasting, and disposal of excavated


material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.
ii)

Grade-II

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

(Powder and fuse) for blasting


(1 lbs and one fus)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/Total
Contractor's Profit & Ove #####
Total

5.00 No.

each

Percent

LABOUR
1
2
3
4
5
6
7

Quarrymen for boring hole and fixing etc.


Digging and breaking
large stone into small one
Chiselar for dressing
Bahishti
Black-smith for repairing tools etc.
Smithy cooly
Coolies unskilled for remaining spoil
upto 50 ft. (15 metre) lead
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00 Nos.

per day

7.00
1.00
0.50
0.50
0.50

per
per
per
per
per

day
day
day
day
day

per day

Nos.
No.
No.
Nos.
No.

6.00 No.

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 23

DESCRIPTION OF ITEM:
Item No. 12 (a)

Excavation in hard rock requiring blasting, and disposal of excavated


material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.
iii)

Grade-III

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

(Powder and fuse) for blasting


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/Total
Contractor's Profit & Ove #####
Total

6.00 No.

each

Percent

LABOUR
1
2
3
4
5
6
7

Quarrymen for boring hole and fixing etc.


Digging and breaking large stones
into small one.
Chiselar for dressing
Bahishti
Blacksmith for repairing tools
Smithy cooly
Coolies un-skilled for removing spoil upto 50 ft.
(15 metre)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

5.00 Nos.

per day

8.50
1.50
0.75
0.75
0.75

per
per
per
per
per

day
day
day
day
day

per day

Nos.
No
No.
No.
No.

6.00 Nos.

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 24

DESCRIPTION OF ITEM:
Item No. 11 (a)

Excavation in hard rock requiring blasting, and disposal of excavated


material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc. complete.
iv)

Grade-IV

Detail

Unit Rate (British System) per 1000 Cft


Rate
Qty
Per Unit
Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

(Powder and fuse) for blasting


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/Total
Contractor's Profit & Ove #####
Total

7.00 No.

each

Percent

LABOUR
1
2
3
4
5
6
7

Quarrymen for boring hole and fixing etc.


Digging and breaking large stones
into small one.
Chiselar for dressing
Bahishti
Blacksmith for repairing tools
Smithy cooly
Coolies un-skilled for removing spoil upto 50 ft.
(15 metre)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

6.00 Nos.

per day

9.00
2.00
0.75
1.00
1.00

per
per
per
per
per

day
day
day
day
day

per day

Nos.
No
No.
No.
No.

6.00 Nos.

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 25

DESCRIPTION OF ITEM:
Item No. 12

Excavation in hard rock requiring blasting, and disposal of excavated


material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc., complete.
v)

Grade-V

Detail

Unit Rate (British System) per 1000 Cft


Rate
Qty
Per Unit
Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

(Powder and fuse) for blasting


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.14/Total
Contractor's Profit & Ove #####
Total

8.00 No.

each

Percent

LABOUR
1
2
3
4
5
6
7

Quarrymen for boring hole and fixing etc.


Digging and breaking large stones
into small one.
Chiselar for dressing
Bahishti
Blacksmith for repairing tools
Smithy cooly
Coolies un-skilled for removing spoil upto 50 ft.
(15 metre)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

7.00 Nos.
10.00
2.50
1.00
1.00
1.00

Nos.
No
No.
No.
No.

6.00 Nos.

per day

per
per
per
per
per

day
day
day
day
day

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 26

DESCRIPTION OF ITEM:
Item No. 12

Excavation in hard rock requiring blasting, and disposal of excavated


material (blasted material) upto 50 ft. (15 metre) lead (including dressing
and levelling to designed section etc., complete.
vi)

Grade-VI

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

(Powder and fuse) for blasting


(1 lbs and 1 fuse)
0.543 kg @ 14.00/kg + 1 fuse 1 metre @ Rs.
Total
Contractor's Profit & Ove #####
Total

9.00 No.

each

Percent

LABOUR
1
2
3
4
5
6
7

Quarrymen for boring hole and fixing etc.


Digging and breaking large stones
into small one.
Chiselar for dressing
Bahishti
Blacksmith for repairing tools
Smithy cooly
Coolies un-skilled for removing spoil upto 50 ft.
(15 metre)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

8.00 Nos.
10.00
3.00
1.00
1.25
1.25

Nos.
No
No.
No.
No.

6.00 Nos.

per day

per
per
per
per
per

day
day
day
day
day

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 27

DESCRIPTION OF ITEM:
Item No. 12 (b)

Excavation in hard rock requiring blasting, but blasting prohibited, and


disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.
i)

Grade-I

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (i)

Add 100% to the rate on item No. 12 (a) (i)

LABOUR
(0.01)

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 12 (b)

Excavation in hard rock requiring blasting, but blasting prohibited, and


disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete).
ii)

Grade-II

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (ii)

Add 100% to the rate on item No. 12 (a) (ii)

LABOUR

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 28

DESCRIPTION OF ITEM:
Item No. 12 (b)

Excavation in hard rock requiring blasting, but blasting prohibited, and


disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.
iii)

Grade-III

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (iii)

Add 100% to the rate on item No. 12 (a) (iii)

LABOUR

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 12 (b)

Excavation in hard rock requiring blasting, but blasting prohibited, and


disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.
iv)

Grade-IV

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (iv)

Add 100% to the rate on item No. 12 (a) (iv)

LABOUR

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 29

DESCRIPTION OF ITEM:
Item No. 12 (b)

Excavation in hard rock requiring blasting, but blasting prohibited, and


disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.
v)

Grade-V

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (v)

Add 100% to the rate on item No. 12 (a) (v)

LABOUR

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 12 (b)

Excavation in hard rock requiring blasting, but blasting prohibited, and


disposal of excavated material within 50 ft. (15 metre) lead (including
dressing and levelling to designed section etc., complete.
vi)

Grade-VI

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
Add 100% to the rate on item No. 12 (a) (vi)

Add 100% to the rate on item No. 12 (a) (iv)

LABOUR

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 30

DESCRIPTION OF ITEM:
Item No. 13

Rehandling of Earth Work


a)

Lead upto a single throw of Kassi, Phaorah or Shovel.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled

2.50 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 13

Rehandling of Earth Work


b)

Upto a lead of

50 ft. (15 metre)

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Cooly un-skilled for filling


Coolies un-skilled for carrying
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

1.50 No.
2.00 No.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 31

Say
Say

DESCRIPTION OF ITEM:
Item No. 14

Rehandling of gravel work or excavated rock, lead upto 50 ft. (15 metre).

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Cooly un-skilled for filling


Coolies un-skilled for carrying
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00 Nos.
6.00 Nos.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 15

Filling watering and ramming earth under floors.


i)

With surplus earth from foundation etc.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3
4

Coolies un-skilled for ramming


Coolies un-skilled for carrying
Dresser earth work
Bahishti
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

1.50
2.00
1.00
0.50

Nos.
Nos.
No.
No.

per
per
per
per

day
day
day
day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 32

Say
Say

DESCRIPTION OF ITEM:
Item No. 15

Filling, watering and ramming earth under floors.


ii)

With new earth excavated from outside, lead upto one chain (30 metre).

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3
4
5

Diggers
Carrier
Dresser
Rammer Cooly un-skilled
Bahishti
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00
2.58
1.00
1.50
0.50

Nos.
Nos.
No.
Nos.
No.

per
per
per
per
per

day
day
day
day
day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 33

Say
Say

DESCRIPTION OF ITEM:
Item No. 16

Extra for every 50 ft. (15 metre) additional lead or part thereof.
i)

For earth work soft, ordinary, hard and very hard.


I) Earth work excavation in ashes sand soft soil or silt lead 500 ft. (150 me
By means of donkey labour.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Actual expenses of 4 No. belchas


LABOUR on monthly basis (for 30 days)
(a)

28 men detailed as below Kharkar (owner)


Belcha men for excavation
Gantiman (with pick axes)
Topalies (men with donkeys for carrying earth)
Langri (Cooks)
Chowkidars
Dobashi (man for supervision)

1.00
8.00
4.00
10.00
2.00
2.00
1.00

No.
Nos.
Nos.
Nos.
Nos.
Nos.
No.

per
per
per
per
per
per
per

month
month
month
month
month
month
month

Total
Exenditure per day
(b)
(c)
i)

0
0.00
30
Jamadari commission for supplying labour on Rs.
0.00 @ 6%
Food etc as under
One seer Atta per man daily for 28 men

Kitchen expenses (tea meat, milk,


fuel, fat & aplienees)
iii) Lantern, Patromax lamp depreciation
and K. oil consumption
iv) Kitchen Utensil, cost of repair and
replacement etc.

28.00 seer
26.12 kg

per kg

ii)

L.S.

Total: = a + b + c =
0.00
II - i)Donkeys
28 Nos. Donkeys worker 500 ft. lead in belcha
7 No. Donkey in each belcha
Average working life of one donkey
6 years
Average cost price of one donkey
=
0.00
After depriceation cost of one donkey =
0.00
Amount per day
28 x 0
0.00
=
6 x 365 Say
ii) Food etc as under for 28 donkeys
Phak, 5 seers (4.67 kg) per day per donkey
= 28 x 5
=
3.50 mds
40
Grams, 2 seers (0.933 x 2) = 1.866 kg per donkey
Per day
28 x 2 =
1.40 mds
40
Total-II
iii) Material
The following articles are required:
a) 4 No. pick axes and 8 Nos. belchas
cost of repairs and replacement
b) Sharpening expenses for pick axes
and belchas 12 No.
c) Palana with namda complete for one donckey
Rs.300 average life 4 months. Hence cost per
day
28 x 0
=
4 x 30
d) 2 sacks daily consumption repairs and
Page 34

L.S.

L.S.

3.50 mds

per Md

1.40 mds

per Md

0.00 per day


12.00 No.

0.00

each

replacement etc.
e) Sutli consumption

2.00 Nos.
0.6 Kg.

each
P. Kg.

Total - III

iv) Comp. Equipment


a) 4 No. tents are used for labour of
4 belchas, cost of one tent Rs.
Average life 12 month
Hence cost per day
4 x 0
365
b) Dondky hut expenditure = 2500/Average lift of hut = 6 months
Cost per day
0
6 x 30
Total - IV
(v) Medical Expenditure

0.00

0.00

III

Total - V
+

IV

Contractor's Profit & Ove #####


Total

per day

For 28 men and 28 donkey


Grand Total I + II

Percent

Hence cost per belcha

0.00
0.00
4
i) Progress per belcha in ashes sand, soft soil or
silt = 1650 Cft and lead 500 ft.
Rate for 1000 Cft
0.00 x 1000
0.00
1650
Rate for 1000 Cft lead 50 ft. (as per item No.2)
of this Chapter
0.00
Difference for 450 =
0.00 - 0.00
Rate for 50 ft. lead
0.00
0.00
9
ii) Progress per belcha in ordinary soil =
1260 Cft
Rate for 1000 Cft lead 500 ft.
0.00 x 1000
0.00
1260
Rate for 1000 Cft lead 50' as per item No. (10-i) SR
of this Chapter
0.00
Difference for lead 450ft
0.00 - 0.00
0.00
Rate for 50 ft. lead
0.00
0.00
9
Rate for every 50 ft. add lead or a part thereof
iii) Progress per belcha in hard soil 1150 Cft
Rate for 1000 Cft lead 500 ft.
0.00 x 1000
0.00
=
1150
Rate for 1000 Cft lead 50 ft.
(as per item No.10-ii of the Chapter
Difference for lead 450ft
0.00 - 0.00
Rate for 50 ft. lead
0.00
9

=
=

Rate for every 50 ft. Addl. lead or thereof


iv) Progress per belcha in very hard soil 990 Cft
Rate for 1000 Cft lead 500 ft.
0.00 x 1000
=
990
Rate for 1000 Cft lead 50 ft.
(as per item No.10-iii) of this Chapter
Difference for lead 450ft
0.00 - 0.00
=
Rate for 50 ft. lead
0.00
Page 35

0.00
0.00

0.00

0.00
0.00

9
Rate for eveyr 50 ft. Add. lead or part thereof
i)

For earth work. Soft, ordifnary, hard and very hard


Extra lead for every 50 ft. or part thereof
(as per detail above i - iv)
Total
Average rate
Vi + Vii + Viii + Viv 0.00
Labour rate per 1000 Cft

= 0.00

(i) (iFor gravel, shingle or rock extra labour required


for 1000 Cft. The carriage of spoil from these
formalities over and above that required for soil
is 20%

Stat

This rate shall apply to


lead upto mile when
the lead is more than
mile lead shall be
paid as carriage of
material by
mechanical mean.

0.00 x 20
100.00

0.00

0.00 + 0.00

0.00

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 36

0.00

DESCRIPTION OF ITEM:
Item No. 17

Transportation of earth all types when the total distance, including the l
covered in the item of work, is more than 1000 ft.
(a)

Upto mile

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Based on item No.1 of Chapter Carriage


Rate of Ist chain of 100 ft.
=
Rate of 2nd chain of 100 ft.
=
Rate of 3rd chain to 10th chain
@ Rs.
per Chain for 8 chains
=
Rate of 1000 to 1320 ft. ( mile)
@ Rs.26.30 per 1000 ft. (26.30 1000 x 400)
Total rate for mile
Deduct rate of
in the item of
Rate of mile
Rate of mile

Ist chain already included


earth work
=
for 100 Cft
for 1000 Cft = (36.77 x 10)

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

0.00

Say
Say

DESCRIPTION OF ITEM:
Item No. 17 (b)

For every 330 ft. additional lead or part-thereof, beyond mile upto one m

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Rate of Ist mile of 100 Cft


=
Rate of Ist mile of 1000 Cft (129.55 x 10) =
Deduct rate of mile as per item 17(a)
=
Net rate for mile upto one mile
=
Rate for 330 ft.:
5280 - 1320
= 12
0.00
330
12

Amount (Rs.)

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 37

Say
Say

DESCRIPTION OF ITEM:
Item No. 17 (c)

For every mile additional lead or part thereof, beyond one mile upto 5 m

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate of 2nd mile


as per item 1 of
Rate of 2nd mile
Rate for every

for 100 Cft


chapter Carriage
per 1000 Cft =
(25.75 x 10) =
mile (257.50 4)

Rate Per Unit

Amount (Rs.)

=
=

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 17 (d)

For every mile additional lead or part thereof, beyond 5 miles.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

mile rate upto 5th mile beyond


one mile for 1000 Cft as per item 17(c)
=
Rate reduced as per percentage
=
calculated between the rates
of item 17(c) and 17(d) of CSR-1979
15 - 10.25 =
75 x 100 =
15
Reduction in rate = 64.40 x 31.67% =
Thus rate for every mile additional lead
beyond 5 miles
(64.40 - 20.40) =

Amount (Rs.)

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 38

Say
Say

DESCRIPTION OF ITEM:
Item No. 18

Dressing and levelling of earth work to designed section etc., complete:


a)

Ashes, Sand, Silt or Soft Soil.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Dresser
Cooly un-skilled

0.20 No.
0.12 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 18

Dressing and levelling of earth work to designed section etc., complete:


b)

Ordinary or hard soil.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Dresser
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

0.50 No.
0.12 No.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 39

Say
Say

DESCRIPTION OF ITEM:
Item No. 18

Dressing and levelling of earth work to designed section etc., complete:


c)

Gravel work or soft rock not requiring blasting.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Quarryman for dressing


Cooly un-skilled

1.00 No.
0.50 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 19

Dowel dressing.

Detail

Unit Rate (British System) per Chain


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 150 Rft


LABOUR
1
2

Dresser
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 150 Rft
Rate per 100 Rft

0.25 No.
0.10 No.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per Chain
Labour rate per R.M

Rs.
Rs.

Page 40

Say
Say

DESCRIPTION OF ITEM:
Item No. 20 (a)

Dressing Slopes of banks or ground surface.

Detail

Unit Rate (British System) per 1000 Sft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Sft


LABOUR
1
2

Dresser
Cooly un-skilled

1.00 No.
0.30 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Sft

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 20 (b)

Dressing of earth work (done by Machinery or otherwise and left undressed)


to designed section.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1600 Sft


LABOUR
1
2

Dresser
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1600 Sft

1.00 No.
2.00 Nos.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 41

Say
Say

DESCRIPTION OF ITEM:
Item No. 21

Excavation in foundation of building, bridges and other structures,


including dag belling, dressing refilling around structure with excavated
earth, watering and ramming, lead upto one chain (30 metre) and lift upto
5 ft. (1.5 metre).
a)

In sand, ashes or loose soil.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies un-skilled for digging & refilling


Coolies un-skilled for carrying earth
Dresser
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

5.00 Nos.
3.00 Nos.
1.00 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 21

Excavation in foundation of building, bridges and other structures,


including dag belling, dressing refilling around structure with excavated
earth, watering and ramming, lead upto one chain (30 metre) and lift upto
5 ft. (1.5 metre).
b)

In ordinary soil.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies un-skilled for digging & refilling


Coolies un-skilled for carrying earth
Dresser
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

6.00 Nos.
3.00 Nos.
1.50 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 42

Say
Say

DESCRIPTION OF ITEM:

Item No. 21

Excavation in foundation of building, bridges and other structures,


including dag belling, dressing refilling around structure with excavated
earth, watering and ramming, lead upto one chain (30 metre) and lift upto
5 ft. (1.5 metre).

c)

In hard soil or soft murum.

Detail

Unit Rate (British System) per 1000 Cft

Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR

Coolies un-skilled for digging & refilling

7.00 Nos.

per day

Coolies un-skilled for carrying earth

3.00 Nos.

per day

Dresser

1.75 No.

per day

Total
Sundries

#####

Percent

Total
Contractor's Profit & Ove #####

Percent

Total Rate for 1250 Cft

ITEM RATES

Labour rate per 1000 Cft

Rs.

Say

Labour rate per Cum

Rs.

Say

Page 43

DESCRIPTION OF ITEM:
Item No. 22

Cutting hard rock such as granite, ballast hard line, stone or sand stone
with chisels and lammers for small foundations.

Detail

Unit Rate (British System) per 1000 Cft


Rate
Qty
Rate Per Unit
Amount (Rs.)

Rate Analysis for 1250 Cft


MATERIAL
1

Steel

Charcoal

Total
Contractor's Profit & Ove #####
Total

50
22.69
500
#####

Lbs
kg
Lbs
kg

kg

kg

Percent

LABOUR
1
2
3
4

Hammerman 4 No. for 7 days


Skilled Coolies 4 No. for 7 days
Black smith 1 No. for 7 days
Cooly un-skilled for carrying 1 No. for 7 days
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

28.00
28.00
7.00
7.00

No.
No.
No.
No.

per
per
per
per

day
day
day
day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 44

DESCRIPTION OF ITEM:
Item No. 23

Extra for excavation requiring shoring.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


METERIAL
1

Kail Wood for shoring

54.00

Total
Contractor's Profit & Ove #####
Total

0.154 Cft.

P. Cft.

Percent

LABOUR
1
2

Cooly un-skilled
Carpenter

1.00 No.
0.25 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 24

Compaction of earth work (soft, ordinary or hard soil)


a)

Mixing, moistering earth to optimum moister content in layer for


compaction etc. complete.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Cooly un-skilled
Bahishti
Dresser earth
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

0.12 No.
0.30 No.
0.75 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 45

Say
Say

DESCRIPTION OF ITEM:
Item No. 24

Compaction of earth work (soft, ordinary or hard soil)


b)

Compaction by rolling with animal driven roller/hand rammed.


i) Soft or sandy soil

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Bullockman
Cooly un-skilled

1.00 No.
0.50 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 24

Compaction of earth work (soft, ordinary or hard soil)


b)

Compaction by rolling with animal driven roller/hand rammed.


ii) Ordinary soil.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Bullockman
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

1.25 No.
0.50 No.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 46

Say
Say

DESCRIPTION OF ITEM:
Item No. 24

Compaction of earth work (soft, ordinary or hard soil)


b)

Compaction by rolling with animal driven roller/hand rammed.


iii) Hard soil.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Bullockman
Cooly un-skilled

1.25 No.
0.75 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 24

Compaction of earth work (soft, ordinary or hard soil)


b)

Compaction by rolling with animal driven roller/hand rammed.


iv) Admixture of shingle.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Bullockman
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

1.50 No.
0.75 No.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 47

Say
Say

DESCRIPTION OF ITEM:
Item No. 24

Compection of earth work (soft, ordinary or hard soil)


c)

Ramming earthwork (all type of soil)

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled

1.50 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 24

Compaction of earth work (soft, ordinary or hard soil)


d)

Ramming earthwork behind retaining walls.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled for watering & ramming


Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

2.00 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 48

Say
Say

DESCRIPTION OF ITEM:
Item No. 25

Compaction of earthwork with power road roller, including ploughing,


mixing, moistening earth to optimum moisture content in layers etc.
complete.
i)

95% to 100% maximum modified AASHTO dry density.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1000 Cft


LABOUR
As per item No. 5 (i) of this chapter for machi

0.00

1000 Cft

Cft

Total Rate for 1000 Cft

ITEM RATES
Composite rate per 1000 Cft
Composite rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 25

Compaction of earthwork with power road roller, including ploughing,


mixing, moistening earth to optimum moisture content in layers etc.
complete.
ii)

90% maximum modified AASHTO dry density.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1000 Cft


LABOUR
As per item No. 5 (ii) of this chapter for mach

0.00

1000 Cft

Total Rate for 1000 Cft

Cft

ITEM RATES
Composite rate per 1000 Cft
Composite rate per Cum

Rs.
Rs.

Page 49

DESCRIPTION OF ITEM:
Item No. 25

Compaction of earthwork with power road roller, including ploughing,


mixing, moistening earth to optimum moisture content in layers etc.
complete.
iii)

85% maximum modified AASHTO dry density.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1000 Cft


LABOUR
As per item No. 5 (iii) of this chapter for mac

0.00

1000 Cft

Cft

Total Rate for 1000 Cft

ITEM RATES
Composite rate per 1000 Cft
Composite rate per Cum

Rs.
Rs.

DESCRIPTION OF ITEM:
Item No. 26

Extra for wet earth work.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled for digging, filling & lifting


Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

3.50 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 50

Say
Say

DESCRIPTION OF ITEM:
Item No. 27

Extra for slush or daldal including dewatering.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled for digging, filling & lifting


and dewatering
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

8.00 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 28

Extra for puddling.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Bahishti
Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

1.50
4.75 No.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 51

Say
Say

DESCRIPTION OF ITEM:
Item No. 29

Earthwork on small rain water drains along canal banks roads and
plantion drains dressed etc., complete.

Detail

Unit Rate (British System) per 100 Rft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 125 Rft


LABOUR
1

Coolies un-skilled

0.95 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate fore 125 Rft

per day

Percent
Percent

ITEM RATES
Labour rate per 100 Rft
Labour rate per metre

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 30

Filling and compacting soil earth and boulders behind retaining walls
(including excavation of soil and lead upto 50 ft. (15 metre).

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Excavation, carriage & filling


Watering and compaction
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

7.00 Nos.
2.00 Nos.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 52

Say
Say

DESCRIPTION OF ITEM:
Item No. 31

Dag belling 3" (75 mm) deep.

Detail

Unit Rate (British System) per Mile


Qty

Rate Per Unit

Amount (Rs.)

Assume 2500 Rft


LABOUR
1

Dresser

1.40 Nos.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total

per day

Percent
Percent

ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 32

Turfing slopes of banks or lawns with grass sods including ploughing


laying settling and watering (Turf got from within a distance of 5 miles
(8 kilometre) and maintenance for 15 days).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 300 Sft


LABOUR
1
2
3
4

Coolies un-skilled for digging sods


Coolies un-skilled for carrying load 8 km
Laying setting and watering
Watering for 15 days
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 300 Sft

0.50
1.00
1.00
1.50

No.
No.
No.
No.

per
per
per
per

day
day
day
day

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 53

Say
Say

DESCRIPTION OF ITEM:
Item No. 33

Berm cutting
a)

Lead upto a single throw of Kassi, phaora or shovel (without dressing).

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled for digging including


dag-belling for barrow pits
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.50 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 33

Berm cutting
b)

Upto 50 ft. (15 metre) lead (including dressing).

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2
3

Coolies un-skilled for digging filling, dag-belling


Carrying
Dresser (for slopes and load)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00 Nos.
3.00 Nos.
1.00 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 54

Say
Say

DESCRIPTION OF ITEM:
Item No. 34

Berm trimming both sides of channels


a)

Upto 3 ft (1 metre) depth.

Detail

Unit Rate (British System) per one Mile


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1.5 Miles


LABOUR
1
2

Dresser's earthwork (for dag-belling & dressing)


Coolies un-skilled coolies (for trimming etc.)
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1.5 miles

2.00 Nos.
12.00 Nos.

per day
per day

Percent
Percent

ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 34

Berm trimming both sides of channels


b)

Exceeding 3 ft. (1 metre) to 5 ft (1.5 metre) depth.

Detail

Unit Rate (British System) per one Mile


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1.5 Miles


LABOUR
1
2
3

Dresser's earthwork (for dag-belling & dressing)


Coolies un-skilled
Mate earthwork for supervision
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1.5 Miles

3.00 Nos.
15.50 Nos.
1.00 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre

Rs.
Rs.

Page 55

Say
Say

DESCRIPTION OF ITEM:
Item No. 34

Berm trimming both sides of channels


c)

Exceeding 5 ft. (1.5 metre) to 8 ft (2.4 metre) depth.

Detail

Unit Rate (British System) per one Mile


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1.5 Miles


LABOUR
1
2
3

Dresser's earthwork (for dag-belling & dressing)


Coolies un-skilled
Mate earthwork for supervision
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1.5 Miles

4.00 Nos.
25.50 Nos.
1.00 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate for 1 Mile
Labour rate for 1 Kilometre

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 35

Ploughing and leveling borrow pits.


i)

Upto 3 ft. (914 mm) depth.

Detail

Unit Rate (British System) per Acre


Qty

Rate Per Unit

Amount (Rs.)

LABOUR
1
2

Bullockman with pair of bullocks


Coolies un-skilled for leveling
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total

60.00

1.00 No.
1.00 No.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per Acre
Labour rate per Hectare

Rs.
Rs.

Page 56

Say
Say

DESCRIPTION OF ITEM:
Item No. 35

Ploughing and leveling borrow pits.


ii)

Above 3 ft (914 mm) depth.

Detail

Unit Rate (British System) per Acre


Qty

Rate Per Unit

Amount (Rs.)

LABOUR
1

Double of item No. 35 (i)

0.00

508.20

Acre

ITEM RATES
Labour rate per Acre
Labour rate per Hectare

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 36

Making boundry or service roads including dag-belling, levelling & dressing


(i)

In unploughed land.
a) From 10 ft (3 metre) to 20 ft (6 metre) wide.

Detail

Unit Rate (British System) per Chain


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1.5 Chain


LABOUR
1
2

Earth work dresser


Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1.5 Chain

0.50 No.
1.00 Nos.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per Chain
Labour rate per Running Metre

Rs.
Rs.

Page 57

Say
Say

DESCRIPTION OF ITEM:
Item No. 36

Making boundry or service roads including dag-belling, levelling & dressing


(i)

In unploughed land.
b) From 20 ft (6 metre) to 40 ft (12 metre) wide.

Detail

Unit Rate (British System) per Chain


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1.5 Chain


LABOUR
1
2

Earth work dresser


Cooly un-skilled

1.00 No.
1.00 Nos.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1.5 Chains

per day
per day

Percent
Percent

ITEM RATES
Labour rate per Chain
Labour rate per Running Metre

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 36

Making boundry or service roads including dag-belling, levelling & dressing


(ii)

In ploughed land.
a) From 10 ft. (3 metre) to 20 ft. (6 metre) wide.

Detail

Unit Rate (British System) per Chain


Qty

Rate Per Unit

Amount (Rs.)

LABOUR
1
2

as per item No.36 (i) (a)


Ploughing charges

0.00 1.5

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total

0.00
0.032 Acre

P.Acre

Percent
Percent

ITEM RATES
Labour rate per Chain
Labour rate per Running Metre

Rs.
Rs.

Page 58

Say
Say

DESCRIPTION OF ITEM:
Item No. 36

Making boundry or service roads including dag-belling, levelling & dressing


(ii)

In unploughed land.
b) From 20.1 ft. (6.1 metre) to 40 ft. (12 metre) wide.

Detail

Unit Rate (British System) per Chain


Qty

Rate Per Unit

Amount (Rs.)

LABOUR
1
2

as per item No.36 (i) (b)


Ploughing charges

0.00 1.5

0.00

L.S

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total

Percent
Percent

ITEM RATES
Labour rate per Chain
Labour rate per Running Metre

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 37

Earthwork by boats including hire of boats.


i)

Digging and loading into boats upto 50 ft. (15 metre) lead.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1
2

Coolies un-skilled for digging, filling in baskets


and lifting
Coolies un-skilled for carrying and loading in
boats
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

4.00 No.

per day

3.50 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 59

Say
Say

DESCRIPTION OF ITEM:
Item No. 37

Earthwork by boats including hire of boats.


ii)

Carriage by boat upto 10 chains (300 metres).

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

(Capacity of boat 200 Cft 5.66 m)


LABOUR
1
2

15 trips in a day/rate for one trip boatman with


large boats per trip 15 trips in a day

0.07 No.

per day

8 No. extra boatmen (0.53 No. per trip)

0.53 No.

per day

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 1 trip (200 Cft
Rate for 5 trips (100 Cft)

Percent
Percent
58.27 x 5

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 37

Earthwork by boats including hire of boats.


iii)

Extra for every additional one chain (30 metre) or part thereof beyond
10 chain (300 metre).

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 1250 Cft


LABOUR
1

Extra boatman required for one chain (30 metre)


lead.
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate per 1250 Cft

0.20 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 60

Say
Say

DESCRIPTION OF ITEM:
Item No. 37

Earthwork by boats including hire of boats including hire of boats.


iv)

Unloading earth from Boats.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1

Coolies un-skilled

3.50 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 38

Unloading earth from B.G. Tracks and clearing 5 ft. (1.5 metre) from rail.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 1250 Cft


LABOUR
1

Cooly un-skilled for


(1.5 metre)

unloading and clear 5 ft.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total Rate for 1250 Cft

3.00 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 61

Say
Say

DESCRIPTION OF ITEM:
Item No. 39

Earthwork by train way, digging and loading in truck, upto 50 ft. (15 metr
lead.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 1250 Cft


LABOUR
1

Cooly un-skilled for digging and loading

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 1250 Cft

7.00 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 40

Unloading earth from B.G. trucks and spreading upto 15 ft. (4.5 metre) from
rail.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

LABOUR
1
2

Cooly un-skilled for unloading


Coolies un-skilled for spreading

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total

2.50 Nos.
2.00 Nos.

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Page 62

Say
Say

DESCRIPTION OF ITEM:
Item No. 41

Supplying clean and screened river or pit sand within 5 chain (150 metre).

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Royalty

100 Cft.

Contractor's Profit & Ove #####


Total

% Cft.

Percent

LABOUR
1

Coolies (for excavation of sand, and


removal of pit earth loading and
screening etc.)

Sundries
#####
Total
Contractor's Profit & Ove #####
Total

0.424 No.

per day

Percent
Percent

TOTAL

CARRIAGE
Ist
2nd
3rd
4th

Chain
Chain
Chain
Chain

=
=
=
=

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 63

DESCRIPTION OF ITEM:
Item No. 42

Earth work excavation inopen cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except, shingle gravel and rock.
(i)

0 ft. to 7.0 ft.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL (For Shutterng 1750 Cft)


1

Vertical planks 26 x 4' x 10" x 1"


Can be used 80 times
Per time 10.83 80
=

10.83 Cft
0.14 Cft

STRUTS
Wood 26 x 4.75' x 6" x 3"
Can be used 100 times
for one time 15.44 100
Total
Wastage 5%

15.44 Cft

Ist class sawing charges 0.31 x 10

Nail bolts & nuts

Total
Contractor's Profit & Ove #####
i.e on Rs.
0.00
Total rate for 1750 Cft
Total rate for 1000 Cft
1
2

(b)
1

1
2

3.10 Sft

Sft

Per Kg.

3.1 Sft

Percent except sawing charges


-

6.50 Nos.
1.00 No.

per day
per day

Percent
Percent

LABOUR for removing surface water 1250 Cft


Cooly un-skilled

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate per 1250 Cft
Labour rate per 1000 Cft
(c)

Cft

0.083 Kg.

For excavation coolies un-skilled for 1250 Cft


Dresser
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 1250 Cft
Labour rate for 1000 Cft

0.154 Cft
0.294 Cft
0.0147 Cft
0.31 Cft
0.31 Cft

0.25 Nos.

per day

Percent
Percent

LABOUR for shutterng for 1750 Cft


Carpenter
Cooly un-skilled

0.10 No.
0.40 No.

Page 64

per day
per day

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 1750 Cft
Total rate for 1000 Cft

Percent
Percent

ITEM RATES
Labour rate for 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 65

DESCRIPTION OF ITEM:
Item No. 42

Earth work excavation in open cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except shingle, gravel and rock.
(ii)

7.01 to 15 ft. (2.1 metre to 4.5 metre).

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for rate for 2000 Cft


MATERIAL for Shuttering
1

Vertical planks
26 Nos.
26 x 8' x 10" x 1"
=
Can be use 80 times
21.67 80
=

Ist class kail wood


21.67 Cft
0.27 Cft

STRUTS 39 Nos.
Kail wood 39 x 4.75 x 6" x 3"
Can be used 100 times
Wood for one time 23.16 100
Total 1 + 2 = 0.27 +
Wastage 5% =

0.23

Sawing charges = 0.53 x 10


Bolts, nuts & nails

23.16 Cft
=

0.23 Cft

0.50 Cft
0.03 Cft
0.53 Cft
5.3 Sft

Total
Contractor's Profit & Ove #####
(except on sawing charges)
Total
Cost per 1000 Cft 212.69 2

Percent

0.53 Cft
5.30 Sft
0.083 Kg.

Cft
Sft
Per Kg.

0.00

0.00

Analysis for 2000 Cft


(a)
1
2

LABOUR for Shutterng


Carpenter
Cooly un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 2000 Cft
Total rate for 1000 Cft

0.20 No.
0.80 No.

Percent
Percent

Page 66

per day
per day

(b)
1
2

For Excavation 1250 Cft


Coolies un-skilled
Dresser
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 1250 Cft
Total rate for 1000 Cft

(c)

12.00 Nos.
1.00 No.

per day
per day

Percent
Percent

Labour For Dewatering


Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total

0.12 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 67

DESCRIPTION OF ITEM:
Item No. 42

Earth work excavation in open cutting for sewers and manholes as shown in
drawing including shuttering and timbering, dressing to correct section an
dimension according to templates and levels and removing surface water, in
all types of soil except shingle gravel and rock.
(iii)

Above 15 ft.

(4.5 metre) depth.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for rate for 2000 Cft


MATERIAL (For Shuttering)
1

STRUTS
2

Kail wood vertical plants


26 Nos.
26 x 8' x 10" x 1"
=
Can be used 80 times
Wood for one time 21.67 80
=

21.67 Cft
0.27 Cft

39 Nos.
Kail wood 39 x 4.75 x 6" x 3" =
Can be used 100 times
Kail wood for one time 23.16 100
Total ( 1 + 2 ) = 0.27 + 0.23
Wastage (5%)
Total
Sawing charges 0.53 x 10
Bolt, nuts & nails

23.16 Cft
=

0.23 Cft

0.50 Cft
0.03 Cft
0.53 Cft

Total
Contractor's Profit & Ove #####
Total rate for 2000 Cft
Cost per 1000 Cft 212.69 2

5.30 Sft

0.53 Cft
5.30 Sft
0.083 Kg.

Cft

Sft
Per Kg.

Percent on 189.50 (Except sawing charges)


=

0.00

Analysis for Rate for 2000 Cft


(a)
1
2

LABOUR

(For Shutterng)

Carpenter
Cooly
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 2000 Cft
Total rate for 1000 Cft

0.20 No.
0.80 No.

Percent
Percent

Page 68

per day
per day

(b)
1
2

For Excavation 1250 Cft


Coolies un-skilled
Dresser
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate for 1250 Cft
Total rate for 1000 Cft

(c)
1

16.00 No.
1.00 No.

Percent
Percent

Labour for Dewatering


Coolies un-skilled
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total per 1000 Cft

0.12 No.

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 69

DESCRIPTION OF ITEM:
Item No. 43

Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.
(i)

0 ft. (0 metre) to 4 ft. (1.2 metre) depth below S.S.W.L.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
(i)

M.S. sheet 8' x 4' x " ft.


For
Excavation
Platform

12 x 8' x 4' = 384 Sft @ 5 lbs/sft


Life = 200 times
For one operation 1920 200
=
(ii) R.S Joist 4 No. 12' long
4 x 12 = 48 Rft @ 20 lbs/Rft
=
Life 1500 times
For one operation 960 1500
=
Total 9.6 + 0.64 =

10 Nos.
2 Nos.
12 Nos.
1920 lbs
9.60 lbs
960 lbs
0.64 lbs
10.24 lbs 10.24 lbs
4.64 kg
2.00 Nos.

(iii) Jhambs
life = 100 time
One opertion = 2 100 =
0.02 No.
0.02
(iv) Charakharies complete
2.00
(v) Kail wood first class planks
=
10 Nos.
10 x 10' x 10" x 1" =
10.41 Cft
Life 20 times
One operation 10.41 20
=
0.520 Cft
(vi) Ballies
16.00 Nos.
16 x 10 x 8" x 4"
=
35.55 Cft
Life 200 time
One operation = 35.55 200
=
0.18 Cft
(vii) Struts =
16.00 Nos.
16 x 6.25' x 8" x 4" =
22.22 Cft
Life = 100 times
One operation = 22.22 100 =
0.22 Cft
Kail wood first class total 0.52 + 0.18 + 0.22 0.92 Cft
Wastage (5%) = 0.92 + 0.05 =
0.97 Cft
0.97
Sawing charges 0.97 Cft x 10 =
9.7 Sft
9.70
Bolts and nuts
0.083
(viii) Manila Rope 1" 100' long
Life 25 times
One operation = 100 25
=
4.00 Rft
4.00
Total
Contractor's Profit & Ove ##### % Except sawing
Total

Page 70

0.00

No.
Nos.

Cft
Sft
Kg.

Rft

kg

each
each

Cft
Sft
Per Kg.

Rft

LABOUR for 1500 Cft


1
2
3
4
5
6
7

Diver sinker
Charakhar-man
Cooly for pully out
Coolies for removing earth
Skilled coolies for hammering M.S sheet to
drive and takout
Cooly for making platform
Carpenter for making shuttering and removing
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate per 1500 Cft
Total rate per 1000 Cft

2.00
4.00
2.00
2.00
2.00

No.
No.
No.
No.
No.

0.50 No.
0.25 No.

per
per
per
per
per

day
day
day
day
day

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 71

DESCRIPTION OF ITEM:
Item No. 43

Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.
(ii)

4 ft. to 8 ft. (1.2 metre to 2.4 metre) depth below SSWL

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
(I)

M.S. sheet (8' x 4' x " ft.)


For
Excavation
Plate form

24 x 8' x 4' = 768 Sft @ 5 lbs/Sft


Life = 200 times
One operation 3840 200 =
(ii) R.S. Joist = 4 Nos. 12' long
4 x 12 = 48 Rft @ 20 lbs/Rft
=
Life 1500 times
One operation 960 1500
=
Total

20 Nos.
4 Nos.
24 Nos.
3840 lbs
19.20 lbs
960 lbs
0.64 lbs
19.84 lbs 19.84 lbs
9.00 kg
2.00 Nos.

(iii) Jhambs
=
Life = 100 times
One operation 2 100 =
0.02 No.
0.02
(iv) Charakharies complete =
2.00 Nos. 2.00
(v) Wooden planks =
10.00 Nos.
Kail wood first class 10 x 10' x 10" x 1" = 10.41 Cft
Life 20 times
One operation = 10.41 20
=
0.52 Cft
(vi) Ballies
=
16.00 Nos.
16 x 10' x 8" x 4" =
35.55 Cft
Life 200 time
One operation
35.55 200
=
0.18 Cft
(vii) Struts
16.00 Nos.
16 x 6.25' x 8" x 4" =
22.22 Cft
Life = 100 times
One operation 22.22 100
=
0.22 Cft
Kail wood Ist class total 0.52 + 0.18 + 0.22 = 0.92 Cft
0.97
Add 5% wastage
0.05 Cft
0.97 Sft
Sawing charges 0.97 x 10
=
9.7 Sft
9.70
Bolts and nuts
0.083
(viii) Manila Rope 1" x 100' long
Life 25 times
One operation 100 25
=
4.00 Rft
4.00
Total
Contractor's Profit & Ove #####
Total

Percent

Page 72

kg

No.
Nos.

each
each

Cft

Cft

Sft
Kg.

Rft

Sft
Per Kg.

Rft

LABOUR for 1500 Cft


1
2
3
4
5
6
7

Diver sinker
Charakhar-man
Cooly un-skilled for pully out
Coolies un-skilled ramming
Skilled coolies for hammering M.S sheet to
drive and takout
Cooly for making platform
Carpenter for making shuttering and removing
Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate per 1500 Cft
Total rate per 1000 Cft

2.50
5.00
2.50
2.50
2.50

No.
No.
No.
No.
No.

0.63 No.
0.31 No.

per
per
per
per
per

day
day
day
day
day

per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 73

DESCRIPTION OF ITEM:
Item No. 43

Earth work excavation of trenches in open cutting for Sewers and manhole
chambers etc. below sub soil water level to correct section and dimension
according to templates and levels, including shoring, timbering and
shuttering of M.S. Sheets on both sides of the trenches.
(iii)

Exceeding 2.40 metre depth below SSWL.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
(i)

M.S. sheet (8' x 4' x " ft.)


For
Excavation
Plate form

26 Nos.
4 Nos.
30 Nos.

30 x 8' x 4' = 960 Sft @ 5 lbs/Sft =


One sheet for making jaharies
8 x 4 = 32 Sft @ 5lbs/Sft =
Life = 200 times
for one operation 4960 200 =
(ii) For R.S. Joist 4 No.
4 x 12 = 48 Rft @ 20 lbs/foot =
Life = 1500 time
One operation = 960 1500 =
Total (I + II)
24.80 + 0.64 =
(iii) Thambs
=
Life = 100 times
One operation 2 100 =
(iv) Charakharies complete
=
(v) Wooden planks
=
Kail wood Ist class 10 x 10 x 10" x 5"
Life 20 times
One operation 10.41 20
=
(vi) Ballies
=
16 x 10' x 8" x 4" =
Life 200 time
One operation 35.55 200
=
(vii) Struts
=
16 x 6.25 x 8" x 4" =
Life = 100 times
One operation = 22.22 100
=
0.52 + 0.18 + 0.22
=
Wastage (5%)
Total
Sawing charges 0.97 x 10 =
Bolts and nuts
(viii) Manila Rope 1" x 100' long
(vi) Cost of rope
Life 25 times
One operation 100 25
=
Total
Contractor's Profit & Ove #####
Total Material cost

4800 lbs
160 lbs
24.80 lbs
960 lbs
0.64 lbs 25.44 lbs
25.44 lbs 11.54 kg
2.00 Nos.

0.02 No.
0.02 No.
2.00 Nos. 2.00 Nos.
10.00 Nos.
10.41 Cft

kg

each
each

Cft
Sft
Per Kg.

Per Rft.

0.52 Cft
16.00 Nos.
35.55 Cft
0.18 Cft
16.00 Nos.
22.22 Cft
0.22
0.92
0.05
0.97
9.70

Cft
Cft
Cft
Cft
Sft

4.00 Rft

Percent

Page 74

0.97 Cft
9.70 Sft
0.083 Kg.

4.00 Rft

LABOUR for 1500 Cft

1.5 times of item No. (43-ii)

0.00

Total rate per 1500 Cft


Total rate per 1000 Cft

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

Composite rate per 1000 Cft


Composite rate per Cum

Rs.
Rs.

Say
Say

Page 75

DESCRIPTION OF ITEM:
Item No. 44

Excavation of trenches in all kind of soil except cutting rock, for water
pipe lines upto to 5 ft. (1.5 metre) depth from ground level including trim
dressing sides, leveling the beds of trenches to correct grade and cutting
pits for joints etc. complete in all respects.

Detail

Unit Rate (British System) per 1000 Cft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 1250 Cft


LABOUR
1
2
3

Coolies for dressing earth


Dewatering the rain
Dresser

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total rate per 1250 Cft
Total rate per 1000 Cft

6.50 No.
0.50 No.
0.50 No.

per day
per day
per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Cft
Labour rate per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 45

Cutting and removing trees within a distance of 100 ft. (30 metre).
a)

Upto 2.5 ft. (0.75 metre) girth.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

LABOUR
1
2

Carpenter
Coolies un-skilled

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total

0.15 No.
1.00 No.

per day
per day

Percent
Percent

ITEM RATES
Labour rate for each

Rs.

Page 76

Say

DESCRIPTION OF ITEM:
Item No. 45

Cutting and removing trees within a distance of 100 ft. (30 metre).
(b)

Above 2.5 ft. (0.75 metre) to 6 ft. (1.8 metre) grith.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

LABOUR
1
2

Coolies un-skilled
Carpenter

2.00 Nos.
0.25 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total

per day
per day

Percent
Percent

ITEM RATES
Labour rate for each

Rs.

Say

DESCRIPTION OF ITEM:
Item No. 46

Uprooting stump and removing with in 100 ft. (30 metre) from 2" to 6 ft.
(0.61 metre to 1.83 metre) grith.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

LABOUR
1

Coolies un-skilled

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total

1.50 Nos.

per day

Percent
Percent

ITEM RATES
Labour rate for each

Rs.

Page 77

Say

DESCRIPTION OF ITEM:
Item No. 47

Jungle clearance and removing within 100 ft. (30 metre).


(a)

Light

Detail

Unit Rate (British System) per 1000 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 1250 Sft


LABOUR
1

Coolies un-skilled

0.25 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total for 1250 Sft

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 47

Jungle clearance and removing within 100 ft. (30 metre).


(b)

Thick

Detail

Unit Rate (British System) per 1000 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 1250 Sft


LABOUR
1

Coolies un-skilled

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total for 1250 Sft

0.50 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 1000 Sft
Labour rate per Sqm

Rs.
Rs.

Page 78

Say
Say

DESCRIPTION OF ITEM:
Item No. 48

Up rooting sarkanda growth and disposal within 100 ft. (30 metre).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 125 Sft


LABOUR
1

Coolies un-skilled

0.12 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total for 125 Sft

per day

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 49

Ploughing 3 times

Detail

Unit Rate (British System) per Acre


Qty

Rate Per Unit

Amount (Rs.)

Assumed for 4.0 Acres


LABOUR
1

Bullock-man

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total

3.25 Nos.

per day

Percent
Percent

ITEM RATES
Labour rate per Acre
Labour rate per Hectar

Rs.
Rs.

Page 79

Say
Say

DESCRIPTION OF ITEM:
Item No. 50

Levelling, dressing and making lawns

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 150 Sft


LABOUR
1

Coolies un-skilled

0.60 No.

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total for 150 Sft

per day

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Item No. 51

Turfing lawns (excluding cost of turf).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 150 Sft


LABOUR
1

Mali

Total
Sundries
#####
Total
Contractor's Profit & Ove #####
Total for 150 Sft

0.50 No.

per day

Percent
Percent

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

Page 80

Say
Say

CHAPTER NO. 24

ELECTRIC INSTALLATION
DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
boxes, inspection boxes, bends, tees, etc., complete with all spec

Item No. 1

On surface including clamps etc.

(a)
(i)

" dia (15 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

G.I. pipe " dia (15 mm i/d)


Clamp " dia (15 mm i/d)
G.I bend " dia (15 mm i/d)
Gutties
Screw 1" to " (25 to 20 mm)
Inspection box " dia (15 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
479.84 7

7.00
10.00
1.00
20.00
1.50
1.00
0.021
0.08

metre
Nos.
No.
Nos.
Dozen
No.
Cft.
Cft.

per mtr.
each
each
dozen
dozen
each
P. Bag
Per % Cft.

0.00

LABOUR (For 25 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft
Composite rate per Metre
Composite rate per Rft

Rs.
Rs.
Rs.
Rs.

Page 1

Say
Say
Say
Say

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

On surface including clamps etc.

(a)
(ii)

" dia (20 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

G.I. pipe " dia (20 mm i/d)


G.I bend " dia (20 mm i/d)
Clamp " dia (20 mm i/d)
Gutties
Screw 1" to " (25 to 20 mm)
Inspection box " dia (20 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
626.14 7

7.00
1.00
10.00
20.00
1.50
1.00
0.021
0.08

metre
No.
Nos.
Nos.
Dozen
No.
Cft.
Cft.

per mtr.
each
each
dozen
dozen
each
P. Bag
Per % Cft.

0.00

LABOUR (For 25 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 2

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

On surface including clamps etc.

(a)
(iii)

1" dia (25 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

G.I. pipe 1" dia (25 mm i/d)


G.I bend 1" dia (25 mm i/d)
Clamp 1" dia (25 mm i/d)
Gutties
Screw " to 1" (25 to 20 mm)
Inspection box 1" dia (25 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
897.63 7

7.00
1.00
10.00
20.00
1.50
1.00
0.021
0.08

metre
No.
Nos.
Nos.
Dozen
No.
Cft.
Cft.

per mtr.
each
each
dozen
dozen
each
P. Bag
Per % Cft.

0.00

LABOUR (For 25 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 3

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

On surface including clamps etc.

(a)
(iv)

1" dia (32 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

G.I. pipe 1" dia (32 mm i/d)


Clamp 1" dia (32 mm i/d)
G.I bend 1" dia (32 mm i/d)
M.S. Inspection box 1" dia (32 mm)
Gutties
Screw " to 1" (25 to 20 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1126.33

7.00
10.00
1.00
1.00
20.00
1.50
0.021
0.08

metre
Nos.
No.
No.
Nos.
Dozen
Cft.
Cft.

per mtr.
each
each
each
dozen
dozen
P. Bag
Per % Cft.

0.00

LABOUR (For 50 Metre)


1 Electrician
2 Coolies skilled

2.00 Nos.
3.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 4

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

On surface including clamps etc.

(a)
(v)

1" dia (40 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

G.I. pipe 1" dia (40 mm i/d)


G.I bend 1" dia (40 mm i/d)
M.S. Inspection box 1" dia (40 mm)
G.I. Clamp 1" dia (40 mm i/d)
Gutties
Screw 1 to " (25 to 20 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1330.43

7.00
1.00
1.00
10.00
20.00
1.50
0.021
0.08

metre
Nos.
No.
Nos.
Nos.
Dozen
Cft.
Cft.

per mtr.
each
each
each
dozen
dozen
P. Bag
Per % Cft.

0.00

LABOUR (For 50 Metre)


1 Electrician
2 Coolies skilled

2.00 No.
3.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 5

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

On surface including clamps etc.

(a)
(vi)

2" dia (50 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

G.I. pipe 2" dia (50 mm i/d)


G.I bend 2" dia (50 mm i/d)
M.S. Inspection box 2" dia (50 mm)
G.I. Clamp 2" dia (50 mm i/d)
Gutties
Screw 1 to " (25 to 20 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1758.85

7.00
1.00
1.00
10.00
20.00
1.50
0.021
0.08

metre
No.
No.
Nos.
Nos.
Dozen
Cft.
Cft.

per mtr.
each
each
each
dozen
dozen
P. Bag
Per % Cft.

0.00

LABOUR (For 42 Metre)


1 Electrician
2 Coolies skilled

2.00 No.
3.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 6

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

On surface including clamps etc.

(a)
(vii)

3" dia (80 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

G.I. pipe 3" dia (80 mm i/d)


G.I. Clamp 3" dia (80 mm i/d)
M.S. Inspection box 3" dia (80 mm)
G.I bend 3" dia (80 mm i/d)
Gutties
Screw 1 to " (25 to 20 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
2949.77

7.00
10.00
1.00
1.00
20.00
1.50
0.021
0.08

metre
Nos.
No.
No.
Nos.
Dozen
Cft.
Cft.

per mtr.
each
each
each
dozen
dozen
P. Bag
Per % Cft.

0.00

LABOUR (For 33 Metre)


1 Electrician
2 Coolies skilled

2.00 No.
3.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 7

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

Recessed in walls, including hooks, cutting, jharries and repairin

(b)
(i)

" dia (15 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

G.I. Pipe " dia (15 mm i/d)


G.I. Bend " dia (15 mm i/d)
Hooks
M.S. Inspection box " dia (15 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
442.55 7

7.00
1.00
8.00
1.00
0.021
0.08

metre
Nos.
No.
Nos.
Cft.
Cft.

per mtr.
each
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 25 Metre)


1 Electrician
2 Coolies skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 8

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

Recessed in walls, including hooks, cutting, jharries and repairin

(b)
(ii)

" dia (20 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

G.I. Pipe " dia (20 mm i/d)


G.I. Bend " dia (20 mm i/d)
Hooks
M.S. Inspection box " dia (20 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
564.44 7

7.00
1.00
7.00
1.00
0.021
0.18

metre
Nos.
No.
Nos.
Cft.
Cft.

per mtr.
each
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 25 Metre)


1 Electrician
2 Coolies skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 9

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

Recessed in walls, including hooks, cutting, jharries and repairin

(b)
(iii)

1" dia (25 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

G.I. Pipe 1" dia (25 mm i/d)


G.I. Bend 1" dia (25 mm i/d)
Hooks
M.S. Inspection box 1" dia (25 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
820.19 7

7.00
1.00
8.00
1.00
0.052
0.18

metre
Nos.
No.
Nos.
Cft.
Cft.

per mtr.
each
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 24 Metre)


1 Electrician
2 Coolies skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 10

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

Recessed in walls, including hooks, cutting, jharries and repairin

(b)
(iv)

1" dia (32 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

G.I. Pipe 1" dia (32 mm i/d)


G.I. Bend 1" dia (32 mm i/d)
Hooks
M.S. Inspection box 1" dia (32 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1046.69

7.00
1.00
8.00
1.00
0.063
0.18

metre
Nos.
No.
Nos.
Cft.
Cft.

per mtr.
each
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 24 Metre)


1 Electrician
2 Coolies skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 11

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

Recessed in walls, including hooks, cutting, jharries and repairin

(b)
(v)

1" dia (40 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

G.I. Pipe 1" dia (40 mm i/d)


G.I. Bend 1" dia (40 mm i/d)
M.S. Inspection box 1" dia (40 mm i/d)
Hooks
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1252.99

7.00
1.00
1.00
8.00
0.074
0.20

metre
Nos.
No.
Nos.
Cft.
Cft.

per mtr.
each
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 22 Metre)


1 Electrician
2 Coolies skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 12

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

Recessed in walls, including hooks, cutting, jharries and repairin

(b)
(vi)

2" dia (50 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

G.I. Pipe 2" dia (50 mm i/d)


G.I. Bend 2" dia (50 mm i/d)
M.S. Inspection box 2" dia (50 mm i/d)
Hooks
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1679.21

7.00
1.00
1.00
8.00
0.084
0.24

metre
Nos.
No.
Nos.
Cft.
Cft.

per mtr.
each
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 16 Metre)


1 Electrician
2 Coolies skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 13

DESCRIPTION OF ITEM:
Supply and erection of G.I pipes for wiring purposes including pul
inspection boxes, bends, tees, etc., complete with all specials.

Item No. 1

Recessed in walls, including hooks, cutting, jharries and repairin

(b)
(vii)

3" dia (80 mm i/d).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7

G.I. Pipe 3" dia (80 mm i/d)


G.I. Bend 3" dia (80 mm i/d)
M.S. Inspection box 3" dia (80 mm)
Hooks
G.I. Socket 3" dia (80 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
2871.23

7.00
1.00
1.00
8.00
1.00
0.08
0.24

metre
No.
No.
Nos.
No.
Cft.
Cft.

per mtr.
each
each
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 10 Metre)


1 Electrician
2 Coolies skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 14

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

On surface, including clamps.

(a)
(i)

" dia (16 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 7 Metre)


1
2
3
4
5
6

M.S. Conduit pipe " dia (16 mm)


M.S. Bend " dia (16 mm)
M.S. Inspection box " dia (16 mm)
Clamps " dia (16 mm)
Screw
Gutties
Total
Contractor's Profit & O ## Percent
Total
Material per metre
251.69 7

7.00
1.00
1.00
10.00
1.20
1.00

metre
No.
No.
Nos.
Dozen
Dozen

per mtr.
each
dozen
each
dozen
dozen

0.00

LABOUR (For 36 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 15

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

On surface, including clamps.

(a)
(ii)

" dia (20 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

M.S. Conduit pipe " dia (20 mm)


M.S. Bend " dia (20 mm)
M.S. Inspection box " dia (20 mm)
M.S. Clamps " dia (20 mm)
Screw
Gutties
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
325.92 7

7.00
1.00
1.00
10.00
1.20
1.00
0.02
0.06

metre
No.
No.
Nos.
Dozen
Dozen
Cft.
Cft.

per mtr.
each
per doz.
each
dozen
dozen
P. Bag
Per % Cft.

0.00

LABOUR (For 36 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 16

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

On surface, including clamps.

(a)
(iii)

1" dia (25 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

M.S. Conduit pipe 1" dia (25 mm)


M.S. Bend 1" dia (25 mm)
M.S. Inspection box 1" dia (25 mm)
M.S. Clamps 1" dia (25 mm)
Screw
Gutties
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
334.40 7

7.00
1.00
1.00
10.00
1.20
1.00
0.042
0.12

metre
No.
No.
Nos.
Dozen
Dozen
Cft.
Cft.

per mtr.
each
per doz.
each
dozen
dozen
P. Bag
Per % Cft.

0.00

LABOUR (For 36 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 17

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

On surface, including clamps.

(a)
(iv)

1" dia (32 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

M.S. Conduit pipe 1" dia (32 mm)


M.S. Conduit Bend 1" dia (32 mm)
M.S. Inspection box 1" dia (32 mm)
M.S. Clamps 1" dia (32 mm)
Screw
Gutties
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
572.62 7

7.00
1.00
1.00
10.00
1.20
1.00
0.042
0.12

metre
No.
No.
Nos.
Dozen
Dozen
Cft.
Cft.

per mtr.
each
per doz.
each
dozen
dozen
P. Bag
Per % Cft.

0.00

LABOUR (For 36 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 18

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

On surface, including clamps.

(a)
(v)

1" dia (40 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

M.S. Conduit pipe 1" dia (40 mm)


M.S. Bend 1" dia (40 mm)
M.S. Inspection box 1" dia (40 mm)
M.S. Clamps 1" dia (40 mm)
Screw
Gutties
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
652.76 7

7.00
1.00
1.00
10.00
1.20
1.00
0.042
0.12

metre
No.
No.
Nos.
Dozen
Dozen
Cft.
Cft.

per mtr.
each
per doz.
each
dozen
dozen
P. Bag
Per % Cft.

0.00

LABOUR (For 32 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 19

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

On surface, including clamps.

(a)
(vi)

2" dia (50 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6
7
8

M.S. Conduit pipe 2" dia (50 mm)


M.S. Conduit Bend 2" dia (50 mm)
M.S. Inspection box 2" dia (50 mm)
M.S. Clamps 2" dia (50 mm)
Screw
Gutties
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
822.43 7

7.00
1.00
1.00
10.00
1.20
1.00
0.042
0.12

metre
No.
No.
Nos.
Dozen
Dozen
Cft.
Cft.

per mtr.
each
per doz.
each
dozen
dozen
P. Bag
Per % Cft.

0.00

LABOUR (For 26 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 20

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

Recessed in walls including cutting, jharries, cost of hooks and r


surface etc.

(b)

(i)

" dia (16 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

M.S. Conduit pipe " dia (16 mm)


M.S. Bend " dia (16 mm)
M.S. Inspection box " dia (16 mm)
M.S. Hooks
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
247.29 7

7.00
1.00
1.00
10.00
0.021
0.08

metre
No.
No.
Nos.
Cft.
Cft.

per mtr.
each
per doz.
each
P. Bag
Per % Cft.

0.00

LABOUR (For 28 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 21

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

Recessed in walls including cutting, jharries, cost of hooks and r


surface etc.

(b)

(ii)

" dia (20 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

M.S. Condict pipe " dia (20 mm)


M.S. Bend " dia (20 mm)
M.S. Inspection box " dia (20 mm)
M.S. Hooks
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
310.12 7

7.00
1.00
1.00
10.00
0.042
0.12

metre
No.
No.
Nos.
Cft.
Cft.

per mtr.
each
per doz.
each
P. Bag
Per % Cft.

0.00

LABOUR (For 28 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 22

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

Recessed in walls including cutting, jharries, cost of hooks and r


surface etc.

(b)

(iii)

1" dia (25 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

M.S. Conduit pipe 1" dia (25 mm)


M.S. Bend 1" dia (25 mm)
M.S. Inspection box 1" dia (25 mm)
Hooks
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
385.81 7

7.00
1.00
1.00
10.00
0.052
0.18

metre
No.
No.
Nos.
Cft.
Cft.

per mtr.
each
per doz.
each
P. Bag
Per % Cft.

0.00

LABOUR (For 25 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 23

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

Recessed in walls including cutting, jharries, cost of hooks and r


surface etc.

(b)

(iv)

1" dia (32 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

M.S. Conduit pipe 1" dia (32 mm)


M.S. Conduit Bend 1" dia (32 mm)
M.S. Inspection box 1" dia (32 mm)
M.S. Hooks
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
524.22 7

7.00
1.00
1.00
10.00
0.063
0.18

metre
No.
No.
Nos.
Cft.
Cft.

per mtr.
each
per doz.
each
P. Bag
Per % Cft.

0.00

LABOUR (For 24 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 24

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

Recessed in walls including cutting, jharries, cost of hooks and r


surface etc.

(b)

(v)

1" dia (40 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

M.S. Conduit pipe 1" dia (40 mm)


M.S. Conduit Bend 1" dia (40 mm)
M.S. Inspection box 1" dia (40 mm)
M.S. Hooks
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
606.56 7

7.00
1.00
1.00
10.00
0.074
0.20

metre
No.
No.
Nos.
Cft.
Cft.

per mtr.
each
per doz.
each
P. Bag
Per % Cft.

0.00

LABOUR (For 23 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 25

DESCRIPTION OF ITEM:
Supply and erection of M.S conduit pipes for wiring, including ins
boxes, pull boxes, bends, tees, etc., complete with all specials.

Item No. 2

Recessed in walls including cutting, jharries, cost of hooks and r


surface etc.

(b)

(vi)

2" dia (50 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

M.S. Conduit pipe 2" dia (50 mm)


M.S. Conduit Bend 2" dia (50 mm)
M.S. Inspection box 2" dia (50 mm)
Hooks
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
778.43 7

7.00
1.00
1.00
10.00
0.084
0.24

metre
No.
No.
Nos.
Cft.
Cft.

per mtr.
each
per doz.
each
P. Bag
Per % Cft.

0.00

LABOUR (For 22 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 26

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.

Item No. 3

(i)

" dia (12 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6

PVC pipe " dia (12 mm)


PVC Bend " dia (12 mm)
M.S. Hook
PVC Inspection box " (12 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
129.43 1

10.00
2.00
10.00
2.00
0.042
0.12

metre
No.
No.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 31 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 27

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.

Item No. 3

(ii)

" dia (20 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6

PVC pipe " dia (20 mm)


PVC Bend " dia (20 mm)
M.S. Hook
PVC Inspection box " dia (20 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
163.53 1

10.00
2.00
10.00
2.00
0.052
0.18

metre
No.
No.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 30 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 28

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.

Item No. 3

(iii)

1" dia (25 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6

PVC pipe 1" dia (25 mm)


PVC Bend 1" dia (25 mm)
M.S. Hook
PVC Inspection box 1" dia (25 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
235.03 1

10.00
2.00
10.00
2.00
0.063
0.18

metre
No.
No.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 27 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 29

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.

Item No. 3

(iv)

1" dia (30 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6

PVC pipe 1" dia (30 mm)


PVC Bend 1" dia (30 mm)
M.S. Hook
PVC Inspection box 1" dia (30 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
228.053 1

10.00
2.00
10.00
2.00
0.065
0.37

metre
No.
No.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 25 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 30

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.

Item No. 3

(v)

1" dia (40 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6

PVC pipe 1" dia (40 mm)


PVC Bend 1" dia (40 mm)
M.S. Hook
PVC Inspection box 1" dia (40 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
454.67 1

10.00
2.00
10.00
2.00
0.070
0.40

metre
No.
No.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 24 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 31

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring purposes recessed in
including inspection boxes, pull boxes, hooks, cutting, jharriers
repairing surface etc., complete with all specials.

Item No. 3

(vi)

2" dia (50 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5

PVC pipe 2" dia (50 mm)


PVC Bend 2" dia (50 mm)
M.S. Hook
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
625.35 1

10.00
2.00
10.00
0.084
0.24

metre
No.
No.
Cft.
Cft.

per mtr.
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 23 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 32

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.

Item No. 4

(i)

" dia (12 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6
7
8

PVC pipe " dia (12 mm)


PVC Bend " dia (12 mm)
M.S. Clamp/saddle
Gutties
Screws for " dia clamp
PVC Inspection Box " dia (12 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
176.37 1

10.00
2.00
20.00
20.00
20.00
2.00
0.021
0.06

metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

per mtr.
each
each
each
per doz.
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 80 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 33

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.

Item No. 4

(ii)

" dia (20 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6
7

PVC pipe " dia (20 mm)


PVC Bend " dia (20 mm)
M.S. Clamp " dia (20 mm)
Screws for " dia clamp
PVC Inspection Box " dia (20 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
186.27 1

10.00
2.00
10.00
20.00
2.00
0.021
0.06

metre
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 80 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 34

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.

Item No. 4

(iii)

1" dia (25 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6
7
8

PVC pipe 1" dia (25 mm)


PVC Bend 1" dia (25 mm)
M.S. Clamp/saddle 1 dia (25 mm)
Screws for 1" dia clamp
Gutties
PVC Inspection Box 1" dia (25 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
347.23 1

10.00
2.00
20.00
20.00
20.00
2.00
0.021
0.06

metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
per doz.
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 80 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 35

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.

Item No. 4

(iv)

1" dia (30 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 10 Metre)


1
2
3
4
5
6

PVC pipe 1" dia (30 mm)


PVC Bend 1" dia (30 mm)
M.S. Clamp/saddle 1" dia (30 mm)
Gutties
Screws for 1" dia clamp
PVC Inspection Box 1" dia (30 mm)
Total
Contractor's Profit & O ## Percent
Total
Material per metre
484.73 1

10.00
2.00
20.00
20.00
20.00
2.00

metre
Nos.
Nos.
Nos.
Nos.
Nos.

per mtr.
each
each
per doz.
per doz.
per doz.

0.00

LABOUR (For 70 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 36

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.

Item No. 4

(v)

1" dia (40 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6
7
8

PVC pipe 1" dia (40 mm)


PVC Bend 1" dia (40 mm)
M.S. Clamp/saddle 1" dia (40 mm)
Gutties
Screws for 1" dia clamp
PVC Inspection Box 1" dia (40 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
619.67 1

10.00
2.00
20.00
20.00
20.00
2.00
0.021
0.06

metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
per doz.
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 70 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 37

DESCRIPTION OF ITEM:
Supply and erection of P.V.C pipe for wiring on surface including
inspection boxes, pull boxes bends, tees repairing surface etc.,
with all specials.

Item No. 4

(vi)

2" dia (50 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6
7
8

PVC pipe 2" dia (50 mm)


PVC Bend 2" dia (50 mm)
M.S. Clamp/saddle 2" dia (50 mm)
Gutties
Screws for 2" dia clamp
PVC Inspection Box 2" dia (50 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
860.02 1

10.00
2.00
20.00
20.00
20.00
2.00
0.021
0.06

metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
per doz.
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 58 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 38

DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.

Item No. 5

(i)

" dia (12 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

G.I. Flexible Pipe " dia (12 mm)


Socket " dia (12 mm)
Nipple " dia (12 mm)
Check Nuts " dia (12 mm)
Soldering etc.

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

per mtr.
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 32 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges

1.00 No.
1.00 No.
2.00 joints

per day
per day
per joints

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 39

DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.

Item No. 5

(ii)

" dia (20 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

G.I. Flexible Pipe " dia (20 mm)


G.I. Socket " dia (20 mm)
G.I. Nipple " dia (20 mm)
Check Nuts " dia (20 mm)
Solder joint

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

per mtr.
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 30 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges

1.00 No.
1.00 No.
2.00 joints

per day
per day
per joint

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 40

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.

Item No. 5

(iii)

1" dia (25 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

G.I. Flexible Pipe 1" dia (25 mm)


G.I. Socket 1" dia (25 mm)
G.I. Nipple 1" dia (25 mm)
Check Nuts 1" dia (25 mm)
Solder

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

per mtr.
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 29 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges

1.00 No.
1.00 No.
2.00 joints

per day
per day
per joints

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 41

DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.

Item No. 5

(iv)

1" dia (32 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

G.I. Flexible Pipe 1" dia (32 mm)


G.I. Socket 1" dia (32 mm)
G.I. Nipple 1" dia (32 mm)
Check Nuts 1" dia (32 mm)
Solder

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

per mtr.
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 24 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges

1.00 No.
1.00 No.
2.00 joints

per day
per day
per joints

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 42

DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.

Item No. 5

(v)

1" dia (40 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

G.I. Flexible Pipe 1" dia (40 mm)


G.I. Socket 1" dia (40 mm)
G.I. Nipple 1" dia (40 mm)
Check Nuts 1" dia (40 mm)
Solder

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

per mtr.
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 22 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges

1.00 No.
1.00 No.
2.00 joints

per day
per day
per joints

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 43

DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.

Item No. 5

(vi)

2" dia (50 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

G.I. Flexible Pipe 2" dia (50 mm)


G.I. Socket 2" dia (50 mm)
G.I. Nipple 2" dia (50 mm)
Check Nuts 2" dia (50 mm)
Solder

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

per mtr.
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 20 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges

1.00 No.
1.00 No.
2.00 joints

per day
per day
per joints

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 44

DESCRIPTION OF ITEM:
Supply and erection of G.I Flexible pipe for wiring including weld
sockets, nipples and check nuts etc complete.

Item No. 5

(vii)

3" dia (80 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

G.I. Flexible Pipe 3" dia (80 mm)


G.I. Socket 3" dia (80 mm)
G.I. Nipple 3" dia (80 mm)
Check Nuts 3" dia (80 mm)
Solder

1.00
2.00
2.00
2.00
L.S

metre
Nos.
Nos.
Nos.

per mtr.
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 15 Metre)
1 Electrician
2 Cooly skilled
3 Welding charges

1.00 No.
1.00 No.
2.00 joints

per day
per day
per joints

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 45

DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for recessed wiring (main and subpurposes including bends special etc., in floor, wall or trenches

Item No. 6

(i)

2" dia (50 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6

PVC Pipe 2" dia (50 mm)


PVC Bend 2" dia (50 mm)
M.S Hooks
PVC Inspection box
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
631.22

10.00
2.00
10.00
2.00
0.084
0.24

metre
Nos.
Nos.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 23 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 46

DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for recessed wiring (main and subpurposes including bends special etc., in floor, wall or trenches

Item No. 6

(ii)

3" dia (80 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5

PVC Pipe 3" dia (75 mm)


PVC Bend 3" dia (75 mm)
PVC Inspection box
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
818.58

10.00
2.00
2.00
0.106
0.25

metre
Nos.
Nos.
Cft.
Cft.

per mtr.
each
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 20 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 47

DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for recessed wiring (main and subpurposes including bends special etc., in floor, wall or trenches

Item No. 6

(iii)

4" dia (100 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5

PVC Pipe 4" dia (100 mm)


PVC Bend 4" dia (100 mm)
PVC Inspection box
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1141.80

10.00
2.00
2.00
0.106
0.25

metre
Nos.
Nos.
Cft.
Cft.

per mtr.
each
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 20 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 48

DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for on surface wiring (main and su
including clamps bends etc., complete with all specials.

Item No. 7

(i)

2" dia (50 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6
7

PVC Pipe 2" dia (50 mm)


PVC Bend 2" dia (50 mm)
M.S Clamp
PVC Inspection boxes
Gutties
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
802.27 1

10.00
2.00
20.00
2.00
20.00
0.021
0.06

metre
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 58 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 49

DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for on surface wiring (main and su
including clamps bends etc., complete with all specials.

Item No. 7

(ii)

3" dia (80mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6
7
8

PVC Pipe 3" dia (75 mm)


PVC Bend 3" dia (75 mm)
M.S Clamp
PVC Inspection boxes
Screws for 3" dia clamp
Gutties
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1155.92

10.00
2.00
20.00
2.00
40.00
40.00
0.042
0.12

metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
per doz.
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 40 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 50

DESCRIPTION OF ITEM:
Supply and erection of PVC pipe for on surface wiring (main and su
including clamps bends etc., complete with all specials.

Item No. 7

(iii)

4" dia (100 mm dia).

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6
7
8

PVC Pipe 4" dia (100 mm)


PVC Bend 4" dia (100 mm)
M.S Clamp
Gutties
Screws for 4" dia clamp
PVC Inspection boxes
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1533.77

10.00
2.00
20.00
40.00
40.00
2.00
0.084
0.24

metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

per mtr.
each
each
per doz.
per doz.
per doz.
P. Bag
Per % Cft.

0.00

LABOUR (For 35 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 51

DESCRIPTION OF ITEM:
Item No. 8

Supply and erection of wooden strip batten for wiring purposes inc
insulation cleats etc.

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 100 Metre)


1
2
3
4
5

Strip casing
Gutties
Clamp & nails
Screw
Insulated cleats
Total
Contractor's Profit & O ## Percent
Total
Material per metre
491.70 1

100.00
10.00
300.00
7.25
100.00

metre
Nos.
Nos.
Dozen
Nos.

% per mtr.
per doz.
% No.
Dozen
each

0.00

LABOUR (For 200 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 52

DESCRIPTION OF ITEM:
Item No. 9

Supply and erection of sahl wood casing and capping for wiring pur
including insulation cleats, screws etc., complete.

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 100 Metre)


1
2
3
4
5

Casing Sahlwood
Screw
Gutties
Insulated cleats
Screw for cover
Total
Contractor's Profit & O ## Percent
Total
Material per metre
2662.00

100.00
20.00
20.00
20.00
0.60

metre
Nos.
Nos.
Nos.
Dozen

per mtr.
P. Doz.
per doz.
each
Dozen

0.00

LABOUR (For 200 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 53

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 Volts PVC insulated.

(a)
(i)

3/0.74 mm (3/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3/0.029"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
439.49 9

90.00 metre

per mtr.

0.00

LABOUR (For 100 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 54

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 Volts PVC insulated.

(a)
(ii)

3/0.91 mm (3.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3/0.036"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
636.29 9

90.00 metre

per mtr.

0.00

LABOUR (For 100 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 55

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 Volts PVC insulated.

(a)
(iii)

7/0.74 mm (7/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.029"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
908.55 9

90.00 metre

per mtr.

0.00

LABOUR (For 100 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 56

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 Volts PVC insulated.

(a)
(iv)

7/0.91 mm (7/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
1150.22

90.00 metre

per mtr.

0.00

LABOUR (For 90 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 57

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 Volts PVC insulated.

(a)
(v)

7/1.12 mm (7/0.044")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
1640.70

90.00 metre

per mtr.

0.00

LABOUR (For 80 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 58

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 Volts PVC insulated.

(a)
(vi)

7/1.63 mm (7/0.064")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
4371.45

90.00 metre

per mtr.

0.00

LABOUR (For 65 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 59

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 Volts PVC insulated.

(a)
(vii)

19/1.32 mm (19/0.052")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 19/0.052"
Wastage (2%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
5759.90

90.00 metre

per mtr.

2.00 Nos.
3.00 Nos.

per day
per day

0.00

LABOUR (For 70 Metre)


1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 60

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 Volts PVC insulated.

(a)
(viii)

19/1.63 mm (19/0.064")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 90 Metre)


1 PVC cable 19/0.064"
Wastage (2%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
13464.0

90.00 metre

per 90 mtr.

2.00 Nos.
3.00 Nos.

per day
per day

0.00

LABOUR (For 60 Metre)


1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 61

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 volts. PVC insulated cotton braided and compounded cables.

(b)
(i)

3/0.74 mm (3/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3/0.029"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
509.85 9

90.00 metre

per mtr.

0.00

LABOUR (For 90 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 62

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 volts. PVC insulated cotton braided and compounded cables.

(b)
(ii)

3/0.91 mm (3/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3/0.036"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
611.82 9

90.00 metre

per mtr.

0.00

LABOUR (For 90 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 63

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 volts. PVC insulated cotton braided and compounded cables.

(b)
(iii)

7/0.74 mm (7/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.029"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
815.76 9

90.00 metre

per mtr.

0.00

LABOUR (For 90 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 64

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 volts. PVC insulated cotton braided and compounded cables.

(b)
(iv)

7/0.91 mm (7/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
968.72 9

90.00 metre

per mtr.

0.00

LABOUR (For 85 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 65

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 volts. PVC insulated cotton braided and compounded cables.

(b)
(v)

7/1.12 mm (7/0.044")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
1529.55

90.00 metre

per mtr.

0.00

LABOUR (For 76 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 66

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated copper conductor
in prelaid PVC pipe M.S conduit/G.I pipe/wooden strip batten/woode
casing and capping/G.I wire/trenches (rate for cable only).

Item No. 10

250/440 volts. PVC insulated cotton braided and compounded cables.

(b)
(vi)

7/1.63 mm (7/0.064")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
4078.80

90.00 metre

per mtr.

0.00

LABOUR (For 66 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 67

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).

Item No. 11

(i)

3/0.74 mm (3/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3/0.029"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
505.77 9

90.00 metre

per mtr.

0.00

LABOUR (For 100 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 68

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).

Item No. 11

(ii)

3/0.91 mm (3/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3/0.036"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
740.30 9

90.00 metre

per mtr.

0.00

LABOUR (For 100 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 69

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).

Item No. 11

(iii)

7/0.74 mm (7/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.074"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
1008.48

90.00 metre

per mtr.

0.00

LABOUR (For 100 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 70

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).

Item No. 11

(iv)

7/0.91 mm (7/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
1517.31

90.00 metre

per mtr.

0.00

LABOUR (For 90 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 71

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).

Item No. 11

(v)

7/1.12 mm (7/0.044")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
2143.41

90.00 metre

per mtr.

0.00

LABOUR (For 80 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 72

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection at single core PVC insulated PVC sheathed copp
conductor, 250/440 volts grade cable. (BSS-2004) in prelaid PVC pi
conduit/G.I pipe/wooden strip batten/wooden casing and
capping/trenches etc., (rate for cable only).

Item No. 11

(vi)

7/1.63 mm (7/0.064")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064"
Wastage (3%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
4443.85

90.00 metre

per mtr.

0.00

LABOUR (For 65 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 73

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).

Item No. 12

(i)

7/1.63 mm (7/0.064")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064"
Wastage (2%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
4329.01

90.00 metre

per mtr.

0.00

LABOUR (For 66 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 74

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).

Item No. 12

(ii)

19/0.32 mm (19/0.052")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 19/0.052"
Wastage (2%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
5759.90

90.00 metre

per mtr.

0.00

LABOUR (For 60 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 75

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).

Item No. 12

(iii)

19/0.63 mm (19/0.064")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 19/0.064"
Wastage (2%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
7847.16

90.00 metre

per mtr.

0.00

LABOUR (For 55 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 76

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).

Item No. 12

(iv)

19/2.11 mm (19/0.083")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 19/0.083"
Wastage (2%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
12207.59

90.00 metre

per mtr.

0.00

LABOUR (For 50 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 77

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).

Item No. 12

(v)

37/1.83 mm (37/0.072")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 37/0.072"
Wastage (2%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
21264.40

90.00 metre

per mtr.

0.00

LABOUR (For 29 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 78

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).

Item No. 12

(vi)

37/2.11 mm (37/0.083")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 37/0.083"
Wastage (2%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
26390.11

90.00 metre

per mtr.

0.00

LABOUR (For 24 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 79

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of single core PVC insulated, PVC sheathed cop
conductor, 660/1100 volts grade cable, in prelaid G.I pipe/M.S con
pipe/G.I wire/trenches etc., (rate per cable only).

Item No. 12

(vii)

37/2.62 mm (37/0.103")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 37/0.103"
Wastage (2%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
40719.18

90.00 metre

per mtr.

0.00

LABOUR (For 17 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 80

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed twin core, 250/440 volts.

(a)
(i)

3/0.74 mm (3/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3/0.029"
Wastage (3%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 81

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed twin core, 250/440 volts.

(a)
(ii)

3/0.91 mm (3/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3/0.036"
Wastage (3%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 82

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed twin core, 250/440 volts.

(a)
(iii)

7/0.74 mm (7/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.029"
Wastage (3%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 90 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 83

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed twin core, 250/440 volts.

(a)
(iv)

7/0.91 mm (7/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036"
Wastage (3%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 84

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed twin core, 250/440 volts.

(a)
(v)

7/1.12 mm (7/0.044")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044"
Wastage (3%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 85

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed twin core, 250/440 volts.

(a)
(vi)

7/1.63 mm (7/0.064")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 66 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 86

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 3 core, 660/1100 volt cable.

(b)
(i)

3/0.74 mm (3/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3 core
Wastage (3%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 87

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 3 core, 660/1100 volt cable.

(b)
(ii)

3/0.91 mm (3/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3 core
Wastage (3%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 88

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 3 core, 660/1100 volt cable.

(b)
(iii)

3/0.74 mm (7/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.029"
Wastage (3%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 85 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 89

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 3 core, 660/1100 volt cable.

(b)
(iv)

7/0.91 mm (7/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 90

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 3 core, 660/1100 volt cable.

(b)
(v)

7/1.12 mm (7/0.044")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 72 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 91

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 3 core, 660/1100 volt cable.

(b)
(vi)

7/1.13 mm (7/0.064")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 63 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 92

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 4 core, 660/1100 volt non-armored cabl

(c)
(i)

3/70.74 m,m (3/0.29")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3/0.029"
Wastage (3%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 80 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 93

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 4 core, 660/1100 volt non-armored cabl

(c)
(ii)

3/0.91 mm (3/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 3/0.036"
Wastage (3%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 80 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 94

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 4 core, 660/1100 volt non-armored cabl

(c)
(iii)

7/0.74 mm (7/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.029"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 95

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 4 core, 660/1100 volt non-armored cabl

(c)
(iv)

7/0.91 mm (7/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.036"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 76 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 96

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 4 core, 660/1100 volt non-armored cabl

(c)
(v)

7/1.12 mm (7/0.044")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.044"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 72 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 97

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 4 core, 660/1100 volt non-armored cabl

(c)
(vi)

7/1.63 mm (7/0.064")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 7/0.064"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 63 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 98

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed 4 core, 660/1100 volt non-armored cabl

(c)

19/1.32 mm (19/0.052")

(vii)

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 19/0.052"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 45 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 99

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed, 660/1100 volts grade cable, armoured


wire 16 SWG.

(d)

19/1.32 mm (19/0.052")

(i)

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 19/0.052"
Wastage (2%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
11164.35

90.00 metre

per mtr.

0.00

LABOUR (For 45 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 100

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed, 660/1100 volts grade cable, armoured


wire 16 SWG.

(d)

19/1.63 mm (19/0.064")

(ii)

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 19/0.064"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 42 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 101

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed, 660/1100 volts grade cable, armoured


G.I wire 16 SWG.

(d)

19/1.83 mm (19/0.072")

(iii)

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 19/0.072"
Wastage (2%)

1 coil

Total
Contractor's Profit & O ## Percent
Total
Material per metre
21288.60

90.00 metre

per mtr.

0.00

LABOUR (For 40 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 102

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed, 660/1100 volts grade cable, armoured


G.I wire 16 SWG.

(d)

19/2.11 mm (19/0.083")

(iv)

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 19/0.083"
Wastage (2%)

1 coil

90.00

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 37 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 103

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed, 660/1100 volts grade cable, armoured


wire 16 SWG.

(d)

37/1.83 mm (37/0.072")

(v)

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 37/0.072"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 36 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 104

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed, 660/1100 volts grade cable, armoured


wire 16 SWG.

(d)

37/2.11 mm (37/0.083")

(vi)

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 37/0.083"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 30 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 105

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed, 660/1100 volts grade cable, armoured


wire 16 SWG.

(d)

37/2.36 mm (37/0.093")

(vii)

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 37/0.093"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 25 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 106

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper conductor cables for service connect
prelaid pipe/G.I wire/trenches, etc., (rate for cable only).

Item No. 13

PVC insulated, PVC sheathed, 660/1100 volts grade cable, armoured


wire 16 SWG.

(d)

37/2.62 mm (37/0.103")

(viii)

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 90 Metre)


1 PVC cable 37/0.103"
Wastage (2%)

1 coil

90.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total
Material per metre
LABOUR (For 20 Metre)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 107

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.

Item No. 14

(i)

10 x 10 cm (4" x 4") (100 x 100 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1 M.S Box 4" x 4" (100 x 100 mm)
2 Cement
3 Sand

1.00 No.
0.021 Cft.
0.08 Cft.

each
P. Bag
Per % Cft.

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 20 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 108

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.

Item No. 14

(ii)

17.5 x 10 cm

(7" x

4") (175 x 100 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1 M.S Box 7" x 4" (175 x 100 mm)
2 Cement
3 Sand

1.00 No.
0.026 Cft.
0.09 Cft.

each
P. Bag
Per % Cft.

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 16 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 109

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.

Item No. 14

(iii)

22.5 x 10 cm

(9" x 4") (225 x 100 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1 M.S Box 9" x 4" (225 x 100 mm)
2 Cement
3 Sand

1.00 No.
0.032 Cft.
0.08 Cft.

each
P. Bag
Per % Cft.

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 12 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 110

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.

Item No. 14

(iv)

20 x 25 cm

(8" x 10")

Detail

(200 x 250 mm)

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1 M.S Box 8" x 10" (200 x 250 mm)
2 Cement
3 Sand

1.00 No.
0.036 Cft.
0.150 Cft.

each
P. Bag
Per % Cft.

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 10 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES

Page 111

Labour rate for Each


Composite rate for Each

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.

Item No. 14

(v)

25 x 30 cm

(10" x 12") (250 x 300 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1 M.S Box 10" x 12" (250 x 300 mm)
2 Cement
3 Sand

1.00 No.
0.047 Cft.
0.155 Cft.

each
P. Bag
Per % Cft.

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 8 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 112

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of M.S sheet box of 16 SWG, 10 cm 4" (100 mm)
4.75 mm thick 3/16" (6 mm) bakelite sheet top, for recessed wiring
making holes for regulators, switches, plugs, etc.

Item No. 14

(vi)

30 x 35 cm

(12" x 14")

(300 x 350 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1 M.S Box 12" x 14" (300 x 350 mm)
2 Cement
3 Sand

1.00 No.
0.052 Cft.
0.180 Cft.

each
P. Bag
Per % Cft.

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 113

Say
Say

DESCRIPTION OF ITEM:
Item No. 15

Supply and erectionof round block of Sahl wood, 10 x 4 cm 4" x 1"


(100 x 40 mm).

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Round block
2 W. Gutti 1" x 1" (40 x 25 mm)
3 Screw

0.544 No.
1.00 No.
1.00 Dozen

each
per doz.
per doz.

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 70 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 114

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of teak wood board, 4.5 cm 1" (45 mm) thick.

Item No. 16
(i)

17.5 x 10 cm

(7" x 4")

(175 x 100 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Teak Wood Board 7" x 4" (175 x 100 mm)
2 W. Gutti
3 Screw

1.00 No.
2.00 Nos.
2.00 Nos.

each
per dozen
per dozen

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 115

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of teak wood board, 4.5 cm 1" (45 mm) thick.

Item No. 16
(ii)

22.5 x 10 cm

(9" x 4")

(225 x 100 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Teak Wood Board 9" x 4" (225 x 100 mm)
2 W. Gutti
3 Screw

1.00 No.
2.00 Nos.
2.00 Nos.

each
per dozen
per dozen

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 116

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of teak wood board, 4.5 cm 1" (45 mm) thick.

Item No. 16
(iii)

20 x 25 cm

(8" x 10") (200 x 250 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Teak Wood Board 8" x 10" (200 x 250 mm)
2 W. Gutti
3 Screw

1.00 No.
2.00 Nos.
2.00 Nos.

each
per dozen
per dozen

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 45 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 117

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of teak wood board, 4.5 cm 1" (45 mm) thick.

Item No. 16
(iv)

25 x 30 cm

(10" x 12")

(250 x 300 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Teak Wood Wooden Board 10" x 12" (250 x 300 mm)
2 W. Gutti
3 Screw

1.00 No.
4.00 Nos.
4.00 Nos.

each
per dozen
per dozen

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 40 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 118

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of teak wood board, 4.5 cm 1" (45 mm) thick.

Item No. 16
(v)

30 x 35 cm

(12" x 14") (300 x 350 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1 Teak Wood Board 12" x 14" (300 x 350 mm)
2 W. Gutti
3 Screw

1.00 No.
4.00 Nos.
4.00 Nos.

each
per dozen
per dozen

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 35 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 119

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Supply and erection of Sahl wood board 4.5 cm 1" (45 mm) thick.

Item No. 17
(i)

17.5 x 10 cm

(7" x 4")

(175 x 100 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Sahl Wood Board 7" x 4" (175 x 100 mm)
2 W. Gutti
3 Screw

1.00 No.
2.00 Nos.
2.00 Nos.

each
per dozen
per dozen

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 120

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of Sahl wood board 4.5 cm 1" (45 mm) thick.

Item No. 17
(ii)

22.5 x 10 cm

(9" x 4")

(225 x 100 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Sahl Wood Board 9" x 4" (225 x 100 mm)
2 W. Gutti
3 Screw

1.00 No.
2.00 Nos.
2.00 Nos.

each
per dozen
per dozen

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 121

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of Sahl wood board 4.5 cm 1" (45 mm) thick.

Item No. 17
(iii)

20 x 25 cm

(8" x 10")

(200 x 250 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Sahl Wood Board 8" x 10" (200 x 250 mm)
2 W. Gutti
3 Screw

1.00 No.
2.00 Nos.
2.00 Nos.

each
per dozen
per dozen

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 45 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 122

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of Sahl wood board 4.5 cm 1" (45 mm) thick.

Item No. 17
(iv)

25 x 30 cm

(10" x 12")

(250 x 300 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Sahl Wood Board 10" x 12" (250 x 300 mm)
2 W. Gutti
3 Screw

1.00 No.
2.00 Nos.
2.00 Nos.

each
per dozen
per dozen

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 40 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 123

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of Sahl wood board 4.5 cm 1" (45 mm) thick.

Item No. 17
(v)

30 x 35 cm

(12" x 14")

(300 x 350 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Sahl Wood Board 12" x 14" (300 x 350 mm)
2 W. Gutti
3 Screw

1.00 No.
2.00 Nos.
2.00 Nos.

each
per dozen
per dozen

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 35 Nos.)
1 Electrician
2 Cooly skilled
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 124

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.

Item No. 18

Double pole:

(a)
(i)

Main Switch 15/20 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7
8
9
10

Main switch 15/20 Amp. 500 volts


G.I Flexible pipe 1" dia (25 mm)
Angle iron board including paints (9"x9"x1")
Reg bolts 9" x 5/8" (225 x 16 mm)
Nipple 1" dia (25 mm)
Socket 1" dia (25 mm)
Check nut 1" dia (25 mm)
Thimble
Cement
Sand

1.00
0.50
1.00
4.00
2.00
3.00
1.00
8.00
0.032
0.08

No.
metre
No.
Nos.
Nos.
Nos.
No.
Nos.
Cft.
Cft.

each
per mtr.
each
% No.
each
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 125

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.

Item No. 18

Double pole:

(a)
(ii)

Main switch 30/35 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7
8
9
10

Main Switch 30/35 Amp. 500 volts


G.I Flexible pipe 1" dia (25 mm)
L-Iron board including paint (9"x12"x1")
Reg bolts 9" x 5/8" (225 x 16 mm)
Nipple 1" dia (25 mm)
Socket 1" dia (25 mm)
Check nut 1" dia (25 mm)
Thimble
Cement
Sand

1.00
0.50
1.00
4.00
2.00
3.00
1.00
8.00
0.032
0.08

No.
metre
No.
Nos.
Nos.
Nos.
No.
Nos.
Cft.
Cft.

each
per mtr.
each
% No.
each
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 126

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.

Item No. 18

Double pole:

(a)
(iii)

Main switch 60/65 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7
8
9

Main Switch 60/65 Amp. 500 volts


G.I Flexible pipe 1" dia (38 mm)
L-Iron board including paint (10"x12"x1")
Nipple 1" dia (38 mm)
Socket 1" dia (38 mm)
Check nut 1" dia (38 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Cement
Sand

1.00
0.50
1.00
2.00
2.00
2.00
4.00
0.032
0.08

No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

each
per mtr.
each
each
each
each
% No.
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 127

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.

Item No. 18

Double pole:

(a)
(iv)

Main switch 100 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7
8
9

Main Switch 100 Amp. 500 volts


G.I Flexible pipe 1" dia (38 mm)
L-Iron board including paint (10"x12"x1")
Nipple 1" dia (38 mm)
Socket 1" dia (38 mm)
Check nut 1" dia (38 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Cement
Sand

1.00
0.50
1.00
2.00
2.00
2.00
4.00
0.032
0.08

No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

each
per mtr.
each
each
each
each
% No.
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 128

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.

Item No. 18

Triple pole:

(b)
(i)

Main switch 15/20 Amp (500 Volts).

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7
8
9

Main Switch 15/20 Amp. 500 volts


G.I Flexible pipe 1" dia (25 mm)
L-Iron board including paint (9"x12"x1")
Nipple 1" dia (25 mm)
Socket 1" dia (25 mm)
Check nut 1" dia (25 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Cement
Sand

1.00
0.50
1.00
2.00
2.00
2.00
4.00
0.032
0.08

No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

each
per mtr.
each
each
each
each
% No.
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 129

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.

Item No. 18

Triple pole:

(b)
(ii)

Main switch 30/35 Amp (500 Volts).

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7
8
9
10

Main Switch 30/35 Amp. 500 volts


L-Iron board including paint (10"x12"x1")
G.I Flexible pipe 1" dia (25 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Nipple 1" dia (25 mm)
Socket 1" dia (25 mm)
Check nut 1" dia (25 mm)
Thimble
Cement
Sand

1.00
1.00
0.50
4.00
2.00
2.00
2.00
8.00
0.032
0.08

No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

each
each
per mtr.
% No.
each
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 130

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.

Item No. 18

Triple pole, with neutral link:

(c)
(i)

Main switch 30/35 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7
8
9
10

Main Switch 30/35 Amp. 500 volts


L-Iron board including paint (10"x12"x1")
G.I Flexible pipe 1" dia (25 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Nipple 1" dia (25 mm)
Socket 1" dia (25 mm)
Check nut 1" dia (25 mm)
Thimble
Cement
Sand

1.00
1.00
0.50
4.00
2.00
2.00
2.00
8.00
0.032
0.08

No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

each
each
per mtr.
% No.
each
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 131

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.

Item No. 18

Triple pole, with neutral link:

(c)
(ii)

Main switch 60/65 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7
8
9

Main Switch 60/65 Amp. 500 volts


L-Iron board including paint (12"x15"x1")
G.I Flexible pipe 1" dia (32 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Nipple 1" dia (40 mm)
Socket 1" dia (32 mm)
Check nut 1" dia (32 mm)
Cement
Sand

1.00
1.00
0.50
4.00
2.00
2.00
2.00
0.052
0.18

No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

each
each
per mtr.
% No.
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 132

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad 500 volts main switches
fuses, on angle iron board with 3 mm (1/8") thick M.S. sheet cover
bonding to earth with necessary flexible pipe and thimbles, etc.

Item No. 18

Triple pole, with neutral link:

(c)
(iii)

Main switch 100 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
7
8
9

Main Switch 100 Amp. 500 volts


L-Iron board including paint (12"x18"x1")
G.I Flexible pipe 1" dia (40 mm)
Brass Nipple 1" dia (40 mm)
Socket 1" dia (40 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Cement
Sand

1.00
1.00
0.50
2.00
2.00
4.00
0.052
0.18

No.
No.
metre
Nos.
Nos.
Nos.
Cft.
Cft.

each
each
per mtr.
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.62 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 133

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.

Item No. 19

(i)

60/65 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7
8

Main Switch with triple pole and


Flexible pipe 1" (40 mm)
L-Iron board including paint (10"x15"x1")
Brass Nipple 1" dia (40 mm)
Brass check nut 1" (40 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Brass Socket 1" dia (40 mm)
Thimble 60/65 Amp

1.00
0.50
1.00
2.00
2.00
4.00
2.00
4.00

No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Nos.

each
per mtr.
each
each
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 134

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.

Item No. 19

(ii)

100 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7
8

Main Switch 100 Amp. 500 volts


Flexible pipe 1" (40 mm)
L-Iron board including paint (12"x18"x1")
Brass Nipple 1" dia (32 mm)
Brass check nut 1" (32 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Brass Socket 1" dia (40 mm)
Thimble 100 Amp.

1.00
0.50
1.00
2.00
2.00
4.00
2.00
4.00

No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Nos.

each
per mtr.
each
each
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.62 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 135

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.

Item No. 19

(iii)

150 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Main Switch 150 Amp. 500 volts


L-Iron board including paint (15"x18"x1")
Flexible pipe 1" (40 mm)
Brass Nipple 1" dia (32 mm)
Brass Socket 1" dia (40 mm)
Thimble 150 Amp.
Reg bolts 9" x 5/8" (225 x 16 mm)

1.00
1.00
0.50
2.00
2.00
4.00
4.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly skilled

1.00 No.
1.62 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 136

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.

Item No. 19

(iv)

200 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7
8

Main Switch 200 Amp. 500 volts


L-Iron board including paint (15"x18"x1")
Flexible pipe 1" (40 mm)
Brass Nipple 1" dia (32 mm)
Brass Socket 1" dia (40 mm)
Brass check nut 1" (32 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Copper Thimble 200 Amp.

1.00
1.00
0.50
2.00
2.00
2.00
4.00
4.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 137

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.

Item No. 19

(v)

300 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7
8

Main Switch 300 Amp. 500 volts


Flexible pipe 1" (40 mm)
L-Iron board including paint (15"x18"x1")
Brass Nipple 1" dia (32 mm)
Brass Socket 1" dia (40 mm)
Brass check nut 1" (32 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Copper Thimble 300 Amp.

1.00
0.50
1.00
2.00
2.00
2.00
4.00
4.00

No.
metre
No.
Nos.
Nos.
Nos.
Nos.
Nos.

each
per mtr.
each
each
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 138

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.

Item No. 19

(vi)

400 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7
8

Main Switch 400 Amp. 500 volts


L-Iron board including paint (15"x18"x1")
Flexible pipe 2" (50 mm)
Brass Nipple 2 dia (50 mm)
Brass Socket 2" dia (50 mm)
Brass check nut 2" (50 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Copper Thimble 400 Amp.

1.00
1.00
0.50
2.00
2.00
2.00
4.00
4.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled

1.25 No.
3.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 139

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, 500 volts main switche
pole and neutral link and HRC fuses, on angle iron board with 3 mm
thick M.S sheet covering, including bonding to earth with necessar
pipe and thimbles.

Item No. 19

(vii)

500 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7
8
8
9

Main Switch 500 Amp. 500 volts


L-Iron board including paint (15"x18"x1")
Flexible pipe 4" (100 mm)
Brass Nipple 4" dia (100 mm)
Brass Socket 4" dia (100 mm)
Brass check nut 4" (100 mm)
Reg bolts 12" x 5/8" (300 x 16 mm)
Copper Thimble 500 Amp.
Cement
Sand

1.00
1.00
0.50
2.00
2.00
2.00
4.00
4.00
0.203
0.99

No.
No.
metre
Nos.
Nos.
Nos.
Nos.
Nos.
Cft.
Cft.

each
each
per mtr.
each
each
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 1 No.)
1 Electrician
2 Coolies skilled

1.50 Nos.
3.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 140

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(i)

2 way, 15 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/aluminium clad 2 way15 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 141

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(ii)

3 way, 15 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/aluminium clad 3 way15 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 142

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(iii)

4 way, 15 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 4 way15 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 143

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(iv)

5 way, 15 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 5 way15 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 144

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(v)

6 way, 15 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 6 way15 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 145

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(vi)

7 way, 15 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 7 way15 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 146

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(vii)

8 way, 15 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 8 way15 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 147

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(viii)

9 way, 15 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 9 way15 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 148

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(ix)

10 way, 15 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 10 way15 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 149

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(x)

11 way, 15 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 11 way15 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 150

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(xi)

12 way, 15 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 12 way15 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 151

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(xii)

2 way, 30 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 2 way 30 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 152

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(xiii)

3 way, 30 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 3 way 30 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 153

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(xiv)

4 way, 30 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 4 way 30 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 154

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(xv)

5 way, 30 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 5 way 30 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 155

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(xvi)

6 way, 30 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 6 way 30 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 156

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(xvii)

7 way, 30 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 7 way 30 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 157

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 20

(xviii)

Supply and erection of iron/aluminium clad, branch distribution bo


on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co
8 way, 30 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 8 way 30 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 158

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(xix)

9 way, 30 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 9 way 30 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 159

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of iron/aluminium clad, branch distribution bo
on angle iron frame of suitable size with 3 mm (1/8") M.S sheet co

Item No. 20

(xx)

10 way, 30 Amp. per way.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Iron/Aluminium clad 10 way 30 Amp. per way


L-Iron board (9"x 9"x1") (225 x 225 x 40 mm)
PVC Flexible pipe " dia (12 mm)
PVC Socket " dia (12 mm)
PVC Nipple " dia (12 mm)
PVC Check nut " dia (12 mm)
PVC bushes " dia (12 mm)

1.00
1.00
0.50
4.00
4.00
2.00
8.00

No.
No.
metre
Nos.
Nos.
Nos.
Nos.

each
each
per mtr.
each
each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Coolies skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 160

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of bus bars, for 500 volts 3 phase A.C supply
copper bars, including glazed porcelain bridges, on angle iron boa
with rag bolts and M.S sheet box 1.5 mm thick, etc., complete:

Item No. 21

(i)

60 Amp. with 4 copper bars size 1" x 1/8" (40 x 3 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7

Porcelain (Imported)
Copper strip 1" x 1/8" x 14" (40 x 3 x 350 mm)
Box 1.5 mm thick
L-Iron board 18" x 12" x 1" (450 x 300 x 40 mm)
Reg bolts 9 x 5/8 (225 x 16 mm)
Cement
Sand

8.00
4.00
1.00
1.00
4.00
0.063
0.18

Nos.
Nos.
No.
No.
Nos.
Cft.
Cft.

each
each
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)

1.50 Nos.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 161

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of bus bars, for 500 volts 3 phase A.C supply
copper bars, including glazed porcelain bridges, on angle iron boa
with rag bolts and M.S sheet box 1.5 mm thick, etc., complete:

Item No. 21

(ii)

100 Amp. with 4 copper bars size 1" x 1/8" (40 x 3 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7

Porcelain (Imported)
Copper strip 14" x 1" x 1/8" (350 x 40 x 3 mm)
Box 1.5 mm thick
L-Iron board 18" x 12" x 1" (450 x 300 x 40 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Cement
Sand

8.00
4.00
1.00
1.00
4.00
0.063
0.18

Nos.
Nos.
No.
No.
Nos.
Cft.
Cft.

each
each
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)

1.50 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 162

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of bus bars, for 500 volts 3 phase A.C supply
copper bars, including glazed porcelain bridges, on angle iron boa
with rag bolts and M.S sheet box 1.5 mm thick, etc., complete:

Item No. 21

(iii)

200 Amp. with 4 copper bars size 2" x 1/8" (50 x 3 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7

Porcelain (Imported)
Copper strip 14" x 2" x 1/8" (350 x 50 x 3 mm)
Box 1/16 (2 mm) thick
L-Iron board 18" x 12" x 1" (450 x 300 x 40 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Cement
Sand

8.00
4.00
1.00
1.00
4.00
0.063
0.18

Nos.
Nos.
No.
No.
Nos.
Cft.
Cft.

each
each
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Coolies (helper)

2.00 Nos.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 163

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of bus bars, for 500 volts 3 phase A.C supply
copper bars, including glazed porcelain bridges, on angle iron boa
with rag bolts and M.S sheet box 1.5 mm thick, etc., complete:

Item No. 21

(iv)

300 Amp. with 4 copper bars size 2" x 3/16" (50 x 4 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7

Porcelain (Imported)
Copper strip 2" x 3/16" x 14" (50 x 4 x 350 mm)
Box 1/16" (2 mm) thick
L-Iron board 18" x 12" x 1" (450 x 300 x 40 mm)
Reg bolts 2 "x 5/8" (50 x 16 mm)
Cement
Sand

8.00
4.00
1.00
1.00
4.00
0.063
0.18

Nos.
Nos.
No.
No.
Nos.
Cft.
Cft.

each
each
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Coolies skilled

2.50 Nos.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 164

Say
Say

DESCRIPTION OF ITEM:
Supply and erection of bus bars, for 500 volts 3 phase A.C supply
copper bars, including glazed porcelain bridges, on angle iron boa
with rag bolts and M.S sheet box 1.5 mm thick, etc., complete:

Item No. 21

(v)

500 Amp. with 4 copper bars size 2" x " (50 x 6 mm)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7

Porcelain (Imported)
Copper strip 14" x 2" x " (350 x 50 x 6 mm)
Box 1/16" (2 mm) thick
L-Iron board 18" x 12" x 1" (450 x 300 x 40 mm)
Reg bolts 9" x 5/8" (225 x 16 mm)
Cement
Sand

8.00
4.00
1.00
1.00
4.00
0.084
0.24

Nos.
Nos.
No.
No.
Nos.
Cft.
Cft.

each
each
each
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)

2.00 Nos.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 165

Say
Say

DESCRIPTION OF ITEM:
Item No. 22 (i)

Supply and erection of plain pendent lamp holder, complete, with b


holder and flexible twin wire 23/0.0076" upto 2 metre length (with
shade).

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Pendent lamp holder bakelite
2 Flexible twin wire 23/0.0076 (23/0.195 mm)

1.00 No.
2.00 metre

each
per mtr.

0.50 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 24 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 166

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 22 (ii)

Extra for additional length of flexible wire, beyond 2 metres.

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL
2 Flexible twin wire 23/0.0076 (23/0.195 mm)

1.00 metre

per mtr.

Total
Contractor's Profit & O ## Percent
Total

ITEM RATE
Composite rate per Metre
Composite rate per ft.

Rs.
Rs.

Page 167

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 23

Supply and erection of counter weight pendent with porcelain count


and fitting on bakelite lamp holder, with flexible twin wire 23/0.
(without bulb & shade).

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Flexible twin wire 23/0.0076 (23/0.195 mm)
2 Bakelite lamp holder
3 Counter weight with accessories

3.00 metre
1.00 No.
1.00 No.

per mtr.
each
each

0.50 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 12 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 168

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 24

Supply and erection of stiff pendent with brass/metal pipe 6.3 cm


15 mm (") dia brass oxidised or painted along lamp holder with VI
3/0.74 mm (3/0.029").

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4

Brass pipe " dia (12 mm)


Canopy nipple & hook
Brass lamp holder
VIR/PVC cable 3/0.29

2.00
1.00
1.00
2.00

metre
job
No.
metre

per mtr.
per job
each
per mtr.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 169

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 25

Supply and erection of 22.5 cm (9") long swan neck plain brass/ste
oxidised bracket lamp holder, complete.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Brass bracket
2 Brass lamp holder
3 VIR/PVC Cable 3/0.029

1.00 No.
1.00 No.
0.50 metre

each
each
per mtr.

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 29 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 170

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 26

Supply and erection of wall type/pole type bracket, with double co


tight reflector, flexible wire and brass holder.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

G.I. Pipe " dia (20 mm)


Brass nipple
Brass lamp holder
Double cone reflector
Flexible wire

1.00
1.00
1.00
1.00
1.00

metre
No.
No.
No.
metre

per mtr.
each
each
each
per mtr.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 21 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 171

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 27

Supply and erection of bakelite button holder shade, large size.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Button Switch holder
2 Bakelite screwed cover

1.00 No.
1.84 Dozen

each
P. Doz

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 100 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
0.50 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 172

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 28

Supply and erection of call bell 220/250 volts, fixed on teak wood
17.5 x 10 cm (7" x 4").

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Call bell
2 Board 7" x 4" (175 x 100 mm)
3 Screw

1.00 No.
1.00 No.
1.85 Dozen

each
each
P. Doz

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 173

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 29

Supply and erection of bell push or bed switch, with 5 metre twin
wire 23/0.0076"

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Bed switch/bell push
2 Flexible wire 23/0.0076" (23/0.195 mm)

1.00 No.
5.00 metre

each
per mtr.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 80 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 174

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 30

Supply and erection of celling rose, bakelite.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Ceiling rose
2 Iron screw

1.00 No.
1.50 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 48 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 175

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.

Item No. 31
(i)

Open type.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Switch 5 Amp
2 Screw

1.00 No.
1.50 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 176

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.

Item No. 31
(ii)

Piano type.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Switch 5 Amp piano type
2 Screw

1.00 No.
1.50 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 177

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.

Item No. 31
(iii)

Switch ring type, recessed.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Switch ring type

1.00 No.

each

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 178

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.

Item No. 31
(iv)

Switch plate type recessed.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Switch plate type
2 Screw

1.00 No.
1.50 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 179

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.

Item No. 31
(v)

Double control, open type.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Double control switch
2 Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.
0.25 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 44 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 180

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.

Item No. 31
(vi)

Double control, ring type recessed.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Double control switch recessed type
2 Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.
0.25 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 44 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 181

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of switches 5 Amp.

Item No. 31
(vii)

Double control, piano type.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Double control piano type
2 Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.
0.25 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 44 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 182

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of switches 10/15 Amp.

Item No. 32
(i)

Open type.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Switch 10/15 Amp
2 Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 183

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of switches 10/15 Amp.

Item No. 32
(ii)

Recessed type switch 10/15 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Switch 10/15 Amp. recessed
2 Mechine Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 184

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 33

Supply and erection of wall socket with 3 pin 5 Amp. shoe.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 3 pin 5 Amp wall socket
2 Shoe
3 Screw

1.00 No.
1.00 No.
2.00 Nos.

each
each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 185

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 34

Supply and erection of 3 pin 5 Amp. wall socket.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Wall socket 3 pin 5 Amp.
2 Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 186

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of 3 pin 10/15 Amp. wall socket.

Item No. 35
(i)

Open type.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Wall socket 10/15 Amp.
2 Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 187

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of 3 pin 10/15 Amp. wall socket.

Item No. 35
(ii)

Wall socket 10/15 Amp. recessed.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Wall socket 10/15 Amp. recessed
2 Machine Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 188

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of 3 pin switch and plug combined, recessed ty

Item No. 36
(i)

5 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Plugs 3 pin and switch (combine) 5 Amp.
2 Machine Screw

1.00 No.
4.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 189

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of 3 pin switch and plug combined, recessed ty

Item No. 36
(ii)

10/15 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Plugs 3 pin and switch (combine) 10/15 Amp.
2 Machine Screw

1.00 No.
5.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 190

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 37

Supply and erection of 3 pin 10/15 Amp. wall socket with shoe open

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Wall socket 3 pin 10/15 Amp.
2 Shoe 3 pin
3 Screw

1.00 No.
1.00 No.
2.00 Nos.

each
each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 50 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 191

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of cut out, bakelite:

Item No. 38
(i)

Open type.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Cut out bakelite
2 Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 90 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 192

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of cut out, bakelite:

Item No. 38
(ii)

Recessed type cut out.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Cut out
2 Machine Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 90 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 193

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of button holder:

Item No. 39
(i)

Bakelite large size.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Button holder large
2 Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 80 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 194

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of button holder:

Item No. 39
(ii)

Button holder Brass.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Button holder
2 Screws

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 80 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 195

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 40

Supply and erection of brass bracket with holder.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Brass bracket with holder
2 Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 60 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 196

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 41

Supply and erection of bell push, open/recessed type (without flex

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Bell push
2 Screw

1.00 No.
2.00 Nos.

each
P. Doz.

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 90 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 197

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:

Item No. 42
(i)

15/20 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Kit kat 15/20 Amp.
2 Screw

1.00 No.
1.00 Nos.

each
P. Doz.

1.00 No.
0.25 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 60 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 198

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:

Item No. 42
(ii)

30/35 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Kit kat 30/35 Amp.
2 Screw

1.00 No.
1.00 Nos.

each
P. Doz.

1.00 No.
0.25 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 55 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 199

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:

Item No. 42
(iii)

60/65 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Kit kat 60/65 Amp.
2 Screw

1.00 No.
1.00 Nos.

each
P. Doz.

1.00 No.
0.25 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 36 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 200

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:

Item No. 42
(iv)

100 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Kit kat 100 Amp.
2 Screw

1.00 No.
1.00 Nos.

each
P. Doz.

1.00 No.
0.25 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 32 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 201

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:

Item No. 42
(v)

200 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Kit kat 200 Amp.
2 Screw

1.00 No.
1.00 Nos.

each
P. Doz.

1.00 No.
0.25 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 28 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 202

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:

Item No. 42
(vi)

300 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Kit kat 300 Amp.
2 Screw

1.00 No.
1.00 Nos.

each
P. Doz.

1.00 No.
0.25 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 28 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 203

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:

Item No. 42
(vii)

400 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Kit kat 400 Amp.
2 Screw

1.00 No.
1.00 Nos.

each
P. Doz.

1.00 No.
0.50 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 25 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 204

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of kit kat, 500 volt:

Item No. 42
(viii)

500 Amp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Kit kat 500 Amp.
2 Screw

1.00 No.
2.00 No.

each
each

1.00 No.
0.50 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 25 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 205

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of tube light, including rod, choke, starter w
flexible wire, including connection from ceiling rose, etc., compl

Item No. 43

(i)

Double rod (80 watts) with two chokes and 2 starters.

Detail

Unit Rate (Metric System) per Set


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Tube rod
Chokes
Starters
Frame with holder
Flexible wire
Hooks, Chain

2.00
2.00
2.00
1.00
2.00
L.S

Nos.
Nos.
Nos.
job
metre

each
each
each
per job
per mtr.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Sets)
1 Electrician
2 Cooly (helper)

1.00 No.
0.50 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for each Set
Composite rate for each Set

Rs.
Rs.

Page 206

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of tube light, including rod, choke, starter w
flexible wire, including connection from ceiling rose, etc., compl

Item No. 43

(ii)

Single rod (40 watts) with one choke and one starter.

Detail

Unit Rate (Metric System) per Set


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5

Tube rod
Choke
Starter
Frame set
Flexible wire
Hooks, Chain

1.00
1.00
1.00
1.00
2.00
L.S

No.
No.
No.
No.
metre

each
each
each
each
per mtr.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 5 Sets)
1 Electrician
2 Cooly (helper)

1.00 No.
0.50 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for each Set
Composite rate for each Set

Rs.
Rs.

Page 207

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of tube light, including rod, choke, starter w
flexible wire, including connection from ceiling rose, etc., compl

Item No. 43

(iii)

Single round tube, 32 watts, with one choke and one starter, witho

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7

Round tube 32 watts


Starter
Choke
Holder
Base
Flexeble wire
Hooks

1.00
1.00
1.00
2.00
1.00
2.00
1.00

No.
No.
No.
Nos.
No.
metre
No.

each
each
each
each
each
per mtr.
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 5 Sets)
1 Electrician
2 Cooly (helper)

1.00 No.
0.50 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 208

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of tube light, including rod, choke, starter w
flexible wire, including connection from ceiling rose, etc., compl

Item No. 43

(iv)

Round tube, 32 watts, with one choke and one starter, with cover.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1
2
3
4
5
6
7
8

Round tube 32 watts


Starter
Choke
Holder
Base
Plastic cover
Flexeble wire
Hooks

1.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00

No.
No.
No.
Nos.
No.
No.
metre
No.

each
each
each
each
each
each
per mtr.
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
0.50 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 209

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Providing and fixing M.S iron box for housing main switches, made
(1/16") thick M.S sheet, with locking arrangement, including paint

Item No. 44

(i)

60 x 35 x 15 cm (24" x 14" x 6")

Detail

Unit Rate (Metric System) for Each


Qty

MATERIAL
1 M.S sheet 1.5 mm thick
Base side 1 x 24/12 x 14/12 (1 x 600 x 350 mm)
Long side 2 x 24/12 x 7 12 (2x600x190mm)
Short side 2 x 14/12 x 7 12 (2x350x190mm)
Top 1 x 24 x 12 x 14 (600 x 350 x 150 mm)
1.04 Sqm @ 12.20 Kg/Sqm
2 Angle Iron 25 x 25 x 3 mm/Sqm
2 x 24" =
48" (2 x 600 mm)
2 x 14" =
28" (2 x 350 mm)
4 x 7.12 =
30" (4 x 190 mm)
=
0.82 Sqm @ 6.08 Kg/Sqm
1.70 kg
3 Handle chromium plated
4 Painting
5 Hinges
6 Locking arrangement

Rate

Per Unit

12.68 kg

per kg

1.70
1.00
0.178
3.00
L.S

kg
No.
Gallon
Nos.

each
each
Gallon
each

1.00
1.00
0.125
1.00

No.
No.
No.
No.

per
per
per
per

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1
2
3
4

Black Smith
Cooly (helper)
Painter
Electrician

day
day
day
day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 210

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Providing and fixing M.S iron box for housing main switches, made
(1/16") thick M.S sheet, with locking arrangement, including paint

Item No. 44

(ii)

95 x 40 x 20 cm (38" x 16" x 8")

Detail

Unit Rate (Metric System) for Each


Qty

MATERIAL
1 M.S sheet 38"x16"x 8" thick (1965x406x200mm)
Base side 1x38/12x16/12 (965x406mm) =
0.39 Sqm
Long side 2x38/12x8/12 (2x965x200mm)
= 0.39 Sqm
Short side 2x16/12x8/12 (2x406x200mm)
0.17 Sqm
Top 1x38/12x16/12 (1x965x406mm)
=
0.39 Sqm
1.34 Sqm
1.34 Sqm @ 12.45 Kg/Sqm
2 Angle Iron 1" x 1" x 1/8" (25 x 25 x 3mm)
2 x 965 mm = 1.93 R/m
2 x 406 mm = 0.82 R/m
4 x 200 mm = 0.80 R/m
3.55 R/m
3.55 R/m @ 0.632 Kg/R/m
3 Handle chromium plated
4 Paint
5 Hinges
6 Locking arrangement

Rate

Per Unit

16.70 kg

per kg

2.25
1.00
0.045
3.00
L.S

kg
No.
Gallon
Nos.

per kg
each
Gallon
each

1.25
1.00
0.125
1.00

Nos.
No.
No.
No.

per
per
per
per

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1
2
3
4

Black Smith
Cooly (helper)
Painter
Electrician

day
day
day
day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 211

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Providing and fixing M.S iron box for housing main switches, made
(1/16") thick M.S sheet, with locking arrangement, including paint

Item No. 44

(iii)

105 x 52.5 x 22.5 cm (42" x 21" x 9")

Detail

Unit Rate (Metric System) for Each


Qty

MATERIAL
1 M.S sheet 42" x 21" x 9" thick (1067 x 534 x 225mm)
Base side 1 x 42/12 x 21/12 (1076x534mm)
Long side 2 x 42/12 x 9/12
(2x1067x225mm)
Short side 2 x 21/12 x 9/12
(2x534x225mm)
Top
1 x
42 (1x1067x534mm)
12
12
1.872 Sqm
1872 Sqm @ 27.44 Per Sqm
(51.36 lbs) 23.30
2 Angle Iron 1" x 1" x 1/8 (25x25x3mm)
2 x 42" =
84" (2x1076)
2 x 21" =
42" (2x534)
4 x 9"
=
36" (4x225mm)
162" or 13.5 ft. (4.12 R/m)
412 ft. 1.394 lbs/PRM
5.74 lbs
2.60
3 P/F chromium plated
1.00
4 P/F Hinges
3.00
Paint
0.054
Locking arrangement
L.S

Rate

Per Unit

kg

per kg

kg
No.
Nos.
Gallon

per kg
each
each
Gallon

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1
2
3
4

Black Smith
Colly (helper)
Painter
Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

1.25
1.00
0.17
1.00

Nos.
No.
No.
No.

per
per
per
per

day
day
day
day

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 212

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Providing and fixing M.S iron box for housing main switches, made
(1/16") thick M.S sheet, with locking arrangement, including paint

Item No. 44

(iv)

135 x 70 x 27.5 cm (54" x 28" x 11")

Detail

Unit Rate (Metric System) for Each


Qty

MATERIAL
1 M.S sheet (54" x 28" 11") thick (1372x710x280mm)
Base side 1 x 54/12 x 28/12 (1372x710mm)
Long side 2 x 54/12 x 11/12
(2x1372x280mm)
Short side 2 x 28/12 x 11/12
(2x710x280mm)
Top 1 x 54/12 x 28/12
(1x1372x710mm)
3.12 Sqm
3.12 Sqm @ 27.44 lbs/Per Sqm
(85.50 lbs)
2 Angle Iron 1" x 1" x 1/8" (25x25x3mm)
1x2 x 54"=
108" (2x1372mm)
2 x 28" =
56" (2x710mm)
4 x 11" =
44 (4x280mm)
5.28 R/M
5.28 R/M @ 1.39 lbs/Per R/M
7.36 lbs
(7.36 lbs)
3 Handle chromium plated
4 Hinges with screws
5 Locking arrangement

38.78 kg

3.34 kg
1.00 No.
4.00 Nos.

Rate

Per Unit

per kg

per kg
each
each

L.S

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1
2
3
4

Black Smith
Cooly (helper)
Painter
Electrician

1.50
1.00
0.25
1.00

No.
No.
No.
No.

per
per
per
per

day
day
day
day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 213

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 45

Supply and erection of girder clamp hook, 16 mm (5/8") with M.S pl


with bolts and nuts for hanging ceiling fans.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Girder clamp hock 5/8" (16 mm) with
M.S plate 1" x " (25 x 6 mm)
2 Nut & bolts " (12 mm) 1" (40 mm) long

1.00 No.
2.00 Nos.

each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
0.50 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 214

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 46

Supply and erection of girder strut, of M.S tee section 40 x 40 x


1" x ") complete with clamp, bolts and nuts, etc., including fix
cement concrete 1 : 3 : 6.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
5.00
(11.00
1.00
3.00
1.00

1 T - Iron " x 1" x 1" x 5"


Clamps
2 Nut & Bolts 1" (25 mm)
3 Manufacturing

kg
lbs)
kg
No.
No.

per kg
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 30 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 215

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 47

Supply and erection of roof suspension hook,16mm (5/8" dia) rod wi


(3 x 1" x 1/8") M.S Steel Channel, with clamp, bolts & nuts etc.,
with cement concrete 1:3:6.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL

1 Steel channel 75 x 40 x 3 mm
1.5 R/m @ 6.90 Kg/R/m
2 Hook 5/8" (16 mm) with nut & bolts
3 Clamp
4 Cement
5 Sand

10.35 kg

10.35
1.00
1.00
0.042
0.12

kg
No.
No.
Cft.
Cft.

per kg
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 28 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 216

Say
Say

DESCRIPTION OF ITEM:
Item No. 48

Supply and erection of roof suspension hook, of M.S plate 75 x 40


(3 x 1" x ") with 16 mm (5/8") hook, complete with bolts and nut
with cement concrete 1 : 3 : 6.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1 Iron plate 3"x1"x" (0.862x40x12mm)

6.96 lbs
3.16 kg

2 Hook 5/8" with bolts & nut


3 Cement
4 Sand

3.16
1.00
0.063
0.18

kg
No.
Cft.
Cft.

per kg
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 21 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 217

Say
Say

DESCRIPTION OF ITEM:
Item No. 49

Supply and erection of 3/8" (10 mm) dia M.S bar fan hook placed at
casting of slab.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 M.S bar hook 3/8" (!0 mm) dia

1.00 No.

each

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 39 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 218

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 50

Erection of circular L.T pole in cement concrete 1 : 3 : 6, one me


ground level (excluding the cost of pole), including cement concre
(1 : 2 : 4) excavation of foundation and finishing surface.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Cement concrete 1:3:6 (1.22x.300x1.0) 0.3714 Cum

0.3714 Cum

Per Cum

0.3714 Cum
0.3714 Cum

Cum
Cum

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Cement concrete 1 : 3 : 6
2 Excavation of foundatin
3 Erection of pole in position
Plumber
Helper
4 Extra labour for shuttering

0.50 No.
2.00 Nos.
L.S

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 219

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of bracket of M.S channel 75 x 40 x 6 mm (3"x1
section:

Item No. 51

(i)

0.60 metre (2') long for 2 lines.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Steel channel (25 x 13 x 6 mm)
0.600 @ 5.22 Kg
Steel plate (75 x 20 x 20 mm)

3.18 Kg
0.79 Kg
3.97 Kg

Bolts and nuts 5/8" dia (16 mm)

3.97 Kg
2.00 Nos.

per kg
each

1.00 No.
0.25 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 7 Nos.)
1 Black Smith
2 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 220

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of bracket of M.S channel 75 x 40 x 6 mm (3"x1
section:

Item No. 51

(ii)

1.20 metre (4') long, for 4 lines.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Steel channel 75 x 13 x 6 mm
1.322 m @ 5.22 Kg/Rm
Iron plate 75 x 20 x 6 mm

6.35 Kg
0.80 Kg
7.15 Kg

Bolts and nuts 5/8" dia (16 mm)


Manufacturing charges

7.15 Kg
2.00 Nos.
1 job

per kg
each
per job

1.00 No.
0.25 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Black Smith
2 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 221

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 52

Supply and erection of anchor rod Henley type for pole, including
clamps and 7/12" stay wire, straining screws, etc., erected in cem
1 : 3 : 6 and collar of cement concrete.

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 10 Metre)


1
2
3
4
5
6
7

Stay wire 7/12"


Double clamp
Steining Screw
Eye bolts
Cement
Sand
Bajri

10.00
1.00
1.00
1.00
0.064
0.16
0.322

Total
Contractor's Profit & O ## Percent
Total
Material per metre
235.40 1

metre
No.
No.
No.
Cft.
Cft.

per mtr.
each
each
each
P. Bag
Per % Cft.
P. Cft.

LABOUR (For 70 Metre)


1 Electrician
2 Cooly (helper)

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 222

DESCRIPTION OF ITEM:
Item No. 53

Supply and erection of stay for house service pipe, erected with s
screws and 7/14" stay wire, complete.

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 5 Metre)


1
2
3
4
5
6
7
8

Stay wire 7/14"


Double clamp 9" dia (225 mm)
Stearining Screw
Hook size
Eye bolts
Cement
Sand
Bajri

5.00
1.00
1.00
1.00
1.00
0.064
0.16
0.322

Total
Contractor's Profit & O ## Percent
Total
Material per metre
129.80 5

metre
No.
No.
No.
No.
Cft.
Cft.

per mtr.
each
each
each
each
P. Bag
Per % Cft.
P. Cft.

LABOUR (For 35 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 223

DESCRIPTION OF ITEM:
Item No. 54

Supply and erection of house service pipe Henley (G.I pipe water q
pole, type, 50 mm (2" dia) erected to install insulated overhead l
shackle insulator for holding insulated wire and straining devices
wire and other accessories, etc., complete.

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 4 Metre)


1
2
3
4
5
6
7
8
9
10
11

G.I. pipe 2" dia (50 mm)


Shakle insulator
Clamp double
Clamp 2" dia (50 mm)
Rag bolts 5/8" 9" (16 x 225 mm)
G.I bend 2" (50 mm) cap
G.I Reducing socket 2 x " dia (50 x 20 mm)
M.S bolts for suport
Cement
Sand
Bajri
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1090.45

4.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
0.064
0.16
0.322

metre
No.
No.
No.
No.
Nos.
No.
No.
Cft.
Cft.

per mtr.
each
each
each
each
each
each
each
P. Bag
Per % Cft.
P. Cft.

0.00

LABOUR (For 12 Metre)


1 Electrician
2 Cooly skilled

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 224

DESCRIPTION OF ITEM:
Item No. 55

Supply and erection of house service pipe 50 mm (2" dia) G.I pipe
pole type, for bare copper wire overhead line, including shackle i
straining devices and other accessories, etc.

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 4 Metre)


1
2
3
4
5
6
7
8
9
10

G.I. pipe (water quality)


Shakle insulator
Clamp double
Clamp 2" dia (50 mm)
Rag bolts 5/8" 9" (16 x 225 mm)
G.I bend 2" (50 mm) cap
G.I Reducing socket 2 x " dia (50 x 20 mm)
M.S bar suport
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per metre
1081.65

4.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
0.042
0.12

metre
No.
No.
No.
No.
Nos.
No.
No.
Cft.
Cft.

per mtr.
each
each
each
each
each
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 12 Metre)


1 Electrician
2 Cooly (helper)

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 225

DESCRIPTION OF ITEM:
Item No. 56

Supply and erection of lightening arrestor horn type, complete.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Lightening arrestor

1.00 No.

each

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 5 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 226

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 57

Supply and erection of shackle insulator, medium size.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Shackle insulator (medium size)

1.00 No.

each

0.33 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 7 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 227

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 58

Supply and erection of pin insulator, green medium size.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Pin insulator green (medium size)

1.00 No.

each

0.33 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 7 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 228

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 59

Supply and erection of bare copper conductor wire, No.2 to No.10 S


including binding wire No.16 SWG.

Detail

Unit Rate (Metric System) per Kg


Qty

Rate

Per Unit

MATERIAL
13.61
(30.00
1.00
0.454

1 Copper wire No.2 to 10


2 Binding wire No.16
Total
Contractor's Profit & O ## Percent
Total
Per Kg
1211.65

kg
lbs)
lbs
kg

per kg
per kg

0.00

LABOUR (For 90 Lbs) 40.82 Kg


1 Electrician

1.00 No.

per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Kg
Composite rate per Kg

Rs.
Rs.

Page 229

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of G.I wire of all sizes, including binding wi
for support of rubber wire or earthing wire, pole to pole, etc.

Item No. 60

Detail

Unit Rate (Metric System) per Kg


Qty

Rate

Per Unit

MATERIAL
13.61
(30.00
(1.00
0.454

1 G.I wire (all size)


2 Binding wire No.16

Total
Contractor's Profit & O ## Percent
Total
Material cost per Kg
418.20 1
LABOUR (For 90 Lbs)

kg
lbs)
lbs)
kg

per kg
per kg

0.00

40.83 Kg

1 Electrician

1.00 No.

per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Kg
Composite rate per Kg

Rs.
Rs.

Page 230

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Wiring overhead line in 2 single core, PVC/weather proof cable, on
No.8 SWG bearer wire and in house service pipe, including connecti
through joint box:

Item No. 61

(i)

3/0.74 mm (3/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 47 Metre)


1 PVC/weather proof cable 3/0.029" (3/0.74 mm)
Single core
2 Leather or wooden cleats
3 G.I wire No.8 SWG
4 Eye - bolts
Total
Contractor's Profit & O ## Percent
Total
Material cost per metre
573.62 4

47.00
25.00
1.81
(4.00
2.00

metre
Nos.
kg
lbs)
Nos.

per mtr.
each
kg
each

0.00

LABOUR (For 90 Metre)


1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 231

Amount (Rs.)

DESCRIPTION OF ITEM:
Wiring overhead line in 2 single core, PVC/weather proof cable, on
No.8 SWG bearer wire and in house service pipe, including connecti
through joint box:

Item No. 61

(ii)

7/0.74 mm (7/0.029")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 47 Metre)


1 PVC/weather proof cable /0.029" (7/0.74 mm)
Single core
2
3
4
5
6

47.00
1.81
(4.00
2.00
2.00
1.00
25.00

G.I wire No.8 SWG


Eye - bolts
Cut out
T. Wooden board 7" x 4" (175 x 100 mm)
Wooden & leather cleats
Total
Contractor's Profit & O ## Percent
Total
Material cost per metre
880.13 47

metre
kg
lbs)
Nos.
Nos.
No.
Nos.

per mtr.
kg
each
each
each
each

0.00

LABOUR (For 90 Metre)


1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 232

Amount (Rs.)

DESCRIPTION OF ITEM:
Wiring overhead line in 2 single core, PVC/weather proof cable, on
No.8 SWG bearer wire and in house service pipe, including connecti
through joint box:

Item No. 61

(iii)

7/0.91 mm (7/0.036")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 47 Metre)


1 PVC/weather proof cable /0.036" (7/0.91 mm)
Single core
2
3
4
5
6

47.00
1.81
(4.00
2.00
2.00
1.00
25.00

G.I wire No.8 SWG


Eye - bolts
Cut out
T. Wooden board 7" x 4" (175 x 100 mm)
Wooden & leather cleats
Total
Contractor's Profit & O ## Percent
Total
Material cost per metre
1230.76

metre
kg
lbs)
Nos.
Nos.
No.
Nos.

per mtr.
kg
each
each
each
each

0.00

LABOUR (For 90 Metre)


1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 233

Amount (Rs.)

DESCRIPTION OF ITEM:
Wiring overhead line in 2 single core, PVC/weather proof cable, on
No.8 SWG bearer wire and in house service pipe, including connecti
through joint box:

Item No. 61

(iv)

7/1.12 mm (7/0.044")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 47 Metre)


1 PVC/weather proof cable /0.044" (7/1.12 mm)
Single core
2
3
4
5
6

47.00
1.81
(4.00
2.00
2.00
1.00
25.00

G.I wire No.8 SWG


Eye - bolts
Cut out
T. Wooden board 7" x 4" (175 x 100 mm)
Wooden & leather cleats
Total
Contractor's Profit & O ## Percent
Total
Material cost per metre
1437.56

metre
kg
lbs)
Nos.
Nos.
No.
Nos.

per mtr.
kg
each
each
each
each

0.00

LABOUR (For 80 Metre)


1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 234

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 62

Supply and erection of all aluminium stranded hard drawn bare cond
size 7/3.099 mm (7/0.122").

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL
1 Aluminium stranded hard drawn bare
conductor 7/3.099 mm (7/0.122")

1.00 No.

each

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 26 Metre)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 235

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 63

Supply and erection of street light pole bracket 30 mm (1") G.I p


long, complete with 2 No. pole clamp.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 G.I. Pipe 1" dia (32 mm) 7 ft. (2.13 metre)
2 Cost of clamp

2.13 metre
2.00 Nos.

per mtr.
each

1.00 No.
1.00 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 236

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of pole mounted street light, holders, shade a
etc., for fitting 125/250 watts mercury vapour lamp (excluding cos

Item No. 64

(i)

G.E.C design

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Pole street with holder shade and glass
for mercury vapour lamp 125/250 complete
2 Bracket
3 Clamps with bolts & nuts etc.

1.00 No.
1.00 No.
2.00 Nos.

each
each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 237

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of pole mounted street light, holders, shade a
etc., for fitting 125/250 watts mercury vapour lamp (excluding cos

Item No. 64

(ii)

Phillips design

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Cost of fitting complete with holder
shade and glass
2 Cost of bracket 1" (32 mm) G.I pipe
7 ft. long half round
3 Cost of pole clamp with bolt & nuts

1.00 No.

each

1.00 No.
2.00 Nos.

each
each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 238

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and fitting of mercury vapour lamp, complete with choke set

Item No. 65
(i)

125 watt lamp

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Vapour mercury lamp 125 watt
with choke set 649 + 330

979.00

1.00 Nos.

each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 6 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
0.50 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 239

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and fitting of mercury vapour lamp, complete with choke set

Item No. 65
(ii)

250 watt lamp

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Vapour mercury lamp 250 watt
with choke set 2558 + 100

3658

1.00 Nos.

each

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 5 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
0.50 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 240

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 66

Manufacture and erection of angle iron lattice steel structure pol


long (9348 mm ground level) 355 mm square at base & 204 mm square
electric distribution line, using 1"x1"x3/16" angle iron legs an
angle iron bracings 420 mm long fixed between legs on all the four
diagonal position, and 1" x 1" x 3/16" angle iron on top and 4 b
flat iron 2" x ", 305 mm centre to centre, as per standard drawin
silverpainting of pole 3 coats, excavation and refilling of founda
concrete 1 : 2 : 4, 1807 x 500 x 500 mm for foundation, etc., comp
respects.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Angle iron 1"x1"x3/16" (32x32x4 mm)
Legs 4x10923 mm = 43692mm = 143.35 ft.

143.35 ft. @ 1.47 lbs/ft.


=
2 Angle Iron "x"x1/8 (20x20x3 mm)

210.72 lbs

Bracing 18x4x420mm = 30240mm or 99.21 ft.

99.21 ft. @ 0.58 lbs/ft. =


3 Angle Iron 1"x1"1/8 (25x25x3 mm)

57.54 lbs

Bracing 3x4x385mm = 4620 mm or 15.16 ft.

15.16 ft. @ 0.80 lbs/ft.

12.13 lbs
280.39 lbs

4 M.S. flat 2x" (50 x 6 mm)


4x4x204 mm = 3264 mm = 10.71 ft.
10.71 ft. @ 1.70 lbs/ft. =
18.21 lbs
5 Angle Iron 1"x1"x3/16" (44x44x4 mm)
4x4x204 mm = 3264mm = 10.71 ft.
10.71 ft. @ 2.11 lbs/ft. =
22.60 lbs
6 Silver paint 0.25 gallon @ 550 per gallon
7 Cement concrete 1 : 2 :4
foundation 500x500x1728 mm = 0.43 m
15.06 Cft
8 Pre cast cement concrete 1 : 2 : 4
2x100x100x100 = 2000000 mm or 0.07 Cft
0.07 Cft
Total
Contractor's Profit & O ## Percent
Total

Page 241

127.22 kg

per kg

8.26 kg

per kg

10.25 kg
0.25 gallon

per kg
per gln.

15.06 Cft.

per Cft

0.07 Cft.

per Cft

Amount (Rs.)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

LABOUR
1 Black Smith
Cooly (helper)
2 Welding charges
No. of weld 2(72+12+16) = 200 Nos.
3 Drilling hole
Painter
4 Excavation 500x500x1576 mm = 394000000
or 13.91 Cft (Item 4b Chap. 3)
5 Concrete 1:2:4
Foundation 500x500x1728 mm = 432000000
15.06 Cft (Item 5f Chap. 6)
6 Pre cast cement concrete 1:2:4
2x100x100x100 = 2000000 mm or 0.07 Cft
(Item 10 Chap. 6)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

1.50 Nos.
3.00 Nos.

per day
per day

200.00 Nos.
20.00 Nos.
0.25 No.

each
each
per day

13.91 Cum

per Cft

15.06 Cum

per Cft

0.07 Cum

per Cft

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 242

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 67

Manufacture and erection of galvanized angle iron lattice steel st


pole 11.30 metre long (9.85 metre above ground level), 875mm squar
base, 350mm square at top, for electric distribution line, using 5
high tensile steel angle iron legs, and 310x310x3mm M.S angle iro
fixed between legs on all the four sides in diagonal position, as
drawing including silver painting of pole, excavation and refilli
foundation, one ft. thick cement concrete 1:3:6 foundation of oute
2.44x1.067x1.067 metre complete in all respects.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Angle iron 50x50x4mm (lattice steel)
Legs 4x30 ft.
=
120 ft.
Studs 4x7 = 28 = 148 ft. 1.96 lbs/Rft290.08 lbs
131.62 kg
131.62 kg
2 Angle Iron 1 3/8 x 1 3/8 3 x 1/8
Braces 4x16x2.75 = 176 ft.
@ 1.55 lbs/ft. = 272.8 lbs =
123.77 kg
123.77 kg
3 M.S plate 5/32" thick
13"x13"x5/32"
= 0.017 Cft
@ 493 lbs/Cft = 8.38 lbs
3.80 kg
3.80 kg
4 Silver paint 0.25 gallon
5 Cement concrete 1:3:6
(3.5 x 3.5 x 0.5)
(1 x 3.5 x 6.5)
(1 x 1.5 x 6.5)

0.25 gallon
=
=
=

6.13 Cft
22.75 Cft
9.75 Cft
38.63 Cft

Total
Contractor's Profit & O ## Percent
Total

Page 243

38.63 Cum

per kg

per kg

per kg
per gln.

per Cum

Amount (Rs.)

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

LABOUR
1 Black Smith
2 Cooly (helper)
3 Welding charges (No. of weld)
Bacing 64 x 2 =
T/plate 1 x 4
=

1.50 Nos.
3.00 Nos.

per day
per day

128 Nos.
4 Nos.
132 Nos.

132 Nos. weld


4 Drilling hole
5 Painter
6 Excavation of foundation
(3.5 x 3.5 x 7.5) (Item 4b Chap. 3) 91.88 Cft

132.00 Nos.
8.00 Nos.
0.25 No.

per weld
per hole
per day

91.88 Cft

per Cft

7 Cement Concrete 1:3:6

38.630 Cft

per Cft

14.630 Cft

per Cft

(Item 3a Chap. 6)

8 Earth filling(1.5x.5 x 6.5) (Item 15(14.63 Cft

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 244

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Earthing of iron clad/aluminium switches, etc., with G.I wire No.8
pipe 15 mm (" dia) recessed or on surface of wall and floor, comp
1.5 metre long G.I pipe, 50 mm (2" dia) with reducing socket 4 to
below ground level, and 2 metre away from building plinth.

Item No. 68

Detail

Unit Rate (Metric System) per Job


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1 Boring
2 G.I pipe " (12 mm) (medium quality)
3
4
5
6
7
8

G.I wire No.8 SWG @


G.I pipe 2" (50 mm)
G.I reducing socket
G.I bend " (13 mm)
Cement
Sand

(2 lbs)
(medium quality)
size 2 x " (50 x 13 mm)

10.00
8.00
0.907
(2.00
1.50
1.00
4.00
0.063
0.18

metre
metre
kg
lbs)
metre
No.
No.
Cft.
Cft.

per mtr.
per mtr.
kg
per mtr.
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 245

Say
Say

DESCRIPTION OF ITEM:
Earthing of Metallic cases, etc., with G.I wire No.8 SWG, in 15 mm
pipe, best quality:

Item No. 69

(i)

On surface, including clamps, etc.

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL (For 7 Metre)


1 G.I pipe " dia (12 mm)
2
3
4
5
6
7

7.00
0.454
(1.00
6.00
1.00
10.00
10.00
1.00

G.I wire No.8 SWG


G.I clamp " dia (12 mm)
G.I bolts 2" x " dia (50 x 6 mm)
Gutties
Screw " (20 mm)
G.I bend " dia (12 mm)
Total
Contractor's Profit & O ## Percent
Total
Material per Metre
145.48

metre
kg
lbs)
Nos.
No.
Nos.
Nos.
No.

per mtr.
per kg
each
each
per doz.
each
each

0.00

LABOUR (For 40 Metre)


1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

0.00 per day


0.00 per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 246

Amount (Rs.)

DESCRIPTION OF ITEM:
Earthing of Metallic cases, etc., with G.I wire No.8 SWG, in 15 mm
pipe, best quality:

Item No. 69

(ii)

Recessed in wall, including hooks, jharries and making good surfac

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1 G.I pipe " dia (12 mm)
2
3
4
5
6
7

7.00
0.454
(1.00
1.00
6.00
1.00
0.063
0.18

G.I wire No.8 SWG


G.I bolts 2" x " dia (50 x 6 mm)
Hooks
G.I bend " dia (12 mm)
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per Metre
470.64

metre
kg
lbs)
No.
Nos.
Nos.
Cft.
Cft.

per mtr.
kg
each
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 25 Metre)


1 Electrician
2 Cooly (helper)

1.00 No.
2.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total
ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 247

DESCRIPTION OF ITEM:
Bonding to earth with wire on surface, including cost of wire,
clamps, thimbles, etc.

Item No. 70

G.I wire:

(a)
(i)

8 SWG

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5
6

G.I wire No.8 SWG


Copper themble
G.I Nuts & Bolts 2" long " (50 mm x 13 mm)
G.I clamp
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per Metre
51.00

0.68
(1.50
1.00
1.00
1.00
0.042
0.12

kg
lbs)
No.
No.
No.
Cft.
Cft.

per kg
each
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 50 Metre)


1 Electrician

1.00 No.

per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 248

DESCRIPTION OF ITEM:
Bonding to earth with wire on surface, including cost of wire,
clamps, thimbles, etc.

Item No. 70

G.I wire:

(a)
(ii)

16 SWG

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5

G.I wire No.16 SWG


Copper themble
G.I Nuts & Bolts 1" x " long
Cement
Sand

(40 x 6 mm)

0.112
1.00
1.00
0.011
0.03

kg
No.
No.
Cft.
Cft.

per kg
each
each
P. Bag
Per % Cft.

Total
Contractor's Profit & O ## Percent
Total
Material per Metre
LABOUR (For 50 Metre)
1 Electrician

1.00 No.

per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 249

DESCRIPTION OF ITEM:
Bonding to earth with wire on surface, including cost of wire,
clamps, thimbles, etc.

Item No. 70

Copper wire:

(b)
(i)

16 SWG

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5

Copper wire No.16 SWG


Copper themble
G.I Nuts & Bolts 1" x " long
Cement
Sand

0.133
1.00
1.00
0.011
0.03

(40 x 6 mm)

Total
Contractor's Profit & O ## Percent
Total
Material per Metre
28.56

kg
No.
No.
Cft.
Cft.

per kg
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 50 Metre)


1 Electrician

1.00 No.

per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 250

DESCRIPTION OF ITEM:
Bonding to earth with wire on surface, including cost of wire,
clamps, thimbles, etc.

Item No. 70

Copper wire:

(b)
(ii)

20 SWG

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5

Copper wire No.20 SWG


Copper themble
G.I Nuts & Bolts 1" x " long
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per Metre
15.04

0.035
1.00
1.00
0.011
0.03

kg
Nos.
Nos.
Cft.
Cft.

per kg
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 50 Metre)


1 Electrician

1.00 No.

per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 251

DESCRIPTION OF ITEM:
Item No. 71

Erection only, of lightening conductor of copper staple, and coppe


cement, sand mortar.

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL (For 7 Metre)


1
2
3
4
5

Gutties
Copper nail
Copper stapple
Cement
Sand
Total
Contractor's Profit & O ## Percent
Total
Material per Metre
44.00

8.00
8.00
4.00
0.021
0.06

Nos.
Nos.
Nos.
Cft.
Cft.

per doz.
each
each
P. Bag
Per % Cft.

0.00

LABOUR (For 25 Metre)


1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

Say
Say

Page 252

DESCRIPTION OF ITEM:
Item No. 72

Supply and erection of 600 x 600x3mm (2'x2x1/8") copper plate, inc


riveting to copper tape and placing in mixture of salt & charcoal,

Detail

Unit Rate (Metric System) per Each


Qty

Rate

Per Unit

MATERIAL
9.98
(22.00
36.30
(80.00
18.15
(40.00

1 Copper plate 600x600x3mm=0.00133 Cum


@ 550 lbs/cft 22 lbs

2 Char coal
3 Salt

kg
lbs)
kg
lbs)
kg
lbs)

per kg
per kg
per kg

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Metre)
1 Electrician
2 Cooly (helper)

1.00 No.
2.00 Nos.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 253

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper tape, including copper staple copper
cement, sand, etc.

Item No. 73

(i)

Tape 40 x 3 mm (1" x 1/8")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL
1 Copper tap 1"x1/8"
= 1 metre
1 metre = 0.004 Cft @ 550 lbs/Cft
2 Gutties
3 Copper nail
4 Copper staple

2.2 lbs

1.00
(2.20
1.00
1.00
1.00

kg
lbs)
No.
No.
No.

per kg
per doz.
each
each

1.00 No.
2.00 Nos.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 25 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 254

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of copper tape, including copper staple copper
cement, sand, etc.

Item No. 73

(ii)

Tape 50 x 3 mm (2" x 1/8")

Detail

Unit Rate (Metric System) per Metre


Qty

Rate

Per Unit

MATERIAL
1 Copper tap 2"x1/8"
= 1 metre
1 metre = 0.005 Cft @ 550 lbs/Cft
2 Copper nail
3 Copper staple
4 Gutties

2.7 lbs

1.22
(2.27
1.00
1.00
1.00

kg
lbs)
No.
No.
No.

per kg
each
each
per doz.

1.00 No.
2.00 Nos.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 25 Metre)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate per Metre
Labour rate per Rft

Rs.
Rs.

Say
Say

Composite rate per Metre


Composite rate per Rft

Rs.
Rs.

Say
Say

Page 255

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 74

Supply and erection of 25 mm (1"/dia) and one metre long lightning


copper rod with 5 spikes on ball and base, etc., complete.

Detail

Unit Rate (Metric System) per Job


Qty

Rate

Per Unit

MATERIAL
Copper
with 5
1 Weight
2 weight
3 weight

rod 1" dia (25 mm)


= 1 metre
spikes on ball and base
of rod
9.9 lbs
of ball
3.00 lbs
of base and spikes
1.00 lbs
13.90 lbs

(13.90 lbs)
6.30 kg

per kg

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
2 Cooly (helper)

1.00 No.
1.00 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each Job
Composite rate for Each Job

Rs.
Rs.

Page 256

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of electric energy metre, including metre test

Item No. 75

Single phase:

(a)
(i)

1 x 10 Amp 250 volts

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Energy metre 10 Amp. Single phase 250 Volts
2 Testing Fee

1.00 No.
L.S

each

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 257

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of electric energy metre, including metre test

Item No. 75

Single phase:

(a)
(ii)

1 x 30 Amp 250 volts

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Energy metre 30 Amp. Single phase 250 Volts
2 Testing Fee

1.00 No.
L.S

each

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 258

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of electric energy metre, including metre test

Item No. 75

Three phase, 4 wires

(b)
(i)

3 x 15 Amp. 400 volts

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Energy metre 3 x 15 Amp. Three phase 400 Volts
2 Testing Fee

1.00 No.
L.S

each

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 259

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of electric energy metre, including metre test

Item No. 75

Three phase, 4 wires

(b)
(ii)

3 x 50 Amp. 400 volts

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Energy metre 3 x 50 Amp. Three phase 400 Volts
2 Testing Fee

1.00 No.
L.S

each

1.00 No.
0.50 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 260

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Supply and erection of electric energy metre, including metre test

Item No. 75

Three phase, 4 wires

(b)
(iii)

3 x 80 Amp. 400 volts

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Energy metre 3 x 80 Amp. Three phase 400 Volts
2 Testing Fee

1.00 No.
L.S

each

1.00 No.
0.50 No.

per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 2 Nos.)
1 Electrician
2 Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 261

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Rewinding of A.C ceiling fan, capacitor type, including cost of wi
paper cotton tape, soldering, etc.

Item No. 76

(i)

1200 mm (48") sweep, 275 - 300 RPM

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Leatheride paper

L.S
1.02
2 Copper wire No.32 SWG - 26 SWG
(2.25
3 Soldring and vanishing hoop wire No.3
Job
4 Deduction cost of 2 lbs (1.02 kg) copper wire ol 2.25
1.02

kg
lbs)
lbs
kg

per kg
per kg

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Cooly (helper)

1.50 No.
0.50 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 262

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Rewinding of A.C ceiling fan, capacitor type, including cost of
wire, leatheride paper cotton tape, soldering, etc.

Item No. 76

(ii)

1400 mm (56") sweep, 250 - 275 RPM

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Leatheride paper and cotten tape
2
3
4
5

Job
1.13
(2.50
1.00
4.00
2.50
1.13

Enemal wire No.26 SWG to 32 SWG


Soldering and varnishing
Loop wire 4 loop 3/0.029 (3/0.74 mm)
Deduction cost of old material

kg
lbs)
No.
ft.
lbs
kg

per kg
each
per Rft
per kg

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 4 Nos.)
1 Electrician
2 Cooly (helper)

1.50 No.
0.75 No.

per day
per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 263

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Rewinding of A.C exhaust fan, including cost of wire,
leatheride paper, cotton tape, soldering, etc.

Item No. 77

(i)

375 mm (15") sweep, and 1300 - 1500 RPM

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Leatheride paper and cotten tape

Job
0.68
(1.50
Job
1.50
0.68

2 Enamel wire No.26 SWG to 32 SWG


3 Varnishing and soldering
4 Deduction cost of old material

kg
lbs)
lbs
kg

per kg
per kg

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician

1.00 No.

per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 264

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Rewinding of A.C exhaust fan, including cost of wire,
leatheride paper, cotton tape, soldering, etc.

Item No. 77

(ii)

450 mm (18") sweep, and 1300 - 1500 RPM

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Leatheride paper and cotten tape
2
3
4
5

Job
0.79
(1.75
Job
4.00
1.75
0.79

Enamel wire No.26 SWG to 32 SWG


Varnishing and soldering
Loop wire 3/0.029" (3/0.74 mm)
Deduction cost of old material

kg
lbs)

per kg

ft.
lbs
kg

per ft.
per kg

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 3 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 265

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 78

Rewinding of pedestal fan 600 mm (24") sweep, and 900 - 950


RPM, including wire, leatheride paper, cotton, tape, etc.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Leatheride paper and cotten tape

Job
0.91
(2.00
Job
(2.00
0.91

2 Enamel wire No.26 SWG to 32 SWG


3 Varnishing and soldering
4 Deduction cost of old material

kg
lbs)
lbs)
kg

per kg
per lbs

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 5 Nos.)
1 Electrician

2.00 No.

per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 266

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 79

Supply and fitting of regulator nob with shaft and plate of


electric fan regulator.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Knob with shaff and plate

1.00 No.

each

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 16 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 267

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 80

Supply and fitting of capacitor 2.2 uf, for ceiling fans.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Capacitor 2.2 uf

1.00 No.

each

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 20 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 268

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 81

Supply and fitting of ball bearing of size 6201, 6202 or 6203, for

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Ball bearing size (6201, 6202 or 6203)

1.00 No.

each

1.00 No.

per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 16 Nos.)
1 Electrician
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 269

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 82

Rewinding regulator of ceiling fan (1200/1400 mm) sweep, to contro


3/4 speeds.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 Enamel copper wire No.26 SWG to 32 SWG
2 Leathoride paper, cotten tape and vinishing
3 Deduct cost of old material

0.18
(0.403
L.S
(0.403
0.18

kg
lbs)
lbs)
kg

kg
per kg

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 8 Nos.)
1 Electrician

1.00 No.

per day

Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 270

Say
Say

Amount (Rs.)

DESCRIPTION OF ITEM:
Item No. 83

Erection of ceiling fan alongwith regulator (all sizes), including


from local Railway Station/Store to site of work, electric wire/ca
suspension rod and board connection, and cutting threading on the
where necessary.

Detail

Unit Rate (Metric System) for Each


Qty

Rate

Per Unit

MATERIAL
1 PVC wire 3/0.029"

2.00 metre

per mtr.

L.S
8.00 Nos.
1.00 No.
1.00 No.

each
per day
per day

Total
Contractor's Profit & O ## Percent
Total
LABOUR (For 10 Nos.)
1
2
3
4

Carriage from stone to site


Cutting & threading G.I pipe (22mm) dia
Electrician
Cooly (helper)
Total
Sundries
## Percent
Total
Contractor's Profit & O ## Percent
Total

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 271

Say
Say

Amount (Rs.)

LIST EQUIPMENT
S. No.
EQ-01
EQ-02
EQ-03
EQ-04
EQ-05
EQ-06
EQ-07
EQ-08
EQ-09
EQ-10
EQ-11
EQ-12
EQ-13
EQ-14
EQ-15
EQ-16
EQ-17
EQ-18
EQ-19
EQ-20
EQ-21
EQ-22
EQ-23
EQ-24
EQ-25
EQ-26
EQ-27
EQ-28
EQ-29
EQ-30
EQ-31
EQ-32
EQ-33
EQ-34
EQ-35
EQ-36
EQ-37
EQ-38
EQ-39
EQ-40
EQ-41
EQ-42
EQ-43
EQ-44
EQ-45
EQ-46
EQ-47
EQ-48
EQ-49
EQ-50
EQ-51
EQ-52
EQ-53
EQ-54

NAME OF MACHINERY
Bull Dozer D-6 (16 Ton)
Motor Grader
Wheel Loader (15 Ton)
Rental Charges of equipment for desilting
3 Wheel Roller (10-15 Ton)
Pneumatic Tyre Roller (8-13 Ton)
Tandum/Road Roller (8-12 Ton)
Vibratory Roller (8 Ton)
Asphalt Plant (45-46 Ton)
Asphalt Finishers (Paver)
Electric Power Plant (Generator) (100 KW)
Truck 2-Axle (Local) (10 Ton)
Truck 3-Axle (Local) (15 Ton)
Truck 3-Axle (Imported) (15-18 Ton)
Dumper Truck (Imported) (15 Ton)
Water Lorry (Local)
Donkey
Wheel Tractor with Plough
Wheel Tractor with Trolley
Wheel Tractor with Sheep foot Roller
Wheel Tractor with Water Tank
Wheel Tractor with Blade
Concrete Mixer
Concrete Mixer
Concrete Vibrator
Plate Compactor
Tar Boiler
Cost of lifting machinery including carriage
Cost of trollies
Road Roller
Hire charges for a cart having a capacity of about 20 Cft/one ton
Hire charges of Rig
Hire charges of truck (5 ton - 10 tons) excluding POL but including crew
Hire Charges of testing apparatus
Reg Pump
Cost of pump set 6"x5" with 15 HP Diesel Engine
Generator set light
Pumping for out water 0-1' to 0-8'
Pumping for out water 0-9' to 0-12'
Pumping Machinery Boring 0-1' to 0-8'
Pumping Machinery Boring 0-9' to 0-12'
Pump charges for pumping out water from 0-1' to 0-8' depth
Pump charages for pumping out water from 0-9' to 0-12' depth
Hire Charges of Assembling Machine for A.C. Pipe 3" to 6"
Hire Charges of Assembling Machine for A.C. Pipe 8" to 10"
Hire Charges of Assembling Machine for A.C. Pipe 12" to 18"
Hire Charges of Assembling Machine for A.C. Pipe 20" to 24"
Disposal of Pumped Out Water upto 100' distance for 1' depth
Disposal of Pumped Out Water upto 100' distance upto 3' depth
Disposal of Pumped Out Water upto 100' distance upto 5' depth
Disposal of Pumped Out Water upto 100' distance upto 6' depth
Disposal of Pumped Out Water upto 100' distance upto 7' to 12' depth
Cost of Bulldozer-D6
Cost of Motor Grader

Page 1

CAPACITY
Per Hour
Per Hour
Per Hour
Per Day
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
Each
Per Hour
Per Hour
Per Hour
Per Hour
Per Hour
2 Bag
1 Bag
Per Hour
Per Hour
Per Hour
Each
Each
Per Day
Per Day
Per Hour
Per Day
Per Day
Per Hour
Each
Per Hour
Per Hour
Per Hour
Per Day
Per Day
Per Hour
Per Hour
---------140 HP
135 HP

COST

LIST EQUIPMENT
S. No.
EQ-55
EQ-56
EQ-57
EQ-58
EQ-59
EQ-60
EQ-61
EQ-62
EQ-63
EQ-64
EQ-65
EQ-66
EQ-67
EQ-68
EQ-69
EQ-70
EQ-71
EQ-72
EQ-73
EQ-74
EQ-75
EQ-76
EQ-77

NAME OF MACHINERY
Cost Wheel Loader
Cost of 3 wheel-Static Roller (local)
Cost of Pneumatic Roller
Cost of Tandem Roller
Cost of Vibratory Roller
Cost of Asphalt Plant
Cost of Asphalt Paver
Cost of Electric power Generator
Cost of Truck-2axle (local)
Cost of Truck-3axle (local)
Cost of Truck-3axle (imported)
Cost of Dump truck
Cost of Water lorry (local)
Cost of Wheel Tractor with Plough
Cost of Wheel Tractor with Trolley
Cost of Wheel Tractor with Sheep foot roller
Cost of Wheel Tractor with Water Tank
Cost of Wheel Tractor with Blade
Cost of Concrete Mixer
Cost of Concrete Mixer
Cost of Concrete vibrator
Cost of Plate Compactor
Cost of Tar Boiler

Page 2

CAPACITY
100 HP
10-12 Ton
8-13 Ton
8-12 Ton
8-Ton
45-46 Ton.
145 HP
100 KW
10 Ton
15-18 Ton
18 Ton
18.0 Ton
------2 bags
1 bag
--1000Ltr.

COST

CHAPTER NO. 10

FLOORING
i)

ii)

Rates for all finished works include the removal of surplus debris, unused
material and by products.
For handling of all types of material for short lead including carriage upto
3 chains (90m) nothing is to be paid as extra. Where handling and carriage
involves an extra lead beyond 3 chains, (90m) carriage for whole of the distance
should be paid
DESCRIPTION OF ITEM
Laying Muram flooring consisting of 1" (25m) layer of fine powdery or flakey variety of M
laid over 6" (150mm) good hard layer of Muram spreaded over 9" (225mm) thick sub base
comprising of hand packed rubble or broken bricks properly watered and rammed provided
over well rammed earth

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

MATERIAL
1
2
3

9" thick rubble or broken hard bricks


6" Hard Muram
1" Fine Powdery Muram
Total
Contractor's Profit & Ove ## Percent
Total

80.00
55.00
9.00

Cft
Cft
Cft.

0.00Per 100 Cft


0.00Per 100 Cft
0.00Per 100 Cft

0.50
3.00
0.5

No.
Nos.
No.

0.00
0.00
0.00

per day
per day
Per day

0.00
-

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 1

DESCRIPTION OF ITEM
2

Earth flooring consisting of 6" thick consolidated layer of moistured


earth including ramming

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Earth (Loose measured)
Contractor's Profit & Ove ## Percent
Total

50.00

Cft

0.00Per 100 Cft

0.125
1.00
0.25

No.
No.
No.

0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Coolly
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per day
Per day
Pay day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 2

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
3

Providing, laying, watering and ramming brick ballast 1" - 2" gauge mixed with
25% sand, for floor foundation, complete in all respects.

Detail

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2

Brick Ballast
Sand
Total
Contractor's Profit & Ove ## Percent
Total

100.00
25.00

Cft
Cft

0.00Per 100 Cft


0.00Per 100 Cft

3.10
0.10

No.
No.

0.00
0.00

0.00
0.00

LABOUR
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

per day
Per day

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 3

Say
Say
Say
Say

0.00
0.00
0.00
0.00

Mud Flooring
DESCRIPTION OF ITEM
Mud flooring consisting of 6" thick consolidated layer of moistured earth and
finished off with 1" mud plaster and gobri leeping.

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4
5

Earth for filling


50.00
Cft
Earth for Mud Plaster
10.00
Cft
Bhoosa
34 lbs (15.44 Kg.
Fine Clay for Gobri Leeping
0.75
Cft.
Cow Dung
0.75 Cft. (5.44 Kg
Total
Contractor's Profit & Ove ## Percent
Total

0.00Per
0.00Per
0.00
0.00Per
0.00Per

100
100
Kg.
100
100

Cft
Cft
Cft
Kg.

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.25
2.00
0.25

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 4

Say
Say
Say
Say

0.00
0.00
0.00
0.00

Brick Flooring
DESCRIPTION OF ITEM
Dry brick paving laid flat, sand grouted including preparation of bed by watering, rammin
bringing the same to proper camber by " mud plaster

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3

Brick 9"
Sand
" Mud Plaster (Good earth)
Total
Contractor's Profit & Ove ## Percent
Total

350
5
6

Nos.
Cft.
Cft.

0.00Per 1000 No
0.00Per 100 Cft
0.00Per 100 Cft

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR FOR 125 SFT.


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.50
1.00
0.05

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 5

DESCRIPTION OF ITEM
6

Dry brick on edge paving sand grouted including preparation of bed by watering,
ramming and bringing the same to proper camber by thick mud plaster

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
2

Brick 9" (including wastage)


" thick mud plaster (good earth)
Sand
Total
Contractor's Profit & Ove ## Percent
Total

525
6
6

Nos.
Cft.
Cft.

0.00er 1000 Nos


0.00Per 100 Cft
0.00Per 100 Cft

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.67
1.50
0.08

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 6

DESCRIPTION OF ITEM
7

Grouting 4"

dry brick work with cement mortar ratio 1:5

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

0.70
4.50

Bag
Cft.

0.00 Per Bag


0.00Per 100 Cft

0.50
0.50
0.50

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR FOR 125 SFT


Mason
Coolies (Unskilled)
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 7

DESCRIPTION OF ITEM
8

Flat brick flooring laid in 1:6 cement mortar over a bed of /4" thick cement mortar 1:6

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4
5

Bricks 9" size


Cement (for laying)
Cement (for bedding mortar)
Sand for laying
Sand for bedding mortar
Total
Contractor's Profit & Ove ## Percent
Total

350
0.50
0.80
4.00
6.00

Nos.
Bag
Bag
Cft.
Cft.

0.00Per 1000 No
0.00 Per Bag
0.00 Per Bag
0.00Per 100 Cft
0.00Per 100 Cft

0.75
1.50
0.50

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR FOR 125 SFT.


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 8

DESCRIPTION OF ITEM
9

Brick on edge flooring laid in 1:6 cement mortar over a bed of 3/4" thick cement mortar (

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4
5

Bricks 9" size


Cement for laying
Cement for bedding mortar
Sand for laying
Sand for bedding mortar
Total
Contractor's Profit & Ove ## Percent
Total

525
0.85
0.88
7.00
6.00

Nos.
Bag
Bag
Cft.
Cft.

0.00Per 1000 No
0.00 Per Bag
0.00 Per Bag
0.00Per 100 Cft
0.00Per 100 Cft

1.00
2.00
0.50

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR FOR 125 Sft.


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 9

DESCRIPTION OF ITEM
10

Brick tiles (12"x6"x2") laid in (1:6) cement mortar, over a bed of 3/4" thick cement mort

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
4

Tiles 12"x6"x2"
Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

210
1.10
8.00

Nos.
Bag
Cft.

0.00Per 1000 No
0.00
Bag
0.00Per 100 Cft

0.75
1.50
0.50

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 10

DESCRIPTION OF ITEM
11

Brick tiles (9" x 4" x 1") laid flat in 1:3 cement mortar over a bed of 3/4" thick ceme

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
4

Tiles 9"x4"x1"
Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

350
1.40
12.00

Nos.
Bag
Cft.

0.00Per 1000 No
0.00
Bag
0.00Per 100 Cft

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR
Mason
Coolies (Unskilled)
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.00
1.50
0.50

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 11

DESCRIPTION OF ITEM
12

Cement tiles (8"x8"x") laid fiat in 1:2 cement mortar over 3/4" thick bed of cement mort

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
4

Cement tiles (8"x8"x3/4")


Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

240
1.87
4.70

Nos.
Bags
Cft.

0.00 Per No.


0.00 Per Bag
0.00Per 100 Cft

1.25
2.00
0.34

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR FOR 200 SFT.


Mason
Coolies (Unskilled)
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 12

DESCRIPTION OF ITEM
13

Cement concrete tiles laid in 1:2 cement mortar over 3/4" thick bed of cement mortar 1:2
a)

12" x 12" x 1"

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
4

Cement concrete tiles (1" thick)


Cement for bedding and laying of 1:2 rat
Sand
Total
Contractor's Profit & Ove ## Percent
Total

105
1.85
4.67

Nos
Bags
Cft.

0.00
Each
0.00 Per Bag
0.00Per 100 Cft

1.25
2.00
0.34

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR FOR 200 SFT


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 13

b)

9" x 9" x 3/4"

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
4

Cement concrete tiles


Cement for bedding and laying of 1:2
Sand
Total
Contractor's Profit & Ove ## Percent
Total

186
1.86
4.67

Nos
Bags
Cft.

0.00
Each
0.00 Per Bag
0.00Per 100 Cft

1.25
2.00
0.34

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR FOR 200 SFT.


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 14

c)

6" x 6" x 3/4"

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
4

Cement concrete tiles


Cement for bedding and laying of 1:2 rat
Sand
Total
Contractor's Profit & Ove ## Percent
Total

420
1.90
4.74

Nos
Bags
Cft.

0.00
Each
0.00 Per Bag
0.00Per 100 Cft

1.25
2.00
0.34

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR FOR 200 SFT.


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 15

DESCRIPTION OF ITEM
14

Coloured cement tiles (8"x8"3/4") of approved dark shade laid flat in 1:2 cement
mortar over 3/4" bedding mortar of 1:2

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Tiles
240
Each
Cement
1.87
Bag
Sand
4.70
Cft.
Pigment
0.67 Lbs (0.30 Kg
Total
Contractor's Profit & Ove ## Percent
Total

0.00
Each
0.00 Per Bag
0.00Per 100 Cft
0.00 Per Kg.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

Say
Say
Say
Say

0.00
0.00
0.00
0.00

LABOUR FOR 200 SFT.


Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.25
2.00
0.34

No.
No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 16

DESCRIPTION OF ITEM
15

Providing and laying topping of cement concrete (1:2:4) including


surface finishing and dividing into panels.
a)

1" (25mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

1.50
3.70
7.40
0.034

Bags
Cft.
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

1.00
0.50
0.10
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Coolies
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 17

Say
Say
Say
Say

0.00
0.00
0.00
0.00

b)

1" (30mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

1.85
4.60
9.20
0.034

Bags
Cft.
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

1.00
0.50
0.10
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Coolies
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 18

Say
Say
Say
Say

0.00
0.00
0.00
0.00

c)

1" (40mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

2.20
5.50
11.00
0.034

Bags
Cft.
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

1.00
1.00
0.15
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Cooly (Unskilled)
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 19

Say
Say
Say
Say

0.00
0.00
0.00
0.00

d)

1 /4" (45mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

2.55
6.50
12.80
0.040

Bags
Cft.
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

1.00
1.00
0.15
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 20

Say
Say
Say
Say

0.00
0.00
0.00
0.00

e)

2" (50mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

3.00
7.40
14.70
0.040

Bags
Cft.
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

1.00
1.50
0.20
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 21

Say
Say
Say
Say

0.00
0.00
0.00
0.00

f)

2" (55mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

3.30
8.40
16.50
0.046

Bags
Cft.
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

1.00
1.60
0.20
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 22

Say
Say
Say
Say

0.00
0.00
0.00
0.00

g)

2" (60mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

3.65
2.20
18.35
0.051

Bags
Cft.
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

1.00
2.00
0.25
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 23

Say
Say
Say
Say

0.00
0.00
0.00
0.00

h)

2 3/4" (70mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

4.00
10.00
20.20
0.051

Bags
Cft.
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.
No.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.00
2.00
0.25
0.25

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 24

Say
Say
Say
Say

0.00
0.00
0.00
0.00

i)

3" (75mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Cement
Sand
Shingle
Form Work (Kail Wood)
Total
Contractor's Profit & Ove ## Percent
Total

4.40
11.00
22.00
0.057

Bags
Cft.
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft
0.00 Per Cft.

No.
No.
No.
No.

0.00
0.00
0.00
0.00

0.00
-

LABOUR
Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.00
2.00
0.25
0.25

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 25

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
16

Providing and laying conglomerate flooring (two coat work) with top layer of " thick
wearing surface, consisting of one part of cement and two parts of stone chips passing
3/16" sieave, over bottom layer of cement concrete 1:3:6 including surface finishing and
dividing in panels:a)

1" (40mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
i)

" Thick Topping

1
2

Cement
Sand

ii)

1.25
3.00

Bags
Cft.

0.00 Per Bag


0.00Per 100 Cft

1.08
3.83
7.67

Bags
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft

0.50
0.25
0.05
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

Per
Per
Per
Per

day
day
day
day

0.80
0.50
0.15
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

Per
Per
Per
Per

day
day
day
day

0.00
0.00

1" Thick Bedding 1:3:6


Cement
Sand
Shingle
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
i)

" Thick Topping


Mason
Cooly
Bahishti
Carpenter

ii)

1" Thick Bedding 1:3:6


Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 26

Say
Say
Say
Say

0.00
0.00
0.00
0.00

b)

1 3/4" (45mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
i)

" Thick Topping

1
2

Cement
Sand

ii)

1.25
3.00

Bags
Cft.

0.00 Per Bag


0.00Per 100 Cft

1.35
4.06
8.12

Bags
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft

0.50
0.25
0.05
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

Per
Per
Per
Per

day
day
day
day

0.80
0.50
0.15
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

Per
Per
Per
Per

day
day
day
day

0.00
0.00

1" Thick Bedding 1:3:6


Cement
Sand
Shingle
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
i)

" Thick Topping


Mason
Cooly
Bahishti
Carpenter

ii)

1" Thick Bedding 1:3:6


Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 27

Say
Say
Say
Say

0.00
0.00
0.00
0.00

c)

2" (50mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
i)

" Thick Topping

1
2

Cement
Sand

ii)

1.25
3.00

Bags
Cft.

0.00 Per Bag


0.00Per 100 Cft

1.63
5.75
11.50

Bags
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft

0.50
0.25
0.05
0.25

No.
No.
No.
No.

0.00
0.00
0.00
0.00

Per
Per
Per
Per

day
day
day
day

1.00
1.00
0.20
0.30

No.
No.
No.
No.

0.00
0.00
0.00
0.00

Per
Per
Per
Per

day
day
day
day

0.00
0.00

1" Thick Bedding 1:3:6


Cement
Sand
Shingle
Total
Contractor's Profit & Ove ## Percent
Total

LABOUR
i)

" Thick Topping 1:2


Mason
Cooly
Bahishti
Carpenter

ii)

1" Thick Bedding 1:3:6


Mason
Cooly
Bahishti
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 28

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
17

Add extra in cement concrete floor topping, if finished with pigment and polishing

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty

MATERIAL
1
Grey Cement for Finishing 1/16" Thick
0.40
Bags
2
Pigment
4.5 Lbs (2.04 Kg
3
Polish
0.5 Lbs (0.23 Kg.
Total
Contractor's Profit & Ove ## Percent
Total

0.00
0.00
0.00

Per Bag
Per Kg.
Per Kg.

0.00
0.00

Per day
Per day

0.00
0.00

LABOUR FOR 150 SFT.


Mason
Cooly (Skilled)
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.50
0.50

No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 29

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
18

Extra labour for each storey above ground floor for moasic, conglomerate, tiles
stone and wooden floor

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
LABOUR FOR 125 SFT.
Cooly for carriage of material
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.75

No.

0.00

Per day

ITEM RATE
Labour Rate per 100 Sft.
Labour Rate per Sqm.

Rs.
Rs.

0.00
-

Say
Say

0.00
0.00

DESCRIPTION OF ITEM
19

Flag stone flooring laid in lime mortar 1:2 over 3/4" bedding mortar in plat forms
and floors etc.
a)

2" (50mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4
5

Dressed Stone 2'x2'x2"


25.00
Nos.
Lime
1.3 Mds (48.5 Kg
Sand
5.00
Cft.
Steel
0.76
Kg.
Charcoal
1.75
Kg.
Total
Contractor's Profit & Ove ## Percent
Total

0.00
Each
0.00 Per Kg.
0.00Per 100 Cft
0.00 Per Kg.
0.00 Per Kg.

0.00
0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Coolies
Bahishti
Blacksmith
Bollow Man
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

2.50
3.00
0.12
0.10
0.10

No.
No.
No.
No.
No.

Per
Per
Per
Per
Per

day
day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 30

Say
Say
Say
Say

0.00
0.00
0.00
0.00

b)

3" (75mm) Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4
5

Dressed Stone 2'x2'x3"


Lime
Surkhi
Steel
Charcoal
Total
Contractor's Profit & Ove ## Percent
Total

25.00
Nos.
1.42 Mds (53 Kg.)
5.00
Cft.
0.75
Kg.
1.81
Kg.

0.00
Each
0.00 Per Kg.
0.00Per 100 Cft
0.00 Per Kg.
0.00 Per Kg.

0.00
0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Cooly
Bahishti
Blacksmith
Bollow Man
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

2.50
3.00
0.12
0.10
0.10

No.
No.
No.
No.
No.

Per
Per
Per
Per
Per

day
day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 31

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
20

Asphalt flooring including preparation of proper base, remelting, setting out and
finishing complete
a)

1" Thick Topping

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Asphalt
2.36 Cwt (119.90 Kg
Steam Coal
0.5 Md (18.66 Kg.
Fine Aggregate
9.00
Cft.
Form Work (Kail Wood)
0.034
Cft.
Total
Contractor's Profit & Ove ## Percent
Total

0.00 Per Kg.


0.00 Per Kg.
0.00Per 100 Cft
0.00 Per Cft.

0.00
0.00
0.00

0.00
0.00

LABOUR
Mason for Setting out and laying
Coolies
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.25
2.00
0.25

No.
No.
No.

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 32

Say
Say
Say
Say

0.00
0.00
0.00
0.00

b)

" Thick Topping

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Asphalt
1.20 Cwt (60.960 Kg
Steam Coal
0.25 Md (9.33 Kg.
Fine Aggregate
4.51
Cft.
Form Work (Kail Wood)
0.034
Cft.
Total
Contractor's Profit & Ove ## Percent
Total

0.00 Per Kg.


0.00 Per Kg.
0.00Per 100 Cft
0.00 Per Cft.

0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Coolies
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.20
1.50
0.25

No.
No.
No.

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 33

Say
Say
Say
Say

0.00
0.00
0.00
0.00

c)

" Thick Topping

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Asphalt
0.60 Cwt (30.48 Kg
Steam Coal
0.25 Md (8.58 Kg.
Fine Grit
2.51
Cft.
Form Work (Kail Wood)
0.034
Cft.
Total
Contractor's Profit & Ove ## Percent
Total

0.00 Per Kg.


0.00 Per Kg.
0.00Per 100 Cft
0.00 Per Cft.

0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Cooly
Carpenter
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.17
1.00
0.25

No.
No.
No.

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 34

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
21

1 3/8" thick mosaic flooring consisting of 3/8" mosaic topping of one part of
cement and marble powder in the ratio 3:1 and two parts of marble chips laid
over 1" thick flooring of 1:2:4 cement concrete including rubbing and polishing
complete.
a)

Using

Grey Cement

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

MATERIAL for mosaic topping, rubbing & polishing


1
2
3
4
5
6
7

Cement For 3/8" topping


0.94
Bag
Marble Chips
3.00 Cwt (152.40 Kg
Corborandom Stone
3.00
Nos.
Wax Polish
0.5 Lbs (0.23 Kg.
Linen and Cotton
0.40
Kg.
Marble Powder
0.31 Cwt (15.75 Kg
Tatric Acid
0.34 Lbs (0.15 Kg
Total
Contractor's Profit & Ove ## Percent
Total

0.00 Per Bag


0.00 Per Kg.
0.00
Each
0.00Pack. of 3
0.00
P. Kg.
0.00Per 100 Kg.
0.00 Per Kg.

MATERIAL for 1" thick 1:2:4 concrete


1
2
3
4

Cement
Sand
Shingle
Form Work
Total
Contractor's Profit & Ove ## Percent
Total
Total Material

1.50
3.70
7.40
0.034

Bags
Cft.
Cft.
Cft.

0.00 Per Bag


0.00Per 100 Cft
0.00Per 100 Cft
0.00 P. Cft.

1.50
1.25
5.00
0.75

No.
No.
Nos.
No.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR for mosaic topping


Mason for Laying
Coolies
Coolies (skilled for rubbing)
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per
Per
Per
Per

day
day
day
day

LABOUR for 1" Thick 1:2:4 Concrete


As per Item 15(a)
Total Labour

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 35

Say
Say
Say
Say

0.00
0.00
0.00
0.00

b)

Using White Cement

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

MATERIAL for 3/8"


1
2
3
4
5
6
7

Cement (White)
0.94
Bag
Marble Poweder
0.31 Cwt (15.75 Kg
Marble Chips
3.00 Cwt (152.40 Kg
Carborandom Stone
3.00
Nos.
Wax Polish
0.50 Lbs (0.23 Kg
Linen Cotton etc.
0.40
Kg.
Tar Taric Acid
0.34 Lbs (0.15 Kg
Total
Contractor's Profit & Ove ## Percent
Total

0.00 Per Bag


0.00Per 100 Kg.
0.00 Per Kg.
0.00
Each
0.00Packet 3 Kg
0.00
P. Kg.
0.00 Per Kg.

Add for cement concrete 1" thick


As per Item 15(a) Material
Total Material

0.01

LABOUR
Mason for Laying
Coolies
Coolies (skilled for rubbing)
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.50
1.25
5.00
0.75

No.
No.
Nos.
No.

0.00
0.00
0.00
0.00

Per
Per
Per
Per

day
day
day
day

Add Labour for 1" thick C.C. topping 1:2:4


As per item No. 15(a)
Total Labour

0.00
0.00

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 36

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
22

1" thick mosaic flooring consisting of " mosaic topping of one part of
cement and marble powder in the ratio of 3:1 and two parts of marble chips laid
over 1" thick flooring of 1:2:4 cement concrete including rubbing and polishing
complete.
a)

Using Grey Cement

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7

Grey Cement for " Topping


1.27
Bag
Marble Chips
3.00 Cwt (152.40 Kg
Carborandom Stone
2.00
Nos.
Wax Polish
0.50 Lbs (0.23 Kg
Linen Cotton etc.
0.72
Kg.
Tar Taric Acid
0.34 Lbs / (0.15 Kg
Marble Poweder
0.42 Cwt (21.34 Kg
Total
Contractor's Profit & Ove ## Percent
Total

0.00 Per Bag


0.00 Per Kg.
0.00
Each
0.00Packet 3 Kg
0.00
P. Kg.
0.00 Per Kg.
0.00Per 100 Kg.

Add Material for 1" thick cement concrete


Topping as per Item 15(a)
Total Material

LABOUR FOR 125 SFT.


Mason for Laying
Coolies
Coolies (skilled for rubbing and Polish
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.50
1.25
5.00
0.75

No.
No.
Nos.
No.

0.00
0.00
0.00
0.00

Per
Per
Per
Per

day
day
day
day

Add Labour for 1" thick cement concrete


Topping as per Item 15(a)
Total Labour

0.00
0.00

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 37

Say
Say
Say
Say

0.00
0.00
0.00
0.00

b)

Using White Cement

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

MATERIAL
1
2
3
4
5
6
7

Cement White
1.27
Bag
Marble Powder
0.42 Cwt (21.34 Kg
Marble Chips
4.16 Cwt (211.33 Kg
Carborandom Stone
3.00
Nos.
Wax Polish
0.50 Lbs (0.23 Kg
Linen Cotton etc.
0.72
Kg.
Tar Taric Acid
0.34 Lbs (0.15 Kg
Total
Contractor's Profit & Ove ## Percent
Total

0.00 Per Bag


0.00Per 100 Kg.
0.00 Per Kg.
0.00
Each
0.00Packet 3 Kg
0.00
P. Kg.
0.00 Per Kg.

Add for material of 1" thick cement concrete


Topping as per Item No. 15(a)
Total Material

LABOUR FOR 125 SFT.


Mason for Laying
Coolies
Coolies (skilled for rubbing and Polish
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.50
1.25
5.00
0.75

No.
No.
Nos.
No.

0.00
0.00
0.00
0.00

Per
Per
Per
Per

day
day
day
day

Add labour for 1" thick cement concrete


Topping as per Item No. 15(a)
Total Labour

0.00
0.00

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 38

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
23

Providing and laying floor of mosaic marble chips tiles 1" thick of approved quality and
laid in white cement and pigment over 3/4" bedding of cement sand mortar 1:2, incluidng
finishing and polishing complete.

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

MATERIAL
1
2
3
4
5

Mosaic marble tiles 12"x12"x1"


105
Nos.
Cement Grey
1.69
Bags
Sand
4.00
Cft.
Pigment
1.00 Lbs (0.45 Kg
White Cement
0.08
Bag
Total
Contractor's Profit & Ove ## Percent
Total

0.00
Each
0.00 Per Bag
0.00Per 100 Cft
0.00 Per Kg.
0.00 Per Bag

0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.84
2.80
0.34

No.
No.
Nos.

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 39

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
24

Laying floor of approved white glazed tile 1/4" thick in white cement 1:2 over
3/4" thick cement mortar 1:2 complete.

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Tile (Glazed) 6"x6"x" including 5% brea


White Cement for laying
Grey Cement for Bed
Sand
Total
Contractor's Profit & Ove ## Percent
Total

420
0.10
2.16
5.20

No.
Bag
Bag
Cft.

0.00
Each
0.00 Per Bag
0.00 Per Bag
0.00Per 100 Cft

2.00
4.00
0.50

No.
No.
No.

0.00
0.00
0.00

0.00
0.00

LABOUR
Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 40

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
25

Laying floors of a approved coloured glazed tiles 1/4" thick laid in white
cement and pigment on a bed of 3/4" thick cement mortar 1:2

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4
5

Coloured glazed tiles 6"x6" including 5


420
No.
White Cement
0.10
Bag
Grey Cement
2.16
Bag
Pigment
1.00 Lb/0.45 Kg.
Sand
5.20
Cft
Total
Contractor's Profit & Ove ## Percent
Total

0.00
Each
0.00 Per Bag
0.00 Per Bag
0.00 Per Kg.
0.00Per 100 Cft

0.00
0.00
0.00

0.00
0.00

LABOUR
Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

2.00
4.00
0.50

No.
No.
No.

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 41

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
26

Rubbing and polishing old grit/mosaic floor including repairing voids, un-even
surface complete in all respects.

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
3
4

Carborandum Stone
0.50
No.
Wax Polish
0.50 Lb (0.23 Kg.
Tartric Acid
0.34 Lb (0.162 Kg
Cotton waste cloth etc.
0.72
Kg.
Total
Contractor's Profit & Ove ## Percent
Total

0.00
Each
0.00cket of 3 K
0.00 Per Kg.
0.00
P. Kg.

0.00
0.00
0.00

0.00
-

LABOUR FOR 125 SFT.


Skilled Cooly for rubbing and polishing
Cooly
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.00
1.00
0.25

No.
No.
No.

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 42

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
27

Rubbing and Polishing grit floor, including repairing voids, uneven surface
complete in all respects.

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2
4

Carborandum Stone
Wax Polish
Cotton waste cloth etc.
Total
Contractor's Profit & Ove ## Percent
Total

1.50
No.
0.5 Lb (0.23 Kg.)
0.08
Kg.

0.00
Each
0.00cket of 3 K
0.00
P. Kg.

0.00
0.00
0.00

0.00
0.00

LABOUR FOR 125 SFT.


Cooly
Cooly Skilled
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.00
1.00
0.40

No.
No.

Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 43

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
28

Cleaning and washing mosaic or marble floor with caustic soda mixture

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
1
2

Caustic Soda
Hassein Cloth
Total
Contractor's Profit & Ove ## Percent
Total

1 Lb (0.45 Kg.)
0.5 Yard (0.46 m)

0.00 Per Kg.


0.00 Per Metre

0.00
0.00

LABOUR FOR 150 SFT.


Mason
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.25
0.12

No.
No.

Per day
Per day

0.00
0.00

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 44

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
29

Shisham wood boarding or strips flooring 3/4" thick (sawn to required sizes)
tongued and grooved or splayed rebated fixed with brass screws on deedar wood
battens 1"x2" placed at 12" centre to centre including two coats of bitumen laid
hot on the base.

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Shisham Wood
100 x 3/4' x 1/12'
Add 5% rebate
Total
Add 60% Wastage
Total

6.25
0.31
6.56
3.94
10.50

Cft.
Cft.
Cft.
Cft.
Cft.

0.00 Per Cft.

2.29
1.15
3.44

Cft.
Cft.
Cft.

0.00 Per Cft.

0.00 Per Kg.


0.00 Per Kg.
0.00 Per Dozen
0.00 Per Dozen

0.00
0.00

0.00
0.00

Deodar Wood Battens


11 x 10' x 1/8' x 1/6'
Add 50% Wastage
Total

Bitumen
35 Lbs (15.89 Kg.
Fire Wood
0.125 Lbs (4.67 Kg
Brass Screws 2"
7.00 Dozen
Sand Paper Sheet
1.50 Dozen
Total
Contractor's Profit & Ove ## Percent
Total
LABOUR FOR 300 SFT.
Carpenters
Coolies
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

10.00
5.00

No.
No.

Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 45

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
30

Decdar wood boarding or strips flooring 3/4" thick (sawn to required


sizes)tongued and grooved or splayed rebated fixed with brass screws on
deodar wood battens 1"x2" placed at 12" c/c including two coats of bitumens
laid hot on the base.

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Deodar wood planks 100 x 3/4' x 1/12'
Add 5% for rebate
Total
Deodar wood batten 11x10' x 1/6' x 1/8'
Total
Add 50% Wastage
Total

6.25
0.31
6.56
2.29
8.85
4.43
13.28

Cft.
Cft.
Cft.
Cft.
Cft.
Cft.
Cft.

Bitumen
34 Lbs (15.44 Kg.
Fire Wood
0.125 Mds (4.67 Kg
Brass Screws 2" long
7.00 Dozen
Sand Paper
1.00 Dogen
Total
Contractor's Profit & Ove ## Percent
Total

0.00 Per Cft.

0.00 Per Kg.


0.00 Per Kg.
0.00 Per Dozen
0.00 Per Dozen

0.00
0.00

0.00
0.00

LABOUR FOR 200 SFT.


Carpenters
Coolies
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

6.00
6.00

No.
No.

Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 46

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
31

Teakwook boarding or strips flooring " thick (Sawn to required sized)


tongued and grooved screwed on deodar wood battens 1" x 2" size, placed at 12"
centre to centre including 2 coats of bitumen laid hot on the base.

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Teak Wood (100x' x

4.20

Cft.

Add 5% for rebate


Total
Add 20% Wastage
Total

/12'

0.20
4.40
0.88
5.28

Cft.
Cft.
Cft
Cft.

Deodar wood 11x10' x 1/8' x 1/6'


Add. 50% Wastage
Total

2.29
1.15
3.44

Cft.
Cft.

Bitumen
34 Lbs (15.44 Kg.
Sand Paper
2.00 Dozen
Fuel Wood
0.125 Mds (4.67 Kg
Total
Contractor's Profit & Ove ## Percent
Total

0.00 Per Cft.

0.00

Cft.

0.00 Per Kg.


0.00 Per Dozen
0.00 Per Kg.

0.00
0.00

0.00
0.00

LABOUR FOR 300 SFT.


Carpenters
Coolies
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

10.00
5.00

No.
No.

Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 47

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
32

Shisham wood block flooring 1" thick cut to required size, fixed on a layer of
asphalt bitumen laid on base

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Shisham Wood of best quality
100 x 1/12' sawan to required size
Add 100 % Wastage
Total

8.33

Cft.

8.33
16.66

Cft.
Cft.

Bitumen for laying and dipping blocks 80 Lbs (36.32 Kg.


Primer
5.00 Lbs (2.27 Kg
Fire Wood
0.25 Md (9.33 Kg.
Sand Paper
2.00 Dozen
Total
Contractor's Profit & Ove ## Percent
Total

0.00 Per Cft.

0.00 Per Kg.


0.00 Per Kg.
0.00 Per Kg.
0.00 Per Dozen

0.00
0.00

0.00
0.00

LABOUR FOR 200 SFT.


Carpenters
Coolies
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

6.00
5.00

No.
No.

Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 48

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
33

Teak wood block 1" thick cut to required size fixed on a layer of asphalt bitumen laid on

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Teak wood for blocks 1"
thick sawn to size 100 x1/12'
Add 40% Wastage
Total

8.33

Cft.

3.33
11.66

Cft.
Cft.

Bitumen
80 Lbs (36.32 Kg.
Primer
5.00 Lbs (2.27 Kg
Fuel Wood
0.125 Lbs (4.67 Kg
Sand Paper
2.00 Dozen
Total
Contractor's Profit & Ove ## Percent
Total

0.00 Per Cft.

0.00 Per Kg.


0.00 Per Kg.
0.00 Per Kg.
0.00 Per Dozen

0.00
0.00

0.00
0.00

LABOUR FOR 300 SFT.


Carpenters
Coolies
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

10.00
5.00

No.
No.

Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 49

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
34

Laying wooden paving of hard wood on edge in coal tar and asphalt
a)

Shisham Wood

Detail

Unit Rate Per 100 Sft. (Per Inch Thickness)


Rate
Qty
Per Unit (Rs.)
Amount (Rs.)

MATERIAL
Shisham Wood Sawn into
1" thick or any required
Add 30% Wastage
Total

8.33

Cft.

2.50
10.83

Cft.
Cft.

size

Bitumen
Total
Contractor's Profit & Ove ## Percent
Total

34 Lbs / 15.44 Kg

0.00 Per Cft.

0.00

Per Kg.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

LABOUR FOR 150 SFT.


Carpenters
Coolies
Mason
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.00
3.00
1.00

No.
No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 50

Say
Say
Say
Say

0.00
0.00
0.00
0.00

b)

Kikar Wood

Detail

Unit Rate Per 100 Sft. (Per Inch Thickness)


Rate
Qty
Per Unit (Rs.)
Amount (Rs.)

MATERIAL
Kikar Wood

100

8.33

Cft.

2.50
10.83

Cft.
Cft.

12
Wastage 30%
Total
Bitumen
Total
Contractor's Profit & Ove ## Percent
Total

34 Lbs (15.44 Kg.

0.00 Per Cft.

0.00

Per Kg.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00

LABOUR FOR 150 SFT.


Carpenter
Coolies
Mason
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.00
3.00
1.00

No.
No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 51

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
35

Tile skirting laid in 1:2 cement mortar over 3/4" thick cement mortar 1:2 including
cement washing and filling joints complete.
a)

Cement Tiles

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL

240
No.
Cement tiles 8"x8" including 5% breakage
and Wastage
Bags
Cement for laying and pointing cement t 2.45
Sand
6.00
Cft.
Pigment
1 Lb (0.45 Kg.)
Total
Contractor's Profit & Ove ## Percent
Total

0.00

Each

0.00 Per Bag


0.00Per 100 Cft
0.00 Per Kg.

0.00
0.00
0.00

0.00
0.00

LABOUR FOR 150 SFT.


Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

1.56
2.50
0.34

No.
No.
No.

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 52

Say
Say
Say
Say

0.00
0.00
0.00
0.00

b)

Mosaic Tiles

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Tiles 6"x6"x3/4"
Cement
Sand
Pigment
White Cement
Total
Contractor's Profit & Ove ## Percent
Total

420
No.
2.54
Bag
6.00
Cft
1 Lbs (0.45 Kg.)
0.08
Bag

0.00
Each
0.00 Per Bag
0.00Per 100 Cft
0.00 Per Kg.
0.00 Per Bag

0.00
0.00
0.00

0.00
0.00

LABOUR
Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

2.00
2.50
0.25

No.
No.
No.

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 53

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
36

Providing grey cement skirting or dado 3/8" thick including rounding of corner and
straightening of top edge and finishing to smooth surface after plastering
a)

1:2 Cement Sand Mortar

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

0.96
2.50

Bag
Cft.

0.00 Per Bag


0.00Per 100 Cft

2.50
1.50
0.34

No.
No.
No.

0.00
0.00
0.00

0.00
0.00

LABOUR FOR 125 SFT.


Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 54

Say
Say
Say
Say

0.00
0.00
0.00
0.00

b)

1:3 Cement Sand Mortar

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

0.66
2.55

Bag
Bag

0.00 Per Bag


0.00Per 100 Cft

2.50
1.50
0.34

No.
No.
No.

0.00
0.00
0.00

0.00
0.00

LABOUR FOR 125 SFT.


Masons
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 55

Say
Say
Say
Say

0.00
0.00
0.00
0.00

c)

Extra if skirting or dado is finished with pigment of any colour

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Pigment
Contractor's Profit & Ove ## Percent
Total

6 Lbs (2.72 Kg.)

0.00

Per Kg.

0.00

Per day

0.00
-

LABOUR FOR 200 SFT.


Cooly for mixing
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.50

No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 56

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
37

White glazed tiles " thick dado jointed in white cement and laid over 1:2 cement
sand mortar 3/4" thick including finishing complete

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Tiles 6"x6"x"
White Cement
Grey Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

420
0.10
2.16
5.20

No.
Bag
Bag
Cft.

0.00
Each
0.00 Per Bag
0.00 Per Bag
0.00Per 100 Cft

2.50
5.00
0.50

No.
No.
No.

0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 57

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
38

Glazed tile dado " thick dado laid in pigment over 1:2 cement sand mortar /4" thick
including finishing

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Tiles 6"x6"x"
White Cement
Grey Cement
Pigment
Sand
Total
Contractor's Profit & Ove ## Percent
Total

420
No.
0.10
Bag
2.16
Bag
0.67 Lb (0.30 Kg.
5.00
Cft.

0.00
Each
0.00 Per Bag
0.00 Per Bag
0.00 Per Kg.
0.00Per 100 Cft

0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

2.50
5.00
0.50

No.
No.
No.

Per day
Per day
Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 58

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
39

Masaic dado or skirting with one part of cement and marble powder in the ratio of
3:! and two parts of marble chips, laid over " thick cement plaster 1:3 including
rubbing and polishing complete with finishing:
a - i)

Using Grey Cement 3/8" Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL

Grey Cement
0.94
Bags
Marble Powder
0.31 Cwt. (15.75 Kg
Marble Chips
3.00 Cwt.(152.40 Kg
Carbordum Stone
3
No.
Wax Polish
0.5 Lbs (0.23 Kg.
Tartric Acid
0.34 Lbs (0.15 Kg
Total
Contractor's Profit & Ove ## Percent
Total

0.00
Bag
0.00Per 100 Kg.
0.00 Per Kg.
0.00 Per Kg.
0.00Packet 3 Kg
0.00 Per Kg.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Coolies
Skilled Cooly
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

2.00
2.00
5.00
1.00

No.
No.
No.
No.

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 59

Say
Say
Say
Say

0.00
0.00
0.00
0.00

a-ii)

Using Grey Cement " Thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty
MATERIAL
Cement
Marble Powder
Marble Chips
Carboradom Stone
Wax Polish
Linion Cloth
Tartric Acid

1.27
Bags
0.42 Cwt. (21.34 Kg
3 Cwt. (152.40 Kg
3
No.
0.5 Lbs (0.23 Kg.
0.72
Kg.
0.34 Lbs (0.15 Kg

0.00
Bag
0.00Per 100 Kg.
0.00 Per Kg.
0.00
Each
0.00Packet 3 Kg
0.00
P. Kg.
0.00 Per Kg.

"cement plaster under neath


Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

0.88
3.40

Bag
Cft.

0.00
Bag
0.00Per 100 Cft

2.00
2.00
5.00
1.00

No.
No.
No.
No.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason
Cooly
Skilled Cooly
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 60

Say
Say
Say
Say

0.00
0.00
0.00
0.00

b-i)

Using White Cement

3/8" thick

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty

MATERIAL
i)

3/8" Thick
White Cement
Marble Powder
Marble Chips
Carboradom Stone
Wax Polish
Linion Cloth
Tartric Acid

ii)

0.94
Bags
0.31 Cwt. (15.75 Kg
3 Cwt. (152.40 Kg
3
No.
0.5 Lbs (0.23 Kg.
0.72
Kg.
0.34 Lbs (0.15 Kg

0.00
Bag
0.00Per 100 Kg.
0.00 Per Kg.
0.00
Each
0.00Packet 3 Kg
0.00
P. Kg.
0.00 Per Kg.

"cement plaster under neath


Grey Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

0.88
3.40

Bag
Cft.

0.00
Bag
0.00Per 100 Cft

2.00
5.00
2.00
1.00

No.
No.
No.
No.

0.00
0.00
0.00
0.00

0.00
0.00

LABOUR
Mason for Laying
Coolies for rubbing and polishing
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

Per
Per
Per
Per

day
day
day
day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 61

Say
Say
Say
Say

0.00
0.00
0.00
0.00

b-ii)

Using White Cement

(" thick)

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.)
Amount (Rs.)

Qty

MATERIAL
i)

Thick
White Cement
Marble Powder
Marble Chips
Carboradom Stone
Wax Polish
Linion Cloth
Tartric Acid

ii)

1.27
Bags
0.42 Cwt. (21.34 Kg
3 Cwt. (152.40 Kg
3
No.
0.5 Lbs (0.23 Kg.
0.72
Kg.
0.34 Lbs / 0.15 Kg

0.00
Bag
0.00Per 100 Kg.
0.00 Per Kg.
0.00
Each
0.00Packet 3 Kg
0.00
P. Kg.
0.00 Per Kg.

0.00
Bag
0.00Per 100 Cft

"cement plaster 1:3 under neath


Grey Cement
Sand
Total
Contractor's Profit & Ove ## Percent
Total

0.88
3.40

Bag
Cft.

LABOUR
Mason
Skilled Cooly
Coolies
Bahishti
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

2.00
5.00
2.00
1.00

No.
No.
No.
No.

0.00
0.00
0.00
0.00

Per
Per
Per
Per

day
day
day
day

0.00
0.00

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 62

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION ITEM
40

Rubber Flooring, consisting of 12"x12"x1/8" rubber tiles laid on firm foundation

Detail

Unit Rate Per Sft.


Rate
Per Unit (Rs.)

Qty

Amount (Rs.)

(Assume for 100 Sft.)


MATERIAL
Rubber tiles (12"x12"x1/8")
including 5% wastage
Adhesive mixutre (10 Lbs) (4.56 Kg.)
Brushes etc.
Total
Contractor's Profit & Ove ## Percent
Total

105

Nos.

0.00

Each

4.56
0.04

Kg.
No.

0.00
0.00

Kg.
Each

1.00
1.50

No.
No.

0.00
0.00

Per day
Per day

LABOUR
Mason
Coolies
Total
Sundries
## Percent
Total
Contractor's Profit & Ove ## Percent
Total

0.00
0.00

ITEM RATE
Labour Rate Per Sft.
Labour Rate Per Sqm.
Composite Rate per Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 63

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM
41

Providing and Fixing Glass Strip 5mm thick and 1" wide
for dividing mosaic flooring into panels.

Detail

Unit Rate Per Rft.


Rate
Per Unit (Rs.)

Qty

Amount (Rs.)

(Assume for 100 Rft.)


MATERIAL
Glass Strips 1" wide
5mm Thick
Wastage 10%
Total
Contractor's Profit & Ove ## Percent
Total

100.00
10.00
110.00

Rft.
Rft.
Rft.

0.00Per 100 Rft

ITEM RATE
Composite Rate per Rft.

Rs.

Say

0.00

Composite Rate per R.M.

Rs.

Say

0.00

Note :Labour for fixing already included in item 15 & 22 of this chapter

Page 64

DESCRIPTION OF ITEM
42

Providing and fixing marble strip of any shade for dividing the mosaic flooring into pann
a)

Size 1" x 3/8"

Detail

Unit Rate Per Rft.


Rate
Per Unit (Rs.)

Qty

Amount (Rs.)

(Assume for 100 Rft.)


MATERIAL
Marble Strip 1" x 3/8"
Wastage 10%
Total
Contractor's Profit & Ove ## Percent
Total

100.00
10.00
110.00

Rft.
Rft.
Rft.

0.00 Per Rft.

ITEM RATE

Note

Composite Rate per Rft.

Rs.

Say

0.00

Composite Rate per R/M

Rs.

Say

0.00

Labour already included in item 15, 16 and 22 of this chapter.

Page 65

b)

Size 1" x "

Detail

Unit Rate Per Rft.


Rate
Per Unit (Rs.)

Qty

Amount (Rs.)

(Assume for 100 Rft.)


MATERIAL
Marble Strips 1" x "
Wastage 10%
Total
Contractor's Profit & Ove ## Percent
Total

100.00
10.00
110.00

Rft.
Rft.
Rft.

0.00 Per Rft.

ITEM RATE

Note

Composite Rate per Rft.

Rs.

Say

0.00

Composite Rate per R/M

Rs.

Say

0.00

Labour already included in item 15, 16 and 22 of this chapter.

Page 66

CHAPTER NO. 25

IRON WORK
DESCRIPTION OF ITEM:
1

Laying, Linking & Packing


Tram way line.

Detail

Unit of Rate 100 Rft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 350 Rft


LABOUR
1
2
3

Jamadar (Mate)
Keyman (Skilled Cooly)
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
7.00

No.
No.
Nos.

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate Per R M

Rs.
Rs.

Page 1

Say
Say

0.00
0.00

2.

Dismantling Tramway track.

Detail

Unit of Rate 100 Rft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 1400 Rft.


LABOUR
1
2
3

Jamadar (Mate)
Skilled Cooly
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.0
1.0
10.0

No.
No.
Nos.

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate per RM

Rs.
Rs.

Page 2

Say
Say

0.00
0.00

3.

Laying, Linking of B.G Track including packing, straightening and levelling.

Detail

Unit = 100 Rft


Rate
Per Unit

Qty

Amount

Rate Analysis per 120 Rft.


LABOUR
1
2
3

Jamadar (Mate)
Keyman (Skilled Cooly)
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.0
1.0
6.0

No.
No.
Nos.

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate Per 100 Lft.

Rs.

Say

0.00

Labour Rate per RM

Rs.

Say

0.00

Page 3

4.

Linking points and crossings complete with fastenings.

Detail

Unit = Each
Rate
Per Unit

Qty

Amount

LABOUR
1
2
3

Jamadar (Mate)
Keyman (Skilled Cooly)
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

0.5
0.5
5.5

No.
No.
Nos.

0.00
0.00
0.00

0.00
0.00
0.00

Say

0.00
0.00
0.00
0.00
0.00

Say

0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate Per Each

Rs.

Page 4

5.

Bending or straightening B.G.

rail with Jim crow

Detail
Qty

Unit Rate Per Each Point


Rate
Per Unit

Amount

LABOUR
1
2

Black Smith
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

0.20
0.50

No.
No.

0.00
0.00

per day
per day

0.00
0.00

Say

0.00
0.00
0.00
0.00
0.00

Say

0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate Per Each Point

Rs.

Page 5

6.

Fixing street lamp post.

Detail

Unit Rate Per Each


Rate
Per Unit

Qty

Amount

LABOUR
1

Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

0.85

No.

0.00

per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00

Percent

ITEM RATE
Labour Rate Per/Each

Rs.

Page 6

Say

0.00

7.

Binding ends of sleepers and timbers of all sizes and kinds including spreading and
restacking.

Detail
Qty

Unit Rate Per 100 Nos.


Rate
Per Unit

Amount

LABOUR
1
2
3

Fitter
Mate
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.5
0.5
5.75

No.
No.
No.

0.00
0.00
0.00

per day
per day
per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00
0.00

Percent
Say

ITEM RATE
Labour Rate Per 100 Nos.

Rs.

Page 7

Say

0.00

8.

Opening stacks of sleepers and Timbers of all kinds and sizes including spreading for
inspection and restacking within chain lead.

Detail

Unit Rate Per 100 Nos.


Rate
Per Unit

Qty

Amount

Rate Analysis for 1500 Nos.


LABOUR
1
2

Mate
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.0
14.0

No.
Nos.

0.00
0.00

per day
per day

0.00
0.00

Say

0.00
0.00
0.00
0.00
0.00
0.00

Say

0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate Per 100 Nos.

Rs.

Page 8

9.

Small Iron work such as gusset plates, knees, bends, strips, straps, rings etc. including
cutting, drilling, revitting, bending assembling & fixing but excluding erection in position.

Detail

Unit = 1 Cwt.
Rate
Per Unit

Qty

Amount

Rate Analysis for 1 Cwt.


MATERIAL
1

2
3

Iron
wastage 10%

= 1.0 Cwt.
0.1 Cwt.
1.10 Cwt. or 55.

Char Coal
Steel Revits
Total
Contractor's Profit & O
Total

20.00

55.90

Kg

0.00

per Kg

8.40
0.68

Kg
Kg

0.00
0.00

per Kg
per Kg

1.50
2.50

Nos.
Nos.

Percent

LABOUR
Black Smith
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

per day
per day

10.00 Percent
20.00

Percent
Say

ITEM RATE
Labour Rate for 1 Cwt.

Rs.

Say

Composite Rate for 1 Cw

Rs.

Say

Labour Rate/100 Kgs.

Rs.

Say

Composite Rate/100 Kgs.

Rs.

Say

Page 9

10.

Fabrication of heavy steel work, with angle, tees, flat iron, round iron and sheet iron for
making trusses, girders, tanks etc. including cutting, drilling, revitting handling,
assembling and fixing but excluding erection in position.

Detail

Unit
Qty

1 Cwt.
Rate
Per Unit

Amount

Rate Analysis for 1 Cwt.


MATERIAL
1

Iron
wastage 5%

= 1.00 Cwt
= 0.05 Cwt
1.05 Cwt.or

2
3

Char Coal
Steel Revits
Total
Contractor's Profit & O
Total

20.00

53.36
(53.36 Kg.)
7.46
0.45

Kg

0.00

Per Kg.

0.00

Kg
Kg

0.00
0.00

Per Kg.
Per Kg.

0.00
0.00
0.00
0.00
0.00

Percent

LABOUR
1
2

Black Smith
Hammer man
Total
Sundries
Total
Contractor's Profit & O
Total

0.5
0.9

No.
No.

0.00
0.00

per day
per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate/Cwt

Rs.

0.00

Say

0.00

Composite Rate/One Cwt.

Rs.

0.00

Say

0.00

Labour Rate/100 Kg.

Rs.

0.00

Say

0.00

Composite Rate/100 Kg

Rs.

0.00

Say

0.00

Page 10

11.

Erection and fitting in position of iron trusses, staging of water tanks.

Detail

Unit
Qty

100 Kg
Rate
Per Unit

Amount

Rate Analysis for 9.00 Cwt.


LABOUR
1
2

Fitter
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

Rate/Cwt

2.0
2.0

No.
No.

0.00
0.00

per day
per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
9

0.00
0.00

Percent

= Rs. 65.88

ITEM RATE
Labour Rate / Cwt.

Rs.

Say

0.00

Labour Rate 100 Kg

Rs.

0.00

Say

0.00

Page 11

12.

Fixing corrugated iron sheet including revitting.

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 125 Sft.


LABOUR
1
2

Black smith
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.0
1.0

No.
No.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate 100 Sft.

Rs.

Say

0.00

Labour Rate/Sq.m

Rs.

Say

0.00

Page 12

13.

Erecting corrugated iron sheet tanks upto 20 ft. height.

Detail

Unit
Qty

100 Kg
Rate
Per Unit

Amount

Rate Analysis for 14.25 Cwt.


LABOUR
1
2

Black smith
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

Rate / Cwt.

2.0
9.5

Nos.
Nos.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
14.25

Percent

Rs.

0.00
0.00

0.00

ITEM RATE
Labour Rate/ One Cwt

Rs.

Say

0.00

Labour Rate / 100 Kg.

Rs.

0.00

Say

0.00

Page 13

14.

Erecting rolled steel beams on old rails in roofs etc., erection and fixing in position.

Detail

Unit
Qty

100 Kg.
Rate
Per Unit

Amount

Rate Analysis for 30 Cwt.


LABOUR
1
2

Black smith
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

0.5
14.5

No.
Nos.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate /Cwt.

Rs.

Say

0.00

Labour Rate / 100 Kg.

Rs.

0.00

Say

0.00

Page 14

15.

Erecting rolled steel beams or rails, erection for posts etc. (other than in roofs).

Detail

Unit 100 Kg.


Rate
Per Unit

Qty

Amount

Rate Analysis for 30 Cwt.


LABOUR
1
2

Black smith
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

Rate/Cwt.

0.5
6.75

No.
Nos.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rs.

Say

0.00

Rs.

0.00

Say

0.00

10.00 Percent
20.00

Percent

0.01
30

Rs.

0.00

ITEM RATE
Labour Rate /Cwt.
Labour Rate / 100 Kg.

Page 15

16.

Making bolts and nuts of iron rods.

Detail

Unit 100 Kg.


Rate
Per Unit

Qty

Amount

Rate Analysis for 1 Cwt.


MATERIAL
1

Mild Steel
wastage 10%

2
3

Steel chisel
Coal
Total
Contractor's Profit & O
Total

1 .0 Cwt.
0.1 Cwt
1.1 Cwt. or

20.00

55.90

Kg

0.00

Per Kg.

0.00

0.68
46.51

Kg
Kg

0.00
0.00

Per Kg.
Per Kg.

0.00
0.00

(55.90 Kg)

0.00
0.00
0.00

Percent

LABOUR
1
2
3

Black Smith
Hammer man
Cooly (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.5
0.75
0.75

Nos.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00
0.00

Percent

ITEM RATE
Labour Rate/ Cwt.

Rs.

0.00

Say

0.00

Composite Rate/Cwt

Rs.

0.00

Say

0.00

Labour Rate/100 Kg.

Rs.

0.00

Say

0.00

Composite Rate/100 Kg.

Rs.

0.00

Say

0.00

Page 16

17.

Cutting rails, rolled steel joists and beams with hack saw:a) upto 6" size.

Detail

Unit per cut


Rate
Per Unit

Qty

Amount

Rate Analysis for 1 Cut.


LABOUR
1
2

Fitter
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

0.15
0.15

No.
No.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate per Cut

Rs.

Page 17

Say

0.00

17.

b) Above 6" size.

Detail

Unit per Cut


Rate
Per Unit

Qty

Amount

Rate Analysis for 5 Cuts.


LABOUR
1
2

Fitter
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.20
1

Nos.
No.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate per Cut.

Rs.

Page 18

Say

0.00

18.

Cutting rails or rolled steel beams of size below 6" with Jim.

Detail

Unit per Cut


Rate
Per Unit

Qty

Amount

Rate Analysis for 14 Cuts


LABOUR
1
2

Fitter
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00

No.
No.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate per Cut.

Rs.

Page 19

Say

0.00

19.

Bending rolled steel beams on rails.

Detail

Unit / Bend
Rate
Per Unit

Qty

Amount

Rate Analysis for 10 Bends


MATERIAL
1

Steam coal

Total
Contractor's Profit & O
Total

139.95

20.00

Kg

0.00

Per Kg

0.00

0.00
0.00
0.00

Percent

LABOUR
1
2

Black Smith
Hammer man
Total
Sundries
Total
Contractor's Profit & O
Total

0.75
0.75

No.
No.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Labour Rate Per Bend

Rs.

Say

0.00

Composite Rate/Bend

Rs.

Say

0.00

10.00 Percent
20.00

Percent

ITEM RATE

Page 20

20.

Drilling holes in plates upto 1/2" thick per inch dia or part thereof.

Detail

Unit Rate per Hole


Rate
Per Unit

Qty

Amount

Rate Analysis for 40 holes


LABOUR
1
2

Fitter (Grade I)
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

0.50
2.00

No.
No.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate per hole

Rs.

Page 21

Say

0.00

21.

Extra for drilling holes in plates over each 1/2" thick per inch dia or part thereof.

Detail

Unit Rate Per Hole


Rate
Per Unit

Qty

Amount

Rate Analysis for 120 holes


LABOUR
1
2

Fitter (Grade I)
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

0.25
4.00

No.
Nos.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate per hole

Rs.

Page 22

Say

0.00

22.

Riveting 1/8" dia

Detail

Unit Rate Per 100 Nos.


Rate
Per Unit

Qty

Amount

Rate Analysis for 120 Nos.


LABOUR
1
2

Riveted
Coolies (unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

0.50
0.50

No.
No.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate for 100 Nos.

Rs.

Page 23

Say

0.00

23.

Cutting out rivets, all sizes.

Detail

Unit 100 Nos.


Rate
Per Unit

Qty

Amount

Rate Analysis for 160 Nos.


LABOUR
1
2

Fitter (Grade II)


Hammer man
Total
Sundries
Total
Contractor's Profit & O
Total

2.00
2.00

Nos.
Nos.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate for 100 Nos.

Rs.

Page 24

Say

0.00

24.

Fitting and erection

of gutters of sheet iron.

Detail

Unit / Lft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 115 Feet


LABOUR
1
2
3

Fitter (Grade II)


Mason
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00
10.00

No.
No.
Nos.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00
0.00

Percent

ITEM RATE
Labour Rate Per Lft.

Rs.

Labour Rate per RM

Rs.

Page 25

Say

0.00

Say

0.00

25.

Cutting and fixing iron bars for barred windows

Detail

Unit / Bar
Rate
Per Unit

Qty

Amount

Rate Analysis for 35 Bars


LABOUR
1
2
3

Fitter (Grade III)


Carpenter
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

0.50
0.50
1.00

No.
No.
No.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00
0.00

Percent

ITEM RATE
Labour Rate Per Bar

Rs.

Page 26

Say

0.00

26.

Cutting GI sheets.

Detail

Unit Rate Per Cut


Rate
Per Unit

Qty

Amount

Rate Analysis for 65 Cuts


LABOUR
1
2

Fitter (Grade II)


Hammer man
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00

No.
No.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate per cut

Rs.

Page 27

Say

0.00

27.

Notching web or foot of rail posts for housing rail beams.

Detail

Unit Rate Per Notch


Rate
Per Unit

Qty

Amount

Rate Analysis for 3 Notches


MATERIAL
1

Steam Coal

Total
Contractor's Profit & O
Total

28.00

20.00

Kg

0.00

Per Kg

0.00

0.00
0.00
0.00

Percent

LABOUR
1
2

Black Smith
Hammer man
Total
Sundries
Total
Contractor's Profit & O
Total

1.0
1.0

Nos.
Nos.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate/Notch
Composite Rate/Notch

Page 28

Rs.

0.00

Say

0.00

Rs.

Say

0.00

28.

Hoop Iron netted trellis work fixed with nails.

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 50 Sft.


LABOUR
1
2

Fitter (Grade - II)


Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00

No.
No.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate per Sft.

Rs.

0.00

Say

0.00

Labour Rate per Sq.m

Rs.

Say

0.00

Page 29

29.

Fixing zinc Iron or GI Sheets on table tops.

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 85 Sft.


LABOUR
1
2

Carpenter
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00

No.
No.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate per Sft.

Rs.

0.00

Say

0.00

Labour Rate per Sq.m

Rs.

Say

0.00

Page 30

30.

Making and fixing steel grated doors, complete with locking arrangement, angle iron frame 2"x2"x3
3/4" square bars 4" center to center

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
Rate Analysis for 7' x 4' = 28.00
MATERIAL
a)
1
Angle Iron frame 2"x2"x3/8"
vertical 4x7
Top rail 2 x 4'-0"
Bottom & central rail
2
3

b
c
d
e
f

Grating("x")
Gusset Plate (" thick)
8x6"x3"
4x8"x3"

Amount

Sft.

28 Rft
8 Rft
8 Rft.
44 Rft.
= 9x7'-0" = 63 Rft. @

90.44
53.74

1.0 0 Sft.
0.67 Sft.
1.67 Sf
7.58
Total
151.76
Wastage
7.59
Total
159.35

Kg.
Kg.

Kg.

Kg.

0.00

Per Kg.

0.00

Nos.

0.00

Each

0.00

No.
Kg.
Kg.
Kg.

0.00
0.00
0.00
0.00

Each
Per Kg.
Per Kg.
Per Kg.

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Nos.
Nos.
Nos.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Labour Rate per Sft.


Composite Rate per Sft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Hold fast with pivot and fixed


Locking arrangement with sliding bolt 1 long
and 1" dia
Coal
Rivets and bolts
Steel
Total
Contractor's Profit & O
20.00 Percent
Total

6.00
1.00
15.00
2.27
1.13

LABOUR
1
2
3

Black Smith
Hammer man
Blowman
Total
Sundries
Total
Contractor's Profit & O
Total

2.0
3.0
2.0
10.00 Percent
20.00

Percent

ITEM RATE

Page 31

31.

Making and fixing steel grated door with 1/16" thick sheeting including angle iron frame
2"x2"x3/8" and 3/4" square bars 4" center to center with locking arrangement.

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
Rate Analysis for 7'x4'

28 Sft.

MATERIAL
1
2

As per Item No. 30 (a) to (f)


M.S. sheet 1/16" , 7x4=
Wastage @ 5%
@
Total
Contractor's Profit & O
Total

28 Sft.
1.4 Sft
29.40 S

33.35

Kg.

Per Kg.

2.25
3.00
2.00

Nos.
Nos.
Nos.

Per day
Per day
Per day

lb/Sft.
20.00

Percent

LABOUR
1
2
3

Black Smith
Hammer man
Blowman
Total
Sundries
Total
Contractor's Profit & O
Total

10.00 Percent
20.00

Percent
Say

ITEM RATE
Labour Rate/Sft.
Composite Rate per Sft.

Rs.
Rs.

Say
Say

Labour Rate Per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

Say
Say

Page 32

Amount

32.

Making and fixing grating in opening, including fixing at site with flat iron 2"x3/8" and 3/4"
square bars at 4" cetnre to center.

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
Rate Analysis for 5'x8'

40

Amount

Sft.

MATERIAL
1
a
b

Steel
Frame 2" x 3/8"
3 x 6' = 18 Rft.
Grating 3/4"x3/4"
Total
Wastage @ 5%

@ 2.51 lb/Rft. = 45 lb
20.50
14x 8' = 112 Rft. @ 1.88 lb/ft.
= 210.5
95.54
116.04
5.80
Total
121.84

Coal
Total
Contractor's Profit & O
Total

1.40

20.00

Kg.
Kg.
Kg.
Kg.

0.00

Per Kg.

0.00

Kg.

0.00

Per Kg.

0.00
0.00
0.00
0.00

Percent

LABOUR
1
2
3

Black Smith
Hammer man
Blowman
Total
Sundries
Total
Contractor's Profit & O
Total

1.25
1.25
1.50

Nos.
Nos.
Nos.

0.00
0.00
0.00

Per day
Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00
0.00

Percent

ITEM RATE
Labour Rate/Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 33

33.

Providing and fixing stair railing (all types and designs) of hard wood, including bends
and corners, screwed to 5/8"x5/8" M.S. square bars 2.75 ft. high, at 5.5 inch center to
center, fixed in steps of stairs, M.S. flat 1"x1/8" welded to bars, painting/polishing 3 coats,
etc. complete.

Detail

Unit Rate Per Rft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 10 Rft.


MATERIAL
1
2
3
4

Wooden railing
M.S. flat 1"x1/8" 10 Rft. @ 0.42

10 Rft.
LB/ft. =10x0
1.91
Kg.
= 4.2 lbs/ft.
M.S. square bars (5/8"x5/8") 11x2 = 22 Nos x 3
=66 ft. @ 1.33 lbs/ft.
39.83
Kg.
Painting
0.045 Gallon
Total
Contractor's Profit & O
Total

20.00

0.00 Per Rft.


0.00 Per Kg.

0.00
0.00

0.00
0.00

0.00
0.00

Per Kg.
Gallon

0.00
0.00
0.00

Percent

LABOUR
1
2
3
4
5
6

Cutting 5/8" square bars.


Cutting flat iron 2 Nos. cuts
Welding bar with M.S. flat 22 Nos.
Drilling holes in stone or masonry
Mason
Cooly (Unskilled)
Total
Sundries
10.00 Percent
Total
Contractor's Profit & O
20.00 Percent
Total

22
2
22
22
0.75
1.0

cuts
cuts
Nos
Nos
No.
No.

0.00 per cut


0.00 Per cut
0.00 per No.
0.00 per hole
0.00 per day
0.00 per day

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Labour Rate/Rft.
Composite Rate/Rft.

Rs.
Rs.

0.00
-

Say
Say

0.00
0.00

Labour Rate per Rm


Composite Rate per Rm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

ITEM RATE

Page 34

34.

Providing/fixing stair railing consisting of M.S. Box section size 1-1/2"x3" of 16 SWG
welded with M.S. flat 1"x1/8" continuously and welded over M.S. square bars 5/8"x5/8"
punched in M.S. flat 2 ' high @ 5" c/c fixed in steps of stair I/C painting 3 coats
complete.

Detail

Unit Rate Per Rft.


Rate
Per Unit

Qty
MATERIAL
1

Rate of stair railing with hard wood hand railing


(Item No. 33)
Rate/ft.
#####
Less: rate of shisham wood railing
#####
(No. 31 (a) wood work
#####
Providing fixing M.S. Box section of 16 SWG
1"x3" for hand rail
Add 5% wastage
Painting 3 coats (Item 5d i & ii Painting)
including Contractor Profit
54.73+72.6
100
20.00 Percent 0.00
Contractor's Profit & O

Per Rft.
1.00
0.05
1.05
0.62

Rft.
Rft.
Sft.

0.00 Per Rft.


0.00 Per Sft.
Say 1.3

Total
LABOUR
1

2
3

Stair railing
Rs. 83.95
Less shisham wood rail
Rs. 40.70
(Ref. 28 (a) (wood)
Rs. 43.
Labour for painting (Ref. as above)
Making/fixing M.S. box section to required
shape i/c bends/corners welding i/c cost of
welding rod.
Total
Sundries
10.00 Percent 0.00
20.00 Percent
Contractor's Profit & O
at Rs. (6.40+0.64)
=
0.00
Total

1.00
0.62

Rft.
Sft.

Per Rft.
Per Sft.

1.00

Rft.

Per Rft.

Labour Rate/Rft.
Composite Rate/Rft.

Rs.
Rs.

Say
Say

Labour Rate/ RM
Composite Rate/RM

Rs.
Rs.

Say
Say

ITEM RATE

Page 35

Amount

35.

Providing and fixing terrace railing of 2" i/d conduit pipe 16 SWG welded with 5/8"x5/8"
square bars 2.75 ft. high fixed at 5" center to center in reinforced cement concrete slab
with suitable arrangement, complete in all respects as per design and drawing.

Detail

Unit Rate Per Rft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 10 Rft.


MATERIAL
1
2
3

Conduit pipe including specials


M.S. square bars 5/8"x5/8" @5" c/c =22x3 =66'
@ 1.33 lb/ft. = 87.78 lbs (39.83 Kg)
M.S. flat iron 1"x1/8"=10 ft. @ 0.42 LB/ft. =4
(1.91 Kg.)
Total
Contractor's Profit & O
20.00 Percent
Total

10
39.83

Rft.
Kg.

0.00
0.00

Per ft.
Per Kg.

0.00
0.00

1.91

Kg.

0.00

Per Kg.

0.00
0.00
0.00
0.00

LABOUR
1
2
3

Cutting 5/8" square bars


Welding square bar with conduit pipe
Drilling hole 22x3 = 66 Nos.
Total
Sundries
10.00 Percent
Total
Contractor's Profit & O
20.00 Percent
Total

22
22
66

Nos.
Nos.
Nos.

0.00 per cut


0.00 per No.
0.00 per hole

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Labour Rate Rft.


Composite Rate/Rft.

Rs.
Rs.

0.00
-

Say
Say

0.00
0.00

Labour Rate per RM


Composite Rate per RM

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

ITEM RATE

Page 36

36.

Providing and fixing collapsible gate made of 2"x2"x1/4" tee iron at top and bottom,
channel iron vertical 3/4"x1/4"x1/4"x1/8" at 3" to 5" center to center (Approximately) and flat
iron crosses 3"x3/16" and best quality rollers at bottom of 3" dia meter including holdfast,
handles 12" long of 3/4"x1/4"x1/4"x 1/8" channel iron, locking arrangement inside and out
side, painting 3 coats of black Japan enameled, complete in working order.

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
Rate Analysis for 7'x10'

75

Amount

Sft.

MATERIAL
i)
ii)

iii)

iv)
v)
vi)
vii)
viii)
ix)
x)

xi)

Top and bottom tee 2"x2"x1/4", 2x8'=16 Rft


@ 3.2 Lbs/ft. = 51.20 lbs or 23.23 Kg.
23.23
Kg.
Vertical channels 3"x1/4"x1/4"x1/8"
24x2x10' =
480 Rft.
Wastage @ 5%
24
Rft.
Total
504 Rf
128.06
Kg.
@ 0.56 lb
per ft. = 282.24 lbs
Flat iron 3/4"x3/16 crosses
12" long 4x4x1'
= 16 Rft.
24" long 46x4x2' = 368 Rft.
384 Rft.
wastage @ 5%
19.20 Rft.
91.47
Kg.
403.20 Rft. @ 0.50 lb/ft.=201.60 lbs
Total
242.76
Kg.
3" diameter rollers
Rivets with heads 2" long 11x24= 264 No.
Rivets 1" long 4x2x24 = 192 Nos
Handles 12" long 3/4"x1/4" channels inside
and outside
Locking arrangement in & outside
Holdfast
Cement
Sand
Bajri
Painting 3 coats Qty. gallon
Total
Contractor's Profit & O
Total

20.00

0.00

Per Kg.

0.00

Nos.
Each
Each

0.00
0.00
0.00

6.00
264.00
192.00

Nos.

0.00
0.00
0.00

2.00
2.00
8.00
0.480
1.30
2.450
0.50

Nos.
Nos.
Nos.
Cft.
Cft.
Cft.
gln.

0.00
Each
0.00
Each
0.00
Each
0.00
P. Bag
0.00 Per % Cft.
Per % Cft.
0.00
gln

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Percent

Page 37

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

LABOUR
1
2
3
4
5
6

Black Smith
Coolies (Skilled)
Coolies (Unskilled)
Mason
Coolies
Painter
Total
Sundries
Total
Contractor's Profit & O
Total

6
12
6
0.50
1.50
0.33

Nos
Nos
Nos
No.
No.
No.

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Labour Rate/ Sft.


Composite Rate/Sft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

10.00 Percent
20.00

Percent

ITEM RATE

Page 38

37.

Providing and fixing 24 SWG GI sheet rolling shutter, consisting of steel frame of M.S.
channel 2"x1"x1/8", angle iron 1"x1"x1/8", M.S. plat 1'x1'x1/8", GI pipe 1" dia, spring
2' center to center, rollers, 24 SWG, GI covering 1'x1', handles, holdfast & painting three
coats, complete in all respects.

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
Rate Analysis shutter size 8'x9'
MATERIAL
1

M.S. channels 2"x1"x1/8"


Frame sides 2 Nos x 9'
wastage @ 5%

M.S. plate 1'x1'x1/8"


2 Nos x 1 x 1
wastage @ 5%

Angle Iron 1"x1"x1/8"


Bottom side 7'-10"
wastage @ 5%

GI sheet 24 SWG
i) For shutter 1x7.83x9 =
ii) For box 1x8x3.25 =
iii) For covering plate =
Over lap 10%
Wastage 5%

GI bracket

GI Holdfast

GI Pipe 1" dia:Pipe


wastage 5%

Amount

72' Sft.

18.00
Rft.
0.9 Rft.
18.9 Rf
19.21
lbs/ft.

Kg.

0.00

Per Kg.

0.00

Kg.

0.00

Per Kg.

0.00

Kg.

0.00

Per Kg.

0.00

70.47 Rft.
26.00 Rft.
2.00 Sft.
98.47 Sft.
9.85 Rft..
108.32 Sft.
5.41 Sft.
113.73 Sft.
@ 1.112
57.38
2.00

Kg.
Nos.

0.00
0.00

Per Kg.
Each

0.00
0.00

6.00

Nos.

0.00

Each

0.00

Rft.
Rft.
R
8.40

Rft.

0.00 Per Rft.

0.00

2.00 Sft
0.10 Sft
2.10 S
4.86
@ 5.10 lbs/Sft.
7.83 Rft.
0.39 Rft.
8.22 R
4.59
@ 1.23 lbs/ft.

8.00
0.40
8.40

Handle 2 Nos

2.00

Nos.

0.00

Each

0.00

GI spring

2.00

Nos.

0.00

Each

0.00

10

Rolling gear 3 Nos.

3.00

Nos.

0.00

Each

0.00

11

Making (holes/khuda)

2.00

Nos.

0.00

Each

0.00

12

Rivets

0.86

Kg.

0.00

P. Kg.

0.00

13

Greasing

0.80

Kg.

0.00

P. Kg.

0.00

14

Cement

0.00

P. Bag

0.00

Page 39

0.212 Cft.

15

Sand
Total
Contractor's Profit & O
Total

0.50 Cft.

20.00

0.00 Per % Cft.

0.00
0.00
0.00
0.00

Percent

LABOUR
1
2
3
4

Black Smith
Coolies (Skilled)
Coolies (Unskilled)
Mason
Total
Sundries
Total
Contractor's Profit & O
Total

2.50
1.50
1.00
0.50

Nos
Nos
Nos
No.

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

Percent

ITEM RATES
Labour Rate/ Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 40

38.

Providing and fixing M.S. angle iron 1"x1"x" edge protector nozing of steps of stairs,
having holdfast of 3/8" dia M.S. bars 8" long welded at 2' center to center and embedded
in cement concrete on steps complete in all respects.

Detail

Unit Rate Per Rft.


Rate
Per Unit

Qty
Rate Analysis for one step
MATERIAL
1

Angle Iron 1"x1"x"


wastage 5%

4.00 Rft.
0.20 Rft.
4.20 R
9.74 Lbs or
@ 2.32 lb/ft.
4.42
Kg.

Holdfast 3/8" dia


Total
Contractor's Profit & O
Total

Amount

4 ft. long

3.00

20.00

Nos.

0.00

Per Kg.

0.00

0.00

Each

0.00
0.00
0.00
0.00

Percent

LABOUR
1
2

Welding charges of angle iron


Fixing charge
Total
Sundries
Total
Contractor's Profit & O
Total

4.00 No.weld

0.00 Each weld


0.00

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate per foot
Composite Rate / Foot.

Rs.
Rs.

0.00
-

Say
Say

0.00
0.00

Labour Rate per RM


Composite Rate per RM

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 41

39.

Providing and fixing stair railing of 2' i/d GI pipe, welded with 5/8"x5/8" square M.S.
bars 2'-9" high, fixed in each step, complete in all respects, including painting, polishing
three coats.

Detail

Unit Rate Per Rft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 10 Rft.


MATERIAL
1

GI pipe 2" dia


wastage 5%

1.00 Rft.
0.50 Rft.
10.50
10.50
(Medium Quanlity)
10.00 Rft.
0.50 Rft.
10.50
3.90
@ 0.82 lbs/ft.

M.S. flat 2"x1/8"


wastage 5%

M.S. square bars 5/8"x5/8"


1x13x2.75
wastage 5%

20.00

0.00

ft.

0.00

Kg.

0.00

Per Kg.

0.00

0.00
0.00

Per Kg.
Gallon

0.00
0.00

35.75 Rft.
3.58 Rft.
39.33 Rft.
@ 1.33
23.73
Kg.
0.089 Gallon

Paint for 3 coats


Total
Contractor's Profit & O
Total

Rft.

0.00
0.00
0.00

Percent

LABOUR
1
2
3
4
5

Black smith
Mason
Coolies (Unskilled)
Welding GI pipe with M.S. flat 2"x1/8", 10' lo
Welding M.S. square bars with M.S. flat
Total
Sundries
10.00 Percent
Total
Contractor's Profit & O
20.00 Percent
Total

0.50
0.50
0.75
10.00
13.00

No.
No.
No.
Long
Nos.

0.00
0.00
0.00
0.00
0.00

Per day
Per day
Per day
Each
Each

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Labour Rate per Rft


Composite Rate per Rft.

Rs.
Rs.

0.00
-

Say
Say

0.00
0.00

Labour Rate per RM


Composite Rate per RM

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

ITEM RATE

Page 42

40.

Providing and fixing galvanized wire gauze 24 SWG 144 mesh per square inch fixed to
steel window, complete in all respects.

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
Rate Analysis for 3'x5'

15

Amount

Sft

MATERIAL
1

G. I. wire gauge
wastage 5% over lap

15.00 Sft.
0.75 Sft.
15.75
15.75

Sft.

0.00 Per Sft.

0.00

Kg.

0.00

Per Kg.

0.00

Dozen

0.00

Dozen

0.00

M.S. flat "x1/16"


4 x 3'
4 No x 5

12.00 Rft.
20.00 Rft.
32.00 Rft.
wastage 5%
1.60 Rft.
33.60
1.61
per foot = 3.56 lbs/ (1.61 Kg)
Machine screws 1/8"x1/2"
5.70
Total
Contractor's Profit & O
Total

20.00

0.00
0.00
0.00

Percent

LABOUR
1

Carpenter /Blacksmith
Total
Sundries
Total
Contractor's Profit & O
Total

0.50

No.

0.00

per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00

Percent

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 43

41.

Providing and fixing steel windows with openable glazed panels, using beam section for
frame 1"1x5/8"x1/8" Z section for beams 3/4"x1"x3/4"x1/8", T section sashes 1"x1"x1/8"
glass panes, wooden screeds for glazing, embedded over a thin layer of putty duly
screwed with beams, brass fittings, holdfast, duly painted, complete in all respects,
including all costs of material and labour, etc., as per approved design and as directed by the En

a)

Without Wire Gauze

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
MATERIAL
1

Rate Analysis for 6' x 4' = 24 Sft.


(without glass panes)
Beam section 1"x1"x5/8"x1/8"
Horizontal 2x6' =
vertical 5x4' =
wastage 5%

Amount

Z-section "x1"x"x1/8"
Horizontal 8x1'-5" = 11.67 Rft.
vertical 8x3'-11" = 31'-8"
Add wastage 5%

T-section 1"x1"x1/8"
Horizontal 8x 1-5"
Add wastage 5%

12.00 Rft.
20.00 Rft.
32.00 Rft.
1.60 Rft
33.60
18.60
@ 1.22 lb/ft

Kg.

0.00

Per Kg.

0.00

Kg.

0.00

Per Kg.

0.00

Kg.

0.00

Per Kg.

0.00

Nos.

0.00

Each

0.00

8.00

Nos

0.00

Each

0.00

43.33 Rft
2.16 Rft.
45.49
19.81
@ 0.96 lb/ft.
11.66 Rft.
0.59 Rft.
12.25
4.44
@ 0.798 lb/ft.
6.00

Iron holdfast

Window hinges 1/4" thick with 5/16 dia

Brass casement handle 6" with screwing flat and


catching hook

4.00

Nos.

0.00

Each

0.00

Mild steel casement stay 15" long with gap flats


and catching pins

4.00

Nos.

0.00

Each

0.00

pins

Wooden strips for fixing glass pans

68.00

Rft.

0.00 Per Rft.

0.00

96 Nos steel glazing clips for fixing glass panes in


position before applying putty
96.00

Nos.

0.00

0.00
0.00

Page 44

Each
Total Rs.

41 a (i) Using Glass Pans 2 mm thick


Material as per item No. 41 (a) above
Cost of glass 2 mm thick
Total
Contractor's Profit & O
20.00 Percent
Total

24.00

Sft.

0.00 Per Sft.

1333.90
0.00
1333.90
266.78
1600.68

LABOUR
1

Labour for 24 Sft. for fabrication, welding and


fixing fixtures 42 welds including grinding to
smoothern the surface.

Labour for 24 Sft. for fixing 12 Nos. glass pa


position by fixing 96 Nos. glazing clips in
position and then applying wooden strips

One job labour for fixing in position

Painting 24 Sft.

Carriage to site of work


Total
Sundries
Total
Contractor's Profit & O
Total

42.00

24.00

24.00

Sft.

Sft.

0.00 per weld

0.00

0.00 Per Sft.

0.00

0.00

0.00

0.00 Per Sft.

0.00

L.S.

0.00
0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
66.70

Say
Say

0.00
66.70

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

-0.05
717.64

Say
Say

0.00
717.65

Page 45

41 a (ii Using 2.5 mm thick glass of Panes

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
Rate Analysis for 24

Amount

Sft.

MATERIAL
1
2

Same as per item No: 41 (a)


Cost of 2.5 mm glass panes

Total
Contractor's Profit & O
Total

20.00

24.00

Sft.

0.00 Per Sft.

0.00
0.00

0.00
0.00
0.00

Percent

LABOUR
1

Same as per item No. 41 a (i)

0.00

Total

0.00

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

-0.05
0.00

Say
Say

0.00
0.00

Page 46

41

a (i Using

3 mm thick glass panes

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
Rate Analysis

Amount

for 6' x 4' = 24 Sft.

MATERIAL
1
2

Same as per item No: 41 (a)


(excluding cost of glass panes)
Cost of 3 mm thick glass
Total
Contractor's Profit & O
20.00 Percent
Total

0.00
24.00

Sft.

0.00 Per Sft.

0.00
0.00
0.00
0.00

LABOUR
Same as per item No. 41 a (i)

0.01

Total

0.01

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

-0.05
0.00

Say
Say

0.00
0.00

Page 47

41

a (ivUsing 4 mm thick glass panes

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
Rate Analysis for 6' x 4'

Amount

24 Sft.

MATERIAL
1
2

Same as per item No: 41 (a)


excluding cost of glass
Cost of 4 mm thick glass
Total
Contractor's Profit & O
Total

20.00

0.00
24.00

Sft.

0.00 Per Sft.

0.00
0.00
0.00
0.00

Percent

LABOUR
Same as per item No. 41 a (i)

0.01

Total

0.01

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 48

41

a (v Using 5 mm thick glass panes

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 6'x4' = 24 Sft.


MATERIAL
1
2

Same as per item No: 40 (a)


excluding cost of glass
Cost of 5 mm thick glass panes
Total
Contractor's Profit & O
Total

20.00

0.00
24.00

Sft.

0.00 Per Sft.

0.00
0.00
0.00
0.00

Percent

LABOUR
Same as per item No. 40 a(i)

0.01

Total

0.01

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

-0.05
0.00

Say
Say

0.00
0.00

Page 49

41

- b Fixed with Wire Gauze 22 SWG.

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
Rate Analysis for 6' x 4'

Amount

24 Sft.

MATERIAL
1

Beam section 1"1"x5/8"1/8"


Horizontal 2x6
Vertical 5x4
Total
Wastage 5%
Total
Z-section "x1"x"x1/8"
Horizontal 8'x1-5"
Vertical 8x3'-11"
Total
Wastage 5%
Total
T-section 1"x1"x1/8"
Horizontal 8x1-5"
Add 5% wastage

Wire gauze 24x12 mesh


1x6'x4'
Add wastage 5%
Total

12.00 Rft
20.00 Rft.
32.00 Rft.
1.60 Rft.
33.60 Rft.
@ 1.22
18.60

Kg.

0.00

Kg

0.00

11.67 Rft.
31.67 Rft.
43.33 Rft.
2.16 Rft.
45.49 Rft.
@ 0.96
19.81

Kg.

0.00

Per Kg.

0.00

11.66 Rft.
0.59 Rft.
12.25 Rft.
@ 0798
4.44

Kg.

0.00

Per Kg.

0.00

24.00 Sft.
2.40 Sft.
26.40
26.40

Sft.

0.00 Per Sft.

0.00

Flat Iron 3/4"x1/8"


Horizontal 2x6
Vertical 5x3 1/8"

12 Rft.
15.625 Rft.
Total
27.625 Rft.
Add 5% wastage
1.381 Rft
Total
29.006 Rft.
@ 0.32
4.21
Machine screws "x3/16" (3" apart for fixing
wire gauze)
Horizontal 2x6x12/3
48 Nos
Vertical 5x4x12/3
80 Nos
Total
128 No
13.00

Kg.

0.00

Per Kg.

0.00

Dozen

0.00

Dozen

0.00

Iron holdfast

Nos.

0.00

Each

0.00

6.00

Page 50

Window hinges 1/4" thick with 5/16" dia

8.00

Nos

0.00

Each

0.00

Mild steel casement handles 6" with screwing


flat & catching hook 4 Nos. @ Rs. 4.00 each

4.00

Nos.

0.00

Each

0.00

10

Mild steel casement, 15" long with gap flat an


catch pins

4.00

Nos.

0.00

Each

0.00

11

Wooden screeds to form the glass panes

68.00

Rft.

0.00 Per Rft.

0.00

12

96 Nos steel glazing clips for fixing glass pa


in position before applying putty

96.00

Nos.

0.00

0.00

Total

Each

0.00

Page 51

41 - b ( Using

glass panes 2 mm thick

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty
Rate Analysis for 6' x 4' = 24

Amount

Sft.

MATERIAL
1
2

Same as per item No. 41 (b)


glass.
2 mm thick glass panes
Total
Contractor's Profit & O
Total

excluding cost of

20.00

0.00
24.00

Sft.

0.00

Per Sft.

240.00
240.00
48.00
288.00

Percent

LABOUR
1

Labour for fabrication, welding & fixing


fixture 42 welds for 24 Sft.

42.00

welds

0.00 per weld

0.00

Labour for fixing 12 Nos. Glass panes in


position by making 128 No. holes & fixing
128 Nos screws

24.00

Sft.

0.00

0.00

Labour for fixing 12 No. glass panes in


position by fixing 96 Nos. glazing clips in position
and then fixing wooden strips with screws
24.00

Sft.

0.00 Per Sft.

0.00

0.00

0.00

0.00 Per Sft.

0.00

Labour for fixing in position

Painting with black Japan paint i/c cost of pa

Carriage to site of work


Total
Sundries
Total
Contractor's Profit & O
Total

24.00

Sft.

P.Sft

L.S

0.00
0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate per Sft
Composite Rate/Sft.
Labour Rate per Sq.m
Composite Rate Sq.m

Page 52

Rs.
Rs.

0.00
11.95

Say
Say

0.00
11.95

Rs.
Rs.

-0.05
128.88

Say
Say

0.00
128.90

41 - b ( Using 2.5 mm thick glass panes

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 6'x4' = 24 Sft.


MATERIAL
1
2

Same as per item No. 41 (b)


glass.
2.5 mm thick glass panes
Total
Contractor's Profit & O
Total

excluding cost of

20.00

0.00
24

Sft.

0.00 Per Sft.

0.00
0.00
0.00
0.00

Percent

LABOUR
1

Labour for fabrication, welding & fixing


fixture, 42 welds for 24 Sft.

Labour for fixing 12 Nos. Glass panes in


position by making 128 No. holes & fixing
128 Nos screws

Labour for fixing 12 No. glass panes in


position by fixing 96 Nos. glazing clips in po
and then fixing wooden strips with screws
@ Rs. 0.75 per Sft.

Labour for fixing in position

Painting with black Japan paint i/c cost of pa

Carriage to site of work


Total
Sundries
10.00 Percent
Total
Contractor's Profit & O
20.00 Percent
Total

42.00

welds

0.00 per weld

0.00

24.00

Sft.

0.00 Per Sft.

0.00

24.00

Sft.

0.00 Per Sft.

0.00

0.00

0.00

0.00 per Sft/

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00

24.00

Sft.

L.S.

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
-0.05

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

-0.05
-0.24

Say
Say

0.00
-0.20

Page 53

41 - b ( Using 3 mm thick glass panes

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 6'x4' = 24 Sft.


MATERIAL
1
2

Same as per item No. 41 (b)


glass.
3 mm thick glass panes
Total
Contractor's Profit & O
Total

excluding cost of

20.00

0.00
24.00

Sft.

0.00 Per Sft.

0.00
0.00
0.00
0.00

Percent

LABOUR
1

Labour for fabrication, welding & fixing


fixture, 42 welds for 24 Sft.

42.00

welds

0.00 per weld

0.00

Labour for fixing 12 Nos. Glass panes in


position by making 128 No. holes & fixing
128 Nos screws

24.00

Sft.

0.00 Per Sft.

0.00

Labour for fixing 12 No. glass panes in


24.00
position by fixing 96 Nos. glazing clips in position
and then fixing wooden strips with screws
@ Rs. 0.75 per Sft.

Sft.

0.00 Per Sft.

0.00

Labour for fixing in position

0.00

0.00

Painting with black Japan paint i/c cost of pa

0.00 Per Sft.

0.00

Carriage to site of work


Total
Sundries
10.00 Percent
Total
Contractor's Profit & O
20.00 Percent
Total

0.00

0.00
0.00
0.00
0.00
0.00
0.00

24.00

Sft,

L.S.

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
-0.05

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

-0.05
-0.29

Say
Say

0.00
-0.20

Page 54

41 - b ( Using 4 mm thick glass panes

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 6'x4' = 24 Sft.


MATERIAL
1
2

Same as per item No. 41 (b)


glass.
4 mm thick glass panes
Total
Contractor's Profit & O
Total

excluding cost of

20.00

0.00
24.00

Sft.

0.00 Per Sft.

0.00
0.00
0.00
0.00

Percent

LABOUR
1

Labour for fabrication, welding & fixing


fixture 42 welds for 24 Sft.

42.00

Weld

0.00 per weld

0.00

Labour for fixing 12 Nos. Glass panes in


position by making 128 No. holes & fixing
128 Nos screws

24.00

Sft

0.00 Per Sft.

0.00

Labour for fixing 12 No glass panes in


24.00
position by fixing 96 Nos. glazing clips in position
and then fixing wooden strips with screws
@ Rs. 0.75 per Sft.

Sft.

0.00 Per Sft.

0.00

Labour for fixing in position

0.00

0.00

Painting with black Japan paint i/c cost of pa

0.00 Per Sft.

0.00

Carriage to site of work

0.00

0.00

Total
Sundries
Total
Contractor's Profit & O
Total

24.00

Sft.

L.S.

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
-0.05

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

-0.05
-0.24

Say
Say

0.00
-0.20

Page 55

41 - b (vUsing 5 mm thick glass panes

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 6'x4' = 24 Sft.


MATERIAL
1
2

Same as per item No. 41 (b)


glass.
5 mm thick glass panes
Total
Contractor's Profit & O
Total

excluding cost of

20.00

0.00
24.00

Sft.

0.00 Per Sft.

0.00
0.00
0.00
0.00

Percent

LABOUR
1

Labour for fabrication, welding & fixing


fixture, 42 welds for 24 Sft.

42.00

Weld

0.00 per weld

0.00

Labour for fixing 12 Nos. Glass panes in


position by making 128 No. holes & fixing
128 Nos screws

24.00

Sft

0.00 Per Sft.

0.00

Labour for fixing 12 No glass panes in


24.00
position by fixing 96 Nos. glazing clips in position
and then fixing wooden strips with screws

Sft.

0.00 Per Sft.

0.00

Labour for fixing in position

0.00

0.00

Painting with black Japan paint i/c cost of pa

0.00 Per Sft.

0.00

Carriage to site of work

0.00

0.00

Total
Sundries
Total
Contractor's Profit & O
Total

24.00

Sft.

L.S.

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
-0.05

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

-0.05
-0.29

Say
Say

0.00
-0.20

Page 56

42.

Providing and fixing steel windows using M.S. sheet (16 SWG) moulded tubuler pipe
1"x1" for frame and 1"x1" for leaves including M.S. Square bars "x" welded around
each panel of frame, 5 mm thick glass panes fixed with double M.S. square tubular pipe
3/8"x3/8" (22 SWG) beading with 'U' shapped rubber lining, brass fitting, holdfast,
including painting three coats complete in all respects.

a)

For openable pannels fixed with wire gauze 24 SWG, 12x12 mesh and glass panes 5 mm
thick

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 6'x6'=36 Sft.


MATERIAL
1
M.S. moulded tubular pipe of 18 SWG
1"x1"
a)
Beam for frame
Horizontal 3x6'
Vertical 4x5'-7"

18.00 Rft.
22.50 Rft.
40.50 Rft.
Wastage 5%
2.02 Rft.
42.52
19.29
42.52 Rft. @ 1 lb/Rft.
b)
Beams for openable pannels 1"x1 "
Upper Portion
i) Horizontal 2x3 x(1'-10")
11.00 Rft.
ii) Vertical 3x2 x(1'-1")
7.00 Rft.
Lower Portion
ii) Horizontal 2x3x (1'-10")
iv) Vertical 3x2 x (4'-1")

c)

Hold fast 3x2 (0-6")


Add 5% wastage

Kg.

0.00

Per Kg.

0.00

Kg.

0.00

Per Kg.

0.00

Kg.

0.00

Per Kg.

0.00

11.00 Rft.
24.25 Rft.
3.00 Rft.
56.25 Rft.
2.81 Rft.
59.06
22.51

@ 0.84 lb/ft.
2
M.S. square beading 3/8"x3/8" tubuler pipe all
around the glass pannels
Upper Portion
i) Horizontal 2x3x (1'-7")
9.75 Rft.
ii) Vertical 3x2 x (1'-1")
6.62 Rft.
Lower Portion
ii) Horizontal 2x3 x(1'-7")
iv) Vertical 3x2 x (3'-11")
For both sides 50x2 =
Add 5% wastage
@ 0.478 lb/ft.
3

9.75 Rft.
23.87 Rft.
50.00 Rft.
100 Rft.
5 Rft.
22.77
105 Rf

M.S. square bars "x" fixed all around each


panes.

Page 57

a)

Upper Portion
i) Horizontal 2x3x (1'-10")
ii) Vertical 3x2 x (1'-4")

b)
iii) Horizontal

Lower Portion
2x3x (1'-10")

iv) Vertical 3x2 x (4'-2")


Add 5% wastage
@ 0.213 lb/ft.
4

Brass hinges (4" long)

Brass Handles (4" long)

5 mm thick glass
3x(1'-7")x(4'-1")
3x(1-7")x(1'-2")
Add 5% wastage

11.00 Rft.
8.00 Rft.

11.00 Rft.
25.25 Rft.
55.25 Rft.
2.76 Rft.
58.00
5.61

Kg.

0.00

Per Kg.

0.00

12.00

Nos.

0.00

Each

0.00

3.00

Nos.

0.00

Each

0.00

19.70 Sft.
5.68 Sft.
25.38 Sft.
1.25 Sft.
26.63
26.63

Sft.

0.00 Per Sft.

0.00

U' shapped rubber linning (" thick) single


quality as in item No. 2

50.00

Rft.

0.00per Per Rft

0.00

24 SWG (12x12) mesh wire gauze galvanized

36.00

Sft.

0.00 Per Sft.

0.00

Screws

15.00

Dozen

0.00 per Dozen

0.00

10

M.S. flat 3/4"x1/8" for fixing wire gauze


5x6'
30.00
4x5'-8"
22.75
52.75
Add 5% wastage
2.63
55.38
@0.318
Painting 3 costs
Total
Contractor's Profit & O
20.00 Percent
Total

Kg.

0.00per Per Kg.

0.00

gln

0.00

per gln

0.00
0.00
0.00
0.00

0.00
0.00
120.00
0.00
0.00
0.00

per day
per day
per day

0.00
0.00
60.00
0.00
0.00
0.00

11

LABOUR
1
2
3
4
5
6

Black smith
Welder
Welding machine on hire basis
Electric charges with electrode
Painter
Glazier
Total
Sundries
10.00 Percent
Total
20.00 Percent
Contractor's Profit & O
Total
ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rft.
Rft.
Rft.
Rft.
7.99
lb/ft.
0.50

0.50
No.
0.50
No.
0.50 No./day
L.S
0.34
No.
0.50
No.

per day
per day

0.00
0.00
0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Page 58

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

42.
b)

For fixed pannels without wire gauze

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 6'x6' = 36 Sft.


MATERIAL
1
M.S. moulded tubular pipe of 16 SWG 1"x1"
a)
Beam for frame
1 . Horizontal 3x6
18.00 Rft.
2 . Vertical 4x5'-7"
22.50 Rft.
3 . Holdfast 3x2x0.5
3.00 Rft.
43.50 Rft.
Wastage 5%
2.17 Rft.
45.67 Rft.
45.67 Rft. @ 1.33 lb/Rft. = 60.74 lbs = 27.56
27.56
2
M.S. square beading of 3/8"x3/8" (22 SWG)
tubular pipe all around the glass pannels
Upper Portion
i) Horizontal 2x3 (1'-10")
11.00 Rft.
ii) Vertical 3x2 (1'-3")
7.85 Rft.

Kg.

0.00

Kg.

0.00per Per Kg.

0.00

Sft.
Sft.
Sft.
32.48

Sft.

0.00 Per Sft.

0.00

Say 32.48 Sft.


U-shapped rubber lining (" thick single
quantity as per item No. 2

55.00

Rft.

0.00per Per Rft

0.00

Screws (25 mm) for fixing

15.00

Dozen

0.00 per dozen

0.00

Painting 3 coats

0.25

gln

0.00

0.00

Lower Portion
ii) Horizontal 2x3 (1'-10")
iv) Vertical 3x2 (4'-2")
Total

110.00
5.50
115.50

@ 0.145 lb/Rft.
5 mm thick glass
Upper Portion
3(1'-4") (1'-10")
Lower Portion
3(4'-3") (1'-10")

20.00

Rft.
Rft.
7.60

7.56 Sft.
23.375
30.935
1.54
32.475

Add 5% wastage

Total
Contractor's Profit & O
Total

0.00

11.00 Rft.
25.12 Rft.
55 Rft.

For both sides 55x2 =


Add 5% wastage

Per Kg.

per gln

0.00
0.00
0.00

Percent

LABOUR
1
2
3

Black smith
Welder
Welding machine on hire basis

Page 59

0.50
0.50
0.50

No.
No.

0.00
0.00
120.00

per day
per day

0.00
0.00
60.00

4
5
6

Electric charges with electrodes


Painter
Glazier
Total
Sundries
10.00 Percent
Total
Contractor's Profit & O
20.00 Percent
Total

0.25
0.50

No.
No.

0.00
0.00

L.S.
per day
per day

0.00
0.00
0.00
0.00
0.00
0.00
0.00

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 60

43.

Providing and fixing windows consisting of M.S. Box section frame 2"x1", leaves frame
1-"x1" Box section frame for glazing 3/8"x3/8" using 16 SWG sheet 'U' shaped rubber
supported with 1"x1/8" M.S. flat for fixing 5 mm thick glass panes M.S. box section frame
"x" of 16 SWG for fixing 24 SWG wire gauze on outer side by means of "x1/8" M.S. flat
and screws I/C all C.P. fitting and painting 3 coats complete in all respect.

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Ananysis for 6'x4' = 24 Sft.


MATERIAL
1

M.S. box section frame 1"x2" 16 SWG for


chowkat.
Vertical
2x6'
central side 1x5'
Horizontal wall top
bottom 2x4'
Central
2x1'-13/16

12.00 Rft.
5.75 Rft.

Total
Add 5% wastage

Total
@ 1.55 lb/ft.
M.S. box section for leaf 1'-1"x1" of 16 SWG
Vertical
Horizontal

2x2x4-'
2x2x1 - 3/16'

Leaf for fixed light


Vertical
2x2x1-3/8'
Horizontal 2x2x1-13/16'
Add 5% wastage

Kg.

0.00

Per Kg.

0.00

5.50 Rft.
7.25 Rft.
37.00 Rft.
1.85 Rft.
38.85
19.74

Kg.

0.00

Per Kg.

0.00

17.00
7.25
5.50
7.25
37.00
1.85
38.85

Kg.

0.00

Per Kg.

0.00

Kg.

0.00

Per Kg.

0.00

17.00
7.25
24.25

Rft.
Rft.
Rft.

Total
@ 1.12 lb/Rft.
M.S. Box section 3/8"x3/8" of 16 SWG for glazing.
for leave
2x2x4-'
Horizontal 2x2x1-13/16
Fan light 2x2x1'-3/8
2x2x1'-13/16
Total
Add 5% wastage

8.00 Rft.
3.63 Rft.
29.375 Rft.
1.468 Rft.
30.343
21.34

Rft.
Rft.
Rft.
Rft.
Rft.
Rft.

5.82
@ 0.33 lb/Rft.
M.S. box section "x" of 16 SWG for fixing wire
gauze
for leave
2x2x4'-
17.00 Rft.
2x2x1'-13/16
7.25 Rft.
for fan light 2x2x1'-3/6
5.50 Rft.
2x2x1'-13/16
7.25 Rft.
Total
37.00 Rft.
Add 5% wastage
1.85 Rft.
Total
38.85
7.93
@ 0.45 lb/Rft.
M.S. flat 1"x1/8" for fixing glazing.
for leaves
2x2x4-'
17.00 Rft.
2x2x1'-13/16
7.25 Rft.
for fixed glazing 2x2x1'-3/8
5.50 Rft.
2x2x1'-13/16
7.25 Rft.
Total
37.00 Rft.
Page
Add 5% wastage
1.8561 Rft.

Total
@ 0.424 lb/ft.
M.S. flat for wire gauze "x1/8"
side
2x6'
central 2x6'
horizontal 2x4x1'-13/16

38.85

Add 5% wastage

10

Total
@ 0.318 lb/ft.
Holdfast of angle iron (1-"x1")x1/8"
6x' = 4.50 Rft.
@ 1.27 lb/Rft.
G.I. wire gauze 24 SWG 12x12 meshes
2x4-'x1-13/16'
2x1-3/8'x1-13/16'
Total
Add 10% wastage

Glazing with glass panes 5 mm thick


2x4-1/6'x1-'
2x1-1/3'x1-3/4'
Total
Add 10% wastage

U' shape rubber


2x2x4-'
2x2x1-13/16'
2x2x1-3/8'
2x2x1-13/16'
Total
Add 10% wastage
Total

7.47

Kg.

0.00per Per Kg.

0.00

12.00 Rft.
12.00 Rft.
14.50 Rft.
38.50 Rft.
1.93 Rft.
40.43
5.83

kg.

0.00

Per Kg.

0.00

2.59

Kg.

0.00

Per Kg.

0.00

15.40
4.98
20.38
2.04
22.42

Sft.
Sft.
Sft.
Sft.
22.42

Sft.

0.00 Per Sft.

0.00

14.52
4.66
19.18
1.92
21.10

Sft.
Sft.
Sft.
Sft.
21.10

Sft.

0.00 Per Sft.

0.00

17.00 Rft.
7.25 Rft.
5.50 Rft.
7.25 Rft.
37.00 Rft.
3.70 Rft.
40.70
40.70

Rft.

0.00 Per Rft.

0.00

91.00

Nos.

0.00 per dozen

0.00

11

Machine screws

12

M.S. hinges special type 3x2 (100 mm long)

6.00

Nos.

0.00

Each

0.00

13

C.P. tower bolt

2.00

Nos.

0.00

Each

0.00

14

Brass handle special type

2.00

Nos.

0.00

Each

0.00

15

G.I. stay

2.00

Nos.

0.00

Each

0.00

16

PCC 1:2:4 for fixing holdfast

64.00

L.S.

64.00

17

Paint

(225 mm long)

Total
Contractor's Profit & O
Total

0.50

20.00

gln

0.00

per gln

Percent

0.00

0.00
0.00

LABOUR
1
2
3
4

Black smith
Welder
Welding machine on hire basis for day
Electrode
Page 62

0.34
0.34
0.34

No.
No.
day

0.00
0.00
0.00

per day
per day
per day
L.S

0.00
0.00
0.00

5
6

Fixer (glass panes)


Painter

(Glazier)

Total
Sundries
Total
Contractor's Profit & O
Total

0.50
0.25

No.
No.

0.00
0.00

per day
per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

Page 63

0.00

Say
Say

0.00
0.00

Say
Say

0.00
0.00

44.

Providing and fixing windows consisting of M.S. Box section frames 2"1" leaves frame
1"1" box section frame for glazing 3/8"x3/8" using 16 SWG sheet 'U' shaped rubber
supported with 1"x1/8" M.S. flat for fixing 5 mm thick glass panes M.S. box section frame
"x" of 16 SWG for fixing 24 SWG wire gauze on outer side by means of "x1/8" M.S. flat
and screws including grill of M.S. flat "x1/8" or "x" square bar with independent frame
of "x" box section of 16 SWG i/c all C.P. fitting and painting 3 coats complete in all
respect.

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 6'x4' = 24 Sft.


MATERIAL
1

M.S. box section frame 1"x2" 16 SWG for


chowkat.
Vertical side
2x6'
central side 1x5'-
Horizontal top
bottom 2x4'
Central
2x1'-13/16

12.00 Rft.
5.75 Rft.

Total
Add 5% wastae

Total
@ 1.55 lb/ft.
M.S. box section for leaf 1"x1" of 16 SWG
Vertical
Horizontal

2x2x4'-
2x2x1 - 13/16'

Leaf for fixed light


Vertical
2x2x1-3/8'
Horizontal 2x2x1'-13/16
Add 5% wastage

Kg.

0.00per Per Kg.

0.00

5.50 Rft.
7.25 Rft.
37.00 Rft.
1.85 Rft.
38.85
19.74

Kg.

0.00per Per Kg.

0.00

17.00
7.25
5.50
7.25
37.85
1.85
38.85

5.82

Kg.

0.00per Per Kg.

0.00

7.93

Kg.

0.00per Per Kg.

0.00

17.00
7.25
24.25

Rft.
Rft.
Rft.

Total
@ 1.12 lb/Rft.
M.S. Box section 3/8"x3/8" of 16 SWG for glazing.
for leaves
2x2x4'-
Horizontal 2x2x1'-13/16
Fan light 2x2x1'-3/8
2x2x1'-13/16
Total
Add 5% wastage

8.00 Rft.
3.63 Rft.
29.375 Rft.
1.468 Rft.
30.343
21.34

@ 0.33 lb/Rft.
M.S. box section "x" of 16 SWG for fixing
wire gauge
for leaves
2x2x4-'
17.00
2x2x1'-13/16
7.25
for fan light 2x2x1'-3/6
5.50
2x2x1'-13/16
7.25
Total
37.00
Add 5% wastage
1.85
Total
38.85
@ 0.45 lb/ft.
Page 64

Rft.
Rft.
Rft.
Rft.
Rft.
Rft.

Rft.
Rft.
Rft.
Rft.
Rft.
Rft.

M.S. flat 1"x1/8" for fixing glazing.


for leave
2x2x4'-
2x2x1'-13/16
for fixed glazing 2x2x1'-3/8
2x2x1'-13/16
Total
Add 5% wastage
Total
@ 0.424 lb/ft.
M.S. flat for wire gauze "x1/8"
side
2x6'
central 2x6'
horizontal 2x4x1'-13/16
Add 5% wastage
Total
@

0.318

17.00
7.25
5.50
7.25
37.00
1.85
38.85

Rft.
Rft.
Rft.
Rft.
Rft.
Rft.
7.47

Kg.

0.00per Per Kg.

0.00

12.00 Rft.
12.00 Rft.
14.50 Rft.
38.50 Rft.
1.93 Rft.
40.43
5.83

Kg.

0.00per Per Kg.

0.00

0.00per Per Kg.

0.00

lb/ft.

Holdfast of angle iron 1-"x1"


6x = 4.50 Rft.

2.59

Kg.

Porividng fixing M.S. grill "x1/8" M.S. flat


frame without holdfast including painting
2x4 1/6'x1-3/16'
15.09 Sft.
2x1 1/16'x1 13/16'
3.84 Sft.
Total
18.93
18.93

Sft.

0.00 Per Sft.

0.00

10

G.I. wire gauge 24 SWG 12x12 meshes


2x4-'x1-13/16'
2x1-3/8x1-13/16
Total
Add 5% wastage

Glazing with glass panes 5 mm thick


2x4-1/6x1-
2x1-1/3x1-3/4
Total
Add 5% wastage

15.40
4.98
20.38
2.04
22.42

Sft.
Sft.
Sft.
Sft.
22.42

Sft.

0.00 Per Sft.

0.00

14.52
4.66
19.18
1.92
21.10

Sft.
Sft.
Sft.
Sft.
21.10

Sft.

0.00 Per Sft.

0.00

Page 65

11

U' shape rubber


2x2x4-'
2x2x1-13/16'
2x2x21-3/8
2x2x1-13/16
Total
Add 5% wastage
Total

17.00 Rft.
7.25 Rft.
5.50 Rft.
7.25 Rft.
37.00 Rft.
3.70 Rft.
40.70
40.70

Rft.

0.00per Per Rft

0.00

91.00

Nos.

0.00 per dozen

0.00

12

Machine screws

13

M.S. hinges special type 3x2 (100 mm long)

6.00

Nos.

0.00

Each

0.00

14

C.P. tower bolt (225 mm long)

2.00

Nos.

0.00

Each

0.00

15

Brass handle special type

2.00

Nos.

0.00

Each

0.00

16

G.I. stay

2.00

Nos.

0.00

Each

0.00

17

Cement
Sand
Bajri

18

Paint
Total
Contractor's Profit & O
Total

0.250 Cft.
0.60 Cft.
1.200
0.25

20.00

gln

0.00
P. Bag
0.00 Per % Cft.
200.00 100 Cft.
0.00

per gln

Percent

0.00
0.00
2.40
0.00

0.00
0.00

LABOUR
1
2
3
4
5
6

Black smith
Welder
Welding machine on hire basis for 1 day
Electrode
Fixer (glass panes) (Glazier)
Painter
Total
Sundries
Total
Contractor's Profit & O
Total

0.50
0.50
0.50
0.427
0.50
0.25

No.
No.
No.
No.
No.

0.00 per day


0.00 per day
0.00 per day
0.00 P. Bundle
0.00 per day
0.00 per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00
0.00
0.00
0.00
0.00

Percent

ITEM RATE
Labour Rate per Sft.
Composite Rate/Sft.

Rs.
Rs.

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

Page 66

0.00

Say
Say

0.00
0.00

Say
Say

0.00
0.00

45.

Flapping G.I. Pipes for bathroom drains

Detail

Unit Rate Per Each Job


Rate
Per Unit

Qty

Amount

Rate Analysis for Each Job


MATERIAL
1

Cost of flaps including hinges

Total
Contractor's Profit & O
Total

20.00

Each

0.00

Each

0.00

0.00
0.00
0.00

Percent

LABOUR
Fitter
Total
Sundries
Total
Contractor's Profit & O
Total

0.75

No.

0.00

Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00

Percent

ITEM RATE
Labour Rate / Each
Composite Rate/Each

Rs.
Rs.

Page 67

Say
Say

0.00
0.00

46.

Supply & Fixing iron grating for fire places

Detail

Unit Rate Per Sft.


Rate
Per Unit

Qty

Amount

Rate Analysis for Sft.


MATERIAL
1

Cost of grating
Total
Contractor's Profit & O
Total

1.00

20.00

Sft.

0.00 Per Sft.

0.00
0.00
0.00
0.00

Percent

LABOUR
1
2

Mason
Cololies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

0.10
0.05

Nos
Nos.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate /Sft.
Composite Rate per Sft.

Rs.
Rs.

Labour Rate per Sq.m


Composite Rate per Sq.m

Rs.
Rs.

Page 68

0.00
0.00

Say
Say

0.00
0.00

0.00

Say
Say

0.00
0.00

47.

Fixing Copper flashing, including cutting of sheets, grooving and rivetting.

Detail

Unit Rate Per Lft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 30 Lft.


LABOUR
1
2

Black Smith
Coolies (Unskilled)
Total
Sundries
Total
Contractor's Profit & O
Total

1.00
1.00

No.
No.

0.00
0.00

Per day
Per day

0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

0.00
0.00

Percent

ITEM RATE
Labour Rate /Lft.
Labour Rate Per Metre

Rs.
Rs.

Page 69

Say
Say

0.00
0.00

48.

Providing and fixing angle Iron railing, using 2"x2"x3/8" angle iron post 4 foot long, 5' to 6'
2"x2"x3/8" angle iron top rail and two rows of M.S. flat 2"x" including fixing to side of bri
structure with "U" bolt 1' long " dia, painting etc complete in all respects.

Detail

Unit Rate Per Rft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 24 Rft.


MATERIAL
1

Angle Iron post 2"x2"x3/8"


Vertical 5x4'
Horizontal 1x24

22.50 Rft.
24.00 Rft.
46.50 Rft.
2.33 Rft.
48.83
132.71
@ 5.99 lb/ft.

Wastage 5%
Total
2

M.S. flat 2"x"


Horizontal 2x 24
wastage 5%

0.00

Per Kg.

0.00

Kg.

0.00

Per Kg.

0.00

Nos.

0.00

Each

0.00

0.056

Litre

48.00 Rft.
2.40 Rft.
50.40
49.39
@ 2.16 lb/Rft.

1 ft. long M.S. U-Clamp 3/4" dia threaded at


both ends including nuts complete.

Paint for 2 coats


Total
Contractor's Profit & O
Total

Kg.

20.00

0.00 Per Litre

0.00
0.00
0.00
0.00

Percent

LABOUR
1
2
3
4

Welding 15 No . welds
Fitter
Coolies (Unskilled)
Painter
Total
Sundries
Total
Contractor's Profit & O
Total

15.00
0.375
1.50
0.125

Nos
No.
Nos.
No.

0.00 Per weld


0.00 Per day
0.00 per day
0.00 per day

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rs.
Rs.

Say
Say

0.00
0.00

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate /Rft.
Composite Rate/Rft.
Labour Rate per RM
Composite Rate per RM

Page 70

49.

Providing and fixing barbed wire fencing, consisting of 1"x1"3/16" angle iron post 3 ft.
long 5 to 6 ft. centre to centre embedded in cement concrete 1:4:8 base of size 9"x9"12"
and three rows of barbed wire painting posts etc complete in all respects.

Detail

Unit Rate Per 100 Rft.


Rate
Per Unit

Qty

Amount

Rate Analysis for 44 Rft.


MATERIAL
1

Angle Iron 1"x1"x3/16"


9 Nos.x 3.25'
Wastage 5%
Total
Cement Concrete 1:4:8
9x9"x9"x12"

29.25 Rft.
1.46 Rft.
30.71 Rft.
@ 1.84
25.64

Kg.

0.00

Per Kg.

0.00

5.06

Cft.

0.00

Cft.

0.00

132 .00 Rft


6.60 Rft.
138.6 Rft.
@ 1.25
6.52

Kg.

0.00

Kg

0.00

Nos.

0.00

per No.

0.00

5.06

Strained Barbed Wire 3 rows


3'x44
Wastage 5%

Painting small detached articles not


exceeding one Sft. of painted surface, 2 coats
Total
Contractor's Profit & O
Total

20.00

9.00

0.00
0.00
0.00

Percent Item 1 &3

LABOUR
1
2

Cement concrete (1:4:8)


Fixing barbed wire and angle iron
i) Black smith for wire and angle iron
ii) Coolies (Unskilled)
3
Painting small detached articles not exceeding
1 Sq.ft. area painted surface 2 coats
Total
Sundries
10.00 Percent
Total
Contractor's Profit & O
20.00 Percent
Total
ITEM RATE

5.06

Cft.

0.00 per Cft.

0.00

0.25
0.25
9

No.
No.
Nos.

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Labour Rate /100 Rft.


Composite Rate/100Rft.

Rs.
Rs.

Labour Rate per RM


Composite Rate per RM

Rs.
Rs.

Page 71

per day
per day
Each

0.00

Say
Say

0.00
0.00

Say
Say

0.00
0.00

50.

Providing and fixing barbed wire fencing on compound wall consisting of 1"x1"3/16"
angle iron post 3 ft. long 4 apart embedded in cement concrete 1:4:8 base of size 6"x6"x9"
and 4 rows of barbed wire , including binding wire, painting posts, etc. complete in all
respects.

Detail

Unit Rate Per 100 Rft.


Rate
Per Unit

Qty
Rate Analysis for 48

Amount

Rft.

MATERIAL
1

Angle Iron 1"x1"x3/16"


13 Nos.x 3'
Wastage 5%
Total
Cement Concrete 1:4:8
13"x6"x6"x9"

39.00 Rft.
3.90 Rft.
42.90 Rft.
@ 1.84
35.81

Kg.

0.00

Per Kg.

0.00

2.44

Cft.

0.00

Cft.

0.00

192 .00 Rft


9.60 Rft.
201.60 Rft.
@ 1.25
9.49

Kg.

0.00

Per Kg.

0.00

Nos.

0.00

per No.

0.00

2.44

Strained Barbed Wire 4 rows


4'x48
Wastage 5%

Painting small detached articles not


exceeding one Sft. of painted surface, 2 coats

Total
Contractor's Profit & O
Total

20.00

13.00

0.00
0.00
0.00

Percent 0.00

LABOUR
1
2

Cement concrete (1:4:8)


Fixing angle iron and barbed wire fencing
i) Black smith
ii) Coolies
3
Painting small detached articles not exceeding
1 Sq.ft. area painting surface 2 coats
Total
Sundries
10.00 Percent
Total
Contractor's Profit & O
20.00 Percent
Total
Say
ITEM RATE

2.44

Cft.

0.00 per Cft.

0.00

0.70
0.75
13

No.
No.
Nos.

0.00
0.00
0.00

0.00
0.00
0.00

per day
per day
Each

0.00
0.00
0.00
0.00
0.00
0.00

Labour Rate /100 Rft.


Composite Rate/100Rft.

Rs.
Rs.

Say
Say

0.00
0.00

Labour Rate per RM


Composite Rate per RM

Rs.
Rs.

Say
Say

0.00
0.00

Page 72

51

Providing and fixing all types of partly fixed and partly openable glazed anodized bronze colour a
delux section of M/s. Al-Cop or Pakistan cables boring showkhat frame of size 40mm x 100mm and lea
x 40mm wide sections i/c the cos tof 5mm thick imported tinted glass with aluminium triangular gol
to support the glass and leaf edgings using approved standard fittings, locks, 3" wide long handle
required as approved by the engineer inchrage (Follow Note Below).

Detail
Qty

Unit Rate Per 100 Rft.


Rate
Per Unit

MATERIAL
a)

Amount
3

1.6 mm thick
Unit = 4 x 10

40 Sft.
7

Cost of Material

4'x1"

i) Chowkhat Frame
13"x6"x6"x9"

40mm x 100 mm
4'-0

3 x 4
=
2 x 10 =
1 x 3
Total
Add Wastage 10%
Total

12.00
20.00
3.00
35.00
3.50
38.50

Rft.
Rft.
Rft.
Rft.

27.00
5.50
32.50
3.25
35.75

Rft.
Rft.
Rft.

28.00
8.00
36.00
1.80
37.80

Rft.
Rft.
Rft.

Rft.

0.00

Rft

0.00

0.00

per No.

0.00

Rft.

0.00

per No.

0.00

40.00

Sft.

0.00

Sft.

0.00

20.00
28.00
5.50
53.50
5.35
58.85

Rft.
Rft.
Rft.
Rft.
0.00

per No.

0.00

ii) Leaf Frames Section


40mm x 60mm (1" 2")
4 x 6.75 =
2x2x1.375 =
Total
Add Wastage 10%
Total

Rft.

iii) Leaf Edging


4 x 7
2 x 4

=
=

Total
Add Wastage 5%
Total
iv) Imported tinted glass 5 mm
4 x 10

v) Aluminum tringular gola and gasket


to 4 (2 + 3) =
Leaver 4 x 7 =
4 x 1.375
=
Total
Add Wastage 10%
Total
Page 73

Rft.

vi) Pivots

4.00

vii) Cost of Hardwares

Nos.

0.00

Each

L.S

viii) Long Handle 4 x 2 =


ix) Lock
x) Aluminium tower bolts

0.00
8.00

Rft.

0.00

Rft.

0.00

1.00

No.

0.00

Each

0.00

2.00

Nos.

0.00

Each

0.00

Total
B)

0.00

0.00

Labour
a) Labour Charges
For Manuracturing and Fabrication
Aluminium Technician
Carriage Cooly
Carriage Charges

2.00
3.00

b) Labour for Fixing the Glass Panes


Total
Sundries
Total
Contractor's Profit & O
Total

40.00

Nos.
Nos.
L.S.

0.00
0.00

per day
per day

0.00
0.00
0.00

Sft.

0.00

Sft.

0.00
0.00
0.00
0.00
0.00
0.00

10.00 Percent
20.00

Percent

ITEM RATE
Labour Rate /100 Rft.

Rs.

Say

0.00

Composite Rate per RM

Rs.

0.00

Say

0.00

Note :
i) Increase rate by 20/- P. Sft,. If sections will be of 2mm thickness
ii) Reduce rate by 20/- P. Sft. If sections will be of dull aluminium shade
iii) Reduce rate by 20/- P. Sft if using local pain glass

Page 74

ANALYSIS OF RATE
IRON WORK
52 Providing and fixing all types of glazed aluminium windows of anodized bronze colour partly fixed and
party sliding using deluxe section of M/s. Al-Cop or Pakistan Cables having Frame of size 100mm x
20mm and leaf frame sections of 50mm x 20mm, all of 1.6mm thickness i/c 5mm thick imported
tinted glass with rubber gasket using approved standard latches, hardware etc., as approved by the
engineer incharge.

Unit = 6 x 4.50 = 27.00 Sft.

4'

6'-0
(A)

COST OF MATERIAL
a)

Frame 100mm x 20mm (4" x ")


2x6 =
2 x 4.50 =

12.00
9.00
21.00
2.10
23.10

Total
Wastage 10%
Total

Rft.
Rft.
Rft.
Rft.
Rft.

@ Rs. 60/b)

Rs.

Leaf frame sections 50mm x 20mm (2" x ")


4x4 =
2x6 =

12.00
12.00
24.00
2.40
26.40

Total
Wastage 10%
Total
@ Rs.
c)

Rft.
Rft.
Rft.
Rft.
Rft.
Rs.

Rubber gasket
4x4 =
2 x 5.25 =

16.00
10.50
26.50
2.65
29.15

Total
Wastage 10%
Total
@ Rs.

B/F
d)

Cost of hardwares

e)

Latches of matching
shade

f)

L.S

Imported tinted glass Page 75

1 No.

Rft.
Rft.
Rft.
Rft.
Rft.
Rs.
Rs.

Rs.

Rs.

Rs.

6 x 4.50 = 27 Sft.
@ Rs.
g)

(B)

Rs.

Rs.
Rs.
Rs.
Rs.

2 Nos.

Rs.

3 Nos.

Rs.

Rs.
Rs.
Rs.
Rs.
Rs.
Rs.

Polistevene or polisulphide
for water tight
L.S
Total
Contractor's 20% Prof
Total

LABOUR
a)

For Manufacturing & Fabricating


Aluminium technician
@ Rs.
Cooly
@ Rs.

b)

Labour for fixing of glass panes


27 Sft. @ /Sft
Total
Sundries 10%
Total
Contractor's 20% Prof
Total

Notes :
i)
ii)
iii)

Reduce rate by
Reduce rate by
Reduce rate by

Labour Rate

P. Sft if sections will be of 1.2mm thickness.


P. Sft if dull sections of aluminium will be used.
P. Sft if local plain glass will be used.

P. Sft

P. Sft

P. Sft

27
Composite Rate =
27
Say Rs.

Page 76

S.No.
LB-001
LB-002
LB-003
LB-004
LB-005
LB-006
LB-007
LB-008
LB-009
LB-010
LB-011
LB-012
LB-013
LB-014
LB-015
LB-016
LB-017
LB-018
LB-019
LB-020
LB-021
LB-022
LB-023
LB-024
LB-025
LB-026
LB-027
LB-028
LB-029
LB-030
LB-031
LB-032
LB-033
LB-034
LB-035
LB-036
LB-037
LB-038
LB-039
LB-040
LB-041
LB-042
LB-043
LB-044
LB-045
LB-046
LB-047
LB-048
LB-049
LB-050
LB-051
LB-052
LB-053
LB-054
LB-055
LB-056
LB-057
LB-058

Labour
Chowkidar
Gate Keeper
Beldar
Boatman
Bullockman
Cartman
Camelman
Donkeyman
Greaser
Oiler
Punkha Cooly
Sweeper
Sewerman
White Washer
Cooly Un-skilled (all types)
Waherman
Bahishti
Chainman
Dresser Earthwork
Head Khalasi Survey
Hammar Man
Mali
Quarryman
Skilled Cooly
Tar Sprayer
Armature Winder
Auto Electric Mechanic
Blacksmith
Carpenter
Caner
Chiseler
Denter
Driller
Driver
Electrician
Furniture Polisher
Glazier
Instrument Machanic
Machine Man
Mason
Electric Motor Winder
Moulder
Mechanic
Pettern Maker
Pipe Fitter
Plumber
Spray Painter
Sawyer
Turner
Tailor
Tin Smith
Welder
Boatman with large boat
Boatman with small boat
Bullock (each) (without attendant)
Camel (each) (without attendant)
Donkey (each) (without attendant)
Bullock Cart (without bullock & attendant)
Page 1

UNIT
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day
Per day

RATE

LB-059
LB-060
LB-061
LB-062
LB-063
LB-064
LB-065
LB-066
LB-067
LB-068
LB-069
LB-070
LB-071
LB-072
LB-073
LB-074
LB-075
LB-076
LB-077
LB-078
LB-079
LB-080
LB-081
LB-082
LB-083
LB-084
LB-085
LB-086
LB-087
LB-088
LB-089
LB-090
LB-091
LB-092
LB-093
LB-094
LB-095
LB-096
LB-097
LB-098
LB-099
LB-100
LB-101
LB-102
LB-103
LB-104
LB-105
LB-106
LB-107
LB-108
LB-109
LB-110
LB-111
LB-112

Camel Cart (without bullock & attendant)


Donkey or Mule Cart (without animal & attendant)
Helper
Painter
Polisher
Foreman
Mate
Diggers
Kharkar
Belcha men
Gantiman (with pick axes)
Topalies (men with donkeys for carrying earth)
Langri (Cooks)
Dobashi (man for supervision)
Bullockman with pair of bullocks
Charkhara-man
Aluminum Technician
Riveted
Blowman
Crane operator
Hire charges of cart with Bullock & Bullock man
Diver Sinker
Ploughing Charges
Carriage Charges of RCC Pipe 4" (Class L)
Carriage Charges of RCC Pipe 6" (Class L)
Carriage Charges of RCC Pipe 9" (Class L)
Testing Charges of RCC Pipes 4" (Class L)
Testing Charges of RCC Pipes 6" (Class L)
Testing Charges of RCC Pipes 9" (Class L)
Carriage Charges of Non-reinforced Concrete Pipe 4"(Class I)
Carriage Charges of Non-reinforced Concrete Pipe 6"(Class I)
Carriage Charges of Non-reinforced Concrete Pipe 8"(Class I)
Carriage Charges of Non-reinforced Concrete Pipe 9"(Class I)
Carriage Charges of Non-reinforced Concrete Pipe 10"(Class I)
Testing Charges of Non-reinforced Concrete Pipe 4"(Class I)
Testing Charges of Non-reinforced Concrete Pipe 6"(Class I)
Testing Charges of Non-reinforced Concrete Pipe 8"(Class I)
Testing Charges of Non-reinforced Concrete Pipe 9"(Class I)
Testing Charges of Non-reinforced Concrete Pipe 10"(Class I)
Carriage Charges of RCC Pipe 12" (Class II, III & IV)
Carriage Charges of RCC Pipe 15" (Class II, III & IV)
Carriage Charges of RCC Pipe 18" (Class II, III & IV)
Carriage Charges of RCC Pipe 21" (Class II, III & IV)
Carriage Charges of RCC Pipe 24" (Class II, III & IV)
Carriage Charges of RCC Pipe 27" (Class II, III & IV)
Carriage Charges of RCC Pipe 30" (Class II, III & IV)
Carriage Charges of RCC Pipe 33" (Class II, III & IV)
Carriage Charges of RCC Pipe 36" (Class II, III & IV)
Carriage Charges of RCC Pipe 42" (Class II, III & IV)
Carriage Charges of RCC Pipe 48" (Class II, III & IV)
Carriage Charges of RCC Pipe 54" (Class II, III & IV)
Carriage Charges of RCC Pipe 60" (Class II, III & IV)
Carriage Charges of RCC Pipe 66" (Class II, III & IV)
Carriage Charges of RCC Pipe 72" (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 12"
LB-113 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 15"
LB-114 (Class II, III & IV)
Page 2

Per day
Per day
Per Day
Per day
Per day
Per day
Per day
Per day
P.Month
P.Month
P.Month
P.Month
P.Month
P.Month
P.Day
P.Day
Per Day
Per Day
Per Day
P.Day
Per Day
Per Day
P. Acre
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe

Carriage Charges of Non-reinforced Concrete Pipe 18"


LB-115 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 21"
LB-116 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 24"
LB-117 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 27"
LB-118 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 30"
LB-119 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 33"
LB-120 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 36"
LB-121 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 42"
LB-122 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 48"
LB-123 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 54"
LB-124 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 60"
LB-125 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 66"
LB-126 (Class II, III & IV)
Carriage Charges of Non-reinforced Concrete Pipe 72"
LB-127 (Class II, III & IV)

Page 3

Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe
Per Pipe

CHAPTER NO. 14

LINING OF CANAL
DESCRIPTION

OF

ITEM NO

1:

Formation, dressing and preparing sub-grade.


a)

In Bed.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Labour
Rate Analyses for 125 Sft
Dresser
Unskilled Cooly
Total
Sundries
Total

0.33 No
0.77 No

P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm

Rs.

Say

Rs.

Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 1

Item No.

Formation, dressing and preparing sub-grade.


b)

On Slope.
Unit Rate (British System) per 100 Sft

Detail

Qty

Labour
Rate Analyses for 125 Sft
Dresser
Unskilled Cooly

Total
Sundries
Total

0.50 No
1.00 No

Rate
Per Unit (Rs.)

P. Day
P. Day

Amount (Rs.)

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm

Rs.

Say

Rs.

Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 2

DESCRIPTION

OF

ITEM NO

2:

Stabilized layer of cement sand ratio 1:30 2"


(50mm) thick on slope.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand

0.50 Bag
18.00 Cft

P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Rate Analyses for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.50 No
1.50 No
0.50 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 3

DESCRIPTION

OF

ITEM NO

3:

a)

Cement plaster " (12mm) thick, ratio 1:10.

In Bed.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand

0.34 Bag
4.20 Cft

P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Rate Analyses for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.33 No
1.00 No
0.50 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 4

Item No.

Cement plaster " (12mm) thick, ratio 1:10.


b)

On Slope.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand

0.34 Bag
4.20 Cft

P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Rate Analyses for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.50 No
1.25 No
0.50 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 5

DESCRIPTION

OF

ITEM NO

4:

a)

Cement plaster 3/8"(10mm) thick,

ratio 1:3

In Bed.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand

0.70 Bag
2.50 Cft

P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Rate Analyses for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.33 No
1.00 No
0.50 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 6

Item No.

Cement plaster 3/8"(10mm) thick,


b)

ratio 1:3.

On Slope.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand

0.70 Bag
2.50 Cft

Each
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Rate Analyses for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.50 No
1.25 No
0.50 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 7

DESCRIPTION

OF

ITEM NO

5:

Cement plaster 1" (40mm) thick, ratio 1:6.

a)

In Bed.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand

1.56 Bag
11.70 Cft

P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.50 No
1.25 No
0.50 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 8

Item No.

Cement plaster 1" (40mm) thick, ratio 1:6.


b)

On Slope.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand

1.56 Bag
11.70 Cft

P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.75 No
1.50 No
0.50 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Sft
Labour Rate for 1 Sqm
Composite Rate for 100 Sft
Composite Rate for 1 Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 9

DESCRIPTION

OF

ITEM NO

6:

Tile lining (12"x6"x2") (300x150x50mm) in 1:6


cement sand mortar.
a)

In Bed.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Brick Tiles
Cement
Sand

Per
1000 Nos
P. Bag
Cft

###### Nos
3.44 Bag
25.70 Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

2.50 No
5.00 No
0.75 No

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying tiles over 1/8" (6mm) thick layer of 1:6 mortar items 1 to 5
above are payable separately.

Page 10

Item No.

Tile lining (12"x6"x2") (300x150x50mm) in 1:6


cement sand mortar.
b)

On Slope.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Brick Tiles
Cement
Sand

###### Nos
3.44 Bag
25.70 Cft

1000 Nos
P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

2.75 No
6.00 No
0.75 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying tiles over 1/8" (6mm) thick layer of 1:6 mortar items 1 to 5
above are payable separately.

Page 11

DESCRIPTION

OF

ITEM NO

7:

Tile lining (12"x6"x2") (300x150x50mm) in 1:3


cement sand mortar.
a)

In Bed.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Brick Tiles
Cement
Sand

###### Nos
6.00 Bag
22.50 Cft

1000 Nos
P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

2.50 No
5.00 No
0.75 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying tiles over 1/8" (6mm) thick layer of 1:3 mortar items
1 to 5 above are payable separately.

Page 12

Item No.

Tile lining (12"x6"x2") (300x150x50mm) in 1:3


cement sand mortar.
b)

On Slope.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Brick Tiles
Cement
Sand

###### Nos
6.00 Bag
22.50 Cft

1000 Nos
P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

2.75 No
6.00 No
0.75 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total
Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying tiles over 1/8" (6mm) thick layer of 1:3 mortar items
1 to 5 above are payable separately.

Page 13

DESCRIPTION

OF

ITEM

8:

Brick lining (9"x4"x3") (225x114x75mm) in


1:6 cement sand mortar.
a)

In Bed.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

###### Nos
3.44 Bags
25.70 Cft

1000 Nos
P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

2.50 No
5.00 No
0.75 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying bricks over 1/8" (6mm) thick layer of 1:6 mortar items
1 to 5 above are payable separately.

Page 14

Item No.

Brick lining (9"x4"x3") (225x114x75mm) in


1:6 cement sand mortar.
b)

On Slope.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

###### Nos
3.44 Bags
25.70 Cft

1000 Nos
P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

2.75 No
6.00 No
0.75 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying bricks over 1/8" (6mm) thick layer of 1:6 mortar items
1 to 5 above are payable separately.

Page 15

DESCRIPTION

OF

ITEM No

9:

Brick lining (9"x4"x3") (225x114x75mm) in


1:3 cement sand mortar.
a)

In Bed.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

###### Nos
6.00 Bags
22.50 Cft

1000 Nos
P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

2.50 No
5.00 No
0.75 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying bricks over 1/8" (6mm) thick layer of 1:3 mortar items
1 to 5 above are payable separately.

Page 16

Item No.

Brick lining (9"x4"x3") (225x114x75mm) in


1:3 cement sand mortar.
b)

On Slope.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

###### Nos
6.00 Bags
22.50 Cft

1000 Nos
P. Bag
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

2.75 No
6.00 No
0.75 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.
The rates are only for laying bricks over 1/8" (6mm) thick layer of 1:3 mortar items
1 to 5 above are payable separately.

Page 17

DESCRIPTION

OF

ITEM NO

10:

Cement concrete lining, using washed screened


and graded stone aggregate.
a)
i)

In Bed.
Ratio 1:2:4
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand
Aggregate

17.60 Bags
44.00 Cft
88.00 Cft

P. Bag
Cft
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.00 No
6.00 No
0.60 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 18

Item No.

10

Cement concrete lining, using washed screened


and graded stone aggregate.
a)
ii)

In Bed.
Ratio 1:3:6
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand
Aggregate

13.00 Bags
46.00 Cft
92.00 Cft

P. Bag
Cft
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.00 No
6.00 No
0.60 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 19

Item No.

10

Cement concrete lining, using washed screened


and graded stone aggregate.
a)
iii)

In Bed.
Ratio 1:4:8
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand
Aggregate

9.60 Bags
48.00 Cft
96.00 Cft

P. Bag
Cft
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.00 No
6.00 No
0.60 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 20

Item No.

10

Cement concrete lining, using washed screened


and graded stone aggregate.
b)
i)

On Slope.
Ratio 1:2:4
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand
Aggregate

17.60 Bags
44.00 Cft
88.00 Cft

P. Bag
Cft
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.25 No
7.00 No
0.50 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 21

Item No.

10

Cement concrete lining, using washed screened


and graded stone aggregate.
b)
ii)

On Slope.
Ratio 1:3:6
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand
Aggregate

13.00 Bags
46.00 Cft
92.00 Cft

P. Bag
Cft
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.25 No
7.00 No
0.50 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 22

Item No.

10

Cement concrete lining, using washed screened


and graded stone aggregate.
b)
iii)

On Slope.
Ratio 1:4:8
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand
Aggregate

9.60 Bags
48.00 Cft
96.00 Cft

P. Bag
Cft
Cft

Total
Contractor's Profit & Ov ## Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.25 No
7.00 No
0.50 No

P. Day
P. Day
P. Day

## Percent

Contractor's Profit & Ov ## Percent


Total

Item Rates
Labour Rate for 100 Cft
Labour Rate for 1 Cum
Composite Rate for 100 Cft
Composite Rate for 1 Cum

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

1 Rates for all finished work include the removal of surplus debris, unused material
and byproducts.
2 The rates include curing for specified period wherever necessary.
3 Nominal dimensions of tile or brick shall be taken for the purpose on measurement
& payments.

Page 23

CHAPTER NO. 2

LOADING UNLOADING AND STACKING


DESCRIPTION

OF

ITEM NO

1:

Loading or unloading into or from Railway


Wagons lead within one chain Shingle, sand,
ballast, surkhi ashes, kankar, brick bats, coal.
Lime or 1000 Nos. tiles size 12"x6"x2" or
9"x4"x1" properly laid and stacked.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 1250 Bricks


Labour
Unskilled Cooly
Total
Sundries
Total

1.00 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Cft

Rs.

0.00

Say

0.00

Labour Rate Per Cum

Rs.

0.00

Say

0.00

Page 1

DESCRIPTION

OF

ITEM NO

2:

Loading or unloading bricks into or from Railway


Wagons laid and stacked lead within one chain.

a)

Bricks

Detail

10" size.

Unit Rate (British System) per 1000 Nos


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 1250 Bricks


Labour
Unskilled Cooly
Total
Sundries
Total

1.25 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 1000 Nos

Rs.

Page 2

0.00

Say

0.00

Item No.

Loading or unloading bricks into or from Railway


Wagons laid and stacked lead within one chain.
b)

Bricks

Detail

9" or smaller size.

Unit Rate (British System) per 1000 Nos


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 1250 Bricks


Labour
Unskilled Cooly
Total
Sundries
Total

1.00 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 1000 Nos

Rs.

Page 3

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

3:

Loading or unloading into or from Railway


Wagons cement in bags (from inside or outside
the go-down) and stacking within one chain.

Detail

Unit Rate (British System) per 100 Bags


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Bags


Labour
Unskilled Cooly
Total
Sundries
Total

1.25 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Bags

Rs.

Page 4

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

4:

Loading or unloading into of from Railway


Wagons empty cement bags (from inside or
outside the go-down) and stacking.

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Nos.


Labour
Unskilled Cooly
Total
Sundries
Total

0.12 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 5

0.00
125

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

5:

Loading or unloading into or from Railway


Wagons (from inside or outside the go-down) and
stacking white lime in bags.

Detail

Unit Rate (British System) per 100 Mds


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Mds


Labour
Unskilled Cooly
Total
Sundries
Total

0.75 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Mds

Rs.

0.00

Say

0.00

Labour Rate Per 100 Kg

Rs.

0.00

Say

0.00

Page 6

DESCRIPTION

OF

ITEM NO

6:

Loading or unloading into or from Railway


Wagons structural steel, joists, broad, narrow or
meter gauge rail and rail fastening etc.

Detail

Unit Rate (British System) per Ton


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Ton


Labour
Unskilled Cooly
Total
Sundries
Total

0.60 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per Ton
Labour Rate per Tonne

Rs.
Rs.

Page 7

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION

OF

ITEM NO

7:

Loading or unloading 45 gallons drum full into


or from Railway Wagons lead upto one chain.

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Labour
Unskilled Cooly
Total
Sundries
Total

0.06 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per Each

Rs.

Page 8

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

8:

Loading or unloading packages or stock of all


sorts upto I cwt. except cement in jute or paper
bags.

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Labour
Unskilled Cooly
Total
Sundries
Total

0.03 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per Each No.

Rs.

Page 9

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

9:

Loading or unloading sleepers other than wooden


including stacking lead within one chan in.

a)

Broad gauge sleepers.

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Nos.


Labour
Unskilled Cooly
Total
Sundries
Total

2.50 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 10

0.00

Say

0.00

Item No.

Loading or unloading sleepers other than wooden


including stacking load within one chan in.
b)

Metre guage and narrow guage sleepers.

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Nos


Labour
Unskilled Cooly
Total
Sundries
Total

1.25 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 11

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

10:

Loading or unloading timber logs or timber for


shuttering into or from Railway Wagons of any
gauge including stacking, lead within one chain.

Detail

Unit Rate (British System) per Ton


Qty

Rate Analysis
Labour

for

20

Amount (Rs.)

Ton

Unskilled Cooly
Total
Sundries
Total

Rate
Per Unit (Rs.)

5.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per Ton

Rs.
Rs.

Per Tonne

Page 12

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION

OF

ITEM NO

11:

Loading or unloading bhoosa in Railway Wagons


lead upto 150 feet.

Detail

Unit Rate (British System) per 100 Mds


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Mds


Labour
Unskilled Cooly
Total
Sundries
Total

3.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Mds.

Rs.

0.00

Say

0.00

Labour Rate Per 100 Kg

Rs.

0.00

Say

0.00

Page 13

DESCRIPTION

OF

ITEM NO

12:

Loading or unloading timber scrap or wooden


plugs into or from Railway Wagons and stacking
within one chain lead.

Detail

Unit Rate (British System) per Ton


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 1.25 Ton


Labour
Unskilled Cooly
Total
Sundries
Total

0.50 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rs.
Rs.

Page 14

0.00

Say
Say

0.00
0.00

DESCRIPTION

OF

ITEM NO

13:

Loading or unloading pitching stone or spawl


from Railway Wagons of any gauge (including
clearing 5 feet away from the rail)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Cft.


Labour
Unskilled Cooly
Total
Sundries
Total

0.37 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Cft

Rs.

0.00

Say

0.00

Labour Rate Per Cum

Rs.

0.00

Say

0.00

Page 15

DESCRIPTION

OF

ITEM NO

14:

Loading or unloading building stone (including


clearing 5 feet away from rails)

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Cft.


Labour
Unskilled Cooly
Total
Sundries
Total

0.48 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Cft

Rs.

0.00

Say

0.00

Labour Rate Per Cum

Rs.

0.00

Say

0.00

Page 16

DESCRIPTION

OF

ITEM NO

15:

Unloading oil, bitumen tar etc.

a)

Crude oil (to be pumped from tank wagon, into


tank).

Detail

Unit Rate (British System) per 1000 Gln


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 1250 Gallons


Labour
Unskilled Cooly
Total
Sundries
Total

1.25 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 1000 Gln.

Rs.

0.00

Say

0.00

Labour Rate Per 100 Liters

Rs.

0.00

Say

0.00

Page 17

Item No.

15

Unloading oil, bitumen tar etc.


b)

Crude oil (drained by gravity).

Detail

Unit Rate (British System) per 1000 Gln


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 1250 Gallons


Labour
Unskilled Cooly
Total
Sundries
Total

1.25 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 1000 Gln.

Rs.

0.00

Say

0.00

Labour Rate Per 100 Liters

Rs.

0.00

Say

0.00

Page 18

Item No.

15

Unloading oil, bitumen tar etc.


c)

Crude oil materials from Railway Wagons.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Cft


Labour
Unskilled Cooly
Total
Sundries
Total

0.16 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Cft

Rs.

0.00

Say

0.00

Labour Rate Per Cum

Rs.

0.00

Say

0.00

Page 19

Item No.

15

Unloading oil, bitumen tar etc.


d)

Fuel oil from tank into empty drums and stacking


within one chain.

Detail

Unit Rate (British System) per Ton


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

45 Ton

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rs.
Rs.

Page 20

0.00
0.00

Say
Say

0.00
0.00

Item No.

15

Unloading oil, bitumen tar etc.


e)

Petrol (2 gallon tin)

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Nos


Labour
Unskilled Cooly
Total
Sundries
Total

0.63 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 21

0.00

Say

0.00

Item No.

15

Unloading oil, bitumen tar etc.


f)

Kerosine oil (4 gallons tin).

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Nos


Labour
Unskilled Cooly
Total
Sundries
Total

1.25 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 22

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

16:

Removing and stacking within one chain lead.

a)

Stones, Spawl, Brick Bats, shingle, sand, lime.


Surki, ashes, Kankar & Coal etc.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Cft


Labour
Unskilled Cooly
Total
Sundries
Total

0.50 No

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Cft

Rs.

0.00

Say

0.00

Labour Rate Per Cum

Rs.

0.00

Say

0.00

Page 23

Item No.

16

Removing and stacking within one chain lead.


b)

Bricks

Detail

Unit Rate (British System) per 1000 Nos


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

15,000 Nos

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 1000 Nos

Rs.

Page 24

0.00

Say

0.00

Item No.

16

Removing and stacking within one chain lead.


c)

Broad gauge wooden sleepers

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

2,500 Nos

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 25

0.00

Say

0.00

Item No.

16

Removing and stacking within one chain lead.


d)

Metre gauge or narrow gauge wooden sleepers.

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

4,200 Nos

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 26

0.00

Say

0.00

Item No.

16

Removing and stacking within one chain lead.


e)

Rails, girders, pipes, cement etc.

Detail

Unit Rate (British System) per Ton


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

90 Ton

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rs.
Rs.

Page 27

0.00

Say
Say

0.00
0.00

Item No.

16

Removing and stacking within one chain lead.


f)

Bridge and crossing timber etc.

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

750 Nos

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 28

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

17:

Loading into Wagons Girders, Rails, permanent


way material (except wooden sleepers) iron work,
M.S. Bars, Pipes, etc. including lead one chain
and stacking inside Wagons.

Detail

Unit Rate (British System) per Ton


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

40 Ton

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rs.
Rs.

Page 29

0.00

Say
Say

0.00
0.00

DESCRIPTION

OF

ITEM NO

18:

Unloading from Wagons Girders, Rails,


permanent way material (except wooden sleepers)
iron work, M.S. Bars, Pipes, etc. lead upto one
chain but excluding stacking.

Detail

Unit Rate (British System) per Ton


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

70 Ton

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rs.
Rs.

Page 30

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION

OF

ITEM NO

19:

Loading into Wagons, wooden broad gauge


sleepers including one chain lead and stacking.

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

1,000 Nos

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 31

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

20:

Unloading wooden broad gauge sleepers from


Wagons including one chain lead and stacking.

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

2,100 Nos

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 32

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

21:

Loading metre gauge or narrow gauge wooden


sleepers including one chain lead and stacking
inside Wagons.

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

2,000 Nos

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 33

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

22:

Unloading metre gauge or narrow gauge wooden


sleepers including one chain lead but excluding
stacking

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

3,800 Nos

Unskilled Cooly
Total
Sundries
Total

16.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 34

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

23:

Loading Bridge and grossing timber including


one chain lead and stacking.

Detail

Unit Rate (British System) per 100 Nos


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Nos


Labour
Unskilled Cooly
Total
Sundries
Total

4.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

Page 35

0.00

Say

0.00

DESCRIPTION

OF

ITEM NO

24:

Unloading Bridge and crossing timber including


one chain lead but excluding stacking.

Unit Rate (British System) per 100 Nos

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Rate Analysis for 125 Nos


Labour
Unskilled Cooly
Total
Sundries
Total

2.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Rs.

0.00

Say

0.00

NOTE :
Rate for loading and unloading for Mobile trucks/ boats, item 1-15 will be 80%
of the rate of Railway Wagons.

Page 36

DESCRIPTION

OF

ITEM NO

25:

Loading or unloading bitumen, asphalt or tar in


drums, into or from Railway Wagons lead upto
one chain.

Detail

Unit Rate (British System) per Ton


Qty

Rate Analysis
Labour

for

Rate
Per Unit (Rs.)

Amount (Rs.)

25 Ton

Unskilled Cooly
Total
Sundries
Total

6.00 Nos

0.00 P. Day

#### Percent

Contractor's Profit & Ove #### Percent


Total

Item Rates
Labour Rate Per Ton
Labour Rate Per Tonne

Rs.
Rs.

Page 37

0.00
0.00

Say
Say

0.00
0.00

LIST OF LUMPSUM ITEMS-1


S.No.

MATERIAL
Unit
Kitchen Expenses (tea, meat, milt fuel fat & appliances)
LS-01 Ch. 3 Item 16 (i)
-Lantern,
Patromax
lamp
depreciation
and
K.
oil
LS-02 consumption Ch. 3 Item 16 (i)
-Kitchen
Utensil,
cost
of
repair
and
replacement
etc.
Ch.
LS-03
-3 Item 16 (i)
LS-04 Kitchen Utensil, cost of repair and replacement etc. Ch. -3 Item 16 (i)
LS-05 Construction of Temporary Island (Ch. 6 Item 7 (i)
-LS-06 Carriage of material to site of work (Boring Material) -(Ch 6 Item 7 (i)
LS-07 Hire charges of plant (Ch. 6 Item 8 (a) & (b)
-Hire charges of assembling bunch cable wire cutter
LS-08 stressing, jack Hydraulic pump, conce, fixer grout
injecting pump relievable observation and supply of
-recorded data of stresses. (Ch. 6 Item 20)
LS-09 Repair of plate for the down struts spacers (Ch. 6 Item -21)
Hire
charges of wire cutter stressing, Jack, Hydraulic
LS-10 pump relievable cone, observation and supply of recorded
-d
f
(Ch 6
21)
LS-11 Fixture (Ch. 9 Item 18)
-LS-12 Hire Charges of Spray Machine (Ch. 11 Item 6 i, ii & iii) -LS-13 Nail & Screws bolt and brackets (Ch. 12 Item 24 (a)
-LS-14 Accessories for fixing of Eave Board (Ch. 12 Item 28 (b)
LS-15 Cost of Putty and Nails (Ch. 12 Item 44 a)
LS-16 Electricity Charges (Ch. 12 Item 51)
LS-17 Hold Fast (Ch. 12 Item. 57 b)

-----

LS-18 Burner Charges, Kerosene Oil & Scraper (Ch. 13 Item 16)
LS-19 Misc. i.e. small T&P, working of Crane & Tar Boiler (Ch.
18 Item 10)
LS-20 Excavation and fixing (Ch. 18 Item 18 (iv) a)
LS-21 Jointing Plate with T Iron (Ch. 18 Item 18 (iv) a)

--

LS-22 Painting and lettering (Ch. 18 Item 18 (iv) a)


LS-23 Fixing manhole frame & cover including carriage to site
(Ch 21 Item 15)
LS-24 Rental Charges of T&P (Ch. 21 Item. 19 a i)
Carriage from store to site of work for reverse rotary
LS-25 drilling reg complete set and generator set etc. (Ch. 23
Item 5 (a) i)
LS-26 Mix. Expenditure (Ch. 23 Item 5 (a) i)
LS-27 Taking and preserving box 2 lbs sample of strata. (Ch. 23
Item 7)
Taking samples of water from bore hole including bailing
LS-28 or 'pumping.
(Ch. 23 Item 7)

--

Sealing the water sample and providing necessary packing


LS-29 etc. (Ch. 23 Item 7)
LS-30 Handling charges (Ch. 23 Item 7)
LS-31 C. Oil (Ch. 23 item 17 i & ii)
Providing
LS-32 hard wood
19 C)
Providing
LS-33 hard wood
19 C)
Providing
LS-34 hard wood
19 C)

-------------

and fixing temporary wooden tapered plug of


to each end of pipe line for 3" (Ch. 23 Table
-and fixing temporary wooden tapered plug of
to each end of pipe line for 4" (Ch. 23 Table
and fixing temporary wooden tapered plug of
to each end of pipe line for 5" (Ch. 23 Table

Page 1

---

RATE

LIST OF LUMPSUM ITEMS-1


S.No.
LS-35
LS-36
LS-37
LS-38
LS-39
LS-40
LS-41

Providing
hard wood
19 C)
Providing
hard wood
19 C)
Providing
hard wood
19 C)
Providing
hard wood
19 C)
Providing
hard wood
19 C)
Providing
hard wood
19 C)
Soldering

MATERIAL
Unit
and fixing temporary wooden tapered plug of
to each end of pipe line for 6" (Ch. 23 Table
-and fixing temporary wooden tapered plug of
to each end of pipe line for 8" (Ch. 23 Table
-and fixing temporary wooden tapered plug of
to each end of pipe line for 10" (Ch. 23 Table
-and fixing temporary wooden tapered plug of
to each end of pipe line for 12" (Ch. 23 Table
-and fixing temporary wooden tapered plug of
to each end of pipe line for 15" (Ch. 23 Table
-and fixing temporary wooden tapered plug of
to each end of pipe line for 18" (Ch. 23 Table
-etc. (Ch. 24 Item 5 i)
--

LS-42 Locking arrangement (Ch. 24 Item 44 i)


LS-43 Extra labour for shuttering (Ch. 24 Item 44 i)
LS-44 Testing Fee (Ch. 24 Item 75 a & b)
LS-45 Leatheride Paper (Ch. 24 Item 76 i)
LS-46 Carriage from stone to site (Ch. 24 Item 42 a)
LS-47 Carriage to site of work (Ch. 25 Item 41 a)

-------

LS-48 Carriage to site of work (Ch. 25 Item 41 b)


LS-49 Electric charges with electrode (Ch. 24 Item 42 a)

--

LS-50 Sewing charges (Labour) (Ch. 26 Item 4)


LS-51 Cost of Polish & Nails (Ch. 26 Item 20)

--

LS-52 Rope, rags, etc. (Ch. 26 Item 22)


LS-53 Filling cement bags with coal (Ch. 26 Item 27)

----

-LS-54 Cotton Waste, Grease & Packing etc. (Ch. 26 Item 35 b)


-LS-55 Accessories, repair and replacement portion (Ch. 26 Item -35 b)
-LS-56 Spraying Machine (Ch. 26 Item 42)

Page 2

RATE

LIST OF MATERIAL
ITEM
MATERIAL
UNIT
RATE
01.001Cotton waste
Per Kg
Per Kg
01.002Grease
01.003H.S. Diesel oil
Per Ltr.
01.004Kerosine oil
Per Ltr.
01.005Mobil oil
Per Ltr.
01.006Average diesel consumption of a truck
miles/gallon
01.007Average mobile oil consumption of a truck
miles/gallon
Each
03.001Gun powder and fuse for blasting (1 pound and 1 fuse)
03.002Jhambs
Each
03.003Charakharies complete
Each
03.004Manila Rope 1"
Rft
03.005Cost of repair and replacement of 4 Nos. picks axes and 8 No Per Day
03.006Palana with namda for one donkey
Each
03.007Repair and replacement of sacks
Each
Each
03.008Tent
03.009Donkey hut
Each
03.010Royalty for pit sand
% Cft
03.011Nail bolts and nuts
Kg.
03.012Atta
P.Kg.
03.013Phak
per Md
per Md
03.014Grams
06.001Brick Ballast 1" (at site)
100 Cft
06.002Brick Ballast 1" to 1" (at site)
100 Cft
06.003Stone Ballast 1" to 1" (at source)
100 Cft
06.004Brick Bats
100 Cft
06.005Coarse sand (Chenab) (at site)
100 Cft
100 Cft
06.006Harrow/Sand (at site)
06.007Sand (Local) (at site)
100 Cft
06.008Cement (Grey)
Per Bag
Per Bag
06.009Cement (White)
06.010Shingle (Naturally Graded) at site (Bajri)
100 Cft
06.011Aggregate/Stone Crushed " to 1" (Graded) (at site)
100 Cft
M. Ton
06.012M.S. Bars (Plain) " and above (36000 PSI)
06.013M.S. Bars (Deformed) (40 grade)
M. Ton
06.014M.S. bars (Tor Steel 60 grade)
M. Ton
06.015Cost of casing pipe of 18" dia
Per Rft
06.016Cost of casing pipe of 20" dia
Per Rft
06.017Cost of casing pipe of 22" dia
Per Rft
06.018Cost of casing pipe of 24" dia
Per Rft
06.019Nail and Screw (Copper)
Per. Kg.
06.020Brush (Large)
Each
06.021Brush (Small)
Each
06.022Binding wire
Kg
06.023Special Clamps with bolts and nuts
Each
06.024Welding electrode
P.Bundle
06.025Prestressing Cable having 12 Nos. wire
P.Ton
06.026Anchorage cone
per set
06.027Corrugated sheath of 1-9/16" for 12/0.276" (7mm) cable
per metre
06.028Making good recesses
Each end
06.029Steel rope 1"
Rft
06.030U Clamp i/c 5/8" bolts & nuts
each
06.031Steel rope " dia
Rft
06.032Railway track including sleepers bolts & nuts complete
Rft
06.033Crow bar
Each
06.034Aluminum powder
per kg
06.035Aluminum sheet 1/16" to 1/8" (1.6 to 3 mm) thick
per kg
06.036Helical core (compressed for 10 tons)
per metre
06.037G.I. Sheet special "V shaped "
each
06.038Mastic strip
P.Rft
06.039Copper flashing 1/16" thick
P.Sft
06.040Rubber water stopper 10" wide and 1/4" thick
P.Rft
06.041Bitumen
P.Kg.
06.042Sawdust
P.Cft
06.043Wood for heating
P.Kg.
06.044Thermopore sheet 1" (40 mm) thick
m
06.045Thermopore sheet 1" (25 mm) thick
m
06.046Polythene @ 1.13 kg % Sft
P.Kg.
06.047Broken glass
% kg
07.001Ist class bricks 9" x 4" x 3" (225 x 112.5 x 75 mm)
%o Nos.
07.002Fire Clay Bricks 225 x 112.5 x 75 mm
Each
07.003Good earth/clay
100 Cft
07.004Fire resistant cement
0 Kg per bag
Page 1

ITEM
MATERIAL
UNIT
07.005Moulded Special bricks 9" x 4" x 3"
%o Nos.
07.006Sun dried bricks
%o Nos.
07.007Lime (Slaked)
Kg
07.008Lime (Unslaked)
Kg
07.009Brick grinded and sand
Cft
Per Kg.
07.010Hoop Iron
08.001Quarried Stone at source
100 Cft
08.002Headers or through stone (1.5" x 8" x 10")
Each
08.003Pitching stone at source
% Cft
08.004Charcoal
Per Kg
08.005Wood preservative (Heptaclore)
Per Ltr.
Per Kg.
08.006Steel
08.007Hand dressed stone average (2 Cft)
Each
08.008Hand dressed stone average (4 Cft.)
Each
09.001Brick tiles 300 x 150 x 50 mm (12"x6"x2" )
%o Nos.
1
%o Nos.
09.002 Brick tiles 300 x 150 x 40 mm 12"x6"x1 /2")
09.003Brick tiles 300 x 150 x 32 mm (12"x6"x1" )
%o Nos.
%o Nos.
09.004 Brick tiles 225 x 112.5 x 50 mm (9"x41/2"x2")
09.005Brick tiles 225 x 112.5 x 40 mm (9"x41/2"x1")
%o Nos.
09.006G.I. Plain Sheet 18 - 20 SWG
Per kg
09.007G.I Plain Sheet 22 - 24 SWG
Kg
Per Kg
09.008G.I. Corrugated sheet 18 - SWG
09.009G.I. Corrugated sheet 22 - 24 SWG
Per Kg
09.010G.I. Corrugated sheet 20 SWG
Per Kg
09.011G.I. Hook, Nuts and Bolts
Doz
09.012G.I. Washers
Per Kg
09.013Washers Limpet
Per Dozen
Kg
09.014Bhoosa
09.015Pig lead
Kg
09.016Cowdung (wet)
% Kg
09.017A.C. T-bend 100 mm
Each
09.018A.C. Shoe 100 mm
Each
09.019A.C. Ridge Sheet (6mm)
Rft
Per Kg.
09.020Fuel wood
09.021Wire Nails
Per Kg.
09.022Wind tie (rod)
P Kg.
09.023Bitumen washers
Doz
09.024Brick Aggregate
P. Cft
09.025Lead flashing 1/16" thick
P. Sft
09.026C.I. Heads 4"
Each
09.027Clamps with hold fasts etc. (For Rain Water Pipe)
Each
09.028C.I. water down pipe 4" (100mm) dia
P. Rft
09.029C.I. water down pipe down 3" (75mm) dia
P. Rft.
09.030C.I. shoes bend or offsets 4"
Each
09.031Corrugated A.C. sheets
P.Sft
09.032G.I. or limpet washers and bitumastic washers
Doz
09.033Wrought iron bracket complete with bolts, Nuts and rivets et
Each
09.034Polythene 0.03" (0.08 mm)
Pr. Kg.
09.035Thermopore " (12mm) thick
Per Sft.
09.036Thermopore " (19mm) thick
Per Sft.
09.037Thermopore 1" (25mm) thick
Per Sft.
09.038A.C. pipe 4" (100mm) dia
P.Rft
09.039U.I. Clips
Kg.
09.040Screws 3" & 2"
Kg.
10.001Murrum powder fine.
% Cft
10.002Cement concrete tiles 200 x 200 x 20 mm (8" x 8" x ")
Each
10.003Cement Concrete tiles 300 x 300 x 25 mm (12" x 12" x 1")
Each
10.004Cement Concrete tiles 225 x 225 x 20 mm (9" x 9" ")
Each
10.005Cement concrete tiles 150 x 150 x 20 mm (6" x 6" x ")
Each
10.006White Tile (Glazed) 6"x6"x"
Each
10.007Coloured Glazed tiles 150 x 150 x 6 mm (6" x 6" x ")
Each
10.008Coloured Glazed tiles 300 x 300 x 6 mm (12" x 12" ")
Each
10.009Mosaic marble chips tiles300 x 300 x 25 mm (12" x 12" x 1")
Each
10.010Rubber tiles 300 x 300 x 3 mm (12" x 12" x 1/8")
Each
10.011White glazed tiles 300 x 300 x 6mm (12" x 12" x ")
Each
10.012Dressed Stone 2'x2'x2"
Each
10.013Dressed Stone 2'x2'x3"
Each
10.014Carborandum Stone
Each
10.015Pigment for Cement/Concrete
Per Kg
10.016Marble Chips
Per Kg
10.017Marble Powder
100 Kg
10.018Neoprene strip 100 x 6 mm
P. Foot
10.019Wax Polish
3 Kg.
Page 2

RATE

ITEM
MATERIAL
10.020Tartaric Acid
10.021Hessian Cloth
10.022Linen Cloth
10.023Asphalt
10.024Sand Paper
10.025Brass Screws 50 mm long
10.026Glass stip 3 mm thick 40 mm wide
10.027Glass Strips 4 mm thick 40 mm wide
10.028Glass Strips 5 mm thick 50 mm wide
10.029Marble strips 6 mm thick 40 mm wide
10.030Marble strips 10 mm thick 40 mm wide
10.031Sutli
10.032Steam coal
10.0339" thick rubble or broken hard bricks
10.034Hard Marrum
10.035Floor Polish
10.036Adhesive Mixture dry
10.037Surkhi
10.038Fine Aggregate
10.039Primer
11.001Chopped Jute
11.002Distemper (Vinyle Emulsion)
11.003Distemper Plastic bound (Plastic Emulsion)
11.004Distemper Water bound
11.005Rice
11.006Pigment for colour wash
11.007Primer/red oxide pigment
11.008Chopped Straw
11.009Expended metal edge bead 5" wide
12.001Chir Ist Class
12.002Deodar Wood best quality
12.003Deodar Wood 2nd class
12.004Fire Wood
12.005Kail Ist class
12.006Shisham wood Ist class
12.007Teak wood
12.008Partal wood
12.009Kikar wood
12.010Sheets Aluminum 8 - SWG - 24 SWG (local)
12.011Sheets Aluminum " thick and above (local)
12.012Copper sheet 0.80 mm to 2.50 mm
12.013Copper sheet 3.00 mm to 6.00 mm
12.014Formica sheet (8' x 4')
12.015Plain Galvanized iron sheet
12.016Corrugated Galvanized iron sheet
12.017Commercial ply 6 mm thick
12.018Commercial ply 3 mm thick
12.019Shisham wood ply (6 mm thick)
12.020Teak wood ply (6 mm thick)
12.021Thermopore sheet " (12 mm) thick 20 kg/m (39" x 39")
12.022Thermopore sheet " (20 mm) thick 20 kg/m (39" x 39")
12.023Thermopore sheet 1" (25 mm) thick 20 kg/m (39" x 39")
12.024Masonite sheet 5 mm thick for partitions
12.025Masonite Sheet for ceiling
12.026Bacolite sheet (2.50 mm) thick (size 4' x 4')
12.027Bacolite sheet (3.75 mm) thick (size 4' x 4')
12.028Bacolite sheet (4.00 mm) thick (size 4' x 4')
12.029Rubber sheet 5 mm (size 4' x 6')
12.030Zinc Plate 525 x 11 mm
12.031Spike
12.032Glass pan 3 mm thick 16 x to 18 oz
12.033Glass pan 3 mm thick 24 x to 26 oz
12.034Glass plate " (6 mm) thick upto 8 SFT
12.035Glass plate " (6 mm) thick not exceeding 24 SFT
12.036Glass Plate 6 mm thick
12.037Glass Plate 8 mm
12.038Glass Plate " (12 mm) thick
12.039Glue
12.040Machine Screws 38.10 x 7.35 mm
12.041Iron strips 1" x 1/8"
12.042Brass finger plate
12.043Brass hinges 50 mm
12.044Brass hinges 63 mm
Page 3

UNIT
RATE
Per Kg
Per Mtr.
P. Kg.
P. Kg.
Per Doz.
Per Doz.
% Rft
% Rft
% Rft
Rft
Rft
Per Kg
Kg
%Cft.
%Cft.
P. Kg.
Per Kg.
P. % Cft.
% Cft.
P.Kg.
Per Kg
Per Gallon
Per Gallon
Per Gallon
Per Kg
Per Kg
Per Gln.
P.Kg
P. Rft
CFT
CFT
CFT
Kg
CFT
CFT
CFT
CFT
CFT
Per Kg
Per Kg
Per Kg
Per Kg
Per sheet
Per Kg
Per Kg
SFT
SFT
SFT
SFT
P. sheet
P. sheet
P. sheet
P. Sft
P.Sft
eet 4'x4' size
eet 4'x4' size
eet 4'x4' size
eet 4'x6' size
Kg
Per Kg
SFT
SFT
SFT
SFT
SFT
SFT
PSF
Per Kg
Per Doz.
Kg
Each
Each
Each

ITEM
MATERIAL
UNIT
12.045Brass hinges 75 mm
Each
12.046Brass hinges 100 mm
Each
12.047Brass hinges 125 mm
Each
12.048Brass tower bolts 300 mm
Each
12.049Brass tower bolts 225 mm
Each
Each
12.050Brass tower bolts 200 mm
12.051Brass tower bolts 150 mm
Each
12.052Steel nut and bolts (all sizes)
Per Kg
12.053Iron hold fast (for doors/windows)
Each
12.054Iron handle 100 mm 4"
Each
12.055Iron handle 150 mm (6")
Each
Each
12.056Iron handle 200 mm (8")
12.057Brass handle 100 mm
Each
12.058Brass handle 150 mm
Each
12.059C.P. handles 4" (2nd Quality)
Rft
12.060C.P. handles 4"
Each
12.061C.P Handle 6"
P.Doz
Each
12.062C.P. handles 6" (Best Quality)
12.063Handle
Each
12.064Iron sliding bolt 200 mm (8") with screws
Each
Each
12.065Iron sliding bolt 250 mm (10") with screws
12.066Iron sliding bolt 300 mm (12") with screws
Each
12.067Racal plugs 1" (40mm) long
Each
Each
12.068Racal Plug (small)
12.069Push plate (Stainless)
Each
12.070Kikai plate (Aluminum) 4" wide 22 gauge 12" long
Each
12.071Rim lock (China)
Each
12.072Mortise lock (Local)
Each
12.073Sliding bolts Brass 300 mm (12")
Each
12.074Hinges (Iron) 50 mm
Each
12.075Hinges (Iron) 75 mm
Each
12.076Hinges (Iron) 100 mm
Each
12.077Hinges (Iron) 125 mm
Each
12.078Double action spring Hinges (Brass) Medium 4" - 5" (100 to 1 Per pair
12.079Double action spring Hinges (Iron) 4"-5" (100 to 125 mm)
Each set
12.080Brass screw 20 mm
Doz.
12.081Brass screw 25 mm
Doz.
12.082Brass screw 40 mm
Doz.
12.083Door Stops 150 mm
Each
12.084Door stopper 150 mm (wooden)
Each
12.085Foot hinges 1"
Each
12.086Tee hinges 250 mm
Each
12.087Tee hinges 150 mm
Each
12.088Tee hinges 200 mm
Each
12.089Butt Hinges (125mm)
Each
12.090Butt Hinges (150mm)
Each
12.091Hasp & staples (medium size)
Each
12.092Iron tower bolt 100 mm long
Per Doz.
12.093Iron tower bolt 150 mm long
Per Doz.
12.094Iron tower bolt 225mm long
Per Doz.
12.095Iron tower bolt 250 mm long
Per Doz.
12.096Iron tower bolt 300 mm long
Per Doz.
12.097Hold fast with pivot & clamp 4"
Each
12.098Hold fast with pivot & clamp 6"
Each
12.099Hold fast with pivot & clamp 8"
Each
12.100spring hinges (doors/windows)
Each
12.101Wrought Iron Hold Fast (small)
Each
12.102Wrought Iron Hold Fast (Large)
Each
12.103Deodar wooden beading (1" x ")
Rft
12.104Deodar wooden lipping 6 mm
Rft
12.105Deodar wooden lipping 3/8
Rft
12.106Chord with hook (" x ")
Each
12.107Wooden cleat for door
Each
12.108G.I. hook with clamp (doors/windows)
Each
12.109Khunda - Chapka (For Almirah)
Each
12.110Rubber Pad Stopper
Each
12.111Wire Gauze (12x12)
Sft.
12.112Wooden Plug for door
Each
12.113Expended Metal (12mm to 20mm mesh of 16 gauge)
Sft.
12.114Hinges 10" (250mm)
Each
12.115Hinges chocks 4" (100mm) (for battened doors)
Each
12.116Hasp and staple
Each
12.117Hold fast with pivots & clamp for framed and braced doors
Each
Page 4

RATE

ITEM
MATERIAL
UNIT
RATE
12.118Sliding bolts 18" (450mm) long
Each
12.119M.S. Angle Iron 1"x1"x" (40x40x6mm)
P.Kg.
12.120M.S. Flat 6"x"x1/8" (150x6x3mm)
P.Kg.
12.121Hinges Chocks 3" (75mm)
Each
12.122Screws upto 1" long
Doz
Per Doz.
12.123Screws above 1" long
12.124Nails of sorts
Pr. Kg.
12.125Brass spring hinges Complete with Screws
Each
12.126Brass sliding bolt 10" (250mm) long 'complete with screws &
Each
12.1271" (25mm) thick solid flush shutter
Sft.
12.128Solid flush door 1" thick
Sft.
Each
12.129C.P. dasti I/C screws
12.130Hard Board
Sft
12.131Brass butt hinges 2" (50mm)
Each
12.132Brass butt hinges 6" (150mm)
Each
12.133Sawing Charges
Sft
12.134Tie rod welding and fixing arragement
Each
Sft.
12.135Vin board " thick
12.136Vin board " thick
Sft.
12.137Chip Board " (20mm) 700 density
P.Sft
P.Sft
12.138Chip Board " (12mm) 700 density
12.139Full hinges " (20mm) wide (Imported)
Rft
12.140Catcher
Each
Each
12.141lock China
12.142C.P. Hanger rod with 2 hooks
Each
12.143Hanger hook including pull out rod
Each
12.144Brass hooks
Each
12.145Door rubber stopper
Each
12.146G.I. Hook
Each
12.147Hooks forPunkha Pole
Per Dozen
12.148Nails
P.Kg.
12.149Washers
Each
12.150Hard Wood Gutty
Each
12.151M.S clamp
Each
12.152M.S hook
Each
12.153Sand Paper
Each
12.154Tower bolt C.P.
Each
12.155C.P. finger plate with screws
Each
12.156M.S. sheets (plain) 20 SWG
Kg
12.157M.S. Sheet 18 SGW
Sft
12.158M.S. Sheet 22 SGW
Sft
12.159Curtain Railing
Rft.
12.160Electrod
Pkt
12.161Gola (Wood)
P. Ft.
13.001Black Japan paint
Gln.
13.002Chalk powder
Per Kg
13.003Dana Lakh
Per Kg
13.004Emulsion paint
Per Gallon
13.005Paint Enamel
P. Gln
13.006French Polish
Per Kg
13.007Gum and Gun rasin
Per Gallon
13.008Linseed oil
Per Kg
13.009Road marking enamel
Per Ltr.
13.010Solignum paint (Imported)
Per Gallon
13.011Spirit
Per Ltr.
13.012Varnish
Kg
13.013White Enamel paint
Per Gln.
13.014Caustic Soda
Kg
13.015Painting Brushes (average rate)
Each
13.016Mineral Pitch
Kg
13.017Primer Paint
P.Gln
13.018Reflective Paint
P. Gln
13.019Reflective Tape/Paper
P. Sft.
13.020Creosote
P. Gln
13.021Steel Scrapper
Each
13.022Kerosine Oil
Litre
13.023Terpentine oil
Per Ltr.
13.024Water Proofing Emulsion Paint
P.Kg.
16.001Jute bag (Empty) (1.25 Cft.)
Each
16.002New jute bag (4 to 5 Cft.)
Each
16.003Pitching Stone
% Cft
16.004Munj patha ban
Per Kg
16.005G.I Wire No.15
Per Kg
Page 5

ITEM
MATERIAL
UNIT
16.006Bamboo (60 - 120 mm dia) 2.5 meter to 3.0 metre long
Each
16.007Bamboo (60 - 120 mm dia) 3.0 meter to 3.75 metre long
Each
16.008Bamboo (60 - 120 mm dia) 3.75 meter to 4.25 metre long
Each
16.009Bamboo (60 - 120 mm dia) 4.25 meter to 4.90 metre long
Each
16.010Bamboo (60 - 120 mm dia) 4.90 meter to 6.25 metre long
Each
Per Kg
16.011G.I Wire No. 8 to 10
16.012Sutli
P.Kg
16.013wooden vertical stakes 7" to 12" dia for groynes
P. % Nos.
16.014Royality charges of wooden stakes
Each
16.015Shingle / spawl
P.% Cft
16.016Boulder
P.% Cft
P.% Cft
16.017Supply pilchi lead within one mile
16.018Pilchi Roll 6" dia 5' long
P.% Cft
16.019Bajri / shingle
P.% Cft
16.020Royality kikar brush wood
P.% Mds
16.021Kikar wood for pegs
P. Cft
18.001Course aggregate (bajri) for surface dressing (Quarry site) 100 Cft
100 Cft
18.002Graded stone for base course (Quarry site)
18.003Brick Aggregate For Sub Base course (Quarry site)
100 Cft
18.004Pit-run/Bedrun graval (Quarry site)
100 Cft
100 Cft
18.005Stone screaned (Crusher site)
18.006Stone Dust (Quarry/Plant site)
100 Cft
18.007Steel bars (including binding wire)
Per Kg.
Per Kg
18.008Iron post
18.009Elbow 2"
Each
18.010Tee 2" x 2" x 2"
Each
18.011Steel bearing (standard quality)
Each
18.012Rubber bearing pad 1" x 1" x 1" (2.5x2.5x2.5 cm)
P.Cub
18.013A.C pipe 3" i/d
per metre
18.014T.Iron and M.S Plate
P. Kg.
18.015Lettering 4" height
Each
18.016Lettering 3" height
Each
19.001Cast iron head 4"
Per Kg
19.002Cast iron shoe 4"
Per Kg
19.003Cast iron bend 4"
Per Kg
19.004Cast iron off set 4"
Per Kg
19.005G.I spout 4" 460 mm long
Each
19.006AC - bend 4" (100 mm)
Each
19.007AC Shoe 4" (100 mm)
Each
19.008AC Tee (100 mm)
Each
19.009Angle Iron Bracket Set for W.H.B & Cistern
Each
19.010'Angle Iron Bracket Set for Sink
Each
19.011Waste pipe 3 cm (1") (PVC)
Each
19.012Waste pipe 4 cm (1") (PVC)
Each
19.013C.P. waste coupling 3 cm (1")
Each
19.014C.P. waste coupling 4 cm (1")
Each
19.015Rubber plug with chain 3 cm (1")
Each
19.016Rubber plug with chain 4 cm (1")
Each
19.017PVC Flushing bend 3 cm (1")
Each
19.018PVC Flushing bend 4 cm (1")
Each
19.019Plastic rubber connection with check nut
Each
19.020Copper connectionn with check nut:
Each
19.021C.P. Shower rose 1.5 x 10 cm (" x 4")
Each
19.022C.P. Shower rose 2.0 x 15 cm (" x 6")
Each
19.023C.I brackets for high level flushing cistern
Per pair
19.024C.I. Bracket for Wash hand basin
Each
19.025White Glazed earthen ware low down cistern 13.63 ltr. (3/Gln
Each
19.026Coloured Glazed earthen ware low down cistern 13.63 ltr. (3/
Each
19.027White Glazed cast iron low down cistern 13.63 ltr. (3/Gln)
Each
19.028RCC Pipe 4" dia
Rft.
19.029Plastic made low down flushing cistern 13.63 litre (3 gallo
Each
19.030Pedestal for W.H.B
Each
19.031Bolt and Nuts for W.C. (European Type)
Each
19.032A.C soil pipe 6cm (2" dia)
Metre
19.033A.C soil pipe 7.5cm (3" dia)
Metre
19.034A.C soil pipe 10cm (4" dia)
Metre
19.035A.C soil pipe 15cm (6" dia)
Metre
19.036C.I. Soil Down 50 mm (2") dia
Metre
19.037C.I Soil Down 100 mm (4") dia (30 PSI)
Metre
19.038Yarn
per lbs
19.039Chromium plated T-stop cock 1.5 c.m (")
Each
19.040Brass gas cock 1.5 c.m (")
Each
19.041Brass gas cock 2.0 c.m (")
Each
Page 6

RATE

ITEM
MATERIAL
19.042Brass bib cock " (1.5 cm)
19.043Brass bib cock " (2 cm) / brass stop cock
19.044Glazed Earthenware sink 60 x 45 cm (24" x 18")
19.045Glazed Earthenware sink 37.5 x 45 cm (15" x 18")
19.046Statinless steel sink with drain board 120 x 60 cm (48 x 24
Terazzo concrete sink 60 x 45 cm (24" x 18") With drain
19.047
board
19.048Brass ball float valves 15 mm (") dia
19.049Brass ball float valves 20 mm (") dia
19.050Brass ball float valves 25 mm (1") dia
19.051Brass ball float valves 30 mm (1") dia
19.052Brass ball float valves 40 mm (1") dia
19.053Brass ball float valves 50 mm (2") dia
19.054C.P. Mixing Valves " dia (Mixer)
19.055Glass Shelf 60 x 13 cm (24" x 5")
19.056Chromium plated bracket and railling for glass shelf
Glazed earthen ware shelf 60 x 13 cm (24" x 5") with
19.057
chromium plated bracket and railing (Coloured)
Glazed earthen ware shelf 60 x 13 cm (24" x 5")
19.058
withchromium plated bracket and railing (White)
19.059Soap dish chromium plated
19.060Soap dish glazed earthen ware white colour
19.061Soap dish plastic
19.062Toilet Paper Holder (Chromium plated)
19.063Toilet Paper Holder (Plastic)
19.064Towel Rail With Brackets (Chromium plated) 60 x 2 cm (24" x
19.065Towel Rail With Brackets (Chromium plated) 50 x 1.5 cm (20"
19.066Towel Rail With Brackets (Plastic)
19.067C.I floor trap including grating size 10 x 5 cm (4" x 2")
19.068Chromium plated bottle trap 3 cm (1") (with waste pipe)
19.069Chromium plated bottle trap 4 cm (1") (with waste pipe)
19.070Cast iron P-trap 10 cm (4")
19.071Concrete gully trap 4"
19.072Glazed Pee trap 10 cm (4" dia)
19.073PVC grating 15 x 15 cm (6" x 6")
White Glazed earthenware Wash Hand Basins (22" x 16") (56
19.074
cm x 40 cm) with padestal
19.075Wash Hand Basin (22" x 16") (56 cm x 40 cm)} without pedesta
19.076Coloured wash hand basin with pedestal (22" x 16") (56 cm x
19.077Coloured wash hand basin without pedestal (22" x 16") (56 cm
19.078European type water closet without seat and cover (coloured)
19.079European type water closet without seat and cover (white)
19.080Double seat and cover Bekelite
19.081Double seat and cover Plastic
White Glazed earthenware squater (Orisa pattern) WC
19.082
combined with footrest
Coloured {Glazed earthenware squater (Orisa pattern) WC
19.083
combined with footrest}
19.084Terazzo concrete water closet squater type
Glazed earthen ware W.C squater type with seperate foot
19.085
rest (Orisa pattern)
19.086Urinal Glazed earthenware flat back
19.087Pillar cock chromium plated heavy duty 2 cm (")
19.088Pillar cock chromium plated heavy duty 1.5 cm (")
19.089Stop cock under ground 15 mm (") with C.P cover
19.090Stop cock chromium plated heavy duty 2 cm (")
19.091Stop cock chromium plated heavy duty 1.5 cm (")
19.092Swan neck cock single way chromium plated 1.5 cm (")
19.093Swan neck cock double way chromium plated 1.5 cm (")
19.094Swan neck cock three way chromium plated 1.5 cm (")
19.095Gas cock chromium plated oxidised (") single way
19.096Gas cock chromium plated oxidised (") double way
19.097Gas cock chromium plated oxidised (") three way
19.098Looking glass 5 mm thick 55 x 40 cm (22" x 16")
19.099Hanger hook with pullout rod
19.100Gun metal peat/gate valve (screwed) 15 mm (") dia
19.101Gun metal peat/gate valve (screwed) 20 mm (") dia
19.102Gun metal peat/gate valve (screwed) 25 mm (1") dia
19.103 Gun metal peat/gate valve (screwed) 30 mm (1") dia
19.104 Gun metal peat/gate valve (screwed) 40 mm (1") dia
19.105Gun metal peat/gate valve (screwed) 50 mm (2") dia
19.106Gun metal peat/gate valve (screwed) 65 mm (2") dia
19.107Gun metal peat/gate valve (screwed) 80 mm (3") dia
19.108Foot rest for squatter type W.C.
19.109Waste coupling with bracket and waste pipe
19.110Screw (75 mm) 3" long
Page 7

UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

RATE

ITEM

MATERIAL
C.I. High level flushing cistern 13.63 litre or 3 gallon
19.111
capacity including accessories
19.112C.I. High level flushing cistern I/C all accessaries (1 gall
19.113Soap dish coloured (glazed earthen weare)
19.114Plastic shelf with railing
19.115Bracket
19.1162 cm (") bib cock
19.1171.5 cm (") bib cock
19.118Union brass cock " (1.5 cm)
19.119Union brass cock " (2 cm)
19.120C.I floor trap including grating size 10 x 7.5 cm (4" x 3")
19.121Manhole cover 30 cm (12" dia)
19.122C.I. manhole cover with frame 45 cm (18" dia)
19.123C.I. manhole cover with frame 60 cm (24" dia)
19.124 C.P Bottle trap with waste pipe 3cm (11/4" dia)
19.125 C.P Bottle trap with waste pipe 4cm (11/2" dia)
19.126Nail with Cutter for angle iron brackets
19.127 Copper connection with assessories " dia
19.1281.5 cm (" dia) brass ball valve with assessaries
21.001C.I. gully grating 12" x 12" with hinged safety type (81 lbs
21.002Concrete gully trap 12" x 12"
21.003China ware trap with C.I screen
21.004Iron Bolt 12"
21.005C.I Ventilating Shaft tool 6" to 12" I/d 18' to 36' long
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.006
B) 300
mmpipes
(12")confirming
i/d
RCC
sewer
to ASTM C-76-79 (class III wall
21.007
B) 375
mm pipes
(15") i/d
RCC
sewer
confirming to ASTM C-76-79 (class III wall
21.008
B)
mm pipes
(18") i/d
RCC450
sewer
confirming to ASTM C-76-79 (class III wall
21.009
B)
525
mm
(21") i/d
RCC sewer pipes
confirming to ASTM C-76-79 (class III wall
21.010
B)
mm pipes
(24") i/d
RCC600
sewer
confirming to ASTM C-76-79 (class III wall
21.011
B) 675
mm pipes
(27") i/d
RCC
sewer
confirming to ASTM C-76-79 (class III wall
21.012
B) 750
mm pipes
(30") i/d
RCC
sewer
confirming to ASTM C-76-79 (class III wall
21.013
B) 825
mm pipes
(33") i/d
RCC
sewer
confirming to ASTM C-76-79 (class III wall
21.014
B) 900 mm (36") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.015
B) 1070 mm (42") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.016
B) 1220 mm (48") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.017
B) 1370 mm (54") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.018
B) 1520 mm (60") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.019
B) 1680 mm (66") i/d
RCC sewer pipes confirming to ASTM C-76-79 (class III wall
21.020
B) 1830 mm (72") i/d
RCC Pipes conforming (to BS 5911 part I, 1981 class 'L')
21.021
'100
mm (4")
i/d
RCC Pipes
conforming
(to BS 5911 part I, 1981 class 'L')
21.022
'150Pipes
mm (6")
i/d
RCC
conforming
(to BS 5911 part I, 1981 class 'L')
21.023
225 mm (9") i/d
Non/reinforced concrete pipe 100 mm (4") dia conforming to
21.024
ASTM C-14-73 Class I
Non/reinforced concrete pipe 150 mm (6") dia conforming to
21.025
ASTM C-14-73 Class I
Non/reinforced concrete pipe 200 mm (8") dia conforming to
21.026
ASTM C-14-73 Class I
Non/reinforced concrete pipe 225 mm (9") dia conforming to
21.027
ASTM C-14-73 Class I
Non/reinforced concrete pipe 250 mm (10") dia conforming to
21.028
ASTM C-14-73 Class I
dia RCC Sewer pipe 300 mm (12") Conforming to ASTM C-76-79
21.029
(ClassII
RCC
Sewerwall
pipe'B')
'375 cc (15") dia Conforming to ASTM C-76-79
21.030
(ClassII
RCC
Sewerwall
pipe'B')
450 mm (18") dia Conforming to ASTM C-76-79
21.031
(ClassII
wall
'B')
RCC Sewer pipe 525 mm (21") dia Conforming to ASTM C-76-79
21.032
(ClassII
RCC Sewerwall
pipe'B')
600 mm (24") dia Conforming to ASTM C-76-79
21.033
(ClassII
wall
RCC Sewer pipe'B')
675 mm (27") dia Conforming to ASTM C-76-79
21.034
(ClassII
RCC
Sewerwall
pipe'B')
750 mm (30") dia Conforming to ASTM C-76-79
21.035
(ClassII
RCC
Sewerwall
pipe'B')
825 mm (33") dia Conforming to ASTM C-76-79
21.036
(ClassII
RCC
Sewerwall
pipe'B')
900 mm (36") dia Conforming to ASTM C-76-79
21.037
(ClassII wall 'B')
RCC Sewer pipe 1070 mm (42") dia Conforming to ASTM C-76-79
21.038
(ClassII wall 'B')
RCC Sewer pipe 1220 mm (48") dia Conforming to ASTM C-76-79
21.039
(ClassII wall 'B')
RCC Sewer pipe 1370 mm (54") dia Conforming to ASTM C-76-79
21.040
(ClassII wall 'B')
Page 8

UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Kg
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Rft
Per
Per
Per
Per
Per
Per
Per
Per
Per

Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.
Ft.

Per Ft.
Per Ft.
Per Ft.

RATE

ITEM

MATERIAL
RCC Sewer pipe 1520 mm (60") dia Conforming to ASTM C-76-79
21.041
(ClassII wall 'B')
RCC Sewer pipe 1680 mm (66") dia Conforming to ASTM C-76-79
21.042
(ClassII wall 'B')
RCC Sewer pipe 1830 mm (72") dia Conforming to ASTM C-76-79
21.043
(ClassII wall 'B')
21.044Rubber Ring
RCC Sewer pipe 300 mm (12") dia Conforming to ASTM C-76-79
(class IV wall 'B')
RCC Sewer pipe 380 mm (15") dia Conforming to ASTM C-76-79
21.046
(class IV wall 'B')
RCC Sewer pipe 460 mm (18") dia Conforming to ASTM C-76-79
21.047
(class IV wall 'B')
RCC Sewer pipe 535 mm (21") dia Conforming to ASTM C-76-79
21.048
(class IV wall 'B')
RCC Sewer pipe 610 mm (24") dia Conforming to ASTM C-76-79
21.049
(class IV wall 'B')
RCC Sewer pipe 685 mm (27") dia Conforming to ASTM C-76-79
21.050
(class IV wall 'B')
RCC Sewer pipe 760 mm (30") dia Conforming to ASTM C-76-79
21.051
(class IV wall 'B')
RCC Sewer pipe 800 mm (33") dia Conforming to ASTM C-76-79
21.052
(class IV wall 'B'
RCC Sewer pipe 915 mm (36") dia Conforming to ASTM C-76-79
21.053
(class IV wall 'B')
RCC Sewer pipe 1070 mm (42") dia Conforming to ASTM C-76-79
21.054
(class IV wall 'B')
RCC Sewer pipe 1220 mm (48") dia Conforming to ASTM C-76-79
21.055
(class IV wall 'B')
RCC Sewer pipe 1370 mm (54") dia Conforming to ASTM C-76-79
21.056
(class IV wall 'B')
RCC Sewer pipe 1520 mm (60") dia Conforming to ASTM C-76-79
21.057
(class IV wall 'B')
RCC Sewer pipe 1680 mm (66") dia Conforming to ASTM C-76-79
21.058
(class IV wall 'B')
RCC Sewer pipe 1830 mm (72") dia Conforming to ASTM C-76-79
21.059
(class IV wall 'B')
21.060Steel bolt 12" long
21.061Foundation bolts & nuts " dia 2' long .
21.062Rubber sheet 1/8" thick
21.063Foundation bolts & nuts " dia 1' long
21.064Foundation bolts " dia 2' long.
21.065 Foundation bolts 7/8" dia 2' long.
22.001Winch including cost of tripod, tackle etc. for sinking of w
22.002Steel rope 3/4" dia
22.003One cusic capacity pumping set for dewatering
22.004Sleeper
22.005Bolts & Nuts
A.C pressure pipe '80mm (3") dia Class 'B' BSS with comet
23.001
joint and rubber rings
A.C pressure pipe 100 mm (4") dia Class 'B' BSS with comet
23.002
joint and rubber rings.
A.C pressure pipe 150 mm (6") dia Class 'B' BSS with comet
23.003
joint and rubber rings.
A.C pressure pipe 200 mm (8") dia Class 'B' BSS with comet
23.004
joint and rubber rings.
A.C pressure pipe 250 mm (10") dia Class 'B' BSS with comet
23.005
joint and rubber rings.
A.C pressure pipe 300 mm (12") dia Class 'B' BSS with comet
23.006
joint and rubber rings.
A.C pressure pipe 350 mm (14") dia Class 'B' BSS with comet
23.007
joint and rubber rings.
A.C pressure pipe 400 mm (16") dia Class 'B' BSS with comet
23.008
joint and rubber rings.
A.C pressure pipe 450 mm (18") dia Class 'B' BSS with comet
23.009
joint and rubber rings.
A.C pressure pipe 500 mm (20") dia Class 'B' BSS with comet
23.010
joint and rubber rings.
A.C pressure pipe 600 mm (24") dia Class 'B' BSS with comet
23.011
joint and rubber rings.
A.C pressure pipe 80 mm (3") dia Class 'C' BSS with comet
23.012
joint and rubber rings
A.C pressure pipe 100 mm (4") dia Class 'C' BSS with comet
23.013
joint and rubber rings.
21.045

Page 9

UNIT
Per Ft.
Per Ft.
Per Ft.
Per Inch
dia of
pipe
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Each
Each
P.Kg
Each
Each
Each
Each
Per Rft.
Each
Each
P.Kg
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.

RATE

ITEM

MATERIAL
UNIT
RATE
A.C pressure pipe 150 mm (6") dia Class 'C' BSS with comet
23.014
Per Ft.
joint and rubber rings.
A.C pressure pipes 200 mm (8") dia Class 'C' BSS with comet
23.015
Per Ft.
joint and rubber rings.
A.C pressure pipe 250 mm (10") dia Class 'C' BSS with comet
23.016
Per Ft.
joint and rubber rings.
A.C pressure pipe 300 mm (12") dia Class 'C' BSS with comet
23.017
Per Ft.
joint and rubber rings.
A.C pressure pipe 350 mm (14") dia Class 'C' BSS with comet
23.018
Per Ft.
joint and rubber rings.
A.C pressure pipe 400 mm (16") dia Class 'C' BSS with comet
23.019
Per Ft.
joint and rubber rings.
A.C pressure pipe 450 mm (18") dia Class 'C' BSS with comet
23.020
Per Ft.
joint and rubber rings.
A.C pressure pipe '500 mm (20") dia Class 'C' BSS with
23.021
Per Ft.
comet joint and rubber rings.
A.C pressure pipe 600 mm (24") dia Class 'C' BSS with comet
23.022
Per Ft.
joint and rubber rings.
A.C pressure pipe 80 mm (3") dia Class 'D' BSS with comet
23.023
Per Ft.
joint and rubber rings
A.C pressure pipe 100 mm (4") dia Class 'D' BSS with comet
23.024
Per Ft.
joint and rubber rings.
A.C pressure pipe 150 mm (6") dia Class 'D' BSS with comet
23.025
Per Ft.
joint and rubber rings.
A.C pressure pipe 200 mm (8") dia Class 'D' BSS with comet
23.026
Per Ft.
joint and rubber rings.
A.C pressure pipe 250 mm (10") dia Class 'D' BSS with comet
23.027
Per Ft.
joint and rubber rings.
A.C pressure pipe 300 mm (12") dia Class 'D' BSS with comet
23.028
Per Ft.
joint and rubber rings.
A.C pressure pipe 350 mm (14") dia Class 'D' BSS with comet
23.029
Per Ft.
joint and rubber rings.
A.C pressure pipe 400 mm (16") dia Class 'D' BSS with comet
Per Ft.
23.030
joint and rubber rings.
A.C pressure pipe 450 mm (18") dia Class 'D' BSS with comet
23.031
Per Ft.
joint and rubber rings.
A.C pressure pipe 500 mm (20") dia Class 'D' BSS with comet
23.032
Per Ft.
joint and rubber rings.
23.033G.I. pressure pipe 15 mm (") dia BSS-1387 - 1967 (light qua Per Ft.
23.034G.I. pressure pipe 20 mm (") dia BSS-1387 - 1967 (light qua Per Ft.
23.035G.I. pressure pipe 25 mm (1") dia BSS-1387 - 1967 (light qua Per Ft.
23.036G.I. pressure pipe 30 mm (1") dia BSS-1387 - 1967 (light qu Per Ft.
23.037G.I. pressure pipe 40 mm (1") dia BSS-1387 - 1967 (light qu Per Ft.
23.038G.I. pressure pipe 50 mm (2") dia BSS-1387 - 1967 (light qua Per Ft.
23.039G.I. pressure pipe 65 mm (2") dia BSS-1387 - 1967 (light qu Per Ft.
23.040G.I. pressure pipe 80 mm (3") dia BSS-1387 - 1967 (light qua Per Ft.
23.041G.I. pressure pipe 100 mm (4") dia BSS-1387 - 1967 (light qu Per Ft.
23.042G.I. pressure pipe 15 mm (") dia BSS-1387 - 1967 (medium qu Per Ft.
23.043G.I. pressure pipe 20 mm (") dia BSS-1387 - 1967 (medium q Per Ft.
23.044G.I. pressure pipe 25 mm (1") dia BSS-1387 - 1967 (medium q Per Ft.
23.045G.I. pressure pipe 30 mm (1") dia BSS-1387 - 1967 (medium Per Ft.
23.046G.I. pressure pipe 40 mm (1") dia BSS-1387 - 1967 (medium Per Ft.
23.047G.I. pressure pipe 50 mm (2") dia BSS-1387 - 1967 (medium q Per Ft.
23.048G.I. pressure pipe 65 mm (2") dia BSS-1387 - 1967 (medium Per Ft.
23.049G.I. pressure pipe 75 mm (3") dia BSS-1387 - 1967 (medium q Per Ft.
23.050G.I. pressure pipe 100 mm (4") dia BSS-1387 - 1967 (medium Per Ft.
23.051G.I. pressure pipe 125 mm (5") dia BSS-1387 - 1967 (medium Per Ft.
23.052G.I. pressure pipe 150 mm (6") dia BSS-1387 - 1967 (Medium q Per Ft.
23.053G.I. pressure pipe 15 mm (") dia BSS-1387 - 1967 (heavy qua Per Ft.
23.054G.I. pressure pipe 20 mm (") dia BSS-1387 - 1967 (heavy qua Per Ft.
23.055G.I. pressure pipe 25 mm (1") dia BSS-1387 - 1967 (heavy qua Per Ft.
23.056G.I. pressure pipe 30 mm (1") dia BSS-1387 - 1967 (heavy qu Per Ft.
23.057G.I. pressure pipe 40 mm (1") dia BSS-1387 - 1967 (heavy qu Per Ft.
23.058G.I. pressure pipe 50 mm (2") dia BSS-1387 - 1967 (heavy qua Per Ft.
23.059G.I. pressure pipe 65 mm (2") dia BSS-1387 - 1967 (heavy qu Per Ft.
23.060G.I. pressure pipe 75 mm (3") dia BSS-1387 - 1967 (heavy qua Per Ft.
23.061G.I. pressure pipe 100 mm (4") dia BSS-1387 - 1967 (heavy qu Per Ft.
23.062G.I. pressure pipe '125 mm (5") dia BSS-1387 - 1967 (heavy q Per Ft.
23.063G.I. pressure pipe 150 mm (6") dia BSS-1387 - 1967 (heavy qu Per Ft.
23.064 Jointing Material of Socket Joint for 1/2" dia G.I. Pipe for Per % Rft.
23.065 Jointing Material of Socket Joint for 3/4" dia G.I. Pipe fo Per % Rft.
23.066Jointing Material of Socket Joint for 1" dia G.I. Pipe for 1Per % Rft.
23.067 Jointing Material of Socket Joint for 11/4" dia G.I. Pipe fo Per % Rft.
23.068 Jointing Material of Socket Joint for 11/2" dia G.I. Pipe fo Per % Rft.
Page 10

ITEM
MATERIAL
UNIT
RATE
23.069Jointing Material of Socket Joint for 2" dia G.I. Pipe for 1Per % Rft.
23.070 Jointing Material of Socket Joint for 21/2" dia G.I. Pipe fo Per % Rft.
23.071Jointing Material of Socket Joint for 3" dia G.I. Pipe for 1Per % Rft.
23.072Jointing Material of Socket Joint for 4" dia G.I. Pipe for 1Per % Rft.
23.073Jointing Material of Socket Joint for 5" dia G.I. Pipe for 1Per % Rft.
23.074Jointing Material of Socket Joint for 6" dia G.I. Pipe for 1Per % Rft.
23.075Testing charges of G.I. Pipes for 1" dia
Per % Rft.
23.076Testing charges of G.I. Pipes for 1" dia
Per % Rft.
23.077Testing charges of G.I. Pipes for 1" dia
Per % Rft.
23.078Testing charges of G.I. Pipes for 2" dia
Per % Rft.
23.079Testing charges of G.I. Pipes for 2" dia
Per % Rft.
23.080Testing charges of G.I. Pipes for 3" dia
Per % Rft.
23.081Testing charges of G.I. Pipes for 4" dia
Per % Rft.
23.082Testing charges of G.I. Pipes for 5" dia
Per % Rft.
23.083Testing charges of G.I. Pipes for 6" dia
Per % Rft.
23.08450 mm (2") dia 3 mm (1/8") thick M.S blind pipes
Per Ft.
23.08580 mm (3") dia 3 mm (1/8") thick M.S blind pipes
Per Ft.
23.086100 mm (4") dia 3 mm (1/8") thick M.S blind pipes
Per Ft.
23.087125 mm (5") dia 5 mm (3/16") thick M.S blind pipes
Per Ft.
23.088150 mm (6") dia 5 mm (3/16") thick M.S blind pipes
Per Ft.
23.089175 mm (7") dia 5 mm (3/16") thick M.S blind pipe
Per Ft.
23.090200 mm (8") dia 5 mm (3/16") thick M.S blind pipes
Per Ft.
23.091225 mm (9") dia 5 mm (3/16") thick M.S blind pipes
Per Ft.
23.092250 mm (10") dia 6 mm (3/16") thick {M.S blind pipe
Per Ft.
23.093300 mm (12") dia 6 mm (3/16") thick {M.S blind pipe
Per Ft.
23.094375 mm (15") dia 6 mm (3/16") thick {M.S blind pipes
Per Ft.
23.095450 mm (18") dia 6 mm (3/16") thick {M.S blind pipes
Per Ft.
23.096500 mm (20") dia 6 mm (3/16") thick {M.S blind pipes
Per Ft.
23.097550 mm (22") dia 6 mm (3/16") thick {M.S blind pipes
Per Ft.
80-600 mm (3"-24") dia {C.I specials (with Commet joint and
23.098
Per Kg
rubber ring) For A.C Pipes}
23.09980-450 mm (3"- 18") dia C.I Specials of BSS Class B with S Per Kg
23.10080-450 mm (3"- 18") dia C.I Specials of BSS Class B With Fla Per Kg
23.10180-450 mm (3"- 18") dia C.I Specials of BSS Class B with Tyt Per Kg
23.10280 mm (3") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.103100 mm (4") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.104125 mm (5") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.105150 mm (6") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.106200 mm (8") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.107250 mm (10") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.108300 mm (12") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.109375 mm (14") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.110450 mm (18") dia Sluice Valves of BSS for AC & CI pipe line
Each
23.111Single Air Valve 75 mm (3")
Each
23.112Double Air Valve 75 mm (3")
Each
23.113Fire Hydrant BSS 65 mm (2")
Each
23.11480 mm (3") dia P.V.C tapperd core BSS Class 'B'
Each
23.115100 mm (4") dia P.V.C tapperd core BSS Class 'B'
Each
23.116125 mm (5") dia P.V.C tapperd core BSS Class 'B'
Each
23.117150 mm (6") dia P.V.C tapperd core BSS Class 'B'
Each
23.118200 mm (8") dia P.V.C tapperd core BSS Class 'B'
Each
23.119250 mm (10") dia P.V.C tapperd core BSS Class 'B'
Each
23.120300 mm (12") dia P.V.C tapperd core BSS Class 'B'
Each
23.121350 mm (14") dia P.V.C tapperd core BSS Class 'B'
Each
1
Each
23.122 15 mm (1 /4") dia P.V.C tapperd core BSS Class 'D'
23.12340 mm (1") dia P.V.C tapperd core BSS Class 'D'
Each
23.12450 mm (2") P.V.C tapperd core BSS Class 'D'
Each
23.12575 mm (3") dia P.V.C Bends BSS class 'B'
Each
23.126100 mm (4") dia P.V.C Bends BSS class 'B'
Each
23.127100 mm (5") dia P.V.C Bends BSS class 'B'
Each
23.128150 mm (6") dia P.V.C Bends BSS class 'B'
Each
23.12930 mm (1") dia P.V.C Bends BSS class 'D'
Each
23.13040 mm (1") dia P.V.C Bends BSS class 'D'
Each
23.13150 mm (2") dia P.V.C Bends BSS class 'D'
Each
23.13280 mm (3") dia P.V.C Bends BSS class 'D'
Each
23.133100 mm (4") dia P.V.C Bends BSS class 'D'
Each
23.134125 mm (5") dia P.V.C Bends BSS class 'D'
Each
23.135150 mm (6") dia P.V.C Bends BSS class 'D'
Each
23.13680 mmm (3") dia P.V.C Tee BSS Class 'B'
Each
23.137100 mm (4") dia P.V.C Tee BSS Class 'B'
Each
23.138125 mm (5") dia P.V.C Tee BSS Class 'B'
Each
23.139150 mm (6") dia P.V.C Tee BSS Class 'B'
Each
23.140200 mm (8") dia P.V.C Tee BSS Class 'B'
Each
Page 11

ITEM
MATERIAL
23.141250 mm (10") dia P.V.C Tee BSS Class 'B'
23.142300 mm (12") dia P.V.C Tee BSS Class 'B'
23.143350 mm (14") dia P.V.C Tee BSS Class 'B'
23.14430 mm (1") dia P.V.C Tee BSS Class 'D'
23.14540 mm (1") dia P.V.C Tee BSS Class 'D'
23.14650 mm (2") dia P.V.C Tee BSS Class 'D'
23.14780 mm (3") dia P.V.C Tee BSS Class 'D'
23.148100 mm (4") dia P.V.C Tee BSS Class 'D'
23.149125 mm (5") dia P.V.C Tee BSS Class 'D'
23.150150 mm (6") dia P.V.C Tee BSS Class 'D'
23.15180 mmm (3") dia P.V.C sockets BSS Class 'B'
23.152100 mm (4") dia P.V.C sockets BSS Class 'B'
23.153125 mm (5") dia P.V.C sockets BSS Class 'B'
23.154150 mm (6") dia P.V.C sockets BSS Class 'B'
23.155200 mm (8") dia P.V.C sockets BSS Class 'B'
23.156250 mm (8") dia P.V.C sockets BSS Class 'B'
23.157300 mm (12") dia P.V.C sockets BSS Class 'B'
23.158350 mm (14") dia P.V.C sockets BSS Class 'B'
23.15930 mm (1") dia P.V.C sockets BSS Class 'D'
23.16040 mm (1") dia P.V.C sockets BSS Class 'D'
23.16150 mm (2") dia P.V.C sockets BSS Class 'D'
23.16280 mm (3") dia P.V.C sockets BSS Class 'D'
23.163100 mm (4") dia P.V.C sockets BSS Class 'D'
23.164125 mm (5") dia P.V.C sockets BSS Class 'D'
23.165150 mm (6") dia P.V.C sockets BSS Class 'D'
23.166Bleaching powder/chlorine
23.16750 mm (2") dia 4 mm (5/32") Brass strainer incluidng specia
23.16875 mm (3") dia 4 mm (5/32") Brass strainer incluidng specia
23.169100 mm (4") dia 5 mm (3/16") Brass strainer incluidng spec
23.170125 mm (5") dia 5 mm (3/16") Brass strainer incluidng speci
23.171150 mm (6") dia 5 mm (3/16") Brass strainer incluidng speci
23.172175 mm (7") dia 5 mm (3/16") Brass strainer incluidng speci
23.173200 mm (8") dia 5 mm (3/16") Brass strainer incluidng speci
23.174225 mm (9") dia 5 mm (3/16") Brass strainer incluidng speci
23.175250 mm (10") dia 5 mm (3/16") Brass strainer incluidng spec
23.176250 mm (10") dia 6 mm (") Brass strainer incluidng special
23.177300 mm (12") dia 6 mm (") Brass strainer incluidng special
23.178375 mm (15") dia 6 mm (") Brass strainer incluidng special
23.179450 mm (18") dia 6 mm (") Brass strainer incluidng special
23.180500 mm (20") dia 6 mm (") Brass strainer incluidng special
23.181550 mm (22") dia 6 mm (") Brass strainer incluidng special
23.18275 mm (3") dia P.V.C strainer Class 'B'
23.183100 mm (4") dia P.V.C strainer Class 'B'
23.184125 mm (5") dia 60 cm P.V.C strainer Class 'B'
23.185150 mm (6") dia 60 cm P.V.C strainer Class 'B'
23.186200 mm (7") dia 60 cm P.V.C strainer Class 'B'
23.187250 mm (8") dia 60 cm P.V.C strainer Class 'B'
23.188300 mm (9") dia 60 cm P.V.C strainer Class 'B'
23.189350 mm (10") dia 60 cm P.V.C strainer Class 'B'
23.190PVC Stainer Class D 1" dia (30mm)
23.191PVC Stainer Class D 1 dia (40 mm)
23.192PVC Stainer Class D 2" dia (50 mm)
23.193PVC Stainer Class D 3" dia (75 mm)
23.194PVC Stainer Class D 4" dia (100 mm)
23.195PVC Stainer Class D 5" dia (125 mm)
23.196PVC Stainer Class D 6" dia (150 mm)
23.19750 mm (2") i/d, Bail Plug-mild steel
23.19875 mm (3") i/d Bail Plug-mild steel
23.199100 mm (4") i/dBail Plug-mild steel
23.200125 mm (5") i/d Bail Plug-mild steel
23.201150 mm (6") i/d Bail Plug-mild steel
23.202175 mm (7") i/d
Bail Plug-mild steel
23.203200 mm (8") i/d
Bail Plug-mild steel
23.204225 mm (9") i/d
Bail Plug-mild steel
23.205250 mm (10") i/d Bail Plug-mild steel
23.206300 mm (12") i/d Bail Plug-mild steel
23.207375 mm (15") i/d Bail Plug-mild steel
23.208450 mm (18") i/d Bail Plug-mild steel
23.209500 mm (20") i/d Bail Plug-mild steel
23.210550 mm (22") i/d Bail Plug-mild steel
23.21175 mm (3") dia PVC BSS Class 'B' Bail Plug
23.212100 mm (4") dia PVC BSS Class 'B' Bail Plug
23.213125 mm (5") dia PVC BSS Class 'B' Bail Plug
Page 12

UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Per Kg
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Each
Each
Each

RATE

ITEM
MATERIAL
23.214150 mm (6") dia PVC BSS Class 'B' Bail Plug
23.215200 mm (8") dia PVC BSS Class 'B' Bail Plug
23.216250 mm (10") dia PVC BSS Class 'B' Bail Plug
23.217300 mm (12") dia PVC BSS Class 'B' Bail Plug
23.218350 mm (14") dia PVC BSS Class 'B' Bail Plug
23.21930 mm (1") dia P.V.C. Class 'D' Bail Plug
23.22040 mm (1") dia P.V.C. Class 'D' Bail Plug
23.22150 mm (2") dia P.V.C. Class 'D' Bail Plug
23.22280 mm (3") dia P.V.C. Class 'D' Bail Plug
23.223100 mm (4") dia P.V.C. Class 'D' Bail Plug
23.224125 mm (5") dia P.V.C. Class 'D' Bail Plug
23.225150 mm (6") dia P.V.C. Class 'D' Bail Plug
23.226G.I. pipe with flanged joint 1" dia 40mm (Heavy Quality)
23.227G.I. pipe with G.I. flanged joint 2" dia 50 mm (Heavy Qualit
23.228G.I. pipe with GI. flanged joint 2" dia 65 mm (Heavy Qualit
23.229G.I. pipe with G.I. flanged joint 3" dia 75 mm (Heavy Quali
23.230G.I. pipe with G.I. flanged joint 4" dia 100 mm (Heavy Quali
23.231G.I. pipe with G.I. flanged joint 5" dia 125 mm (Heavy Quali
23.232G.I. pipe with G.I. flanged joint 6" dia 150 mm (Heavy Quali
23.233G.I. pipe with C.I. flanged joint 1" dia 40mm (Medium Quali
23.234G.I. pipe with C.I. flanged joint 2" dia 50 mm (Medium Quali
23.235G.I. pipe with C.I. flanged joint 2" dia 65 mm (Medium Qual
23.236G.I. pipe with C.I. flanged joint 3" dia 75 mm (Medium Qual
23.237G.I. pipe with C.I. flanged joint 4" dia 100 mm (Medium Qual
23.238G.I. pipe with C.I. flanged joint 5" dia 125 mm (Medium Qual
23.239G.I. pipe with C.I. flanged joint 6" dia 150 mm (Medium Qual
23.24075 mm Sluice Valve for A.C. Pipe Line with commet joint & ru
23.241100 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.242150 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.243200 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.244250 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.245300 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.246400 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.247450 mm Sluice Valve for A.C. Pipe Line with commet joint & r
23.248Lock for wooden box for pressuring samples off strata from b
23.249Cost of Lubricant for PVC Pipe
23.250Steel Handle 4" (100mm)
23.25175 mm PVC Blind/Pressure Pipe Class "B"
23.252100 mm PVC Blind/Pressure Pipe Class "B"
23.253125 mm PVC Blind/Pressure Pipe Class "B"
23.254150 mm PVC Blind/Pressure Pipe Class "B"
23.255200 mm PVC Blind/Pressure Pipe Class "B"
23.256250 mm PVC Blind/Pressure Pipe Class "B"
23.257300 mm PVC Blind/Pressure Pipe Class "B"
23.258350 mm PVC Blind/Pressure Pipe Class "B"
23.25930 mm PVC Blind/Pressure Pipe Class "D"
23.26040 mm PVC Blind/Pressure Pipe Class "D"
23.26150 mm PVC Blind/Pressure Pipe Class "D"
23.26275 mm PVC Blind/Pressure Pipe Class "D"
23.263100 mm PVC Blind/Pressure Pipe Class "D"
23.264125 mm PVC Blind/Pressure Pipe Class "D"
23.265150 mm PVC Blind/Pressure Pipe Class "D"
23.266Loading expenses for pipes
23.267(Petty store) bolts & nuts etc. for 5" dia bore
23.268(Petty store) bolts & nuts etc. for 6" dia bore
23.269(Petty store) bolts & nuts etc. for 8" dia bore
23.270(Petty store) bolts & nuts etc. for10" dia bore
23.271(Petty store) bolts & nuts etc. for 12" dia bore
23.272(Petty store) bolts & nuts etc. for15" dia bore
23.273(Petty store) bolts & nuts etc. for 18" dia bore
23.274Hire charges of boring material, installation & Carriage (3
23.275Hire charges of boring material, installation & Carriage (4
23.276Hire charges of boring material, installation & Carriage (5
23.277Hire charges of boring material, installation & Carriage (6
23.278Hire charges of boring material, installation & Carriage (8
23.279Hire charges of boring material, installation & Carriage (10
23.280Hire charges of boring material, installation & Carriage (12
23.281Hire charges of boring material, installation & Carriage (15
23.282Hire charges of boring material, installation & Carriage (18
Hire charges of boring material, installation & Carriage
23.283
for (5" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.284
for (6" dia bore) from 100.10 to 200 Ft. depth
Page 13

UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Each
Each
Each
Each
Each
Each
Each
Each
Each
Per Kg.
Each
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
P. Day
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.

RATE

ITEM

MATERIAL
Hire charges of boring material, installation & Carriage
23.285
for (8" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.286
for (10" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.287
for (12" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.288
for (15" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.289
for (18" dia bore) from 100.10 to 200 Ft. depth
Hire charges of boring material, installation & Carriage
23.290
for (5" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.291
for (6" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.292
for (8" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.293
for (10" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.294
for (12" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.295
for (15" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.296
for (18" dia bore) from 200.10 to 300 Ft. depth
Hire charges of boring material, installation & Carriage
23.297
for (8" dia bore) from 300.10 to 400 Ft. depth
Hire charges of boring material, installation & Carriage
23.298
for (10" dia bore) from 300.10 to 400 Ft. depth
Hire charges of boring material, installation & Carriage
23.299
for (12" dia bore) from 300.10 to 400 Ft. depth
Hire charges of boring material, installation & Carriage
23.300
for (15" dia bore) from 300.10 to 400 Ft. depth
Hire charges of boring material, installation & Carriage
23.301
for (18" dia bore) from 300.10 to 400 Ft. depth
23.302Repair charges of T&P for 5" dia bore hole
23.303Repair charges of T&P for 6" dia bore hole
23.304Repair charges of T&P for 8" dia bore hole
23.305Repair charges of T&P for 10" dia bore hole
23.306Repair charges of T&P for 12" dia bore hole
23.307Repair charges of T&P for 15" dia bore hole
23.308Repair charges of T&P for 18" dia bore hole
23.309Solvent for PVC Strainer 3" dia (Class B)
23.310Solvent for PVC Strainer 4" - 5" dia (Class B)
23.311Solvent for PVC Strainer 6" dia (Class B)
23.312Solvent for PVC Strainer 8" - 10" dia (Class B)
23.313Solvent for PVC Strainer 12" - 14" dia (Class B)
23.314Solvent for PVC Strainer 1" dia (Class D)
23.315Solvent for PVC Strainer 1" dia (Class D)
23.316Solvent for PVC Strainer 2" dia (Class D)
23.317Solvent for PVC Strainer 3" dia (Class D)
23.318Solvent for PVC Strainer 4" dia (Class D)
23.319Solvent for PVC Strainer 5" dia (Class D)
23.320Solvent for PVC Strainer 6" dia (Class D)
23.321Solvent for PVC Bail Plug 3" dia (Class B)
23.322Solvent for PVC Bail Plug 4" dia (Class B)
23.323Solvent for PVC Bail Plug 5" dia (Class B)
23.324Solvent for PVC Bail Plug 6" dia (Class B)
23.325Solvent for PVC Bail Plug 8" dia (Class B)
23.326Solvent for PVC Bail Plug 10" dia (Class B)
23.327Solvent for PVC Bail Plug 12" dia (Class B)
23.328Solvent for PVC Bail Plug 14" dia (Class B)
23.329Solvent for PVC Bail Plug 1" dia (Class D)
23.330Solvent for PVC Bail Plug 1" dia (Class D)
23.331Solvent for PVC Bail Plug 2" dia (Class D)
23.332Solvent for PVC Bail Plug 3" dia (Class D)
23.333Solvent for PVC Bail Plug 4" dia (Class D)
23.334Solvent for PVC Bail Plug 5" dia (Class D)
23.335Solvent for PVC Bail Plug 6" dia (Class D)
23.336Testing and Disinfecting of PVC Pipe 3" dia
23.337Testing and Disinfecting of PVC Pipe 4" dia
23.338Testing and Disinfecting of PVC Pipe 5" dia
23.339Testing and Disinfecting of PVC Pipe 6" dia
23.340Testing and Disinfecting of PVC Pipe 8" dia
Page 14

UNIT
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Per Ft.
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
100 Ft.
100 Ft.
100 Ft.
100 Ft.
100 Ft.

RATE

ITEM
MATERIAL
UNIT
RATE
23.341Testing and Disinfecting of PVC Pipe 10" dia
100 Ft.
23.342Testing and Disinfecting of PVC Pipe 12" dia
100 Ft.
23.343Testing and Disinfecting of PVC Pipe 14" dia
100 Ft.
23.344Testing and Disinfecting of G.I Pipe 40mm (1") dia
100 Ft.
23.345Testing and Disinfecting of G.I Pipe 50mm (2") dia
100 Ft.
23.346Testing and Disinfecting of G.I Pipe 63mm (2") dia
100 Ft.
23.347Testing and Disinfecting of G.I Pipe 75mm (3") dia
100 Ft.
23.348Testing and Disinfecting of G.I Pipe 100mm (4") dia
100 Ft.
23.349Testing and Disinfecting of G.I Pipe 125mm (6") dia
100 Ft.
23.350Testing and Disinfecting of G.I Pipe 150mm (7") dia
100 Ft.
23.351Disc for bail plugs
P. Kg.
23.352Testing and Disinfecting of G.I Pipe
P. Lbs
23.353Bottle 2 lbs capacity
Each
23.35475 mm to 450 mm dia CI flanges for pipes
P. Kg.
23.355Cost of C.I. Flanges for Pipe
100 cwt
23.356Welding Charges of spigot or socket, flanged or tyton ends er Inch Bore
23.357Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.358Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.359Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.360Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.361Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.362Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.363Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.364Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.365Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.366Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.367Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.368Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.369Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.370Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.371Equipment Charges for lowering Brass Stainer in Tubewel Bore Per Ft.
23.372M.S. Bolt & Nut 6" to 22" dia bore hole bail plug
Each
23.373M.S. Bolt & Nut 2" to 5" dia bore hole bail plug
Each
23.374Threading Clamp 2" to 6"
Each
23.375Threading Clamp 7" to 22"
Each
%0 Gallon
23.376Water for testing and disinfecting of pipes
23.377Lead
Per Kg.
23.378Yarn
Per Kg.
23.379Disinfecting agent for C.I. Pipe
P. Kg.
23.380Bolt and nuts (3" to 4") for flanged joint
Each
23.381Bolt and nuts (5" to 12") for flanged joint
Each
23.382Bolt and nuts (15" to 18") for flanged joint
Each
23.383Cost of ring for cast iron pipe(3") with tyton joints
Each
23.384Cost of ring for cast iron pipe(4") with tyton joints
Each
23.385Cost of ring for cast iron pipe(5") with tyton joints
Each
23.386Cost of ring for cast iron pipe(6") with tyton joints
Each
23.387Cost of ring for cast iron pipe(8") with tyton joints
Each
23.388Cost of ring for cast iron pipe(10") with tyton joints
Each
23.389Cost of ring for cast iron pipe(12") with tyton joints
Each
23.390Cost of ring for cast iron pipe(15") with tyton joints
Each
23.391Cost of ring for cast iron pipe(18") with tyton joints
Each
23.392Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.393Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.394Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.395Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.396Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.397Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.398Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.399Cost of material for joints of sluice Valve for A.C. pipe wi 2 joints
23.400Material for jointing of fire hydrant
Each
23.401Material for jointing of air valve
Each
23.402Cost of Bolt and nuts for G.I. Flanged Joints 1" to 2"
Each
23.403Cost of Bolt and nuts for G.I. Flanged Joints 2" to 7"
Each
23.404Rubber Insertion for G.I. flanged joints
Per Lbs
23.405Solvent for PVC bends
Per Kg.
23.406Lubricant
Per Kg.
23.407Material for C-I specials with spigot and socket joint fo 2 joints
23.408Material for C-I specials with spigot and socket joint fo 2 joints
23.409Material for C-I specials with spigot and socket joint fo 2 joints
23.410Material for C-I specials with spigot and socket joint fo 2 joints
23.411Material for C-I specials with spigot and socket joint fo 2 joints
23.412Material for C-I specials with spigot and socket joint fo 2 joints
23.413Material for C-I specials with spigot and socket joint fo 2 joints
Page 15

ITEM
MATERIAL
23.414Material for C-I specials with spigot and socket joint fo
23.415Material for C-I specials with spigot and socket joint fo
23.416Material for CI flanged speical with flanged and flanged joi
23.417Material for CI flanged speical with flanged and flanged joi
23.418Material for CI flanged speical with flanged and flanged joi
23.419Material for CI flanged speical with flanged and flanged joi
23.420Material for CI flanged speical with flanged and flanged joi
23.421Material for CI flanged speical with flanged and flanged joi
23.422Material for CI flanged speical with flanged and flanged joi
23.423Material for CI flanged speical with flanged and flanged joi
23.424Material for CI flanged speical with flanged and flanged joi
Casting material (supply of speicals I/c moulding, painting
23.425 carriage to site of work)
CI specials with
spigot
an
socket
joint
Casting material (supply of speicals I/c moulding, painting
23.426 carriage to site of work)
CI flanged
speical with flanged and flanged joints
Casting material (supply of speicals I/c moulding, painting
23.427 carriage to site of work)
CI speicals with
tyton joints / with comet joint and rubber ring complete
23.428Material for AC pipe line with comet joint and rubber ring
23.429Material for AC pipe line with comet joint and rubber ring
23.430Material for AC pipe line with comet joint and rubber ring
23.431Material for AC pipe line with comet joint and rubber ring
23.432Material for AC pipe line with comet joint and rubber ring
23.433Material for AC pipe line with comet joint and rubber ring
23.434Material for AC pipe line with comet joint and rubber ring
23.435Material for AC pipe line with comet joint and rubber ring
23.436Material for AC pipe line with comet joint and rubber ring
23.437Material for AC pipe line with comet joint and rubber ring
24.00117.5 x 10 x cm (7" x 4") {Sal Wood Boards (4.5 cm) 1" thic
24.00222.5 x 10 x cm (9" x 4") {Sal Wood Boards (4.5 cm) 1" thic
24.00322.0 x 25 x cm (8" x 10") {Sal Wood Boards (4.5 cm) 1" thi
24.00425.0 x 30 x cm (10" x 12") {Sal Wood Boards (4.5 cm) 1" th
24.00530.0 x 37 x cm (12" x 14") {Sal Wood Boards (4.5 cm) 1" th
24.00617.5 x 10 x cm (7" x 4") {Teak Wood Boards (4.5 cm) 1.75" t
24.00722.5 x 10 x cm (9" x 4") {Teak Wood Boards (4.5 cm) 1.75" t
24.00820.0 x 25 x cm (8" x 10") {Teak Wood Boards (4.5 cm) 1.75"
24.00925.0 x 30 x cm (10" x 12") {Teak Wood Boards (4.5 cm) 1.75
24.01030.0 x 37 x cm (12" x 14") {Teak Wood Boards (4.5 cm) 1.75
2 way 15 Amp Branch distribution board iron/aluminium clad
24.011 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
3 way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.012 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
4
way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.013 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
5 way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.014 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
6 way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.015 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
7 way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.016 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
8
way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.017 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
9 way 15 for
Amp BDB
Branch
board iron/aluminium clad
24.018 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250 volts
10 way 15for
AmpBDB
Branch
distribution board iron/aluminium clad
24.019 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250 volts
11 way 15for
AmpBDB
Branch
distribution board iron/aluminium clad
24.020 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250 volts
12
way 15for
AmpBDB
Branch
distribution board iron/aluminium clad
24.021 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
2 way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.022 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
3 way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.023 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
4 way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.024 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
5
way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.025 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
6 way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.026 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering
250distribution
volts
7 way 30 for
Amp BDB
Branch
board iron/aluminium clad
24.027 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
covering for BDB 250 volts
Page 16

2
2
2
2
2
2
2
2
2
2
2

UNIT
joints
joints
joints
joints
joints
joints
joints
joints
joints
joints
joints

Per Cwt
Per Cwt
Per Cwt
2
2
2
2
2
2
2
2
2
2

joints
joints
joints
joints
joints
joints
joints
joints
joints
joints
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

RATE

ITEM

MATERIAL
UNIT
8 way 30 Amp Branch distribution board iron/aluminium clad
24.028 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
Each
covering
for
BDB
250
volts
9 way 30 Amp Branch distribution board iron/aluminium clad
24.029 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
Each
covering
for
BDB
250
volts
10 way 30 Amp Branch distribution board iron/aluminium clad
24.030 250 volts angle iron frame with 3 mm (1/8") M.S. sheet
Each
covering for BDB 250 volts
24.031PVC insulated single core copper conductor cable 3/0.029" 25 Metre
24.032PVC insulated single core copper conductor cable 3/0.036" 2 Metre
24.033PVC insulated single core copper conductor cable 7/0.029" 2 Metre
24.034PVC insulated single core copper conductor cable 7/0.036" 2 Metre
24.035PVC insulated single core copper conductor cable 7/0.044" 2 Metre
24.036PVC insulated single core copper conductor cable 7/0.064" 2 Metre
24.037PVC insulated single core copper conductor cable 19/0.052" 2 Metre
24.038PVC insulated single core copper conductor cable 19/0.064" Per Metre
PVC insulated cotton braided and compounded copper
24.039
Per Metre
conductor cable 3/0.029" 250/440 Volts
PVC insulated cotton braided and compounded copper
24.040
Per Metre
conductor cable 3/0.036" 250/440 Volts
PVC insulated cotton braided and compounded copper
24.041
Per Metre
conductor cable 7/0.029" 250/440 Volts
PVC insulated cotton braided and compounded copper
24.042
Per Metre
conductor cable 7/0.036" 250/440 Volts
PVC insulated cotton braided and compounded copper
Per Metre
24.043
conductor cable 7/0.044" 250/440 Volts
PVC insulated cotton braided and compounded copper
24.044
Per Metre
conductor cable 7/0.064" 250/440 Volts
PVC insulated sheathed single core copper conductor cable
24.045
Per Metre
3/0.029" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
Per Metre
24.046
cable 3/0.036" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
24.047
Per Metre
cable 7/0.074" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
24.048
Per Metre
cable 7/0.036" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
Per Metre
24.049
cable 7/0.044" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
24.050
Per Metre
cable 7/0.064" 250/440 Volts
PVC insulated PVC sheathed single core copper conductor
24.051
Per Metre
cable 7/0.064" 660/1100 volts grade
PVC insulated PVC sheathed single core copper conductor
24.052
Per Metre
cable 19/0.064" 660/1100 volts grade
PVC insulated PVC sheathed single core copper conductor
24.053
Per Metre
cable 19/0.064" 660/1100 volts grade
PVC insulated PVC sheathed single core, copper conductor
24.054
Per Metre
cable 19/0.083" 660/1100 volts grade
PVC insulated PVC sheathed single core, copper conductor
24.055
Per Metre
cable 37/0.072" 660/1100 volts grade
PVC insulated PVC sheathed single core, copper conductor
24.056
Per Metre
cable 37/0.083" 660/1100 volts grade
PVC insulated PVC sheathed single core, copper conductor
24.057
Per Metre
cable 37/0.103" 660/1100 volts grade
PVC insulated, PVC sheathed twin core copper conductor
24.058
Per Metre
cable 3/0.029" 250/440 volts
PVC insulated, PVC sheathed twin core copper conductor
24.059
Per Metre
cable 3/0.036" 250/440 volts
PVC insulated, PVC sheathed twin core copper conductor
24.060
Per Metre
cable 7/0.029" 250/440 volts
PVC insulated, PVC sheathed twin core copper conductor
24.061
Per Metre
cable 7/0.036" 250/440 volts
PVC insulated, PVC sheathed twin core copper conductor
24.062
Per Metre
cable 7/0.044" 250/440 volts
PVC insulated, PVC sheathed twin core copper conductor
24.063
Per Metre
cable 7/0.064" 250/440 volts
24.064PVC insulated, PVC sheathed three core cable 660/1100 volts Per Metre
24.065PVC insulated, PVC sheathed three core cable 660/1100 voltsPer Metre
24.066PVC insulated, PVC sheathed three core cable 7/0.029"
66Per Metre
24.067PVC insulated, PVC sheathed three core cable 7/0.036"
660Per Metre
24.068PVC insulated, PVC sheathed three core cable 7/0.044"
660Per Metre
24.069PVC insulated, PVC sheathed three core cable 7/0.064" 660/Per Metre
24.070PVC sheathed 4 core non armoured cable 3/0.029" 660/1100 vPer Metre
24.071PVC sheathed 4 core non armoured cable 3/0.036" 660/1100 vPer Metre
24.072PVC sheathed 4 core non armoured cable 7/0.029" 660/1100 vPer Metre
Page 17

RATE

ITEM
MATERIAL
24.073PVC sheathed 4 core non armoured cable 7/0.036" 660/1100
24.074PVC sheathed 4 core non armoured cable 7/0.044" 660/1100
24.075PVC sheathed 4 core non armoured cable 7/0.064" 660/1100
24.076PVC sheathed 4 core non armoured cable 19/0.052" 660/1100
PVC sheathed armoured with G.I. WIRE 16 SWG cable
24.077
19/0
052" 660/1100
volts
PVC sheathed
armoured
with G.I. WIRE 16 SWG cable
24.078
19/0sheathed
064" 660/1100
volts
PVC
armoured
with G.I. WIRE 16 SWG cable
24.079
19/0sheathed
072" 660/1100
volts
PVC
armoured
with G.I. WIRE 16 SWG cable
24.080
19/0sheathed
083" 660/1100
volts
PVC
armoured
with G.I. WIRE 16 SWG cable
24.081
37/0sheathed
072" 660/1100
volts
PVC
armoured
with G.I. WIRE 16 SWG cable
24.082
37/0sheathed
083" 660/1100
volts
PVC
armoured
with G.I. WIRE 16 SWG cable
24.083
37/0
093"
660/1100
volts
PVC sheathed armoured with G.I. WIRE 16 SWG cable
24.084
37/0
103" stranded
660/1100hard
volts
Aluminium
drawn bare conductor 7/3.099 mm
24.085
(7/0
122")
Flexible wire 7/3.099 mm (7/.122") {PVC insulated PVC
24.086 sheathed armoured with G.I wire 16 SWG for service
conneciton 3 core:}
24.087Flexible twin wire 23/.0076" (23/0.195mm)
24.088PVC wire (3/.029")
24.089Capacitor 2.2 UF for ceiling fan
24.090M.S Clamp " dia (16mm)
24.091M.S Clamp 3/4" dia (20mm)
24.092M.S Clamp 1" dia (25mm)
24.093M.S Clamp 11/4" dia (32mm)
24.094M.S Clamp 1" dia (40mm)
24.095M.S Clamp 2" dia (50mm)
24.096M.S Clamp 4" dia (100mm)
24.097Clamps for electric wiring 15 mm (")
24.098Clamps for electric wiring 20 mm (")
24.099Clamps for electric wiring '25 mm (1")
24.100Clamps for electric wiring '32 mm (1")
24.101Clamps for electric wiring 40 mm (1")
24.102Clamps for electric wiring 50 mm (2")
24.103Clamps for electric wiring '63 mm (2")
24.104Clamps for electric wiring '80 mm (3")
24.105Clamps for electric wiring 100 mm (4")
24.106PVC Inspection Boxes 15 mm (")
24.107PVC Inspection Boxes 20 mm (")
24.108PVC Inspection Boxes 25 mm (1")
24.109PVC Inspection Boxes 30 mm (1")
24.110PVC Inspection Boxes 40 mm (1")
24.111PVC Inspection Boxes 50 mm (2")
24.112PVC Inspection Boxes 75 mm (3")
24.113PVC Inspection Boxes 100 mm (4")
24.114Chokes 40 watts
24.115Chokes 20 watts
24.116Round block of Sahl wood
GEC design Pole mounted street light with holder shade and
24.117 glass for fitting 125/250 watts mercury Vapour lamp
(excluding cost of lamp) with bracket clamp nuts & bolts
24.118Street light pole bracket
24.119Cost of bracket 1" (32 mm) G.I pipe 7 ft. long half round
24.120Shackle Insulator for holding insulated wire
24.121Pin Insulator greeen (medium size)
24.122Staining screws for stay wire of electric pole
24.123Stay wire for electric pole 7/12"
24.124Stay wire for electric pole 7/14"
24.125Bakelite button holder shade large size
24.126Bakelite button holder shade Large size
24.127Bakelite Button Holder large size
24.128Bell push or bed switch
24.129Bakelite lamp holder
24.130Braket lamp holder
24.131Brass bracket with holder
24.132Brass bracket with holder
24.133Brass Button Holder
24.134Call bell 220/250 volts
24.135Ceiling rose bakelite
24.136Cut out bakelite open type
24.137Cut out backolite recessed type
24.138Electric Energy Metre Single Phase} 250 volts 10 AMP
24.139Electric Energy Metre Single Phase 250 volts 30 AMP
24.140Electric Energy Metre Single Phase 250 volts 60 AMP
24.141Three phase 4 wires, 400 volts: 3 x 15 Amps
24.142Three phase 4 wires, 400 volts:3 x 50 Amps
Page 18

UNIT
vPer Metre
vPer Metre
vPer Metre
vPer Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Per Metre
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Per Doz.
Each
Each
Each
Each
Each
Each
Each
Each
Each
Metre
Metre
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

RATE

ITEM
MATERIAL
24.143Three phase 4 wires, 400 volts: 3 x 80 Amps
24.144Electric shoe 3 pin 10/15 Amps
24.145Wall Shoe 3 pin 5 Amps
24.146Wall socket 3 pin 5 Amps
24.147Wall socket 3 pin 5 Amps without Shoe.
24.148Wall socket 3 pin 10/15 Amp open type
24.149Wall socket 3 pin 10/15 Amp recessed type
24.150Wall socket 3 pin 10/15 Amp with shoe
24.151Flouresent tube 40 watts
24.152Starter for Flourscent Tube 40 watts
24.153Kit kat fuses 500 volt 15/20 Amp
24.154Kit kat fuses 500 volt 30/35 Amp
24.155Kit kat fuses 500 volt 60/65 Amp
24.156Kit kat fuses 500 volt 100 Amp
24.157Kit kat fuses 500 volt 200 Amp
24.158Kit kat fuses 500 volt 300 Amp
24.159Kit kat fuses 500 volt 400 Amp
24.160Kit kat fuses 500 volt 500 Amp
24.161Leathoride paper
24.162Cooper nail 2" / 3"
24.163Cooper plates 600 x 600 x 3 mm (2' x 2' x 1/8")
24.164Lightining arrestor Horn type
24.165Copper enamel wire No. 26 to 32
24.166Soldering and varnishing for A.C. ceiling fan
24.167Wooden Gutties
24.168Switch double control open type (5 Amp)
24.169Switch double control piano type (5 Amp)
24.170Switch double controil ring type recessed (5 Amp)
24.171Switch Piano type (5 Amp)
24.172Switch plate type recessed (5 Amp)
24.173Switch ring type (5 Amp)
Double pole 15/20 Amp {Iron/Alminum clad 500 volt main
24.174
switch with kit kat fuse}
Double pole 30/35 Amp {Iron/Alminum clad 500 volt main
24.175
switch with kit kat fuse}
Double pole 60/65 Amp {Iron/Alminum clad 500 volt main
24.176
switch with kit kat fuse}
Double pole 100 Amp {Iron/Alminum clad 500 volt main switch
24.177
with kit kat fuse}
Tripple pole 15/20 Amp {Iron/Alminum clad 500 volt main
24.178
switch with kit kat fuse}
Tripple pole 30/35 Amp {Iron/Alminum clad 500 volt main
24.179
switch with kit kat fuse}
24.180Tripple pole with neutral link 30/35 Amp main switch
24.181Tripple pole with neutral link 60/65 Amp main switch
24.182Tripple pole with neutral link 100 Amp main switch
Iron/Aluminum clad 500 volt main switch with tripple pole
24.183
and neutral link with HRC fueses: 60/65 Amps
Iron/Aluminum clad 500 volt main switch with tripple pole
24.184
and neutral link with HRC fueses:
100 Amps.
Iron/Aluminum clad 500 volt main switch with tripple pole
24.185
and neutral link with HRC fueses:
150 Amps.
Iron/Aluminum clad 500 volt main switch with tripple pole
24.186
and neutral link with HRC fueses:
200 Amps.
Iron/Aluminum clad 500 volt main switch with tripple pole
24.187
and neutral link with HRC fueses:
300 Amps.
Iron/Aluminum clad 500 volt main switch with tripple pole
24.188
and neutral link with HRC fueses:
400 Amps.
Iron/Aluminum clad 500 volt main switch with tripple pole
24.189
and neutral link with HRC fueses:
500 Amps.
24.190Thimble copper 60/65 Amp
24.191Thimble copper 100 Amp
24.192Thimble 150 Amp.
24.193Thimble copper 200 Amp
24.194Thimble copper 300 Amp
24.195Thimble copper 400 Amp
24.196Thimble copper 500 Amp
24.197G.I bend " (15 mm) dia
24.198G.I bend " (20 mm) dia
24.199G.I bend 1" (25 mm) dia
24.200G.I bend 1" (32 mm) dia
24.201G.I bend 1" (40 mm) dia
24.202G.I. Bend 2" dia (50 mm) dia
24.203G.I bend 3" (80 mm) dia
Page 19

UNIT
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Job
Each
Kg
Each
Kg
each
Dozen
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each

RATE

ITEM
MATERIAL
24.204M.S. Bend "
(15 mm) dia
24.205M.S. Bend " (20 mm) dia
24.206M.S. Bend 1" (25 mm) dia
24.207M.S. Bend 1" (40 mm) dia
24.208M.S. Conduit Bend 1" (32 mm) dia
24.209M.S. Conduit Bend 1" (40 mm) dia
24.210M.S. Conduit Bend 2" (50 mm) dia
24.211PVC Bend " (12 mm) dia ordinary
24.212PVC Bend " (20 mm) dia ordinary
24.213PVC Bend 1" (25 mm) dia ordinary
24.214PVC Bend 1" (30 mm) dia ordinary
24.215PVC Bend 1" (40 mm) dia ordinary
24.216PVC Bend 2" (50 mm) dia ordinary
24.217PVC Bend 3" dia (75 mm) ordinary
24.218PVC Bend 4" dia (100 mm) ordinary
24.219Inspection box " (15 mm) dia
24.220Inspection box " (20 mm) dia
24.221Inspection box 1" (25 mm) dia
24.222M.S. Inspection box 1" (32 mm) dia
24.223M.S. Inspection box 1" (40 mm) dia to 3" (80mm) dia
24.224Hooks for " to 1" dia pipe
24.225 Hooks for 11/4" to 1" dia pipe
24.226Hook for 2" dia pipe
24.227Hook for 3" dia pipe
24.228 M.S. Conduit pipe "
(15 mm) dia
24.229M.S. Conduit pipe " (20 mm) dia
24.230M.S. Conduit pipe 1" (25 mm) dia
24.231M.S. Conduit pipe 1" (32 mm) dia
24.232M.S. Conduit pipe 1" (40 mm) dia
24.233M.S. Conduit pipe 2" (50 mm) dia
24.234PVC pipe " (12 mm) dia ordinary
24.235PVC pipe " (20 mm) dia ordinary
24.236PVC pipe 1" (25 mm) dia ordinary
24.237PVC pipe 1" (30 mm) dia ordinary
24.238PVC pipe 1" (40 mm) dia ordinary
24.239PVC pipe 2" (50 mm) dia ordinary
24.240PVC Pipe 3" dia (75 mm) ordinary
24.241PVC Pipe 4" dia (100 mm) ordinary
24.242PVC Flexible Pipe " (12 mm) dia
24.243G.I. pipe " dia (15 mm i/d)
24.244G.I. Pipe " dia (20 mm i/d)
24.245G.I. Pipe 1" dia (25 mm i/d)
24.246G.I. pipe 1" dia (32 mm i/d)
24.247G.I. pipe 1" dia (40 mm i/d)
24.248G.I. pipe 2" dia (50 mm i/d)
24.249G.I. pipe 3" dia (75 mm i/d)
24.250G.I. Flexible Pipe " (12 mm) dia
24.251G.I. Flexible Pipe " (20 mm) dia
24.252G.I. Flexible Pipe 1" (25 mm) dia
24.253G.I. Flexible Pipe 1" (32 mm) dia
24.254G.I. Flexible Pipe 1" (40 mm) dia
24.255G.I. Flexible Pipe 2" (50 mm) dia
24.256G.I. Flexible Pipe 3" (80 mm) dia
24.257G.I. Flexible pipe 4" (100 mm)
24.258Screws 1" (25 mm) long
24.259Screws 2" (25 mm) long
24.260Screws 3" (25 mm) long
24.261Screws 4" (25 mm) long
24.262Screws 6" (25 mm) long
24.263G.I reducing socket size 2 x " (50 x 13 mm)
24.264G.I Reducing socket 2 x " dia (50 x 20 mm)
24.265Boring " dia
24.266G.I. Socket " (12 mm) dia
24.267G.I. Socket " (20 mm) dia
24.268G.I. Socket 1" (25 mm) dia
24.269G.I. Socket 1" (32 mm) dia
24.270G.I. Socket 1" (40 mm) dia
24.271G.I. Socket 2" (50 mm) dia
24.272G.I. Socket 3" (80 mm) dia
24.273Brass Socket 1" (40 mm) dia
24.274Brass Socket 2" (50 mm) dia
24.275Brass Socket 4" (100 mm) dia
24.276PVC Socket " (12 mm) dia
Page 20

UNIT
Each
each
each
each
each
each
each
each
each
each
each
each
each
each
each
Each
Each
Each
per doz.
per doz.
Each
Each
Each
Each
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
per mtr.
per mtr.
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
Per Mtr
per mtr.
per mtr.
per mtr.
per mtr.
per mtr.
per mtr.
per mtr.
each
Dozen
Dozen
Dozen
Dozen
Dozen
each
each
Metre
each
each
each
each
each
each
each
each
each
each
each

RATE

ITEM
MATERIAL
UNIT
RATE
24.277G.I. Nipple " (12 mm) dia
each
24.278G.I. Nipple " (20 mm) dia
each
24.279G.I. Nipple 1" (25 mm) dia
each
24.280G.I. Nipple 1" (32 mm) dia
each
24.281G.I. Nipple 1" (40 mm) dia
each
24.282G.I. Nipple 2" (50 mm) dia
each
24.283G.I. Nipple 3" (80 mm) dia
each
24.284Brass nipple 1" dia (25mm)
each
24.285Brass Nipple 1" dia (32 mm)
each
24.286Brass Nipple 1" (40 mm) dia
each
24.287Brass Nipple 2" (50 mm) dia
each
24.288Brass Nipple 4" (100 mm) dia
each
24.289PVC Nipple " (12 mm) dia
each
24.290Brass Check nut " (12 mm) dia
each
24.291Brass check nut 1" (40 mm)
each
24.292Brass check nut 1" (25 mm)
each
24.293Brass check nut 1" (32 mm)
each
24.294Brass check nut 2" (50 mm)
each
24.295Brass check nut 4" (100 mm)
each
24.296Check Nuts " (12 mm) dia
each
24.297Check Nuts " (20 mm) dia
each
24.298Check Nuts 1" (25 mm) dia
each
24.299Check Nuts 1" (32 mm) dia
each
24.300Check Nuts 1" (40 mm) dia
each
24.301Check Nuts 2" (50 mm) dia
each
24.302Check Nuts 3" (80 mm) dia
each
24.303M.S Box 4" x 4" (100 x 100 mm)
each
24.304M.S Box 7" x 4" (175 x 100 mm)
each
24.305M.S Box 9" x 4" (225 x 100 mm)
each
24.306M.S Box 8" x 10" (200 x 250 mm)
each
24.307M.S Box 10" x 12" (250 x 300 mm)
each
24.308M.S Box 12" x 14" (300 x 350 mm)
each
24.309Angle iron board including paints (9"x9"x1")
each
24.310Angle Iron board including paint (9"x12"x1")
each
24.311Angle Iron board including paint (10"x12"x1")
each
24.312Angle Iron board including paint (12"x15"x1")
each
24.313Angle Iron board including paint (12"x18"x1")
each
24.314Angle Iron board including paint (10"x15"x1")
each
24.315Anle Iron board including paint (15"x18"x1")
each
24.316Copper strip 1" x 1/8" x 14" (40 x 3 x 350 mm)
each
24.317Copper strip 14" x 2" x 1/8" to 3/16" (350 x 50 x 3 mm to 6
each
24.318Copper strip 14" x 2" x 1/4" (350 x 50 x 6 mm) to 6mm
each
24.319Rag bolts 9" x 5/8" (225 x 16 mm)
each
24.320Reg bolts 12" x 5/8" (300 x 16 mm)
each
24.321Eye bolts
Each
24.322Eye bolts (bigger size) for straining posts, stiffening post
Each
24.323PVC/weather proof cable 3/0.029" (3/0.74 mm) Single core
per mtr.
24.324PVC/weather proof cable /0.029" (7/0.74 mm) Single core
per mtr.
24.325PVC/weather proof cable /0.036" (7/0.91 mm) Single core
per mtr.
24.326PVC/weather proof cable /0.044" (7/1.12 mm) Single core
per mtr.
24.327Nut & Screw
Each
24.328Straining Screw for electric pole
Each
24.329Sal wood casing for wiring
Per mtr.
24.330Wooden strip casing
Per % mtr.
24.331Insulated cleat (small)
each
24.332Insulated cleat (big size)
each
24.333Leather or wooden cleats
each
24.334M.S Hooks
each
24.335M.S bar hook 3/8" (!0 mm) dia
each
24.336Canopy nipple & hook
Per Job
24.337Hook 5/8" (16 mm) with nut & bolts
each
24.338Girder clamp hook 5/8" (16 mm)
each
24.339PVC bushes " (12 mm) dia
each
24.340Glazed porcelain (Imported)
each
24.341Glazed Porcelain counter weight with accessories
each
24.342VIR/PVC cable 3/0.29
per mtr.
24.343Brass lamp holder
each
24.344Brass lamp holder
each
24.345Brass lamp holder
each
24.346Double cone reflector
each
24.347Switch ring type
each
24.348Switch 10/15 Amp
each
24.349Switch 10/15 Amp. recessed
each
Page 21

ITEM
MATERIAL
24.350Plug 3 pin and switch (combined) 10/15 Amp.
24.351Plug 3 pin and switch (recessed) 10/15 Amp.
24.352Pole mounted street light holder shade and glass
24.353Frame with holder
24.354Frame set
24.355Round tube 32 watts
24.356Starter
24.357Choke
24.358Holder
24.359Base patti for tube light
24.360Ball bearing size (6201, 6202, 6203)
24.361Plastic cover
24.362Handle chromium plated for iron box
24.363Nut & bolts " (12 mm) dia 1" (40 mm) long
24.364T - Iron " x 1" x 1" x 5"
24.365Clamps
24.366Steel channel 75 x 40 x 3 mm
24.367steel plate 3"x1"x" )75x40x40 mm)
24.368 Steel plate 3"x 3/4 x 3/4 (75 x 20 x 20 mm)
24.369Bolts and nuts 5/8" dia (16 mm)
24.370Double clamp for anchor rod henley type for pole
24.371Double clamp 9" dia (225 mm)
24.372Clamps with bolts & nuts etc. for street pole
24.373Clamp double for erection of house service pipe Henley
24.374Clamp 2" dia (50 mm)
24.375Steel clamp " dia (12 mm)
24.376G.I clamp (small)
24.377G.I. Clamp (large)
24.378Pole clamp with bolt & nuts for street light pole
24.379Shakle insulator
24.380M.S bolts for suport
24.381Copper wire No.2 to 10
24.382G.I wire (all size)
24.383Cut out
24.384Wooden & leather cleats
24.385Vapour mercury lamp 125 watt with choke set
24.386Vapour mercury lamp 250 watt with choke set
24.387Silver paint
24.388G.I Nuts & Bolts 2" long " (50 mm x 13 mm)
24.389G.I Nuts & Bolts 1" x " long (40 x 6 mm)
24.390Copper wire No.16 & 20 SWG
24.391Copper Wire Old
24.392Enemal wire No.26 SWG to 32 SWG
24.393 Copper tap 1" to 2" x1/8"
24.394Copper rod 1" dia (25 mm)
24.395Copper nail (small)
24.396Copper stapple
24.397Soldering and Vernishing
24.398Salt
24.399Loop wire 4 loop 3/0.029 (3/0.74 mm)
24.400Knob with shaff and plate
25.001Locking arrangements with sliding bolt 1' long and 1" dia
25.002Hard wood stair railing
25.003M.S. Channels
25.004Steel beam
25.005Steel chisel
25.006Grating 3/4"x3/4" size
25.007M.S. Box section of 16 SWG 1" x 3" hand rail
25.008Conduit pipe 2" dia including specials
25.009Roller 3" dia
25.010Rivets with heads 2" long
25.011Rivets 1" long
25.012Locking arrangement collapsible gate
25.013 Handles 12" long of 3/4"x1/4" steel channels for collapsibl
25.014GI sheet 24 SWG
25.015GI bracket for railing shutter
25.016GI Holdfast for railing shutter
25.017GI Pipe 1" dia (light quality)
25.018Handle for railing shutter
25.019GI spring for railing shutter
25.020Rolling gear for railing shutter
25.021Iron Holdfast for steel windows
25.022GI pipe 2" dia (light quality)
Page 22

UNIT
each
each
each
Per Job
Per Job
each
each
each
each
each
each
each
each
each
P.kg
P. Kg.
P.Kg.
P.Kg.
per kg
Each
Each
Each
each
each
each
each
each
each
each
each
each
per kg
per kg
each
each
each
each
P.Gln
each
each
per kg
per kg
per kg
per kg
per kg
each
each
each
per kg
Rft
each
Each
Rft
Kg
Kg
P.Kg.
P.Kg.
P.Rft
P.Ft
each
Each
Each
Each
Each
P.Kg.
Each
Each
P. Rft
Each
Each
Each
Each
P. Foot

RATE

ITEM
MATERIAL
UNIT
1
5
Each
25.023 Window hinges /4" thick with /16" dia pins
25.024Brass casement handle 6" for steel windows
Each
25.025Mild steel casement stay 15" long for steel windows
Each
25.026Wooden strips for fixing glass pans
P.Rft
25.027Steel glazing clips for fixing glass panes
Each
25.028Glass panes 2 mm thick
P. Sft.
25.029Glass panes 2.5 mm thick
P. Sft.
25.030Glass panes 3 mm thick
P. Sft.
25.031Glass panes 4 mm thick
P. Sft.
25.032Glass panes 5 mm thick
P. Sft.
25.033M.S. moulded tubular pipe of 18 SWG
P.Kg.
25.034Brass hinges (4" long)
Each
25.035Brass Handles (4" long)
Each
25.036U' shapped rubber linning (" thick)
P. Rft
25.037Wire gauze galvanized 24 SWG (12x 12 mesh)
P.Sft.
25.038 x M.S square box of 16 SWG for fixing wire gauge
P. Kg.
25.039C.P. tower bolt (225 mm long)
Each
25.040Brass handle special type for steel windows
Each
25.041G.I. Stay for windows
Each
1
P. Sft.
25.042 Grill of M.S. flat "x /8" with frame
25.043Cost of flaps including hinges for G.I. Pipes
Each
25.044Steel grating
P.Sft
25.0451 ft. long M.S. U-Clamp 3/4" dia threaded at both ends incl
Each
25.046Painting small detached articles not exceding 1" sft.
Each
3
Rft
25.047 Aluminum frame 100x20mm (4"x /4")
25.048Aluminum frame 100x40mm (4 x1")
Rft.
25.049Aluminum frame 60x40mm (1" x 2")
Rft.
3
Rft.
25.050 Aluminum frame 50x20mm (2" x /4")
25.051Aluminum leaf edging for aluminium windows
Rft.
25.052Tinted glass 5mm thick
Sft.
25.053Aluminum tringular gola and gasket
Rft.
25.054Pivot for aluminium doors
each
25.055Alimuninum tower bolt 9" long
each
25.056locking arrangement
each
25.057Handle Large
Rft
25.058Rubber gasket for Aluminium Windows
Rft.
25.059Latch for Aluminium Windows
each
25.060Steam Coal
P. Kg.
26.0017 Strand barbed wire
P.Kg.
26.002Anti termite (Heptachlore)
P-Ltr
26.003Cane Singapore
Per Kg.
26.0043/16" dia washers for straining posts, stiffening posts & in
Dozn
26.005Cost of bamboo 10' to 12' long
Each
26.006Cost of iron shoes for survey Jhandy
Each
26.007Cost of red cloth for survey Jhandy
Each
26.008Cost of ordinary wood for pegs
P. Cft.
26.009Hooks for fixing iron gauges
Dozen
26.010Filling cement bags with coal
Per Kg.
26.011Cost of manure
per Cart
26.012Polythene sheet of 300 gauge (0.003 thick)
P.Kg.
26.013Soap
P. Kg.
26.014Eye bolt
Each
26.015Primer (Zinc)
P. Kg.
26.016Weather Sheet Paint
P. Lt

Page 23

RATE

CHAPTER NO. 26

MISCELLANEOUS
DESCRIPTION OF ITEM:
1.

Notice Board made of cement


Note :

sand mortar

The board is to be of cement plaster " (12 mm) thick with 2" (50
1" (25mm) thick beading

Detail
Qty

Unit Rate Per Sft.


Rate
Per Unit

Amount

Size of Board 4' x 5' = 20 Sft.


4' (1.22m) x 5' (1.53m) = 20 Sft. (1.87 Sqm)
MATERIAL
1
2

Sand

1.20
0.3

Cement

Total
Contractor's Profit & Ove
Total

Cft
bag

0.00 %Cft.
0.00 per bag

20.0 Percent

LABOUR
1
2

Mason

0.75
1

Coolies

No.
No.

0.00 Per day


0.00 Per day

0.00
0.00
0.00
0.00

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATE
Labour Rate Per Sft.
Labour Rate Per Sqm
Composite Rate Per Sft.
Composite Rate Per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 1

Say
Say

2.

Fixing handles to iron hammers.

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

FOR 12 NOS.
LABOUR
1

Carpenter
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 12 Nos.

1.25

Nos.

0.00 Per day

0.00

ITEM RATE
Labour Rate Per Each

Rs.

Page 2

Say

3.

Providing and fixing barbed wire fencing with 4 horizontal and 2 number cross wires fixed
(1:2:4) straining posts 7'x9"x9" (2.14m x 225mm) at 100' (30m) centre to centre stiffenin
x 15 mmx 50mm) at 50' (15m) interval and intermediate posts 7'x5"x5" at 8' centre to centr
steel, its fabrication and placing of steel reinforcement, eye bolt, washers, etc. complet

Detail
Qty

Unit Rate for 100 Cft.


Rate
Per Unit

Amount

MATERIAL FOR 48 RFT.


1

R.C.C. posts (1:2:4) straining


posts = x 7' x 0.75 x 0.75
2.00
Collar around the straining posts
x (1.5)2xxx22/7=
0.44
Stiffening post 6"x6"
x7xx
0.88
Intermediate posts 5"x5"
5x7x5/12x5/12
6.07
Deduction for portion of posts
xxx
-0.14

9.25
2

M.Steel with binding wire straining


posts
Vertical bars " dia 2x7
14
stirrups " = x 8 x 3
12
Stiffening posts
Vertical bars 3/8" dia = 2x7
14
stirrups = x 8 x 2
8
Intermediate Posts
Vertical bars 3/8" dia=5x4x7
140
Stirrups " = 5x8x5/3 =
67
weight " 14..0' @ 0.67 Lb/f 9.368
" 12+8+67 = 87 ft. @ 0.167 14.53
3/8" 14+140 = 154' @ 0.37 lb 57.75
Total
81.648
add wastage 5%
4.082

Cft.
Cft.
Cft.
Cft.
Cft.
Cft.

9.25

Cft.

0.00 Per Cft,

Lbs.
Lbs.

38.89
85.73

Kg.
Lbs.

0.00 Per Kg.

85.73

Page 3

B / F :

MATERIAL
3

7 Strand barbed wires


192 Rft.
108 Rft.
300 Rft.
15 Rft.
315
14.82

Kg

Total

4 Nos
2 Nos
20 Nos
26 No
26.0

Total

4 Nos
2 Nos
20 Nos
26 No
26.0

Horizontal 4x48 =
cross wire 2x6x9
Add 5% wastage

Total

0.00 Per Kg.

Nos.

0.00

Each

Nos

0.00

Dozen

315 Rft. @ 1.25 Cwt/450 Yards

Eye
For
For
For

bolts (bigger size)


straining posts
stiffening posts
intermediate posts

3/16" washers
For straining posts
For stiffening posts
For intermediate posts

Total
Contractor's Profit & Ove
Total
Total for 100 Rft.

20.0 Percent

2462.21
48

x 100

Rs.

LABOUR
i) R.C.C. work (Item 6a(ii) Chap. 6)
ii) Fabrication of steel work 9Item 9(b) Chap. 6)
iii) Blacksmith for wire fencing
erection.
iv) Coolies

9.25
38.89

Cft.
Kg.

0.00 Per Cft.


0.00 Per Kg.

0.75
2.00

No.
Nos.

0.00 Per day


0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate Per LM
Composite Rate 100 Lft.
Composite Rate Per LM

4.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.00
0.00
0.00
0.00

Supplying bamboo jhandies 10' to 12' (3m to 2054m) with iron shoes and flag 15" (375 mm) s

Detail

Unit Rate Each


Page 4

Rate
Per Unit

Qty

Amount

MATERIAL
1
2

Cost of bamboo

1.00
1.0
1.0

Cost of iron shoes


Cost of red cloth

Total
Contractor's Profit & Ove
Total

No.
No.
No.

0.00
0.00
0.00

Each
Each
Each

20.0 Percent

LABOUR
1
2

Carpenter

0.04

Sewing charges

No.
L.S.

0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATE
Labour Rate for Each
Composite Rate for Each

Rs.
Rs.

Page 5

Say
Say

0.00
0.00

5.

Supplying wooden pegs for leveling 1" (40mm) dia 6" (150mm)

Detail
Qty

long

Unit Rate Per 100 Nos


Rate
Per Unit

Amount

MATERIAL FOR 300 NOS.


Cost of wood
Contractor's Profit & Ove
Total for 300 Nos.
Total for 100 Nos.

0.78

Cft.

0.00 Per Cft.

0.50

No.

0.00 Per day

0.00
0.00

20.0 Percent

LABOUR
1

Carpenter
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 300 Nos.
Total for 100 Nos.

ITEM RATE
Labour Rate Per 100 Nos.
Composite Rate Per 100 Nos.

Rs.
Rs.

Page 6

Say
Say

6.

Supplying wooden pegs for alignment 2" to 3" (50 to 75mm) dia 9"

Detail
Qty

(225mm)

long

Unit Rate Per 100 Nos.


Rate
Per Unit

Amount

MATERIAL
Cost of wood
Contractor's Profit & Ove

3.00

Cft

0.00 Per Cft.

20.0 Percent

Total

LABOUR
1

Carpenter
Sundries

10.00 Percent

0.40

No.

0.00 Per day

Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATE
Labour Rate Per 100 Nos.
Composite Rate Per 100 Nos.

Rs.
Rs.

Page 7

Say
Say

0.00
0.00

7.

Fixing enamalled iron gauges flush with masonry including cost of hooks.

Detail

Unit Rate Per Lft. / Assumed for 20 Lft.


Rate
Qty
Per Unit
Amount

MATERIAL
1

Hooks
Total
Contractor's Profit & Ove
Total for 20 Lft.

6.00

Nos.

0.00

Each

20.0 Percent

LABOUR
1
2

Mason
Coolies

1.00
1.00

No.
No.

0.00 Per day


0.00 Per day

Total

Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 20 Lft.

ITEM RATE
Labour Rate Per Lft.
Labour Per LM
Composite Rate Per Lft.
Composite Rate Per LM

8.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.00
0.00
0.00
0.00

Placing boundary pillars in position including digging pits.

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

LABOUR FOR 30 NOS.


1
2

Mason
Coolies

1.00
1.00

No.
No.

0.00 Per day


0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 30 Nos.

ITEM RATE
Labour Rate Each

Rs.

Page 8

Say

0.00

9.

Fixing mainline iron distance marks in position including making 1:3;6 cement concrete blo
size of block 10x14"x15" = 14.58 Cft.

Detail

Unit Rate Per Each / Assumed for 10 Nos.


Rate
Qty
Per Unit
Amount

MATERIAL
1
2
3

Cement
Sand
Aggregate stone
Total
Contractor's Profit & Ove
Total

1.80
6.75
13.50

Bags
Cft.
Cft.

0.00 per bag


0.00100 Cft.
0.00per Cft.

20.0 Percent

LABOUR
1
2

Mason
Coolies

1.00
2.00

No.
No.

0.00 Per day


0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.

Page 9

Say
Say

0.00
0.00

10.

Cutting Pipes upto 2" (50mm) dia.

Detail

Unit Rate Per Cut


Rate
Per Unit

Qty

Amount

LABOUR FOR 30 CUT


1
2

Blacksmith
Coolies

1.00
1.00

No.
No.

0.00 Per day


0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 30 Nos.

ITEM RATE
Labour Rate Per Cut

11.

Rs.

Say

0.00

Cutting Pipes above 2" (50mm) dia.

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

LABOUR FOR 25 CUTS


1
2

Blacksmith
Coolies

1.75
1.25

Nos.
Nos.

0.00 Per day


0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 25 Nos.

ITEM RATE
Labour Rate Per Cut

Rs.

Page 10

Say

0.00

12.

Threading pipe ends 1" to 4" (40 mm to 100 mm) dia

Detail
Qty

Unit Rate Per Each End


Rate
Per Unit

Amount

LABOUR FOR 30 NOS.


1
2

Blacksmith
Coolies

1.50
1.00

Nos.
No.

0.00 Per day


0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 30 Nos.

ITEM RATE
Labour Rate Per Each End

13.

Assembling 1" (40mm)

Rs.

Say

0.00

dia pressure pipes

Detail
Qty

Unit Rate Per 100 Lft.


Rate
Per Unit

Amount

LABOUR FOR 800 LFT.


1
2

Fitter Grade II
Coolies

1.00
1.50

No.
Nos.

0.00 Per day


0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 800 Lft.

ITEM RATE
Labour Rate Per 100 Lft.
Labour Rate Per Lm

Rs.
Rs.

Page 11

Say
Say

0.00
0.00

14.

Boring and fixing 1"

(40mm)

dia pressure pipe

Detail
Qty

Unit Rate Per Lft.


Rate
Per Unit

Amount

LABOUR FOR 40 LFT.


a)

In ordinary soil
Fitter
Coolies

1.00
3.50

No.
Nos.

0.00 Per day


0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 40 Lft.

b)

Labour Rate Per Lft.


Labour Rate Per Lm.

Rs.
Rs.

In clay (For 40 Lft.)


Fitter
Coolies

1.00
8.00

No.
Nos.

Say
Say

0.00 Per day


0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 40 Rft.
Labour Rate Per Lft.
Labour Rate Per Lm.
c)

0.00
0.00

Rs.
Rs.

In Shingle (For 40 Lft.)


Fitter
Coolies

1.00
12.50

No.
Nos.

Say
Say

0.00 Per day


0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 40 Rft.

0.00
0.00

ITEM RATE
Labour Rate Per 1 Lft.
Labour Rate Per Lm.

Rs.
Rs.

Page 12

Say

0.00

15.

Repair to hand pumps pulling out and

re-fitting.

Detail
Qty

Unit Rate Per Lft.


Rate
Per Unit

Amount

LABOUR FOR 50 LFT


1
2

Blacksmith
Coolies

0.50
2.00

No.
Nos.

0.00 Per day


0.00 Per day

Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total for 50 Rft.

ITEM RATE
Labour Rate Per Lft.
Labour Rate Per Lm.

16.

Rs.
Rs.

Say
Say

0.00
0.00

Fixing Hand pump (machine only)

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

LABOUR
1

Blacksmith
Sundries

10.00 Percent

0.20

No.

0.00 Per day

Total
Contractor's Profit & Ove 20.00 Percent
Total

ITEM RATE
Labour Rate Per Each

Rs.

Page 13

Say

0.00

17.

Washing Niwar of Bed

Detail

Unit Rate Per Bed


Rate
Per Unit

Qty

Amount

MATERIAL
1

Soap etc.
Total
Contractor's Profit & Ove
Total

0.42

Kg.

0.00 P. Kg.

20.0 Percent

LABOUR
1

Coolies (washerman)
Total
Sundries

0.75

No.

0.00 Per day

10.00 Percent

Total
Contractor's Profit & Ove 20.00 Percent
Total
ITEM RATE
Labour Rate Per Bed
Composite Rate Per Bed

Rs.
Rs.

Page 14

Say
Say

0.00
0.00

18.

Washing

Durries

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit

Amount

MATERIAL
Cost of Soap

1.00

Total
Contractor's Profit & Ove
Total

Kg.

0.00 P. Kg.

20.0 Percent

LABOUR
1

Coolies (washerman)

1.00

Nos.

0.00 Per day

Total
Sundries

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate Per 100 Sft.
Composite Rate Per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 15

Say
Say
Say
Say

0.00
0.00
0.00
0.00

19

Recaning Chairs.

(i)

Office chair single caning seat only.

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

MATERIAL
1

Cane

Total
Contractor's Profit & Ove
Total

3.00 Ozs (0.085 Kg

0.00

Kg.

20.0 Percent

LABOUR
1

Canners

0.35

No.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 16

Say
Say

0.00
0.00

19 (i Office chairs double caning seat only

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

MATERIAL
1

Cane (Singapur)

Total
Contractor's Profit & Ove
Total

4 Ozs. (0.12 Kg.

0.00

Kg.

20.0 Percent

LABOUR
1

Canners

0.45

No.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.

Page 17

Say
Say

0.00
0.00

19 (i Office chairs single caning back only

Detail

Unit Rate Per Each / Assumed for 8 Nos.


Rate
Qty
Per Unit
Amount

MATERIAL
1

Cane (Singapur)

Total
Contractor's Profit & Ove
Total

1.5 Ozs (0.043 Kg

0.00

Kg.

20.0 Percent

LABOUR
1

Canners

2.00

Nos.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 18

Say
Say

0.00
0.00

19 (i Office chairs double caning back only

Detail

Unit Rate Per Each / Assumed for 5 Nos.


Rate
Qty
Per Unit
Amount

MATERIAL
1

Cane (Singapur)
Total
Contractor's Profit & Ove
Total for 5 Nos.

0.23

Kg.

0.00

Kg.

20.0 Percent

LABOUR
1

Canners

2.00

Nos.

0.00 Per day

Total
Sundries

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 19

Say
Say

0.00
0.00

19 (v Easy chairs single caning seat only

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

MATERIAL
1

Cane

Total
Contractor's Profit & Ove
Total

0.114

Kg.

0.00

Kg.

20.0 Percent

LABOUR
1

Canners

0.25

No.

0.00 Per day

Total
Sundries

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 20

Say
Say

0.00
0.00

19 (v Easy chairs double caning seat only

Detail

Unit Rate Per Job


Rate
Per Unit

Qty

Amount

MATERIAL
1

Cane

Total
Contractor's Profit & Ove
Total

0.17

Kg.

0.00

Kg.

20.0 Percent

LABOUR
1

Canners

0.70

No.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 21

Say
Say

0.00
0.00

19 (v Easy chairs, single caning only back and seat in one piece.

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

MATERIAL
1

Cane

Total
Contractor's Profit & Ove
Total

12 Ozs (0.70 Kg.

0.00

Kg.

20.0 Percent

LABOUR
1

Canners

1.00

No.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 22

Say
Say

0.00
0.00

19 (v Easy chairs double caning back and seat in one piece or couches (caned area
about 16 Sft. 1.50 Sqm)

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

MATERIAL
1

Cane

Total
Contractor's Profit & Ove
Total

32.00 Ozs (1.70 Kg

0.00

Kg.

20.0 Percent

LABOUR
1

Canners

1.50

Nos.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 23

Say
Say

0.00
0.00

20

Making and fixing hat pegs ordinary

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

MATERIAL
1

Shisham wood 1x2.5'x.0.4' x 0.1'


3x0.75' x 0.2' x 0.1'
Total
Wastage 20%

Cost of Polish & Nails


Total
Contractor's Profit & Ove
Total

=00.1
0.17
=0.04
0.145
0.029
0.174 Cft

Cft.

0.00

Cft

L.S.

20.0 Percent

LABOUR
1

Carpenter

0.18

No.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each

Rs.
Rs.

Page 24

Say
Say

0.00
0.00

21. Weaving charpoys

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

LABOUR
1

Coolies Skilled

0.65

No.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
Say
ITEM RATE
Labour Rate Per Each

22

Rs.

Say

0.00

Sweeping Chimneys

Detail

Unit Rate Per Each / Assumed for 12 Nos.


Rate
Qty
Per Unit
Amount

MATERIAL
Rope, rags, etc.
Contractor's Profit & Ove

L.S

0.00

20.0 Percent

Total

LABOUR
Coolies Unskilled

2.00

Nos.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each
Composite Rate Per Each 13.20+181.50
12

Page 25

Rs.
Rs.

Say
Say

0.00
0.00

23. Picture, railing including making, fixing and painting

Detail

Unit Rate Per Lft. / Assumed for 20 Lft.


Rate
Qty
Per Unit
Amount

MATERIAL FOR 20 LFT.


1
2
3
4

Deodar wood for 0.3' x 0.1' x 1.5' = 0.45 Cft


0.50
+ coastage 10% = 0.05
Paint
0.38 / 0.04
Nails
0.006
Brush
0.05
Total
Contractor's Profit & Ove 20.0 Percent
Total

Cft

0.00 Per Cft.

Gallon
Kg.
No.

0.00Per Gallon
0.00 Per Kg.
0.00
Each

No.
No.

0.00 Per day


0.00 Per day

LABOUR
1
2

Carpenter
Painter

1.00
0.03

Total
Sundries

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Rft.
Labour Rate Per Metre
Composite Rate Per Rft.
Composite Rate Per Metre 297.82 + 211.87
12

Page 26

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

0.00
0.00
0.00
0.00

24. Cutting fuel wood from plantation

Detail
Qty

Unit Rate Per 100 Kg.


Rate
Per Unit

Amount

Analysis for 15 Mds. (560 Kg.)


LABOUR
1

Coolies

1.25

Nos.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per 100 Kg.

Rs.

Say

0.00

25. Splitting fuel wood

Detail
Qty

Unit Rate Per 100 Kg.


Rate
Per Unit

Amount

LABOUR FOR (385 Kg.)


1

Coolies Unskilled

1.80

Nos.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total for 385 Kg.
ITEM RATE
Labour Rate Per 100 Kg.

Rs.

Page 27

Say

0.00

26

Burning charcoal including loading unloading and repairing kiln

Detail
Qty

Unit Rate Per 100 Kg.


Rate
Per Unit

Amount

LABOUR FOR 100 MAUNDS (3732 KG.)


1
2
3
4

Coolies for repairing kiln


Coolies for loading & unloading
wood
Coolies skilled
Mason for repairing kiln

3.00

Nos.

0.00 Per day

15.00
8.00
1.00

Nos.
Nos.
No.

0.00 per day


0.00 per day
0.00 per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per 100 Kg.

Rs.

Say

0.00

27. Filling cement bags with coal and sewing including cost of string.

Detail
Qty
MATERIAL FOR 500 CFT.
Filling cement bags with coal
Contractor's Profit & Ove 20.0 Percent
Total
LABOUR
1 Coolies Unskilled

Unit Rate Per 100 Cft.


Rate
Per Unit

L.S

10.25

Nos

0.00

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate Per 100 Cft.
Composite Rate Per Cum

Rs.
Rs.
Rs.
Rs.

Page 28

Amount

Say
Say
Say
Say

0.00
0.00
0.00
0.00

28. Supply manure (capacity of cart 200 ft. or 0.57 cum)

Detail
Qty

Unit Rate Per Cart Load


Rate
Per Unit

Amount

MATERIAL
1

Cost of manure
Total
Contractor's Profit & Ove
Total

Cart

0.00 per Cart

20.0 Percent

LABOUR
1

Cart with cartman

0.25

Nos

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Cart Load
Composite Rate Per Cart Load

29

Rs.
Rs.

Say
Say

0.00
0.00

Washing punkha frills.

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

LABOUR
1

Washerman Cooly Skilled

0.20

No.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each

Rs.

Page 29

Say

0.00

30

Washing

a) Table Cloth

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

LABOUR FOR 10 NOS.


Washerman Cooly Skilled

0.50

No.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total for 10 Nos.
ITEM RATE
Labour Rate Per Each

b)

Rs.

Say

0.00

Napkins, dusters etc.

Detail

Unit Rate Per Job


Rate
Per Unit

Qty

Amount

LABOUR FOR 15 NOS.


Washerman Cooly Skilled

0.50

No.

0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total for 15 Nos.
ITEM RATE
Labour Rate Per Each

Rs.

Page 30

Say

0.00

31

Hoisting and placing sleepers for centring, including carriage within one chain.

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

LABOUR FOR 40 NOS.


1
2

Mason
Coolies

0.50
3.00

No.
Nos.

0.00 Per day


0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total for 40 No.s
ITEM RATE
Labour Rate Per Each

Rs.

Say

0.00

32. Dismantling sleeper from centring including stacking within one chain

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

LABOUR FOR 80 SLEEPERS


1
2

Coolies (skilled)
Coolies (unskilled)

1.00
7.00

No.
Nos.

0.00 Per day


0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Each

Rs.

Page 31

Say

0.00

33. Dredging sumps

Detail
Qty

Unit Rate Per Shift


Rate
Per Unit

Amount

LABOUR
1

Coolies

Unskilled

Sundries
Total

3.75

Nos.

0.00 per day

0.00

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Shift

Rs.

Say

34. Fixing 'U' bolt in masonry or concrete including leveling and tying for fixing angle iron
post.

Detail
Qty

Unit Rate Per Each


Rate
Per Unit

Amount

LABOUR FOR 12 NOS.


1
2
3

Mason
Blacksmith
Cooly

1.00
1.00
1.00

No.
No.
No.

0.00 per day


0.00 per day
0.00 per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total for 12 Nos.
ITEM RATE
Labour Rate Per Each

Rs.

Page 32

Say

0.00

35.

Bailing out water


a) By hand

Detail
Qty

Unit Rate Per 1000 Cft.


Rate
Per Unit

Amount

LABOUR
1

Coolies

3.00

Nos.

0.00 per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per 1000 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Page 33

Say

0.00

35 b) By pump (Rate including cost of pump P.O.L etc. and operational charges)
Detail
Qty

Unit Rate Per 1000 Cft.


Rate
Per Unit

Amount

Analysis for 800 Cft.


MATERIAL
i)

Depreciation
Cost of pump set 6"x5" with 15 HP
diesel engine.
0
Anticipated life of pump
10000
Hours
1/6 x
Residual Charges
0
= 0
Rate of depriciation/hour0
0
10000
Total
Contractor's Profit & Ove 20.0 Percent
Total

ii) Operation charges


LABOUR FOR 800 CFT.
1

Driver
Cooly

1.00
1.00

No.
No.

0.00 per day


0.00 per day

Total

10.00 Percent

Sundries
Total

Contractor's Profit & Ove 20.00 Percent


Total
Rate Per Hour

296.45
8

Rs.

37.06

iii) P.O.L Charges Etc.


H.S. Diesel Oil
0.6 / Ltr Per Hour =0.6x8

4.80 Litre

0.00Per Litre

Mobil Oil

1.00 Litre

0.00Per Litre

Cotton Waste, Grease & Packing etc.


Total
Contractor's Profit & Ove 20.00 Percent
Total

L.S.

18.56

L.S.

Rate Per Hour

4.80

148.50
8

Litre

iv) Accessories, repair and replacement portion


(maintenance charges etc.)

Rs.

ITEM RATE
Labour Rate Per 1000 Cft.
Labour Rate Per Cum
Composite Rate Per 1000 Cft.
Composite Rate Per Cum.

Rs.
Rs.
Rs.
Rs.

Page 34

Say
Say
Say
Say

0.00
0.00
0.00
0.00

36

Drilling holes in R.C. trough

Detail

Unit Rate Per No.


Rate
Per Unit

Qty

Amount

LABOUR FOR 12 NOS.


1
2

Blacksmith
Cooly

1.00
1.00

No.
No.

0.00 per day


0.00 per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total for 12 Nos.
ITEM RATE
Labour Rate Per No.

Rs.

Page 35

Say

0.00

37.
i)

Supplying and Laying polythene sheet over D.P.C., under floor and on roof etc.
300 Gauge (0.003" thick)

Detail

Unit Rate Per Sft. / Assumed for 100 Sft.


Rate
Qty
Per Unit
Amount

MATERIAL
1

Polythene of (0.003 thick) size 100 Sft.


Add 5%overlap
= 5%
Contractor's Profit & Ove

1.500
Lbs.
0.08
Lbs.
1.58 Lbs (0.717 Kg

0.00 Per Kg.

0.00 per day

20.0 Percent

Total
LABOUR
1

Cooly (skilled)

0.15

No.

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Sft.
Labour Rate Per Sqm.
Composite Rate Per Sft.
Composite Rate Per SQm.

Rs.
Rs.
Rs.
Rs.

Page 36

Say
Say
Say
Say

0.00
0.00
0.00
0.00

37 ii 500 Gauge (0.005" thick)

Detail

Unit Rate Per Sft. / Assumed for 100 Sft.


Rate
Qty
Per Unit
Amount

MATERIAL
1

Polythene sheet of 0.005" gauge


Including 5% Extra for Overlap
Total
Contractor's Profit & Ove
Total

1.32 Lbs (0.600 Kg

0.00

Kg.

20.0 Percent

LABOUR
1

Cooly (skilled)

0.30

No.

0.00 per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Sft.
Labour Rate Per Sqm.
Composite Rate Per Sft.
Composite Rate Per Sqm

Rs.
Rs.
Rs.
Rs.

Page 37

Say
Say
Say
Say

0.00
0.00
0.00
0.00

38.

Laying 2" thick sand and bitumen carpet on top of foundation of oil tanks

Detail

MATERIAL

Unit Rate 100 Sft. / Assumed for 246 Sft.


Rate
Qty
Per Unit
Amount

2464

= 410 Cft.)

6
1
2
3
4

Sand
Bitumen
Coal
Fuel wood

410.00 Cft.
1.23 Ton
1.00 Mnd. (37.324 K
58.20 Kg.

Total
Contractor's Profit & Ove
Total

0.00er 100 Cf
0.00 Per Ton
0.00 Per Kg.
0.00 Per Kg.

20.0 Percent

LABOUR
1
2

Mason
Cooly

12.00
35.00

Nos.
Nos.

0.00 Per day


0.00 Per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate Per 100 Sft.
Composite Rate Per Sqm

Rs.
Rs.
Rs.
Rs.

Page 38

Say
Say
Say
Say

0.00
0.00
0.00
0.00

39

Cutting hole 4" x 6" in stone masonry or brick wall with chisel, repairing masonry and
removing debris within one chain lead.

Detail
Qty

Unit Rate Per Hole


Rate
Per Unit

Amount

LABOUR FOR 7 HOLES


1
2

Mason
Cooly Unskilled

1.00
1.00

No.
No.

0.00 per day


0.00 per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Hole

40

Rs.

Making 1"x1" groove in wall of stone or


9" deep.

Say

0.00

brick masonry in cement for fixing planks upto

Detail
Qty

Unit Rate Per Plank


Rate
Per Unit

Amount

LABOUR FOR 4 NOS. PLANKS


1
2

Mason
Cooly

0.50
0.50

No.
No.

0.00 per day


0.00 per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Plank

Rs.

Page 39

Say

0.00

41. Drilling holes in stone or bricks masonry upto 2" dia, per inch depth.

Detail

Unit Rate Per Hole Per Inch. Depth


Rate
Qty
Per Unit
Amount

LABOUR FOR 10 NOS.


1

Cooly

Unskilled

1.00

No.

0.00 per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per Hole per Inch Depth
Per CM

Rs.
Rs/

Page 40

Say
Say

0.00
0.00

42

Spraying anti termite liquid mixed with water in

Detail

the ratio of (1.40)

Unit Rate Per 100 Sft. / Assumed for 1000 Sft.


Rate
Qty
Per Unit
Amount

MATERIAL FOR 1000 SFT.


1
2

Termite Liquid
Spraying Machine

1.04 Litre
L.S.

Total
Contractor's Profit & Ove
Total

0.00 P. Litre
0.00

20.0 Percent

LABOUR for 1000 sft


1

Sprayman

1.00

No.

0.00 per day

Total
Sundries
Total

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate Per 100 Sft.
Composite Rate Per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 41

Say
Say
Say
Say

0.00
0.00
0.00
0.00

43

Providing and fixing barbed wire fencing with 4 horizontal and two cross wires, with RCC
1:2:4 posts 5.5' x 6" x9" at 8 ft. centre to centre. Reinforced with 4 number 3/8" dia ve
1/8" dia stirrups 12" centre to centre, complete in all respects.
i)

Without cement concrete base.


Detail
Qty

ASSUMED FOR 48 RFT.


MATERIAL
i) RCC Post (1:2:4)
6.5 x 5'.5x0.5x0.75 = 13.40
(Item 6 a (i) of Concrete)

Unit Rate Per 100 Rft.


Rate
Per Unit

Amount

Cft.

ii) Fabrication of steel work as per


S No. 9 (b) Chapter Concrete
3/8" dia 4 x 5.5
= 22 Rft. @ Lbs /Rft
1/8 dia stirrups 5 x 2 = 10 Rft @ 0.042 Lbs/R
For 6.5 x 8.67 lbs = 56.3
8.67
Lbs
iii) Strained barbed wire
Horizontal 4x48'
Cross 2 Nox6x9.4

13.400

Cft.

0.00 Per Cft.

25.51

Kgs.

0.00 Per Kg.

Kg.

0.00 Per Kg.

28.00

Nos.

0.00

Each

28.00

Nos.

0.00

dozen

192.00 Lft.
112.8 Lft.
304.80 Lft.
15
14.74
320.00 Lft.

Wastage 5%
320 Lt. @ 1.25 Cwt/450 Yard =0.29 Cwt
iv) Eye bolts 4 No.x7 post
v)

Washers
Contractor's Profit & Ove 20.00 Percent
on item iii and iv and (v)
Total
(I to V)
x
Rate per 100 Rft.

100

48

LABOUR
i)

RCC

as per item 6 - a (i) Chap. Concrete

ii) Fabrication of steel as per item 9 (b) Chap.


iii) Fixing barbed wire black smith
Coolies

13.40per Cft

0.00 Per Cft.

25.51 Per Kg.

0.00 Per Kg.

0.00 Per day


0.00 Per day

0.75
2.00

No.
Nos.

Total
10.00
Contractor's Profit & Ove 20.00
Total for 48 Rft.

Sundries (Item-III)

Percent #
Percent #

Rate per 100 Rft.

867.21
48

ITEM RATE
Labour Rate Per 100 Rft.
Labour Rate Per Metre
Composite Rate Per 100 Rft
Composite Rate Per Metre

Rs.
Rs.
Rs.
Rs.

Page 42

100 =

Say
Say
Say
Say
Say

0.00
0.00
0.00
0.00

ii)

In cement concrete base. (1:4:8) of size 12"x12"x21")


Detail

Unit Rate Per 100 Rft.


Rate
Per Unit

Qty

Amount

MATERIAL FOR 48 RFT


i)

RCC Post (1:2:4) as per part (i) Ref. 6 a (i)

ii) Base (1:4:8) 12"X12"X21"


d/D=0.5X0.75X0.75 =
Net

1.75
0.28

13.40

Cft.

Per Cft.

9.55

Cft.

0.00 Per Cft.

25.51

Kg.

0.00 Per Kg.

192.00 Lft.
112.8 Lft.
304.80 Lft.
15.2 Lft.
320.00 Lft.
14.74

Kg.

0.00 Per Kg.

28.00

Nos.

0.00

Each

28.00

Nos.

0.00

dozen

Cft.
1.47 x 6.5

iii) Fabrication of steel


as per Item 9 (b) of Chapter Concrete
iv) Strained barbed wire
Horizontal 4x48'
Cross 2 Nox6x9.4
Add 5% wastage

iv) Eye bolts 4 No.x7 post


v)

Washers
Total
Contractor's Profit & Ove 20.00 Percent
Total for 48 Rft.

Rate for 100 Rft.

x 100
48

Say

0.00

LABOUR
i)

RCC (1:2:4) (Rate as per item 6 a (i) of Chap

13.40

Cft.

0.00 Per Cft.

ii) PCC (1:4:8) (Rate as per item 3 b of Chap No.

9.55

Cft.

0.00 Per Cft.

25.51

Kg.

0.00 Per Kg.

0.75
2.00

No.
Nos.

0.00 Per day


0.00 Per day

iii) Fabrication of steel as per item 9 (b) of Chap

iv) Fixing barbed wire


Blacksmith for wire
Coolies for erection

Total
10.00
Total
Contractor's Profit & Ove 20.00
Total for 48 Rft.

Sundries (Item-IV)

Percent #

Percent #

Rate for 100 Rft.

100

48
ITEM RATE
Labour Rate Per 100 Rft.
Labour Rate Per Metre
Composite Rate Per 100 Rft.
Composite Rate Per Metre

Rs.
Rs.
Rs.
Rs.

Page 43

Say
Say
Say
Say

0.00
0.00
0.00
0.00

CHAPTER NO. 17

OUTLETS
DESCRIPTION OF ITEM:
1.0

Earth Work for Outlet excavation, refilling, ramming and Puddling

Rate for all finished works include the removal of the surplus debris un-used material and
a)

Channel Discharge upto 50 Cs.

Detail

Unit Rate Per Job


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Job


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

2.50

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate Per Job

b)

Channels discharge from 51-100 Cs.

Detail

Unit Rate Per Job


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Job


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

3.30

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate Per Job

Page 1

by

c)

Channels discharge from 101-200 Cs.

Detail

Unit Rate Per Job


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Job


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

5.00

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate Per Job

d)

Channels discharge from 201-350 Cs.

Detail

Unit Rate Per Job


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Job


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

6.75

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate Per Job

e)

Channels Discharges Over 350 Cusecs

Detail

Unit Rate Per Job


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Job


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

10.00

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate Per Job

Page 2

2.

Dismantling Outlets

Note :

These rates are for total dismantlement and removal of material. The rates do
not include earth work for which rates are given in item No. 1 above

a)

Old types such as K.G.O's Orifices etc.

Detail

Unit Rate for Each


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

2.50

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate for Each

b)

A.P.M. or O.F.H upto 2.0 Ft. (610mm)

Detail

Unit Rate for Each


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

3.75

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate for Each

Page 3

c)

A.P.M.

or O.F.H from 2.1 ft. (635mm) to 3.00 ft. (915mm)

Detail

Unit Rate for Each


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

5.00

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate for Each

d)

A.P.M. or O.F. 'H' above 3.0 ft. (915mm)

Detail

Unit Rate for Each


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

6.25

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate for Each

e)

Tail Cluster bifurcation

Detail

Unit Rate for Each


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

3.75

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate for Each

Page 4

f)

Tail cluster trifurcation

Detail

Unit Rate for Each


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

5.00

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate for Each

g)

Tail Cluster Quadrification

Detail

Unit Rate for Each


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Nos.


LABOUR
1

Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

6.25

Nos.

Rs.

0.00
1.5

per day

Say

Percent
Percent

ITEM RATE
Labour Rate for Each

Page 5

Making Temporary A.P.M. Bricks Block and fixing at Site

Detail

Unit Rate for Each


Rate
Per Unit

Qty

Amount

MATERIAL
1
2
3

Brick
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total

20
0.25
1

Nos.
Bag
Cft.

0.33
0.33

No.
No.

Per 1000 No
Per Bag
Cft.

Percent

3.50
3.50
0.70
4.20

LABOUR
1

Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

per day
per day

Say
Say

Percent
Percent

ITEM RATE
Labour Rate for Each
Composite Rate for Each

Rs.
Rs.

Dismentalling Walls, taking out Temporary A.P.M. Bricks Block and fixing
iron block and rebuilding dismantled walls.

Detail

Unit Rate Job


Rate
Per Unit

Qty

Amount

Assumed for 1.25 Job


LABOUR
1

Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.75
1.00

No.
No.

Rs.

0.00
1.25

per day
per day

Say

Percent
Percent

ITEM RATE
Labour Rate Per Job

Page 6

Dismantling walls and fitting iron block of O.F. Outlets

Detail

Unit Rate Each


Rate
Per Unit

Qty

Amount

Assumed for 1.25 Nos.


LABOUR
1

Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

0.75
1.00

No.
No.

Rs.

0.00
1.25

per day
per day

Say

Percent
Percent

ITEM RATE
Labour Rate for Each

Constructing watching and removing bund for outlet built in running water

Detail

Unit Rate Each


Rate
Per Unit

Qty

Amount

Assumed for 1.25 Nos.


LABOUR
a)

Upto 3.0 ft. (915mm) depth


Cooly (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

5.00

Nos.

Rs.

0.00
1.25

6.75

Nos.

Rs.

0.00
1.25

per day

Say

per day

Say

Percent
Percent

ITEM RATE
Labour Rate for Each

Assumed for 1.25 Nos.


b)

Above 3.0 ft. (915mm) depth


Cooly (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

Percent
Percent

ITEM RATE
Labour Rate for Each

Page 7

Adjusting 'B' of tail cluster by dismantling and rebuilding throat walls.

Detail

Unit Rate Each


Rate
Per Unit

Qty

Amount

MATERIAL
1
2
3

Brick
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total

30
0.30
2.00

Nos.
Bag
Cft.

0.40
0.75

No.
No.

Labour Rate for Each

Rs.

0.00
1.5

Composite Rate for Each

Rs.

Per 1000 No
Per Bag
100 Cft.

Percent

LABOUR FOR 1.5 NOS.


Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

per day
per day

Say

Say

Percent
Percent

ITEM RATE

Adjusting 'Y' of an A.P.M. Outlets including dismantling and rebuilding

Detail

Unit Rate Each


Rate
Per Unit

Qty

Amount

MATERIAL
1
2
3

Brick
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total

50
0.50
2.00

Nos.
Bag
Cft.

0.75
1.50

No.
Nos.

Rs.

0.00
1.5

Per 1000 No
Per Bag
100 Cft.

Percent

LABOUR FOR 1.5 NOS.


Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

per day
per day

Say

Say

Percent
Percent

ITEM RATE
Labour Rate for Each
Composite Rate for Each

Rs.

Page 8

9
Note:

Extra Labour in Fixing A.P.M. and O.F. Outlets block including Dressing of Bricks.
Rate to be Rs. 5.00 less in case of O.F.
Outlets when there is no O.F. iron block
a)

For Channel Depth of 5.0 ft. (1.5 Metre)

Detail

Unit Rate Each


Rate
Per Unit

Qty

Amount

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total

0.20
1.00

Bag
Cft.

Per Bag
100 Cft.

1.00
1.00

No.
No.

per day
per day

Labour Rate for Each

Rs.

0.00
1.25

Say

Composite Rate for Each

Rs.

Say

Qty

Unit Rate Each


Rate
Per Unit

Amount

Percent

LABOUR (FOR 1.25 NOS.)


Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total

Percent
Percent

ITEM RATE

b)

For Channel depth of 4.0 ft. (1.2 m)

Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total

0.20
1.00

Bag
Cft.

0.75
0.75

No.
No.

Rs.

0.00
1.25

Per Bag
Per 100 Cft

Percent

LABOUR (ASSUMED FOR 1.25 NOS.)


Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

per day
per day

Say

Say

Percent
Percent

ITEM RATE
Labour Rate for Each
Composite Rate for Each

Rs.

Page 9

c)

For Channel depth of 3.0 ft. (915mm)

Detail

Unit Rate Each


Rate
Per Unit

Qty

Amount

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total

0.20
1.00

Bag
Cft.

Per Bag
Per 100 Cft.
-

Percent

LABOUR (FOR 1.25 NO.)


Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total

0.60
0.60

No.
No.

per day
per day

Labour Rate for Each

Rs.

0.00
1.25

Say

Composite Rate for Each

Rs.

Say

Unit Rate Each


Rate
Per Unit

Qty

Amount

Percent
Percent

ITEM RATE

d)

For Channel depth of 2.0 ft. (610mm)

Detail

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total

0.15
1.00

Bag
Cft.

0.50
0.50

No.
No.

Labour Rate for Each

Rs.

0.00
1.25

Composite Rate for Each

Rs.

Per Bag
Per 100 Cft

Percent

LABOUR (FOR 1.25 NOS.)


Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

per day
per day

Say

Say

Percent
Percent

ITEM RATE

Page 10

e)

For Channel depth of less than 2.0 ft (610mm)

Detail

Unit Rate Each


Rate
Per Unit

Qty

Amount

MATERIAL
1
2

Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total

0.10
1.00

Bag
Cft.

0.40
0.40

No.
No.

Labour Rate for Each

Rs.

0.00
1.25

Composite Rate for Each

Rs.

Per Bag
Per 100 Cft

Percent

LABOUR (FOR 1.25 NOS.)


Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

per day
per day

Say

Say

Unit Rate Each


Rate
Per Unit

Amount

Percent
Percent

ITEM RATE

10

Repairing damaged reducing collar of

Hume Pipe Outlets

Detail
Qty
MATERIAL
1
2
3

Shingle/Stone Crushed
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total

1.00
0.25
1.00

Cft.
Bag
Cft.

0.33
0.33

No.
No.

Per 100 Cft


Per Bag
Per 100 Cft

Percent

LABOUR
Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total

per day
per day

Percent
Percent

ITEM RATE
Labour Rate for Each

Rs.

Say

Composite Rate for Each

Rs.

Say

Page 11

11

Laying Iron Pipes of Outlets

Detail

Unit Rate Per Foot


Rate
Per Unit

Qty

Amount

LABOUR FOR 1.25 RFT.


Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total

0.02
0.02

No.
No.

Labour Rate Per Foot

Rs.

0.00
1.25

Labour Rate per Metre

Rs.

per day
per day

Say

Say

Percent
Percent

ITEM RATE

12
Note:

Water allowance for constructing outlets or culverts when canal water is not flowing
At the discreation of Engineering-in-charges depending upon
the distance and source or supply

Detail

Unit Rate Each


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Nos


LABOUR
(i)

Cooly (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total

1.22

Nos.

Rs.

0.00
1.5

2.50

Nos.

Rs.

0.00
1.5

per day

Say

per day

Say

Percent
Percent

ITEM RATE
Labour Rate Per Each

Assumed for 1.5 Nos.


LABOUR
(ii)

Coolies (Unskilled)
Sandries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total

Percent
Percent

ITEM RATE
Labour Rate Per Each

Page 12

13

Hoisting and placing R.C. slabs or stone in position in outlets or W.C. culverts

Detail

Unit Rate Each


Rate
Per Unit

Qty

Amount

Assumed for 1.5 Nos.


LABOUR
Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total

0.20
0.65

No.
No.

Rs.

0.00
1.5

per day
per day

Say

Percent
Percent

ITEM RATE
Labour Rate for Each

14
a)

Fixing Pipe Outlet Including Back Filling or Earth and Puddling


Portion Under Bank

Detail

Unit Rate Per Foot


Rate
Per Unit

Qty

Amount

Assumed for 15 Rft.


MATERIAL
1
2

LABOUR
1
2

Cement for Joining R.C. Collar


Sand
Total
Contractor's Profit & Ove 20.00
Total

Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total

0.20
1.00

Bag
Cft.

Per Bag
Per 100 Cft.
-

Percent

0.25
2.00

No.
Nos.

Rs.

0.00
15
0.00
15

per day
per day

Say

Say

Percent
Percent

ITEM RATE
Labour Rate Per Foot
Compsite Rate for Foot

Rs.

Labour Rate per Metre

Rs.

Say

Composite Rate per Metre

Rs.

Say

Page 13

b)

Portion under road beyond bank

Detail

Unit Rate (British System) per Rft.


Rate
Qty
Per Unit
Amount

Assumed for 15 Rft.


MATERIAL
1
2

Cement for Joining R.C. Collar


Sand
Total
Contractor's Profit & Ove 20.00
Total

0.20
1.00

Bag
Cft.

0.20
0.75

No.
No.

Labour Rate Per Foot

Rs.

Composite Rate Per Foot

Rs.

0.00
15
0.00
15

Labour Rate Per Metre


Composite Rate per metre

Per Bag
Per 100 Cft

Percent

LABOUR
1
2

Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total

per day
per day

Percent
Percent

ITEM RATE
=

Say

Say

Rs.

Say

Rs.

Say

15

Removing Pipe Outlets Refilling Earth and Pudding

a)

Portion Under Bank

Detail

Unit Rate (British System) per Rft.


Rate
Qty
Per Unit
Amount

Analysis for 15 Ft.


LABOUR
Coolies (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total for 15.0 Feet

2.00

Nos.

Labour Rate Per Foot

Rs.

0.00
15

Labour Rate Per Metre

Rs.

per day

Say

Say

Percent
Percent

ITEM RATE

Page 14

b)

Portion Under Road Byond Bank

Detail

Unit Rate (British System) per Foot


Rate
Qty
Per Unit
Amount

Analysis for 15.0 Ft.


LABOUR
Cooly (Unskilled)
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total for 15 Feet

0.75

No.

Labour Rate Per Foot

Rs.

0.00
15

Labour Rate Per Metre

Rs.

per day

Say

Say

Percent
Percent

ITEM RATE

16

Changing Pipe Outlets by removing One Pipe and replacing it at the same site
with another pipe complete with earth and puddling

a)

Portion Under Bank

Detail

Unit Rate (British System) per Foot


Rate
Qty
Per Unit
Amount

Analysis for 15.0 Ft.


MATERIAL
1
2

Cement for Joining R.C. Collar


Sand
Total
Contractor's Profit & Ove 20.00
Total for 12 Feet

0.20
1.00

Bag
Cft.

Per Bag
Per 100 Cft

0.20
2.50

No.
Nos.

per day
per day

15
15

Say

Say

Say
Say

Percent

LABOUR
1
2

Mason
Cooly (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total for 15 Feet
ITEM RATE

Percent
Percent

Labour Rate Per Foot

Rs.

Composite Rate per Foot

Rs.

Labour Rate Per Metre


Composite Rate per Metre

Rs.
Rs.

Page 15

b)

Portion Under Road Beyond Bank

Detail

Unit Rate (British System) per Foot


Rate
Qty
Per Unit
Amount

Analysis for 15.0 Ft


MATERIAL
1 Cement for Joining R.C. Collar
2 Sand
Total
Contractor's Profit & Ove 20.00
Total

0.20
1.00

Bag
Cft.

Per Bag
Per 100 Cft

0.10
1.25

No.
Nos.

per day
per day

Labour Rate Per Foot

Rs.

Say

Composite Rate Per Foot

Rs.

0.00
15
15

Say

Labour Rate Per Metre


Composite Rate Per Metre

Rs.
Rs.

Say
Say

Percent

LABOUR
1 Mason
2 Coolies (Unskilled)
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Grand Total

Percent
Percent

ITEM RATE

Page 16

CHAPTER NO. 13

PAINTING AND VARNISHING


Note :

DESCRIPTION

OF

ITEM NO

Rates for all finished works include the re


surplus debris, unused material and by-prod

1:
a)

Detail

Cleaning painted wood work with oil and wat


Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Oil Terpen tine
Brushes (Small)
Sand Paper

0.5Lbs (0. 26) Ltr


0.04 No.
0.16 No.

P. Ltr
Each
P. Doz

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Unskilled Cooly
Total
Sundries
Total

0.20 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 1

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

1
b)

Oiling wood work with boiled linseed oil.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Linseed oil
Brushes (Small)

0.40 Kg
0.06 No.

P. Kg
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Unskilled Cooly
Total
Sundries
Total

0.20 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 2

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

2:

Brushing and Scraping blisters of old paint


wood works.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material

N I L

Labour
Rate Analysis for 125 Sft
Unskilled Cooly
Total
Sundries
Total

0.50 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 3

0.00
1.25

Say

Say

DESCRIPTION

OF

ITEM NO

3:

Scraping, brushing and removing old paints


metal surface.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material

N I L
Rate Analysis for 125 Sft
Labour
Unskilled Cooly
Total
Sundries
Total

2.00 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 4

0.00
1.25

Say

Say

DESCRIPTION

OF

ITEM NO

4:

Painting old surfaces.

a)

Painting corrugated surfaces, patent roofin


with oil paint.
First Coat

i)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

2Lbs (0. 20) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.33 No
0.33 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 5

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Painting old surfaces.


a)

Painting corrugated surfaces, patent roofin


with oil paint.
Each Subsequent Coat

ii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1Lbs (0. 10) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Cooly
Total
Sundries
Total

0.25 No
0.25 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 6

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Painting old surfaces.


b)
i)

Painting sashes, fanlights, glazed or gauzed doors


and windows.
First Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1Lbs (0. 10) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.20 No
0.20 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 7

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Painting old surfaces.


b)
ii)

Painting sashes, fanlights, glazed or gauzed doors


and windows.
Each Subsequent Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

0.75Lbs ( 0.08) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.17 No
0.17 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 8

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Painting old surfaces.


c)
i)

Painting doors & windows any type.


First Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

2Lbs (0. 20) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.33 No
0.33 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 9

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Painting old surfaces.


c)
ii)

Painting doors & windows any type.


Each Subsequent Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1.5Lbs (0. 15) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.25 No
0.25 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 10

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Painting old surfaces.


d)

i)

Painting guard bars, gates of iron bars, gratings,


railing (including) standards, braces etc.) and
similar open works.
First Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1Lbs (0. 10) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.20 No
0.20 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 11

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Painting old surfaces.


d)

ii)

Painting guard bars, gates of iron bars, gratings,


railing (including) standards, braces etc.) and
similar open works.
Each Subsequent Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

0.75Lbs ( 0.08) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.17 No
0.17 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 12

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Painting old surfaces.


e)
i)

Painting fillets, framing, skirtings, pipes, gutters


and similar linear work, not exceeding 6" in girth.
First Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1Lbs (0. 10) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Rft
Painter
Unskilled Cooly
Total
Sundries
Total

0.17 No
0.17 No

P. Day
P. Day

Composite Rate Per 100 Rft


Composite Rate Per Rm

Page 13

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Painting old surfaces.


e)
ii)

Painting fillets, framing, skirting, pipes, gutters


and similar linear work, not exceeding 6" in girth.
Each Subsequent Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

0.75Lbs ( 0.08) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Rft
Painter
Unskilled Cooly
Total
Sundries
Total

0.12 No
0.12 No

P. Day
P. Day

Composite Rate Per 100 Rft


Composite Rate Per Rm

Page 14

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Painting old surfaces.


f)
i)

Painting small detached articles not exceeding one


square foot of painted surface.
First Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

2Lbs (0. 20) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 200 Nos
Painter
Unskilled Cooly
Total
Sundries
Total

1.00 No
0.25 No

P. Day
P. Day

Composite Rate Per 100 Nos

Page 15

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos

Rs.

Say

Rs.

Say

Item No.

Painting old surfaces.


f)
ii)

Painting small detached articles not exceeding one


square foot of painted surface.
Each Subsequent Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1Lbs (0. 10) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 No.
Painter
Unskilled Cooly
Total
Sundries
Total

0.75 No
0.25 No

P. Day
P. Day

Composite Rate Per 100 Nos

Page 16

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos

Rs.

Say

Rs.

Say

Item No.

Painting old surfaces.


g)

i)

Painting small detached articles, exceeding one


square foot (0.09 Sqm) but not exceeding three
square foot (0.81 Sqm) of painted surface.
First Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

6Lbs (0. 60) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 No.
Painter
Unskilled Cooly
Total
Sundries
Total

2.00 No
0.50 No

P. Day
P. Day

Composite Rate Per 100 Nos

Page 17

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos

Rs.

Say

Rs.

Say

Item No.

Painting old surfaces.


g)

ii)

Painting small detached articles, exceeding one


square foot but not exceeding three square foot of
painted surface.
Each Subsequent Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

3Lbs (0. 30) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 No.
Painter
Unskilled Cooly
Total
Sundries
Total

1.00 No
0.50 No

P. Day
P. Day

Composite Rate Per 100 Nos

Page 18

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Labour Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO 5:
a)
Painting/ new surface preparing surface and
painting corrugated surface, patent roofing etc.
i)

Priming Coat

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

3Lbs (0. 30) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Painter
Unskilled Cooly
Total
Sundries
Total

0.50 No
0.12 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 19

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

5
a)
ii)

Painting/ new surface preparing surface and


painting corrugated surface, patent roofing etc.
Each Subsequent Coat of paint.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

2.50Lbs (0 .25) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.25 No
0.08 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 20

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

5
b)

i)

Preparing surface and painting sashes, fan light


glazed or gauzed doors and windows etc. any type
(including edges)
Priming Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1.75Lbs(0 .175) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.25 No
0.08 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 21

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

5
b)

ii)

Preparing surface and painting sashes, fan light,


glazed or gauzed doors and windows etc. any type
(including edges)
Each Subsequent Coat of Paint.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1.4Lbs (0 .14) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.12 No
0.12 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 22

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

5
c)
i)

Preparing surface and painting of doors and


windows any type (including edges).
Priming Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

3Lbs (0 .3) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Painter
Unskilled Cooly
Total
Sundries
Total

0.50 No
0.12 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 23

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

5
c)
ii)

Preparing surface and painting of doors and


windows any type (including edges).
Each Subsequent Coat of Paint.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

2.50Lbs ( 0.25) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Cooly
Total
Sundries
Total

0.25 No
0.08 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 24

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

5
d)

i)

Preparing surface and painting guard bars, gates of


iron bars, gratings, railing (including standards
braces, etc.) and in similar open work.
Priming Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1.75Lbs(0 .175) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Painter
Unskilled Cooly
Total
Sundries
Total

0.25 No
0.17 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 25

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

5
d)

ii)

Preparing surface and painting guard bars, gates of


iron bars, gratings, railing (including standards
braces, etc.) and in similar open work.
Each Subsequent Coat of Paint.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1.4Lbs (0 .14) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.12 No
0.12 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 26

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

5
e)

i)

Preparing surface and painting of fillets, framing,


skirtings, pipes gutters and similar linear work not
exceeding 6" girth.
Priming Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1.3Lbs (0 .13) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Painter
Unskilled Cooly
Total
Sundries
Total

0.17 No
0.17 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per 100 Lft
Labour Rate Per Rm
Composite Rate Per 100 Lft
Composite Rate Per Rm

Page 27

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

5
e)

ii)

Preparing surface and painting of fillets, framing,


skirting, pipes gutters and similar linear work not
exceeding 6" girth.
Each Subsequent Coat of Paint.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

1.1Lbs (0 .11) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Rft
Painter
Unskilled Cooly
Total
Sundries
Total

0.08 No
0.08 No

P. Gln
P. Gln

Composite Rate Per 100 Lft


Composite Rate Per Rm

Page 28

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Rft.
Item Rates
Labour Rate Per 100 Lft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

5
f)

i)

Preparing surface and painting of small detached


articles not exceeding one square foot of painted
surface.
Priming Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

6.25Lbs(0 .625) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Nos
Painter
Unskilled Cooly
Total
Sundries
Total

0.75 No
0.75 No

P. Day
P. Day

Composite Rate Per 100 Nos

Page 29

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos

Rs.

Say

Rs.

Say

Item No.

5
f)

ii)

Preparing surface and painting of small detached


articles not exceeding one square foot of painted
surface.
Each Subsequent Coat of Paint.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

5Lbs (0 .50) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 No
Painter
Unskilled Cooly
Total
Sundries
Total

0.40 No
0.33 No

P. Day
P. Day

Composite Rate Per 100 Nos

Page 30

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos

Rs.

Say

Rs.

Say

Item No.

5
g)

i)

Preparing surface and painting of small detached


articles exceeding one square foot and not
exceeding 3 square foot of painted surface.
Priming Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes (Small)

12Lbs (0 1.2) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Painter
Unskilled Cooly
Total
Sundries
Total

1.75 No
1.00 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per 100 Nos

Composite Rate Per 100 Nos

Page 31

Rs.

Say

Rs.

Say

Item No.

5
g)

ii)

Preparing surface and painting of small detached


articles exceeding one square foot and not
exceeding 3 square foot of painted surface.
Each Subsequent Coats of Paint.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Oil Paint
Brushes (Small)

9Lbs (0 .9) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 No
Painter
Unskilled Cooly
Total
Sundries
Total

0.75 No
0.50 No

P. Day
P. Day

Composite Rate Per 100 Nos

Page 32

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate per 100 Nos.
Item Rates
Labour Rate Per 100 Nos

Rs.

Say

Rs.

Say

Item No.

5
h)

Extra for knotting and stopping to priming coats on


new surface of wood.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint etc.

0.018 Gln.

P. Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Total
Sundries
Total

0.06 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 33

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Rft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

6:

Applying Khanki Mixture hot to barrage gate


i)

Detail

First Coat.
Unit Rate (British System) per 100 Sft
Qty

Material
Coaltar
Mineralpitch
Slaked lime
Kerosene Oil
Fuel Wood

0.75Cwt (
10Lbs (4.
9Lbs (4
1Gln (4.
32.45

Rate
Per Unit (Rs.) Amount (Rs.)

38) Kg
5) Kg
) Kg
55) Ltr
Kg.

P.
P.
P.
P.
P.

Kg
Kg
Kg
Ltr
Kg

Material
For 100 Sft
i) First Coat
=

0.00
20
Brushes

0.18 No.

Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.25 No
0.25 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 34

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Applying Khanki Mixture hot to barrage gates.


ii)

Second Coats.

Detail

Unit Rate (British System) per 100 Sft


Qty

Material
For 100 Sft
ii Second Coat

Rate
Per Unit (Rs.) Amount (Rs.)

Material 0.62 of Item No. (6-I)


0.62

Brushes

0.18 No.

Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Unskilled Cooly
Total
Sundries
Total

0.16 No
0.25 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 35

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

7:

French polishing complete.


a)

Detail

On new works.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
French Polish
Brushes

0.5Lbs 23) Kg
0.12 No.

P. Kg
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 Sft
Polisher
Unskilled Cooly
Total
Sundries
Total

4.50 No
1.00 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 36

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

French polishing complete.


b)

Old work.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
French Polish
Brushes

0.25Lbs ( 0.11) Kg
0.12 No.

P. Kg
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 175 Sft
Polisher
Unskilled Cooly
Total
Sundries
Total

2.00 No
1.00 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 37

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

8:

Varnishing wood work, including cleaning an


preparing surface.
a)

Detail

First Coat.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Varnish
Brushes

0.33Gln ( 1.50) Kg
0.12 No.

P. Kg
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Polisher
Unskilled Cooly
Total
Sundries
Total

0.20 No
0.20 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 38

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Varnishing wood work including cleaning and


preparing surface.
b)

Second Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Varnish
Brushes

0.25Gln ( 1.13) Kg
0.10 No.

P. Kg
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 200 Sft
Polisher
Unskilled Cooly
Total
Sundries
Total

0.10 No
0.10 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 39

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Varnishing wood work including cleaning and


preparing surface.
c)

Third Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Varnish
Brushes

0.2Gln ( 0.91) Kg
0.06 No.

P. Kg
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 200 Sft
Polisher
Unskilled Cooly
Total
Sundries
Total

0.10 No
0.10 No

P. Day
P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 40

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

9:

Bitumen coating to plastered or cement conc


surface.
i)

Detail

20 Lbs per 100 Sft.


Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Bitumen
Fuel

20Lbs ( 9.07) Kg
4.26 Kg.

P. Kg
P. Kg

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Unskilled Cooly
Total
Sundries
Total

0.50 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 41

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Bitumen coating to plastered or cement concrete


surface.
ii)

14 Lbs per 100 Sft.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Bitumen
Fuel

10Lbs ( 4.54) Kg
2.84 Kg.

P. Kg
P. Kg

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly
Total
Sundries
Total

0.40 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 42

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Bitumen coating to plastered or cement concrete


surface.
iii)

10 Lbs per 100 Sft.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Bitumen
Fuel

10Lbs ( 4.54) Kg
2.84 Kg.

P. Kg
P. Kg

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly
Total
Sundries
Total

0.33 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 43

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

10:

Writing letters or figures per letter, per


height.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for

Rate
Per Unit (Rs.) Amount (Rs.)

100 Nos

Material
Paint
Brushes

0.6Lbs (0. 06) Gln


0.18 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per No.

Total
Sundries
Total

0.00
100

Labour
Rate Analysis for 150 Nos
Painter (Artisit)
Unskilled Cooly

1.00 No
1.00 No

P. Day
P. Day

Composite Rate Per No.

Page 44

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per No.
Item Rates
Labour Rate Per No.

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

11:

Writing letters or figures at any surface w


reflective paint of approved quality and co
letter, per inch height.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

nalysis for 100 Letters, P. Inch Height


Material
Reflective Paint
Brushes

0.6Lbs (0. 06) Gln


0.18 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per No.

Total
Sundries
Total

0.00
100

Labour
Rate Analysis for 150 No.
Painter (Artisit)
Unskilled Cooly

1.00 No
1.00 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per No.
Item Rates

Labour Rate P. Letter, P. Inch height

Rs.

Say

Composite Rate P. Letter, P. Inch height

Rs.

Say

Page 45

DESCRIPTION

OF

ITEM NO

12:

Writing letters or figures on any surface w


reflective tape of approved quality and col
letter, per inch height.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

nalysis for 100 Letters, P. Inch Height


Material
Reflective tape/ paper

1.00 Sft

P. Sft

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Plinth, Per Inch height
Labour
Painter (Artisit)
Unskilled Cooly
Total
Sundries
Total

0.59

1.00 No
0.50 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Plinth, Per Inch height
Item Rates

Labour Rate P. Letter, P. Inch height

Rs.

Say

Composite Rate P. Letter, P. Inch height

Rs.

Say

Page 46

DESCRIPTION

OF

ITEM NO

13:

Coaltar Painting.
a)

Detail

First Coat laid hot.


Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Coaltar
Fuel etc.

16Lbs (7. 26) Kg


2.18 Kg.

P. Kg
P. Kg

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Skilled Cooly
Total
Sundries
Total

0.33 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 47

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

13

Coaltar Painting.
b)

Second Coat laid hot.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Coaltar
Fuel etc.

10Lbs (4 .5) Kg
2.18 Kg.

P. Kg
P. Kg

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Skilled Cooly
Total
Sundries
Total

0.20 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 48

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

14:

Solignum Painting.
a)

Detail

One Coat applied hot.


Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Solignum Paint
Brushes

0.20Lbs ( 0.02) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Total
Sundries
Total

0.33 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 49

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

14

Solignum Painting.
b)

Two Coat applied hot.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Solignum Paint
Brushes

0.34Lbs(0 .034) Gln


0.16 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 150 Sft
Painter
Total
Sundries
Total

0.50 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 50

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

15:

Creosote Painting.
a)

Detail

One Coat applied hot.


Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Creosote
Brushes fuel

0.20 Gallon
0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Total
Sundries
Total

0.33 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 51

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

15

Creosote Painting.
b)

Two Coat applied hot.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Creosote
Brushes fuel

0.34 Gln
0.16 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Painter
Total
Sundries
Total

0.50 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 52

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

16:

Burning off or rubbing down with pumice sto


paint from wood work.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Burner Charges
Kerosene Oil
Scraper

L.S.
L.S.
L.S.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Skilled Cooly
Unskilled Cooly
Total
Sundries
Total

1.00 No
0.25 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 53

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

17:

Removing with caustic soda, old paint from


work.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Caustic soda

0.09

Kg.

P. Kg.

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly
Total
Sundries
Total

0.50 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 54

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

18:

Painting distance marks for white ground an


lettering on both faces.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 10 Nos


Material
Brushes
White paint
Black japan

0.04 No.
0.5Lbs (0. 05) Gln
0.2Lbs (0. 02) Gln

Each
P. Gln
P. Gln

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per No.

Total
Sundries
Total

0.00
10

Labour
Rate Analysis for 15 No.
Painter (Artist)
Unskilled Cooly

0.50 No
0.50 No

P. Day
P. Day

Composite Rate Per No.

Page 55

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per No.
Item Rates
Labour Rate Per No.

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

19:

Painting two feet (M) with gauge reading to


a foot (M).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for

Rate
Per Unit (Rs.) Amount (Rs.)

10 Rft

Material
Paint white and black
Brushes

1Lbs (0. 1) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft

Total
Sundries
Total

0.00
10

Labour
Rate Analysis for 15 Rft
Painter (Artist)
Unskilled Cooly

1.00 No
1.00 No

P. Day
P. Day

Composite Rate Per Rft


Composite Rate Per Rm

Page 56

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Rft.
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

20:

Painting sounding rods and other gauge, rea


10th of a foot (M).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for

Rate
Per Unit (Rs.) Amount (Rs.)

10 Rft

Material
Paint black and white
Brushes

0.25Lbs ( 0.03) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft

Total
Sundries
Total

0.00
10

Labour
Rate Analysis for 15 Rft
Painter (Artist)
Unskilled Cooly

0.50 No
0.50 No

P. Day
P. Day

Composite Rate Per Rft


Composite Rate Per Rm

Page 57

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Rft.
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

21:

Painting levelling staves.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for

Rate
Per Unit (Rs.) Amount (Rs.)

10 Rft

Material
Paint black and white
Brushes

0.5Lbs (0 .05) Gln


0.06 No.

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft
Labour
Rate Analysis for 15 Rft
Painter (Artist)
Cooly
Total
Sundries
Total

P. Gln
Each

0.00
10

2.00 Nos
1.00 No

P. Day
P. Day

Composite Rate Per Lft


Composite Rate Per Rm

Page 58

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Lft.
Item Rates
Labour Rate Per Lft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

22:
a)
i)

Detail

Painting and lettering mile/Km stones on bo


One Coat.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint black and white
Brushes

0.35Lbs(0 .035) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 2 Nos
Painter (Artist)
Unskilled Cooly
Total
Sundries
Total

1/7
1/7

No
No

P. Day
P. Day
-

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Each
Item Rates
Labour Rate Per Each

Composite Rate Per Each

Page 59

Rs.

Say

Rs.

Say

Item No.

22
a)

Painting and lettering mile/Km stones on bo


ii)

Detail

Two Coat.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint white and black
Brushes

0.6Lbs (0. 06) Gln


0.02 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 2 Nos
Painter (Artist)
Cooly
Total
Sundries
Total

0.25 No
0.25 No

P. Day
P. Day

Composite Rate Per Each

Page 60

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Each
Item Rates
Labour Rate Per Each

Rs.

Say

Rs.

Say

Item No.

22
b)

Painting and lettering furlong Km stone o


sides.
i)

Detail

One Coat.
Unit Rate (British System) per 100 Sft
Qty

Rate Analysis for

Rate
Per Unit (Rs.) Amount (Rs.)

No.

Material
Paint white and black
Brushes

0.35Lbs (0 .035) Gln


0.02 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total

Rate Per Each

Total
Sundries
Total

0.00
8

Labour
Rate Analysis for 15 Nos
Painter (Artist)
Cooly

1/7
1/7

No
No

P. Day
P. Day
-

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per No.
Item Rates
Labour Rate Per Each

Composite Rate Per Each

Page 61

Rs.

Say

Rs.

Say

Item No.

22
b)

Painting and lettering furlong Km stone on both


sides.
ii)

Two Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for

Rate
Per Unit (Rs.) Amount (Rs.)

No.

Material
Paint white and black
Brushes

0.6Lbs (0 .06) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each

0.00
8

Labour
Rate Analysis for 15 No.
Painter (Artist)
Cooly

0.25 No
0.25 No

Total
Sundries
##### Percent
Total
Rate Per No.
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per Each

Composite Rate Per Each

Page 62

P. Day
P. Day

Rs.

Say

Rs.

Say

Item No.

22
c)

Painting and lettering sign posts.


i)

One Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis

for

1.5

Rate
Per Unit (Rs.) Amount (Rs.)

Nos.

Material
Paint white and black
Brushes

0.35Lbs (0 .035) Gln


0.04 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each

0.00
1.5

Labour
Rate Analysis for 2.5 No.
Painter (Artist)
Cooly
Total
Sundries
Total

0.20 No
0.20 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Each
Item Rates
Labour Rate Per Each

Composite Rate Per Each

Page 63

Rs.

Say

Rs.

Say

Item No.

22
c)

Painting and lettering sign posts.


ii)

Two Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 1.5 Nos


Material
Paint white and black
Brushes

0.6Lbs (0 .06) Gln


0.06 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Each

Total
Sundries
Total

0.00
1.5

Labour
Rate Analysis for 2.5 No.
Painter (Artist)
Cooly

0.33 No
0.33 No

P. Day
P. Day

Composite Rate Per Each

Page 64

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Each
Item Rates
Labour Rate Per Each

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

23:

Removing paint or varnish from wall.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Sft


Labour
Unskilled Cooly
Total
Sundries
Total

1.00 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft

Labour Rate Per Sqm

Page 65

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

24:

a)

Scraping from hydraulic gates.


Khanki Paint.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Sft


Labour
Unskilled Cooly
Total
Sundries
Total

2.00 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft

Labour Rate Per Sqm

Page 66

Rs.

Say

Rs.

Say

Item No.

24

Scraping from hydraulic gates.


b)

Aluminium paint.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Sft


Labour
Unskilled Cooly
Total
Sundries
Total

2.00 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft

Labour Rate Per Sqm

Page 67

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

25:

Painting lettering with shade.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

nalysis for 100 Letters, P. Inch Height


Material
Paint
Brushes

0.5Lbs (0 .05) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total

Total
Sundries
Total

0.37

36.85
100

Labour
Rate Analysis for 150 Letters
Painter (Artist)
Unskilled Cooly

1.60 No
1.60 No

P. Day
P. Day

Composite Rate Per 100 Litter


Composite Rate Per Each

Page 68

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 litters
Item Rates
Labour Rate Per 100 Litter
Labour Rate Per Each

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

26:

Scraping rust for old rail or girders.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Sand Paper

3.00

No.

P. Doz

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Unskilled Cooly
Total
Sundries
Total

1.50 No

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 69

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

27:

Chiselling old paint from brick work.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Steel Scrapper

1.00

No.

P. Doz

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Unskilled Cooly
Total
Sundries
Total

2.00 Nos

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 70

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

28:

Cleaning glasses with chalk and spirit etc

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.) Amount (Rs.)

600 Sft

Material
Chalk
Spirit

1.00
No.
1.00 Litre

P. Doz
P. Lit

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per 100 Sft

Total
Sundries
Total

0.00
6

Labour
Rate Analysis for 750 Sft
Unskilled Cooly

10.00 Nos

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 71

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

29:

Cleaning and oiling rafter or rolled steel

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Oil
Brushes

0.5Lbs (0 .37) Ltr


0.04 No.

P. Ltr
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for 125 Sft
Cooly
Total
Sundries
Total

0.50 Nos

P. Day

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Page 72

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

30:

Cleaning and painting punkha poles, includi


fixing hooks.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for


Material

Rate
Per Unit (Rs.) Amount (Rs.)

3 Nos

Paint
Brushes

0.25Lbs (0 .025) Gln


0.04 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate for Each
Labour
Rate Analysis for
Skilled cooly

0.00
3
4 Nos

Total
Sundries
Total

1.00 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per No.
Item Rates
Labour Rate Per Each

Composite Rate Per Each

Page 73

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

31:

Preparing surface and painting with emulsio


a)

Detail

First Coat.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes
Sand Paper

1.57Lbs ( 0.16) Gln


0.08 No.
0.33 No.

P. Gln
Each
P. Doz

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
Unskilled Cooly

125 Sft

Total
Sundries
Total

0.33 No
0.06 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 74

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

31

Preparing surface and painting with emulsion paint.


b)

2nd Coat and subsequent coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Emulsion Paint
Sand paper

1.18Lbs (0 .118) Gln


1.17 No.

P. Gln
P. Doz

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
Unskilled Cooly

125 Sft

Total
Sundries
Total

0.25 No
0.05 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 75

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

32:

a)
i)
Detail

Preparing surface and painting with water p


coloured cement finish, like duracem, buxce
other finishes with similar specifications
etc.
New Surface
Ist Coat.
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint Durasum
Brushes

1.50 Kg
0.12 No.

P. Kg
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
Unskilled Cooly

125 Sft

Total
Sundries
Total

0.33 No
0.06 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 76

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

32

a)
ii)

Preparing surface and painting with water proof


coloured cement finish, like duracem, buxcem or
other finishes with similar specifications on walls,
etc.
New Surface
2nd Coat and subsequent coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Emulsion Paint
Brushes
Sand Paper

1.25 Kg
0.12 No.
0.17 No.

P. Kg
Each
P. Doz

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter
Unskilled Cooly

125 Sft

Total
Sundries
Total

0.25 No
0.05 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 77

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

32

b)
i)

Preparing surface and painting with water proof


coloured cement finish, like duracem, buxcem or
other finishes with similar specifications on walls,
etc.
Old Surface
Ist Coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes

1.25Lbs ( 0.57) Kg
0.10 No.

P. Kg
Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour Rate for 125 Sft.


Painter
Unskilled Cooly
Total
Sundries
Total

0.33 No
0.06 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 78

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

32

b)
ii)

Preparing surface and painting with water proof


coloured cement finish, like duracem, buxcem or
other finishes with similar specifications on walls,
etc.
Old Surface
2nd Coat and subsequent coat.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Emulsion Paint
Sand paper

1.10Lbs ( 0.50) Kg
0.67 No.

P. Kg
P. Doz

Total
Contractor's Profit & Ove ##### Percent
Total

Labour for 125 Sft.


Painter
Unskilled Cooly
Total
Sundries
Total

0.25 No
0.05 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 79

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Providing and applying weather shield paint of approved


quality on external surface of building including
preparation of surface application of primer complete
in all respects.
a) New Surface
i) Ist Coat

32A

Detail

Unit Rate (British System) per 10 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
i) Varnish
ii) Putty and sand paper (L.S)
iii) Primer (Zine) 1 Kg (for % Sft) @ Rs.80.00 per Kg.
iv) Weather shield paint 0.7 Litre (for 100 Sft)
@ Rs.120.00 per Litre
Total
Contractor's Profit & Ove ##### Percent
Total

1 kg
1 LS
1
0.7

P. Kg
L.S
P. Kg

Labour
Painter
Cooly
Total
Sundries
Total

0.40 No
0.80 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per % Sft
Labour Rate Per Sqm
Composite Rate Per % Sft
Composite Rate Per Sqm

Page 80

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Providing and applying weather shield paint of approved


quality on external surface of building including
preparation of surface application of primer complete
in all respects.
a) New Surface
ii) 2nd Coat

32A

Detail

Unit Rate (British System) per 10 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
i) Weather Shield paint
0.67 litre (for 100 Sft) @ 120/- per litre

0.67

P. Lit

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Painter
Cooly
Total
Sundries
Total

0.25 No
0.40 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per % Sft
Labour Rate Per Sqm
Composite Rate Per % Sft
Composite Rate Per Sqm

Page 81

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Providing and applying weather shield paint of approved


quality on external surface of building including
preparation of surface application of primer complete
in all respects.
b) Old Surface

32A

Detail

Unit Rate (British System) per 10 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
i) Weather Shield paint
0.67 litre (for 100 Sft) @ 120/- per litre

0.67

P. Lit

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Painter
Cooly
Total
Sundries
Total

0.25 No
0.40 No

P. Day
P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per % Sft
Labour Rate Per Sqm
Composite Rate Per % Sft
Composite Rate Per Sqm

Page 82

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

33:

Painting traffic lanes 5" (125mm) wide with


marking enamel.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for

Rate
Per Unit (Rs.) Amount (Rs.)

700 Rft

Material
Road marking enamel
Brushes

7.3Lbs ( 3.32) Ltr


0.18 No.

P. Ltr
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft

Total
Sundries
Total

0.00
700

Labour
Rate Analysis for 1000 Rft
Painter
Cooly

1.00 No
1.00 No

P. Day
P. Day

Composite Rate Per Rft


Composite Rate Per Rm

Page 83

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Rft.
Item Rates
Labour Rate Per Rft
Labour Rate Per P.Rm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

34:

Painting traffic lanes 5" (125mm) wide with


paint, complete in all respects. marking en

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.) Amount (Rs.)

700 Rft

Material
Reflective Paint
Brushes

7.3Lbs ( 3.32) Ltr


0.18 No.

P. Ltr
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Per Rft

Total
Sundries
Total

0.00
700

Labour
Rate Analysis for 1000 Rft
Painter
Cooly

1.00 No
1.00 No

P. Day
P. Day

Composite Rate Per Rft


Composite Rate Per Rm

Page 84

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Rft.
Item Rates
Labour Rate Per Rft
Labour Rate Per P.Rm

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

35:

Repainting of ceiling fan (all sizes and ty


including painting of blades, canopy, suspe
rod and regulator, with suitable enamel pai

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brush

0.13Lt (0 .03) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter

14 No

Total
Sundries
Total

1.00 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Job
Item Rates
Labour Rate Per Job

Composite Rate Per Job

Page 85

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

36:

Repainting of iron poles with cross arms, w


bitumen or other approved paint.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brush

0.6Ltr (0 .13) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Labour
Rate Analysis for
Painter

6 Nos

Total
Sundries
Total

1.00 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per Job
Item Rates
Labour Rate Per Job

Composite Rate Per Job

Page 86

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

37:

Repainting of pipes and specials of G.I. M


conduit etc. fixed on surface for electric
with approved paint.
i)

Detail

Upto 40mm (1") dia.


Unit Rate (Metric System) per Meter
Qty

Material
Rate Analysis for 7 Metre
Paint
Brush

Rate
Per Unit (Rs.) Amount (Rs.)

0.1Ltr (0. 022) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate for One Metre

Total
Sundries
Total

0.00
7

Labour
Rate Analysis for 200 Metre
Painter

1.00 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Rate for One Metre

Item Rates
Labour Rate Per Rm
Composite Rate Per Rm
Labour Rate Per Rft
Composite Rate Per Rft

Page 87

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

37

Repainting of pipes and specials of G.I. M.S. or


conduit etc. fixed on surface for electric wiring
with approved paint.
ii)

Above 40mm (1") to 50mm (2") dia.

Detail

Unit Rate (Metric System) per Meter


Qty

Material
Rate Analysis for 7 Metre
Paint
Brushes

Rate
Per Unit (Rs.) Amount (Rs.)

0.2Ltr (0. 044) Gln


0.12 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate for One Metre

Total
Sundries
Total

0.00
7

Labour
Rate Analysis for 100 Metre
Painter

1.00 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Rate for One Metre

Item Rates
Labour Rate Per Rm
Composite Rate Per Rm
Labour Rate Per Rft
Composite Rate Per Rft

Page 88

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

37

Repainting of pipes and specials of G.I. M.S. or


conduit etc. fixed on surface for electric wiring
with approved paint.
iii)

Above 50mm (2") to 100mm (4") dia.

Detail

Unit Rate (Metric System) per Meter


Qty

Material
Rate Analysis for 7 Metre
Paint
Brushes

Rate
Per Unit (Rs.) Amount (Rs.)

0.3Ltr (0. 066) Gln


0.18 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total
Rate for One Metre

Total
Sundries
Total

0.00
7

Labour
Rate Analysis for 60 Metre
Painter

1.00 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Rate for One Metre

Item Rates
Labour Rate Per Rm
Composite Rate Per Rm
Labour Rate Per Rft
Composite Rate Per Rft

Page 89

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

38:

Repainting main switches and branch distrib


boards of all sizes and types, with approve
(complete set).

Detail

Unit Rate (British System) per Job


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
Paint
Brushes

0.2Ltr (0. 044) Gln


0.16 No.

P. Gln
Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Painter
Total
Sundries
Total

0.03 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Item Rates
Labour Rate Per Each

Composite Rate Per Each

Page 90

Rs.

Say

Rs.

Say

DESCRIPTION

OF

ITEM NO

39:

Extra labour for painting, varnishing, etc


(6 M) height and above, for every additiona
(3.05 M) height, or scaffolding.

Detail

it Rate (British System) per 100 Sft per Co


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Sft


Labour
Unskilled Cooly
Total
Sundries
Total

0.16 No

P. Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Rate Per 100 Sft.
Item Rates
Labour Rate Per 100 Sft Per Coat
Labour Rate Per Sqm Per Coat

Page 91

Rs.

Say

Rs.

Say

CHAPTER NO. 16

PROTECTION & DIVERSION WORKS


DESCRIPTION OF ITEM
1

Cutting pilchi frash or sarkanda including carriage within one mile (1.6 Km.)

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Cft.


LABOUR
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total for 125 Cft.

1.90
10.00

Percent

20.00

Percent

Nos.

0.00 per day

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM
2

Weaving matresses

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Cft.


LABOUR
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total for 125 Cft.

3.60
10.00

Percent

20.00

Percent

Nos.

0.00 per day

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum

Rs.
Rs.

Page 1

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
3 a)

Supplying and filling jute bags 1.25 Cft. capacity with sand or earth sewing and
stacking in dry

Detail
Qty

Unit of Rate Per Bag


Rate
Per Unit (Rs.) Amount (Rs.)

(Rate Analysis for 10 Nos.)


MATERIAL
Empty Jute Bags 1.25 Cft. Capacity
10
Nos.
Sutli
1/8 Sr. (0.12 Kg.)
Total
Contractor's Profit & Ov 20.00 Percent
Total for 10 Bags

0.00 Each
0.00 Per Kg.

Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total for 10 Bags

0.00 Per day

LABOUR
0.45
10.00

Percent

20.00

Percent

No.

ITEM RATE
Labour Rate Per Bag

Composite Rate Per Bag

0.00
10
-

+ 0.00
10

Page 2

0.00

0.00

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

b)

Supplying and filling jute bags 1.25 Cft. Capacity with sand or earth sewing
and laying in position under water

Detail
Qty

Unit of Rate Per Bag


Rate
Per Unit (Rs.) Amount (Rs.)

(Rate Analysis for 10 Nos.)


MATERIAL
Empty Jute Bags 1.25 Cft. Capacity
10
Nos.
Sutli
1/8 Sr. (0.12 Kg.)
Total
Contractor's Profit & Ov 20.00 Percent
Total for 10 Bags

0.00 Each
0.00 Per Kg.

Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total for 10 Bags

0.00 Per day

LABOUR
0.70
10.00

Percent

20.00

Percent

No.

ITEM RATE
Labour Rate Per Bag

Composite Rate Per Bag

0.00
10
-

+ 0.00
10

Page 3

0.00

0.00

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
4 a)

Supplying and filling new jute bags 4 to 5 Cft. capacity, with sand or earth
Sewing and stacking in dry.

Detail

Unit of Rate Per Bag


Rate
Per Unit (Rs.) Amount (Rs.)

Qty
(Rate Analysis for 65 Bags)
MATERIAL

New jute bags 4 to 5 Cft capacity


50
Nos.
Cost of Sutli
1.50 Sr. (1.40 Kg.)
Total
Contractor's Profit & Ov 20.00 Percent
Total for 65 Bags

0.00 Each
0.00 Per Kg.

Coolies required for filling, sewing


and stacking in dry (50 Nos. bags)
Sundries (10%)
10.00 Percent
Total
Contractor's Profit & Ov 20.00 Percent
Total for 65 Bags

0.00 Per day

LABOUR
7

Nos.

ITEM RATE
Labour Rate Per Bag

Composite Rate Per Bag

0.00
65
-

+ 0.00
65

Page 4

0.00

0.00

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

b)

Supply and filling new jute bags 4 to 5 Cft. capacity with sand or earth, sewing
and laying in position under water.

Detail

Unit of Rate Per Bag


Rate
Per Unit (Rs.) Amount (Rs.)

Qty
(Rate Analysis for 65 Bags)
MATERIAL

New jute bags 4 to 5 Cft capacity


50
Nos.
Cost of Sutli
1.50 Sr. (1.40 Kg.)
Total
Contractor's Profit & Ov 20.00 Percent
Total for 65 Bags

0.00 Each
0.00 Per Kg.

Coolies required for filling, sewing


and stacking in dry 50 Nos. bags.
Sundries (10%)
10.00 Percent
Total
Contractor's Profit & Ov 20.00 Percent
Total for 65 Bags

0.00 Per day

LABOUR
10

Nos.

ITEM RATE
Labour Rate Per Bag

Composite Rate Per Bag

0.00
65
-

+ 0.00
65

Page 5

0.00

0.00

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
5

Carriage of jute bags 1.25 Cft. capacity filled with sand or earth

Detail
Qty
A)

Unit of Rate 100 Bags


Rate
Per Unit (Rs.) Amount (Rs.)

First Chain (30.0 Metre)

LABOUR FOR 125 BAGS


Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Labour of Rate for 100
B)

0.50
10.00

Percent

20.00

Percent

Bags

No.

Rs.

0.00 Per Day

0.00

Say

Second to Fourth Chain

(Above 30.0 metre to 120 Metre)


LABOUR FOR 125 BAGS
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Labour of Rate for 100
C)

0.18
10.00

Percent

20.00

Percent

Bags

No.

Rs.

0.00 Per Day

0.00

Say

Fifth and Subsequent Chain

(120 metres and above)


LABOUR FOR 125 BAGS
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total

0.07
10.00

Percent

20.00

Percent

Labour of Rate for 100 Bags

Rs.

Page 6

No.

0.00 Per Day

0.00

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
6

Carriage of new jute bags 4 to 5 Cft. Capacity filled with sand or earth

Detail
Qty
A)

Unit of Rate 100 Bags


Rate
Per Unit (Rs.) Amount (Rs.)

First Chain

LABOUR FOR 125 BAGS


Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Labour of Rate for 100
B)

2.00
10.00

Percent

20.00

Percent

Bags

Nos.

Rs.

0.00 Per day

0.00

Say

Second to Fourth Chain

(30.0 metre to 120.0 metre)


LABOUR FOR 125 BAGS
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total

0.70
10.00

Percent

20.00

Percent

Labour of Rate for 100 Bags/Per Chain


C)

No.

Rs.

0.00 Per day

0.00

Say

Fifth and Subsequent Chain

(120 metres and above)


LABOUR FOR 125 BAGS
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total

0.27
10.00

Percent

20.00

Percent

Labour of Rate per 100 Bags/per chain

Rs.

Page 7

No.

0.00 Per day

0.00

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
7

Rolling matresses to river edge and floating after unrolling

Detail

Unit of Rate

100 Sft.
Rate
Per Unit (Rs.) Amount (Rs.)

Qty
a)

Area of matress upto 2000 Sft

LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total

0.90
10.00

Percent

20.00

Percent

Labour Rate Per 100 Sft.


Labour Rate Per Sqm

b)

Nos.

Rs.
Rs.

0.00 Per day

0.00
0.00

Say
Say

Area of matresses from 2000


to 2500 Sft.

LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total

1.50
10.00

Percent

20.00

Percent

Labour Rate Per 100 Sft.


Labour Rate Per Sqm

c)

Nos.

Rs.
Rs.

0.00 Per day

0.00
0.00

Say
Say

Area of matresses over 2500 Sft.

LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Labour Rate Per 100 Sft.
Labour Rate Per Sqm

1.75
10.00

Percent

20.00

Percent

Rs.
Rs.

Page 8

Nos.

0.00 Per day

0.00
0.00

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
8

Sewing empty cement bags in sheets

Detail

Unit of
Qty

Rate Per 100 Nos.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
1

Sutli, Strings
Contractor's Profit & Ov
Total

1 Sr. (0.933 Kg.)


20.00

Percent

10.00

Percent

20.00

Percent

0.00 Per Kg.

0.00 Per day

LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total

1.40

No.

ITEM RATE
Labour Rate Per 100 Nos.
Composite Rate Per 100 Nos.

Rs.
Rs.

Page 9

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
9

Making compact round pilchi, frash or sarkanda round bundles of specified


size for the work

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Munjban
100 x 5 seer

= 2.31 Seers (2.1


216 Cft.
Contractor's Profit & Ov 20.00 Percent
Total

2.15

Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total

1.95

Kg.

0.00 Per Kg.

LABOUR

10.00

Percent

20.00

Percent

Nos.

0.00 Per day

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 10

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
10

Launching and placing in position, compact round pilchi, frash or Sarkanda


bundles of specified size.

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.


LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total

1.20
10.00

Percent

20.00

Percent

Nos.

0.00 Per Day

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM
11

Supplying within 5 chains


a)

Boulders 9" and above

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.


LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total

3.62
10.00

Percent

20.00

Percent

Nos.

0.00 Per Day

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Page 11

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

b)

Over size shingle 3" to 9"

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.


LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total

2.42
10.00

Percent

20.00

Percent

Nos.

0.00 Per Day

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.

c)

Rs.
Rs.

Say
Say

Mixed graded shingle

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.


LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total

2.87
10.00

Percent

20.00

Percent

Nos.

0.00 Per Day

ITEM RATE
Labour Rate
Labour Rate

Per 100 Cft.


Per Cum.

Rs.
Rs.

Page 12

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
12

Supply munj or patha trungers 6" mesh to hold 3 Cft.

Detail

Unit of

Rate Per No
Rate
Per Unit (Rs.) Amount (Rs.)

Qty
(Rate Analysis for Two Nos.)
MATERIAL
Munjban (rough)
Contractor's Profit & Ov
Total

2 seer (1.87 Kg.)


20.00

Percent

10.00

Percent

20.00

Percent

0.00 Per kg.

0.00 Per day

LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total

0.25

No.

ITEM RATE
Labour Rate Per Bag

Composite Rate Per Bag

0.00
2
-

+ 0.00
2

Page 13

0.00

0.00

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
13

Providing and weaving G.I. wire netting for wire crates with G.I. wire of approved size
(including siding and partition to make crates).
a)

6" mesh

(i)

G.I. Wire 15 SWG

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
G.I. Wire No. 15 (500' long)
Contractor's Profit & Ov 20.00
Total

6.8 Lbs (3.08 Kg.)

1.00 Per Kg.

3.08
0.62
3.70

0.00 Per day


0.00 Per day

Percent

LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

0.70
0.70
10.00

Percent

20.00

Percent

No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 14

3.70
0.40

Say
Say
Say
Say

3.70
0.40

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
13

Providing and weaving G.I. wire netting for wire crates with G.I. wire of approved size
(including siding and partition to make crates).
a)

6" mesh

(ii)

G.I. Wire 10 SWG

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
G.I. Wire No. 10 (500' long)
Contractor's Profit & Ov 20.00
Total

22.0 Lbs (10.0 Kg.)


Percent

0.00 Per Kg.

0.75
0.75

0.00 Per day


0.00 Per day

LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 15

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

a)

6" mesh

(iii) G.I. Wire 8 SWG

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
G.I. Wire No. 8 (500' long)
Contractor's Profit & Ov 20.00
Total

34.5 Lbs (15.68 Kg.


Percent

0.00 Per Kg.

0.75
0.75

0.00 Per day


0.00 Per day

LABOUR
Black smith
Cooly
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 16

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

13 b)

4" mesh

(i)

G.I. Wire 15 SWG

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
G.I. Wire No. 15 750' long
Contractor's Profit & Ov 20.00
Total

10.20 Lbs (4.63 Kg.


Percent

0.00 Per Kg.

0.90
0.90

0.00 Per day


0.00 Per day

LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 17

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

13 b)

4" mesh

(ii)

G.I. Wire 10 SWG

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
G.I. Wire No. 10 750' long
Contractor's Profit & Ov 20.00
Total

33.0 Lbs (14.97 Kg.


Percent

0.00 Per Kg.

1.00
1.00

0.00 Per day


0.00 Per day

LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 18

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

13 b)

4" mesh

(iii) G.I. Wire 8 SWG

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
G.I. Wire No. 8 750' long
Contractor's Profit & Ov 20.00
Total

51.75 Lbs (23.47 Kg


Percent

0.00 Per Kg.

0.00 Per day


0.00 Per day

LABOUR
Black smith
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

1.00
1.00
10.00

Percent

20.00

Percent

No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 19

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

14

Providing and laying shingle on top of bund, including handling of material within
three chains (90 metres)

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Shingle
Contractor's Profit & Ov
Total

20.00

Percent

10.00

Percent

20.00

Percent

110.00

Cft.

0.00 r 100 Cf

1.00

No.

0.00 Per day

LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 20

0.02

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
15

Supply and Dumping at site, without boat, including handling of material within
three chains (90 metres).
a)

Stone or boulder

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Boulder
Contractor's Profit & Ov
Total

20.00

Percent

10.00

Percent

20.00

Percent

110.00

Cft.

0.00er 100 C

1.75

No.

0.00 Per day

LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

b)

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Shingle or Spawl
Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Shingle / Spawl
Contractor's Profit & Ov
Total

20.00

Percent

10.00

Percent

20.00

Percent

110.00

Cft.

0.00er 100 C

1.75

No.

0.00 Per day

LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

c)

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Brick Bats

Page 21

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Brick Bat
Contractor's Profit & Ov
Total

20.00

Percent

10.00

Percent

20.00

Percent

110.00

Cft.

0.00er 100 C

1.35

No.

0.00 Per day

LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total
ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 22

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
16

Supply and damping by boat including loading into boats within 3 chains lead
and hire charges of boat and boatman
a)

Stone, Boulder

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Stone or Boulder
Contractor's Profit & Ov
Total

20.00

110.00

Cft.

0.00er 100 C

1.00
2.00

No.
No.

0.00 Per day


0.00 Per day

Percent

LABOUR
Boatman with large boat
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 23

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

b)

Shingle, Spawl

Detail
Qty
MATERIAL
Spawl
Contractor's Profit & Ov
Total

20.00

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

110.00

Cft.

0.00er 100 C

1
2

No.
No.

0.00 Per day


0.00 Per day

Percent

LABOUR
Boatman with large boat
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

c)

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Brick Bats

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Brick Bat
Contractor's Profit & Ov
Total

20.00

110.00

Cft.

0.00er 100 C

1
1.6

No.
No.

0.00 Per day


0.00 Per day

Percent

LABOUR
Boatman with Large Boat
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM
17

Providing and filling bricks bats in crates (excluding cost of crates)


Page 24

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Brick Bat
Contractor's Profit & Ov
Total

20.00

110.00

Cft.

0.00er 100 C

1.00
1.30

No.
Nos.

0.00 Per day


0.00 Per day

Percent

LABOUR
Skilled Cooly
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 25

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
18

Supplying and filling bricks in wire crates and hand packing (excluding cost of crates)

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Bricks
Contractor's Profit & Ov
Total

20.00

1500.00

Nos.

0.00r 1000 No

1.00
1.80

No.
Nos.

0.00 Per day


0.00 Per day

Percent

LABOUR
Cooly (Skilled)
Coolies (Unskilled)
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate Per 100 Cft.
Composite Rate Per Cum.

Rs.
Rs.
Rs.
Rs.

Page 26

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
19

Supplying and filling in wire crates, including sewing crates (excluding cost of crates)
i)

Stone or Boulders

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Stone or Boulders
Contractor's Profit & Ov
Total

20.00

110.00

Cft.

0.00er 100 C

1.00
2.20

No.
Nos.

0.00 Per day


0.00 Per day

Percent

LABOUR
Cooly (Skilled)
Coolies (unskilled)
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate Per 100 Cft.
Composite Rate Per Cum.

Rs.
Rs.
Rs.
Rs.

Page 27

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

ii

Shingle or Spawl

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Shingle or Sprawl
Contractor's Profit & Ov
Total

20.00

110.00

Cft.

0.00er 100 C

1.00
2.20

No.
Nos.

0.00 Per day


0.00 Per day

Percent

LABOUR
Cooly (Skilled)
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 28

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
20

Extra for anchoring boat for dumping by boats or tipping crates.

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.


LABOUR
Boatman
Sundries (10%)
Total
Contractor's Profit & Ov
Total

0.44
10.00

Percent

20.00

Percent

No.

0.00 Per day

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM
21

Extra for tipping crates (in addition to anchoring boats)

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.


LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Extra L.s. for ballies
Total

2.00
10.00

Percent

20.00

Percent

Nos.

0.00 Per day

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.

Rs.
Rs.

Page 29

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
22

Pilchi revetment, including carriage upto one mile (1.6 Km)

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Supply pilchi lead within one mile
(As per item No. 1 of this chapter)
Total

######

Sft.

0.00er 100 S

LABOUR
Cooly
Sundries (10%)
Total
Contractor's Profit & Ov
Total

1.00
10.00

Percent

20.00

Percent

No.

0.00 Per day

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM
23

Surface protection with pilchi matresses carriage upto one mile (1.76 Km)

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Supply pilchi lead

within one mile

20.00

Cft.

0.00er 100 C

2.50

No.

0.00 Per day

LABOUR
Coolies
Sundries (10%)
10.00
Total
Contractor's Profit & Ov 20.00
Total
ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Percent
Percent

Rs.
Rs.
Rs.
Rs.

Page 30

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
24

Pilchi, sarkanda or frash pitching on slopes, including supply of pilchi,


sarkanda or frash within one mile, also supply and driving of pegs 1' long
sharpened at one end and typing with wire or Munj ban (excluding cost of
placing earth between rolls.

Detail

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

Qty
MATERIAL
Cutting pilchi and carriage to river ba
lead upto one mile
i.

ii.

Pilchi rolls 6" dia 10 long


10x10x 22 x x x = 20 Cft.
7
Pilchi rolls 6" dia 5' long
Cross wise
10x20x5x 22
x (0.5)2 x = 196 Cft
7
Total
= 20 + 196
= 216 Cft.

######

Kiker wood for pegs 18" long 2" dia=25 N


=
25 x 1/6 x 1/6 x x 22/7 x 1
7
Wastage 2%

= 0.17 Cft.
= 1.02 Cft.

Binding wire 1 Lbs (0.454 Kg.)


Total
Contractor's Profit & Ov 20.00
Total

Cft.

0.00 r 100 Cf

0.85 Cft.

1.02

Cft.

0.00 Per Cft.

0.45

Kg.

0.00 Per Kg.

######

Cft.

0.00 r 100 Cf

2.00
0.50

Nos.
No.

0.00 Per day


0.00 Per day

25.00

Nos.

0.00er 100 No

Percent

LABOUR FOR 125 SFT.


i.
ii.

Making pilchi rolls 6" dia

For laying pitchi rolls in position and


dressing page
Coolies (Unskilled)
Coolies (Skilled)

iii.

Sharpening wooden pegs 2" dia and


18" long
Total
Sundries (10%)
10.00 Percent
Total
Contractor's Profit & Ov 20.00 Percent
Total

Labour Per 100 Sft.

551.06

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 31

######
59.29
######
59.29

Say
Say
Say
Say

551.05
59.30
551.05
59.30

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
25

Construction groynes upto 5 feet with single row of woodem vertical stacks 7"
to 12" dia. One average lead one mile

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

LABOUR
Vertical stakes 7" - 12" dia 1 foot a p 21.00
Nos.
Supports
4.00
Nos.
Total
25.00
No.
Wastage 10%
2.50
Nos.
Total
27.50
Nos.
Say
28.00
Nos.
Ordinary coir (Ban)
0.35 Sr. (0.33 Kg.)
Royalty charges for 28 Nos. Stakes
28.00
Nos.
Total
Contractor's Profit & Ov 20.00 Percent

0.00 r 100 No
0.00 Per Kg.
0.00 Each

0.00 Per day


0.00 Per day

LABOUR
Skilled Cooly
Cooly
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

0.85
1.00
10.00

Percent

20.00

Percent

No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 32

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
26

Constructing groynes upto 10 ft height with double roww of wooden vertical


stackes 7" to 12" dia, 2' apart, average lead one mile.

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

LABOUR
Lai stickes 7" - 12" thick
vertical stakes 9" - 12" thick
22.00
Nos
2' apart or two rows cross wise
3.00
Nos.
Supports
4.00
Nos.
Total
29.00
Nos.
Wastage 10%
2.90
Nos.
Total
31.90
Nos.
Say
32.00
Nos.
Ordinary coir (Ban)
Seer (0.47 Kg.)
Royalty charges for 32 Nos. Stakes
32.00
Nos.
Total
Contractor's Profit & Ov 20.00 Percent

0.00 r 100 No
0.00 Per Kg.
0.00 Each

0.00 Per day


0.00 Per day

LABOUR
Skilled Cooly
Cooly
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

1.20
2.00
10.00

Percent

20.00

Percent

No.
No.

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 33

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
27

Providing and laying stone pitching/filling, dry hand packed, as filling behind
retaining walls or in pitching and aprons

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Stone
Contractor's Profit & Ov

20.00

######

Cft.

1.00
1.00

No.
No.

100 C

0.00 Per day


0.00 Per day

0.00r

Percent

LABOUR
Skilled Cooly
Cooly
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 34

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
28

Providing and laying stone pitching with hammer dressed stones on surface
laid in courses

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Pitching Stone
Contractor's Profit & Ov

20.00

######

Cft.

2.25
3.00

No.
No.

100 C

0.00 Per day


0.00 Per day

0.00r

Percent

LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Note : Carriage of stone will be paid for separately.

DESCRIPTION OF ITEM

Page 35

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

29

Providing and laying stone pitching for top layer only


a)

On slope

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Pitching Stone
Contractor's Profit & Ov

20.00

######

Cft.

1.50
3.00

Nos
Nos

100 C

0.00 Per day


0.00 Per day

0.00r

Percent

LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Note : Carriage of stone will be paid separately.

Page 36

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

29 b)

On level

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Pitching Stone
Contractor's Profit & Ov

20.00

######

Cft.

1.50
2.50

Nos
Nos

100 C

0.00 Per day


0.00 Per day

0.00r

Percent

LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Note : Carriage of stone will be paid separately.

Page 37

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
30

Providing and laying stone or spawl filling


a)

On level

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Spawl
Contractor's Profit & Ov

20.00

######

Cft.

0.25
1.00

No.
No.

100 C

0.00 Per day


0.00 Per day

0.00r

Percent

LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 38

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

b)

On Slope

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Spawl
Contractor's Profit & Ov

20.00

######

Cft.

0.48
1.00

No.
No.

100 C

0.00 Per day


0.00 Per day

0.00r

Percent

LABOUR
Mason
Cooly
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Rs.
Rs.
Rs.
Rs.

Page 39

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
31

Providing and laying stone pitching hand packed, with surface leveled off to the correct
section and voide filled in 1:8 cement, sand mortar, in floors of bridges along banks
and in aprons, etc.
i)

Top layer on slope

Detail
Qty

Unit Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Pitching Stone
Cement
Sand
Total
Contractor's Profit & Ov

20.00

######
2.70
26.40

Cft.
Bags
Cft.

0.00r 100 C
0.00 Per Bag
0.00r 100 C

2.50
2.78
0.50

Nos.
Nos.
No.

0.00 Per day


0.00 Per day
0.00 Per day

Percent

LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Note

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Carriage of stone will be paid for separately

Page 40

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

ii)

Top layer on level

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Pitching Stone
Cement
Sand
Total
Contractor's Profit & Ov

20.00

######
2.70
26.40

Cft.
Bags
Cft.

0.00r 100 C
0.00 Per Bag
0.00r 100 C

2.50
2.28
0.50

Nos.
Nos.
No.

0.00 Per day


0.00 Per day
0.00 Per day

Percent

LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Note

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Carriage of stone will be paid for separately

Page 41

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

iii)

Stone pitching/filling on slope or on level (other than top layer)

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Pitching Stone
Cement
Sand
Total
Contractor's Profit & Ov

20.00

######
2.70
26.40

Cft.
Pegs
Cft.

0.00r 100 C
0.00 Per Peg
0.00r 100 C

1.25
1.50
0.37

Nos.
Nos.
No.

0.00 Per day


0.00 Per day
0.00 Per day

Percent

LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum.
Composite Rate per 100 Cft.
Composite Rate per Cum.

Note

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Carriage of stone will be paid for separately

Page 42

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
32

Grouting stone pitching or apron, etc. in


a)

Cement sand mortar (1:3)

Detail
Qty

Unit of Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Cement
Sand
Total
Contractor's Profit & Ov

20.00

6.00
22.30

Pegs
Cft.

0.00 Per Peg


0.00r 100 C

0.50
1.34
0.25

No.
Nos.
No.

0.00 Per day


0.00 Per day
0.00 Per day

Percent

LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 43

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Pitching or grouting stone apron etc. in :b)

Cement sand mortar (1:8)

Detail
Qty

Unit of Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Cement
Sand
Total
Contractor's Profit & Ov
Total
Say

20.00

2.70
26.40

Pegs
Cft.

0.00 Per Peg


0.00r 100 C

0.50
1.00
0.25

No.
Nos.
No.

0.00 Per day


0.00 Per day
0.00 Per day

Percent

636.00

LABOUR
Mason
Coolies
Bahishti
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 44

######
68.43

Say
Say
Say
Say

636.00
68.45

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
33

Sand grouting in stone apron, with high pressure hose

Detail
Qty

Unit of Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Sand
Contractor's Profit & Ov
Total
Say

20.00

50.00

Cft.

0.20
0.50

No.
No.

100 C

193.00

0.00 Per day


0.00 Per day

86.52

0.00r

Percent

LABOUR
Mason
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Say

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm
Composite Rate per 100 Sft.
Composite Rate per Sqm.

Rs.
Rs.
Rs.
Rs.

Page 45

86.52
9.31
######
30.08

Say
Say
Say
Say

86.50
9.30
279.50
30.10

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
34

Grouting stone filling or pitching with bajri

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Pegri
Contractor's Profit & Ov

20.00

Percent

10.00

Percent

20.00

Percent

30.00

Cft.

0.00r

100 C

1.25

Nos.

0.00 Per day

LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 46

Say
Say
Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
35

Removing stone and repitching hand packed on slopes or level after making good
damaged slope/portion.

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.


LABOUR
Cooly For Dismantling
Masons for repitching
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

0.85
1.50
3.00
10.00

Percent

20.00

Percent

No.
Nos.
Nos.

0.00 Per day


0.00 Per day
0.00 Per day

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum

Rs.
Rs.

Page 47

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
36

Collecting and stacking boulders from nullah beds or loose shale, or from any other
site, within 3 chains lead

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.


LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total

2.00
10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum

Nos.

Rs.
Rs.

0.00 Per day

Say
Say

DESCRIPTION OF ITEM
37

Levelling and dressing stone filling under blocks and grouting with shingle

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Shingle
Contractor's Profit & Ov

20.00

30.00

Cft.

0.25
1.00

No.
No.

100 C

0.00 Per day


0.00 Per day

0.00r

Percent

LABOUR
Masons
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Say

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM
38

Grouting jharies between blocks with bajri


Page 48

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Bajri
Contractor's Profit & Ov

20.00

20.00

Cft.

0.25
1.00

No.
No.

100 C

0.00 Per day


0.00 Per day

0.00r

Percent

LABOUR
Masons
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total
Say

10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate per 100 Cft.
Composite Rate per Cum

39

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

DESCRIPTION OF ITEM
Breaking stone into spawls and stacking

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.


LABOUR
Coolies
Sundries (10%)
Total
Contractor's Profit & Ov
Total

1.50
10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum

Rs.
Rs.

No.

0.00 Per day

Say
Say

DESCRIPTION OF ITEM
40

Fixing floating spurs with materials from canal plantation within one mile lead
a)

Upto 2 foot F.s. depth

Detail

Unit of Rate Per No.


Rate
Page 49

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Qty

Per Unit (Rs.) Amount (Rs.)

Analysis for 225 Nos.


LABOUR
Carpenter
Mate
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

1.00
1.00
7.00
10.00

Percent

20.00

Percent

No.
No.
Nos.

0.00 Per day


0.00 Per day
0.00 Per day

ITEM RATE
Labour Rate Per No.

b)

Rs.

225

0.00

Say

2.0' to 3.0' F.s. Depth

Detail
Qty

Unit of Rate Per No.


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 200 Nos.


LABOUR
Carpenter
Mate
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

1.00
1.00
7.00
10.00

Percent

20.00

Percent

No.
No.
Nos.

0.00 Per day


0.00 Per day
0.00 Per day

ITEM RATE
Labour Rate Per No.

Rs.

Page 50

200

0.00

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

3.0' to 4.0' F.s. depth

Detail
Qty

Unit of Rate Per No.


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 150 Nos.


LABOUR
Carpenter
Mate
Coolies
Total
Sundries (10%)
Total
Contractor's Profit & Ov
Total

1.00
1.00
7.00
10.00

Percent

20.00

Percent

No.
No.
Nos.

0.00 Per day


0.00 Per day
0.00 Per day

ITEM RATE
Labour Rate Per No.

d)

Rs.

Above

######

0.00

Say

4'-0" F.S. Depth

Detail
Qty

Unit of Rate Per No.


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 60 Nos.


LABOUR
Carpenter
Mate
Coolies
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00
1.00
7.00
10.00

Percent

20.00

Percent

No.
No.
Nos.

0.00 Per day


0.00 Per day
0.00 Per day

ITEM RATE
Labour Rate Per No.

Rs.

Page 51

60.00

0.00

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

DESCRIPTION OF ITEM
41

a (i)

Staking and bushing from canal plantation within one mile. (Royalty to be paid to
Forest Department or private owner if and when required.
Cutting and supply un-sharpened pegs 3.5 long, 3" to 6" dia from canal plantation
sites lead within one mile (1.6 Km.)

Detail

Unit of Rate Per 100 No. Pegs


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Kikar wood required for 100 No. Pegs
100 x 3.5 x 9/24x9/24 x 1/4x22/7 =38.70 Cft
Add 20% Wastage
Say

7.74 / 46.44
46.50 Cft.

Weight of 46.50 Cft. of green wood at


62 Lbs/ per Cft.
46.50 x 62/82.5 = 35 Mds (1306 Kgs.)
Royalty of Wood @ 70.00 per 100 mds
Total

35.00

Mds.

0.00r 100

Nos.

0.00 Per

Md

24.70
24.70

LABOUR
Coolies for Cutting of wood for Pegs
Sundries
10.00 Percent
Total
Contractor's Profit & Ov 20.00 Percent
Total

No.

ITEM RATE
Labour Rate for 100 Pegs
Composite Rate for 100 Pegs.

Rs.
Rs.

Page 52

24.70

Say
Say

24.70

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (a) Sharpening one end of pegs 3.5 long


3" to 6 " dia.

Detail

Unit of Rate Per 100 No. Pegs


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Pegs


LABOUR
Carpenter
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.50
0.50
10.00

Percent

20.00

Percent

No.
No.

0.00 Per
0.00 Per

day
day

ITEM RATE
Labour Rate for 100 Pegs

Rs.

Say

41 (a) Driving pegs 3.5 long 3" to 6" (Driven


1.0' below the available bed or ground)

Detail

Unit of Rate Per 100 No. Pegs


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Pegs


LABOUR
Cooly Skilled
Sundries
Total
Contractor's Profit & Ov
Total

1.40
10.00

Percent

20.00

Percent

Nos.

0.00 Per day

ITEM RATE
Labour Rate for 100 Pegs

Rs.

Page 53

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (a) Tying pegs with Munj/Patha ban one line including tying around the pegs.

Detail

Unit of Rate Per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of ban for one chain
length of row of killas including a tie
around the pegs.
100 + (50x1 x 9/24 x 22
Add 10% wastage
Total
Say

158.96
15.89
174.85
175.00

Lft.
Lft.
Lft.
Lft.

Length of 1 Seer (0.933 Kg.) of Ban 250'


= 0.70 Seer
175
Hence Weight of 175 Lft
250
a) Supplying Ban Munj /
0.70 Seer (0.65 Kg.)
0.65
Contractor's Profit & Ov
Total

20.00

Percent

10.00

Percent

20.00

Percent

Kg.

0.00 Per Kg.

LABOUR
Cooly
Sundries
Total
Contractor's Profit & Ov
Total

0.10

No.

0.00 Per

day

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 54

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (a) Cutting and supplying brushwood from canal plantation on private source (Lead within one mile)
and wattling between stakes and intertwining. (Thickness of wattled brush wood 1.0 average)

Detail

Unit Rate Per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)
i.

MATERIAL
Requirement of brush wood
Length 100 Ft.
Thickness 1 Ft.
Height 2.5 Ft.
Contents 100x1.0'x2.5' 250 Cft.
250 Cft. or 188 Mds.
Royalty charges @ 20.00 % Cft.

Brush wood measured in thoroughly compacted & pa


shapes before filling in the

ii.

The composite rates include the cost of labour


royalty and cost of cutting and supplying brus
one mile vide item No. 58-A of C.S.R. (Royalty
the forest Deptt. or private owner if and whe
188

Mds.

Per 100 Mds

######
1.00

Mds.
No.

Per 100 Md
0.00 Per day

LABOUR
Cutting brushwood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
Say

Percent
Percent

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 55

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (b) Cutting and supplying un-sharpened pegs 4'.0 long

Detail

(4 feet)

3"-6" dia from canal plantation l

Unit of Rate Per 100 No. Pegs


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Wood required for 100 No. pegs =
= 100 x 4 x 9/24 x 9/24 x x 22/7 = 44.20 Cft.
20% Wastage 8.84/53.04 = 8.84
Cft.
53.04
Weight of 53 Cft. green wood
@ 62 Lbs per Cft.
= 53 x 62/82.50 = 39.83 Mds.
Royalty of Wood @ 70.00 Per % Mds.

39.83

Mds.

0.00 er % Mds

39.83

Mds.

0.00 er % Mds

LABOUR
Cutting of wood
Total Material and Labour
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Say
Say

41 (b) Sharpening one end of pegs 4'.0 long 3" to 6" dia.

Detail
Qty

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly (Unskilled)
Total
Sundries
Total
Contractor's Profit & Ov
Total
Rate Per 100 No. Pegs

0.50
0.50
10.00

Percent

20.00

Percent

No.
No.

0.00 Per day


0.00 Per day

1.25

ITEM RATE
Labour Rate for 100 No. Pegs

Rs.

Say

41 (b) Driving pegs 4'-0" long 3" to 6" dia (driven 1.25' below the available bed or ground (average)

Page 56

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail

Unit of Rate Per 100 No. Pegs


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Cooly Skilled
Cooly Unskilled
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
Rate Per 100 No. Pegs
158.63
1.25

1.00
0.73

No.
No.

0.00 Per day


0.00 Per day

Percent
Percent

ITEM RATE
Labour Rate for 100 No. Pegs

41 (b) Tying pegs with Munj /

Patha

Rs.

Say

ban (one line including tying around the pegs).

Detail

Unit of Rate Per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Same as per item No. 41(a) (iv)

Same as per item No. 41(a)(iv)

Total

LABOUR

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 57

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (b) Cutting and supplying brushwood from canal plantation or private source (lead within one mile)
wattling between stakes and intertwining. (Thickness of wattled brush wood 1.0' (average)

Detail

Unit Rate Per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement

of brushwood

Brushwood measured in thoroughly compacted and packe


shape before filling in the desi

Length 100'
Thickness 1'-0"
Height 2.75'
Content 100x1.0x2.75 = 275 Cft.
Royalty of brush wood 275 Cft.

######

Cft.

20.00 r 100 Cf

2.50
1.00

Nos.
Nos.

0.00 Per day


0.00 Per day

55.00

LABOUR
Cooly Unskilled
for cutting brushwood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total

Percent
Percent

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 58

55.00

Say
Say

55.00

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (c) Cutting and supplying unsharpened pegs 5'-0" long 3" to 6" dia from canal plantation
(lead within one mile)

Detail

Unit of Rate Per 100 No. Pegs


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Wood required for 100 No. pegs
100 x 5'.0 x 9/24 x 9/24 x x 22/7
55.25 Cft.
Add wastage 20%
11.05
66.30 Cft.

Brushwood measured in thoroughly compacted and packe


shape before filling in the desi

Weight of 66.30 cft green wood


@ 62 Lbs per Cft. (66.30x62) / 82.5 = 49.82 Mds.
Royalty of wood per 100 Mds @ 70.00 % Md 49.82

Mds.

0.00Per % Md

Cutting wood for pegs


Total Material and Labour

Mds.

0.02 er % Mds

0.01

LABOUR

49.82

ITEM RATE
Labour Rate Per 100 No. Pegs
Composite Rate Per 100 No. Pegs

Rs.
Rs.

0.01
0.01

Say
Say

41 (c) Sharpening one end of pegs 5'-0" long 3" to 6" dia.

Detail
Qty

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
ITEM RATE
Labour Rate

0.55
0.50
10.00

Percent

20.00

Percent

Per 100 No. Pegs

Rs.

No.
No.

0.00 Per day


0.00 Per day

Say

41 c - Driving pegs 5'-0" long 3" to 6" dia (driven 1.5' below the available bed on ground (average).

Page 59

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail
Qty

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Cooly skilled
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00
1.00
10.00

Percent

20.00

Percent

No.
No.

0.00 Per day


0.00 Per day

ITEM RATE
Labour Rate

Per 100 No. Pegs

Rs.

Say

41 (c) Tying Peg with Munj / Patha ban one line including tying around the pegs.

Detail

Unit Rate Per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Same as per Item 41 (a) (iv)

Same as per item 41 (a) (iv)


Total

LABOUR

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 60

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (c) Cutting and supply brushwood from canal plantation or private source (lead within one mile) an
between stakes and intertwining thickness of wattled brush wood 1.0')

Detail

Unit Rate Per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of brush wood
Length 100 Ft.
Thickness 1.0'
Height 3.5'
CONTENTS
100 X 1.0 X 3.5
= 350 Cft.
Weight of brush wood
350x62
82.5

263 Mds ######

Mds.

0.00 r 100 Cf

No.

0.00 Per day

MATERIAL
Cooly skilled for wattling brush wood
Sundries
10.00 Percent
Total
Contractor's Profit & Ov 20.00 Percent
Total

1.50

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 61

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (d) Cutting and supplying unsharpened pegs 6'-0" long 3" to 6" dia from canal plantation (lead wit

Detail
Qty

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Wood required for 100 No. pegs
100 x 6 x 9/24 x 9/24 x x 22/7 = 66.30 Cft.
Add wastage 20% 13.26
Say

Cft.
79.6 Cft.

Weight of 79.60 Cft green wood


@ 62 Lbs / per cft.
79.6 x 62/82.50 59.80 Mds.
Royalty of wood

59.80

Mds.

0.00 r 100 Md

4.00

Nos.

0.00 Per No.

LABOUR
Coolies for cutting wood for pegs.
Sundries
10.00 Percent
Total
Contractor's Profit & Ov 20.00 Percent
Total
ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Say
Say

41 (d) Sharpening one end of pegs 6'-0" long

Detail
Qty
Analysis for 125 Nos.
MATERIAL
Carpenter
Cooly
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
ITEM RATE
Labour Rate Per 100 No. Pegs

0.65
0.60

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

No.
No.

0.00 Per day


0.00 Per day

Percent
Percent

Rs.

Page 62

0.01

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (d) Driving pegs 6'-0" long 3'-6" driven 1.75' below the available bed of ground (average)

Detail
Qty

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Cooly Skilled
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.20
1.20
10.00

Percent

20.00

Percent

Nos.
Nos.

0.00 Per day


0.00 Per day

ITEM RATE
Labour Rate Per 100 No. Pegs

Rs.

Say

41 (d) Tying pegs with Munj / Patha ban (one line including tying around the pegs)

Detail
Qty

Unit Rate Per Chain of Row


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Same as per item No. 41 (a)(iv)

Same as per Item No. 41 (a)(iv)

LABOUR

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 63

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (d) Cutting and supplying brush wood from canal plantation or private source (lead within one mile
wattling between stakes and intertwining, thickness of wattled brush wood 1'.0 average

Detail
Qty

Unit Rate Per Chain


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of brush wood
Length 100 Ft.
Thickness 1 Ft.
Height
4.25 Ft.
Contents 100 x 1.0 x 4.25 = 425 Cft.
Weight of brush wood = 425 x 62 = 319.40 ######
82.5

Mds.

0.00 r 100 Md

Nos.
Nos.

0.00 Per No.


0.00 Per day

LABOUR
For cutting brush wood
Coolies skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total

3.00
1.00
Percent
Percent

ITEM RATE
Total Labour Per Chain
Composite Rate Per Chain

Rs.
Rs.

Page 64

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (e) Cutting and supplying un-sharpened pegs 6'-1" to 8'-0" long 4" to 8" dia from canal plantation
within one mile.

Detail
Qty

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Wood required for 100 No. pegs
100 x 7'.0 x x x x
22

= 137.
7

Add wastage 20%

27.50 Cft.
165.00 Cft.

Total

Weight of 165 Cft. green wood


@ 62 Lbs per Cft.
165 x 62/82.5 = 124.00 Mds
Royalty of wood

######

Mds.

0.00er 100 Md

3.00

Nos.

0.00 Per No.

LABOUR
Coolies for Cutting Wood
Sundries
Total
Contractor's Profit & Ov
Total

10.00

Percent

20.00

Percent

ITEM RATE
Total Labour Per 100 No. Pegs
Composite Rate Per 100 No. Pegs

Rs.
Rs.

Say
Say

41 (e) Sharpening one end of pegs 6'-1" to 8'-0" long, 4" to 8" dia.

Detail
Qty

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly Unskilled
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
ITEM RATES
Labour Rate Per 100 No. Pegs

0.80
0.80

No.
No.

0.00 Per day


0.00 Per day

Percent
Percent

Rs.

Page 65

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (e) Driving pegs 6'-1" to 8'-0' long 4" to 8" dia driven 2'-0" below the available bed or ground (

Detail
Qty

Unit Rate Per 100 No. Pegs


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Cooly skilled
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.30
1.35
10.00

Percent

20.00

Percent

Nos.
Nos.

0.00 Per day


0.00 Per day

ITEM RATE
Labour Rate Per 100 No. Pegs

Rs.

Page 66

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (e) Tying pegs 4" to 8" dia with Munj / Patha ban (one line including tying around the pegs).

Detail

Unit Rate Per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirements of Munj / Patha ban for one
Chain length including winding of Peg
100 + (50 x x 22 / 7)
=
178.57
Add. wastage @ 10% =
Total length =
Say = 200 Lft.

Lft.

17.86
196.43

196

hence weight of 200'


Length of Munj / Patha ban
@ 250 per sor. 200 / 250 =
Munj / Patha ban
Contractor's Profit & Ov
Total

080

20.00

Sr.

0.80 Sr. (0.36 Kg.)


Percent

0.00 Per Kg.

LABOUR
Same as per Item 41 (a) (iv)

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 67

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

41 (e) Cutting and supplying brush wood (from canal plantation or private source lead within one mile
wattling between stacks and intertwining (thickness or wattled brush wood 1.0 average).

Detail

Unit Rate Per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of brush wood
Length
100.00 Ft.
Thickness
1.00
Ft.
Height
5.00
Ft.
Contents 100 x 1'.0" x 5'.0" = 500 Cft.
Weight of 500 Cft. Brush Wood
500 x 62 =
375.75 Mds]
Royalty of brush wood 500 Cft.
Total
Say

######

Mds.

0.00er 100 Md

3.00
1.50

Nos.
Nos.

0.00 Per day


0.00 Per day

LABOUR
Coolies Unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
Say
ITEM RATE

Percent
Percent

Labour Rate Per Chain of One Row


Composite Rate Per Chain of One Row

Rs.
Rs.

Page 68

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

42

Staking with bamboos from market and brushing from canal plantation or private source
(Royalty of brush wood for brushing or cost to private owners if and when required).

a - i) Supplying bamboos 8'-1" to 10' long, 2" to 5" dia

Detail

Unit of Rate Per 100 No. Bamboos


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Bamboos
Contractor's Profit & Ov
Total

######
20.00

Nos.

0.00

Each

Percent

ITEM RATE
Cost of 100 No. Bamboos

(a)

Rs.

Say

i Sharpening one end of bamboos 8'-1" to 10' long 2" to 5" dia

Detail

Unit of Rate Per 100 No. Bamboos


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.70
0.70
10.00

Percent

20.00

Percent

No.
No.

0.00
0.00

Each
Each

ITEM RATE
Labour Rate Per 100 No. Bamboos

Rs.

Page 69

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

(a) ii Driving bamboos 8'-1" to 10'-0" long 2" to 5" dia. Driven2.5' below the available 'bed or gro

Detail

Unit of Rate Per 100 No. Bamboos


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Cooly skilled
Cooly unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.45
1.45
10.00

Percent

20.00

Percent

ITEM RATE
Labour Rate Per 100 No. Bamboos

Nos.
Nos.

Rs.

0.00 Per day


0.00 Per day

Say

2 (a) ivTying bamboos 2" to 5" dia with munj/Patha ban two lines including tying around the bamboos.

Detail

Unit of Rate per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of Munj/Patha ban for
one chain length
200 + 50 (15/48 x 22 / 7) = 249 Lft.
Add wastage 10%
=
25 Lft.
Total
=
Say
=

274 Lft.
275 Lft.

Length of one Sr. Munj/Patha ban=250 Lft.


hence weight of 275 Lft.
Munj/Patha ban 275/250 Lft=1.10 Sr.
Munj/Patha ban
1.10 Sr.
2.26 Lbs (1.02 Kg.)
Contractor's Profit & Ov 20.00 Percent
Total

0.00 Per Kg.

0.00 Per day

LABOUR
Cooly unskilled
Sundries
Total
Contractor's Profit & Ov
Total

0.15
10.00

Percent

20.00

Percent

No.

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Say
Say

42 (a) v Cutting and supply brushwood from canal plantation or private source lead within one mile and
between stakes and intertwining (thickness of wattled brushwood 1'.0 average)

Page 70

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail

Unit of Rate per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of brush wood
Length
100.00 Ft.
Thickness
1.00
Ft.
Height
6.50
Ft.
Contents 100 x 1.0' x 6.5 = 650 Cft.
Weight of brush wood = 650 x 62= 488 Mds ######
82.5
Total

Mds.

0.00 r 100 Md

LABOUR
Unskilled Coolies
for cutting brushwood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total

3.50
2.00

Nos.
Nos.

0.00 Per day


0.00 Per day

Percent
Percent

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Say
Say

42 (b) i Supplying bamboos 10'-1" to 12'-0" long 2" to 5" dia

Detail
Qty
MATERIAL
Bamboos
Contractor's Profit & Ov

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

######
20.00

Nos.

0.00

Each

Percent

Total

ITEM RATE
Material Rate Per 100 No. Bamboos

Rs.

2 (b) iiSharpening one end of bamboo 10'-1" to 12'-0" long 2"

Detail
Qty

to 5"

Say

dia

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

Page 71

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.80
0.80
10.00

Percent

20.00

Percent

No.
No.

0.00 Per day


0.00 Per day

ITEM RATE
Total Labour Rate Per 100 No. Bamboos

Rs.

Say

(b) ii Driving bamboos 10'-1" to 12'-0" long 2" to 5" (driven 2.75' below the available bed or groun

Detail
Qty

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Coolies Skilled
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.55
1.60
10.00

Percent

20.00

Percent

Nos.
Nos.

0.00 Per day


0.00 Per day

ITEM RATE
Total Labour Rate Per 100 No. Bamboos

Rs.

Page 72

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

2 (b) ivTying bamboos 2" to 5" dia with BSWG No. 10 (two lines including tying around the bamboos and
tie around the topend only)

Detail

Unit RatePer Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of B.S.W.G 10 for one chain
length (two lines 2(100 + 50 x 15/48x22/7)=298 Lft
top and only 50 x 15/48x22/7 = 50 Lft.
Total 348 Lft.
Add 5% wastage = 18 Lft. = 366 Lft.
Weight of 100 yard of
B.S.S.W.G. No. 10(13.12) Lbs.
Weight of 366 Left = 366/300x13.12
= 16 Lbs or 0.143 Cwt.
B.S.W.G. No. 10
16.00 Lbs. (7.27 Kg
Contractor's Profit & Ov 20.00 Percent
Total

0.00 Per Kg.

0.00 Per day

LABOUR
Cooly Unskilled
Sundries
Total
Contractor's Profit & Ov
Total

0.50
10.00

Percent

20.00

Percent

No.

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 73

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

42 (b) v Wattling brushwood between stakes and intertwining (thickness of wattled brush wood 1'.0 avera

Detail

Unit of Rate per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of brush wood lenth=100 Ft.
Thickness
= 1'-0"
Height
= 8.25 Ft.
Contents 100 x 1 x 8.25 = 825 Cft.
Weight of brush wood = 825 x 62= 620 Mds
82.5
Royality of brush wood
######
Mds.
Total

0.00 r 100 Md

0.00 Per day


0.00 Per day

LABOUR
Cooly Unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total

4.50
2.25

Nos.
Nos.

Percent
Percent

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Say
Say

42 (c) i Supplying bamboos 12'-1" to 14' long 2" to 5" dia

Detail
Qty

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Bamboos
Contractor's Profit & Ov
Total

######
20.00

Nos.

0.00

Each

Percent

ITEM RATE
Material Rate Per 100 No. Bamboos

Rs.

Say

2 (c) iiSharpening one end of bamboo 12'-1" to 14' long 2" to 5" dia.

Page 74

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail
Qty

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

0.90
0.90
10.00

Percent

20.00

Percent

No.
No.

0.00
0.00

Each
Each

ITEM RATE
Labour Rate Per 100 No. Bamboos

Rs.

Say

(c) ii Driving bamboos 12'-1" to 14' long 2" to 5" dia . Driven 3.5' below the available bed or grou

Detail
Qty

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Coolies Skilled
Coolies Unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total

1.80
1.80
10.00

Percent

20.00

Percent

Nos.
Nos.

0.00
0.00

Each
Each

ITEM RATE
Labour Rate Per 100 No. Bamboos

Rs.

Page 75

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

2 (c) ivTying bamboos 2" to 5" dia with B.S.W.G. No. 10 Two lines including tying around the bamboo a
third tying around the topend only.

Detail

Unit of Rate per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Same as per Item No. 42 (b) (iv)

Same as per Item No. 42 (b) (iv)

Total

LABOUR

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Say
Say

42 (c) v Cutting and supplying brushwood from canal plantation / private source lead within one mile an
between stakes and intertwining thickness of wattled brush wood 1'-0" average.

Detail

Unit of Rate per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of brush wood length=100 Ft.
Thickness
= 1'-0"
Height
= 9.50 Ft.
Contents 100 x 1 x 9.50 = 950 Cft.
Weight of brush wood =
950x62 =714 Mds
82.5
Royality of brush wood
714
Total

Mds.

0.00r 100 Md

Nos.
Nos.

0.00 Per day


0.00 Per day

LABOUR
Coolies unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total

5.50
2.50
Percent
Percent

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

42 (d) i Supplying bamboos 14'-1" to 16'-0"

Rs.
Rs.

Say
Say

long 2" to 5" dia

Page 76

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail
Qty

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Bamboos
Contractor's Profit & Ov
Total

100
20.00

Nos.

0.00

Each

Percent

ITEM RATE
Material Rate Per

100 No. Bamboos

Rs.

2 (d) iiSharpening one end of bamboo 14'-1" to 16'-0"

Detail
Qty

Say

long 2" to 5" dia.

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
Rate per 100 Nos.

1.00
1.00
10.00

Percent

20.00

Percent

No.
No.

0.00
0.00

Each
Each

1.25

ITEM RATE
Labour Rate Per 100 No. Bamboos

Rs.

Page 77

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

(d) ii Driving bamboos 14'-1" to 16'-0"

long 2" to 5" dia. Driven 4'-0"' below the available bed or

Detail
Qty

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Nos.


LABOUR
Cooly Skilled
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
Rate per 100 Nos.

2.00
2.00
10.00

Percent

20.00

Percent

125

Nos.
Nos.

0.00
0.00

Each
Each

x 100 =

ITEM RATE
Labour Rate Per 100 Nos.

(d)

Rs.

Say

ivTying bamboos 2" to 5" dia with B.S.W.G. No. 10 Two lines including tying around the bamboo a
third tying around the top only.

Detail

Unit of Rate per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Same as per Item No. 42 (b) (iv)

Same as per Item No. 42 (b) (iv)

Total

LABOUR

ITEM RATE
Labour Rate Per 100 Nos.
Comparative Rate Per 100 Nos.

Rs.
Rs.

Page 78

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

42 (d) v Cutting and supplying brush wood from canal plantation / private source lead within one mile a
between stakes and intertwining thickness of wattled brush wood 1'-0" average.

Detail

Unit of Rate per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of brush wood length=100 Ft.
Thickness
= 1'-0"
Height
= 11 Ft.
Contents 100 x 1 x 11
= 1100 Cft.
Weight of brush wood = 1100 x 62=826.67
82.5
Mds.
Royalty of brush wood
Total

######

Mds.

0.00er 100 Md

6.20
3.00

Nos.
Nos.

0.00 Per day


0.00 Per day

LABOUR
Cooly Unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total

Percent
Percent

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 79

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

2 (e)

iSupplying bamboos 16'-1" to 20'-0"

long 2" to 5" dia

Detail
Qty

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Bamboos
Contractor's Profit & Ov

100
20.00

Nos.

0.00

Each

Percent

ITEM RATE
Composite Rate Per 100 Nos.

(e)

Rs.

Say

i Sharpening one end of bamboo 16'-1" to 20' long 2" to 5" dia.

Detail
Qty

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Carpenter
Cooly
Total
Sundries
Total
Contractor's Profit & Ov
Total
Rate for 100 Nos.

1.20
1.20
10.00

Percent

20.00

Percent

Nos.
Nos.

0.00
0.00

Each
Each

1.25

ITEM RATE
Labour Rate Per 100 No. Bamboos

Rs.

Page 80

Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

(e) ii Driving bamboos 16'-1" to 20'-0"

long 2" to 5". Driven 4'-0"' below the available bed or gro

Detail
Qty

Unit of Rate 100 No. Bamboos


Rate
Per Unit (Rs.) Amount (Rs.)

Analysis for 125 Nos.


LABOUR
Cooly Skilled
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ov
Total
Rate for 100 Nos.

2.40
2.40
10.00

Percent

20.00

Percent

Nos.
Nos.

0.00
0.00

Each
Each

Say

1.25

Labour Rate Per 100 No. Bamboos

Rs.

2 (e) ivTying bamboos 2" to 5" dia with B.S.W.G. No. 10 Two lines including tying around the bamboos
third tying around the top only.

Detail

Unit of Rate per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Same as per Item No. 42 (b) (iv)

Same as per Item No. 42 (b) (iv)

Total

LABOUR

ITEM OF RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 81

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

42 (e) v Cutting and supplying brush wood from canal plantation / private source lead within one mile a
between stakes and intertwining thickness of wattled brush wood 4'-0" average

Detail

Unit of Rate per Chain of One Row


Rate
Qty
Per Unit (Rs.) Amount (Rs.)

MATERIAL
Requirement of brush wood length=100 Ft.
Thickness
= 1'-0"
Height
= 14 Ft.
Contents 100 x 1' x 14' = 1400 Cft.
Weigth of brush wood = 1400 x 62 =1052
82.5
Mds.
Royalty of brush wood
######

Mds.

0.00 r 100 Md

Total

LABOUR
Cooly Unskilled
for cutting brush wood
Cooly skilled for wattling
Total
Sundries
10.00
Total
Contractor's Profit & Ov 20.00
Total
Say

7.50
4.00

Nos.
Nos.

0.00 Per day


0.00 Per day

Percent
Percent

ITEM RATE
Labour Rate Per Chain of One Row
Composite Rate Per Chain of One Row

Rs.
Rs.

Page 82

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

43

Cutting and supplying brush wood from canal plantation or from any other source
within one mile

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Remarks Royalty to be paid to the forest department


and when required.
ii)
Measured in thoroughly compacted and packed
Weight of 100 Cft. brush wood = 100 x 62 = 75
shapebefore filling.
82.5 Mds.
Royalty of brush wood
75.00
Mds.
0.00 r 100 Md

MATERIAL

LABOUR
Cooly
Sundries
Total
Contractor's Profit & Ov
Total

0.50
10.00

Percent

20.00

Percent

No.

0.00 Per day

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum
Composite Rate Per 100 Cft.
Composite Rate Per Cum

44

Rs.
Rs.
Rs.
Rs.

Say
Say
Say
Say

Filling brush wood only thoroughly packed

Detail
Qty

Unit of Rate Per 100 Cft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Cft.


LABOUR
Cooly Unskilled
Sundries
Total
Contractor's Profit & Ov
Total
Rate per 100 Cft.

ITEM RATE
Labour Rate Per 100 Cft.
Labour Rate Per Cum

45

0.50
10.00

Percent

20.00

Percent

No.

0.00 Per day

1.25

Rs.
Rs.

Say
Say

Covering road 10' to 12' wide with 3" sarkanda or jungle upto one chain lead

Page 83

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

Detail
Qty

Unit Rate per Chain


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Rft.


LABOUR
Cooly Unskilled
Sundries
Total
Contractor's Profit & Ov
Total
Rate per 100 Rft.
=

1.20
10.00

Percent

20.00

Percent

Nos.

0.00 Per day

1.25

ITEM RATE
Labour Rate Per Chain
Labour Rate Per 30 Metre

Rs.
Rs.

Say
Say

46 a) Gachi pitching 1" thick

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Sft.


LABOUR
Cooly Unskilled
Sundries
Total
Contractor's Profit & Ov
Total
Rate per 100 Sft.
=

6.50
10.00

Percent

20.00

Percent

Nos.

0.00 Per day

1.25

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.

Rs.
Rs.

Page 84

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

46 b) Gachi pitching done with silt clearance and berm dressing

Detail
Qty

Unit Rate Per 100 Sft.


Rate
Per Unit (Rs.) Amount (Rs.)

Rate Analysis for 125 Sft.


LABOUR
Cooly Unskilled
Sundries
Total
Contractor's Profit & Ov
Total
Rate per 100 Sft.
=

5.50
10.00

Percent

20.00

Percent

Nos.

0.00 Per day

1.25

ITEM RATE
Labour Rate Per 100 Sft.
Labour Rate Per Sqm.

Rs.
Rs.

Page 85

Say
Say

C:\SCHD-RAT\PROT-DIV.XLS/ZAK

CHAPTER NO. 19

PLUMBING SANITARY INSTALLATION


& GAS FITTINGS
DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware water closet European Typ
excluding seat and cover.

Item No. 1

(i)

White

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6

W.C. European Type


Rubber Sheet
Bolts & Nuts
Cement
Sand
Bajri
Total
Contractor's Profit & Overh
Total

1.00
0.222
4.00
0.161
0.40
0.80

No.
Kg.
Nos.
Bag
Cft.
Cft.

each
P. Kg.
each
Bag
% Cft.
% Cft.

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
1.00 No.

per day
per day

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 1

Say
Say

DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware water closet European Typ
excluding seat and cover.

Item No. 1

(ii)

Coloured

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6

W.C. European Type


Rubber Sheet
Bolts & Nuts
Cement
Sand
Bajri
Total
Contractor's Profit & Overh
Total

1.00
0.222
4.00
0.161
0.40
0.80

No.
Kg.
Nos.
Bag
Cft.
Cft.

0.00 each
0.00 P. Kg.
0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
1.00 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 2

0.00
0.05

Say
Say

0.00
0.05

DESCRIPTION OF ITEM:
Providing and fixing double seat and cover only.

Item No. 2
(i)

Bakelite.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Seat and cover double (Bakelite)

Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00

0.00
-

20.00 Percent

LABOUR For 48 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

0.25 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 3

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing double seat and cover only.

Item No. 2
(ii)

Plastic.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Seat and cover double (Plastic)

Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00

0.00
-

20.00 Percent

LABOUR For 48 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

0.25 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 4

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware water closet, squatt
(orisa pattern) combined with foot rest.

Item No. 3

(i)

White

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

W.C Orisa pattern with foot rest


Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00 No.
0.021 Bag
0.056 Cft.

0.00 each
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.50 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 5

0.00
0.00

Say
Say

0.00
0.00

Providing and fitting glazed earthen ware water closet, squatt


(orisa pattern) combined with foot rest.

Item No. 3

(ii)

Coloured.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

W.C Orisa pattern with foot rest


coloured
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00 No.
0.021 Bag
0.056 Cft.

0.00

each

0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.50 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 6

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 4

Providing and fitting white glazed earthen ware water closet, squat
with separate foot rest.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

W.C. squatter type


Foot rest
Total
Contractor's Profit & Overh
Total

1.00 No.
2.00 Nos.

0.00
0.00

each
each

0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.50 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 7

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 5

Providing and fitting water closet squatter type of terrazzo concre

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

W.C. squatter type of terrazzo concrete


Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00 No.
0.021 Bag
0.056 Cft.

0.00 each
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.50 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 8

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware wash hand basin 56 x 40 c
(22" x 16"), including bracket set, waste pipe and waste coupling,

Item No. 6

(i)

White with padestal.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Glazed earthen ware wash hand basin


Padestal
Waste coupling, Bracket, Waste Pipe
Total
Contractor's Profit & Overh
Total

1.00 No.
1.00 No.
1.00 No.

0.00
0.00
0.00

each
each
each

0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
1.00 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 9

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware wash hand basin 56 x 40 c
(22" x 16"), including bracket set, waste pipe and waste coupling,

Item No. 6

(ii)

Coloured with padestal.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Earthen ware wash hand basin (coloured)


Pedestal
Waste coupling, Bracket Waste
Pipe
Total
Contractor's Profit & Overh
Total

1.00 No.
1.00 No.

0.00
0.00

each
each

0.00
0.00

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
1.00 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 10

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware wash hand basin 56 x 40 c
(22" x 16"), including bracket set, waste pipe and waste coupling,

Item No. 6

(iii)

White without padestal.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

W.H. Basin
Waste coupling, Bracket, Waste Pipe
Total
Contractor's Profit & Overh
Total

1.00 No.
1.00 No.

0.00
0.00

each
each

0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 11

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware wash hand basin 56 x 40 c
(22" x 16"), including bracket set, waste pipe and waste coupling,

Item No. 6

(iv)

Coloured without padestal.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Coloured W.H. Basin


Coupling, C.I. Bracket, Waste Pipe
Total
Contractor's Profit & Overh
Total

1.00 No.
1.00 No.

0.00
0.00

each
each

0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 12

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 7

Providing and fixing stainless steel sink with drain board, size 12
(48" x 24") including bracket set, waste pipe and waste coupling.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Stainless steel sink with drain

2
3
4
5
6

board 120 x 60 cm (48" x 24")


Waste coupling
Waste pipe
Bracket
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
1.00
1.00
2.00
0.042
0.130

No.
No.
No.
Nos.
Bag
Cft.

0.00 each
0.00 each
0.00 each
0.00 each
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 13

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 8

Providing and fitting terrazzo concrete sink 60 x 45 cm (24" x 18")


drain board of mosaic including bracket set waste pipe and waste co

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6

Terrazzo concrete sink


60 x 45 cm (24" x 18")
C.I. Bracket
Waste coupling
Waste pipe
Cement
Sand

Total
Contractor's Profit & Overh
Total

1.00
2.00
1.00
1.00
0.067
0.280

No.
Nos.
No.
No.
Bag
Cft.

0.00 each
0.00 each
0.00 each
0.00 each
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00

0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 14

0.00
-0.05

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing glazed earthen ware sink, including bracket se
pipe and waste coupling.

Item No. 9

(i)

60 x 45 cm (24" x 18")

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6

Glazed earthen ware sink


C.I. Bracket
Waste pipe
Waste coupling
Cement
Sand

Total
Contractor's Profit & Overh
Total

1.00
2.00
1.00
1.00
0.053
0.144

No.
Nos.
No.
No.
Bag
Cft.

0.00 each
0.00 each
0.00 each
0.00 each
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00

0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 15

0.00
-0.05

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing glazed earthen ware sink, including bracket se
pipe and waste coupling.

Item No. 9

(ii)

37.5 x 45 cm (15" x 18")

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
6
7

G.E. Sink Size 37.5 x 45 cm


(15" x 18")
Waste pipe
Waste coupling
C.I. Bracket
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
1.00
1.00
2.00
0.053
0.144

No.
No.
No.
Nos.
Bag
Cft.

0.00 each
0.00 each
0.00 each
0.00 each
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 16

0.00
-0.05

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 10

Providing and fixing glazed earthen ware Flat Back Urinal.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

1.00 No.
2.00 Nos.
2.00 Nos.

G.E. flat Back Urinal Complete set

Gutties
Screw (75 mm) 3" long

Total
Contractor's Profit & Overh
Total

0.00 each
0.00 P. Doz
0.00 each

0.00
0.00
0.00

0.00
-

20.00 Percent

LABOUR For 4 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 17

0.00
-0.20

Say
Say

0.00
-0.20

DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware low down flushing cistern
litres (3 gallons) capacity, including bracket set, copper connecti

Item No. 11

(i)

White

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

Low down flushing cistern 3 gallon


or 13.63 litters
C.I. Bracket
Copper connection with check nut
Cement
Sand

Total
Contractor's Profit & Overh
Total

1.00
one pair
1.00
0.04
0.23

No.
No.
Bag
Cft.

0.00 each
0.00 per pair
0.00 each
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00

0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 18

0.00
0.20

Say
Say

0.00
0.20

DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware low down flushing cistern
litres (3 gallons) capacity, including bracket set, copper connecti

Item No. 11

(ii)

Coloured

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

Low down flushing cistern


C.I. Bracket
Copper connection with check nut
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
one pair
1.00
0.04
0.23

No.
No.
Bag
Cft.

0.00 each
0.00 per pair
0.00 each
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 19

0.00
0.20

Say
Say

0.00
0.20

DESCRIPTION OF ITEM:
Item No. 12

Providing and fitting plastic made low down flushing cistern 13.63
(3 gallons) capacity, including bracket set, copper connection, etc
complete.
Coloured & White.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

Low down flushing cistern


C.I. Bracket
Copper connection with check nut
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
one pair
1.00
0.04
0.23

No.
No.
Bag
Cft.

0.00 each
0.00 per pair
0.00 each
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each (White)
Composite rate for Each (Coloured)

Rs.
Rs.
Rs.

Page 20

0.00
0.20
687.45

Say
Say
Say

0.00
0.20
687.45

DESCRIPTION OF ITEM:
Item No. 13

Providing and fixing white enamelled cast iron low down flushing ci
13.63 litters (3 gallons) capacity, including bracket set, copper c
etc.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

2
3
4

White enamelled C.I low down


flushing cistern 3 gallons or
13.63 litters capacity including
all assessaries.
C.I. Bracket
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00 No.
one pair
0.021 Bag
0.056 Cft.

0.00 each
0.00 per pair
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 21

0.00
0.05

Say
Say

0.00
0.05

DESCRIPTION OF ITEM:
Providing and fixing C.I. highlevel flushing cistern including cost
bracket set copper connection etc.

Item No. 14

(i)

13.63 litters (3 gallons) capacity.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

2
3
4

C.I. High level flushing cistern


13.63 letters or 3 gallon
capacity including
accessories.
C.I. Bracket
Cement
Sand

Total
Contractor's Profit & Overh
Total

1.00 No.

one pair
0.021 Bag
0.056 Cft.

0.00

each

0.00 per pair


0.00
Bag
0.00 % Cft.

0.00

0.00
0.00
0.00

0.00
-

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.10 Nos.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 22

0.00
0.05

Say
Say

0.00
0.05

DESCRIPTION OF ITEM:
Providing and fixing C.I. highlevel flushing cistern including cost
bracket set copper connection etc.

Item No. 14

(ii)

4.55 liters (1 gallon) capacity.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4

C.I. High level flushing cistern


I/C all accessaries
C.I. Bracket
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00 No.
one pair
0.021 Bag
0.056 Cft.

0.00

each

0.00 per pair


0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00

20.00 Percent

LABOUR For 4 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.10 Nos.
0.75 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 23

0.00
0.05

Say
Say

0.00
0.05

DESCRIPTION OF ITEM:
Item No. 15

Providing and fixing, chromium plated soap dish.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Chromuim plated soap dish


Gutties Plastic
Screws 3/4"

Total
Contractor's Profit & Overh
Total

1.00 No.
2.00 Nos.
2.00 Nos.

0.00 each
0.00 P. Doz
0.00 P. Doz

0.00
0.00
0.00

0.00
-

20.00 Percent

LABOUR For 40 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 24

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting, glazed earthen ware soap dish.

Item No. 16
(i)

White.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Glazed earthen ware soap dish


Gutties Plastic
Screws 3/4"

Total
Contractor's Profit & Overh
Total

1.00 No.
2.00 Nos.
2.00 Nos.

0.00 each
0.00 P. Doz
0.00 P. Doz

0.00
0.00
0.00

0.00
-

20.00 Percent

LABOUR For 40 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 25

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting, glazed earthen ware soap dish.

Item No. 16
(ii)

Soap dish coloured.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Soap dish coloured


Gutties Plastic
Screws 3/4"
Total
Contractor's Profit & Overh
Total

1.00 No.
2.00 Nos.
2.00 Nos.

0.00 each
0.00 P. Doz
0.00 P. Doz

0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 40 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 26

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 17

Providing and fixing chromium plated toilet paper holder.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

C.P. Toilet holder


Gutties Plastic
Screws 3/4"
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
2.00
4.00
0.010
0.060

No.
Nos.
Nos.
Bag
Cft.

0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 27

0.00
-0.01

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing chromium plated towel rail.

Item No. 18
(i)

60 cm (24") long and

Detail

2 cm (3/4") dia.

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

C.P. Towel rail


Gutties
Screws

Total
Contractor's Profit & Overh
Total

1.00 No.
2.00 Nos.
4.00 Nos.

0.00 each
0.00 P. Doz
0.00 P. Doz

0.00
0.00
0.00

0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 28

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing chromium plated towel rail.

Item No. 18
(ii)

50 cm (20") long and 1.5 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

C.P. Towel rail 50 cm (20") long


1.5 cm (" dia)
Gutties
Screws
Total
Contractor's Profit & Overh
Total

1.00 No.
2.00 Nos.
4.00 Nos.

0.00 each
0.00 P. Doz
0.00 P. Doz

0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 29

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 19

Providing and fixing looking glass 55 x 40 cm (22" x 16") size and


thick first quality.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3

Looking glass 5 mm thick


55 x 40 cm (22" x 16")
Gutties
Screw

Total
Contractor's Profit & Overh
Total

1.00 No.
4.00 Nos.

0.00 each
0.00 P. Doz

0.00
0.00

4.00 Nos.

0.00 P. Doz

0.00
0.00
-

20.00 Percent

LABOUR For 16 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 30

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing glass shelf 60 x 13 cm (24" x 5") with 5 mm th
glass.

Item No. 20

(i)

With chromium plated brackets and railing.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6

Glass 60 x 13 cm (24" X 5")


with 5 mm thick glass
Chromium plated brackets and railing
Screws
Gutties
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
1.00
4.00
2.00
0.010
0.060

No.
No.
Nos.
Nos.
Bag
Cft.

0.00 each
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 16 Nos.


1
2

Plumber
Cooly skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.25 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 31

0.00
-0.01

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing glass shelf 60 x 13 cm (24" x 5") with 5 mm th
glass.

Item No. 20

(ii)

Glass Shelf only without chromium plated brackets and railing.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Glass Shelf
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 32

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware shelf 60 x 13 cm (24" x 5
chromium plated bracket and railing.

Item No. 21

(i)

White.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

G.E. shelf 60 x 13 cm (24" x 5")

2
3
4
5

with C.P bracket and railing.


Gutties
Screw
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
2.00
4.00
0.010
0.060

No.
Nos.
Nos.
Bag
Cft.

0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 16 Nos.


1
2

Plumber
Cooly skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.25 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 33

0.00
-0.01

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting glazed earthen ware shelf 60 x 13 cm (24" x 5
chromium plated bracket and railing.

Item No. 21

(ii)

Coloured.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

G.E. shelf 60 x 13 cm (24" x 5")


with C.P bracket and railing.
Gutties
Screw
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
2.00
4.00
0.010
0.060

No.
Nos.
Nos.
Bag
Cft.

0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 16 Nos.


1
2

Plumber
Cooly skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.25 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 34

0.00
-0.01

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting.

Item No. 22
(i)

Plastic soap dish.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

Plastic soap dish


Gutties
Screw
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
2.00
2.00
0.005
0.030

No.
Nos.
Nos.
Bag
Cft.

0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 40 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 35

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting.

Item No. 22
(ii)

Plastic toilet paper holder.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

Plastic toilet paper holder


Gutties
Screw
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
2.00
4.00
0.010
0.060

No.
Nos.
Nos.
Bag
Cft.

0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 36

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting.

Item No. 22
(iii)

Plastic towel rail.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

Plastic towel rail


Gutties
Screw
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
2.00
4.00
0.010
0.06

No.
Nos.
Nos.
Bag
Cft.

0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 37

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting.

Item No. 22
(iv)

Plastic Shelf with bracket and railing.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6

Plastic shelf with railing


Bracket
Gutties
Screw
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
2.00
2.00
4.00
0.004
0.020

No.
Nos.
Nos.
Nos.
Bag
Cft.

0.00 each
0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 38

0.00
0.01

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing chromium plated pillar - cock, heavy.

Item No. 23
(i)

2 cm

(").

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

2 cm (") Pillar Cock


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 39

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing chromium plated pillar - cock, heavy.

Item No. 23
(ii)

1.5 cm (").

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

15 cm (") Pillar Cock heavy


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 40

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing chromium plated stop Cock Heavy.

Item No. 24
(i)

2 cm (").

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

2 cm (") stop cock


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 41

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing chromium plated stop Cock Heavy.

Item No. 24
(ii)

1.5 cm (").

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

1.5 cm (") stop cock


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 42

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 25

Providing and fixing underground stop cock 13 mm (") with chromium


plated cover.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5

Underground stop cock with chromium


plated cover
Gutties
Screw
Cement
Sand
Total
Contractor's Profit & Overh
Total

1.00
4.00
4.00
0.022
0.060

No.
Nos.
Nos.
Bag
Cft.

0.00 each
0.00 P. Doz
0.00 P. Doz
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1
2

Plumber
Cooly un-killed
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.25 No.
0.25 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 43

0.00
0.02

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing chromium plated bib cock.

Item No. 26
(i)

2 cm (").

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

2 cm (") bib cock


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 44

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing chromium plated bib cock.

Item No. 26
(ii)

1.5 cm (").

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

1.5 cm (") bib cock


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 45

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 27

Providing and fixing chromium plated tee stop cock 1.5 cm (").

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

1.5 cm (") Chromium plated


tee stop cock
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 46

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing, chromium plated shower rose.

Item No. 28
(i)

1.5 cm x 10 cm (" x 4")

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Chromium plated shower rose


1.5 cm x 10 cm (" x 4")
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 47

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing, chromium plated shower rose.

Item No. 28
(ii)

2 cm x 15 cm (" x 6")

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Chromium plated shower rose


2 cm x 15 cm (" x 6")
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 48

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 29

Providing & Fixing, chromium plated mixing valve, for wash hand bas
sinks or shower.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Chromium plated mixing valve


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 24 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 49

0.00
0.02

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing gun metal peet/gate valve (screwed).

Item No. 30
(i)

Peet valve 3 cm (1") dia.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Gun Metal Peet Valve


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 50

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing gun metal peet/gate valve (screwed).

Item No. 30
(ii)

Peet valve 4 cm (1") dia.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

G.M. Peet Valve 4 cm (1") dia


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 51

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing gun metal peet/gate valve (screwed).

Item No. 30
(iii)

G.M. Peet Valve 5 cm (2" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

G.M. Peet Valve 5 cm (2" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 52

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing gun metal peet/gate valve (screwed).

Item No. 30
(iv)

G.M. Peet Valve 6.5 cm (2") dia.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

G.M. Peet Valve 6.5 cm (2" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 53

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing gun metal peet/gate valve (screwed).

Item No. 30
(v)

G.M. Peet Valve 7.5 cm (3" dia)

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

G.M. Peet Valve 7.5 cm (3" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 54

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting, Chromium plated or brass oxidised, swan neck
1.5 cm (" dia).

Item No. 31

(i)

Single way 1.5 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

1.00 No.

Cost of cock

Total
Contractor's Profit & Overh
Total

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 55

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting, Chromium plated or brass oxidised, swan neck
1.5 cm (" dia).

Item No. 31

(ii)

Two way 1.5 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Cost of cock
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 56

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting, Chromium plated or brass oxidised, swan neck
1.5 cm (" dia).

Item No. 31

(iii)

Three way 1.5 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Cost of cock
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 15 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 57

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing, union brass cock.

Item No. 32
(i)

1.5 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Cost of cock
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 58

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing, union brass cock.

Item No. 32
(ii)

2 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Cost of cock
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 59

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 33
(i)

Providing and fixing floor trap of Cast Iron including concrete cha
all-round and C.I grating.
10 x 5 cm (4" x 2").

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4

C.I floor trap including grating


size 10 x 5 cm (4" x 2")
Cement
Sand
Crushed Stone
Total
Contractor's Profit & Overh
Total

1.00
0.065
0.160
0.310

No.
Bag
Cft.
Cft.

0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 10 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 60

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing floor trap of Cast Iron including concrete cha
all-round and C.I grating.

Item No. 33

(ii)

Floor trap size 10 x 7.5 cm (4" x 3").

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4

C.I floor trap including grating


size 10 x 7.5 cm (4" x 3")
Cement
Sand
Crushed Stone

Total
Contractor's Profit & Overh
Total

1.00
0.065
0.160
0.310

No.
Bag
Cft.
Cft.

0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.

0.00
0.00
0.00
0.00

0.00
-

20.00 Percent

LABOUR For 10 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 61

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting P-trap including concrete chamber with cast i
gully grating.

Item No. 34

(i)

Cast Iron 10 cm (4" dia)

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4

C.I. P-trap 10 cm (4" dia)


Cement
Sand
Crushed Stone
Total
Contractor's Profit & Overh
Total

1.00
0.016
0.040
0.081

No.
Bag
Cft.
Cft.

0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 12 Nos.


1

Plumber/Mason
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 62

0.00

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting P-trap.

Item No. 34
(ii)

Glazed 10 cm (4" dia)

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4

1.00
0.016
0.040
0.081

Glazed Pee trap 10 cm (4" dia)

Cement
Sand
Crushed Stone
Total
Contractor's Profit & Overh
Total

No.
Bag
Cft.
Cft.

0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 12 Nos.


1

Plumber/Mason
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 63

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 35

Providing and fitting 10 cm (4") gully trap, including cement cncre


costof PVC grating 15 x 15 cm (6" x 6") and Masonry chamber 30 x 30
cm(12" x 12").

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2
3
4
5
6

Concrete Gully trap


P.V.C grating 15 x 15 cm (6" x 6")
Cement
Sand
Crushed Stone

1.00
1.00
0.119
0.190
0.323
20.00

Brick

Total
Contractor's Profit & Overh
Total

No.
No.
Bag
Cft.
Cft.
No.

0.00 each
0.00 each
0.00
Bag
0.00 % Cft.
0.00 % Cft.
0.00 %0 No.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
-

20.00 Percent

LABOUR For 8 Nos.


1

Plumber/Mason
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate for Each
Composite rate for Each

Rs.
Rs.

Page 64

0.00

0.00
0.01

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing & fitting cast iron soil pipe with:

Item No. 36 (i)


(a)

Lead caulked, yarn joint 10 cm (4") dia.

Detail

Unit Rate (Metric) per R.M


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL FOR 2 METRE)


1

C.I Soil 10 cm (4") dia


Cost of lead joint
a) Lead
b) Yarn
c) Fuel wood

Total
Contractor's Profit & Overh
Total
Material cost/metre
=
0.00
2

2.00 Metre

0.00per metre

0.00

2.36 Kg.
0.25 Lbs
1.45 Kg.

0.00 Per Kg.


0.00
Lbs
0.00 Per Kg.

0.00
0.00
0.00

0.00
-

20.00 Percent

0.00

0.00

LABOUR For 20 Metre


1
2

Plumber/Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
2.00 Nos.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 65

DESCRIPTION OF ITEM:
Providing & fitting cast iron soil pipe with:

Item No. 36 (i)


(b)

Lead caulked, yarn joint 5 cm (2") dia.

Detail

Unit Rate (Metric) per R.M


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL FOR 2 METRE)


1

C.I Soil 5 cm (2") dia


Cost of lead joint
a) Lead
b) Yarn
c) Fuel wood
Total
Contractor's Profit & Overh
Total
Material cost/metre
449.46 =
2

2.00 Metre

0.00per metre

0.00

0.23 Kg.
0.13 Lbs
0.73 Kg.

0.00 Per Kg.


0.00
Lbs
0.00 Per Kg.

0.00
0.00
0.00
0.00
-

20.00 Percent

224.73

LABOUR For 50 Metre


1
2

Plumber/Mason
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
2.00 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

-0.01
0.02

Say
Say

0.00
0.00

Page 66

DESCRIPTION OF ITEM:
Cement caulked joint.

Item No. 36 (ii)


(a)

10 cm (4") dia.

Detail

Unit Rate (Metric) per R.M


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL FOR 2 METRE)


1
2
3

C.I Soil pipe 10 cm (4") dia


Yarn
Cement
Total
Contractor's Profit & Overh
Total
Material cost per metre

2.00 Meter
0.25 Lbs
0.022 Bag

0.00per metre
0.00
Lbs
0.00
Bag

0.00
0.00
0.00
0.00
0.00

20.00 Percent

LABOUR For 40 Metres


1
2

Mason/Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.25 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composite rate per metre


Composite rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 67

DESCRIPTION OF ITEM:
Cement caulked joint.

Item No. 36 (ii)


(b)

5 cm (2") dia.

Detail

Unit Rate (Metric) per R.M


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL FOR 2 METRE)


1
2
3

C.I Soil pipe 5 cm (2") dia


Yarn
Cement
Total
Contractor's Profit & Overh
Total
Material cost per metre

2.00 Metre
0.13 Lbs
0.011 Bag

0.00per metre
0.00
Lbs
0.00
Bag

0.00
0.00
0.00
0.00
0.00

20.00 Percent

LABOUR For 100 Metre


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.25 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composite rate per metre


Composite rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 68

DESCRIPTION OF ITEM:
Providing and fitting, A.C Soil pipe with cement caulked joint, inc
specials.

Item No. 37

(i)

6 cm i/d.

Detail

Unit Rate (Metric) per R.M


Qty

Rate Per Unit

Amount (Rs.)

Rate Analysis for 3 Metre


MATERIAL
1
2
3
4

A.C Soil Pipe


Specials @ 10%
Yarn
Cement
Total
Contractor's Profit & Overh
Total
Material cost per metre

3.00 Metre
0.25 Lbs
0.022 Bag

0.00per metre
0.00
0.00

Lbs
Bag

0.00
0.00
0.00
0.00
0.00
0.00

20.00 Percent

LABOUR For 50 Metre


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.25 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

0.02
0.01

Say
Say

0.00
0.00

Page 69

DESCRIPTION OF ITEM:
Providing and fitting, A.C Soil pipe with cement caulked joint,
including all specials.

Item No. 37

(ii)

7.5 cm (3" dia).

Detail

Unit Rate (Metric) per R.M


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL FOR 3 METRE


1
2
3
4

A.C Soil Pipe


Specials @ 10%
Yarn
Cement

Contractor's Profit & Overh


Total
Material cost per metre

3.00 Metre
0.25 Lbs
0.022 Bag

0.00per metre
0.00
0.00

Lbs
Bag

0.00
0.00
0.00
0.00
0.00
0.00

20.00 Percent

LABOUR For 45 Metre


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.25 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 70

DESCRIPTION OF ITEM:
Providing and fitting, A.C Soil pipe with cement caulked joint,
including all specials.

Item No. 37

(iii)

10 cm (4" dia).

Detail

Unit Rate (Metric) per R.M


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL FOR 3 METRE


1
2
3
4

A.C Soil Pipe


Specials @ 10%
Yarn
Cement

Contractor's Profit & Overh


Total
Material cost per metre

4.00 Metre
0.31 Lbs
0.028 Bag

0.00per metre
0.00
0.00

Lbs
Bag

0.00
0.00
0.00
0.00
0.00
0.00

20.00 Percent

LABOUR For 40 Metre


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.25 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 71

DESCRIPTION OF ITEM:
Providing and fitting, A.C Soil pipe with cement caulked joint,
including all specials.

Item No. 37

(iv)

15 cm (6" dia) A/C Soil Pipe.

Detail

Unit Rate (Metric) per R.M


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL FOR 4 METRE


1
2
3
4

A.C Soil pipe 50 cm (6" dia)


Special at 10%
Yarn
Cement

Contractor's Profit & Overh


Total
Material cost per metre

4.00 Metre
0.500 Lbs
0.044 Bag

0.00per metre
0.00
0.00

Lbs
Bag

0.00
0.00
0.00
0.00
0.00
0.00

20.00 Percent

LABOUR For 30 Metre


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
0.25 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 72

DESCRIPTION OF ITEM:
Providing and fitting cast iron specials, such as tee bend, collar,
plain type.

Item No. 38

(i)

Lead Caulked Joint.

Detail

Unit Rate (British System) per Kg


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL FOR 5 KG.


1
2
3
4

C.I. bend 100 mm (4" dia)


Fuel
Yarn
Total
Contractor's Profit & Overh
Total cost for 5 kg
Material cost per Kg

LABOUR FOR
1
2

5.00
0.91
2.91
0.50

Lead

kg
kg
kg
lbs

0.00
0.00
0.00
0.00

per kg
per kg
per kg
per lbs

0.00
0.00
0.00
0.00
0.00
0.00

20.00 Percent

60 NOS.

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
1.20 Nos.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Kg
Composite rate per Kg

Rs.
Rs.

Page 73

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting cast iron specials, such as tee bend, collar,
cross, etc. plain type.

Item No. 38

(ii)

Cement caulked joint.

Detail

Unit Rate (British System) per Kg


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL FOR 5 KG.


1
2
3
4

C.I. bend 10 cm (4" dia)

5.00
0.50
0.040
0.230

Yarn

Cement
Sand
Total
Contractor's Profit & Overh
Total
Material cost per Kg

kg
lbs
Bag
Cft.

0.00 per kg
0.00 per lbs
0.00
Bag
0.00 % Cft.

0.00
0.00
0.00
0.00
0.00
0.00

20.00 Percent

LABOUR For 90 Nos.


1
2

Plumber
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
1.00 No.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Kg
Composite rate per Kg

Rs.
Rs.

Page 74

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Supply and fitting of cast iron Manhole cover with frame, etc. comp

Item No. 39
(i)

30 cm (12" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Manhole cover 30 cm (12" dia)

Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00

0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 75

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Supply and fitting of cast iron Manhole cover with frame, etc. comp

Item No. 39
(ii)

45 cm (18" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

C.I. manhole cover with frame 45 cm


(18" dia)
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00

0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 76

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Supply and fitting of cast iron Manhole cover with frame, etc. comp

Item No. 39

C.I. Manhole cover 60 cm (24" dia)

(iii)

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

1.00 No.

C.I manhole cover with frame 60 cm (24" dia)

Total
Contractor's Profit & Overh
Total

0.00

each

0.00

0.00
-

20.00 Percent

LABOUR For 15 Nos.


1
2

1.00 No.
0.25 No.

Helper (Cooly)
Total
Sundries
Total
Contractor's Profit & Overh
Total

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 77

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 40

Providing and fitting R.C.C Pipe 10 cm (4" dia) including


laying and jointing in trenches.

Detail

Unit Rate (British System) per L.M


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL FOR 2 METRE


1

2.00 metre
6.56 Rft

R.C.C pipe 10 cm (4" dia)


Total
Contractor's Profit & Overh
Total
Material cost per metre

0.00 per Rft

0.00
0.00
0.00

20.00 Percent

LABOUR For 40 Metre


1
2

Plumber
Helper (Cooly)
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
2.00 Nos.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Metre
Labour rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composite rate per Metre


Composite rate per Ft.

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 78

DESCRIPTION OF ITEM:
Providing and fitting chromium plated or oxidised gas Cock
6 mm (" dia)

Item No. 41

(i)

Single way.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Gas Cock of 6 mm (" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 79

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting chromium plated or oxidised gas Cock
6 mm (" dia)

Item No. 41

(ii)

Two way cock.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Gas Cock of 6 mm (" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 80

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fitting chromium plated or oxidised gas Cock
6 mm (" dia)

Item No. 41

(iii)

Three way cock.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Gas Cock of three way


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 15 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 81

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 42

Providing and fitting nipple or bush 6 mm to 10 mm (" - 3/8") i/d.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Nipple or bush 6 mm to 10 mm
(1/4" - 3/8") i/d.
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 40 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 82

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing, brass gas cock.

Item No. 43
(i)

1.5 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Brass gas cock 1.5 cm (" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 48 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

0.25 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 83

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing, brass gas cock.

Item No. 43
(ii)

2 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Brass gas cock 2 cm (" dia)

Contractor's Profit & Overh


Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 48 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

0.25 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 84

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing brass stop cock/bib cock.

Item No. 44
(i)

1.5 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Brass stop cock/bib cock.


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

0.25 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 85

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing and fixing brass stop cock/bib cock.

Item No. 44
(ii)

2 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Brass stop cock/brass bib cock


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 30 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

0.25 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 86

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 45

Hoisting and placing in position precast R.C latrine seats.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

LABOUR For 8 Nos.


1
2

Plumber/Mason
Coolies skilled
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.
3.00 Nos.

0.00 per day


0.00 per day

0.00
0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each

Rs.

Page 87

0.00

Say

0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing, chromium plated waste coupling.

Item No. 1
(i)

3 cm (1" dia)

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

C.P. coupling 3 cm (1" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber/Mason
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 88

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing, chromium plated waste coupling.

Item No. 1
(ii)

4 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

C.P. coupling 4 cm (1" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber/Mason
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 89

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing rubber plug with chain.

Item No. 2
(i)

3 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Rubber plug with chain 3 cm


(1" dia)
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 50 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

0.10 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 90

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing rubber plug with chain.

Item No. 2
(ii)

Rubber plug with chain 4 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Rubber plug with chain 4 cm


(1" dia)
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 50 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

0.10 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 91

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing waste pipe of PVC.

Item No. 3
(i)

3 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

P.V.C. waste pipe 3 cm (1" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 40 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 92

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing waste pipe of PVC.

Item No. 3
(ii)

P.V.C Waste Pipe 4 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

P.V.C. waste pipe 4 cm (1" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 40 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 93

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing flushing

Item No. 4
(i)

bend of P.V.C.

3 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

P.V.C. flushing bend 3 cm (1" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 45 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 94

0.01
-0.02

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing flushing

Item No. 4
(ii)

bend of P.V.C.

P.V.C Flusing bend 4 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

P.V.C. Flusing bend 4 cm (1" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 45 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 95

0.01
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing chromium plated bottle trap with waste
pipe etc. complete.

Item No. 5

(i)

3 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

C.P Bottle trap with waste pipe

Contractor's Profit & Overh


Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 96

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing chromium plated bottle trap with waste
pipe etc. complete.

Item No. 5

(ii)

C.P. Bottle Trap with waste pipe 4 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

C.P Bottle trap 4 cm with waste pipe

Contractor's Profit & Overh


Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 97

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing angle iron brackets for

Item No. 6
(i)

Wash hand basin and cistern.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

2.00 Nos.
4.00 Nos.

Angle Iron Bracket


Nail with Cutter

Total
Contractor's Profit & Overh
Total

0.00
0.00

each
each

0.00
0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 98

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing angle iron brackets.

Item No. 6
(ii)

Sink.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

2.00 Nos.
4.00 Nos.

Angle Iron Bracket for Sink


Nail with cutter

Total
Contractor's Profit & Overh
Total

0.00
0.00

each
each

0.00
0.00
0.00
-

20.00 Percent

LABOUR For 20 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 99

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing 1.5 cm (" dia) connection, including check
nuts etc.

Item No. 7

(i)

Plastic rubber connection.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Rubber connection with


assessories
Total
Contractor's Profit & Overh
Total

1.00 Nos.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 50 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 100

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing 1.5 cm (" dia) connection, including check
nuts etc.

Item No. 7

(ii)

Copper connection.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Copper Connection
assessories
Total
Contractor's Profit & Overh
Total

1.00 Nos.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 50 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 101

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.

Item No. 8
(i)

1.5 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

1.5 cm (" dia) brass ball valve with


assessaries

Contractor's Profit & Overh


Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 24 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 102

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.

Item No. 8
(ii)

2 cm (" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Brass ball valve 2 cm (" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 24 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 103

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.

Item No. 8
(iii)

2.5 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Brass ball valve 2.5 cm (1" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 24 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 104

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.

Item No. 8
(iv)

3 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Brass ball float valve 3 cm (" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 24 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 105

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.

Item No. 8
(v)

4 cm (1" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Brass ball float valve 4 cm (1" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 24 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 106

0.00
0.00

Say
Say

0.00
0.00

REPLACEMENT

DESCRIPTION OF ITEM:
Providing and fixing brass ball float valve.

Item No. 8
(vi)

5 cm (2" dia).

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

Brass ball float valve 5 cm (2" dia)


Total
Contractor's Profit & Overh
Total

1.00 No.

0.00

each

0.00
0.00
-

20.00 Percent

LABOUR For 24 Nos.


1

Plumber
Total
Sundries
Total
Contractor's Profit & Overh
Total

1.00 No.

0.00 per day

0.00
0.00
-

10.00 Percent
20.00 Percent

ITEM RATES
Labour rate per Each
Composite rate per each

Rs.
Rs.

Page 107

0.00
0.00

Say
Say

0.00
0.00

CHAPTER NO. 18

ROAD & ROAD STRUCTURE


DESCRIPTION OF ITEM:
Item No. 1

Providing and laying sub-base course of brick on edge


4" (114 mm)thick including compaction to required
camber and grade.
Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2

Brick
Sand
Total
Contractor's Profit & O
Total

1400 Nos.
22 Cft

20.00

0.00
0.00

No.
% Cft

0.00
0.00
0.00
-

Percent

LABOUR
1
2
3

Mason
Cooly
Bahisthi
Total
Sundries
Total
Contractor's Profit & O
Total

1.35 Nos.
2.65 Nos.
0.10 No.

10.00

Percent

20.00

Percent

0.00 per day


0.00 per day
0.00 per day

0.00
0.00
0.00
0.00
-

COMPACTION CHARGES
1

Working of DRR

0.25 hour

0.00 per hour

0.00
0.00

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composit rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 1

DESCRIPTION OF ITEM:
Item No. 2

Providing and laying sub-base course of brick aggregate


includingcompaction of sub-base course material to

required depth, cambergrade and density.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2

Brick aggregate
Sand
Total
Contractor's Profit & O
Total

122 Cft
24 Cft

20.00

0.00
0.00

% Cft
% Cft

0.00
0.00
0.00
-

Percent

LABOUR
2

Cooly Skilled
Total
Sundries
Total
Contractor's Profit & O
Total

2.00 Nos.

10.00

Percent

20.00

Percent

0.00 per day

0.00
0.00
-

COMPACTION CHARGES
1

Working of DRR

0.75 hour

0.00 per hour

0.00
0.00

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composit rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

-0.55
-0.19

Say
Say

-0.50
-0.10

Page 2

DESCRIPTION OF ITEM:
Item No. 3

(i)

Providing and laying sub-base course of stone product of approved


quality and grade, including placing, mixing, spreading and compaction
of sub-base material to required depth, grade to achieve 100% maximum
modified AASHO dry density, including carriage of all material to site
work, except gravel and aggregate for which supply within 3 Miles (5 km
is included in the rate.
Pit run or bed run gravel.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1

Pit run or bed run gravel


Total
Contractor's Profit & O
Total

20.00

120 Cft

0.00

% Cft

0.00
0.00
-

Percent

LABOUR
2

Cooly Skilled
Total
Sundries
Total
Contractor's Profit & O
Total

2.00 Nos.

10.00

Percent

20.00

Percent

0.00 per day

0.00
0.00
-

COMPACTION CHARGES
1

Working of DRR

0.75 hour

0.00 per hour

0.00
0.00

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composit rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 3

DESCRIPTION OF ITEM:
Item No. 3 (a)

(ii)

Providing and laying sub-base course of stone product of approved


quality and grade, including placing, mixing, spreading and compaction
of sub-base material to required depth, grade to achieve 100% maximum
modified AASHO dry density, including carriage of all material to site
work, except gravel and aggregate for which supply within 3 Miles (5 km
is included in the rate.
Crushed stone aggregate.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1

Crushed stone
Total
Contractor's Profit & O
Total

120 Cft

20.00

0.00

% Cft

0.00
0.00
-

Percent

LABOUR
2

Cooly Skilled
Total
Sundries
Total
Contractor's Profit & O
Total

2.00 Nos.

10.00

Percent

20.00

Percent

0.00 per day

0.00
0.00
-

COMPACTION CHARGES
1

Working of DRR

0.75 hour

0.00 per hour

0.00
0.00

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composit rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 4

DESCRIPTION OF ITEM:
Item No. 4

Providing and laying base course of crushed stone aggregate of


approved quality and grade and supply and spreading of stone
screening including placing mixing spreading and compaction of base
course material to required camber and grade to achieve 100% maximum
Modified AASHTO dry density, including carriage of all materials to sit
of work except crushed stone aggregate for which supply within 3 Miles
(5 km) is included in rate.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate

Per Unit

Amount (Rs.)

MATERIAL
1
2

Crushed Stone aggregate


Screeing
Total
Contractor's Profit & O
Total

122 Cft
22 Cft

20.00

0.00
0.00

% Cft
% Cft

0.00
0.00
0.00
-

Percent

LABOUR
1

Cooly Skilled
Total
Sundries
Total
Contractor's Profit & O
Total

2.50 Nos.

10.00

Percent

20.00

Percent

0.00 per day

0.00
0.00
-

COMPACTION CHARGES
1

Working of DRR

0.75 hour

0.00 per hour

0.00
0.00

ITEM RATES
Labour rate per 100 Cft
Labour rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composit rate per 100 Cft


Composite rate per Cum

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 5

DESCRIPTION OF ITEM:
Item No. 5

Providing and laying road edging of 3" (75 mm) wide and 9" (228 mm)
deep brick on end. complete in all respects.

Detail

Unit Rate (British System) per Foot


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 100 feet


MATERIAL
1

Bricks
Total
Contractor's Profit & O
Total

288 Nos.

20.00

0.00 Nos.

0.00
0.00
-

Percent

LABOUR
1
2

Mason
Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

0.50 No.
0.50 No.

10.00

Percent

20.00

Percent

0.00 per day


0.00 per day

0.00
0.00
0.00
-

ITEM RATES
Labour rate per one foot
Labour rate per metre

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composit rate per foot


Composite rate per metre

Rs.
Rs.

0.00
-0.05

Say
Say

0.00
0.00

Page 6

DESCRIPTION OF ITEM:
Item No. 6

Providing and laying bituminous prime coat, using 10 lbs (4.537 liters)
Kerosene Oil and 10 lbs (4.55 kg) binder.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 100 Sft


MATERIAL
1
2
3

Binder (Bitumen)
Kerosene oil
Fuel wood
Total
Contractor's Profit & O
Total

4.55 kg
4.537 litre
0.07 kg

20.00

100.00per tonne
0.00per litre
0.00 per kg

4.55
0.00
0.00
4.55
0.91
5.46

Percent

LABOUR
1

Cooly un-skilled for laying priming


coat after cleaning
Total
Sundries
Total
Contractor's Profit & O
Total

10.00

Percent

20.00

Percent

0.20 No.

0.00 per day

0.00
0.00
-

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00

Say
Say

0.00
0.00

Page 7

DESCRIPTION OF ITEM:
Item No. 7

Providing and laying bituminous tack coat, using 15 lbs (6.80 kg) of
bitumen.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Per Unit

Amount (Rs.)

Analysis for 100 Sft


MATERIAL
1
2

Bitumen
Fuel wood
Total
Contractor's Profit & O
Total

6.80 kg
0.11 kg

20.00

per tonne
0.00 per kg

0.00
0.00
0.00
-

Percent

LABOUR
1

Cooly un-skilled for cleaning road,


surface and laying tack coat
Total
Sundries
Total
Contractor's Profit & O
Total

10.00

Percent

20.00

Percent

0.20 No.

0.00 per day

0.00
0.00
-

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composit rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 8

DESCRIPTION OF ITEM:
Item No. 8 (I - i)

1- Ist Coat

Providing surface treatment to roads including supply of bitumen and


bajri/crushed stone aggregate of approved quality, including cleaning o
road surface heating and spraying bitumen spreading bajri and rolling
with road roller (including its operation cost, fuel and hire charges,
complete, including carriage of all materials to site of work except
bajri/crushed stone aggregate for which supply within 3 miles (5.0 km)
included in the rate.
Using 40 lbs (18.1590 kg) of bitumen and 5.5 Cft (0.156 Cum) bajri of
nominal size 1 inch (25 mm) per 100 Sft.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 10000 Sft Area


MATERIAL
1
2
3

Bajri
Bitumen
Fuel wood

550 Cft
1.81 Tonne
223.92 kg

Total
Contractor's Profit & O 20.00
Total
Material cost per 100 Sft

0.00 % Cft
per tonne
0.00 per kg

0.00
0.00
0
0.00
-

% on 1&0.00
30549.86 x 100
10000

0.00

LABOUR
1
2
3

Tar Sprayer
Chowkidar
Cooly
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No
12.00 Nos.

10.00

Percent

20.00

Percent

RATE

0.00 per day


per day
0.00 per day

0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

HIRE CHARGES OF MACHINERY


INCLUDING POL AND CREW CHARGES
1
2

Road Roller
Tar Boiler

8.00 hrs
8.00 hrs

0.00 per hour


0.00 per hour

Total

0.00
0.00
#VALUE!

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Page 9

Rs.
Rs.

#VALUE!
#VALUE!

Say
Say

#VALUE!
#VALUE!

Rs.
Rs.

#VALUE!
#VALUE!

Say
Say

#VALUE!
#VALUE!

DESCRIPTION OF ITEM:
Item No. 8 (1-ii)

FIRST COAT

Using 35 lbs (15.880 kg) bitumen and 4.0 Cft (0.113 cu.m) bajri of nomi
size " (20 mm) per 100 Sft.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 10000 Sft area


MATERIAL
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rate per 100 Sft
=

400 Cft
1.588 Tonne
196 kg

20.00

0.00 % Cft
per tonne
0.00 per kg

0.00
-

% on 1&0.00
26392.90 x
10000

0.00
0.00
0.00

100
0.00

LABOUR
1
2
3

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No
12.00 Nos.

10.00

Percent

20.00

Percent

RATE

0.00 per day


per day
0.00 per day

0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

HIRE CHARGES OF MACHINERY


INCLUDING POL AND CREW CHARGES
1
2

Road Roller
Tar Boiler

8.00 hrs
8.00 hrs

0.00 per hour


0.00 per hour

Total

0.00
0.00
#VALUE!

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

#VALUE!
#VALUE!

Say
Say

#VALUE!
#VALUE!

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

#VALUE!
#VALUE!

Say
Say

#VALUE!
#VALUE!

Page 10

DESCRIPTION OF ITEM:
Item No. 8 (2-i)

SECOND COAT.
Using 25 lbs (11.343 kg) bitumen and 2.75 Cft (0.077 m) bajri of nomin
size " (12 mm) per 100 Sft.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 13000 Sft area


MATERIAL
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rate per 100 Sft
=

357.5 Cft
1.475 Tonne
182.5 kg

20.00

0.00

% Cft
tonne
0.00 per Kg

0.00
-

% on 1&0.00
24446.69 x
13000

0.00
0.00
0.00

100
0.00

LABOUR
1
2
3

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No
12.00 Nos.

10.00

Percent

20.00

Percent

RATE

0.00 per day


per day
0.00 per day

0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

HIRE CHARGES OF MACHINERY


INCLUDING POL AND CREW CHARGES
1
2

Road Roller
Tar Boiler

8.00 hrs
8.00 hrs

0.00 per hour


0.00 per hour

Total

0.00
0.00
#VALUE!

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00

Say
Say

0.00
0.00

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00

Say
Say

0.00
0.00

Page 11

DESCRIPTION OF ITEM:
Item No. 8 (2-ii)

SECOND COAT

Using 18 lbs (8.17 kg) bitumen and 2.0 Cft (0.056 m) bajri of
nominal size 3/8" (10 mm).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 13000 Sft area


MATERIAL
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rate per 100 Sft
=

260.0 Cft
1.062 Tonne
131.38 kg

20.00

0.00 % Cft
per tonne
0.00 per kg

0.00
-

% on 1&0.00
17614.43 x
13000

0.00
0.00
0.00

100
0.00

LABOUR
1
2
3

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No
12.00 Nos.

10.00

Percent

20.00

Percent

RATE

0.00 per day


per day
0.00 per day

0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

HIRE CHARGES OF MACHINERY


INCLUDING POL AND CREW CHARGES
1
2

Road Roller
Tar Boiler

8.00 hrs
8.00 hrs

0.00 per hour


0.00 per hour

Total

0.00
0.00
#VALUE!

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00

Say

0.00
0.00

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 12

DESCRIPTION OF ITEM:
Item No. 8 (3)

THIRD COAT

Using 14 lbs (6.35 kg) bitumen and 1.5 Cft (0.0472 m) bajri of
nominal size " (6 mm) per 100 Sft.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 19000 Sft area


MATERIAL
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rater par 100 Sft
=

285.0 Cft
1.207 Tonne
149.3 kg

20.00

0.00 % Cft
per tonne
0.00 per kg

0.00
0.00
0.00
0.00
-

% on 1&0.00
19967.39 x 100
19000

0.00

LABOUR
1
2
3

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No
12.00 Nos.

10.00

Percent

20.00

Percent

RATE

0.00 per day


per day
0.00 per day

0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

HIRE CHARGES OF MACHINERY


INCLUDING POL AND CREW CHARGES
1
2

Road Roller
Tar Boiler

8.00 hrs
8.00 hrs

0.00 per hour


0.00 per hour

Total

0.00
0.00
#VALUE!

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

0.00

Say
Say

0.00
0.00

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 13

DESCRIPTION OF ITEM:
Item No. 9 (a)

(i)

Resurfacting of road, including supply of bitumen and bajri/crushed


stone aggregate of approved quality, including cleaning of road surface
heating and spraying of bitumen, and spreading bajri/crushed stone
aggregate and rolling with road roller (including carriage of all mater
to site of work except bajri/crushed stone aggregate for which supply
within 3.0 Miles (5 km) is included in the rate.
Using 22 lbs (9.981 kg) bitumen and 2.5 Cft (0.07 m) bajri of nominal
" (12 mm).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 15000 Sft area


MATERIAL
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rate per 100 Sft
=

375.0 Cft
1.497 Tonne
185.11 kg

20.00

0.00

% Cft

0.00 per kg

0.00
-

% on 1&0.00
24871.21 x
15000

0.00
0.00
0.00

100
-0.01

LABOUR
1
2
3

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No
12.00 Nos.

10.00

Percent

20.00

Percent

RATE

0.00 per day


per day
0.00 per day

0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

HIRE CHARGES OF MACHINERY


INCLUDING POL AND CREW CHARGES
1
2

Road Roller
Tar Boiler

8.00 hrs
8.00 hrs

0.00 per hour


0.00 per hour

Total

0.00
0.00
#VALUE!

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm
Composite rate per 100 Sft
Composite rate per Sqm

Page 14

Rs.
Rs.

#VALUE!
#VALUE!

Say
Say

#VALUE!
#VALUE!

Rs.
Rs.

#VALUE!
#VALUE!

Say
Say

#VALUE!
#VALUE!

DESCRIPTION OF ITEM:
Item No. 9 a (ii)

Using 20 lbs (9.074 kg) bitumen and 2.0 Cft (0.056 m) bajri of nominal
size 3/8" (10 mm) per 100 Sft.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 15000 Sft area


MATERIAL
1
2
3

Bajri
Bitumen
Fuel wood
Total
Contractor's Profit & O
Total
Rate per 100 Sft
=

300 Cft
1.361 Tonne
168.31 kg

20.00

0.00 % Cft
per tonne
0.00 per kg

0.00
-

% on 1&0.00
22409.14 x
15000

0.00
0.00
0.00

100
0.00

LABOUR
1
2
3

Tar sprayer
Chowkidar
Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.
1.00 No
12.00 Nos.

10.00

Percent

20.00

Percent

RATE

0.00 per day


per day
0.00 per day

0.00
#VALUE!
0.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

HIRE CHARGES OF MACHINERY


INCLUDING POL AND CREW CHARGES
1
2

Road Roller
Tar Boiler

8.00 hrs
8.00 hrs

0.00 per hour


0.00 per hour

Total

0.00
0.00
#VALUE!

ITEM RATES
Labour rate per 100 Sft
Labour rate per Sqm

Rs.
Rs.

#VALUE!
#VALUE!

Say
Say

#VALUE!
#VALUE!

Composite rate per 100 Sft


Composite rate per Sqm

Rs.
Rs.

#VALUE!
#VALUE!

Say
Say

#VALUE!
#VALUE!

Page 15

DESCRIPTION OF ITEM:
Item No. 10(vii)

Providing and laying plant pre-mixed bituminous carpet, including

compaction and finishing to required camber, grade and


density.

Detail

Unit Rate (British System) per 100 Sqm.


Qty

Mixed Design

Rate Per Unit

Amount (Rs.)

Analysis for 2" thick Carpet


(9.29 Sqm)

Coarse aggregate = 90 x 3/5


Fine aggregate = 90 x 2/5
Filler
Bitumen

(54%)
(36%)
(4%)
= (6%)

MATERIAL
Unit weight of Mix
100 x 2/12
= 16.67 Cft (% Sft)
Total weight

3
4

5
6
7

= 145 lbs/Cft

= 16.67 x 145 = 2417 lbs/%Sft

Quantity of Materials/100 Sft


Course aggregate
2417 x 54
100 x 105
Fine aggregate (Herrow sand)
2417 x 36
100 x 100
Filler
2417 x 4
100 x 90
Bitumen
2417 x 6
100

12.43 Cft

0.00

% Cft

0.00

8.70 Cft

0.00

% Cft

0.00

1.07 Cft

0.00

% Cft

0.00

per ton

0.00

145.00 lbs
65.91 kg

Total
Contractor's Profit & O 20.00 on 12&3 0.00
Cost of Brushes and other special Tool
0.30
Contractor's Profit & Overheads (20%) on item '6'
Material cost per 100 Sft (2" thick)

0.00

0.00
0.00
0.00

LABOUR
Labour required at site of work co-ordinating the
working of Machinery of complete unit of premix
plant (Mixing plant, Generator, pick up, including
establishment P.O.L and Depreciation etc.
(Mixing plant, Generator, Pickup, including
establishment POL and depreciation etc.)

Page 16

Plant Running Charges including crew charges


1
2
3
4
5
6
7
8
9
10

Asphalt plant
Dumper
Loader
Bulldozer
Paver Finisher
Road Roller
Water Loory
Road Roller
Tractor
Misc. i.e. small T&P, working
of Crane & Tar Boiler

1.00
10.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00

No.
Nos.
Nos.
No.
No.
No.
No.
No.
No.

0.00 per
0.00 per
0.00 per
0.00 per
0.00 per
0.00 per
0.00 per
0.00 per
0.00 per

hour
hour
hour
hour
hour
hour
hour
hour
hour

L.S

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total cost of working of machinary (P/Hr.)


Working hours of machining = 6 hours

0.00

Total cost for working of machinary per day


0 x
6 =
0
Area completed per day
24624 Sft (2" thick)
45 x 6 x 2204 x 6
145
Rate of machinery per 100 Sft (2" thick)
Labour charges included in it
Assume at 12.5% of machinery charges
=
12.5
0.00
x 0.00
100
Sundries on Labour
10.00 Percent 0.00
Total
Contractor's Profit & O 20.00 Percent 0.000
Total
Labour rate per 100 Sft (2" thick)
(a) Labour Rate per 100 Sft carpet (1" thick)
=
0.00
0.00
2
(b) Material cost per 100 Sft (1" thick)
0.0
=
0.00
2

0.00

0.00
0.00

0.00

0.00

ITEM RATES
Labour rate per 100 Sft (1" thick)
Labour Sqm (25 mm thick)

Rs.
Rs.

Say
Say

0.00
0.00

Composite rate per 100 Sft (1" thick)


Composite rate per Sqm (25 mm)

Rs.
Rs.

Say
Say

0.00
0.00

Page 17

DESCRIPTION OF ITEM:
Item No. 11

Scarifying old road surface including removal of debris within 1 chain (30.0 m)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Per Unit

Amount (Rs.)

LABOUR
1

Cooly un-skilled
Total
Sundries
Total
Contractor's Profit & O
Total

0.33 No.

10.00

Percent

20.00

Percent

0.00 per day


0.00
-

ITEM RATES
Labour rate for 100 Sft
Labour rate for 1 Sqm

Rs.
Rs.

Page 18

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Providing R.C.C railing on bridges as per standard drawing.

Item No. 12

Detail

Unit Rate (British System) per foot


Qty

Rate Per Unit

Amount (Rs.)

Analyses for 12.5 feet


MATERIAL
Cement concrete 1 : 2 : 4 (Material cost)
1
2

Post 3 x 3.5' x 10" x 8" =


Railing 2 x 10 x 9" x 4" =
Total

5.88 Cft
5.00 Cft
10.88 Cf

Steel bars 3/8" dia


Steel 3/8" dia = 3 x 14 x
Railing 18 x

18
12

22
12

Total
104'.0 @ 0.36 lbs/ft
Steel 5/8"dia post:3 x 4 x
Railing 8 x 12

60
12

156 ft @ 1.0 lbs/ft


Wastage 15% (37.44 + 156.0
Total steel

0.00 per Cft

0.00

0.00 per kg
including
cost of

0.00

= 77 ft
27 ft.

10.88 Cft

37.44 lbs

104 ft.
37.44 lbs
60.0 ft.
96.0 ft.
156 ft.
156.00
193.44 l

156.00 lbs

29.01 lbs
222.45 lbs
100.93 kg

binding wire

Total material cost for 12.5 ft.


Material cost per foot

2524.00
201.92

LABOUR
1
2

Cement concrete1:2:4(item 6a(ii) Chap.6=16.6010.88 Cft


Steel
100.93 kg
Labour rate/foot (item 9(a) Chap 6 =291.81-18.00 = 273.80

-0.82 per Cft


-18.00 per % kg

-8.92
-18.17
448.04
35.84

ITEM RATES
Labour rate per foot
Labour rate per metre

Rs.
Rs.

35.84
117.54

Say
Say

35.85
117.55

Composite rate per foot


Composit rate per metre

Rs.
Rs.

237.76
779.85

Say
Say

237.75
779.85

Page 19

DESCRIPTION OF ITEM:
Providing and fixing G.I pipe railing as per standard drawing.

Item No. 13

Detail

Unit Rate (British System) per foot


Qty

Rate Per Unit

Amount (Rs.)

Analysis for 15.5 feet


MATERIAL
1

Iron post 3 No x 4'-4" x 4" x 4" x 3/8" = 22.1 lbs

Wastage 3%

G.I pipe 2" dia


3 x 15'- 6" =
2 x 1'-1" =
Wastage 3%

3
4

Short bend (
Tee 2 x 2" x 2"

= 0.66 l
10.35 kg
= 22.76 lbs
(10.35 kg)
46 - 6"
2' - 3"
48.9"
1.5"
50'.2"
elbow) 2"

50' - 2"
15.30 metre

0.00 per kg

0.00per metre

4.00 Nos.
2.00 Nos.

Pipe fitter
Cooly

Total
Sundries
Total
Contractor's Profit & O
Total

3064.44

= 15.3 mtr
0.00
0.00

0.00
0.00

Total
Contractor's Profit & O 20.00 Percent
Total
Rate per foot
3989.63 =
257.40
15.50
LABOUR
1
2

3064.44
612.89
3,677.33
257.40

1.00 No.
1.00 No.

10.00

Percent

20.00

Percent

0.00 per day


0.00 per day

0.00
0.00

0.00
-

ITEM RATES
Labour rate per foot
Labour rate per metre

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composit rate per foot


Composite rate per metre

Rs.
Rs.

257.45
844.24

Say
Say

257.45
844.25

Page 20

DESCRIPTION OF ITEM:
Item No. 14

Providing and fixing steel bearings of standard quality and type at sit
work.

Detail

Unit Rate (British System) per each


Qty

Rated Per Unit

Amount (Rs.)

MATERIAL
1

Steel bearing
Total
Contractor's Profit & O
Total

1.00 No.

20.00

0.00

each

0.00
0.00
-

Percent

ITEM RATES
Composit rate for each

Rs.

0.00

Say

0.00

DESCRIPTION OF ITEM:
Item No. 15

Providing and fixing rubber bearing pad at site of work.

Detail

Unit Rate (British System) per cubic inch


Qty

Rated Per Unit

Amount (Rs.)

MATERIAL
1

Rubber bearing pad 1 x 1 x 1 inch


Total
Contractor's Profit & O 20.00
Total Rate per cubic inch

1.00 cubic

0.00 per cub.


cm.

0.00
0.00
-

Percent

ITEM RATES
Composite rate per cub. inch
Composite rate per cub. cm

Rs.
Rs.

Page 21

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 16

Providing and laying expansion joint of neoprine strip 4" x " (100 x 6
and plastic bitumen.

Detail

Unit Rate (British System) per foot


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Expansion joint of neoprine strip


Plastic Bitumen (PB - 3)
Total
Contractor's Profit & O
Total

20.00

0.80 Foot
1.14 kg

0.00per metre
per kg

0
0
0.00
-

Percent

LABOUR
1

Cooly skilled
Total
Sundries
Total
Contractor's Profit & O
Total

0.10 No.

10.00

Percent

20.00

Percent

0.00 per day

0.00
0.00
-

ITEM RATES
Labour rate per foot
Labour rate per foot

Rs.
Rs.

Composit rate per foot


Composite rate per metre

Rs.
Rs.

Page 22

0.00
0.00

Say
Say

0.00
0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 17

Providing and fixing rain water outlet of A.C. Pipe.

Detail

Unit Rate (British System) per each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1

A.C pipe 3" i/d (1.571


Total
Contractor's Profit & O
Total

0.457 m)

20.00

0.457 Metre

0.00per metre

0.00
0.00
-

Percent

LABOUFor 20 Nos.
1

Cooly skilled

Total
Sundries
Total
Contractor's Profit & O
Total

1.00 No.

10.00

Percent

20.00

Percent

0.00 per day

0.00

0.00
-

ITEM RATES
Labour rate per each

Rs.

0.00

Say

0.00

Composit rate per each

Rs.

0.00

Say

0.00

Page 23

DESCRIPTION OF ITEM:
Providing and erection at site of work.

Item No. 18

R.C.C Mile/km stone including cost of fabrication etc.

(i)

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
i) P.C.C 1 : 4: 8 in foundation
1 x 3.5 x 1.875 x 1.75 =
D/d mile stone 1 x 2 x 0.375 x 1.5 =

Rate as per item 6 (3)


ii) R.C.C 1: 2: 4
1 x 2 x 0.375 x 4.5 =
D/d 15 x 0.375 x 0.08 =
(Rate as per item 6 (6 b) (i)
iii) Steel reinforcement " dia
12 x 5 = 60.0'
Tie
4 x 5
20.0

11.48 Cft
1.13 Cft
10.35 Cf
3.38 Cft
0.47 Cft
2.91 Cft

10.35 Cft

0.00Per % Cft

2.91 Cft

0.00

Per Cft

0.00

0.00 per kg

0.00

15.00 Sft

0.00Per % Sft

0.00

each
28.00 Nos.

0.00
0.00

0.00
0.00

80. 0 Rft @ .17 lbs/Rft

Rate as per item 8(a)


=13.6 lbs = 6.1
iv) Cement plastec 3/8" thick 1:2 moster
1 x 4.75 x 3
=
14.25 Sft
1 x 2 x 0.375
=
0.75 Sft
Rate as per item 11(7.i)
15.00 Sf
v) Painting 2 coats of mile stone
Rate as per item 13(22 a ii)
vi) Lettering 28 Nos. letres 4" height

6.18 kg

each
each

Total

0.00

LABOUR
i) Excavation of foundation (Item No.21(b) Chap.3)
1 x 3.5 x 1.875 x 1.25 =
8.20 Cft
Rate as per item 3(1)
ii) P.C.C 1 : 4 : 8 in foundation
as per item (i) above
Rate as per (Item 3(b) of Chapter No.6)
iii) R.C.C 1 : 2: 4 (as per item (ii) above
Rate as per (Item 6a(i) Chapter No.6)
vi) Steel reinforcement " dia

8.20 Cft

10.35 Cft
2.91 Cft

0.00Per Cft

0.00

0.00 Per

0.00

Cft

Per Cft

0.00

(as per item (iii) above)

(Rate as per (Item 9(a) of Chapter No.6)


v) Cement plaster 3/8" thick 1 : 2 morar

6.18 kg

0.00 per kg

0.00

% Sft

0.00

(as per item (iv) above)

Rate as per (Item

7(i) of Chapter No.11)

Page 24

15.08 Sft

vi) Painting 2 coats on mile stone


(as per item (v) above)

Rate as per (Item 22 (a) (ii) of Chapter No.13)


vii) Lettering 28 No. letters 4" high
(Item No.11 of Chapter 13)
Total

28.00 Nos.

each
each

0.00

ITEM RATES
Labour rate per Mile/Km Stone
Composite rate per Mile/Km Stone

Rs.
Rs.

Page 25

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 18
(ii)

Providing and erection at site of work.


R.C.C Furlong/ km stone including cost of fabrication etc.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
i) P.C.C 1 : 4: 8 in foundation
1 x 1.5 x 0.75 x 1.0 =
D/d mile stone 0.75 x 0.208 x 1.5 =

1.13 Cft
0.23 Cft
0.90 Cft

Rate as per item 6 (3)


ii) R.C.C 1: 2: 4
0.75 x 0.23 x 1.50
=
0.23 Cft
D/d 1.5 x 0.375 x 0.083 =
0.05 Cft
(Rate as per item 6 (6 b) (i)
0.18 Cft
iii) Steel reinforcement dia
6 x 1'-1 11.0 ft.
Tie
3 x 1-6" 4.6

0.90 Cft

0.00Per % Cft

0.00

0.18 Cft

Per % Cft

0.00

15.6 Rft @ 0.17 lbs/Rft

Rate as per item 8(a)


=2.64 lbs =
iv) Cement plastec 3/8" thick 1:2 master
1 x 1.92 x 0.75 =
1.44
1 x 0.75 x 0.21 =
0.16
Rate as per item 11(6 a)
1.60
v) Painting lettering 2 coats furlong post
(Rate as per item No.20(22 bii)
vi) Lettering 3" height

1.2

1.20 kg

0.00 per kg

0.00

Sft
Sft
Sft

1.60 Sft

0.00Per % Sft
0.00 each

0.00
0.00

each

0.00

0.00

Total
LABOUR
i) Excavation of foundation (Item NO.21(b) of Chap.3)
1.50 x 0.75 x 0.50
=
0.56 Cft
0.56 Cft
ii) P.C.C 1 : 4 : 8 in foundation
as per item (i) above
Rate as per (Item No.3(b) Chapter No.6)
0.90 Cft
iii) R.C.C 1 : 2: 4 (as per item (ii) above
Rate as per (Item 6(a)i Chapter No.6)
0.18 Cft
vi) Steel reinforcement " dia

each

0.00Per Cft

0.00

0.00Per % Cft

0.00

Per % Cft

0.00

(as per item (iii) above)

Rate as per (Item 9(b) Chapter No.6)


v) Cement plaster 3/8" thick 1 : 2 mortar

1.20 kg

0.00 per kg

0.00

1.60 Sft

0.01Per % Sft

0.00

each

0.00

0.00
0.00

Rs.
Rs.

0.00

(as per item (iv) above)

Rate as per (Item 7(i) of Chapter 11)


vi) Painting 2 coats of Furlong / km
(as per item (v) above)

(Rate as per item 20(b)) (Item No.22(b) (ii) Ch

each

ITEM RATES
Labour rate per furlong ( Km) Stone
Composite rate per furlong ( Km) Stone

Page 26

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 18
(iii)

Providing and erection at site of work.


R.C.C Boundry pillar.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
i) R.C.C 1: 2: 4
0.75 x 0.75 x 3
=
(Rate as per item 6 (6 b) (i)
ii) Steel reinforcement 3/8" dia
1 x 2.5

1.70 Cft
1.70 Cft
=

Per

Cft

0.00

2.5 Rft

2.5 Rft @ 0.37 lbs/Rft

Rate as per item 8(a)

0.93 lbs = 0.42

0.42 kg

0.00 per kg

Total

0.00
0.00

LABOUR
i) Excavation of foundation (Item No.21(b) Chap.3)
0.75 x 0.75 x 1.50
=
0.84 Cft
ii) R.C.C 1 : 2: 4 (as per item (ii) above)
Rate as per (Item No.6(a) (i) of Chapter No.6)
iii) Steel reinforcement " dia

0.84 Cft

0.00Per Cft

0.00

1.70 Cft

Per % Cft

0.00

(as per item (iii) above)

Rate as per (Item No.9(b) Chapter No.6)

0.42 kg

0.00 per kg

0.00
0.00

ITEM RATES
Labour rate for each pillar
Composite rate for each pillar

Rs.
Rs.

Page 27

0.00

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 18 (iv)
(a)

Providing and erection at site of work.


Sign post of M.S plate 1/8" thick (Mandatory) Road Signs.

Detail

Unit Rate (British System) for Each


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
i) P.C.C. 1 : 4 : 8 in foundation
2 x 2 x 2.5
=
Rate as per item 6(3)
ii) Steel
a) T. Iron 0.25 x 0.25 x 0.375
9 Rft @ 7.17 lbs/ft. =
b) M.S plate 1/8" thick

10.00 Cft

11x2x2 4 = 3.14 Sft @ 5.10 lbs/sft=

Total
Rate as per item 8(a)
iii) Painting and lettering

10.00 Cft

0.00Per % Cft

0.00

36.60 kg

0.00 per kg

0.00

0.00

0.00

9.00 Rft
64.53 lbs
16.01 lbs
80.54 lb

each

each

Total

0.00

LABOUR
i) Excavation and fixing
ii) P.C.C (1 : 4: 8) in foundation
(as per item (i) above)
Rate as per (Item 3(b) of Chapter No.6)
iii) Febrication of steel

L.S
10.00 Cft

0.00 Per

36.60 kg

0.00 per kg

Cft

0.00
0.00

0.00

(as per item (ii) above)

Rate as per (Item 9(b) Chapter No.6)


iv) Jointing plate with T Iron
v) Painting & lettering

L.S

0.00
0.00
0.00

ITEM RATES
Labour rate for each sign
Composite rate for each sign

Rs.
Rs.

Page 28

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 18 (iv)
(b)

Providing and erection at site of work.


Warning/Direction/Informatory, Road Signs.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
i) P.C.C. 1 : 4 : 8 in foundation
2 x 2 x 2.5
=
Rate as per item 6(3)
ii) Steel
a) T. Iron 0.25 x 0.25 x 0.375
9 Rft @ 7.17 lbs/ft. =
b) M.S plate 1/8" thick
1.7.3 2 @ 5.10 lbs/sft=
Total
Rate as per item 8(a)
iii) Painting and lettering

10.00 Cft

10.00 Cft

0.00Per % Cft

0.00

33.35 kg

0.00 per kg

0.00

9.00 Rft
64.53 lbs
8.83 lbs
73.36 lb

each

each

Total

0.00
0.00

LABOUR
i) Excavation and fixing
ii) P.C.C (1 : 4 : 8) in foundation
(as per item (i) above)
Rate as per (Item 3(b) of Chapter No.6)
iii) Febrication of steel

L.S
10.00 Cft

0.00 Per

33.35 kg

0.00 per kg

Cft

0.00
0.00

0.00

(as per item (ii) above)

Rate as per (Item 9(a) of Chapter No.6)


iv) Jointing of plate with T. Iron
v) Painting and lettering

L.S
L.S

0.00
0.00
0.00

ITEM RATES
Labour rate for each Post
Composite rate for each Post

Rs.
Rs.

Page 29

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 19

Providing and laying dry brick pavement/soling in streets or roads etc.


sand grouted, laid in proper camber including preparation, watering,
compaction of bed to proper camber, and sand cushion.

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate Per Unit

Amount (Rs.)

MATERIAL
1
2

Brick
Sand
Total
Contractor's Profit & O
Total

1400.00 Nos.
22.00 Cft

20.00

0.00 Nos.
0.00 % Cft

0.00
0.00
0.00
-

Percent

LABOUR
1
2
3

Cooly skilled
Cooly
Bahishti
Total
Sundries
Total
Contractor's Profit & O

1.35 Nos.
2.65 Nos.
0.10 No.

10.00

Percent

20.00

Percent

per day
per day
per day

0
0
0
0.00
-

ITEM RATES
Labour rate per 100 Cft
Labour rate for m

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Composite rate per 100 Cft


Composit rate per m

Rs.
Rs.

0.00
0.00

Say
Say

0.00
0.00

Page 30

CHAPTER NO. 9

ROOFING
Note 1.

Rates for all finished works include the removal of surplus debris, unused
material and by products.
Add extra 13%, 32% and 51% on labour rates only or 6%, 15% and 23% on
composite rates for 2nd, 3rd fourth and subsequent floors respectively.

Note 2.

DESCRIPTION

OF

ITEM NO

1:

First class tiles roofing consisting of 4" (100mm)


earth and 1" (25mm) mud plaster with Gobri
leaping over " (12mm) thick cement plaster 1:6
with 34 Ibs of hot bitumen coating sand blinded
provided over two layers of tiles 12" x 6" x 1"
(300x150x32mm) laid in 1:6 cement mortar
with 1" (25mm) thick sand-wiched layer of 1:6
cement mortar including 1:2 cement pointing
under side of tiles, complete including curing etc.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Tiles 12"x6"x1"
Cement for laying
Pointing under side 1:2
Plaster of tiles in between and over tiles 1:6
Plaster along parapet

Sand
Sand
Sand
Sand
Sand

for
for
for
for
for

laying in 1:6 mortar


pointing 1:2
Plaster
1:6
Plaster
1:6 along parapet
blinding of bitumen

Earth upto 100' (30 M) lead and lift


upto 20' (6 M)
For 1" (25mm) mud plaster
For 4" (100mm) filling over tiles

400
0.26
0.17
1.10
0.23
1.76

Nos
Bag
Bag
Bag
Bag
Bags

P. Bag

Cft
Cft
Cft
Cft
Cft
Cft

P. Cft

10.00 Cft
33.00 Cft
43.00 Cft

P. Cft

1.96
0.41
8.28
1.71
1.00
13.36

Page 1

1000 Nos

Item No.

1
Detail

Unit Rate (British System) per 100 Sft


Qty

Bhoosa for top layer only


Clay for gobri leeping
Cowdung for Gobri leeping
Two coats of bitumen
Fuel wood

17Sr (15
0.75
0.75Cft (
34Lbs(15
0.2Md (7

Total
Contractor's Profit & Ove 20
Total

Rate
Per Unit (Rs.)Amount (Rs.)

.8)Kg
Cft
15) Kg
.43)Kg
.44)Kg

P. Kg
P. Cft
P 100
P. Kg
P. Kg

Percent

Labour
Rate Analysis for 125 Sft
Masons for laying tiles
Mason for pointing
Mason for cement plaster
Mason for mud plaster

Unskilled Coolies
Bahishti
Total
Sundries
Total

1.50
0.75
1.00
0.40
3.65

Nos
Nos
No
No
Nos

6.00 Nos
1.25 Nos

10

Percent

Contractor's Profit & Ove 20


Total

Percent

Each

P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate P/ Sqm

Rs.
Rs.

Composite Rate Per 10


Composite Rate P/ Sqm

Rs.
Rs.

Page 2

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

2:

Second class tile roofing consisting of 4" (100mm)


earth and 1" (25mm) mud plaster with gobri leeping
over " thick cement plaster 1:6 with 34 lbs per %
Sft or 1.72 Kg/Sqm of hot bitumen coating sand
blinded provided over one layer of 12"x6"x2"
(300x150x50mm) tiles, laid in 1:6 cement pointing
underneath of tiles complete, including curing etc.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Tiles 12"x6"x2"
Cement for laying in 1:6 mortar
Cement for plaster
1:6
Cement for pointing 1:2
Cement for Plaster along parapet
Sand
Sand
Sand
Sand
Sand

for
for
for
for
for

laying in 1:6 mortar


Plaster
1:6
pointing 1:2
Plaster
1:6 along parapet
blinding of bitumen

Earth upto 100' (30 M) and lift upto


20' (6 M)
For 1" (25mm) mud plaster
For 4" (100mm) filling over tiles
Fine clay for gobri
Bhoosa
Cowdung
Bitumen for 2 coats 1/16" (2mm) thick
Fuel wood
Total
Contractor's Profit & Ove 20
Total

200.00
0.23
0.55
0.17
0.23
1.18

Nos
Bag
Bag
Bag
Bag
Bags

Per
1000 N

P. Bag

Cft
Cft
Cft
Cft
Cft
Cft

P. Cft

10.00 Cft
33.00 Cft
43.00 Cft

P. Cft

P. Cft
P. Kg
P 100
P. Kg
P. Kg

1.68
4.14
0.43
1.71
1.00
8.96

0.75
17Sr (15.
0.75Cft (
34Lbs(15
0.2Mds(7

Cft
81) Kg
15) Kg
.43) Kg
.44) Kg

Percent

Page 3

Item No.

2
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Rate Analysis for 125 Sft
Masons
Unskilled Coolies
Bahishti
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

2.50 Nos
5.00 Nos
1.00 No

P. Day
P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Page 4

Say
Say
Say
Say

DESCRIPTION

OF

ITEM NO

3:

Covering mud roof with coaltar and fine sand.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Coaltar
Fine sand
Charcoal for heating coaltar

Total
Contractor's Profit & Ove 20
Total

7.72 Kg.
1.00 Cft
3.00 Kg.

P. Kg
P. Cft
P. Kg.

Percent

Labour
Mason
Unskilled Cooly
Total
Sundries
Total

0.12 No
0.25 No

P. Day
P. Day

10

Percent

Contractor's Profit & Ove 20


Total

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm

Rs.
Rs.

Composite Rate Per 100 Sft


Composite Rate Per Sqm

Rs.
Rs.

Page 5

Say
Say
Say
Say

Note.
DESCRIPTION

OF

ITEM NO

The unit of rate is for filling 100 Sft of roof.

4:

Filling spaces in between.

a)

Wooden battons over beams filled with deodar


wood pieces (spacers).

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Deodar wood 2x10 (9"x1"x5")
Wastage 20%

Wire Nails
Total
Contractor's Profit & Ove 20
Total

0.54 Cft
0.11 Cft
0.65 Cft

P. Cft

0.28 Kg.

P. Kg

Percent

Labour
Rate Analysis for 150 Sft
Carpenter for making grooves in batten
and fixing of wooden strips
Unskilled Cooly
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

0.50 No
0.50 No

Each
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Page 6

Say
Say
Say
Say

Item No.

Filling spaces in between.


b)

RCC Battens Filled with C.C. Blocks (1:3:6)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
9 No x2/3"x5/12"
2 No x2/3"x5/12"

1.88 Cft
0.28 Cft

Cement for blocks


For laying

0.27
0.17
0.44
1.02
0.65
1.67

Sand for blocks


For laying
Bajri
Total
Contractor's Profit & Ove 20
Total

Bag
Bag
Bag
Cft
Cft
Cft

P. Bag

P. Cft

2.04 Cft

P. Cft

Percent

Labour
Rate Analysis for 125 Sft
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

0.50 No
1.00 No
0.13 No

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 7

Item No.

Filling spaces in between.


c)

Spaces filled with bricks

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Bricks including wastage (30+15)
Cement
Sand

Total
Contractor's Profit & Ove 20
Total

45.00 Nos
0.20 Bag
0.75 Cft

Per
1000 N
P. Bag
P. Cft

Percent

Labour
Rate Analysis for 125 Sft
Mason
Cooly
Bahishti
Total
Sundries
Total

0.17 No
0.17 No
0.10 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 8

DESCRIPTION

OF

ITEM NO

5:

Single layer of tiles 9"x4x1" (225 x 112.5 x


40mm) laid over 4" (100mm) earth and 1" (25mm)
mud plaster without Bhoosa grouted with cement
sand 1:3 on top of RCC roof slab provided with 34
Ibs. per % Sft bitumen coating sand blinded.
Unit Rate (British System) per 100 Sft

Detail

Qty
Material
Brick tiles 225 x 112.5 x 40 mm (9"x41/2"x1")
Sand for grouting
Sand for blinding

360.00
2.50
1.25
3.75
0.75

Nos
Cft
Cft
Cft
Bag

Rate
Per Unit (Rs.)Amount (Rs.)

Cement
Good earth lead upto 100' (30 M) and lift
upto 20' (6 M)
43.00 Cft
Two coats of bitumen
15.42 4Lbs(15 .42) Kg
Total
Contractor's Profit & Ove 20
Total

Per
1000 N

P. Cft
P. Bag

P. Cft
P. Kg

Percent

Labour
Rate Analysis for 150 Sft
Plasterer
Mason for Laying
Mason for Grouting
Cooly for and plaster
Cooly for grouting laying
Cooly for grouting
Painter for bitumen
Bahishti
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

0.125
0.500
0.125
0.75
0.50
0.65
0.25
1.40
0.50
0.50

No
No
No
No
No
No
No
Nos
No
No

Each

Each
Each
Each

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 9

DESCRIPTION

OF

ITEM NO

6:

a)
Detail

Jack arch roofing 4" (112.5mm) thick laid in 1:5


cement mortar including an average depth of 4"
(100mm) thick cement concrete in haunches and
over crown with 3" (75mm) earth and 1" (25mm)
plaster soffits of arches cement plastered 1:6
and " (12mm) thick. The rate also includes
bitumen coating centering, laying skew bricks in
cement sand mortar 1:3 and encasing exposed flanges
of the joints with fine cement concrete 1:2:4. Using
stone aggregate.
Cement concrete in haunches. (1:6:12)
Unit Rate (British System) per 100 Sft
Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Bricks
Cement
Cement
Cement
Cement

Sand
Sand
Sand
Sand

9"x4"x3"
for laying
for plastering Soffits
for concrete in haunches
for concrete in flanges

for
for
for
for

laying
plastering soffit
concrete in haunches
concrete in flanges

Stone aggregate for concrete in haunches


Stone aggregate for concrete in flanges

Earth for filling and plastering


Bhoosa
Fine Clay
Cowdung

Per
1000 N

P. Bag

Cft
Cft
Cft
Cft
Cft

P. Cft

32.00 Cft
3.00 Cft
35.00 Cft

P. Cft

P.
P.
P.
P.

550.00
1.60
0.57
2.00
0.60
4.77

Nos
Bag
Bag
Bag
Bag
Bags

10.00
4.26
16.20
1.50
31.96

33.00
17Lbs(15
0.75
0.75 Cft (

Page 10

Cft
.81) Kg
Cft
15) Kg

Cft
Kg
Cft
100

a)

Cement concrete in haunches.

Detail

(1:6:12)

Unit Rate (British System) per 100 Sft


Qty

Bitumen
Fuel
Kail wood for centring

Rate
Per Unit (Rs.)Amount (Rs.)

34Lbs(15 .42) Kg
0.2Mds(7 .44) Kg
0.4 Cft.

Total
Contractor's Profit & Ove 20
Total

P. Kg
P. Kg
P. Cft

Percent

Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

3.50
0.50
7.00
1.00

Nos
No
Nos
No

P.
P.
P.
P.

Day
Day
Day
Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 11

Item No.

Jack arch roofing 4" (112.5mm) thick laid in 1:5


cement mortar including an average depth of 4"
(100mm) thick cement concrete in haunches and
over crown with 3" (75mm) earth and 1" (25mm)
plaster soffits of arches cement plastered 1:6
and " (12mm) thick. The rate also includes
bitumen coating centering, laying skew bricks in
cement sand mortar 1:3 and encasing exposed
flanges of the joints with fine cement concrete
1:2:4. Using stone aggregate.
b)

Cement concrete in haunches (1:3:6)

Detail

Unit Rate (British System) per 100 Sft


Qty

Material
Bricks
Cement
Cement
Cement
Cement

Sand
Sand
Sand
Sand

9"x4"x3"
for laying
for plastering Soffits
for concrete in haunches
for concrete in flanges

for
for
for
for

laying
plastering soffit
concrete in haunches
concrete in flanges

Stone aggregate for concrete in haunches


Stone aggregate for concrete in flanges
Earth for filling and plastering
Bhoosa
Fine Clay
Cowdung
Bitumen
Fuel
Kail wood for centring
Total
Contractor's Profit & Ove 20
Total

Rate
Per Unit (Rs.)Amount (Rs.)
Per
1000 N

P. Bag

Cft
Cft
Cft
Cft
Cft

P. Cft

31.00 Cft
3.00 Cft
34.00 Cft

P. Cft

P. Cft
P. Kg
P. Cft
P.% Kg
P. Kg
P. Kg
P. Cft

550.00
1.60
0.57
4.10
0.60
6.87

Nos
Bag
Bag
Bag
Bag
Bags

10.00
4.26
15.40
1.50
31.16

33.00
17Lbs(15
0.75
0.75Cft (
34Lbs(15
0.2Mds(7
0.411

Percent

Page 12

Cft
.81) Kg
Cft
15) Kg
.43) Kg
.44) Kg
Cft.

b)

Cement concrete in haunches (1:3:6)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

3.50
0.50
7.00
1.00

Nos
No
Nos
No

P.
P.
P.
P.

Day
Day
Day
Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 13

DESCRIPTION

OF

ITEM NO

7:

a)
Detail

Jack arch roofing 4" (112.5mm) thick laid in 1:5


cement mortar including an average depth of 4"
(100mm) thick cement concrete in haunches and
over crown with " (12mm) thick cement plaster
1:6 on top (Except earth filling, plaster and gobri),
soffits of arches cement plastered. The rate also
includes bitumen coating centering, laying skew
bricks in cement sand mortar 1:3 and encasing
exposed flanges of the joints with fine cement
concrete 1:2:4. Using stone aggregate.
Cement concrete in haunches.

(1:6:12)

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Bricks
Cement
Cement
Cement
Cement
Cement

9"x4"x3"
for laying
for plastering top
for plastering soffits
for concrete in haunches
for concrete in flanges

Sand for laying


Cement for plastering top
Sand for plastering soffits
Sand for concrete in haunches
Sand for concrete in flanges

Stone aggregate for concrete in haunches


Stone aggregate for concrete in flanges

Per
1000 N

P. Bag

Cft
Cft
Cft
Cft
Cft
Cft

P. Cft

32.00 Cft
3.00 Cft
35.00 Cft

P. Cft

550.00
1.60
0.51
0.57
2.00
0.60
5.28

Nos
Bag
Bag
Bag
Bag
Bag
Bags

10.00
3.84
4.26
16.20
1.50
35.80

Page 14

a)

Cement concrete in haunches.

Detail

(1:6:12)

Unit Rate (British System) per 100 Sft


Qty

Bitumen
Fuel
Deodar wood (2nd Class)

Rate
Per Unit (Rs.)Amount (Rs.)

34Lbs(15 .43) Kg
0.2Mds(7 .44) Kg
0.50 Cft

Total
Contractor's Profit & Ove 20
Total

P. Kg
P. Kg
P. Cft

Percent

Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

2.75
0.50
5.50
1.00

Nos
No
Nos
No

P.
P.
P.
P.

Day
Day
Day
Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 15

Item No.

Jack arch roofing 4" (112.5mm) thick laid in 1:5


cement mortar including an average depth of 4"
(100mm) thick cement concrete in haunches and
over crown with " (12mm) thick cement plaster
1:6 on top (Except earth filling, plaster and gobri),
soffits of arches cement plastered. The rate also
includes bitumen coating centering, laying skew
bricks in cement sand mortar 1:3 and encasing
exposed flanges of the joints with fine cement
concrete 1:2:4. Using stone aggregate.
b)
Detail

Cement concrete in haunches.

(1:3:6)

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Bricks
Cement
Cement
Cement
Cement

9"x4"x3"
for laying
for plastering soffits
for concrete in haunches
for concrete in flanges

Sand for laying


Cement for plastering top
Sand for plastering soffits
Sand for concrete in haunches
Sand for concrete in flanges

Stone aggregate for concrete in haunches


Stone aggregate for concrete in flanges

Per
1000 N

P. Bag

Cft
Cft
Cft
Cft
Cft
Cft

P. Cft

31.00 Cft
3.00 Cft
34.00 Cft

P. Cft

550.00
1.60
0.57
4.10
0.60
6.87

Nos
Bag
Bag
Bag
Bag
Bags

10.00
3.84
4.26
15.40
1.50
35.00

Page 16

b)

Cement concrete in haunches.

Detail

(1:3:6)

Unit Rate (British System) per 100 Sft


Qty

Bitumen
Fuel
Kail wood centring

Rate
Per Unit (Rs.)Amount (Rs.)

34Lbs(15 .43) Kg
0.2Mds(7 .44) Kg
0.411 Cft.

Total
Contractor's Profit & Ove 20
Total

P. Kg
P. Kg
P. Cft

Percent

Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Unskilled Coolies
Bahishti
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

2.75
0.50
5.50
1.00

Nos
No
Nos
No

P.
P.
P.
P.

Day
Day
Day
Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 17

DESCRIPTION

OF

ITEM NO

8:

Extra for vaulted jack arch roofing

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Rate Analysis for 125 Sft
Masons
Carpenter
Total
Sundries
Total

1.00 No
1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate for Per 1

Rs.

Labour Rate for P/ Sq

Rs.

Page 18

DESCRIPTION

OF

ITEM NO

9:

Jack arch roofing of shingle and cement concrete


(1:3:6), 4" (112.5mm) thick at crown, with "
(12mm) cement plaster including cost of
supplying erecting and dismantling centering.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Cement
Sand
Shingle
Kail wood

7.46
28.00
56.00
0.411

Total
Contractor's Profit & Ove 20
Total

Bags
Cft
Cft
Cft.

P.
P.
P.
P.

Bag
Cft
Cft
Cft

Percent

Labour
Masons
Coolies
Coolies
Coolies
Coolies

for
for
for
for

0.50
3.00
3.00
2.00
1.00

stacking & mixing


ramming
carrying
carpenter

Carpenter
Bahishti
Total
Sundries
Total

No
Nos
Nos
Nos
No

1.00 No
1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P.
P.
P.
P.
P.

Day
Day
Day
Day
Day

P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 19

DESCRIPTION

OF

ITEM NO

10:

Earth filling over roof including watering


ramming with 1" (25mm) mud plaster finished
with gobri leeping.

a)

3" (75mm) thick earth filling and 1" (25mm) mud


plaster.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Earth lead upto 100' (30 M) and lift upto
20' (6 M)
Bhoosa
Clay
Cowdung
Total
Contractor's Profit & Ove 20
Total

33
17Lbs(15
0.75
0.75Cft (

Cft
.81) Kg
Cft
15) Kg

P. Cft
P. Kg
P. Cft
P % Kg

Percent

Labour
Rate Analysis for 125 Sft
Bahishti
Coolies for lifting and ramming earth
Mason
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

0.12 No
1.00 No
0.12 No

P. Day
P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 20

Item No.

10

Earth filling over roof including watering


ramming with 1" (25mm) mud plaster finished
with gobri leeping.
b)

4" (100mm) thick earth filling and 1" (25mm)


mud plaster.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Earth lead upto 100' (30 M) and lift upto
20' (6 M)
Bhoosa
Fine clay for gobri
Cowdung
Total
Contractor's Profit & Ove 20
Total

43
17Lbs(15
0.75
0.75 Cft (

Cft
.81) Kg
Cft
15) Kg

P. Cft
P. Kg
P. Cft
P % Kg

Percent

Labour
Bshishti
Coolies for lifting and ramming earth
Mason
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

0.18 No
1.00 No
0.12 No

P. Day
P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 21

DESCRIPTION

OF

ITEM

NO

11:

1/8"(3mm) thick gobri leeping on roofs or floors.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Fine clay
Cowdung

0.75 Cft
0.75 Cft ( 15) Kg

Total
Contractor's Profit & Ove 20
Total

P. Cft
P. 100

Percent

Labour
Rate Analysis for 150 Sft
Mason
Bahishti

Sundries
Total

0.12 No
0.06 No

P. Day
P. Day

Total
10 Percent

Contractor's Profit & Ove 20


Total

Percent

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 22

DESCRIPTION

OF

ITEM NO

12:

2 coats of bitumen laid hot using 34 lbs


(1.72Kg/Sqm) per % Sft over roof and
blinded with sand at 1 Cft per % Sft.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Bitumen
Sand
Fuel wood

34Lbs(15 .43) Kg
1.00 Cft
0.12Mds( 4.46)Kg

Total
Contractor's Profit & Ove 20
Total

P. Kg
P. Cft
P. Kg

Percent

Labour
Rate for
Cooly for heating & laying
Total
Sundries
Total

125

Sft
1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day

Item Rates
Labour Rate for Per 1
Labour Rate for P/ Sq

Rs.
Rs.

Say
Say

Composite Rate for Pe


Composite Rate for P/

Rs.
Rs.

Say
Say

Page 23

DESCRIPTION

OF

ITEM NO

13:

Fixing corrugated galvanized iron sheets with


G.I. bolts, nuts, limpet and bitumen washers,
wind ties complete in all respect without valleys
and ridges.

a)

20

Detail

S. W. G.

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Sheets of 20 gauge
= 100 Sft.
wastage & overlaping @ 20% = 20 Sft
=120 Sft 2Cwt (102 .65) Kg
Wind tie (rod)
22Lbs(9 .98) Kg
G.I. bolts and nuts
2.00 Doz
Limpet washers
2.00 Doz
G.I. Hook, bolts & nuts
1.50 Doz
Bitumen washers
3.85 Doz
Charcoal
4 Sr. (3. 75) Kg
Total
Contractor's Profit & Ove 20
Total

P. Kg
P. Kg
Doz
Doz
Doz
Doz
P. Kg

Percent

Labour (for 150 Sft.)


Blacksmith
Cooly
Total
Sundries
Total

1.00 No
1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 24

Item No.

13

Fixing corrugated galvanized iron sheets with


G.I. bolts, nuts, limpet and bitumen washers, wind
ties complete in all respect without valleys and
ridges.
b)

22

Detail

S. W. G.

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
C.G.I. Sheets of 22 gauge including over
lapping and wastage.
120 Sft
Wind tie (rod)
G.I. bolts and nuts
Limpet washers
G.I. Hook, bolts & nuts
Bitumen washers
Charcoal
Total
Contractor's Profit & Ove 20
Total

1.7Cwt (8 6.39)Kg

P. Kg

22Lbs(9
2.00
2.00
1.50
3.82
4 Sr. (3.

P. Kg
Doz
Doz
Doz
Doz
P. Kg

.98) Kg
Doz
Doz
Doz
Doz
72) Kg

Percent

Labour for 150 Sft.


Blacksmith
Cooly
Total
Sundries
Total

1.00 No
1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

0.00 P. Day
0.00 P. Day

Item Rates
Labour Rate for Per 1
Labour Rate for P/ Sq

Rs.
Rs.

Say
Say

Composite Rate for Pe


Composite Rate for P/

Rs.
Rs.

Say
Say

Page 25

Item No.

13

Fixing corrugated galvanized iron sheets with


G.I. bolts, nuts, limpet and bitumen washers, wind
ties complete in all respect without valleys and
ridges.
c)

24

Detail

S. W. G.

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
C.G.I. Sheets of 24 gauge including over
lapping and wastage.
120 Sft

1.34Cwt(6 8.10)Kg

P. Kg

Wind tie
G.I. bolts and nuts
Limpet washers
G.I. Hook, bolts & nuts
Bitumen washers
Charcoal

22Lbs(9
2.00
2.00
1.50
3.82
4 Sr. (3.

P. Kg
Doz
Doz
Doz
Doz
P. Kg

Total
Contractor's Profit & Ove 20
Total

.98) Kg
Doz
Doz
Doz
Doz
72) Kg

Percent

Labour
Rate

for

150

Sft

Blacksmith
Cooly
Total
Sundries
Total

1.00 No
1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 26

DESCRIPTION

OF

ITEM NO

14:

Khassi parnalas in cement and sand mortar (1:2)


12" (300mm) outside width finished smooth with
a floating coat of neat cement.

Detail

Unit Rate (British System) per 100 Rft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

15 Rft

Material
Cement for " (12mm) plaster
Cement for floating
Cement for side filling

0.18
0.06
0.26
0.50
1.10

Sand
Total
Contractor's Profit & Ove 20
Total

Bag
Bag
Bag
Bags
Cft

P. Bag
P. Cft

Percent

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.67 No
0.67 No
0.09 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate for Per R

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 27

DESCRIPTION

OF

ITEM NO

15:

Making Khuras, on roof size 2' x 2' x 4" (600 x 600 x


100mm)

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Cement
Sand
Aggregate (Stone)

0.20 Bag
0.55 Cft
1.25 Cft

Total
Contractor's Profit & Ove 20
Total

P. Bag
P. Cft
P. Cft

Percent

Labour for 125 Nos)


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.20 No
0.20 No
0.05 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate for Each

Rs.

Say

Composite Rate for Ea

Rs.

Say

Page 28

DESCRIPTION

OF

ITEM NO

16:

Bottom khuras of brick masonry in cement mortar


(1:6) 4'x2'x4" (1200x600x114mm) over 3"
(75mm) cement concrete (1:4:8)

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Cement
Sand
Brick Aggregate
Bricks

0.37
2.00
2.00
42.00

Total
Contractor's Profit & Ove 20
Total

Bag
Cft
Cft
No

P. Bag
P. Cft
P. Cft
1000 N

Percent

Labour
Rate Analysis

for

1.25 No.

Mason
Cooly
Bahishti
Total
Sundries
Total

0.20 No
0.20 No
0.05 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate for Each

Rs.

Composite Rate for Ea

Rs.

Page 29

Say

Say

DESCRIPTION

OF

ITEM NO

17:

Plain galvanized iron sheets of 22 S.W.G. rain


water down pipe including clamp and fixing in
position.

a)

4" (100mm) dia down pipe


Unit Rate (British System) per Rft

Detail

Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
G.I. sheets =
1.05 Sft
Add. 10% for joints and wastage 0.10 Sft
1.15 Sft @ 1.31 Lbs/Sft
Add for clamps bolts nuts and rivets.
Total
Contractor's Profit & Ove 20
Total

1.5Lbs(0. 68) Kg
0.125 Kg

P. Kg
P. Kg.

Percent

Labour
Rate Analysis
Blacksmith
Unskilled Cooly
Mason
Total
Sundries
Total

for

1.25 Rft
0.03 No
0.03 No
0.03 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate for Per R

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 30

DESCRIPTION

OF

ITEM NO

17:

Plain galvanized iron sheets of 22 S.W.G. rain


water down pipe including clamp and fixing in
position.

b)

5" (125mm) dia down pipe.


Unit Rate (British System) per Rft

Detail

Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
G.I. sheets
1.31 Sft
Add. 10% for joints and wastage 0.13 Sft
1.44 Sft @ 1.31 Lbs/Sft
Add for clamps bolts nuts and rivets.
Total
Contractor's Profit & Ove 20
Total

1.90Lbs(0 .86) Kg
0.125 Kg

P. Kg
P. Kg.

Percent

Labour 1.25 Rft


Blacksmith
Unskilled Cooly
Mason
Total
Sundries
Total

0.03 No
0.03 No
0.03 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate for Per R

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 31

DESCRIPTION

OF

ITEM NO

18:

Plain galvanized iron sheets flashing of 22 gauge.

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
G.I. sheets
1.00 Lbs
22 guage
0.96 Sft
0.96 Sft @ 1.31 Lbs/Sft
Fixture
Total
Contractor's Profit & Ove 20
Total

1.26Lbs(0 .57) Kg
L.S.

P. Kg

Percent

Labour for 1.25 Sft


Blacksmith
Cooly
Mason
Total
Sundries
Total

0.03 No
0.03 No
0.03 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per Sf


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 32

DESCRIPTION

OF

ITEM NO

19:
Providing and fixing 1/16" (1.5mm) thick lead
flashing over roof expansion joint complete in all
respects.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

100 Sft

Material
Lead flashing 1/16" thick
Nails (Copper) etc.

100.00 Sft
1.00 Kg.

Total
Contractor's Profit & Ove 20
Total

Sft
P. Kg.

Percent

Labour
Driller
Helper
Total
Sundries
Total

1.00 No
1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per Sf


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 33

DESCRIPTION

OF

ITEM NO

20:

Cast iron rain water down pipe fixed in position,


excluding heads and shoes, but including painting
and clamps, etc.

a)

4" (100mm) dia Cast Iron down pipe.

Detail

Unit Rate (British System) per Rft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

6 Rft

Material
C.I. pipe 4" (100mm) dia
Hold fasts with bolts
Cement mortar for fixing hold fast
Cement
Sand
Pig lead
Paint

6.00 Rft
1.00 No
0.07
0.58
0.5Lbs(0
0.05

Total
Contractor's Profit & Ove 20 Percent
Total
Rate per Rft

Bag
Cft
.23) Kg
Gln

P. Rft
Each

Bag
% Cft.
P. Kg
P. Gln

0.00
6

Labour
Unskilled Cooly
Mason
Total
Sundries
Total

0.20 No
0.20 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 34

Item No.

20

Cast iron rain water down pipe fixed in position,


excluding heads and shoes, but including painting
and clamps, etc.
b)

3" (75mm) dia Cast Iron down pipe.

Detail

Unit Rate (British System) per Rft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

6 Rft

Material
C.I. pipe down 3" (75mm) dia
Hold fasts with bolts
Cement mortar for fixing hold fast
Cement
Sand
Pig lead
Paint

6.00 Rft
1.00 No
0.048
0.39
0.5Lbs(0
0.03

Total
Contractor's Profit & Ove 20 Percent
Total
Rate for One Reft

Bag
Cft
.23) Kg
Gln

P. Rft
Each

Bag
% Cft.
P. Kg
P. Gln

0.00
6

Labour
Cooly
Mason
Total
Sundries
Total

0.20 No
0.20 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 35

DESCRIPTION

OF

ITEM NO

21:

Rain water down pipe cast iron heads fixed in


place, including cost of clamp, holdfast, and
painting.

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
C.I. Heads 4"
Clamps with hold fasts etc.
Cement
Sand
Pig lead
Paint

1.00
1.00
0.05
0.29
0.5Lbs(0
0.01

No
No
Bag
Cft
.23) Kg
Gln

Each
Each
Bag
% Cft.
P. Kg
P. Gln

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Cooly
Mason
Pipe fitter
Total
Sundries
Total

0.09 No
0.09 No
0.09 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate for Each

Rs.

Say

Composite Rate

Rs.

Say

for E

Page 36

DESCRIPTION

OF

ITEM NO

22:

Shoes bends or offsets for cast iron rain water


down pipe including fixing and painting.

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
C.I. shoes bend or offsets
Pig lead
Paint

4"

1.00 No
0.5Lbs ( 0.23)Kg
0.01 Gln

Each
P. Kg
P. Gln

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Pipe fitter
Cooly
Total
Sundries
Total

0.05 No
0.05 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate for Each

Rs.

Say

Composite Rate

Rs.

Say

for E

Page 37

DESCRIPTION

OF

ITEM NO

23:

Plain G.I. sheet iron spouts fixed in position,


including painting.

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
G.I. sheets 22 gauge length 28" (712mm)
and width 6" (150mm)
28 x 6
=
1.17 Sft
12 x 12
Cost of cement mortor for fixing
Cement
Sand

1.28Lbs ( 0.68)Kg

P. Kg

0.048 Bag
0.39 Cft

Bag
% Cft.

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Cooly
Mason
Blacksmith
Total
Sundries
Total

0.10 No
0.10 No
0.10 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate for Each

Rs.

Say

Composite Rate

Rs.

Say

for E

Page 38

DESCRIPTION

OF

ITEM NO

24:

Laying " (12mm) thick deodar ceiling complete


(including sawing planing and fixing)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

100 Sft

Material
Deodar wood
Screw 11/2" long
Nails of sorts

5.00 Cft
4.50 Doz
1.6488Sr (1. 64) Kg

P. Cft
Doz
P. Kg

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Unskillied Cooly
Carpenter
Total
Sundries
Total

3.00 Nos
4.00 Nos

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 39

DESCRIPTION

OF

ITEM NO

25:

Flat sheet roof with galvanized iron sheets


including battens, rolls, screw, clips etc. (planking
to be paid for separately).

a)

22

Detail

B. W. G.

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis

Sheets Roofing.

Rate
Per Unit (Rs.)Amount (Rs.)

for 400 Sft

Material
a) 22 B.W.G. sheet of size 6'x4' (1.8x1.20
M) in 400 sft (40 Sm) area including over
lapping and wastage 25% for 100 sft
5.85/4 = 1.46 cwt .
Wastage 25% (400+25%) 500 Sft
@ 1.12 Lbs/Sft
Rolls 5" (0.125m) wide 16' (4.86 M)
long or
16x5x7/12 = 0.54/4 = 0.14
Deodar wood for battens 2"x1" size 7
Nos of 16' length =
Add. 23% wastage

7x16x1/6x1/8.

Bolts, nuts
Limpet Washer
U.I. Clips
Total
Contractor's Profit & Ove 20
Total

5.85Cwt(29 7.20)Kg

P. Kg

7 Nos (27 .08) Sft

P. Kg

2.33 Cft
0.58 Cft
2.91 Cft

P. Cft

1.00 Kg.
4.00 Doz.
1.29 Kg.

P. Kg.
Doz.
Per Kg

Percent

Rate for 100 Sft

0.00
4

Page 40

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Rate Analysis for 500 Sft
Cooly
Carpenter
Blacksmith
Total
Sundries
Total

12.00 Nos
1.50 Nos
8.00 Nos

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Rate for 100 Sft

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 41

Item No.

25

Flat sheet roof with galvanized iron sheets


including battens rolls screw clips etc. (planking
to be psid for separately).
24 B. W. G. Sheets Roofing.

b)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Rate Analysis for 400 Sft


Material
b) 24 B.W.G. sheet roofing
24 B.W.G. sheeting
400 Sft
over laping
100 Sft
Wastage 25%
500 Sft
500 Sft @ 1.12 Lbs/Sft =
Rolls = 47 Sft @ 1.12 =
Deodar wood
Screws of size 3"&2"
Clips

560 Lbs
52.64 Lbs

254.08 Kg
23.88 Kg
2.90 Cft
1.60 Kg.
1.29 Kg.

P.
P.
P.
P.
P.

Kg
Sft
Cft
Kg.
Kg.

Total
Contractor's Profit & Ove 20 Percent
Total
Rate for 100 Sft
Labour

0.00
4

Rate Analysis for 500 Sft


Cooly
Carpenter
Blacksmith
Total
Sundries
Total

12.00 Nos
1.50 No
8.00 Nos
10

Percent

Contractor's Profit & Ove 20


Total

Percent

Rate for 100 Sft

P. Day
P. Day
P. Day

0.00
5

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 42

DESCRIPTION

OF

ITEM NO

26:

Asbestos cement corrugated sheet roofing


including necessary over laps and G.I. hooks,
bolts, nuts, screws washers and bitumen washers
etc. (excluding valleys and ridges etc.)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Corrugated A.C. sheets with 25% over
lapping and wastage.
G.I. or limpet washers and bilumatic
washers.
G.I. bolts with nuts.
G.I. hook bolts and nuts 6"x5/16"

125 Sft

P. Sft

7 Doz
2 Doz
1.5 Doz

Doz
Doz
Doz

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Rate

for

150

Sft

Cooly
Carpenter
Total
Sundries
Total

2.00 Nos
1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 43

DESCRIPTION

OF

ITEM NO

27:

Extra labour for erection of G.I. sheets, flat sheet


or asbestos sheet roofing, above 20' height in
difficult position including lifting with care and
special scaffolding along live electric wires.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Rate Analysis for 150 Sft


Labour
Unskillied Cooly
Fitter
Total
Sundries
Total

0.50 No
0.06 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per 100 S

Rs.

Say

Labour Rate Per Sqm

Rs.

Say

Page 44

DESCRIPTION

OF

ITEM NO

28:

Fixing asbestos cement sheet ridges and valleys


" (6mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

61 Rft

Material
A.C. ridge sheet for a shed of 60'x30'
(18x15 M) or 61 Rft
G.I. bolts and nut with washers
Bituminous washer

61.00 Rft
5.00 Doz
5.00 Doz

P. Rft
Doz
Doz

Total
Contractor's Profit & Ove 20 Percent
Total
Rate Per Rft

0.00
61

Labour
Rate Analysis for 100 Rft
Cooly
Carpenter
Total
Sundries
Total

2.00 Nos
1.50 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 45

DESCRIPTION

OF

ITEM NO

29:

Plain galvanized iron sheet ridging including


fixture, timber for ridge roll and ridge sheeting.

a)

6" (150mm) lap and 18" (450mm) over all of


22 gauge G.I. sheet ridging.

Detail

Unit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
G.I. Sheet 22 gauge
10% for over lapping

1.50 Sft
0.15 Sft
1.65 Sft

1.65 Sft @ 1.12 Lbs/Sft


Deodar wood

1.85 Lbs

0.84 Kg
0.08 Cft

P. Kg
P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Cooly
Carpenter
Blacksmith
Total
Sundries
Total

0.03 No
0.03 No
0.03 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 46

Item No.

29

Plain galvanized iron sheet ridging including


fixture, timber for ridge roll and ridge sheeting.
b)

9" lap and 24" over all of 24 gauge G.I.


sheet ridging.

Detail

Unit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
G.I. Sheet 24 gauge
10% for over lapping
2.31 Sft @ 0.83 Lbs/Sft
Deodar wood

2.10 Sft
0.21 Sft
=

1.94 Lbs

2.31 Sft
0.88 Kg
0.07 Cft

P. Kg
P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Cooly
Carpenter
Blacksmith
Total
Sundries
Total

0.06 No
0.03 No
0.03 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 47

Item No.

29

Plain galvanized iron sheet ridging including


fixture, timber for ridge roll and ridge sheeting.
c)

12" (300mm) lap and 30" (750mm) over all of


22 gauge G.I. sheet ridging.

Detail

Unit Rate (British System) per


Qty

Rft

Rate
Per Unit (Rs.)Amount (Rs.)

Material
22 Gauge G.I. Sheet
Add 10% for over lapping
2.75 Sft @ 1.12 Lbs/Sft
Deodar wood

2.50 Sft
0.25 Sft
=

3.08 Lbs

Total
Contractor's Profit & Ove 20
Total

1.40 Kg
0.07 Cft

2.75 Sft
P. Kg
P. Cft

Percent

Labour
Cooly
Carpenter
Blacksmith
Total
Sundries
Total

0.06 No
0.03 No
0.03 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 48

DESCRIPTION

OF

ITEM NO

30:

Plain 22 Gauge G.I. sheet gutter semi-circular


8" dia meter.

Detail

Unit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
G.I. Sheet
(22 Guage)
Wrought iron bracket complete with bolts,
Nuts and rivets etc.

1.38Lbs(0 .63) Kg

P. Kg

1.00 No

Each

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Cooly
Blacksmith
Total
Sundries
Total

0.03 No
0.03 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 49

DESCRIPTION

OF

ITEM NO

31:

Making masonry ventilators in cement sand


mortar (1:4)

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Pacca bricks
Cement
Sand

50.00 Nos
0.17 Bag
0.88 Cft

Per
1000 N
P. Bag
P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Rate Analysis for 1.5 No.
Cooly
Mason
Total
Sundries
Total

1.00 No
1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate for Each

Rs.

Say

Composite Rate for Ea

Rs.

Say

Page 50

DESCRIPTION

OF

ITEM NO

32:

Fixing water spouts or parnalas.

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Rate Analysis for 1.25 No.


Labour
Unskilled Cooly
Mason
Total
Sundries
Total

0.25 No
0.25 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

Item Rates
Labour Rate for Each

Rs.

Page 51

Say

DESCRIPTION

OF

ITEM NO

33:

Making drip course 2"x" (50x12mm) under


RCC Slab edges in outer opening, in cement, sand
mortar (1:2)

Detail

Unit Rate (British System) per Rft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

100 Rft

Material
Ready mortar 100 Rft
100x1/6x1/24 = 0.69 Cft
Cement
0.75
=
3
Sand

Say 0.75 Cft


0.25 Cft

Total
Contractor's Profit & Ove 20
Total

0.20 Bag

P. Bag

0.50 Cft

P. Cft

Percent

Rate Per Rft

0.00
100

Labour
Rate Analysis
Unskilled Cooly
Mason
Bahishti

for

150 Rft
1.00 No
1.00 No
0.03 No

P. Day
P. Day
P. Day

0.13 No
0.44 No

P. Day
P. Day

For Making Surface


Unskilled Cooly
Bahishti
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

Item Rates
Labour Rate Per Rft
Labour Rate Per Metre

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Me

Rs.
Rs.

Say
Say

Page 52

DESCRIPTION

OF

ITEM NO

34:

Supplying and laying twin G.I. sheet 20 SWG


duly painted with bitumen with polythene film 300
gauge in between to provide a sliding joint under
the bearing of beams with 3" long 3/8" (10mm)
bar to act as hold fast on wall & beam.

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
G.I. sheet 20 gauge 2'x1'= 2Sft @ 1.44Lbs
Bitumen for paint
Polythene film 300 gauge
4 Nos x 3" (75mm) long 3/8" (10mm)
dia bar
=
0.18 Rft

2.88Lbs(1 .31) Kg
2.72Lbs(1 .23) Kg
0.05Lbs(0 .03) Kg

P. Kg
P. Kg
P. Kg

0.03 Kg

P. Kg

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Rate Analysis for 2 Sft
Cooly
placing in position
Blacksmith for cutting of G.I. sheet
Welding of bars 4 points
Total
Sundries
Total

10

Percent

Contractor's Profit & Ove 20


Total

Percent

0.02 No
0.03 No
4.00 Nos

P. Day
P. Day
P. Poi

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per Sf


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 53

DESCRIPTION

OF

ITEM NO

35:

Providing and laying roof insulation, comprising of


single layer of tiles 9"x4"x1" (225 x 112.5 x
40mm) grouted with cement sand mortar 1:3 laid
over 2" thick earth (including Mud Plaster) over
thermopore sheet, over polythene sheet 300 gauge
over a layer of bitumen, complete in all respect.

i)

Thermopore sheet " (13mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Brick tiles 9"x4"x1" (225x112.5x40mm)
Sand
Cement
Bitumen
Earth
Polythene 0.03" (0.08mm) including
wastage 5%
Thermopore " (12mm) thick 1/c 5%
wastage
Total
Contractor's Profit & Ove 20
Total

Per
1000 N
P. Cft
P. Bag
P. Kg
P. Cft

1.58Lbs(0 .72) Kg

P. Kg

105.00 Sft

P. Sft

350.00
2.00
0.50
34Lbs(15
20.00

Nos
Cft
Bag
.43) Kg
Cft

Percent

Labour
Plasterer
Mason for laying
Mason for grouting

Coolies for mud


for mud plaster
for tile laying grout

0.13
0.50
0.13
0.75

No
No
No
No

P. Day

0.50
0.75
0.25
1.50

No
No
No
Nos

P. Day

Page 54

i)

Thermopore sheet " (13mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Painter for painting


Bahishti
Total
Sundries
Total

0.50 No
0.50 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

Rate
Per Unit (Rs.)Amount (Rs.)

P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 55

Item No.

35

Providing and laying roof insulation, comprising of


single layer of tiles 9"x4"x1" (225 x 112.5 x
40mm) grouted with cement sand mortar 1:3 laid
over 2" thick earth (including Mud Plaster) over
thermopore sheet, over polythene sheet 300 gauge
over a layer of bitumen, complete in all respect.
ii)

" (20mm) thick thermopore sheet.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Clay tiles 9"x4"x1" (225x112.5x40mm)
Sand
Cement
Bitumen
Earth
Polythene 0.03" (0.08mm) 1/c
wastage 5%
Thermopore " (19mm) thick 1/c 5%
wastage
Total
Contractor's Profit & Ove 20
Total

Per
1000 N
P. Cft
P. Bag
P. Kg
P. Cft

1.58Lbs(0 .72) Kg

P. Kg

105.00 Sft

P. Sft

350.00
2.00
0.50
34Lbs(15
20.00

Nos
Cft
Bag
.43) Kg
Cft

Percent

Labour
Plasterer
Mason for laying
Mason for grouting

Coolies for mud


for mud plaster
for tile laying grout

0.13
0.50
0.13
0.75
0.75

No
No
No
No
Say

0.50
0.75
0.25
1.50

No
No
No
Nos

Page 56

P. Day

P. Day

ii)

" (20mm) thick thermopore sheet.

Detail

Unit Rate (British System) per 100 Sft


Qty

Painter for painting


Bahishti
Total
Sundries
Total

0.50 No
0.50 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

Rate
Per Unit (Rs.)Amount (Rs.)
P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 57

Item No.

35

Providing and laying roof insulation, comprising of


single layer of tiles 9"x4"x1" (225 x 112.5 x
40mm) grouted with cement sand mortar 1:3 laid
over 2" thick earth (including Mud Plaster) over
thermopore sheet, over polythene sheet 300 gauge
over a layer of bitumen, complete in all respect.
iii)

Thermopore sheet 1" (25mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Brick tiles 9"x4"x1" (225x112.5x40mm)
Sand
Cement
Bitumen
Earth
Polythene 0.03" (0.08mm) 1/c
wastage 5%
Thermopore 1" (13mm) thick 1/c 5%
wastage
Total
Contractor's Profit & Ove 20
Total

Per
1000 N
P. Cft
P. Bag
P. Kg
P. Cft

1.58Lbs(0 .72) Kg

P. Kg

105.00 Sft

P. Sft

350.00
2.00
0.50
34Lbs(15
20.00

Nos
Cft
Bag
.43) Kg
Cft

Percent

Labour
Plasterer
Mason for laying
Mason for grouting

Coolies for mud


for mud plaster
for tile laying grout

0.13
0.50
0.13
0.76

No
No
No
No

P. Day

0.50
0.75
0.25
1.50

No
No
No
Nos

P. Day

Page 58

Item No.

35
iii)

Thermopore sheet 1" (25mm) thick.

Detail

Unit Rate (British System) per 100 Sft


Qty

Painter for painting


Bahishti
Total
Sundries
Total

0.50 No
0.50 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

Rate
Per Unit (Rs.)Amount (Rs.)

P. Day
P. Day

Item Rates
Labour Rate Per 100 S
Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per 10


Composite Rate Per Sq

Rs.
Rs.

Say
Say

Page 59

DESCRIPTION

OF

ITEM NO

36:

Providing and fixing A.C. rain water down pipe


4" (100mm) dia with shoe, T-bend, clamp etc.

Detail

Unit Rate (British System) per Rft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

13 Rft

Material
A.C. pipe 4" (100mm) dia
A.C. T-bend 4" (100mm) dia
A.C. shoe
Clamps & Nuts

13.00
1.00
1.00
2.00

Total
Contractor's Profit & Ove 20
Total

Rft
No
No
Nos

P. Rft
Each
Each
Each

Percent

Rate Per Rft

0.00
13

Labour
Rate Analysis
Plumber
Unskilled Cooly
Total
Sundries
Total

for

20 Rft
0.20 No
0.20 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 60

DESCRIPTION

OF

ITEM NO

37:

Making jharries in existing brick masonry for


providing recesses for bearing of RCC roof slab
including repairing the damaged face.

i)

For slab upto 6" (150mm) thick

Detail

Unit Rate (British System) per Rft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

40 Rft

Material
Cement for repairing Jharry
Sand
Total
Contractor's Profit & Ove 20
Total

0.11 Bag
0.57 Cft.

Bag
% Cft.

Percent

Rate Per Rft

0.00
40

Labour
Rate Analysis

for

50 Rft

Mason
Total
Sundries
Total

1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 61

Item No.

37

Making jharries in existing brick masonry for


providing recesses for hearing of RCC roof slab
including repairing the damaged face.
ii)

For slab exceeding 6" (150mm) to 12" (300mm)


thick.

Detail

Unit Rate (British System) per Rft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

40 Rft

Material
Cement
Sand

0.20 Bag
1.15 Cft.

Total
Contractor's Profit & Ove 20
Total

Rate Per Rft


for

0.00
40

50 Rft

Mason
Cooly
Total
Sundries
Total

Percent

Labour
Rate Analysis

Bag
% Cft.

1.50 No
0.25 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm

Rs.
Rs.

Say
Say

Composite Rate Per Rf


Composite Rate Per Rm

Rs.
Rs.

Say
Say

Page 62

DESCRIPTION

OF

ITEM NO

38:

Making recess in exixting brick masonery for


bearing of beam, girder, R.S. joist, etc. including
repairing damaged face.

i)

Upto 1'.0" (300mm) height of girder or beam.

Detail

Unit Rate (British System) per Each


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

12 Holes

Material
Cement
Sand

0.111 Bag
0.57 Cft.

Total
Contractor's Profit & Ove 20
Total

Bag
% Cft.

Percent

Labour
Mason
Total
Sundries
Total

1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day

Item Rates
Labour Rate for Each

Rs.

Say

Composite Rate for Ea

Rs.

Say

Page 63

Item No.

38

Making recess in exixting brick masonery for


bearing of beam, girder, R.S. joist, etc. including
repairing damaged face.
ii)

For every 6" (150mm) additional height or part


thereof.

Detail

Unit Rate (British System) per Each


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

25 Holes

Material
Cement
Sand

0.111 Bag
0.57 Cft.

Total
Contractor's Profit & Ove 20
Total

Bag
% Cft.

Percent

Labour
Mason
Total
Sundries
Total

1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day

Item Rates
Labour Rate for Each

Rs.

Say

Composite Rate for Ea

Rs.

Say

Page 64

DESCRIPTION

OF

ITEM NO

39:

Hoisting R.S. Beams and wooden beams and


placing in position.

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Mason
Unskilled Coolies
Total
Sundries
Total

0.20 No
0.60 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate for Each

Rs.

Page 65

Rs.

DESCRIPTION

OF

ITEM NO

40:

Hoisting and placing in position sahl ballies, over


roof.

Detail

Unit Rate (British System) per Each


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

35 Nos

Labour
Mason
Unskilled Coolies
Total
Sundries
Total

1.00 No
1.00 No

10

Percent

Contractor's Profit & Ove 20


Total

Percent

P. Day
P. Day

Item Rates
Labour Rate for Each

Rs.

Page 66

Rs.

DESCRIPTION

OF

ITEM NO

41:

Hoisting precast RCC/Pre-stressed concrete


battens and placing in position.

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Mason
Unskilled Coolies
Total
Sundries
Total

1.00 No
3.00 Nos

10

Percent

Contractor's Profit & Ove 20


Total

Percent

a) 5' to 6' (1.5 to 1.8 M) long


Labour per No./ Assumed for

70 Nos

b) 6' to 7' (1.8 to 2.10 M) long


Labour per No./ Assumed for 50 Nos
c) 7' to 8' (2.10 to 2.40 M) long
Labour per No./ Assumed for 40 Nos
d) 8' to 9' (2.40 to 2.70 M) long
Labour per No./ Assumed for 30 Nos
e) Above 9' (2.70 M) length
Labour per No./ Assumed for

25 Nos

P. Day
P. Day

0.00
70

Say

0.00
50

Say

0.00
40

Say

0.00
30

Say

0.00
25

Say

Page 67

DESCRIPTION

OF

ITEM NO

42:

Hoisting and placing in position RC trough.

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Mason
Unskilled Coolies
Total
Sundries
Total

1.00 No
3.00 Nos

10

Percent

Contractor's Profit & Ove 20


Total

Percent

a) Upto 10' (3 M) length


Labour per No./ Assumed for

25 Nos

b) 10' to 11' (3 to 3.30 M) length


Labour per No./ Assumed for 20 Nos
c) 11' to 12' (3.30 to 3.60 M) length
Labour per No./ Assumed for 15 Nos
d) 12' to 13' (3.60 to 3.90 M) length
Labour per No./ Assumed for 13 Nos
e) 13' to 14' (3.90 to 4.20 M) length
Labour per No./ Assumed for 12 Nos
f) 14' to 15' (4.20 to 4.50 M) length
Labour per No./ Assumed for 11 Nos
g) 15' to 16' (4.50 to 4.80 M) length
Labour per No./ Assumed for 10 Nos
h) 16' to 17' (4.80 to 5.1 M) length
Labour per No./ Assumed for 9 Nos

P. Day
P. Day

0.00
25

Say

0.00
20

Say

0.00
15

Say

0.00
13

Say

0.00
12

Say

0.00
11

Say

0.00
10

Say

0.00
9

Say

Page 68

Detail

Unit Rate (British System) per Each


Qty

i) 17' to 18' (5.1 to 5.4 M) length


Labour per No./ Assumed for 7 Nos
j) 18' to 19' (5.4 to 5.7 M) length
Labour per No./ Assumed for 6.5 Nos
k) 19' to 20' (5.7 to 6 M) length
Labour per No./ Assumed for 6 Nos

Rate
Per Unit (Rs.)Amount (Rs.)

0.00
7

Say

0.00
6.5

Say

0.00
6

Say

Page 69

DESCRIPTION

OF

ITEM NO

43:

Hoisting and placing in position RC inverted


battens.

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Mason
Unskilled Coolies
Total
Sundries
Total

1.00 No
4.00 Nos

10

Percent

Contractor's Profit & Ove 20


Total

Percent

i) Upto 10' (3 M) Span


Labour per No./ Assumed for

40 Nos

i) From 10' to 12' (3 to 3.6 M) Span


Labour per No./ Assumed for 18 Nos
i) From 12' to 13' (3.6 to 3.9 M) Span
Labour per No./ Assumed for 15 Nos
v) From 13' to 14' (3.9 to 4.2 M) Span
Labour per No./ Assumed for 12 Nos
v) From 14' to 15' (4.2 to 4.5 M) Span
Labour per No./ Assumed for 11 Nos
i) From 15' to 16' (4.5 to 4.8 M) Span
Labour per No./ Assumed for 10 Nos
i) From 16' to 18' (4.8 to 5.4 M) Span
Labour per No./ Assumed for 8 Nos
i) From 18' to 20' (5.4 to 6 M) Span
Labour per No./ Assumed for 5 Nos

P. Day
P. Day

0.00
40

Say

0.00
18

Say

0.00
15

Say

0.00
12

Say

0.00
11

Say

0.00
10

Say

0.00
8

Say

0.00
5

Say

Page 70

DESCRIPTION

OF

ITEM NO

44:

Reinforced cement concrete spout, including


fixing in position, with top & bottom khurras.

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Cement
Sand
Aggregate

0.25 Bag
1.26 Cft
2.53 Cft

P. Bag
P. Cft
P. Cft

Total

Total

Contractor's Profit & Ove 20


Total

Percent

Labour for 1.5 Nos.


Mason
Unskilled Coolies

Sundries
Total

0.40 No
0.40 No

P. Day
P. Day

Total
10 Percent

Contractor's Profit & Ove 20


Total

Percent

Item Rates
Labour Rate for Each

Rs.

Say

Composite Rate for Ea

Rs.

Say

Page 71

CHAPTER NO. 15

SHEET PILING
1
2
3

Unless otherwise stated, the


Rates for all finished works
and by products.
For handling of all types of
(90 M) nothing is to be paid
lead beyond 3 Chains, (90 M)

rate includes handling of materials with in 3 chains (90M).


include the removal of surplus debris, unused material
materials for shortleads including carriage upto 3 Chains,
as extra. Where handling and carriage involves an extra
carriage for whole of the distance should be paid.

The above notes are to be referred to all items of the chapter.

DESCRIPTION

OF

ITEM NO

1:

Cutting ransome and larson piles.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.25 cut


Labour
Blacksmith

Total
Sundries
Total
Contractor's Profit & Ov
Total

0.25 No

10

Percent

20

Percent

0.00 P. Day

Item Rates
Labour Rate Per Cut

Rs.

Page 1

0.00
1.25

0.00

Say

DESCRIPTION

OF

ITEM NO

2:

Cutting universal Piles.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.25 cut


Labour
Blacksmith

Total
Sundries
Total
Contractor's Profit & Ov
Total

0.37 No

10

Percent

20

Percent

0.00 P. Day

Item Rates
Labour Rate Per Cut

Rs.

Page 2

0.00
1.25

0.00

Say

DESCRIPTION

OF

ITEM NO

3:

Driving steel piles 25' to 30' (7.5 to 9 M).

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Rate Analysis for 125 Sft


Labour
Skilled Cooly
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total rate for 125 Sft

4.25 Nos
2.00 Nos

10

Percent

20

Percent

0.00 P. Day
0.00 P. Day

Item Rates
Labour Rate Per 100 Sft

Rs.

Labour Rate Per Sqm

Rs.

Page 3

0.00
1.25

0.00

Say

0.00

Say

DESCRIPTION

OF

ITEM NO

4:

Driving steel piles more than 15' (4.5 M) and


less than 25' (7.5 M).

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Rate Analysis for 125 Sft


Labour
Skilled Cooly
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total rate for 125 Sft

4.00 Nos
2.00 Nos

10

Percent

20

Percent

0.00 P. Day
0.00 P. Day

Item Rates
Labour Rate Per 100 Sft

Rs.

0.00
1.25

0.00

Say

0.00

Say

Labour Rate Per Sqm


Rs.

Page 4

DESCRIPTION

OF

ITEM NO

5:

Driving steel piles 15' (4.5 M) and under.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Rate Analysis for 125 Sft


Labour
Skilled Cooly
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total rate for 125 Sft

2.50 Nos
2.00 Nos

10

Percent

20

Percent

0.00 P. Day
0.00 P. Day

Item Rates
Labour Rate Per 100 Sft

Rs.

0.00
1.25

0.00

Say

0.00

Say

Labour Rate Per Sqm


Rs.

Page 5

DESCRIPTION

OF

ITEM NO

6:

Dolleying piles.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.25 No.


Labour
Dolly man (Skilled Cooly)
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

0.20 No
0.20 No

10

Percent

20

Percent

0.00 P. Day
0.00 P. Day

Item Rates
Labour Rate for Each

Rs.

Page 6

0.00
1.25

0.00

Say

DESCRIPTION

OF

ITEM NO

7:

Drilling holes in piles by hand.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 12 Holes


Labour
Blacksmith

Total
Sundries
Total
Contractor's Profit & Ov
Total

0.33 No

10

Percent

20

Percent

0.00 P. Day

Item Rates
Labour Rate for Each

Rs.

Page 7

0.00
12

0.00

Say

DESCRIPTION

OF

ITEM NO

8:

Raising and lowering machine.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.5 Feet


Labour
Fitter
Skilled Cooly
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00 No
4.00 Nos
2.00 Nos

10

Percent

20

Percent

0.00 P. Day
0.00 P. Day
0.00 P. Day

Item Rates
Labour Rate Per Foot

Rs.

Labour Rate Per Rm

Rs.

Page 8

0.00
1.5

0.00

Say

0.00

Say

DESCRIPTION

OF

ITEM NO

9:

Turning machine 90.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.25 Jobs


Labour
Fitter
Skilled Cooly
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00 No
3.00 Nos
5.00 Nos

10

Percent

20

Percent

0.00 P. Day
0.00 P. Day
0.00 P. Day

Item Rates
Labour Rate Per Job

Rs.

Page 9

0.00
1.25

0.00

Say

DESCRIPTION

OF

ITEM NO

10:

Turning machine 135.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.25 Jobs


Labour
Fitter
Skilled Cooly
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00 No
5.00 Nos
5.00 Nos

10

Percent

20

Percent

0.00 P. Day
0.00 P. Day
0.00 P. Day

Item Rates
Labour Rate Per Job

Rs.

Page 10

0.00
1.25

0.00

Say

DESCRIPTION

OF

ITEM NO

11:

Turning machine 180.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.25 Jobs


Labour
Fitter
Skilled Cooly
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00 No
7.00 Nos
7.00 Nos

10

Percent

20

Percent

0.00 P. Day
0.00 P. Day
0.00 P. Day

Item Rates
Labour Rate Per Job

Rs.

Page 11

0.00
1.25

0.00

Say

DESCRIPTION

OF

ITEM NO

12:

Traveling machine (Light).

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.25 Chain


Labour
Fitter
Skilled Cooly
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

1.25 Nos
8.00 Nos
8.50 Nos

10

Percent

20

Percent

0.00 P. Day
0.00 P. Day
0.00 P. Day

Item Rates
Labour Rate Per Chain

Rs.

Labour Rate Per 30 Meter

Rs.

Page 12

0.00
1.25

-0.05

Say

-0.05

Say

DESCRIPTION

OF

ITEM NO

13:

Loading and unloading piles.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.25 Ton


Labour
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

0.37 No

10

Percent

20

Percent

0.00 P. Day

Item Rates
Labour Rate Per Ton

Rs.

Labour Rate Per Tonne

Rs.

Page 13

0.00
1.25

0.00

Say

-0.05

Say

DESCRIPTION

OF

ITEM NO

14:

Dismantling piling machine.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.5 No.


Labour
Foreman
Fitter
Skilled Cooly
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

3.00
18.00
12.00
9.50

10

Percent

20

Percent

Nos
Nos
Nos
Nos

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

Item Rates
Labour Rate for Each

Rs.

Page 14

0.00
1.5

0.00

Say

DESCRIPTION

OF

ITEM NO

15:

Erecting pilling machine.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.3 No.


Labour
Foreman
Fitter
Skilled Cooly
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

3.00
18.00
12.00
9.50

10

Percent

20

Percent

Nos
Nos
Nos
Nos

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

Item Rates
Labour Rate for Each

Rs.

Page 15

0.00
1.3

0.00

Say

DESCRIPTION

OF

ITEM NO

16:

Carriage of pile machine under different


condition.

Detail

Unit Rate (British System) per Cut


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Assumed for 1.25 Chain


Labour
Fitter
Skilled Cooly
Unskilled Cooly

Total
Sundries
Total
Contractor's Profit & Ov
Total

1.00 No
2.50 Nos
3.75 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per Chain

Rs.

Page 16

Rs.

Labour Rate Per 30 Meter

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.00
1.25

0.00

Say

0.00

Say

CHAPTER NO. 22

SINKING OF WELLS
DESCRIPTION
Item No.

OF

ITEM:

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within
A)

In ordinary soil or sand.

i)

from 0' (0 M) to 5' (1.5 M)


Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

3.00

2 Coolies for lifting

4.43

Nos

7.43

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 1

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
A)

In ordinary soil or sand.

ii)

from 5'-1" (1-55 M) to 10' (3 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

3.00

2 Coolies for lifting

4.76

Nos

7.76

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 2

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
A)

In ordinary soil or sand.

iii)

from 10'-1" (3.05 M) to 15' (4.5M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

3.00

2 Coolies for lifting

5.73

Nos

8.73

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 3

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
A)

In ordinary soil or sand.

iv)

from 15'-1" (4.55 M) to 20' (6M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

3.00

2 Coolies for lifting

7.02

Nos

10.02

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 4

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
B)
i)

In

Hard

Soil.

from 0' (0 M) to 5' (1.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

4.00

2 Coolies for lifting

5.05

Nos

9.05

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 5

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
B)

In

ii)

Hard

Soil.

from 5'-1" (1.55 M)

to 10' (3 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

4.00

2 Coolies for lifting

5.46

Nos

9.46

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 6

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
B)

In

iii)

Hard

Soil.

from 10'-1" (3.05 M) to 15' (4.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

4.00

2 Coolies for lifting

6.34

Nos

10.34

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 7

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
B)

In

iv)

Hard

Soil.

from 15'-1" (4.55 M) to 20' (6 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

4.00

2 Coolies for lifting

7.63

Nos

11.63

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 8

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
C)
i)

In

Hard

Strata such as Shingle, gravel etc.

from 0' (M) to 5' (1.5M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1

Coolies for digging

4.00

Coolies for lifting

15.52

Nos

Total

19.52

Nos.

Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Nos
-

Per day

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 9

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
C)

In

ii)

Hard

Strata such as Shingle, gravel etc.

from 5'-1" (1.55 M) to 10' (3 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1

Coolies for digging

4.00

Coolies for lifting

16.22

Nos

Total

20.22

Nos.

Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Nos
-

Per day

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 10

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
C)

In

iii)

Hard

Strata such as Shingle, gravel etc.

from 10'-1" (3.05 M) to 15' (4.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

4.00

2 Coolies for lifting

17.08

Nos

21.08

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 11

Item No.

Excavation of well in dry upto 20' (6 M) below ground level and disposal of soil within one chain (30 M).
C)

In

iv)

Hard

Strata such as Shingle, gravel etc.

from 15'-1" (4.55 M) to 20' (6 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

4.00

2 Coolies for lifting

18.63

Nos

22.63

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 12

DESCRIPTION
Item No.

OF

ITEM :

Dry sinking of well including loading and removing excavated material, within one chain (30 metre).
A)

In ordinary soil.

i)

from 10'-1" (3.05 M) to 15' (4.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

10.00

2 Coolies for lifting

30.00

Nos

40.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 13

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)

In ordinary soil.

ii)

from 15'-1" (4.55 M) to 20' (6 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

10.00

2 Coolies for lifting

40.00

Nos

50.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 14

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)

In ordinary soil.

iii)

from 20'-1" (6.05 M) to 25' (7.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

10.00

2 Coolies for lifting

50.00

Nos

60.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 15

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)

In ordinary soil.

iv)

from 25'-1" (7.55 M) to 30' (9 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

10.00

2 Coolies for lifting

60.00

Nos

70.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 16

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)

In ordinary soil.

v)

from 30'-1" (9.05 M) to 35' (10.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

10.00

2 Coolies for lifting

70.00

Nos

80.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 17

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)

In ordinary soil.

vi)

from 35'-1" (10.55 M) to 40' (12 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

10.00

2 Coolies for lifting

80.00

Nos

90.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 18

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)

In ordinary soil.

vii)

from 40'-1" (12.05 M) to 45' (13.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

10.00

2 Coolies for lifting

90.00

Nos

100.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 19

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
A)

In ordinary soil.

viii)

from 45' (13.5 M) to any depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

10.00

2 Coolies for lifting

100.00

Nos

110.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 20

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)

In Hard Soil.

i)

from 10' (3 M) to 15' (4.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

25.00

2 Coolies for lifting

30.00

Nos

55.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 21

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)

In Hard Soil.

ii)

from 15'-1" (4.55) to 20' (6 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

25.00

2 Coolies for lifting

40.00

Nos

65.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 22

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)

In Hard Soil.

iii)

from 20'-1" (6.05 M) to 25' (7.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

25.00

2 Coolies for lifting

50.00

Nos

75.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 23

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)

In Hard Soil.

iv)

from 25'-1" (7.55 M) to 30' (9 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

25.00

2 Coolies for lifting

60.00

Nos

85.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 24

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)

In Hard Soil.

v)

from 30'-1" (9.05 M) to 35' (10.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

25.00

2 Coolies for lifting

70.00

Nos

95.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 25

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)

In Hard Soil.

vi)

from 35'-1" (10.55 M) to 40' (12 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

25.00

2 Coolies for lifting

80.00

Nos

105.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 26

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)

In Hard Soil.

vii)

from 40'-1" (12.05 M) to 45' (13.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

25.00

2 Coolies for lifting

90.00

Nos

115.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 27

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
B)

In Hard Soil.

viii)

from 45' (13.5 M) to any depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

25.00

2 Coolies for lifting

100.00

Nos

125.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 28

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)

In hard strata such as shingle, gravel etc.

i)

from 10' (3 M) to 15' (4.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

40.00

2 Coolies for lifting

35.00

Nos

75.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 29

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)

In hard strata such as shingle, gravel etc.

ii)

from 15'-1" (4.5 M) to 20' (6 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

40.00

2 Coolies for lifting

45.00

Nos

85.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 30

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)

In hard strata such as shingle, gravel etc.

iii)

from 20'-1" (6.05 M) to 25' (7.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

40.00

2 Coolies for lifting

55.00

Nos

95.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 31

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)

In hard strata such as shingle gravel etc.

iv)

from 25'-1" (7.55 M) to 30' (9 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

40.00

2 Coolies for lifting

65.00

Nos

105.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

10.00

Percent

Contractor's Profit & Ove 20.00

Percent

Total
Sundries

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 32

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)

In hard strata such as shingle, gravel etc.

v)

from 30'-1" (9.05 M) to 35' (10.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

40.00

2 Coolies for lifting

75.00

Nos

115.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 33

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)

In hard strata such as shingle, gravel etc.

vi)

from 35'-1" (10.55 M) to 40' (12 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

40.00

2 Coolies for lifting

85.00

Nos

125.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 34

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)

In hard strata such as shingle, gravel etc.

vii)

from 40'-1" (12.05 M) to 45' (13.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

40.00

2 Coolies for lifting

95.00

Nos

135.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 35

Item No.

Dry sinking of well including loading and removing excavated material, with in one chain (30 metre).
C)

In hard strata such as shingle, gravel etc.

viii)

from 45'-1" (13.55 M) to any depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 1250 Cft.


LABOUR
1 Coolies for digging

40.00

2 Coolies for lifting

105.00

Nos

145.00

Nos.

Total
Sundries

Nos
-

Per day

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 1250 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 36

DESCRIPTION
Item No.

OF

ITEM:

Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 Metre).
i)

from 0' (0 M) to 10' (3 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 90 Cft.


LABOUR
1 Divers

2.00

Nos

Per day

2 Coolies

6.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 170 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

#######

Say

10621.65

Labour Rate per Cum

Rs.

198.60

Say

198.60

Page 37

Item No.

Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
ii)

from 10' (3.05 M) to 20' 6 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 80 Cft.


LABOUR
1 Divers

2.00

Nos

Per day

2 Coolies

6.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 80 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 38

Item No.

Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
iii)

from 20' (6.05 M) to 30' (9 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 65 Cft.


3
LABOUR
1 Divers

2.00

Nos

Per day

2 Coolies

6.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 65 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 39

Item No.

Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
iv)

from 30' (9.05 M) to 40' (12 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 50 Cft.


LABOUR
1 Divers

2.00

Nos

Per day

2 Coolies

6.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 50 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 40

Item No.

Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
v)

from 40' (12.05 M) to 50' (15 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 45 Cft.


LABOUR
1 Divers

2.00

Nos

Per day

2 Coolies

6.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 45 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 41

Item No.

Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
vi)

from 50' (15.05 M) to 60' (18 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 40 Cft.


LABOUR
1 Divers

2.00

Nos

Per day

2 Coolies

6.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 40 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 42

Item No.

Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
vii)

from 60' (18.05 M) to 70' (21 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 39 Cft.


LABOUR
1 Divers

2.00

Nos

Per day

2 Coolies

6.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 39 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 43

Item No.

Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
viii)

from 70' (21.05 M) to 80' (24 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 38 Cft.


LABOUR
1 Divers

2.00

Nos

Per day

2 Coolies

6.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 38 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 44

Item No.

Wet Sinking of Well in ordinary soil (value of C upto 5) for depths below spring level including charges of
machinery shoring, kentlege and removal of excavated soil within one chain (30 metre).
ix)

above 80' (24 M) to any depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 35 Cft.


LABOUR
1 Divers

2.00

Nos

Per day

2 Coolies

6.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 35 Cft.

Percent

Total

ITEM RATE
Labour Rate per 1000 Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

Say

0.00

Page 45

DESCRIPTION OF ITEM
Item No. 4
Wet Sinking of Well in cohesive soil (value of C more than 5) for depth below spring level including charges of
machinery, shoring, kentledge and removal of excavated soil within one chain (30 Metre).

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty
A.

Amount

Material (T&P for wet sinking)


1 Winch including cost of tripod,
tackle etc.
Less Residual Value 25%
Net Total

1.00

No.

Per No.

2 3/4" dia steel rope

350.00

Rft.

Per Rft.

3 Loading gunny bags for one side

100.00

Nos.

er 100 Nos

15.00

Nos.

Each

0.38
0.40

Kg.
Kg.

P. Kg.
P. Kg.

4 Sleepers / planks
Cost of 15 Nos. sleeper @ Rs.
Each
0.00
Depriciation 1/6
=
0.00
Total
0.00

0.00

0.00=
50

Take 50 time Use, rate per use =

Rate Per Sleeper

0.00
15

5 Cotton waste
Grease
Total
Contractor's Profit & Ove 20.00
Total

Percent

Sinking in 10 years in term of Cft.


Assume Cost for 350 Cft.

0.00

0.00

#########

Cft.

0.00 x 350
26,000

Page 46

B.

Pumping for Dewatering

a)

One cusic capacity set for dewatering


@ Rs. 60000.00 Each
Residual Value 1/6
Total

2.00

Nos.

Each

Life of pump - 5 years


40 x 40 = 1600 R
To be used on 40 wells of 40 Rft.
depth each
Per Rft.
0
0.00
=
1600
=
Maintenance Cost 1/5
0.00 + 0.00 =
0.00

Running Cost
b)

Fuel etc.
Diesel Oil

1.137 Litre
gallon/Hrs/Pump

Working 8 Hrs per day after every 3 days


2 x 1.137 x 10 x 8
= 60.64
3
c)

CREW
Driver

2.00

Nos.

Per Rft of Well


Sundries
Total

0.00
4
10.00

Each
-

Percent

Total for a+b+c


Contractor's Profit & Ove 20.00 Percent
Total Cost (A+B) for machinery & equipment

Page 47

Item No.

Wet sinking of well in cohesive soil (value of C more than 5) for depth below spring level including charges of
machinery, shoring kentledge and removal of excavated soil within one chain (30 metre).
(1)
i)

0' (0 M) to 10' (3 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 150 Cft.
Rate
Per Unit

Qty

Material and Equipment as

Amount

per above details.


LABOUR 150
1 Driver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 150 Cft.


Total Composite Rate Per 1000 Cft.

0.00

x 1000

150
ITEM RATE
Composite Rate per 1000 Cft

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 48

Item No.

1)
ii)

10' (3 M) to 20' (6 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 120 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 120 Cft.


Material and Equipment as

per above details. (4, i)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 120 Cft.


Total Composite Rate Per 1000 Cft.

0.00

x 1000

120
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 49

Item No.

(1)
iii)

20' (6 M) to 30' (9 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 100 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 100 Cft.


Material and Equipment as

per above details. (4, i)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 100 Cft.


Total Composite Rate Per 1000 Cft.

0.00

x 1000

100
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 50

Item No.

iv)

30' (9 M) to 40' (12 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 75 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 75 Cft.


Material and Equipment as

per above details. (4, i)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 75 Cft.


Total Composite Rate Per 1000 Cft.

0.00

x 1000

75
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 51

Item No.

v)

40' (12 M) to 50' (15 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 65 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 65 Cft.


Material and Equipment as

per above details. (4, i)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 65 Cft.


Total Composite Rate Per 1000 Cft.

0.00

x 1000

65
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 52

Item No.

vi)

50' (15 M) to 60' (18 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 60 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 60 Cft.


Material and Equipment as

per above details. (4, i)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 60 Cft.


Total Composite Rate Per 1000 Cft.

0.00

x 1000

60
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 53

Item No.

(1)
vii)

60' (18 M) to 70' (21 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 55 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 55 Cft.


Material and Equipment as

per above details. (4, i)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 55 Cft.


Total Composite Rate Per 1000 Cft.

0.00

x 1000

55
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 54

Item No.

viii)

70' (21 M) to 80' (24.5 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 53 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 53 Cft.


Material and Equipment as

per above details. (4, i)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 53 Cft.


Total Composite Rate Per 1000 Cft.

0.00

x 1000

53
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 55

Item No.

ix)

80' (24 M)

- to any depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 50 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 50 Cft.


Material and Equipment as

per above details. (4, i)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 50 Cft.


Total Composite Rate Per 1000 Cft.

0.00

x 1000

50
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 56

DETAIL OF SLEEPERS

Detail

Unit Rate (British System) per Sleeper


Assuming for 15 No Sleeper
Rate
Per Unit

Qty

Amount

MATERIAL
Sleeper

15.00

Depreciation

Nos

1/6

Each

Take 50 time use of


Sleepers

0.00

= -

50

Rate for 15 Nos.

ITEM RATE
Rate for

Sleeper

Rs.

Page 57

DESCRIPTION

OF

ITEM:

Item No. 5
Wet sinking of well in shingle, or gravel etc. for depth below spring level, including charges of machinery, sho
removal of excavated spoil within one chain load.

Unit Rate (British System) per 1000 Cft

Detail

Rate
Per Unit

Qty
A.

Amount

Material (T&P for wet sinking)


1 Winch including cost of tripod,
tackle etc.
Less Residual Value 25%
Net Total

1.00

No.

Per No.

2 3/4" dia steel rope

350.00

Rft.

Per Rft.

3 Loading gunny bags for one side

100.00

Nos.

er 100 Nos

15.00

Nos.

Each

0.38
0.40

Kg.
Kg.

P. Kg.
P. Kg.

4 Sleepers / planks
Cost of 15 Nos. sleeper @ Rs.
Each
0.00
Depriciation 1/6
=
0.00
Total
0.00

0.00

0.00=
50

Take 50 time Use, rate per use =

Rate Per Sleeper

0.00
15

5 Cotton waste
Grease
Total
Contractor's Profit & Ove 20.00
Total

0.00

0.00

Percent

Sinking in 10 years in term of Cft.


Assume Cost for 350 Cft.

B.

Pumping for Dewatering

a)

One cusic capacity set for dewatering


@ Rs. 60000.00 Each
Residual Value 1/6
Total

#########

Cft.

0.00 x 350
26000.00

2.00

Nos.

Each

Life of pump - 5 years


40 x 40 = 1600 R
To be used on 40 wells of 40 Rft.
depth each
Per Rft.
4
0.00
=
1600
=
Maintenance Cost 1/5
0.00 + 0.00 =
0.00

4.00
4.00

0.00

Running Cost
b)

Fuel etc.
Diesel Oil

1.137 Litre
gallon/Hrs/Pump

Working 8 Hrs per day after every 3 days


2 x 1.137 x 10 x 8
= 60.64
3
c)

CREW
Driver

2.00

Rft of Well

Nos.
4

Page 58

Each
-

Sundries
Total

10.00

Percent

Total for a+b+c


Contractor's Profit & Ove 20.00 Percent
Total Cost (A+B) for machinery & equipment

Page 59

+ 0.00

0.00

0.00
0.00
0.00

Item No.

Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.

level including charges of machinery,

i) From 0' to 10' depth

Detail

Unit Rate (British System) per 1000 Cft


Rate
Per Unit

Qty

Amount

Rate Analysis for 110 Cft.


Material and Equipment as

per above details.


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 195 Cft.

Labour Rate Per 1000 Cft.

x 1000

(0.02)

110

Labour Rate per 1000 Cft.

Rs.

(0.02)

Say

0.00

Composite Rate per Cum

Rs.

(0.01)

Say

0.00

Page 60

Item No.

Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.

level including charges of machinery,

ii) Above 10' to 20' depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 90 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 90 Cft.


Material and Equipment as

per above details. (5, i)


LABOUR

As per Item 4 (i)

Total

Total Labour Rate Per 90 Cft.

Total Composite Rate Per 1000 Cft.

x 1000

90

Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

(0.01)

Say

0.00

Page 61

Item No. 5
Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.
iii)

level including charges of machinery,

20' (6 M) to 30' (9 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 75 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 75 Cft.


Material and Equipment as

per above details. (5, i, ii)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 75 Cft.

Total Composite Rate Per 1000 Cft.

x 1000

75
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 62

Item No.

Wet sinking of well in shingle or gravel etc. for depths below spring
shoring, kentledge and removal of excavated soil with in one chain.
iv)

level including charges of machinery,

30' (9 M) to 40' (12 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 55 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 55 Cft.


Material and Equipment as

per above details. (5, i, ii)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 55 Cft.

Total Composite Rate Per 1000 Cft.

x 1000

55
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 63

Item No.

Wet sinking of well in shingle or gravel etc. for depths below spring level including charges of machinery,
shoring, kentledge and removal of excavated soil with in one chain (30 metre).
v)

40' (12 M) to 50' (15 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 50 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 50 Cft.


Material and Equipment as

per above details. (5, i, ii)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 50 Cft.

Total Composite Rate Per 1000 Cft.

x 1000

50
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 64

Item No.

Wet sinking of well in shingle or gravel etc. for depths below spring level including charges of machinery,
shoring, kentledge and removal of excavated soil with in one chain (30 metre)
vi)

50' (15 M)

to 60' (18 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 45 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 45 Cft.


Material and Equipment as

per above details. (5, i, ii)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 45 Cft.

Total Composite Rate Per 1000 Cft.

x 1000

45
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 65

Item No.

Wet sinking of well in shingle or gravel etc. for depths below spring level including charges of machinery,
shoring, kentledge and removal of excavated soil with in one chain (30 metre).

vii)

60' (18 M) to 70' (21 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 43 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 43 Cft.


Material and Equipment as

per above details. (5, i, ii)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 43 Cft.

Total Composite Rate Per 1000 Cft.

x 1000

43

ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 66

Item No.

Wet sinking of well in shingle or gravel etc. for depths below spring level including charges of machinery,
shoring, kentledge and removal of excavated soil with in one chain (30 metre).
viii)

70' (21 M) to 80' (24 M) depth

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 42 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 42 Cft.


Material and Equipment as

per above details. (5, i, ii)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 42 Cft.

Total Composite Rate Per 1000 Cft.

x 1000

42
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 67

Item No.

Wet sinking of well in shingle or gravel etc. for depths below spring level including charges of machinery,
shoring, kentledge and removal of excavated soil with in one chain (30 metre).
ix)

80' (24 M) - above

Detail

Unit Rate (British System) per 1000 Cft


Assuming for 38 Cft.
Rate
Per Unit

Qty

Amount

Rate Analysis for 38 Cft.


Material and Equipment as

per above details. (5, i, ii)


LABOUR
1 Diver

2.00

Nos

Per day

2 Coolies

4.00

Nos

Per day

3 Coolies skilled

1.00

Nos

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

Total Labour Rate Per 38 Cft.

Total Composite Rate Per 1000 Cft.

x 1000

38
ITEM RATE
Composite Rate per 1000 Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

Say

0.00

Page 68

DESCRIPTION

OF

Item No.

ITEM:

Making and fixing in position Keekar wood well curb.

Detail

Unit Rate (British System) per Cft


Assuming 2.36 Cft.
Qty

Rate
Per Unit

Amount

Per Cft.

MATERIAL
Kikar Wood

1 x 12/3' x
2

(1

/3'

/3 + ) x 1

0.5

/3'

2.36
1.81

Cft

Cft.
=

2.36 Cft.

M.S. Round bar " (7x1.5 / 2.204 = 4.76 kg.

4.76

Kg

Per kg.

Angle Iron (6"x6"x"

9.07

Kg.

Per Kg.

20 Lbs / 9.07 Kg.

Total

Contractor's Profit & Ove 20.00


Total

Percent

Material Rate Per Cft.

Rs.

LABOUR
1 Carpenter

1.00

No

Per day

2 Cooly

1.00

No

Per day

3 Black Smith

0.50

No

Per day

4 Hammar Man

0.50

No

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total Rate for 2.36 Cft.

Percent

Total

ITEM RATE
Labour Rate per Cft.

Rs.

Say

0.00

Labour Rate per Cum

Rs.

0.15

Say

0.15

Composite Rate per Cft.

Rs.

Say

0.00

Composite Rate per Cum

Rs.

0.25

Say

0.25

Page 69

DESCRIPTION

OF

Item No.

ITEM:

LAYING WELL CURB IN POSITION ONLY

Detail

Unit Rate (British System) per No.


Rate
Per Unit

Qty

Amount

LABOUR
1 Carpenter

0.40

No

Per day

Total
Sundries

10.00

Percent

Contractor's Profit & Ove 20.00


Total

Percent

Total

ITEM RATE
Labour Rate per Each

Rs.

Page 70

Say

0.00

DESCRIPTION OF ITEM:
Item No. 8
MAKING AND LAYING RCC WELL
Providing making and laying RCC Well Curb in position, using coarse sand, including all kinds of
form, moulds, curing, shuttering, rendering and finishing the exposed surface, (including screening
and washing of aggregrate.
(a)

Concrete Mix (1: 1: 3)


Detail

Unit Rate (British System) per Cft


Assuming 100 Cft.
Rate
Qty
Per Unit
Amount

MATERIAL
1
2
3
4
5
6
7

Cement
Sand (Lawrancepur)
Shingle (Bajri)
Bolts & Nuts
Partal Wood for Template
Tar Coal
Nails
Total
Contractor's Profit & Ove 20.00
Total

22.50
Bags
42.00
Cft
84.00
Cft
1.75
Kg.
1.20
Cft
20 .00 Lbs (9.07 Kg.
0.25 Lbs (0.11 Kg.)

Per
Per
Per
Per
Per
Per
Per

Bag
Cft.
Cft.
Kg.
Cft.
Kg.
Kg.

Per
Per
Per
Per

day
day
day
day

Percent

LABOUR
1
2
3
4

Mason
Carpenter
Coolies
Bahishties
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total Rate

6.00
6.00
13.00
3.00

Nos
Nos
Nos
Nos

ITEM RATE
Labour Rate per Cft.
Labour Rate per Cum
Composite Rate per Cft.
Composite Rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 71

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM:
Item No. 8
MAKING AND LAYING RCC WELL
Providing making and laying RCC Well Curb in position, using coarse sand, including all kinds of
form, moulds, curing, shuttering, rendering and finishing the exposed surface, (including screening
and washing of aggregrate.
(b)

Concrete Mix (1:2:4)


Detail

Unit Rate (British System) per Cft


Assuming 100 Cft.
Rate
Qty
Per Unit
Amount

MATERIAL
1
2
3
4
5
6
7

Cement
Sand (Lawrancepur)
Shingle (Bajri)
Bolts & Nuts
Partal Wood for Template 1/10th
Tar Coal
Nails
Total
Contractor's Profit & Ove 20.00
Total

17.60
Bags
44.00
Cft
88.00
Cft
1.75
Kg.
1.20
Cft.
20.00 Lbs (9.07 Kg.)
0.25 Lbs (0.11 Kg.)

Per Bag
Per Cft
Per Cft.
Per Cft.
Per Kg.
Per Kg.
Per Kg.

Percent

LABOUR
1
2
3
4

Mason
Carpenter
Coolies
Bahishties
Total
Sundries
10.00
Total
Contractor's Profit & Ove 20.00
Total Rate

6.00
6.00
13.00
3.00

Nos
Nos
Nos
Nos

Per
Per
Per
Per

day
day
day
day

Percent
Percent

ITEM RATE
Labour Rate per Cft.
Labour Rate per Cum
Composite Rate per Cft.
Composite Rate per Cum

Rs.
Rs.
Rs.
Rs.

Page 72

Say
Say
Say
Say

0.00
0.00
0.00
0.00

DESCRIPTION OF ITEM:
Item No. 9
FIXING STRUCTURAL STEEL
Providing and fixing structural steel for cutting edge.

Detail

Unit Rate (British System) per 100 Kg.


Rate
Per Unit

Qty

Amount

MATERIAL FOR 50 KG.


1 L. Iron/ Steel
Wastage 8%
Total
Contractor's Profit & Ove 20.00
Total for 50 Kg.
Total for 100 Kg.

1.00 Cwt (50.08 Kg.)


04.01 Cwt.
54.09
Kg.

Per Kg.

Percent

LABOUR FOR 100 KG.


Fitter for fabrication of steel
and iron work
1 Coolies
for Joining ends
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total Rate

0.50

No

Per day

0.50

No

Per day

ITEM RATE
Labour Rate Per 100 Kg.
Composite Rate per 100 Kg.

Rs.
Rs.

Page 73

Say
Say

0.00
0.00

DESCRIPTION OF ITEM:
Item No. 10
MAKING AND REMOVING FALSE MASONRY
Making and removing false masonry on well.

Detail

Unit Rate (British System) per 100 Cft


Rate
Per Unit

Qty

Amount

MATERIAL
Pacca Brick
Cement
Sand
Total
Contractor's Profit & Ove 20.00
Total

1,350.00
2.66
26.67

Nos
Bags
Cft

er 0/00 Nos
Per Bag
er 100 Cft

Percent

Cost of bricks (70% bricks at


depreciated value )
1350 x 65
= 950 Nos @ RS. 1000
100
Cost of Brick bats 24 Cft @ Rs. 350
Net Cost of Material
Total

/00 No

950.00

/0 Cft

84.00
1,034.00

LABOUR FOR 150 CFT.


1
2
4
5

Masons
Coolies
Coolies
Bahishti
Coolies for demolishing
Coolies for Scraping mortar of bricks
Total
Sundries
10.00 Percent
Total
Contractor's Profit & Ove 20.00 Percent
Total Rate for 150 Cft.
Total Rate for 100 Cft.

2.50
3.00
1.00
0.50
4.25
2.90

Nos
Nos
No
No
Nos
Nos

Per
Per
Per
Per
Per
Per

day
day
day
day
day
day

ITEM RATE
Labour Rate per 100 Cft.
Labour Rate per Cum
Composite Rate per 100 Cft.
Composite Rate for Cum

Rs.
Rs.
Rs.
Rs.

Page 74

Say
Say
Say
Say

0.00
0.00
0.00
0.00

CHAPTER NO. 8

STONE MASONRY
DESCRIPTION

OF

ITEM NO

1:
a)

Random, rubble masonry (uncoursed), in


foundation and plinth.
Dry Masonry
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.

100 Cft

Per % Cft

20 Nos

Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Total
Sundries
Total

2.00 Nos
3.00 Nos

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 1

Item No.

b)

In Mud Mortar
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth

100 Cft

Per % Cft

20 Nos
45 Cft

Each
%Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

2.50 Nos
3.50 Nos
0.25 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 2

Item No.

c)

In Lime Mortar, Ratio

(1 Lime 2 Sand).

Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Per % Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Lime Slaked (Ground)
Sand

20 Nos
224 Kg
30 Cft

Each
Per Kg.
Per %Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.00 Nos
5.00 Nos
0.50 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 3

(0.05)
-

Say
Say

Say
Say

Item No.

d)
i)

In Cement Sand Mortar


Ratio ( 1:3 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm)
20 Nos.
Cement
Sand

100 Cft

Per % Cft

20 Nos
9 Bag
33.75 Cft

Each
P. Bag
Per %Cft

Total
Contractor's Profit & Ove ##### Percent
Total

118.13
118.13
23.63
141.75

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.00 Nos
5.00 Nos
0.50 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 4

(0.03)
141.75
50.06

Say
Say
Say
Say

141.75
50.05

Item No.

d)
ii)

In Cement Sand Mortar


Ratio ( 1:4 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand

100 Cft

Per % Cft

20 Nos
7.20 Bag
36.0 Cft

Each
Each
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.00 Nos
5.00 Nos
0.50 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 5

(0.02)
-

Say
Say

Say
Say

Item No.

d)
iii)

In Cement Sand Mortar


Ratio ( 1:6 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand

100 Cft

Per % Cft

20 Nos
5.14 Bag
38.57 Cft

Each
Each
Per%Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.00 Nos
5.00 Nos
0.50 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

(0.02)

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

(0.05)

Say
Say

Page 6

Item No.

d)
iv)

In Cement Sand Mortar


Ratio ( 1:8 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand

100 Cft

Per % Cft

20 Nos
4 Bag
40 Cft

Each
Each
Per%Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.00 Nos
5.00 Nos
0.50 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 7

(0.02)
-

Say
Say

Say
Say

DESCRIPTION

OF

ITEM NO

2:

Coursed Rubble Masonry hammer dressed,


foundation and plinth.

a)

Dry Masonry
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.

100 Cft

Per % Cft

20 Nos

Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Total
Sundries
Total

3.00 Nos
3.00 Nos

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 8

Item No.

b)

In Mud Mortar
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth

100 Cft

Per % Cft

20 Nos
45 Cft

Each
Per% Cft

Total
Contractor's Profit & Ove ##### Percent
Total

300.00
300.00
60.00
360.00

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.00 Nos
4.00 Nos
0.50 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 9

360.00
127.13

Say
Say
Say
Say

360.00
127.15

Item No.

c)

In Lime Sand Mortar.

(Ratio 1:2)

Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or headers
Lime Slaked (Ground)
Sand

100 Cft

Per % Cft

20 Nos
5.33/ 199 Kg
26.67 Cft

Each
Per Per Kg
Per%Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.75 Nos
5.00 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 10

(0.01)

Say
Say

Say
Say

Item No.

d)
i)

In Cement Sand Mortar


Ratio ( 1:3 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand

100 Cft

Per % Cft

35 Nos
8 Bag
30 Cft

Each
Each
Per%Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.75 Nos
5.00 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 11

Item No.

d)
ii)

In Cement Sand Mortar


Ratio ( 1:4 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone including wastage
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(450x200x250mm) 35 Nos.
Cement
Sand

100 Cft

Per % Cft

35 Nos
6.40 Bag
32 Cft

Each
Each
Per%Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.75 Nos
5.00 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

0.01

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 12

Item No.

d)
iii)

In Cement Sand Mortar


Ratio ( 1:6 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(450x200x250mm) 35 Nos.
Cement
Sand

100 Cft

Per % Cft

35 Nos
4.57 Bag
34.20 Cft

Each
Each
Per%Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.75 Nos
5.00 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 13

Item No.

d)
iv)

In Cement Sand Mortar


Ratio ( 1:8 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand

100 Cft

Per % Cft

35 Nos
3.56 Bag
35.60 Cft

Each
Each
Per%Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.75 Nos
5.00 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 14

DESCRIPTION

OF

ITEM NO

3:

Random Rubble Masonry (uncoursed) in ground


floor or 20'(6 M) height,building/other than

a)

Dry Masonry
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.

100 Cft

Per % Cft

20 Nos

Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Total
Sundries
Total

2.50 Nos
3.00 Nos

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 15

Item No.

b)

In Mud Mortar
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth

100 Cft

Per % Cft

20 Nos
45 Cft

Each
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

3.00 Nos
4.00 Nos
0.50 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

0.01

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 16

Item No.

c)

In Lime Sand Mortar.

(Ratio 1:2)

Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Per % Cft

Through Stone or headers


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Lime Slaked (Ground)
Sand

20 Nos
224 Kg
30 Cft

Each
Per Per Kg
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.50 Nos
5.00 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 17

Item No.

d)
i)

In Cement Sand Mortar


Ratio ( 1:3 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand

100 Cft

Per % Cft

20 Nos
9 Bag
33.75 Cft

Each
Each
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.50 Nos
5.00 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

1.20

Say
Say

1.20

Page 18

Item No.

d)
ii)

In Cement Sand Mortar


Ratio ( 1:4 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone

100 Cft

Per % Cft

Through Stone or bond stone


Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand

20 Nos
7.2 Bag
36 Cft

Each
Each
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.50 Nos
5 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 19

Item No.

d)
iii)

In Cement Sand Mortar


Ratio ( 1:6 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Cement
Sand

100.00 Cft

Per % Cft

20 Nos
5.14 Bag
38.57 Cft

Each
Each
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.50 Nos
5.00 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

0.01
0.00

Say
Say

Page 20

Item No.

d)
iv)

In Cement Sand Mortar


Ratio ( 1:8 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250) 20 Nos.
Cement
Sand

100 Cft

Per % Cft

20 Nos
4 Bag
40 Cft

Each
Each
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

4.50 Nos
5.00 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 21

DESCRIPTION

OF

ITEM NO

4:

Coursed Rubble Masonry hammer dressed in


ground floor or 20' (6 M) height, building o
than building.

a)

Dry Masonry
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 20x1.5'x8"x10"
(457x200x250mm) 20 Nos.

100 Cft

Per % Cft

20 Nos

Each

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Total
Sundries
Total

3.50 Nos
3.50 Nos

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

0.01

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 22

Item No.

b)

In Mud Mortar
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Headers or through stones
Note: Special size of stone for headers
average size = 30x1.5'x8"x10"
(457x200x250mm) 20 Nos.
Good earth

100 Cft

Per % Cft

20 Nos
43 Cft

Each
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

5.00 Nos
5.00 Nos
0.50 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

0.01

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 23

Item No.

c)

In Lime Sand Mortar.

(Ratio 1:2)

Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone including wastage
Through Stone or headers
Lime Slaked (Ground)
Sand

100 Cft
20 Nos
5.33 Mds(19 9)Kg
26.67 Cft

Per % Cft

Each
Per Per Kg
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

5.50 Nos
5.50 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 24

0.01
(0.00)

Say
Say

Say
Say

Item No.

d)
i)

In Cement Sand Mortar


Ratio ( 1:3 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or headers
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250)
35 Nos.
Cement
Sand

100 Cft

Per % Cft

35 Nos
8 Bag
30 Cft

Each
Each
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

5.50 Nos
5.50 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 25

Item No.

d)
ii)

In Cement Sand Mortar


Ratio ( 1:4 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand

100 Cft

Per % Cft

35 Nos
6 Bag
32 Cft

Each
Each
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

5.50 Nos
5.50 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 26

Item No.

d)
iii)

In Cement Sand Mortar


Ratio ( 1:6 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand

100 Cft

Per % Cft

35 Nos
4.57 Bag
34.20 Cft

Each
Each
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

5.50 Nos
5.50 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 27

Item No.

d)
iv)

In Cement Sand Mortar


Ratio ( 1:8 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Through Stone or bond stone
Note: Special size of stone for headers
average size = 35x1.5'x8"x10"
(457x200x250mm) 35 Nos.
Cement
Sand

100 Cft

Per % Cft

35 Nos
3.56 Bag
35.60 Cft

Each
Each
Per % Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

5.50 Nos
5.50 Nos
0.75 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 28

DESCRIPTION

OF

ITEM NO

5:

Ashlar block in course or scabbled masonry


(including dressing etc.) in ground floor or
(6 M) height, Building other than building.
In Lime Sand.
(Ratio 1:2)

a)

Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Lime Slaked (Ground)
Sand
Charcoal
Steel

200
4Md (149.30
20
30Lb (13.61
3.3Lb (1.50

Cft
Kg)
Cft
Kg)
Kg)

Per
Per
Cft
Per
Per

% Cft
Kg.
Kg.
Kg.

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total

17.00
10.00
1.00
1.00
1.00

Nos
Nos
No
No
No

Per
Per
Per
Per
Per

Day
Day
Day
Day
Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Page 29

(0.01)

Say
Say

Say
Say

Item No.

b)
i)

In Cement Sand Mortar


Ratio ( 1:3 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel

200
6
22.50
30Lb (13.61
3.3Lb (1.50

Cft
Bag
Cft
Kg)
Kg)

Per % Cft
Each
Cft
Per Kg.
Per Kg.

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total

17.00
10.00
1.00
1.00
1.00

Nos
Nos
No
No
No

Per
Per
Per
Per
Per

Day
Day
Day
Day
Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

0.01

Say
Say

Page 30

Item No.

b)
ii)

In Cement Sand Mortar


Ratio ( 1:4 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel

200
4.80
24
30Lb (13.61
3.3Lb (1.50

Cft
Bag
Cft
Kg)
Kg)

Per % Cft
Each
% Cft
Per Per Kg
Per Per Kg

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total

17.00
10.00
1.00
1.00
1.00

Nos
Nos
No
No
No

Per
Per
Per
Per
Per

Day
Day
Day
Day
Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 31

Item No.

b)
iii)

In Cement Sand Mortar


Ratio ( 1:6 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel

200
3.44
25.70
30Lb (13.61
3.3Lb (1.50

Cft
Bag
Cft
Kg)
Kg)

Per % Cft
Each
Cft
Per Per Kg
Per Per Kg

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total

17.00
10.00
1.00
1.00
1.00

Nos
Nos
No
No
No

Per
Per
Per
Per
Per

Day
Day
Day
Day
Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 32

DESCRIPTION

OF

ITEM NO

6:

Ashlar fine masonry (including dressing etc.


ground floor or 20' (6 M) height, Building o
than building.
In Lime Sand Mortar.
(Ratio 1:2)

a)

Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Lime Slaked (Ground)
Sand
Charcoal
Steel

250 Cft
2Md (74.65 Kg)
10 Cft
0.73Md(27.2 5)Kg
4Lb (1.82 Kg)

Per
Per
Cft
Per
Per

% Cft
Per Kg
Per Kg
Per Kg

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total

40.00
8.00
1.00
1.50
1.50

Nos
Nos
No
No
No

Per
Per
Per
Per
Per

Day
Day
Day
Day
Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate Per 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate Per 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 33

Item No.

b)
i)

In Cement Sand Mortar


Ratio ( 1:3 )
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel

250
3
11.25
0.73Md (27.25
4Lb (1.82

Cft
Bag
Cft
Kg)
Kg)

Per % Cft
Each
Per % Cft
Per Per Kg
Per Per Kg

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total

40.00
8.00
1.00
1.50
1.50

Nos
Nos
No
No
No

Per
Per
Per
Per
Per

Day
Day
Day
Day
Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

0.01
0.00

Say
Say

Page 34

Item No.

b)
ii)

In Cement Sand Mortar


Ratio 1:4
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel

250
2.40
12
60Lb (27.22
4Lb (1.82

Cft
Bag
Cft
Kg)
Kg)

Per % Cft
Each
Per % Cft
Per Per Kg
Per Per Kg

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total

40.00
8.00
1.00
1.50
1.50

Nos
Nos
No
No
No

Per
Per
Per
Per
Per

Day
Day
Day
Day
Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

Say
Say

Page 35

Item No.

b)
iii)

In Cement Sand Mortar


Ratio 1:6
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Quarried Stone
Cement
Sand
Charcoal
Steel

250
1.73
13
60Lb (27.22
4Lb (1.82

Cft
Bag
Cft
Kg)
Kg)

Per % Cft
Each
Per % Cft
Per Per Kg
Per Per Kg

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Bahishti
Blacksmith
Bellow-man
Total
Sundries
Total

40.00
8.00
1.00
1.50
1.50

Nos
Nos
No
No
No

Per
Per
Per
Per
Per

Day
Day
Day
Day
Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft


Labour Rate P/ Cum

Rs.
Rs.

Say
Say

Composite Rate for 100 Cft


Composite Rate P/ Cum

Rs.
Rs.

0.01

Say
Say

Page 36

DESCRIPTION

OF

ITEM NO

7:

Extra labour on items 3,4,5 and 6 for work i

i)

First Floor
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Cft.


Mason
Unskilled Coolies
Total
Sundries
Total

0.40 No
1.35 No

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate for 100 Cft

Rs.

0.01

Say

Labour Rate P/ Cum

Rs.

0.00

Say

Page 37

tem No.

ii)

Second Floor

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Cft.


Mason
Unskilled Coolies
Total
Sundries
Total

1.20 No
2.60 Nos

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total for 125 Cft.
Rate for 100 Cft.

Labour Rate for 100 Cft

Rs.

Say

Labour Rate P/ Cum

Rs.

Say

Page 38

Item No.

iii)

Third Floor

Detail

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Cft.


Mason
Unskilled Coolies
Total
Sundries
Total

2 Nos
3.90 Nos

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total for 125 Cft.
Rate for 100 Cft.

Labour Rate for 100 Cft

Rs.

Say

Labour Rate P/ Cum

Rs.

Say

Page 39

Item No.

Fourth

iv)
Detail

Floor

Unit Rate (British System) per 100 Cft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Cft.


Mason
Unskilled Coolies
Total
Sundries
Total

3.60 Nos
5.60 Nos

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total for 125 Cft.
Rate for 100 Cft.

Labour Rate for 100 Cft

Rs.

Say

Labour Rate P/ Cum

Rs.

Say

Page 40

DESCRIPTION

OF

ITEM NO

8:

Extra labour on items 3,4,5 and 6 above for


5ft (1.5 M) additional height building other
building part thereof.

Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Cft.


Mason
Unskilled Coolies
Total
Sundries
Total

0.50 No
1 No

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Totalfor 125 Cft.
Rate for 100 Cft.

Labour Rate for 100 Cft

Rs.

Say

Labour Rate P/ Cum

Rs.

Say

Page 41

DESCRIPTION

OF

ITEM NO

9:

Extra labour for arch work in stone masonry


including centering and de-centering, etc.
Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material
Semi circular opening 15'x1.5'x1.5' = 33.8 Cft
Kikar wood = 3.75 Cft to be used for
60 times 3.75/60 = 0.06 Cft
0.06 Cft
Earth
2.00 Cft

Per Cft
% Cft

Contractor's Profit & Ove ##### Percent


Total for 33.8 Cft
Total for 100 Cft
19.8 x 100
33.8
Labour
Mason
Unskilled Coolies
Total
Sundries
Total

1.50 Nos
1.50 Nos

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total
Total (i+ii)

Labour Rate for 100 Cft

Rs.

Say

Labour Rate P/ Cum

Rs.

Say

Page 42

DESCRIPTION

OF

ITEM NO

10:

Extra labour for :-

a)

Coping and caps etc


Unit Rate (British System) per 100 Cft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Material for 125 Cft.


Stone 12" (300mm) and above
Steel
Charcoal

30 Cft
0.75Lb (0.34 Kg)
10Lb (4.54 Kg)

Per % Cft
Per Kg.
Per Kg.

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Total
Sundries
Total

18.00 Nos

Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total for 125 Cft.
Rate for 100 Cft.

Extra Rate Per 100 Cft

Rs.

Say

Extra Rate P/ Cum

Rs.

Say

Page 43

tem No.

10

b)

Cornice and string course


Unit Rate (British System) per 100 Rft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Rft


Mason
Total
Sundries
Total

18 Nos

Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total for 125 Rft
Rate for 100 Rft

Labour Rate for 100 Rft

Rs.

Say

Labour Rate P/ LM.

Rs.

Say

Page 44

DESCRIPTION

OF

ITEM NO

11:

Dressing Stones

a)

Hammer Dressed
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Sft


Mason
Unskilled Coolies
Total
Sundries
Total

5 Nos
2.50 Nos

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total for 125 Sft
Rate for 100 Sft.

Labour Rate for 100 Sft

Rs.

Say

Labour Rate P/ Sq.m

Rs.

Say

Page 45

tem No.

11

b)

Rough tooled dressed


Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Sft


Mason
Unskilled Coolies
Total
Sundries
Total

10 Nos
4 Nos

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total for 125 Sft
Rate for 100 Sft

Labour Rate for 100 Sft

Rs.

Say

Labour Rate P/ Sq.m

Rs.

Say

Page 46

tem No.

11

c)

Chisel dressed

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Sft


Mason
Unskilled Coolies
Total
Sundries
Total

12 Nos
5 Nos

Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total for 125 Sft
Rate for 100 Sft

Labour Rate for 100 Sft

Rs.

Say

Labour Rate P/ Sq.m

Rs.

Say

Page 47

tem No.

11

d)

Fine dressed
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs)

Amount (Rs)

Labour for 125 Sft


Mason
Unskilled Coolies
Blacksmith
Total
Sundries
Total

28 Nos
5 Nos
1 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total for 125 Sft
Rate for 100 Sft

Labour Rate for 100 Sft

Rs.

Say

Labour Rate P/ Sq.m

Rs.

Say

Page 48

DESCRIPTION

OF

ITEM NO

12:

Dhajji walling 5"x5" (125x125mm) thick


deodar framing with stone laid in 1:6 cement
sand mortar and (1:4) cement sand plaster on
both sides.
Unit Rate (British System) per 100 Sft

Detail

Qty
Rate Analysis for

Rate
Per Unit (Rs)

Amount (Rs)

234 Sft

a) Detail of Wood
i)Top bottom
2x18'x5x5 =
6.25 Cft
12x12
iiVertical post 4" (100mm) apart
6x13'x5/12x5/12 = 13.55 Cft
iii) Horizontal Pieces
3x18'x5/12x
=
5.62 Cft
iv) Diagonl Strutts
20x6x5/12x1/6
=
6.25 Cft
31.67 Cft
Wastage 20%

6.33

38.00 Cft
This wood can be used 10 time hence
wood for our operation would be = 38/10
3.80 Cft
b) Stone (Quarried)
1x18x13x5/12
Deduct Scantling

=
=

98.00 Cft
32.00 Cft
66.00 Cft
112 Cft

Therefore stone required = 66 x 2


Material
Wood as above 2nd Class
Spikes " (20mm)
Wire nail 4" (100mm)
Wood preservative
Stone quarried
Cement for 1:6 ratio for laying
Cement for plastering " thick both
side (1:4)

Page 49

3.80
0.333
0.333
0.304
112.00
3.00

Cft
Kg.
Kg.
Ltr
Cft
Bag

3.40 Bag

Cft
Per
Per
Per
Per
Per

Per Bag

Kg.
Kg.
Litre
% Cft
Bag

Item No.

12
Unit Rate (British System) per 100 Sft

Detail

Qty

Sand
Steel
Coal

40 Cft
3Lb (1.36 Kg)
0.5Md (18.66 Kg)

Rate
Per Unit (Rs)

% Cft
Per Kg.
Per Kg.

Total
Contractor's Profit & Ove ##### Percent
Total

Amount (Rs)

Labour
Carpenters for wood work
UnsKilled Coolies
Masons for dressing of stones including
laying
Unskilled Coolies for laying
Masson for plaster
Unskilled Coolies
Blacksmith
Bellow-man
Total
Sundries
Total

4.00 Nos
2.00 Nos
10.00
5.00
3.00
3.00
0.50
0.50

Nos
Nos
Nos
Nos
No
No

Per Day
Per Day

Per
Per
Per
Per
Per
Per

Day
Day
Day
Day
Day
Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total for 234 Sft
Rate for 100 Sft

Labour Rate for 100 Sft


Labour Rate P/ Sqm

Rs.
Rs.

Say
Say

Composite Rate for 100 Sft


Composite Rate P/ Sqm

Rs.
Rs.

Say
Say

Page 50

DESCRIPTION

OF

ITEM NO

13:

Providing and fixing stone blocks from 2 Cft


Cft (0.06 to 017 M) each, including lift up
20' (6 M).
Unit Rate (British System) per Cft

Detail

Qty
Rate Analysis

for

Rate
Per Unit (Rs)

Amount (Rs)

4 Cft

Material
Hand dressed stone average 4 Cft
Cement
Sand

1
0.06
0.30

No
Bag
Cft.

Each
Bag
% Cft

Total
Contractor's Profit & Ove ##### Percent
Total

Labour
Mason
Unskilled Coolies
Blacksmith
Total
Sundries
Total

0.25 No
2.00 Nos
0.12 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total for 4 Cft
Rate for Per Cft

Labour Rate Per Cft


Labour Rate P/ Cum

Rs.
Rs.

(0.08)

Say
Say

Composite Rate Per Cft


Composite Rate P/ Cum

Rs.
Rs.

(0.30)

Say
Say

Page 51

(0.30)

DESCRIPTION

OF

ITEM NO

14:

Providing and fixing stone blocks under 2 Cf


(0.05 M) each, including lift upto 20 Cft (

Unit Rate (British System) per Cft

Detail

Qty

Material

Rate Analysis

for

1 No
0.03 Bag
0.17 Cft.

Total
Contractor's Profit & Ove ##### Percent
Total
Rate Analysis

for

Each
Bag
% Cft

0.01
0.01

0.01
2.00

1 Cft

Mason
Unskilled Coolies
Blacksmith
Total
Sundries
Total

Amount (Rs)

2 Cft

Hand dressed stone average (2 Cft)


Cement
Sand

Labour

Rate
Per Unit (Rs)

0.05 No
0.25 No
0.03 No

Per Day
Per Day
Per Day

##### Percent

Contractor's Profit & Ove ##### Percent


Total

Labour Rate Per Cft


Labour Rate P/ Cum

Rs.
Rs.

0.25

Say
Say

0.25

Composite Rate Per Cft


Composite Rate P/ Cum

Rs.
Rs.

0.01
0.33

Say
Say

0.35

Page 52

CHAPTER NO. 20

SURFACE DRAINAGE
DESCRIPTION

OF

ITEM NO

1:

Tega formed of pacca bricks on end, laid in and over cement


sand mortar projecting to a height of not more than 6"
(150mm) top of drain along the property side where required,
laid to lines, grades, slopes and shape according to the
engineer's drawing.

a)
i)

3" (75mm) Thick.


Ratio (1:3)
Unit Rate (British System) per 100 Rft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand
Bricks

0.96 Bag
3.20 Cft
260.00 Nos

0.00 Each
0.00 P. Cft
0.00 Per 1000 No

Total
Contractor's Profit & Ove 20 Percent
Total

312.00
312.00
62.40
374.40

Labour for 125 Rft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.67 No
1.00 No
0.25 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

374.39
12.08

Say
Say

374.40
12.10

Page 1

Item No.

Tega formed of pacca bricks on end, laid in and over cement


sand mortar projecting to a height of not more than 6"
(150mm) top of drain along the property side where required,
laid to lines, grades, slopes and shape according to the
engineer's drawing.

a)
ii)

3" (75mm) Thick.


Ratio (1:5)

Detail

Unit Rate (British System) per 100 Rft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand
Bricks

0.64 Bag
4.00 Cft
260.00 Nos

0.00 Each
0.00 P. Cft
0.00 Per 1000 No

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Rft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.67 No
1.00 No
0.25 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 2

Item No.

Tega formed of pacca bricks on end, laid in and


over cement sand mortar projecting to a height of
not more than 6" (150mm) top of drain along the
property side where required, laid to lines,
grades, slopes and shape according to the
engineer's drawing.
b)
i)

4" (115mm) Thick.


Ratio (1:3)
Unit Rate (British System) per 100 Rft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand
Bricks

1.30 Bag
4.70 Cft
380.00 Nos

0.00 Each
0.00 P. Cft
0.00 Per 1000 No

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Rft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.00 No
1.50 No
0.38 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.01
0.00

Say
Say

Page 3

Item No.

Tega formed of pacca bricks on end, laid in and


over cement sand mortar projecting to a height of
not more than 6" (150mm) top of drain along the
property side where required, laid to lines,
grades, slopes and shape according to the
engineer's drawing.
b)
ii)

4" (115mm) Thick.


Ratio (1:5)
Unit Rate (British System) per 100 Rft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand
Bricks

0.83 Bag
5.20 Cft
380.00 Nos

0.00 Each
0.00 P. Cft
0.00 Per 1000 No

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Rft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.00 No
1.50 No
0.38 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Rft
Labour Rate Per Rm
Composite Rate Per 100 Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 4

DESCRIPTION

OF

ITEM NO

2:

a)

Pacca flat brick 3" (75mm) thick, laid in


reimbursement, in cement, sand mortar on sides
of drains and in other works where required. All
joints to be completely filled and struck flush.
Ratio

(1:3)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Pacca Bricks
Cement
Sand

350.00 Nos
1.50 Bag
5.60 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.00 No
1.50 No
0.33 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.01
0.00

Say
Say

Page 5

Item No.

Pacca flat brick 3" (75mm) thick, laid in


reimbursement, in cement, sand mortar on sides
of drains and in other works where required. All
joints to be completely filled and struck flush.
b)

Ratio

(1:5)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

350.00 Nos
1.00 Bag
6.25 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.00 No
1.50 No
0.33 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 6

Item No.

Pacca flat brick 3" (75mm) thick, laid in


reimbursement, in cement, sand mortar on sides
of drains and in other works where required. All
joints to be completely filled and struck flush.
c)

Ratio

(1:6)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

350.00 Nos
0.86 Bag
6.40 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.00 No
1.50 No
0.33 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 7

DESCRIPTION

OF

ITEM NO

3:

a)

Pacca brick on edge, laid in reimbursement, in


cement, sand mortar on sides of drains and in
other works where required. All joints to be
completely filled and struck flush.
Ratio

(1:3)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

525.00 Nos
2.30 Bag
8.55 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.50 No
2.00 No
0.50 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 8

Item No.

Pacca brick on edge, laid in reimbursement, in


cement, sand mortar on sides of drains and in
other works where required. All joints to be
completely filled and struck flush.
b)

Ratio

(1:5)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

525.00 Nos
1.50 Bag
9.50 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.50 No
2.00 No
0.50 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 9

Item No.

Pacca brick on edge, laid in reimbursement, in


cement, sand mortar on sides of drains and in
other works where required. All joints to be
completely filled and struck flush.
c)

Ratio

(1:6)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

525.00 Nos
1.30 Bag
9.78 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.50 No
2.00 No
0.50 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
-0.01

Say
Say

Page 10

DESCRIPTION

OF

ITEM NO

4:

a)

Pacca flat brick, herring bond pitching in cement,


sand mortar laid to lines, grades, shapes and
slopes as per Engineer's Drawing.
Ratio

(1:3)
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

350.00 Nos
1.50 Bag
5.60 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.75 No
1.50 No
0.50 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 11

Item No.

Pacca flat brick, herring bond pitching in cement,


sand mortar laid to lines, grades, shapes and
slopes as per Engineer's Drawing.
b)

Ratio

(1:5)
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

350.00 Nos
1.00 Bag
6.25 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.75 No
1.50 No
0.50 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 12

Item No.

Pacca flat brick, herring bond pitching in cement,


sand mortar laid to lines, grades, shapes and
slopes as per Engineer's Drawing.
c)

Ratio

(1:6)
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

350.00 Nos
0.86 Bag
6.40 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

0.75 No
1.50 No
0.50 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 13

DESCRIPTION

OF

ITEM NO

5:

a)

Pacca brick on edge, herring bond pitching in


cement, sand mortar laid to lines, grades, shapes
and slopes as per Engineer's Drawing.
Ratio

(1:3)
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

525.00 Nos
2.30 Bag
8.55 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.00 No
2.80 Nos
0.50 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 14

Item No.

Pacca brick on edge, herring bond pitching in


cement, sand mortar laid to lines, grades, shapes
and slopes as per Engineer's Drawing.
b)

Ratio

(1:5)
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

525.00 Nos
1.50 Bag
9.50 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.00 No
2.80 Nos
0.50 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 15

Item No.

Pacca brick on edge, herring bond pitching in


cement, sand mortar laid to lines, grades, shapes
and slopes as per Engineer's Drawing.
c)

Ratio

(1:6)
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Bricks
Cement
Sand

525.00 Nos
1.30 Bag
9.78 Cft

0.00 Per 1000 No


0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 125 Sft


Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.00 No
2.80 Nos
0.50 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 16

DESCRIPTION

OF

ITEM NO

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades, slopes
and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).

6:

a)

Type I

Detail

Unit Rate (British System) per Rft


Qty

CC 1:6:12
1x100x5/6'x1/6'

Rate
Per Unit (Rs.)

Amount (Rs.)

13.89 Cft
Say: 13.90 Cft

CC 1:2:5
1x100x5/6'x11/24'

38.19 Cft

D/D 1x100x22/7xxxx

2.45 Cft

D/D 1x100x(6"+10")x"
2

2.78 Cft
32.96 Cft
Say: 33.00 Cft

Surface Rendering
1x100x22/7x3/12'
1x100x(2"+2")
12

78.57 Sft
33.33 Sft
111.90 Sft
Say: 112 Sft

Material
Cement for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
" Cement PLaster 1:1
Sand for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
" Cement PLaster 1:1

0.90
4.78
1.03
6.71

Bag
Bag
Bag
Bag

0.00 Each

6.81
14.95
1.29
23.05

Cft
Cft
Cft
Cft

0.00 P. Cft

Page 17

a)

Type I

Detail

Unit Rate (British System) per Rft


Qty

Brick ballast 1:6:12


Bajri for 1:2:5

13.62 Cft
29.70 Cft

Rate
Per Unit (Rs.)

0.00 P. Cft
0.00 P. Cft

Amount (Rs.)

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

1.50 No
3.00 Nos
0.75 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.05
0.26

Say
Say

0.05
0.25

Rs.
Rs.

0.10
0.33

Say
Say

0.10
0.35

Page 18

Item No.

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades,
slopes and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).
b)
Detail

Type II
Unit Rate (British System) per Rft
Qty

CC 1:6:12
1x100x(1'-2"+1'-8")x7"
88.10
2
Deduction.
1x100x(8"+11")x4"
28.77
2
Net Total
59.33
CC 1:2:5
1x100x(11"+8")x4"
28.77
2
1x100x(1-8")x4"
56.94
Total
85.71
Deduction.
1x100x0.82
8.20
1x100(7 3/8"+10") 2 1/8"
17.34
2
1x100(10"+1"-8")x0.87
4.21
2
Total
29.75
85.71 - 29.75
Net Tot 55.96
Surface Rendering
With Cement Sand Mortar1:1of" thick
220.00
Material
Cement for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
" Cement PLaster 1:1
Sand for.
Cement Concrete 1:6:12
Cement Concrete 1:2:5
" Cement PLaster 1:1

Rate
Per Unit (Rs.)

Amount (Rs.)

Cft

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Sft

3.84
5.62
2.27
11.73

Bags
Bags
Bags
Bags

0.00 Each

28.86
17.54
2.86
49.26

Cft
Cft
Cft
Cft

0.00 P. Cft

Page 19

b)

Type II

Detail

Unit Rate (British System) per Rft


Qty

Brick ballast for 1:6:12


Bajri for 1:2:5

57.70 Cft
35.10 Cft

Rate
Per Unit (Rs.)
0.00 P. Cft
0.00 P. Cft

Amount (Rs.)
-

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

3.00 Nos
6.00 Nos
1.50 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 20

Item No.

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades,
slopes and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).
c)
Detail

Type III
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-3 5/8"+1'-11")
2
2'x100'x4"x1"
Total
Deduction.
1x100x(8"+1'-")x5"
2
Net Total
CC 1:2:5
1x100(8"+1'-2") 5"
2
1x100x1'-11"x4"
Total
Deduction.
1x100x.082
1x100(7-3/8"+1'-")6"
2
1x100(1'-"+1'-11")x"
2
Total
107.81 - 58.84
Net Total
Surface Rendering.
Surface Area.
1x9.4'x100
12
2x6"x100
12

117.33 Cft
9.38 Cft
126.71 Cft
40.93 Cft
85.78 Cft
43.92 Cft
63.89 Cft
107.81 Cft
8.20 Cft
41.40 Cft

9.24 Cft
58.84 Cft
48.97 Cft

78.33 Sft

108.33 Sft

Page 21

Rate
Per Unit (Rs.)

Amount (Rs.)

c)

Type III
Unit Rate (British System) per Rft

Detail

Qty

2x5"x100
12
Material
Cement
Cement
Cement
Cement

Sand
Sand
Sand
Sand

Required.
for.
Concrete 1:6:12
Concrete 1:2:5
for Surface rendering

Say
for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Bajri for 1:2:5

Rate
Per Unit (Rs.)

Amount (Rs.)

87.50 Sft
274.16 Sft
Say: 274.20 Sft
5.57
7.10
2.52
15.19
15.00

Bags
Bags
Bags
Bags

40.00
22.00
3.00
65.00
84.00
44.07

Cft
Cft
Cft
Cft
Cft
Cft

0.00 Each

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti

2.75 Nos
10.00 Nos
1.30 Nos

0.00 P. Day
0.00 P. Day
0.00 P. Day

Total
Sundries
10 Percent
Total
Contractor's Profit & Ove 20 Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 22

Item No.

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades,
slopes and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).
d)
Detail

Type IV
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-3 "+2'-1")x11"
2
2x100x4"x1"
Total
Deduction.
1x100x(8"+1-3")x8"
2
Net Total
CC 1:2:5
1x100(8"+1'-4") 8"
2
1x100x2'-1"x4"
Total
Deduction.
1x100x0.082
1x100(7'-3/8"+1'-2")x8"
2
1x100(1'-2"+2'-1")x"
2
Total
141.74 - 85.82
Net Total
Surface Rendering.
1x9.4/1x100
12
2x5x100
12
2x9x100
12

Rate
Per Unit (Rs.)

164.73 Cft
9.38 Cft
174.11 Cft
69.35 Cft

104.76 Cft
71.60 Cft
70.14 Cft
141.74 Cft
8.20 Cft
67.20 Cft
10.42 Cft
85.82 Cft
55.92 Cft
78.33 Sft
87.50 Sft
158.33 Sft
324.16 Sft
Say: 324.16 Sft

Page 23

Amount (Rs.)

d)

Type IV

Detail

Unit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material Required.
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand

for.
for 1:6:12
for 1:2:5
for Surface rendering

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5

6.81
8.11
2.98
17.90

Bags
Bags
Bags
Bags

0.00 Each

51.33
25.33
3.73
80.39
102.66
50.33

Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

3.25 Nos
11.83 Nos
1.67 Nos

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
-0.05

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 24

Item No.

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades,
slopes and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).
e)
Detail

Type V
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-7"+2'-3")x10"
2
2x100x(6"x4")5"
2

170.44 Cft

44.01 Cft
Total

Deduction.
1x100x(8"+1'-2")x7"
2
Net Total
CC 1:2:5
1x100(8"+1'-6")x1'-1"
2
1x100x2'-3"x4"
Total
Deduction.
1x100x0.082
1x100(7-3/8"+1'-5")x11"
2
1x100(1-5"+2'-3")x"
2
Total
97.83 - 120.40
Net Total
Surface Rendering with 1:1 C/S.
Mortor " thick.
1x9.4"x100
12

214.45 Cft
59.24 Cft
155.21 Cft

120.75 Cft
77.08 Cft
197.83 Cft
8.20 Cft
100.48 Cft

11.72 Cft
120.40 Cft
77.43 Cft

78.33 Sft

Page 25

Rate
Per Unit (Rs.)

Amount (Rs.)

e)

Type V

Detail

Unit Rate (British System) per Rft


Qty

2x5"x100
12
2x1'-1"x100

Sand
Sand
Sand
Sand

Amount (Rs.)

87.50 Sft

Total
Material
Cement
Cement
Cement
Cement

Rate
Per Unit (Rs.)

Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering

for.
for 1:6:12
for 1:2:5
for Surface rendering

216.66 Sft
382.49 Sft
Say: 382.50 Sft
9.96
11.22
3.52
24.70
75.00
35.00
4.40
114.40
150.15
69.70

Brick ballast for 1:6:12


Stone Bajri for 1:2:5

Bags
Bags
Bags
Bags

0.00 Each

Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

4.00 Nos
16.00 Nos
2.20 No

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
-0.02

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 26

Item No.

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades,
slopes and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).
f)
Detail

Type VI
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-7"+2'-6")x1-1"
2
2x100x(6"x4")5"
2

Rate
Per Unit (Rs.)

230.25 Cft
42.01 Cft

Total
Deduction.
1x100x(8"+1-5 1/8")x10"
2
Net Total
CC 1:2:5
1x100(8"+1'-9 1/8")x1'-4"
2
1x100x2'-6-1/8"x4"
Total
Deduction.
1x100(7'-3/8"+1'-7 5/8")x1'-2"
2
1x100(1'-7 5/8"+2'-6 1/8")x0.75"
2
1x100x0.082
Total
45.49 - 159.44
Net Total
Surface Rendering.
1x9.4x100
12
2x5"x100
12
2x1'-4/12"x100

272.26 Cft
91.58 Cft
180.68 Cft
161.81 Cft
83.68 Cft
245.49 Cft
138.28 Cft
12.96 Cft
8.20 Cft
159.44 Cft
86.05 Cft
78.33 Sft
87.50 Sft

Total

266.66 Sft
432.49 Sft
Say: 432.50 Sft

Page 27

Amount (Rs.)

f)

Type VI

Detail

Unit Rate (British System) per Rft


Qty

Material
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand

Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5

Rate
Per Unit (Rs.)

Amount (Rs.)

11.74
12.48
3.98
28.20

Bags
Bags
Bags
Bags

0.00 Each

88.53
38.98
4.97
132.48
177.07
77.45

Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

4.55 Nos
18.50 Nos
2.50 Nos

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 28

Item No.

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades,
slopes and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).
g)
Detail

Type VII
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-7"+2'-8")x1-4 3/8"
2
2x100x(6"x4")5"
2

292.82 Cft
40.10 Cft

Total
Deduction.
1x100x(8"+9'-7")1'-1 3/8"
2
Net Total
CC 1:2:5
1x100(8"+1'-11")1'-6.5/8"
2
1x100x2'-8"x4"
Total
Deduction.
1x100x0.082
1x100(7 3/9"+1'-10")1'-5"
2
1x100(1'-10"+2'-8")x7/8"
2
Total
93.99 - 203.28
Net Total
Surface Rendering with 1:1 CS mortor.
1x9.4x100
12

332.92 Cft

127.71 Cft
205.21 Cft
203.71 Cft
90.28 Cft
293.99 Cft
8.20 Cft
178.52 Cft
16.56 Cft
203.28 Cft
90.71 Cft

78.33 Sft

Page 29

Rate
Per Unit (Rs.)

Amount (Rs.)

g)

Type VII

Detail

Unit Rate (British System) per Rft


Qty

2x5"x100
12
2x1'-7/12"x100
Material Required.
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand

for.
for 1:6:12
for 1:2:5
for Surface rendering

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5

Rate
Per Unit (Rs.)

Amount (Rs.)

87.50 Sft
316.66 Sft
482.49 Sft
Say: 482.50 Sft
13.34
13.15
4.44
30.93

Bags
Bags
Bags
Bags

0.00 Each

100.55
41.09
5.55
147.19
201.00
81.64

Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft
0.90 P. Cft
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti

5.04 Nos
20.50 Nos
2.78 Nos

0.00 P. Day
0.00 P. Day
0.00 P. Day

Total
Sundries
10 Percent
Total
Contractor's Profit & Ove 20 Percent
Total
Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

-0.01
-0.01

Say
Say

Rs.
Rs.

-0.01
-0.03

Say
Say

Page 30

Item No.

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades,
slopes and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).
h)
Detail

Type VIII
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-7"+2'-10 7/8")1' 7"
2x100x(6"+4")5"
2
Total
Deduction.
1x100x(8"+1'-9 7/8")1'-4"
2
Net Total
CC 1:2:5
1x100(8"+2-1 7/8")1'-9"
2
1x100(2'-10 7/8")4"
Total

355.43 Cft
40.10 Cft
395.53 Cft
165.97 Cft
229.56 Cft
249.95 Cft
96.88 Cft
346.83 Cft

Deduction.
1x100x0.082
1x100(7 3/8"+2'-3/8")1'-8"
2
1x100(2'-3/8"+2'-10 7/8")x"
2
Total
6.83 - 247.05
Net Total

8.20 Cft
223.42 Cft
15.43 Cft
247.05 Cft
99.78 Cft

Surface Rendering with 1:1 CS mortor.


1x9.4/x100
12

78.33 Sft

Page 31

Rate
Per Unit (Rs.)

Amount (Rs.)

h)

Type VIII

Detail

Unit Rate (British System) per Rft


Qty

2x5"x100
12
2x1'-10.1/12"x100

Sand
Sand
Sand
Sand

Amount (Rs.)

87.50 Sft
375.00 Sft
540.83 Sft

Material Required.
Cement
Cement
Cement
Cement

Rate
Per Unit (Rs.)

Say :

for.
for 1:6:12
for 1:2:5
for Surface rendering

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5

540.85 Sft

14.92
14.50
4.98
34.40

Bags
Bags
Bags
Bags

0.00 Each

112.48
45.30
6.22
164.00
250.00
90.00

Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

5.63 Nos
22.90 Nos
3.10 Nos

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 32

Item No.

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades,
slopes and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).
i)
Detail

Type IX
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-10 3/8"+3'-3")x1'-8"
2
2x100x(7"+4")9"
2
Total
Deduction.
1x100x(9 3/8"+1'-11")x1'-4"
2
Net Total
CC 1:2:5
1x100(9 3/8"+2'-6")x2'-1"
2
1x100(3'-3")4"
Total
Deduction.
1x100x0.082
1x100(7 3/8"+2'-11/2")x2'-"
2
1x100(2'-2"+3'-3")x"
2
Total
0.11 - 303.80
Net Total
Surface Rendering with (1:) C/S Mortar.
1x9.4/x100
12
2x6x100
12

427.99 Cft

80.30 Cft
508.29 Cft
181.22 Cft
327.07 Cft
347.45 Cft
122.66 Cft
470.11 Cft
8.20 Cft
278.41 Cft
17.19 Cft
303.80 Cft
166.31 Cft
78.33 Sft
104.17 Sft

Page 33

Rate
Per Unit (Rs.)

Amount (Rs.)

i)

Type IX

Detail

Unit Rate (British System) per Rft


Qty

2x1'-10.1/12"x100
Material
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand

Rate
Per Unit (Rs.)

Amount (Rs.)

375.00 Sft
557.50 Sft

Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5

21.26
24.11
5.13
50.50

Bags
Bags
Bags
Bags

0.00 Each

160.26
75.34
6.41
242.01
320.53
149.68

Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

6.66 Nos
31.91 Nos
4.03 Nos

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 34

Item No.

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades,
slopes and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).
j)
Detail

Type X
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-10"+3'-5")x1'-10"
2
2x100x(8"+4")9"
2

503.91 Cft

82.47 Cft
Total

Deduction.
1x100x(9"+2'-1")1'-6"
2
Net Total
CC 1:2:5
1x100(9"+2'-8")2'-4"
2
1x100x3'-5"4"
Total

586.38 Cft

226.43 Cft
359.95 Cft
410.76 Cft
130.47 Cft
541.23 Cft

Deduction.
1x100x0.082
1x100(7' 3/8"+2'-5")2'-2"

23

1x100(2'-5"+3'-5")x"
2
Total
- 360.49
Net Total
Surface Rendering with (1:1) Cement
Sand Mortar.

8.20 Cft
333.86 Cft
18.43 Cft
360.49 Cft
180.74 Cft

620.00 Sft

Page 35

Rate
Per Unit (Rs.)

Amount (Rs.)

j)

Type X

Detail

Unit Rate (British System) per Rft


Qty

Material
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand

Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5

Rate
Per Unit (Rs.)

Amount (Rs.)

23.40
26.20
5.70
55.30

Bags
Bags
Bags
Bags

0.00 Each

176.37
81.85
7.13
265.35
352.75
162.61

Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

7.35 Nos
35.00 Nos
4.43 Nos

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.00
0.00

Say
Say

Page 36

Item No.

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades,
slopes and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).
k)
Detail

Type XI
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-10"+3'-8")x2'-1 3/8"
2
2x100x(8"+4")9"
2

599.05 Cft
82.47 Cft

Total
Deduction.
1x100x(9"+2'-4")1'-9"
2
Net Total
CC 1:2:5
1x100(9"+2'-11")2'-7"
1x100x3'-8"x4"
Total
Deduction.
1x100x0.082
1x100(7' 3/8"+2'-7")2'-5"
2
1x100(2'-7"+3'-8")x"
2
Total
.27 - 428.70
Net Total
Surface Rendering with (1:1) Cement
Sand Mortar.

681.52 Cft

285.09 Cft
396.43 Cft
490.99 Cft
138.28 Cft
629.27 Cft

8.20 Cft
400.71 Cft
19.79 Cft
428.70 Cft
200.57 Cft

711.70 Sft

Page 37

Rate
Per Unit (Rs.)

Amount (Rs.)

k)

Type XI

Detail

Unit Rate (British System) per Rft


Qty

Material
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand

Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5

Rate
Per Unit (Rs.)

Amount (Rs.)

25.77
29.08
6.55
61.40

Bags
Bags
Bags
Bags

0.00 Each

194.25
91.12
8.18
293.55
388.50
180.51

Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Unskilled Cooly
Bahishti
Total
Sundries
Total

8.34 Nos
38.94 Nos
4.96 Nos

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

-0.02
-0.02

Say
Say

Page 38

Item No.

Constructing Punjab standard drains of cement


concrete 1:2:5 with cement concrete bedding
ratio 1:6:12 complete, laid to lines, grades,
slopes and shapes, rendering exposed surface of
concrete with 1:1 cement sand mortar "(6mm)
thick as per Engineers Drawing (excluding
Excavation).
l)
Detail

Type XII
Unit Rate (British System) per Rft
Qty

Material
CC 1:6:12
1x100(1'-10"+3'-10")x2'-4"
2
2x100x(8"+4")9"
2

84.63 Cft
Total

Deduction.
1x100x(9"+2'-6")2'-"
2
Total
CC 1:2:5
1x100(9"+3'-1")2'-10"
1x100x3'-10"x4"
Total
Deduction.
1x100x0.082
1x100(7' 3/8"+2'-10")2'-8"
2

90

681.72 Cft

1x100(2'-10"+3'-10")x"
2
Total
- 495.98
Net Total
Surface Rendering with (1:1) Cement
Sand Mortar.

766.35 Cft
338.91 Cft
427.44 Cft

557.81 Cft
146.09 Cft
703.90 Cft

8.20 Cft
466.17 Cft

21.61 Cft
495.98 Cft
207.92 Cft

765.82 Sft

Page 39

Rate
Per Unit (Rs.)

Amount (Rs.)

l)

Type XII

Detail

Unit Rate (British System) per Rft


Qty

Material
Cement
Cement
Cement
Cement
Sand
Sand
Sand
Sand

Required.
for.
for 1:6:12
for 1:2:5
for Surface rendering

for.
for 1:6:12
for 1:2:5
for Surface rendering

Brick ballast for 1:6:12


Stone Bajri for 1:2:5

Rate
Per Unit (Rs.)

Amount (Rs.)

27.78
30.15
7.05
64.98

Bags
Bags
Bags
Bags

0.00 Each

209.45
94.19
7.05
310.69
418.90
187.12

Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour
Mason
Cooly
Bahishti
Total
Sundries
Total

8.89 Nos
41.50 Nos
5.30 Nos

0.00 P. Day
0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

-0.05
-0.01

Say
Say

Page 40

DESCRIPTION

OF

ITEM NO

7:

Laying RC hume pipes in positions, including


jointing.

a)

6" to 12" (150 to 300mm) Dia.

Detail

t Rate (British System) per Rft/Assumed for 40


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand

0.25 Bags
1.20 Cft

0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 50 Lft


Mason
Unskilled Cooly
Total
Sundries
Total

1.00 No
4.00 Nos

0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.25
0.87

Say
Say

Page 41

0.25
0.85

Item No.

Laying RC hume pipes in positions, including


jointing.
b)

12" to 24" (300 to 600mm) Dia.

Detail

t Rate (British System) per Rft/Assumed for 40


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand

0.50 Bags
2.40 Cft

0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 50 Lft


Mason
Unskilled Cooly
Total
Sundries
Total

1.00 No
7.00 Nos

0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.55
1.80

Say
Say

Page 42

0.55
1.80

Item No.

Laying RC hume pipes in positions, including


jointing.
c)

24" to 36" (600 to 900mm) Dia.

Detail

t Rate (British System) per Rft/Assumed for 40


Qty

Rate
Per Unit (Rs.)

Amount (Rs.)

Material
Cement
Sand

0.75 Bags
3.75 Cft

0.00 Each
0.00 P. Cft

Total
Contractor's Profit & Ove 20 Percent
Total

Labour for 50 Lft


Mason
Unskilled Cooly
Total
Sundries
Total

2.00 No
8.00 Nos

0.00 P. Day
0.00 P. Day

10 Percent

Contractor's Profit & Ove 20 Percent


Total

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Rs.
Rs.

0.00
0.00

Say
Say

Rs.
Rs.

0.80
2.62

Say
Say

Page 43

CHAPTER NO. 12

WOOD WORK
DESCRIPTION

OF

ITEM NO.

1:
a)

Detail

Plain wood work sawn wrought planed & fixed


in position including cost of nails & screw
Deodar Wood.
Unit Rate (British System) per Cft
Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Deodar Wood including wastage (II Class)
Nail
Screws above 1" long
Total
Contractor's Profit & Ove
Total

20

1.15 Cft
0.020 Kg.
1.00 Dozen

0.00 P. Cft
0.00 P. Cft
0.00 P.Doz

Percent

Labour
Carpentre
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.63 No
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Cft
Labour Rate Per Cum
Composite Rate Per Cft
Composite Rate Per Cum

Page 1

0.00 P. Day
0.00 P. Day

Rs.
Rs.

0.01
0.23

Say
Say

0.25

Rs.
Rs.

#####
#####

Say
Say

(0.10)
(5.00)

Item No.

Plain wood work sawn wrought planed & fixed


in position including cost of nails & screw
Shisham Wood

b)
Detail

Unit Rate (British System) per Cft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Shisham wood including 15% wastage
Nail
Screws above 1" long
Total
Contractor's Profit & Ove
Total

20

1.15 Cft
0.023 Kg.
1.00 Dozen

0.00 P. Cft
0.00 P. Cft
0.00 P.Doz

Percent

Labour for 1.50 Cft.


Carpenters
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total
Labour for 1 Cft.

1.00 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Cft
Labour Rate Per Cum
Composite Rate Per Cft
Composite Rate Per Cum

Page 2

0.00 P. Day
0.00 P. Day

Rs.
Rs.

0.10

Say
Say

0.10

Rs.
Rs.

#####
#####

Say
Say

(0.30)
(10.40)

DESCRIPTION

OF

ITEM NO.

2:

Plain wood work for regulation karries or


needles etc. including sawing plaining
wroughting wood providing & fixing steel pa
of karries i.e. end strips and rods etc.

a)

Deodar Wood.

Detail

Unit Rate (British System) per Cft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
i) Deodar Wood
5.5x5/12x5/12 =
Wastage 15%

0.97

0.97 Cft
0.15 Cft
1.12 Cft

ii)1.6' (480mm) long iron strip 1"


(37mm) wide x1/8" (3mm) thick @
0.625 Lbs/ft. (0.930 Kg/Mtr).
2 Nox1' (380mm) long iron bars
" (20mm) on both ends @ 1.502
Lbs/ft. (2.235 Kg/m).
Wastage

3.80
5.80
0.29
6.09Lb (2
1.00

iii) Iron Screw 1" (25mm) long

20

0.00 P. Kg
0.00 P. Doz

2.00 Lbs

5%

Total
Contractor's Profit & Ove
Total

0.00 P. Cft

Percent

Page 3

Lbs
Lbs
Lbs
.76)Kg
Dozen

Detail

Unit Rate (British System) per Cft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenters
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.32 No
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Cft
Labour Rate Per Cum
Composite Rate Per Cft
Composite Rate Per Cum

Page 4

0.00 P. Day
0.00 P. Day

Rs.
Rs.

0.12

Say
Say

0.10

Rs.
Rs.

0.26

Say
Say

0.25

Item No.

Plain wood work for regulation karries or n


etc. including sawing plaining wroughting w
providing & fixing steel parts of karries i
strips and rods etc.

b)

Shisham Wood

Detail

Unit Rate (British System) per Cft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
i) Shisham Wood
5.5x5/12x5/12 =
Wastage 15%

0.97

0.97 Cft
0.15 Cft
1.12 Cft

ii)Iron Strip
1.6' (480mm) long iron strip 1"
(37mm) wide x1/8" (3mm) thick @
0.625 Lbs/ft. (0.930 Kg/Mtr).
2 Nox1' (380mm) long iron bars
" (20mm) on both ends @ 1.502
Lbs/ft. (2.235 Kg/m).
Wastage

3.80
5.80
0.29
6.09Lb (2
1.00

iii) Iron Screw 1" (25mm) long

20

0.00 P. Kg
0.00 P. Doz

2.00 Lbs

5%

Total
Contractor's Profit & Ove
Total

0.00 P. Cft

Percent

Page 5

Lbs
Lbs
Lbs
.76)Kg
Dozen

Detail

Unit Rate (British System) per Cft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenters
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.32 No
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Cft
Labour Rate Per Cum
Composite Rate Per Cft
Composite Rate Per Cum

Page 6

0.00 P. Day
0.00 P. Day

Rs.
Rs.

0.12

Say
Say

0.10

Rs.
Rs.

#####
#####

Say
Say

(0.20)

DESCRIPTION

OF

ITEM NO

3:

First class teak wood wrought joinery in do


windows etc. panelled, panelled and glazed
glazed & fixed in position including chowkh
fast tower bolts, chocks rubber stop, cleat
clamps, chords with hooks, nails screws etc
complete (Excluding sliding bolt and lock).

i)

2" (50mm) Thick.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

4' x 6.75' =

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Teak Wood
Frame
Top Rail 4'x3"x4"
Vertical 2x7'x3"x4"
Vertical Style 4x6'-6"x4"x2"
Horizental Rail 2x1'-10"x4"x2"
Middle Rail 2x1'-10"x6"x2"
Lock Rail 2x1'-10"x6"x2"
Bottom Rail 2x1'-10"x8"x2"

0.45
1.33
1.46
0.20
0.20
0.31
0.42

Panells
2x14"x22"x"
4x14"x18.5"x"

0.27 Cft
0.45 Cft

Beading
2(14"+14"+22"+22")x5/8"
(1 + 2)
2x8

Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.02 Cft

4(14"+14"+18"+18")5/8"
(1 + 2)
2x8

0.02 Cft

Wastage 12%

5.13 Cft
0.62 Cft
5.75 Cft

Page 7

0.00 P. Cft

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws above 1" long
Glue
Spikes
Total
Contractor's Profit & Ove
Total for 27 Sft.

8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20

20

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P. Kg.
P. Kg.

Percent

Rate Per Sft

0.00
27

0.00 P. Day
0.00 P. Day

Labour
Carpenters
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.

3.00 Nos
1.25 Nos

10

Percent

20

Percent

Rate Per Sft


Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 8

730.54
27

27.06

Rs.
Rs.

#####
#####

Say
Say

27.05
291.15

Rs.
Rs.

#####
#####

Say
Say

27.00
291.15

Item No.

First class teak wood wrought joinery in do


windows etc. panelled, panelled and glazed
glazed & fixed in position including chowkh
hold fast tower bolts, chocks rubber stop,
G.I. clamps, chords with hooks, nails screw
complete (Excluding sliding bolt and lock).
1" (45mm) Thick.

ii)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Teak Wood
Frame
Top Rail 4'x3"x4"
Vertical 2x7'x3"x4"
Vertical Style 4x6'-6"x4"x1"

0.45 Cft
1.33 Cft
1.25 Cft

Horizontal Rail
Top 2x1'-10"x4"x1"
Middle 2x1'-10"x4"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x8"x1"

0.18
0.18
0.27
0.36

Panels
2x14"x22"x"
4x14"x18.5"x"

0.27 Cft
0.44 Cft

Beading
2(14"x14"x22"+22")x5/8"
(1 + 2)
2x8

Cft
Cft
Cft
Cft

0.01 Cft

4(14"+14"+18.5"+18.5")5/8"
(1 + 2)
2x8

0.02 Cft

Wastage 12%

4.76 Cft
0.57 Cft
5.33 Cft

Page 9

0.00 P. Cft

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Fitting

7,462.00

Hinges 4" (100mm)


Tower Bolts 9" (225mm)
Handles 6" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws above 1" long
Glue
Spikes
Total
Contractor's Profit & Ove
Total for 27 Sft.

8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20

20

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P. Kg.
P. Kg.

7,462.00
1,492.40
8,954.40

Percent

Rate Per Sft

8954.40
27

331.64

Labour
Carpenters
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.

3.00 Nos
1.25 Nos

10

Percent

20

Percent

Rate Per Sft


Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00
27

Rs.
Rs.

Rs.
Rs.

Page 10

0.00 P. Day
0.00 P. Day

#####
#####

Say
Say
Say
Say

331.60
3,568.10

Item No.

First class teak wood wrought joinery in do


windows etc. panelled, panelled and glazed
glazed & fixed in position including chowkh
hold fast tower bolts, chocks rubber stop,
G.I. clamps, chords with hooks, nails screw
complete (Excluding sliding bolt and lock).
1" (37mm) Thick.

iii)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

4' x 6.75' =

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Teak Wood for Frame
Frame
Top Rail 1x4'x3"x4"
Vertical 2x7'x3"x4"
Vertical style 4x6'-6"x4"x1"

0.45 Cft
1.33 Cft
1.08 Cft

Leaves
Top Rail 2x1'-10"x4"x1"
Middle 2x1'-10"x4"x1"
Lock 2x1'-10"x6"x1"
Bottom 1x1'-10"x8"x1"

0.15
0.15
0.23
0.30

Panels
2x14"x22"x5/8"
4x14"x18.5"x5/8"

0.23 Cft
0.44 Cft

Beading
2(14"x14"x22"+22")x5/8"
(1 + 2)
2x8

Cft
Cft
Cft
Cft

0.01 Cft

4(14"+14"+18.5"+18.5")5/8"
(1 + 2)
2x8

0.02 Cft

Wastage 12%

4.39 Cft
0.53 Cft
4.92 Cft

Page 11

0.00 P. Cft

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)
6,888.00

Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws above 1" long
Glue
Spikes
Total
Contractor's Profit & Ove
Total for 27 Sft.

8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20

20

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P. Kg.
P. Kg.

6,888.00
1,377.60
8,265.60

Percent

Rate Per Sft

8265.60
27

306.13

Labour
Carpenters
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.

3.00 Nos
1.25 Nos

10

Percent

20

Percent

Rate Per Sft

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00
27

Rs.
Rs.

Rs.
Rs.

Page 12

0.00 P. Day
0.00 P. Day

#####
#####

Say
Say
Say
Say

306.05
3,292.95

DESCRIPTION

OF

ITEM NO

4:

First class teak wood wrought joinery in wi


gauze doors & windows with frames 22 SWG
galvanized iron wire gauze 12x12 meshes to
square inchs (625mm) including brass fittin
bars etc. complete :

a)

Teak wood framing 1" (45mm) thick with wir


gauze fixed in position:
Without spring or spring hinges.

i)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Teak Wood
Top Rail 1x4'x3"x"
Vertical 2x7'x3"x"
Fillet 2(15"+15"+25"+25")1"x3/8"
Fillet 2(15"+15"+19"+19")x"x3/8"

0.04
0.15
0.02
0.03

Leaf
Vertical Style 4x6'-6"x4"x1"

1.27 Cft

Horizontal
Top 2x1'-10"x1"x1"
Middle 2x1'-10"x3"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"

0.06
0.07
0.27
0.27
2.18
0.22
2.40

Wastage 10%

Page 13

Cft
Cft
Cft
Cft

Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Fitting

3,360.00

Hinges 4" (100mm)


Tower Bolts 9" (225mm)
Handles 6" (150mm)
Hook & Clamps
Screws above 1" long
Wire Gauze
2x1'-2"x2'-1"
4x1'-2"x1'-7"
Wastage 15%

Total
Contractor's Profit & Ove
Total for 27 Sft

20

6.00
2.00
2.00
2.00
2.00

Nos
Nos
Nos
Nos
Doz

0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz

4.83
7.33
12.16
1.82
13.98

Sft
Sft
Sft
Sft
Sft

0.00 Sft

3,360.00
672.00
4,032.00

Percent

Rate Per Sft

4032.00
27

149.33

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft
Rate Per Sft

0.50 Nos
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
27

Rs.
Rs.

Rs.
Rs.

Page 14

#####
#####

Say
Say
Say
Say

149.30
1,606.30

DESCRIPTION

OF

ITEM NO

4:

First class teak wood wrought joinery in wi


gauze doors & windows with frames 22 SWG
galvanized iron wire gauze 12x12 meshes to
square inch (625mm) including brass fitting
bars etc. complete :

a)

Teak wood framing 1" (45mm) thick with wir


gauze fixed in position:
With spring or spring hinges.

ii)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

4' x 6.75' =

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Teak Wood
Top Rail 1x4'x3"x"
Vertical 2x7'x3"x"
Fillet 2(15"+15"+25"+25")1"x3/8"
Fillet 2(15"+15"+19"+19")1"x3/8"

0.04
0.15
0.02
0.03

Leaf
Vertical Style = 4'x6'-6"x4"x1"

1.27 Cft

Horizontal
Top 2x1'-10"x1"x1"
Middle 2x1'-10"x3"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"

0.06
0.07
0.27
0.27
2.18
0.22
2.40

Wastage 10%

Page 15

Cft
Cft
Cft
Cft

Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

Detail

Unit Rate (British System) per Sft


Qty

Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Hook & Clamps
Screws / Nail
Spring Hings
Wire Gauze
2x1'-2"x2'-1"
4x1'-2"x1'-7"

=
=

Wastage 10%

Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Rate
Per Unit (Rs.)Amount (Rs.)

6.00
2.00
2.00
2.00
2.00
2.00

Nos
Nos
Nos
Nos
Doz
Nos

0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz
Each

4.83
7.33
12.16
1.22
13.38

Sft
Sft
Sft
Sft
Sft

0.00 Sft

3,986.80
147.66

Percent
3986.80
27

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

0.50 Nos
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
27

Rs.
Rs.

Rs.
Rs.

Page 16

#####
#####

Say
Say
Say
Say

147.65
1,588.80

Item No.

First class teak wood wrought joinery in wi


gauze doors & windows with frames 22 SWG
galvanized iron wire gauze 12x12 meshes to
square inch (625mm) including brass fitting
bars etc. complete:
b)

Teak wood framing 1" (40mm) thick with wir


gauze fixed in position.
Without spring or spring hinges.

i)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Ist Class Teak Wood
Vertical Style 4x6'-6"x4"x1"

1.09 Cft

Horizontal
Top Rail 2x1-10"x3"x1"
Middle 2x1-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Fillet 2(15"+15"+25"+25")"x3/8"
Fillet 2(15"+15"+19"+19")"x3/8"
Top Rail 1x4'x3"x"
Vertical Rail 2x7'x3"x"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Hook & Clamps
Screws / Nail

0.12
0.06
0.24
0.24
0.02
0.03
0.05
0.15
2.00
0.20
2.20
6
2
2
2
2

Page 17

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

Nos
Nos
Nos
Nos
Doz

0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz

Detail

Unit Rate (British System) per Sft


Qty

Wire Gauze
2x1'-2"x2'-1"
4x1'-2"x1'-7"

4.83
7.33
12.16
1.82
13.98

Wastage 15%

Total
Contractor's Profit & Ove
Total for 27 Sft.

20

Rate
Per Unit (Rs.)Amount (Rs.)

Sft
Sft
Sft
Sft
Sft

0.00 Sft

Percent

Rate Per Sft

0.00
27

0.00 P. Day
0.00 P. Day

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.

0.50 Nos
0.25 No

10

Percent

20

Percent

Rate Per Sft


Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00
27

Rs.
Rs.

Rs.
Rs.

Page 18

#####

Say
Say

Say
Say

Item No.

First class teak wood wrought joinery in wi


gauze doors & windows with frames 22 SWG
galvanized iron wire gauze 12x12 meshes to
square inch (625mm) including brass fitting
bars etc. complete:
b)

Teak wood framing 1" (40mm) thick with wir


gauze fixed in position.
With spring or spring hinges.

ii)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Ist Class Teak Wood
Vertical Style 4x6-6"x4"x1"

1.09 Cft

Horizontal
Top Rail 2x1'-10"x3"x1"
Middle 2x1'-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Fillet 2(15"+15"+25"+25")"x3/8"
Fillet 2(15"+15"+19"+19")"x3/8"
Top Rail 1x4'x3"x"
Vertical Rail 2x7'x3"x"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Hook & Clamps
Screws / Nail
Spring hings

0.12
0.06
0.24
0.24
0.02
0.03
0.05
0.15
2.00
0.20
2.20
6
2
2
2
2
2

Page 19

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

Nos
Nos
Nos
Nos
Doz
Nos

0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Doz
Each

Detail

Unit Rate (British System) per Sft


Qty

Wire Gauze
2x1'-2"x2'-1"
4x1'-2"x1'-7"

4.83
7.33
12.16
1.82
13.98

Wastage 15%

Total
Contractor's Profit & Ove
Total for 27 Sft.

20

Rate
Per Unit (Rs.)Amount (Rs.)

Sft
Sft
Sft
Sft
Sft

0.00 Sft

Percent

Rate Per Sft

0.00
27

0.00 P. Day
0.00 P. Day

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.

0.50 Nos
0.25 No

10

Percent

20

Percent

Rate Per Sft


Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00
27

Rs.
Rs.

Rs.
Rs.

Page 20

#####

Say
Say

Say
Say

Item No.

First class teak wood wrought joinery in wi


gauze doors & windows with frames 22 SWG
galvanized iron wire gauze 12x12 meshes to
square inch (625mm) including brass fitting
bars etc. complete:
c)

G.I. Wire gauze 22 SWG 12x12 meshes per Sq


Inch (25mm) fixed to chowkhat with " (20mm
teak wood strips and screws.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

3' x 4'

12

Rate
Per Unit (Rs.)Amount (Rs.)

Sft

Material
Teak Wood
Horizontal Strips 2x3'x3"x"
Vertital Strips 2x3.5'x3"x"

0.09
0.11
0.2
0.03
0.23
12
1.2
13.20

Wastage 15%
Wire gauze =
Wastage 10%

1x3x4

Fitting
Screws above 1" long
Nail
Total
Contractor's Profit & Ove
Total for 12 Sft.

Cft
Cft
Cft
Cft
Cft
Sft
Sft
Sft

2.00 Doz
0.07 Kg.

20

0.00 P. Cft

0.00 Sft

0.00 Doz
0.00 P. Kg.

5.28
1.06
6.34

Percent

Rate Per Sft

6.34
12

Page 21

5.28
-

0.53

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 12 Sft.

0.40 No
0.20 No

10

Percent

20

Percent

Rate Per Sft


Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 22

0.00 P. Day
0.00 P. Day

0.00
12

Rs.
Rs.

Say
Say

Rs.
Rs.

0.53
5.69

Say
Say

0.55
5.70

Item No.

First class teak wood wrought joinery in wi


gauze doors & windows with frames 22 SWG
galvanized iron wire gauze 12x12 meshes to
square inch (625mm) including brass fitting
bars etc. complete:
d)

G.I. Wire gauze 22 SWG 12x12 meshes per Sq


Inch (25mm) fixed with " (12mm) teak
wood strips and screws.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

4' x 2'

Rate
Per Unit (Rs.)Amount (Rs.)

8 Sft

Material
Teak Wood
Horizontal Rail 2x4'x2"x2"
Vertital Rail 2x2'x2"x2"
Strip Rail 2x4'x2"x2"
Strips Rail 2x1 2/3'x2"x2"
Moulding

0.22
0.11
0.05
0.03
0.15
0.56
0.09
0.65

Wastage 15%

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

8.00 Sft
0.80 Sft
8.80 Sft

0.00 Sft

2.00 Doz
0.07 Doz
6.00 Nos

0.00 P. Doz
0.00 P. Doz
0.00 Each

Wire gauze 12x12 meshes/Sq. in (25mm)


Area 4x2 = 8 Sft.
Wastage 10%
Fitting
Screws
Nail
Wooden Plug
Total
Contractor's Profit & Ove
Total for 8 Sft

20

3.00
0.60
3.60

Percent

Rate Per Sft

3.60
8

Page 23

3.00

0.45

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 8 Sft.

0.25 No
0.125 No

10

Percent

20

Percent

Rate Per Sft


Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 24

0.00 P. Day
0.00 P. Day

0.00
8

Rs.
Rs.

0.05

Say
Say

0.05

Rs.
Rs.

0.46
4.94

Say
Say

0.45
4.95

DESCRIPTION

OF

ITEM NO

Providing and fixing expanded metal " to


(12mm to 20mm) mesh 16 gauze fixed to
chowkhat with 1" (25mm) teak wood strips an
screws etc. complete.

5:

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

4' x 2'

8 Sft

Material
Teak Wood
Cover moulding/ Strips.
2x2'x1/12'x3/12'
2x3x10/12'x1/12'x3/12'
Wastage 15%
Expended Metal
4'x2'
Wastage 5%
Nail and Screw
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft

20

0.08
0.16
0.24
0.04
0.28

Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

8.00
0.40
8.40
2.00

Sft
Sft
Sft
Doz

0.00 Sft
0.00 P. Doz

0.00 P. Day
0.00 P. Day

0.00
8

Rs.
Rs.

Percent
0.00
8

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

0.25 No
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Rs.
Rs.

Page 25

0.01
#####

Say
Say

Say
Say

DESCRIPTION

OF

ITEM NO

Providing and fixing expanded metal " to


(12mm to 20mm) mesh 16 gauze fixed to chowk
with 1" (25mm) cover moulding & screws
including teak wood frame 2"x2" (50x50mm).

6:

Unit Rate (British System) per Sft

Detail

Qty
Rate Analysis

for

4' x 3'

12 Sft

Material
Teak Wood Frame
2Nox4'x2"x2"
2Nox3'x2"x2"
Moulding 13 2/3x1/12x2/12

0.23
0.17
0.20
0.60
0.09
0.69

Wastage 15%
Expanded Metal
1'x4'x3'
Wastage 5%
Nail and Screw
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft

Cft
Cft
Cft
Cft
Cft
Cft

12.00 Sft
0.60 Sft
12.60 Sft
L.S.
20

0.00 P. Cft

0.00 Sft

Percent
9.60
12

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

0.50 No
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 26

=
0.00 P. Day
0.00 P. Day

8.00
8.00
1.60
9.60
0.80
0.01
0.00

0.01
12

Rs.
Rs.

0.00
0.01

Say
Say

Rs.
Rs.

0.80
8.62

Say
Say

0.80
8.60

DESCRIPTION

OF

ITEM NO

7:

First class deodar wood wrought joinery in


windows etc. panelled or panelled or glazed
glazed fixed in position including chowkhat
fast, hinges, tower bolt rubber stop cleats
handles and chord with hooks etc. complete
(excluding sliding bolts or lock)

a)

2" (50mm) thick.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Top Rail 4x3"x4"
Vertical Rail 2x7'x3"x4"
Vertical Style 4x6'x6"x4"x2"
Horizotal Style 2x1'-10"x4"x2"
Middle Style 2x1'-10"x4"x2"
Middle Style 2x1'-10"x4"x2"
Bottom Style 2x1'-10"x8"x2"

0.45
1.33
1.46
0.20
0.20
0.31
0.42

Panells
2'x14"x22"x"
4'x14"x18.5"x"

0.27 Cft
0.45 Cft

Beading
2(14"+14"+22"+22")5/8"(1"+2")

Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.02 Cft
2x8
0.02 Cft
2x8
5.13 Cft
0.77 Cft
5.90 Cft

4(14"+18.5"+18.5")5/8"(1"+2")

Wastage 15%

Page 27

0.00 P. Cft

Detail

Unit Rate (British System) per Sft


Qty

Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws / Nail
Glue
Spikes
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20

20

Rate
Per Unit (Rs.)Amount (Rs.)

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
Doz
P. Kg.
P. Kg.

0.00 P. Day
0.00 P. Day

Percent
0.00
27

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

3.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 28

0.00
27

Rs.
Rs.

#####
#####

Say
Say

Rs.
Rs.

#####
#####

Say
Say

Item No.

First class deodar wood wrought joinery in


windows etc. panelled or panelled or glazed
glazed fixed in position including chowkhat
fast, hinges, tower bolt rubber stop cleats
handles and chord with hooks etc. complete
(excluding sliding bolts or lock)
b)

1" (45mm) thick.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

4' x 6.75' =

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Top Rail 4x3"x4"
Vertical Rail 2x7'x3"x4"
Vertical Style 4x6-6"x4"x1"

0.45 Cft
1.33 Cft
1.25 Cft

Horizontal Rail
Top 2x1'-10"x4"x1"
Middle 2x1'-10"x4"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x8"x1"

0.18
0.18
0.27
0.36

Panells
2'x14"x22"x"
4'x14"x18.5"x"

0.27 Cft
0.44 Cft

Beadings
2(14"+14"+22"+22")5/8" (1"+2")
4(14"+14"+18.5"+18.5")5/8"(1"+2")

Wastage 15%

Page 29

Cft
Cft
Cft
Cft

0.01 Cft
2x8
0.02 Cft
2x8
4.76 Cft
0.71 Cft
5.47 Cft

0.00 P. Cft

Detail

Unit Rate (British System) per Sft


Qty

Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws / Nail
Glue
Spikes
Total for 27 Sft.
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20

20

Rate
Per Unit (Rs.)Amount (Rs.)

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
Doz
P. Kg.
P. Kg.

(0.01)

Percent
0.00
27

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

3.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 30

0.00 P. Day
0.00 P. Day

0.01
0.00

0.01
27

Rs.
Rs.

0.00
#####

Say
Say

Rs.
Rs.

#####
#####

Say
Say

(0.10)

Item No.

First class deodar wood wrought joinery in


windows etc. panelled or panelled or glazed
glazed fixed in position including chowkhat
fast, hinges, tower bolt rubber stop cleats
handles and chord with hooks etc. complete
(excluding sliding bolts or lock)
c)

1" (40mm) thick.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Top Rail 1x4x3"x4"
Vertical Rail 2x7x3"x4"
Vertical Style 4x6'-6"x4"x1"

0.45 Cft
1.33 Cft
1.20 Cft

Horizontal Rail
Top 2x1'-10"x4"x1"
Middle 2x1'-10"x4"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x8"x1"

0.15
0.15
0.23
0.30

Panells
2'x14"x22"x"x5/8"
4'x14"x18.5"x5/8"

0.22 Cft
0.44 Cft

Beadings
2(14"+14"+22"+22")5/8"(1"+2")
4(14"+14"+18.5"+18.5")5/8"(1"+2")

Wastage 15%

Page 31

Cft
Cft
Cft
Cft

0.01 Cft
2x8
0.02 Cft
2x8
4.50 Cft
0.68 Cft
5.18 Cft

0.00 P. Cft

Detail

Unit Rate (British System) per Sft


Qty

Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6" (150mm)
Iron Hold Fast
Rubber Pad
Hook & Clamps
Screws / Nail
Glue
Spibes
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

6.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.20

20

Rate
Per Unit (Rs.)Amount (Rs.)

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
Doz
P. Kg.
P. Kg.

0.00 P. Day
0.00 P. Day

Percent
0.00
27

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

3.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 32

0.00
27

Rs.
Rs.

#####

Say
Say

Rs.
Rs.

#####

Say
Say

DESCRIPTION

OF

ITEM NO

8:

Deodar wood framed braced and battened door


windows complete with iron fitting & fixed
position including chowkhat.

a)

2"(55mm) thick with 1"(32mm) thick planks

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

3' x 7'

Rate
Per Unit (Rs.)Amount (Rs.)

21 Sft

Material
Deodar Wood
Top Rail 1x3x3"x4"
Vertical Rail 2x7"x3"x4"

0.35 Cft
1.36 Cft

Leaf
Plank 1x2 2/12x6 17/24x1/12
Battens 3x2x1/3'x3/8'x5/8'
Braces 2x3 47/48x3/8x5/8

1.44
0.27
0.31
3.73
0.56
4.29

Wastage 15%
Fitting
Hinges 10" (250mm)
Tower Bolts 9" (225mm)
Bolts 8" (200mm) with staple for pad
lock.
Wrought Iron hold fast
Hinges chocks 4" (100mm)
Door stop 6" (150mm)
Handles 6" (150mm)
Screws above 1" long
Nails of sorts
Total
Contractor's Profit & Ove
Total for 21 Sft.

20

Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

3.00 Nos

0.00 Each

1.00 No

0.00 Each

1.00
6.00
1.00
1.00
2.00
2.00
0.06

0.00
0.00
0.00
0.00
0.00
0.00
0.00

No
Nos
No
No
Nos
Doz
Kg

Percent

Rate Per Sft

0.00
21

Page 33

Each
Each
Each
Each
Each
Doz
P. Kg

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 21 Sft.
Rate Per Sft

2.50 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 34

0.00 P. Day
0.00 P. Day

(0.01)

0.00
21

Rs.
Rs.

#####
#####

Say
Say

Rs.
Rs.

0.08
1.01

Say
Say

0.10
1.00

Item No.

Deodar wood framed braced and battened door


windows complete with iron fitting & fixed
position including chowkhat.
b)

1" (45mm) thick with 1" (25mm) battens and


planking.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

3' x 6.5'

Rate
Per Unit (Rs.)Amount (Rs.)

19.5 Sft

Material
Deodar Wood
Top Rail 1x3'x'x3/8
Vertical Rail 2x6'xx3/8
Leaf Plank 1x2 7/12x6 5/24x 1/16
Ledges 2x3 13/20x1/3x1/12
Braces 2x3 13/20x1/3x1/12
Wastage 15%
Fitting
Hinges 5" (125mm)
Tower Bolts 9" (225mm)
Wrought Iron hold fast
Hinges chocks 4" (100mm)
Door stops 6" (150mm)
Handles 6" (150mm)
Screws above 1" long
Nails of sorts
Total
Contractor's Profit & Ove
Total for 19.5 Sft.

20

0.35
1.17
1.00
0.20
0.20
2.92
0.44
3.36

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

3.00
3.00
4.00
1.00
1.00
2.00
2.00
0.06

Nos
Nos
Nos
No
No
Nos
Doz
Kg

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Percent

Rate Per Sft

0.00
19.5

Page 35

Each
Each
Each
Each
Each
Each
P. Doz
P. Kg

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 19.5

2.00 Nos
1.00 No

10

Percent

20

Percent

Rate Per Sft


Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00
19.5

Rs.
Rs.

Rs.
Rs.

Page 36

0.00 P. Day
0.00 P. Day

#####
#####

Say
Say
Say
Say

(0.70)
(7.20)

DESCRIPTION

OF

ITEM NO

9:

1" (25mm) thick battened doors and windows


in position complete with iron fittings wit
chowkhat.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

100 Sft

Material
Deodar Wood
T. Hinges 6" (150mm)
Tower bolt 6" (150mm)
Stops
Nails
Screws
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

9.50
4.00
2.00
2.00
0.063
2.00

20

Cft
Nos
Nos
Nos
Kg.
Dozen

0.00
0.00
0.00
0.00
0.00
0.00

Cft
Each
Each
Each
Kg.
P. Doz

0.00 P. Day
0.00 P. Day

Percent
0.00
100

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.

16.00 Nos
3.00 Nos

10

Percent

20

Percent

Rate Per Sft


Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 37

0.00
100.0

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

10:

Deodar battened ledged & braced doors and


windows 2" (56mm) thick (1" (30mm) thick
ledge braces and 1" thick battens complete
iron fittings chowkhats and fixed in positi

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

3' x 6.5' =

Rate
Per Unit (Rs.)Amount (Rs.)

19.5 Sft

Material
Deodar Wood
Chowkhat 2x6'x3"x4"
1x3"x3"x4"
Leaf Batten 1x2'-7"x6"-3"x1/12
Styles 3x2'-5"x4"-1"
Braces 2x3.0"x4"x1"
Wastage 15%
Fitting
Hinges Chocks 4" (100mm)
Door Stop 6" (150mm)
Tower Bolts 9" (225mm)
Tower Hinges 8" (200mm)
Wrought Iron hold fast
Hasp and staple
Handles
Screws above 1' long
Nails of sorts
Total
Contractor's Profit & Ove
Total for 19.5 Sft

20

1.30
0.19
1.35
0.26
0.20
3.30
0.50
3.80

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

1.00
1.00
2.00
2.00
4.00
1.00
2.00
2.00
0.13

No
No
Nos
Nos
Nos
No
Nos
Doz
Kg

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2,237.69

Percent

Rate Per Sft

2237.69
19.5

Page 38

Each
Each
Each
Each
Each
Each
Each
P. Doz
P. Kg

114.75

Detail

Unit Rate (British System) per Sft


Qty

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 19.5 Sft.

Rate
Per Unit (Rs.)Amount (Rs.)

2.50 Nos
1.00 No

10

Percent

20

Percent

Rate Per Sft


Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 39

0.00 P. Day
0.00 P. Day

0.00
19.5

Rs.
Rs.

0.05

Say
Say

0.05

Rs.
Rs.

#####
#####

Say
Say

114.75
1,234.75

DESCRIPTION

OF

ITEM NO

11:

a Deodar wood framed with braces and 22 SWG


G.I. Sheet facing including hold fast, wood
beading, hinges and locking arrangement, as
Directed by the Engineer Incharge.
G.I. Sheet facing one side

i)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

8' x 8'

Rate
Per Unit (Rs.)Amount (Rs.)

64 Sft

Material
Deodar Wood
22 gauge G.I. Plain sheet
Wastage 10%

7.00
64.00
6.40
70.40
6.00
3.00
1.00
0.23

Hold fast with pivots & clamp


Screws above 1" long
Sliding bolts 18" (450mm) long
Nails
Total
Contractor's Profit & Ove
Total for 64 Sft.
Rate Per Sft

20

0.00 Cft

0.00
0.00
0.00
0.00
0.00

Sft
Each
P. Doz
Each
P. Kg

0.00 P. Day
0.00 P. Day

0.00
64.0

Rs.
Rs.

Say
Say

Rs.
Rs.

0.05

Say
Say

0.05

Percent
0.00
64

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 64 Sft.
Rate Per Sft

Cft
Sft
Sft
Sft
Nos
Doz
No
Kg

3.50 Nos
1.50 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 40

DESCRIPTION

OF

ITEM NO

11:

a Deodar wood framed with braces and 22 SWG


G.I. Sheet facing including hold fast, wood
beading, hinges and locking arrangement, as
Directed by the Engineer Incharge.
G.I. Sheet facing on both side.

ii)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

8' x 8'

64 Sft

Material
Deodar Wood
22 gauge G.I. Plain sheet
Wastage 10%

7.00
128.00
12.80
140.80
6.00
3.00
1.00
0.47

Hold fast with pivots & clamp


Screws above 1" long
Sliding bolts 1" (450 mm) long
Nails
Total
Contractor's Profit & Ove
Total for 64 Sft.
Rate Per Sft

20

Contractor's Profit & Ove


Total for 64 Sft.
Rate Per Sft

Cft
Sft
Sft
Sft
Nos
Doz
No
Kg

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00

Sft
Each
P. Doz
Each
P. Kg

0.00 P. Day
0.00 P. Day

Percent
0.00
64

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total

Rate
Per Unit (Rs.)Amount (Rs.)

4.00 Nos
1.50 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 41

0.00
64.0

Rs.
Rs.

0.05

Say
Say

0.05

Rs.
Rs.

0.05

Say
Say

0.05

Item No.

11

Partal wood frame with braces & 22 SWG G.I.


Sheet facing including hold fast wooden bea
hinges and locking arrangement as directed
Engineering incharge.
G.I. Sheet facing one side

i)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

8' x 8'

64 Sft

Material
Partal Wood
22 gauge G.I. Plain sheet
Wastage 10%

7.00
64.00
6.40
70.40
6.00
3.00
1.00
0.23

Hold fast with pivots & clamp


Screws above 1" long
Sliding bolts 1" (450 mm) long
Nails
Total
Contractor's Profit & Ove
Total for 64 Sft.
Rate Per Sft

20

Contractor's Profit & Ove


Total
Rate Per Sft

Cft
Sft
Sft
Sft
Nos
Doz
No
Kg

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00

Sft
Each
P. Doz
Each
P. Kg

0.00 P. Day
0.00 P. Day

Percent
0.00
64

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total

Rate
Per Unit (Rs.)Amount (Rs.)

3.50 Nos
1.50 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00
64.0

Rs.
Rs.

Rs.
Rs.

Page 42

#####

Say
Say

Say
Say

Item No.

11

Partal wood frame with braces & 22 SWG G.I.


Sheet facing including hold fast wooden bea
hinges and locking arrangement as directed
Engineering incharge.
G.I. Sheet facing on both side

ii)
Detail

Unit Rate (British System) per Sft


Qty

Rate Anaylsis

for

8' x 8'

64 Sft

Material
Partal Wood
22 gauge G.I. Plain sheet
Wastage 10%

7.00
128.00
12.80
140.80
6.00
3.00
1.00
0.47

Hold fast with pivots & clamp


Screws above 1" long
Sliding bolts 18" (450 mm) long
Nails
Total
Contractor's Profit & Ove
Total for 64 Sft.
Rate Per Sft

20

Contractor's Profit & Ove


Total for 64 Sft.
Rate Per Sft

Cft
Sft
Sft
Sft
Nos
Doz
No
Kg

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00

Sft
Each
P. Doz
Each
P. Kg

0.00 P. Day
0.00 P. Day

Percent
0.00
64

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total

Rate
Per Unit (Rs.)Amount (Rs.)

4.00 Nos
1.50 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 43

0.00
64.0

Rs.
Rs.

0.05

Say
Say

0.05

Rs.
Rs.

0.05

Say
Say

0.05

DESCRIPTION

OF

ITEM NO

12:

First class deodar wood wrought joinery wor


wire gauze doors and windows with 22 SWG
galvanized wire gauze 12x12 mashes per squa
inch (625mm) including iron fittings comple

a)

Deodar framing 1" (45mm) with wire gauge


fixed in position.
Without Springs or Spring Hinges.

i)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Deodar Wood Frame
Top Rail 1x4x3"x"
Vertical Rail 2x7x3"x"
Fillet 2(15+15+25+25)x3/8
Leaves 2(15+15+19+19)x3/8

0.04
0.15
0.02
0.03

Vertical Style
4x6'-6"x4"x1

1.27 Cft

Horizontal
Top 2x1'-10"x3"x1"
Middle 2x1'-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (225mm)
Handles 6"
Hook & Clamp
Screws / Nails

Page 44

Cft
Cft
Cft
Cft

0.07
0.06
0.27
0.27
2.18
0.22
2.40

Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

6.00
2.00
2.00
2.00
2.00

Nos
Nos
Nos
Nos
Doz

0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz

Detail

Unit Rate (British System) per Sft


Qty

Wire Gauge
2x1'-2"x2'-1"
4x1'-2"x1'-7"

4.83
7.33
12.16
1.82
13.98

Wastage 15%

Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Rate
Per Unit (Rs.)Amount (Rs.)

Sft
Sft
Sft
Sft
Sft

0.00 Sft

0.00 P. Day
0.00 P. Day

Percent
0.00
27

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

1.50 Nos
0.75 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 45

0.00
27.0

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

12

First class deodar wood wrought joinery wor


wire gauze doors and windows with 22 SWG
galvanized wire gauze 12x12 mashes per squa
inch (625mm) including iron fittings comple
a)

Deodar wood framing 1" (45mm) thick with


wire gauge fixed in position.
With Springs & Spring Hinges.

ii)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Deodar Wood Frame
Top Rail 1x4'x3"x"
Vertical Rail 2x7'x3"x"
Fillet 2(15"+15"+25"+25")"x3/8"
Leaves 2(15"+15"+19"+19")"x3/8"

0.04
0.15
0.02
0.03

Vertical Style
4x6'-6"x4"x1"

1.27 Cft

Horizontal
Top 2x1'-10"x3"x1"
Middle 2x1'-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts
Handles 6" (150mm)
Hook & Clamp
Screws / Nails
Spring Hinges

Page 46

Cft
Cft
Cft
Cft

0.07
0.06
0.27
0.27
2.18
0.22
2.40

Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

6.00
2.00
2.00
2.00
2.00
2.00

Nos
Nos
Nos
Nos
Doz
Nos

0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz
Each

Detail

Unit Rate (British System) per Sft


Qty

Wire Gauge
2x1'-2"x2'-1"
4x1'-2"x1'-7"

4.83
7.33
12.16
1.82
13.98

Wastage 15%

Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Rate
Per Unit (Rs.)Amount (Rs.)

Sft
Sft
Sft
Sft
Sft

0.00 Sft

0.00 P. Day
0.00 P. Day

Percent
0.00
27

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

1.50 Nos
0.75 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00
27.0

Rs.
Rs.

Rs.
Rs.

Page 47

#####

Say
Say

Say
Say

Item No.

12

First class deodar wood wrought joinery wor


wire gauze doors and windows with 22 SWG
galvanized wire gauze 12x12 mashes per squa
inch (625mm) including iron fittings comple
b)

Deodar Wood framing 1" (40mm) thick with


wire gauze fixed in position.
Without Springs as Spring Hinges.

i)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

4'x6.75' =

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
1st Class Deodar Wood
Vertical Style 4x6'-6"x4"x1"

1.09 Cft

Horizontal
Top 2x1'-10"x3"x1"
Middle 2x1'-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Fillets 2(15"+15"25+25) x 3/8
Frame 4(15"+15"19+19) x 3/8
Top Rail 1x4x3"x1"
Vertical Rail 2x7x3"x1"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (228mm)
Handles 6" (150mm)
Hook & Clamp
Screws / Nails

Page 48

0.12
0.06
0.24
0.24
0.02
0.03
0.05
0.15
2.00
0.20
2.20

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

6.00
2.00
2.00
2.00
2.00

Nos
Nos
Nos
Nos
Doz

0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz

Detail

Unit Rate (British System) per Sft


Qty

Wire Gauge
2x1'-2"x2'-1"
4x1'-2"x1'-7"

4.83
7.33
12.16
1.82
13.98

Wastage 15%

Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Rate
Per Unit (Rs.)Amount (Rs.)

Sft
Sft
Sft
Sft
Sft

0.00 Sft

0.00 P. Day
0.00 P. Day

Percent
0.00
27

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

1.50 Nos
0.75 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 49

0.00
27

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

12

First class deodar wood wrought joinery wor


wire gauze doors and windows with 22 SWG
galvanized wire gauze 144 mashes per square
inch (625mm) including iron fittings comple
b)

Deodar Wood framing 1" (40mm) thick with


wire gauze fixed in position.
With Springs as Spring Hinges.

ii)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

4'x6.75' =

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
1st Class Deodar Wood
Vertical Style 4x6'-6"x4"x1"

1.09 Cft

Horizontal
Top 2x1'-10"x3"x1"
Middle 2x1'-10"x1"x1"
Lock 2x1'-10"x6"x1"
Bottom 2x1'-10"x6"x1"
Fillets 2(15"+15"25+25) x 3/8
Top Rail 1x4'x3"x1"
Vertical Rail 2x7'x3"x1"
Wastage 10%
Fitting
Hinges 4" (100mm)
Tower Bolts 9" (228mm)
Handles 6" (150mm)
Hook & Clamp
Screws / Nails
Spring

Page 50

0.12
0.06
0.24
0.24
0.02
0.05
0.15
1.97
0.22
2.19

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

6.00
2.00
2.00
2.00
2.00
2.00

Nos
Nos
Nos
Nos
Doz
Nos

0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz
Each

Detail

Unit Rate (British System) per Sft


Qty

Wire Gauge
2x1'-2"x2'-1"
4x1'-2"x1'-7"

4.83
7.33
12.16
1.82
13.98

Wastage 15%

Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Rate
Per Unit (Rs.)Amount (Rs.)

Sft
Sft
Sft
Sft
Sft

0.00 Sft

0.00 P. Day
0.00 P. Day

Percent
0.00
27

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

1.50 No
0.75 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 51

0.00
27

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

12

G.I. wire gauze 22 SWG, 12x12 meshes per sq


inch (256mm) fixed to chowkhat with " (20m
thick deodar wood screw and strip.
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

4' x 3'

Rate
Per Unit (Rs.)Amount (Rs.)

12 Sft

Material
Wood Work
Wood
Wire gauze
Nails
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft

0.25 Cft
12.00 Sft
L.S.

20

0.00 P. Cft
0.00 Sft

8.00
1.60
9.60
0.80

Percent
9.60
12

8.00

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

0.50 No
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 52

0.00 P. Day
0.00 P. Day

0.00
12

Rs.
Rs.

Say
Say

Rs.
Rs.

0.80
8.61

Say
Say

0.80
8.60

Item No.

12

G.I. wire gauze 22 SWG, 12x12 meshes per


square inch (625mm) fixed to chowkhat with
(12mm) strip on separate frame of deodar wo
2"x2" (50x50mm).
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

2' x 4'

Rate
Per Unit (Rs.)Amount (Rs.)

8 Sft

Material
Deodar Wood
Horizontal Rail 2x4"x2"x2"
Vertical Rail 2x2"x2"x2"
Strips 2x4"x2"x"
Strips 2x1'-8"x2"x"
Moulding

L.S.

Wastage 20%
Wire Gauze 144 Mesh/Sqare in CW 4x2
Wastage 10%

0.22
0.11
0.05
0.03
0.06
0.47
0.09
0.56
8.00
0.80
8.80

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Cft

0.00 P. Cft

0.00 P. Sft

Fitting
Screws above 1" long
Nails
Wooden Plugs
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft

2.00 Doz
0.08 Kg
6.00 Nos

20

0.00 P. Doz
0.00 P. Kg
0.50 Each

Percent
3.43
8

Page 53

(0.14)
3.00
2.86
0.57
3.43
0.43

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft

0.50 No
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 54

0.00 P. Day
0.00 P. Day

0.00
8

Rs.
Rs.

0.05

Say
Say

0.05

Rs.
Rs.

0.43
4.77

Say
Say

0.45
4.75

DESCRIPTION

OF

ITEM NO

13:

Making and fixing trellis doors and windows


deodar wood complete.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

18 Sft

Material
Deodar Wood
Nail
Screws above 1" long
Hinges 4" (100mm)
Tower Bolt 9" (225mm)
Hasp & Staple
Total
Contractor's Profit & Ove
Total for 18 Sft.
Rate Per Sft

2.30
0.126
2.50
4.00
2.00
1.00

20

Contractor's Profit & Ove


Total for 18 Sft.
Rate Per Sft

0.00
0.00
0.00
0.00
0.00
0.00

P. Cft
P. Kg.
P. Doz
Each
Each
Each

0.00
18
1.50 No
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 55

0.00 P. Day
0.00 P. Day

Percent

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total

Cft
Kg.
Doz
Nos
Nos
No

0.00
18

Rs.
Rs.

Say
Say

Rs.
Rs.

0.05

Say
Say

0.05

DESCRIPTION

OF

ITEM NO

Providing & fixing mild steel chowkhat of d


windows, C. Window etc. including hold fast
making and threading holes for hinges etc.
complete

14:

a)

M.S. angle iron 1"x1"x" (40x40x6mm)


welded M.S. flat 2"x" (50x6mm)

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Structural Steel
M.S. Angle Iron 1"x1"x" (40x40x6mm)
Vertical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90 Rft @ 2.32 Lbs/Rft
M.S. Flat 2"x" (50x6mm)
Vertical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.9 @ 1.68 Lbs/ft
M.S. Flat Patti 1"x1/8" (25x3mm) at
bottom.
4 @ 0.42 Lbs/ft

Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

43.85 Lbs

31.75 Lbs

1.68 Lbs
77.28Lb (3 5.06)Kg

0.00 P. Kg

Percent
0.00
27

Page 56

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Making holes in frame for hinges 4x4
Welding plate with angle iron
Welding hold fast with frame
Welding M.S.Steel bar with frame
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

16.00
18.00
6.00
2.00

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 57

Nos
Nos
Nos
Nos

0.00
0.00
0.00
0.00

Each
Each
Each
Each

0.00
27

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Providing & fixing mild steel chowkhat of d


windows, C. Window etc. including hold fast
making and threading holes for hinges etc.
complete

14

b)

M.S. Tee iron 1"x1"x" (40x40x6mm)


welded with M.S. Flat "x" (12x6mm)

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

4' x 6.75' =

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Structural Steel
Tee Iron 1"x1"x" (40x40x6mm)
Vertical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90ft @ 2.32 Lbs/ft
M.S. Flat "x" (12x6mm)
18.90ft @ 0.425 Lbs/ft
M.S. Bar " dia 4' @ 0.67 Lbs/ft

Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

44.60 Lbs
8.03 Lbs
2.68 Lbs
55.31Lb (2 5.10) Kg

0.00 P. Kg

Percent
0.00
27

Page 58

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Making holes in frame for hinges 4x4
Welding plate with angle iron
Welding hold fast with frame
Welding M.S.Steel bar with frame
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

16.00
18.00
6.00
2.00

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 59

Nos
Nos
Nos
Nos

0.00
0.00
0.00
0.00

Each
Each
Each
Each

0.00
27

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

15

Providing and fixing M.S. Sheet hollow pres


frame of doors, windows, CW, etc. (Chowkha
only) of 20 SWG welded with M.S. flat
6"x1"x1/8" (150x40x3mm) M.S. hold fast
9"x1"x1/8" (225x25x3mm) welded/ screwed 4"
(100mm) long iron hinges including fitting
chowkhat with cement sand mortar 1:8 and
embedding hold fast in cement concrete 1:2:
complete in all respects.
a)

Single Rebate.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

4' x 7'

Rate
Per Unit (Rs.)Amount (Rs.)

28 Sft

Material
M.S. Sheet 20 Swg 15"(375mm) wide
18' long x15/12 (5.486x0.380m)
Wastage 10%

M.S. Flat
3.5 Rft @
M.S. Flat
4.5 Rft @

22.50
2.25
24.75
25.00
17.02
1.86

Kg.
Kg.
Kg.
Kg. Or
Kg
Lbs

SAY
6"x"x1/8" (150x6x3mm)
0.531 Lbs/Rft
hold fast 9"x1"x1/8" (225x25x3mm)
0.425 Lbs/Rft
1.91 Lbs
3.77Lb (1 .71) Kg

Fitting
Hinges 4" (100mm)
Screws
Nails
Welding Charges
Cement sand mortar ratio 1:8 for
filling hollow space 18'x4'/12"x3/12
including wastage (0.057m)
(5.486x0.100x0.075m) 2.00 Cft

Page 60

6.00 Nos
3.00 Doz
0.28 Kg.

0.00 Kg.

0.00 P. Kg

0.00 Each
0.00 P. Doz
0.00 P. Kg.

Detail

Unit Rate (British System) per Sft


Qty

Material
Cement
Sand
Cement Concrete 1:2:4 for fixing hold fast
Cement
Sand
Bajri
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

20

Rate
Per Unit (Rs.)Amount (Rs.)

0.20 Bag
2.00 Cft

0.00 Each
0.00 P. Cft

0.08 Bag
0.20 Cft.
0.40 Cft.

0.00 Bag
0.00 % Cft.
0.00 % Cft.

0.50 No
0.50 No

0.00 P. Day
0.00 P. Day

0.50 No

0.00 P. Day

Percent
0.00
28

Labour
Moulder/ Black Smith
Cooly
SKilled Cooly (for Mortor Filling in the
hallow space)
Total
Sundries
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 61

0.00
28

Rs.
Rs.

Say
Say

Rs.
Rs.

0.10

Say
Say

0.10

Item No.

15

Providing and fixing M.S. Sheet hollow pres


frame of doors, windows, C. window, etc.
(Chowkhat only) of 20 SWG welded with M.S.
6"x1"x1/8" (150x32x3mm) M.S. hold fast
9"x1"x1/8" (225x25x3mm) welded/ screwed 4"
(100mm) long iron hinges including fitting
chowkhat with cement sand mortar 1:8 and
embedding hold fast in cement concrete 1:2:
complete in all respects.
b)

Double Rebate.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

4' x 7'

Rate
Per Unit (Rs.)Amount (Rs.)

28 Sft

Material
M.S. Sheet 20SWG 17"(432mm) wide
19' longx18x18/17(5.486x0.432)= 25.50 Sft
Wastage 10%
28.05 Sft
M.S.
4.50
M.S.
4.50

2.55 Sft
19.10 Kg

Flat 7.5x1"x1/8(2.30x0.032x0.003)=7 No.


Rft @ 0.531 Lbs/Rft
2.39 Lbs
Flat hold fast 9"x1"x1/8"= 6 No
Rft @ 0.425 Lbs/Rft
1.91 Lbs
4.30Lbs (1 .95) Kg

Fitting
Hinges 4" (100mm)
6.00 Nos
Screws
3.00 Doz
Nails
0.28 Kg.
Welding Charges
Cement sand mortar ratio 1:8 for
filling hollow space
18"x11/24x4/12 = (5.486x0.275x0.1m) 2.75 Cft

Page 62

0.00 P. Kg

0.00 P. Kg

0.00 Each
0.00 P. Doz
0.00 P. Kg.

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Cement
Sand
Cement Concrete 1:2:4 for (fixing
hold fast)
Cement
Sand
Bajri

Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

20

Contractor's Profit & Ove


Total for 28 Sft.
Rate Per Sft

0.00 Each
0.00 P. Cft

0.08 Bag
0.20 Cft.
0.40 Cft.

0.00 Bag
0.00 % Cft.
0.00 % Cft.

0.75 No
0.50 No

0.00 P. Day
0.00 P. Day

0.50 No

0.00 P. Day

Percent
0.00
28

Moulder/ Black Smith


Cooly
SKilled Cooly (for Mortor Filling in the
hollow space)
Total
Sundries
Total

0.28 Bag
2.75 Cft

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 63

0.00
28

Rs.
Rs.

Say
Say

Rs.
Rs.

1.30
8.49

Say
Say

1.30
8.50

DESCRIPTION

OF

ITEM NO

16:

Extra for providing & fixing iron double sp


hinges, with brass fittings (it shall inclu
finger plate, 6" tower bolts)

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

21 Sft

Material
4" (100mm) double section spring
hinges iron.
Brass finger plate
6" (150mm) brass tower bolt
Brass screws 1" (40mm)
Brass Screw 1" (25mm)

3.00
2.00
1.00
2.00
2.50

Nos
Nos
No
Doz
Doz

0.00
0.00
0.00
0.00
0.00

Each
Each
Each
P. Doz
P. Doz

4.00
2.00
2.00
2.00
2.00
3.00
3.00

Nos
Nos
Nos
Nos
Nos
Doz
Doz

0.50
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
P. Doz
P. Doz

2.00
2.00

Deduct Cost of Iron Fittings


5" (125mm) Butt Hinges
9" (225mm) Tower Bolts
6" (150mm) Handle
Hinges Chocks
Door Stops
Screws 1"
Screws 1"

Total
Contractor's Profit & Ove
Total for 21 Sft.
Rate Per Sft

262.50-112.96
20

Percent
-2.40
21

Page 64

(2.00)
(0.40)
(2.40)
(0.11)

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

0.05 No
0.05 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 65

0.00 P. Day
0.00 P. Day

0.00
21

Rs.
Rs.

#####

Say
Say

Rs.
Rs.

#####
#####

Say
Say

(0.20)

DESCRIPTION

OF

ITEM NO

17:

Providing and fixing brass spring hinges, t


gauzed doors.

Detail

Unit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Brass spring hinges Complete with
screws

Total
Contractor's Profit & Ove
Total

20

1 No

0.00 Each

Percent

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.05 No
0.05 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each
Composite Rate for Each

Page 66

0.00 P. Day
0.00 P. Day

Rs.

0.00

Say

Rs.

0.00

Say

DESCRIPTION

OF

ITEM NO

18:

Providing and fixing sliding bolt to doors.

i)

Iron sliding bolt 10" (250mm) long.

Detail

Unit Rate (British System)per Each


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

16 Each

Material
Sliding bolt 10"(250mm) long complete with
screws & nuts.

Total
Contractor's Profit & Ove
Total

20

16 Nos

0.00 Each

Percent

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Composite Rate for Each

Page 67

0.00 P. Day
0.00 P. Day

Rs.

0.00
16

0.00

Say

Rs.

0.00
16

0.00

Say

Item No.

18

Providing and fixing sliding bolt to doors.


ii)

Iron sliding bolt 12" (300mm) long.

Detail

Unit Rate (British System)per Each


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

16 Each

Material
Sliding bolt 12" (300mm) long complete
with screws with & nuts.

Total
Contractor's Profit & Ove
Total

20

16 Nos

0.00 Each

Percent

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Composite Rate for Each

Page 68

0.00 P. Day
0.00 P. Day

Rs.

0.00
16

0.00

Say

Rs.

0.00
16

0.00

Say

Item No.

18

Providing and fixing sliding bolt to doors.


iii)

Brass sliding bolt 10" (250mm) long.

Detail

Unit Rate (British System)per Each


Qty

Rate

Anaylysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

16 Each

Material
Brass sliding bolt 10" (250mm) long
complete with screws & nuts.

Total
Contractor's Profit & Ove
Total

20

16 Nos

0.00 Each

Percent

Labour
Carpenter
Skilled Cooly

Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Composite Rate for Each

Page 69

0.00 P. Day
0.00 P. Day

Rs.

0.00
16

0.00

Say

Rs.

0.00
16

0.00

Say

Item No.

18

Providing and fixing sliding bolt to doors.


iv)

Brass sliding bolt 12" (300mm) long.

Detail

Unit Rate (British System)per Each


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

16 Each

Material
Brass sliding bolt 12" (300mm) long
complete with screws & nuts.

Total
Contractor's Profit & Ove
Total

20

16 Nos

0.00 Each

Percent

Labour
Carpenter
Skilled Cooly

Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Composite Rate for Each

Page 70

0.00 P. Day
0.00 P. Day

Rs.

0.00
16

0.00

Say

Rs.

0.00
16

0.00

Say

DESCRIPTION

OF

ITEM NO

19:

Extra for brass fittings to doors and windo


except for hinges, which shall be of iron.
Deodar wood panelled or panelled and glazed
fully glazed.

i)

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

4' x 7' =

28

Rate
Per Unit (Rs.)Amount (Rs.)

Sft

(Brass Fittings)
Material
9" (225mm) Tower bolt
6" (150mm) Handles
2" (50mm) Butt hinges
Screws 1"

3.00
3.00
2.00
3.50

Nos
Nos
Nos
Doz

0.00
0.00
0.00
0.00

Each
Each
Each
P. Doz

Deduct Cost of Iron Fittings


9" (225mm) Tower Bolts
6" (150mm) Handle
2" (50mm) butt hinges
Screws above 1" long

3.00
3.00
2.00
3.50

Nos
Nos
Nos
Doz

0.00
0.00
0.00
0.00

Each
Each
Each
P. Doz

Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

222.38-101.04

0.00 P. Day
0.00 P. Day

0.00
28

Labour Rate Per Sft


Labour Rate Per Sqm

Rs.
Rs.

Say
Say

Composite Rate Per Sft


Composite Rate Per Sqm

Rs.
Rs.

0.08
0.91

Say
Say

0.10
0.90

20

Percent
0.00
28

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

0.04 No
0.04 No

10

Percent

20

Percent

Page 71

Item No.

19

Extra for brass fittings to doors and windo


except for hinges, which shall be of iron.
ii)

Deodar wood wire gauzed shutters.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

4' x 7'

28

Rate
Per Unit (Rs.)Amount (Rs.)

Sft

(Brass Fittings)
Material
9" (225mm) Tower balt
6" (150mm) Handles
2" (50mm) butt hinges
Screws 1"

2.00
2.00
2.00
3.50

Nos
Nos
Nos
Doz

0.00
0.00
0.00
0.00

Each
Each
Each
P. Doz

Deduct Cost of Iron Fittings


9" (225mm) Tower Bolts
8" (200mm) Handle
2" (50mm) Butt hinges
Screws 1"

2.00
2.00
2.00
3.00

Nos
Nos
Nos
Doz

0.00
0.00
1.00
0.00

Each
Each
Each
P. Doz

2.00
2.00

Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

153.75-73.12 =
20

Percent
-2.40
28

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

0.04 No
0.04 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
28

Rs.
Rs.

Rs.
Rs.

Page 72

(2.00)
(0.40)
(2.40)
(0.09)

#####
#####

Say
Say
Say
Say

(0.80)

DESCRIPTION

OF

ITEM NO

20:

Extra for providing and fixing, approved qu


rim lock adjustable over the style surface.

Detail

Unit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Rim lock complete with screws
Deduct cost of handle

Total
Contractor's Profit & Ove
Total

1.00 No
2.00 Nos

20

0.00 Each
0.00 Each

Percent

Labour
Carpenter
Skilled Cooly

Total
Sundries
Total
Contractor's Profit & Ove
Total

0.17 No
0.13 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each
Composite Rate for Each

Page 73

0.00 P. Day
0.00 P. Day

Rs.

0.00

Say

Rs.

0.00

Say

DESCRIPTION

OF

ITEM NO

21:

Providing and fixing approved quality morti


lock.

Detail

Unit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Mortice lock compelte with screws
Deduct cost of handles

Total
Contractor's Profit & Ove
Total

20

1.00 No
2.00 Nos

0.00 Each
0.00 Each

Percent

Labour
Carpenter
Skilled Cooly

Total
Sundries
Total
Contractor's Profit & Ove
Total

0.25 No
0.17 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each
Composite Rate for Each

Page 74

0.00 P. Day
0.00 P. Day

14.45

14.45
1.45
15.90
3.18
19.07

Rs.

19.07

Say

19.05

Rs.

19.07

Say

19.05

DESCRIPTION

OF

ITEM NO

Providing and fixing expanded metal " to


(12mm to 20mm) mesh 16 gauge.
Fixed to chowkhat with 1" (25mm) thick deod
wood strip and screws etc.

22:

a)

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for


4' x 2'
Material
Deodar Wood
Strips vertical 2x2x"x3/12"
Horizontal 2x3-10/12x"x3/12"

8 Sft

0.08
0.16
0.24
0.05
0.29
0.30
8.00
0.80
8.80
2.00

Wastage 20%
SAY
Expanded metal 1x4x2
Wastage 10%
Nails / Screws
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft

20

Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Sft
Doz

0.00 P. Cft

0.00 Sft
0.00 P. Doz

0.00 P. Day
0.00 P. Day

0.00
8

Rs.
Rs.

Percent
0.00
8

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

0.25 No
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Rs.
Rs.

Page 75

#####
#####

Say
Say
Say
Say

(0.20)
(1.90)

Item No.

Providing and fixing expanded metal " to


(12mm to 20mm) mesh 16 gauge.
Fixed with 1" (25mm) cover moulding & screw
including deodar wood frame 2"x2" (50x50mm)

22
b)

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

4' x 3'

12 Sft

Material
Deodar Wood Frame
2 No 4'x2/12"x212"
2 No 3'x2/12"x212"
Moulding 1x13 2/3'x1/12x2/12

0.23
0.17
0.20
0.60
0.12
0.72
12.00
1.20
13.20
2.00

Wastage 20%
Expended metal 1x4x3
Wastage 10%
Nails / Screws
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft

20

Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Sft
Doz

0.00 P. Cft

0.00 Sft
0.00 P. Doz

0.00 P. Day
0.00 P. Day

0.00
12

Rs.
Rs.

Percent
0.00
12

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 12 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

0.50 No
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Rs.
Rs.

Page 76

#####
#####

Say
Say
Say
Say

(0.10)
(1.30)

DESCRIPTION

OF

ITEM NO

23:

a Providing and fixing deodar wood almirah 9"


12" (225 to 300mm) depth, including boxing
with back shelves, shutter and brass fittin
complete.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

3' x 5'

Rate
Per Unit (Rs.)Amount (Rs.)

15 Sft

Material
Deodar Wood
Sides 2x1'x5'x1/12"
Back 1x3'x5'x"
Top & Bottom 2x3'x1'x1/12"
Plank 3x3'x1'x1/12"
Shutters 2x1.5'x5'x1/12"

0.84
0.94
0.50
0.75
1.25
4.28
0.43
4.71

Wastage 10%

Fittings Brass
Hings 3" (75mm)
Hasp & Staple (Brass)
Brass Handle 6" (150mm)
Wooden Plugs
Nails / Screws
Bitumen
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

6.00 Nos
1.00 No
2.00 Nos
10.00 Nos
L.S.
1.43
Kg.

20

0.00 P. Cft

0.00
0.00
0.00
0.50

0.00 P. Kg.

5.00
19.00
-

24.00
4.80
28.80
1.92

Percent
28.80
15

Page 77

Each
Each
Each
Each

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft

2.50 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
15

Rs.
Rs.

Rs.
Rs.

Page 78

1.92
#####

Say
Say

Say
Say

1.90
20.60

Item No.

23

Providing and fixing deodar wood almirah 9"


12" (225 to 300mm) depth, with shelves shut
and brass fittings, etc. without boxing & b
complete.
Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

3' x 5'

15 Sft

Material
Deodar Wood
Plank 3x10x3'x1'x1/12"
Shutters 2x1.5'x5'x1/12"

0.75
1.25
2.00
0.20
2.20

Wastage 10%
Fittings Brass
Hings 3" (75mm)
Hasp & Staple (Brass)
Brass Handle 6" (150mm)
Wooden Plugs
Nails / Screws
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft

Cft
Cft
Cft
Cft
Cft

6.00 Nos
1.00 No
2.00 Nos
6.00 Nos
L.S.

20

0.00 P. Cft
0.00
0.00
0.00
0.50

Each
Each
Each
Each

18.00
15
1.75 Nos
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

3.00
12.00

0.00 P. Day
0.00 P. Day

0.00
15

Rs.
Rs.

Rs.
Rs.

Page 79

15.00
3.00
18.00
1.20

Percent

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

1.20
#####

Say
Say

Say
Say

1.20
12.90

Item No.

24

Providing and fixing class room almirah


consisting of 1" (25mm) thick solid flush s
with deodar wood lipping " (6mm) thick alr
(sterling made) fixed in deodar wood frame
(75x25mm) I/C full hinges C.P. fittings wit
R.C.C. (1:1-:3) shelves 1-" (40mm) thick
coats of painting.
Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Rate Analysis for 4.5' x 3.5' = 15.75 Sft


Material
Precast reinforced cement concrete
(1:1-"3)
Shelves 2x3-x1-1/8x1/8
0.91
Steel " (12mm) dia
4x3.25 (4x0.975=3.900Rm) 13.00 Rft
5x1 1'/6(5x0.375=1.875Rm)
5.63 Rft
18.63 Rft
Wastage 5%
0.93 Rft
19.56 Rft
1.48
@ 0.167 Lbs/Rft
Deodar wood frame I/C sawing
2x4'x'x1/12'
0.19
2x3'xx'x1/12'
0.15
0.34
Wastage 35%
0.12
0.46
1" (25mm) thick solid flush shutter
(Sterling made)
1x3'x4' (1x0.900x1.200 = 1.080)
12.00
Wastage 5%
0.60
12.60
Deodar wood lipping 6mm thick
(Sterling made)
2x4' (2x1.200 = 2.400)
8.00
2x2x-' (2x2x0.450 = 1.800)
6.00
14.00

Page 80

Cft

3.68 P. Cft

3.35

Kg

0.00 Kg

Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

Sft
Sft
Sft

0.00 Sft

Rft
Rft
Rft

0.00 Rft

Detail

Unit Rate (British System) per Sft


Qty

Full hinges 1" (25mm) I/C screws 2x4


C.P. dasti I/C screws
Khunda chapks (Best quality) I/C screws
Rawal plug 1-" long
Screws 1-" long
Glue
Painting 3 coats
Total
Contractor's Profit & Ove
Total for 15.75 Sft.
Rate Per Sft

20

8.00
2.00
1.00
12.00
1.00
0.20
0.428

Rate
Per Unit (Rs.)Amount (Rs.)

Nos
Nos
No
Nos
Doz
Kg.
Gln.

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz
P.Kg.
P. Gln.

3.35
0.67
4.02
0.26

Percent
4.02
15.75

Labour
For bringing the leaves to proper size
fixing deodar wood lipping with glue
and nail making/ fixing deodar wood
frame & fixing at site with rawal plug &
screws.
Carpenter
Helper
Total
Sundries
Total
Contractor's Profit & Ove
Total for 15.75 Sft.
Rate Per Sft

1.00 No
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 81

0.00 P. Day
0.00 P. Day

0.00
15.75

Rs.
Rs.

Say
Say

Rs.
Rs.

0.26
2.50

Say
Say

0.25
2.50

DESCRIPTION

OF

ITEM NO

Providing and fixing wooden box type ward r


22" (550mm) deep including " (20mm) thick
boxing and shelves, hanger rods, hard board
drawers, brass fitting locking arrangements
handles internal bolts shoe rods, etc. incl
three coats of enamel paints.
Partal wood boxing and deodar wood shelves
leaves etc.

25:

i)

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis for

4' x 6.5' =

Rate
Per Unit (Rs.)Amount (Rs.)

26 Sft

Material
Partal Wood
Boxing
Side 2x6-1/3x22/12x3/48
Top & Bottom 2x4 22/12x3/48
Foot Rack 1x3-7/8x22/12x3/48
Vertical Style 1x5x22/12x3/48
Strips 6x22/12x1/8x3/48
Back 2x1x22/12x3/48
Wastage 15%
Shutters Deodar Wood
1x1-2/3x6x1/12
1x2-1/3x6x1/12
Wastage 15%
Hard Board
4x6
Wastage 10%
Sawing Charges
6.88x10

Page 82

1.45
0.92
0.44
0.57
0.09
0.34
3.81
0.57
4.38

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

0.91
1.26
2.17
0.33
2.50

Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

26.00 Sft
2.60 Sft
28.60 Sft

0.00 Sft

68.80 Sft

0.00 Sft

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Fittings
Hings 4" (100mm)
Handle
Tie rod welding fixing arragement
Hanger hook including pull out rod
Tower bolt 4" (100mm)
Bitumen Painting
Total
Contractor's Profit & Ove
Total for 26 Sft.
Rate Per Sft

20

6.00
2.00
2.25
2.00
1.00
1.43

Nos
Nos
Nos
Nos
Nos
Kg.

0.00
0.00
0.00
0.00
-0.08
0.00

Each
Each
Each
Each
Each
Each

(0.08)
(0.02)
(0.10)
(0.00)

Percent
-0.10
26

(0.08)
-

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

4.00 No
2.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
26

Rs.
Rs.

Rs.
Rs.

Page 83

#####
#####

Say
Say

Say
Say

(3.70)
(39.90)

Item No.

Providing and fixing wooden box type ward r


22" (550mm) deep including " (20mm) thick
boxing and shelves, hanger rods, hard board
drawers, brass fitting locking arrangements
handles internal bolts shoe rods, etc. incl
three coats of enamel paints.
Deodar wood boxing and shelves & leaves etc

25

ii)
Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis for

8' x 5'

Rate
Per Unit (Rs.)Amount (Rs.)

40 Sft

Material
Deodar Wood
Boxing
Vetical Side 2x8x22/12x3/48
Control Side 1x7-7/8x22/12x3/48
Horizontal T&B 2x4 11/12x22/12x3/48
Shelves 5x2x22/12x3/48
Vertical 1x1x22/12x3/48
Shoes 2xx1/5x1/12
Sutter 2x2 3/5x8x1/12
Strips 2x8x1/12x1/24
Strips 2x5x1/12x1/24
Wastage 15%
Hard Wood Board
Back 5x8
Wastage 10%
Sawing Charges :
10.20x10
Bitumen Painting 2 Coat
Painting 3 Coats

1.83
0.90
1.13
1.15
0.17
0.02
3.47
0.06
0.03
8.76
1.31
10.07

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

40.00 Sft
4.00 Sft
44.00 Sft

0.00 Sft

102.00 Sft

0.00 Sft

0.00 Each
0.00 P. Gln.

1.43 Kg.
0.27 Kg.

Page 84

Detail

Unit Rate (British System) per Sft


Qty

Fittings
Hings 4" (100mm)
Handle
Tie rod welding fixing arragement
Hanger hook including full out rod
Screws
Tower bolt 4" (100mm)
Nail
Locking arrangement
Total
Contractor's Profit & Ove
Total for 40 Sft.
Rate Per Sft

20

Contractor's Profit & Ove


Total for 40 Sft.
Rate Per Sft

6.00 Nos
2.00 Nos

-0.10 Each
0.00 Each

2.00
4.00
1.00
0.19
1.00

0.00
0.00
-0.08
0.00
0.00

Nos
Doz
Nos
Kg
Nos

Each
P. Doz
Each
P. Kg
Each

-0.82
40
6.00 Nos
2.00 Nos
1.00 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00 P. Day
0.00 P. Day
0.00 P. Day

0.00
40

Rs.
Rs.

Rs.
Rs.

Page 85

(0.60)
(0.08)
(0.68)
(0.14)
(0.82)
(0.02)

Percent

Carpenters
Skilled Cooly
Painter
Total
Sundries
Total

Rate
Per Unit (Rs.)Amount (Rs.)

#####
#####

Say
Say
Say
Say

(0.20)
(2.80)

Item No.

26

Providing/ fixing ward robe 22" (550mm) dee


consisting of RCC shelves 1-" (40mm) thick
(12mm) thick vin board boxing and back (one
ply) vin board shutter " (20mm) thick I/c
wood lipping "(6mm) on all edges fixes I/c
wood frame 3"x1" with hanger rod in centre
drawers at bottom and openable shutter on u
portion I/c full hinges C.P. fitting and pa
coats.
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

7.5' x 7' =

Rate
Per Unit (Rs.)Amount (Rs.)

52.50 Sft

Material
RCC shelves (Precast RCC 1x1-x3 top
and bottom
2x7-x2x1/8
4x2-x2x1/8
Steel Reinforcement
6.12x1.50
" thick vin board (one side ply) for
boxing.
Top/ Bottom 6x2x2-x1-7/8
Side 6x2x1-1/8x1-7/8
Back 6x2-x1-1/8
Top/ Bottom 3x2x2-x1-7/8
Vertical 6x2x1-x1-7/8
Side 2x4x1-7/8
Back 3x2x2-x1-
Back 1x2-x4
Wastage 10%
Vin board " thick on both side ply
6x2-x1-
3x4x2-
Wastage 10%

Page 86

3.62 Cft
2.50 Cft
6.12 Cft

0.00 P. Cft

9.18 Kg

0.00 P. Kg

50.63
25.31
15.18
25.31
28.12
15.00
16.87
9.00
185.42
18.54
203.96

Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft
Sft

0.00 Sft

16.87
27.00
43.87
4.38
48.25

Sft
Sft
Sft
Sft
Sft

0.00 Sft

Detail

Unit Rate (British System) per Sft


Qty

Deodar Wood
Frame 4x7x3/12x1/12
Frame 4x7-x3/12x1/12
Lipping 3x6x2-x1/16x1/24
Lipping 6x2x1-1/8x1/16x1/24
Lipping 2x3x4x1/16x1/24
For drawers side supporting
3x2x1-7/8x1/12x1/24
Drawers 3x2-x1-1/8x1/24
Side 2x3x1-7/8x1-1/8x1/24
Wastage 35%
Hard Board for drawers
3x2-x1-7/8(3x0.686x0.573=1.179
Wastage 10%
Full hinges " (20mm) wide (Imported)
3x4 (3x1.219 = 3.657)
3x1-1/8 (3x0.343 = 1.029)
Wastage 5% (Add Wastage 5%)

C.P. Handle
Catcher (Germany)
China Lock (Glone)
Rawal Plug 1" (40mm)
Screws above 1" long
C.P. Hanger rod with 2 hooks
C.P. Hooks

Page 87

0.58
0.62
0.11
0.04
0.06

Cft
Cft
Cft
Cft
Cft

0.04
0.32
0.53
2.30
0.81
3.11

Cft
Cft
Cft
Cft
Cft
Cft

Rate
Per Unit (Rs.)Amount (Rs.)

0.00 P. Cft

12.65 Sft
1.26 Sft
13.91 Sft

0.00 Sft

12.00
3.37
15.37
0.76
16.13

Rft
Rft
Rft
Rft
Rft

0.00 Rft

9.00
9.00
3.00
30.00
2.50
1.00
2.00

Nos
Nos
Nos
Nos
Doz
No
Nos

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
P. Doz
Each
Each

Detail

Unit Rate (British System) per Sft


Qty

Glue
Nail
Painting

2.00 Kg
L.S.
2.86 Gln.

4(7 x 7)

Total
Contractor's Profit & Ove
Total for 52.50 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

20

0.00 P. Kg
0.00 P. Gln.

32.00
-

32.01
6.40
38.41
0.73

Percent
38.41
52.50

Labour
Labour for making ward robe complete
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

52.50 Sft

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 88

29.00 Sft

1,522.50
1,522.50
152.25
1,674.75
334.95
2,009.70
38.28

2009.70
52.50

Rs.
Rs.

#####
#####

Say
Say

38.30
411.90

Rs.
Rs.

#####
#####

Say
Say

64.75
696.85

DESCRIPTION

OF

ITEM NO

27:

a)

Providing and fixing chowkhat for doors, wi


& C. Windows including hold fast etc.
Teak Wood.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Teak Wood
Top Rail 1x4x3"x4"
Vertical Rail 2x7x3"x4"

0.45
1.33
1.78
0.22
2.00
6.00

Wastage 12%
Iron hold fast
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Cft
Cft
Cft
Cft
Cft
Nos

0.00 P. Cft
0.00 Each

0.00 P. Day
0.00 P. Day

Percent
0.00
27

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

0.70 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 89

0.00
27

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

27
b)

Providing and fixing chowkhat for doors win


& C. Windows including hold fast etc.
Deodar Wood.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis

for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
For Frame
Top Rail 1x4'x3"x4"
Vertical Rail 2x7'x3"x4"

0.45
1.33
1.78
0.27
2.05
6.00

Wastage 15%
Iron hold fast
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Cft
Cft
Cft
Cft
Cft
Nos

0.00 P. Cft
0.00 Each

0.00 P. Day
0.00 P. Day

Percent
0.00
27

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

0.50 No
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 90

0.00
27

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

27
c)

Providing and fixing chowkhat for doors, wi


& C. Windows including hold fast etc.
Shisham Wood.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

4' x 6.75'

27 Sft

Material
Shishim Wood
Top Rail 1x4'x3"x4"
Vertical Rail 2x7'x3"x4"

0.45
1.33
1.78
0.27
2.05
6.00

Wastage 15%
Iron hold fast
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Rate
Per Unit (Rs.)Amount (Rs.)

Cft
Cft
Cft
Cft
Cft
Nos

0.00 P. Cft
0.00 Each

0.00 P. Day
0.00 P. Day

Percent
0.00
27

Labour
Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

0.50 No
0.40 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 91

0.00
27

Rs.
Rs.

Say
Say

Rs.
Rs.

0.05

Say
Say

0.05

DESCRIPTION

OF

ITEM NO

28:

a)

Making & fixing deodar wood planking in eav


boards etc. planed on both side related & f
including nails & screws, bolt & brackets.
1" (25mm) Thick.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

100 Sft

Material
Deodar Wood
Nail & Screws bolt and brackets

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

20

9.50 Cft
L.S.

0.00 P. Cft

0.00 P. Day
0.00 P. Day

Percent
0.00
100

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 92

0.00
100

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

28

Making & fixing deodar wood planking in eav


boards etc. planed on both side related & f
including nails & screws, bolt & brackets.
b)

" (20mm) Thick.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

100 Sft

Material
Deodar Wood
Asscessories for fixing

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

7.12 Cft
L.S.

20

0.00 P. Cft

0.00 P. Day
0.00 P. Day

Percent
0.00
100

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 93

0.00
100

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

28

Making & fixing deodar wood planking in eav


boards etc. planed on both side related & f
including nails & screws, bolt & brackets.
c)

" (12mm) Thick

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

100 Sft

Material

Deodar Wood
Asscessories for fixing

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.75 Cft
L.S.

20

0.00 P. Cft

0.00 P. Day
0.00 P. Day

Percent
0.00
100

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 94

0.00
100

Rs.
Rs.

Say
Say

Rs.
Rs.

0.05

Say
Say

0.05

DESCRIPTION

OF

ITEM NO

29:
Making and fixing deodar wood shelves,
including brackets.
i)

1" (25mm) Thick.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

100 Sft

Material
Deodar Wood
Accessoires for fitting

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

9.50 Cft
L.S.

20

0.00 P. Cft

0.00 P. Day
0.00 P. Day

Percent
0.00
100

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 95

0.00
100

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

29

Making and fixing deodar wood shelves,


including brackets.
ii)

1" (40mm) Thick

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

100 Sft

Material
Deodar Wood
Asscessories for fixing

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

14.25 Cft
L.S.

20

0.00 P. Cft

0.00 P. Day
0.00 P. Day

Percent
0.00
100

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 96

0.00
100

Rs.
Rs.

Say
Say

Rs.
Rs.

0.05

Say
Say

0.05

Item No.

29

Making and fixing deodar wood shelves,


including brackets.
iii)

2" (50mm) Thick.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

100 Sft

Material
Deodar Wood
Asscessories for fixing

Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

19.00 Cft
L.S.

20

0.00 P. Cft

0.00 P. Day
0.00 P. Day

Percent
0.00
100

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

4.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 97

0.00
100

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

30:

a)

Detail

Making and fixing cleats for doors and wind


including hinges and screws.
Unit Rate (British System)per Each
Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

10 Nos

Material
Hinges 2" (50mm)
Screws 1" (25mm)
Deodar wood

Total
Contractor's Profit & Ove
Total

10.00 Nos
3.50 Doz
0.21 Cft

20

0.00 Each
0.00 P. Doz
0.00 P. Cft

Percent

Labour
Carpenters
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.40 No
0.20 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Composite Rate for Each

Page 98

0.00 P. Day
0.00 P. Day

Rs.

0.00
10

0.00

Say

Rs.

0.00
10

-0.25

Say

(0.20)

Item No.

30

Making and fixing cleats with brass hooks f


ventilator.

Detail

Unit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Brass hooks
Deodar Wood
Screws/ Nails

Total
Contractor's Profit & Ove
Total

1 No
0.01 Cft
2.00 Nos

20

0.00 Each
0.00 P. Cft
0.00 P. Doz

0.44

0.44
0.09
0.53

Percent

Labour for 1.25 Nos.


Carpenter
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.05 No
0.05 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Rs.

Page 99

Rs.

Composite Rate for Each

0.00 P. Day
0.00 P. Day

0.00
1.25

0.00

Say

0.48

Say

0.50

Item No.

30

Providing and fixing door stops of 1" (40m


dia rubber block.
Detail

Unit Rate (British System)per Each


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

30 Nos

Material
Door rubber stopper
Gutty
Screws
Total
Contractor's Profit & Ove
Total

30.00 Nos
30.00 Nos
2.50
Doz

20

0.00 Each
0.00 Each
0.00 P. Doz

Percent

Labour
Carpenter
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Composite Rate for Each

Page 100

0.00 P. Day

Rs.

0.00
30

0.00

Say

Rs.

0.00
30

-0.10

Say

(0.10)

Item No.

30

Providing and fixing G.I. hook with clamps


doors.

Detail

Unit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
G.I. Hook
Gutty

Total
Contractor's Profit & Ove
Total

1.00 No
1.00 No

20

0.00 Each
0.00 Each

Percent

Labour (Labour for 30 No.)


Carpenter
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.08 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Rs.

Page 101

Rs.

Composite Rate for Each

0.00 P. Day

0.00
30

0.00

Say

0.00

Say

DESCRIPTION OF
Item No. 31

ITEM:
Hard wood railing of any shape and design
including bends and corners fixed in positi
including polishing complete as directed
by Engineer Incharge.
a)

Shisham Wood.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

12 Rft

Material
Shisham wood
Sand paper
Polishing material
Total
Contractor's Profit & Ove
Total 12 Rft.
Rate Per Rft

0.90 Cft
3.00 Nos
0.075 Kg.

20

0.00 P. Cft
0.00 Each
0.00 P. Kg.

0.00 P. Day
0.00 P. Day
0.00 P. Day

Percent
0.00
12

Labour
Carpenters
Skilled Cooly
Polisher
Total
Sundries
Total
Contractor's Profit & Ove
Total for 12 Rft.
Rate Per Rft

1.50 No
0.75 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Page 102

0.00
12

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

31

Hard wood railing of any shape and design


including bends and corners fixed in positi
including polishing complete as directed
by Engineer Incharge.
b)

Teak Wood.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

10 Rft

Material
Teak wood
Sand paper
Polishing material
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft

0.90 Cft
3.00 Nos
0.075 Kg.

20

0.00 P. Cft
0.00 Each
0.00 P. Kg.

0.00 P. Day
0.00 P. Day
0.00 P. Day

Percent
0.00
10

Labour
Carpenters
Skilled Cooly
Polisher
Total
Sundries
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft

1.00 No.
0.50 No
0.20 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Page 103

0.00
10

Rs.
Rs.

0.01

Say
Say

Rs.
Rs.

0.01

Say
Say

DESCRIPTION

OF

ITEM NO

32:
Deodar wood dado or Picture Rail 3"x1"
(50x40mm) as per approved design including
moulding and fixed in place, cost of screws
plugs and painting complete.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

10 Rft

Material
Deodar wood
Sand paper
Rawal Plugs
Screws
Polishing material
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft

Rate
Per Unit (Rs.)Amount (Rs.)

0.60
1.00
0.50
0.50
0.038

20

Cft
Sht
No
Doz
Kg.

0.00
0.00
0.00
0.00
0.00

P. Cft
P. Sht
Each
P. Doz
P. Kg.

0.00 P. Day
0.00 P. Day
0.00 P. Day

Percent
0.00
10

Labour
Carpenter
Skilled Cooly
Polisher
Total
Sundries
Total
Contractor's Profit & Ove
Total for 10 Rft.
Rate Per Rft

0.50 No
0.25 No
0.10 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

0.00
10

Rs.
Rs.

Rs.
Rs.

Page 104

#####
#####

Say
Say
Say
Say

(0.10)

DESCRIPTION

OF

ITEM NO

33:

Sawing wood by hand.

a)

Soft wood (Deodar Kail, Chir)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

300 Sft

Labour
Sawyer
Skilled Cooly

Total
Sundries
Total
Contractor's Profit & Ove
Total

1.50 Nos
1.50 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft

Rs.

Page 105

Rs.

Labour Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
300

x 100 =154.28

0.02

0.00 Say

Item No.

33:

Sawing wood by hand.


b)

Hard Wood (Shisham, Kikar, Sal or Teak)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit

Amount

450 Sft

Labour
Sawyer
Skilled Cooly

Total
Sundries
Total
Contractor's Profit & Ove
Total

3.00 Nos
3.00 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft

Rs.

Page 106

Rs.

Labour Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
450
0.00

x 100=205.7

Say

DESCRIPTION

OF

ITEM NO

34:

Sawing wood by machine.

a)

Soft Wood.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

300 Sft

Labour
Sawyer
Skilled Cooly

Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 No
0.77 No

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft

Rs.

Page 107

Rs.

Labour Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
300
0.00

x 100=94.97 Say

Say

(0.01)

Item No.

34

Sawing wood by machine.


b)

Hard Wood.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

300 Sft

Labour
Sawyer
Skilled Cooly

Total
Sundries
Total
Contractor's Profit & Ove
Total

1.50 Nos
1.16 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft

Rs.

Page 108

Rs.

Labour Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
300
0.00

x 100=142.62 S
Say

DESCRIPTION

OF

ITEM NO

35:

Making and fixing sun shade of deodar wood


including fixing brackets.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

5 Sft

Material
Deodar Wood
Horizontal Planks
Top 4x5x1/3x1/24
Vertical 2x1x1/6x5/68
Supports along sun shade
2x3/2x1/8x5/48
Suporting brackets 2x1x1/8x5/48
Front ears hard strips 1x5x1/4x1/12
Wastage 10%
Sawing & Nails
Total
Contractor's Profit & Ove
Total for 5 Sft.
Rate Per Sft

20

Contractor's Profit & Ove


Total for 5 Sft.
Rate Per Sft

0.28 Cft
0.06 Cft
0.04 Cft
0.03 Cft
0.10 Cft
0.51 Cft
0.05 Cft
0.56 Cft
L.S.

0.00 P. Cft

9.60
5
0.25 No
0.10 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
5

Rs.
Rs.

Rs.
Rs.

Page 109

8.00
8.00
1.60
9.60
1.92

Percent

Labour
Carpenter
Cooly Skilled
Total
Sundries
Total

Rate
Per Unit (Rs.)Amount (Rs.)

1.92
#####

Say
Say

Say
Say

1.90
20.65

DESCRIPTION

OF

ITEM NO

Making and fixing 1" (25mm) thick Kail or C


wooden notice board with frame.

36:

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

18 Sft

Material
Kail or Chir Wood
Nails
Glue
Iron Hook
Total
Contractor's Profit & Ove
Total for 18 Sft.
Rate Per Sft

1.64
0.093
0.075
1.00

20

Cft
Kg.
Kg.
No.

0.00
0.00
0.00
0.00

P. Cft
P. Kg.
P. Kg.
Each

0.00 P. Day
0.00 P. Day

Percent
0.00
18

Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 18 Sft.
Rate Per Sft

0.75 No
0.75 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 110

0.00
18

Rs.
Rs.

Say
Say

Rs.
Rs.

0.01

Say
Say

DESCRIPTION

OF

ITEM NO

37:

Making deodar Punkha Pole = 10'x6"x6"


(3.047x0.150x0.150M).

Detail

Unit Rate (British System) per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Deodar wood
Hooks

Total
Contractor's Profit & Ove
Total

2.50 Cft
2.00
Doz

20

0.00 P. Cft
0.00 P. Doz

Percent

Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.20 No
0.10 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each
Composite Rate for Each

Page 111

0.00 P. Day
0.00 P. Day

Rs.

Say

Rs.

0.00

Say

DESCRIPTION

OF

ITEM NO

38:

Dismantling and refixing eaves boards.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

70 Rft

Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Rft

Rs.

Page 112

Rs.

Labour Rate Per Rm

0.00 P. Day
0.00 P. Day

0.00
70
0.00

Say

Say

DESCRIPTION

OF

ITEM NO

39:

Making wooden stair cases complete 2' to 3'


915mm) wide frame 1" (40mm) thick planks o
deodar wood, including hand rails.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Analysis

for

15 Rft

Material
Deodar Wood
Detail of Deodar Wood
2x5/6x15x1/8
Stops 14x2x1/8x5/6
and Rail 2x15xx
and Rail 2x4x3xx

3.12
3.65
1.88
1.50
10.15
Wastage
L. S
0.35
10.50
Nails
0.93
Bolts " to 3" (12 to 76mm) long
5.880
Steel rods dia 3x3'-6" = 10.5 Rft
15.3Lb (7
Washers
12.00
Total
Contractor's Profit & Ove
Total for 15 Rft.
Rate Per Rft

Labour
Carpenter
Blacksmith
Hammer-man
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 15 Rft.
Rate Per Rft

Rate
Per Unit (Rs.)Amount (Rs.)

20

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Kg.
.5Kg)
Nos

0.00
0.00
0.00
0.00
0.00

P. Cft
P. Kg
P. Kg
P. Kg
Each

Percent
0.00
15
2.00
0.50
0.50
2.00

10

Percent

20

Percent

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Page 113

Nos
No
No
Nos

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

0.00
15

Rs.
Rs.

0.01

Say
Say

Rs.
Rs.

#####
#####

Say
Say

(7.30)
(24.00)

DESCRIPTION

OF

ITEM NO
a - (i)

40:

Providing and fixing partition including fr


Sheets on one side of frame work.
Hard Board.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for


Material
Hard Board Sheet
1x8x16
Wastage 5%

128 Sft

128.00 Sft
6.40 Sft
134.40 Sft

Deodar Wood & other Accessories


Frame work 2x16x3"x2"
Horizontal post 1x16x2"x2"
2x8x3"x2"
3x8x2"x2"

1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.47
2.00

Wastage 15%
Nails of all sorts
Screws
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

20

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz

0.00 Sft

0.00 P. Cft
0.00 P. Kg
0.00 P. Doz

Percent
0.00
128
1.00 Nos
1.00 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
128

100

Rs.
Rs.

Rs.
Rs.

Page 114

100

#####
#####

Say
Say
Say
Say

(1.00)
(0.10)

Item No.

40
a - (ii)

Providing and fixing partition including fr


Ply wood " (6mm) thick.
One Side.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for


Material
Ply Wood 1x8'x16
Wastage 5%

128 Sft
128.00 Sft
6.40 Sft
134.40 Sft

Deodar Wood
Frame work 2x16x3"x2"
Horizontal post 1x16x2"x2"
Vertical post 3x8x2"x2"
Vertical post 3x8x2"x2"

1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.47
2.00

Wastage 15%
Nails of all sorts
Screws
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft

20

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz

0.00 Sft

0.00 P. Cft
0.00 Kg
0.00 P. Doz

Percent
0.00
128

Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

1.00 Nos
1.00 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
128

100

Rs.
Rs.

Rs.
Rs.

Page 115

100

#####
#####

Say
Say
Say
Say

(1.00)
(0.10)

Item No.

40

Providing and fixing partition including fr


Masonite sheet.
One Side.

a - (iii)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

128 Sft

Material
Masonite sheet 1x8x16
Wastage 5%

128.00 Sft
6.40 Sft
134.40 Sft

Deodar Wood & other Accessories


Frame work 2x16x3"x2"
Horizontal post 1x16x2"x2"
2x8x3"x2"
3x8x2"x2"

1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.47
2.00

Wastage 15%
Nails of all sorts
Screws
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

20

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz

0.00 Sft

0.00 P. Cft
0.00 P. Kg
0.00 P. Doz

Percent
0.00
128
1.00 Nos
1.00 Nos

10

Percent

20

Percent
336.60
128

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 116

100

170.00 P. Day
85.00 P. Day

100

170.00
85.00
255.00
25.50
280.50
56.10
336.60
262.97

Rs.
Rs.

#####
#####

Say
Say

262.95
28.30

Rs.
Rs.

#####
#####

Say
Say

261.90
28.20

Item No.

40

Providing and fixing partition including fr


Sheets on both sides of frame work.
Hard Board.

b (1)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for


Material
Hard Board Sheet
2 x 16 x 8
Wastage 5%

128 Sft

256.00 Sft
12.80 Sft
268.80 Sft

Deodar Wood & other Accessories


Horizontal Post.
2x16x3"x2"
1x16x2"x2"
Vertical post 2x8x3"x2"
3x8x2"x2"

1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.70
2.00

Wastage 15%
Nails of all sorts
Screws of all sorts
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

20

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz

0.00 Sft

0.00 P. Cft
0.00 P. Kg
0.00 P. Doz

Percent
0.00
128
1.20 Nos
1.20 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
128

100

Rs.
Rs.

Rs.
Rs.

Page 117

100

#####
#####

Say
Say
Say
Say

(1.00)
(0.10)

Item No.

40
b - (ii)

Providing and fixing partition including fr


Ply wood.
" (6mm) thick

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

128 Sft

Material
Ply Wood Sheet 2 x 16 x 8 (2 x 4.876 x
2.438) =
23.78 M
Wastage 5%
Deodar Wood for frame work
Horizontal post 2x16x3"x2"
Cross 1x16x2"x2"
Vertical post 2x8x3"x2"
Vertical post 3x8x2"x2"

20

Contractor's Profit & Ove


Total for 128 Sft.
Rate Per Sft

12.80 Sft
268.80 Sft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz

0.00 Sft

0.00 P. Cft
0.00 P. Kg
0.00 P. Doz

Percent
0.00
128

Labour
Carpenter
Cooly Skilled
Total
Sundries
Total

256.00 Sft

1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.70
3.00

Wastage 15%
Nails of all sorts
Screws
Total
Contractor's Profit & Ove
Total for 128 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

1.20 Nos
1.20 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 118

100

0.00 P. Day
0.00 P. Day

0.00
128

100

Rs.
Rs.

#####

Say
Say

Rs.
Rs.

#####
#####

Say
Say

(1.60)
(0.10)

Item No.

40

Providing and fixing partition including fr


Masonite sheet.

b - (iii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

128 Sft

Material
Masonite sheet 2x16'x8'
Wastage 5%

256.00 Sft
12.80 Sft
268.80 Sft

Deodar Wood & other Accessories


Horizontal Post.
2x16x3"x2"
1x16x2"x2"
Vertical post 2x8x3"x2"
3x8x2"x2"

1.67
0.56
0.83
0.83
3.89
0.58
4.47
0.70
2.00

Wastage 15%
Nails of all sorts
Screws
Total
Contractor's Profit & Ove
Total
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

20

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Kg
Doz

0.00 Sft

0.00 P. Cft
0.00 P. Kg
0.00 P. Doz

Percent
0.00
128
1.20 Nos
1.20 Nos

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 119

100

0.00 P. Day
0.00 P. Day

0.00
128

100

Rs.
Rs.

#####

Say
Say

Rs.
Rs.

#####
#####

Say
Say

(1.00)
(0.10)

DESCRIPTION

OF

ITEM NO
i)

41:

Providing and fixing ceiling including fram


Hard Board.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

192 Sft

Material
Hard Board 16x12

192.00 Sft

Partal Wood
7x16x3"x1"
9x16x3"x1"

3.50
3.38
6.88
0.69
7.57
32.00
3.00
0.70
0.178
4.00
4.00

Wastage 10%
Hard Wood Gutti
Screws
Nail
Cement for grouting
M.S clamp
M.S hook
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft

20

Cft
Cft
Cft
Cft
Cft
Nos
Doz
Kg
Bag
Nos
Nos

0.00 Sft

0.00
0.00
0.00
0.00
0.00
0.00
0.00

P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each

0.00 P. Day
0.00 P. Day
0.00 P. Day

Percent
0.00
192

Labour
Carpenter
Cooly Skilled
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

3.00 Nos
2.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.00
192

100

Rs.
Rs.

Rs.
Rs.

Page 120

100

#####
#####

Say
Say
Say
Say

(1.00)
(0.10)

Item No.

41

Providing and fixing ceiling including fram


Chip Board Sheets.

ii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

192 Sft

Material
Chip Board 1x16x12

192.00 Sft

Partal Wood & other Accessories


Partal Wood.
7x16x3"x1"
9x16x3"x1"

3.50
3.38
6.88
0.69
7.57
32.00
3.00
0.70
0.178
4.00
4.00

Wastage 10%
Wooden Hand Gutti
Screws
Nail
Cement for grouting
M.S clamp
M.S hook
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

20

Cft
Cft
Cft
Cft
Cft
Nos
Doz
Kg
Bag
Nos
Nos

0.00 Sft

0.00
0.00
0.00
0.00
0.00
0.00
0.00

P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each

0.00 P. Day
0.00 P. Day
0.00 P. Day

Percent
0.00
192
3.00 Nos
2.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.00
192

100

Rs.
Rs.

Rs.
Rs.

Page 121

100

#####
#####

Say
Say
Say
Say

(1.00)
(0.10)

Item No.

41

Providing and fixing ceiling including fram


work.
Ply Wood " (6mm) thick.

iii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for


=
Material
Ply Wood " (6mm) 12x16

192 Sft
192.00 Sft

Partal Wood & other Accessories


Partal Wood :
7x16x3"x1"
9x16x3"x1"

3.50
3.38
6.88
0.69
7.57
32.00
3.00
0.70
0.178
4.00
4.00

Wastage 10%
Wooden Hand Gutti
Screws
Nail
Cement for grouting
M.S clamp
M.S hook
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft
Labour
Carpenter
Cooly Skilled
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

20

Cft
Cft
Cft
Cft
Cft
Nos
Doz
Kg
Bag
Nos
Nos

0.00 Sft

0.00
0.00
0.00
0.00
0.00
0.00
0.00

P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each

0.00 P. Day
0.00 P. Day
0.00 P. Day

Percent
0.00
192
3.00 Nos
2.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.00
192

100

Rs.
Rs.

Rs.
Rs.

Page 122

100

#####
#####

Say
Say
Say
Say

(1.00)
(0.10)

Item No.

41

Providing and fixing ceiling including fram


Masonite Sheet.

iv)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate Analysis for


=
Material
Masonite Sheet 1x16x12

192 Sft
192.00 Sft

Partal Wood & other Accessories


Partal Wood.
7x16x3"x1"
9x16x3"x1"

3.50
3.38
6.88
0.69
7.57
32.00
3.00
0.70
0.178
4.00
4.00

Wastage 10%
Wooden Hand Gulli
Screws
Nail
Cement for grating
M.S clamp
M.S hook
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft

20

Cft
Cft
Cft
Cft
Cft
Nos
Doz
Kg
Bag
Nos
Nos

0.00 Sft

0.00
0.00
0.00
0.00
0.00
0.00
0.00

P. Cft
Each
P. Doz
P. Kg
P. Bag
Each
Each

0.00 P. Day
0.00 P. Day
0.00 P. Day

Percent
0.00
192

Labour
Carpenter
Cooly Skilled
Cooly Unskilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 192 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

3.00 Nos
2.00 Nos
1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

0.00
192

100

Rs.
Rs.

Rs.
Rs.

Page 123

100

#####
#####

Say
Say
Say
Say

(1.00)
(0.10)

Item No.

42

Providing and fixing thermopore false ceili


including wooden frame panelling, cost of M
clamps, making holes in walls and repairing
damaged surface, complete in all respects.
a)

Deodar wood frame panelling.


" (20mm) Thick.

i)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

12' x 12' =

Rate
Per Unit (Rs.)Amount (Rs.)

144 Sft

Material
Thermopore " thick
Wastage 5%

144.00 Sft
7.20 Sft
151.20 Sft

Deodar Wood
Frame Main 3x12x3"x2"
Cross 3x12x1"x2"
Wooden Strips 12x1"x"

1.53
0.77
0.25
2.55
0.51
3.06

Wastage 20%

Sawing charge
Making holes in walls
Wooden gutties 3 interval
Screws above 1" long
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Sand
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

Cft
Cft
Cft
Cft
Cft
Cft

3.06 Cft
L.S.
16.00 Nos
6.00 Doz
0.70 Kg
4.00 Nos
4.00 Nos
0.083 Bag
1.500 Cft.

20

0.00 Sft

0.00 P. Cft

0.00 P. Cft

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Percent
0.00
144

Page 124

100

Each
P. Doz
P. Kg
Each
Each
P. Bag
% Cft.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenters
Cooly Skilled
Cooly
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

2.25
2.00
0.50
0.25

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Nos
Nos
No
No

P.
P.
P.
P.

Day
Day
Day
Day

0.00
144

100

Rs.
Rs.

Rs.
Rs.

Page 125

0.00
0.00
0.00
0.00

#####
#####

Say
Say
Say
Say

(2.90)
(0.30)

Item No.

Providing and fixing thermopore false ceili


including wooden frame panelling, cost of M
clamps, making holes in walls and repairing
damaged surface, complete in all respects.

42

a)

Deodar wood frame panelling


1" (25mm) Thick.

ii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

12' x 12' =

Rate
Per Unit (Rs.)Amount (Rs.)

144 Sft

Material
Thermopore 1" thick
Wastage 5%

144.00 Sft
7.20 Sft
151.20 Sft

Deodar Wood
Frame Main 3x12x2"x3"
Cross 3x12x1"x2"
Wooden Strips 4x12x1"x"

1.53 Cft
0.77 Cft
0.25 Cft
2.55 Cft
0.51 Cft
3.06 Cft
3.06 Cft
L.S.
6.00 Doz
0.70 Kg
4.00 Nos
4.00 Nos
L.S.

Wastage 20%
Sawing charge
Making holes in walls
Screws of all sorts
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

20

0.00 Sft

0.00 P. Cft
0.00
0.00
0.00
0.00
0.00

Percent
24.00
144

Page 126

100

P. Doz
P. Kg
Each
Each

20.00
20.00
4.00
24.00
16.67

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenter
Cooly Skilled
Cooly
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

2.25
2.00
0.50
0.25

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Nos
Nos
No
No

P.
P.
P.
P.

Day
Day
Day
Day

0.00
144

100

Rs.
Rs.

Rs.
Rs.

Page 127

0.00
0.00
0.00
0.00

#####
1.49

Say
Say

Say
Say

13.85
1.50

Item No.

Providing and fixing thermopore false ceili


including wooden frame panelling, cost of M
clamps, making holes in walls and repairing
damaged surface, complete in all respects.

42

b)

Pertal wood frame panelling


" (20mm) Thick.

i)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for 12' x 12' =

Rate
Per Unit (Rs.)Amount (Rs.)

144 Sft

Material
Thermopore " thick
Wastage 5%

144.00 Sft
7.20 Sft
151.20 Sft

Pertal Wood
Frame Main Style 3x12x2"x3"
Cross Style 3x12x1"x2"
Cross Style 4x12x1"x"

1.53 Cft
0.77 Cft
0.25 Cft
2.55 Cft
0.51 Cft
3.06 Cft
3.06 Cft
L.S.
16.00 Nos
6.00 Nos
0.70 Kg
4.00 Nos
4.00 Nos
0.083 Bag
1.500 Cft.

Wastage 20%
Sawing charge
Making holes in walls
Wooden gutties 3 interval
Screws of all sorts
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Sand
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

20

0.00 Sft

0.00 P. Cft
0.00 P. Cft
0.50
0.00
0.00
0.00
0.00
0.00
0.00

Each
P. Doz
P. Kg
Each
Each
P. Bag
% Cft.

Percent
9.60
144

Page 128

100

8.00
8.00
1.60
9.60
6.67

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenter
Cooly Skilled
Cooly
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

2.25
2.00
0.50
0.25

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Page 129

Nos
Doz
No
No

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

0.00
144

100

Rs.
Rs.

Say
Say

Rs.
Rs.

3.72
0.40

Say
Say

3.70
0.40

Item No.

Providing and fixing thermopore false ceili


including wooden frame panelling, cost of M
clamps, making holes in walls and repairing
damaged surface, complete in all respects.

42

b)

Pertal wood frame panelling


1" (25mm) Thick.

ii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis for

12' x 12' =

Rate
Per Unit

Amount

144 Sft

Material
Thermopore 1" thick
Wastage 5%

144.00 Sft
7.20 Sft
151.20 Sft

Pertal Wood
Frame Main Style 3x12x2"x3"
Cross Style 3x12x1"x2"
Cross Style 4x12x1"x"

1.53 Cft
0.77 Cft
0.25 Cft
2.55 Cft
0.51 Cft
3.06 Cft
3.06 Cft
L.S.
16.00 Nos
6.00 Doz
0.70 Kg
4.00 Nos
4.00 Nos
0.083 Bag
1.500 Cft.

Wastage 20%
Sawing charge
Making holes in walls
Wooden gutties 3 interval
Screws of all sorts
Nail
M.S. hooks
M.S. clamps
Cement sand for repair
Sand
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

20

0.00 Sft

0.00 P. Cft
0.00 P. Cft

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Percent
0.00
144

Page 130

100

Each
P. Doz
P. Kg
Each
Each
P. Bag
% Cft.

Detail

Unit Rate (British System) per 100 Sft


Qty

Labour
Carpenter
Cooly Skilled
Cooly
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total for 144 Sft.
Rate Per Sft

2.25
2.00
0.50
0.25

10

Percent

20

Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate Per Sqm
Composite Rate Per 100 Sft
Composite Rate Per Sqm

Rate
Per Unit (Rs.)Amount (Rs.)

Nos
Nos
No
No

P.
P.
P.
P.

Day
Day
Day
Day

0.00
144

100

Rs.
Rs.

Rs.
Rs.

Page 131

0.00
0.00
0.00
0.00

#####
#####

Say
Say
Say
Say

(2.80)
(0.30)

DESCRIPTION

OF

ITEM NO

43:

a) Fixing door including chowkhat.

Detail

Unit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Mason
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.25 No
0.25 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

0.01

Rs.

Page 132

0.00 P. Day
0.00 P. Day

0.01

Say

Item No.

43

Fixing windows including chowkhat.

Detail

Unit Rate (British System)per Each


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Mason
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.125 No
0.125 No

10

Percent

20

Percent

Item Rates
Labour Rate for Each

Rs.

Page 133

0.00 P. Day
0.00 P. Day

0.00

Say

DESCRIPTION

OF

ITEM NO

44:

a) Glazing with panes 160Z to 180Z (454Gm to 5


Gm) including cost of putty.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

14 Sft

Material
Detail of glass panes
Glass Panes
Wastage 10%

14.00 Sft
1.40 Sft
15.40 Sft
L.S.

Cost of Putty and nails


Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

20

0.00 Sft

0.00 P. Day
0.00 P. Day

Percent
0.00
14

Labour
Glazier for cutting and fixing glass
panes including supplying front & back.
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 134

0.25 No
0.25 No

0.00
14

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

44

Glazing with panes 16 Oz. to 18 Oz. (454Gm


Gm) using deodar wooden fillets and putty.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

14 Sft

Material
Glass Panes
D. Wood
Cost of nails and putty.
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

14.00 Sft
0.09 Cft
L.S.

20

0.00 Sft
0.00 P. Cft

0.00 P. Day
0.00 P. Day
0.00 P. Day

Percent
0.00
14

Labour
Glazier for cutting and fixing glass
panes including supplying front & back.
Cooly Skilled
Cartpenter for
Total
Sundries
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.25 No
0.25 No
0.13 No

0.00
14

Rs.
Rs.

Rs.
Rs.

Page 135

#####

Say
Say

Say
Say

DESCRIPTION

OF

ITEM NO

45:

Glazing with glass panes 24 Oz. to 26 Oz. (


737Gm) using putty and deodar wooden fillet

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

15 Sft

putty and deodar wooden fillet.


Considering 5 Nos panes of average
size i.e. 5x18"x24"

15 Sft

Material
Glass Panes
Wastage 10%

15.00 Sft
1.50 Sft
16.50 Sft
0.06 Cft
L.S.

D. Wood for fillets


Cost of putty and nails
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

20

0.00 Sft
0.00 P. Cft

Percent
0.00
15

Labour
Glazier
Cooly Skilled
Cartpenter
Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 15 Sft.
Rate Per Sft

0.38
0.38
0.13
0.13

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 136

No
No
No
No

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

0.00
15

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO
a)

46:
Cutting to required sizes and fixing glass
with putty.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

14 Sft

Material
Cost of nails & putty

Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

L.S.

20

0.00 P. Day
0.00 P. Day

Percent
0.00
14

Labour
Glazier
Cooly Skilled

Total
Sundries
Total
Contractor's Profit & Ove
Total for 14 Sft.
Rate Per Sft

0.20 No
0.15 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00
14

Rs.
Rs.

#####

Rs.
Rs.

Page 137

Say
Say

Say
Say

Item No.

46

Cutting to required sizes and fixing glass


with wooden fillets and putty.
Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

16 Sft

Material
Deodar wood for fillets
Putty and nails
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft

0.10 Cft
L.S.

20

0.00 P. Cft

Percent
0.00
16

Labour
Glazier
Cooly Skilled
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft

0.20
0.20
0.10
0.10

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 138

No
No
No
No

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

0.00
16

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

47:

Glazing with plate glass " (6mm) thick inc


the cost of deodar wood fillets and putty.
Glazing upto 8 Sft (0.744M).

a)
Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

8 Sft

Material
Plate glass " (6mm) thick
Wastage 10%

8.00 Sft
0.80 Sft
8.80 Sft
0.05 Cft
L.S.

Deodar wood for fillets


Cost of nails and putty

Total
Contractor's Profit & Ove
Total for 8 Sft.
Rate Per Sft

20

0.00
8

Contractor's Profit & Ove


Total for 8 Sft.
Rate Per Sft

0.17
0.17
0.06
0.06

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 139

No
No
No
No

0.00
0.00
0.00
0.00

Percent

Labour
Glazier
Cooly Skilled
Carpenter
Cooly Skilled
Total
Sundries
Total

0.00 Sft
0.00 P. Cft

P.
P.
P.
P.

Day
Day
Day
Day

0.00
8

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

47

Glazing exceeding 8 Sft (0.744M)


and not exceeding 24 Sft (2.230M)
Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs.)Amount (Rs.)

16 Sft

Material
Plate glass " (6mm) thick
Wastage 10%

16.00 Sft
1.60 Sft
17.60 Sft
0.10 Cft
L.S.

Deodar wood for fillets


Cost of nails and putty
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft

20

0.00 Sft
0.00 P. Cft

Percent
0.00
16

Labour
Glazier
Cooly Skilled
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft

0.33
0.33
0.13
0.13

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

No
No
No
No

0.00
0.00
0.00
0.00

Day
Day
Day
Day

0.00
16

Rs.
Rs.

Rs.
Rs.

Page 140

P.
P.
P.
P.

#####
#####

Say
Say
Say
Say

(0.20)

DESCRIPTION

OF

ITEM NO

48:

Providing and fixing 1" (40mm) thick deoda


wood panelled or panelled and glazed, doors
windows, with mild steel chowkhat (frame),
complete in all respects (excluding sliding
lock) with :
M.S. angle iron 1"x1"x" (40x40x6mm)
welded with M.S. flat 2"x" (50x6mm)

i)

Detail

Unit Rate (British System) per Sft


Qty

Rate
Material

Analysis

for 4' x 6.75' =

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Angle Iron 1"x1"x"


Vertical
2 x 7 = 14.00 Rft.
Horizontal l
1 x 4 =
4.00 Rft.
18.00 Rft.
Wastage 5%
0.90 Rft.
18.90 Rft.
18.90 Rft. @ 2.34 lbs/Rft.
44.23
MS Bar "dia 4' @ 0.67 lbs/Rft.
2.68
MS Flat 2"x = 18.90 Rft. @ 1.70 lbs/Rft
32.13
79.04
35.85
Wood
Vertical Style 4x6'-8"x4"x1"
1.12
Horizontal Top 2x1'-11"x4"x1"
0.16
Middle Top 2x1'-11"x4"x1"
0.16
Local Top 2x1'-11"x6"x1"
0.24
Bottom Top 2x1'-11"x8"x1"
0.32
Panells
2x16"x23"x5/8"
4x16"x19"x5/8"
Beading
2(16+16+23+23) 5/8
(1+2) =
0.01
2x8
4(16+16+19+19) 5/8
(1+1)
2x8

lbs
lbs
lbs
lbs
Kgs

0.00 per Kg

0.00 P. Cft

Cft
Cft
Cft
Cft
Cft

0.24 Cft
0.47 Cft

0.01 Cft

0.02 Cft
2.74 Cft
0.82 Cft
3.56 Cft

Wastage 30%

Page 141

Detail

Unit Rate (British System) per Sft


Qty

Fitting
Hinges 4" (100mm)
Tower bolt 9: (225mm)
Handle 6" (150mm)
Iron hold fast
Rubber
Hook & clamp
Screws
Glue
Spikes
Sawing charge

Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

20

Rate
Per Unit (Rs.)Amount (Rs.)

8.00
3.00
3.00
6.00
2.00
2.00

Nos
Nos
Nos
Nos
Nos
Nos

0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each

2.50
0.05
0.13
35.60

Doz
Kg.
Kg.
Sft

0.00
0.00
0.00
0.00

P. Doz
P.Kg.
P.Kg.
Sft

Percent
0.00
27

Labour
Carpenter
Cooly Skilled
Welder
Blacksmith
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

2.40
1.80
1.00
0.57

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Nos
Nos
No
No

P.
P.
P.
P.

Day
Day
Day
Day

0.00
27

Rs.
Rs.

Rs.
Rs.

Page 142

0.00
0.00
0.00
0.00

#####
#####

Say
Say

Say
Say

(1.30)
(14.10)

Item No.

48

Providing and fixing 1" (40mm) thick deoda


wood panelled or panelled and glazed, doors
windows, with mild steel chowkhat (frame),
complete in all respects (excluding sliding
lock) with :
M.S. Tee Iron 1"x1"x" (40x40x6mm)
welded with M.S. flat "x" (12x6mm).

ii)

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

4' x 6.75' =

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
T-Iron 1"x1"x"
Vetical 2x7
Horizontal 1x4

14 Rft
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90 Rft 2.36 Lbs/Rft
M.S. bar " = 4' @ 0.67 Lbs
M.S. flat "x"=18.90 Rft @ 0.425 Lbs

44.60
2.68
8.03
55.31Lbs (

Lbs
Lbs
Lbs
25.10)Kg

Deodar Wood
Vertical Style 4x6'-8"x4"x1"
Horizontal Top 2x1'-11"x4"x1"
Middle Top 2x1'-11"x4"x1"
Local Top 2x1'-11"x6"x1"
Bottom Top 2x1'-11"x8"x1"

1.12
0.16
0.16
0.24
0.32

Panells
2x16"x23"x5/8"
4x16"x19"x5/8"

0.24 Cft
0.47 Cft

Beading
2(16+16+23+23) 5/8
(1+2)
2x8
4(16+16+19+19) 5/8
(1+1)
2x8

0.00 P. Kg

0.00 P. Cft

Cft
Cft
Cft
Cft
Cft

0.01 Cft

0.02 Cft
2.74 Cft
0.82 Cft
3.56 Cft

Wastage 30%

Page 143

Detail

Unit Rate (British System) per Sft


Qty

Fitting
Hinges 4" (100mm)
Tower bolt 9: (225mm)
Handle 6" (150mm)
Iron hold fast
Rubber
Hook & clamp
Screws
Glue
Spikes
Sawing charge
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

8.00
3.00
3.00
6.00
2.00
2.00
2.50
0.05
0.13
35.60

20

Rate
Per Unit (Rs.)Amount (Rs.)

Nos
Nos
Nos
Nos
Nos
Nos
Doz
Kg.
Kg.
Sft

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P.Kg.
P.Kg.
Sft

Percent
0.00
27

Labour
Carpenter
Cooly Skilled
Welder
Blacksmith
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

2.40
1.80
1.00
0.57

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Nos
Nos
No
No

P.
P.
P.
P.

Day
Day
Day
Day

0.00
27

Rs.
Rs.

Rs.
Rs.

Page 144

0.00
0.00
0.00
0.00

#####
#####

Say
Say
Say
Say

(0.10)
(0.60)

DESCRIPTION

OF

ITEM NO

49:

Providing and fixing 1" (40mm) thick hollo


doors and windows, with commercial ply (3mm
both faces of deodar wood shutter frame 1"
(32mm) thick and partal wood braces at abou
(76mm) apart and deodar wood lipping 1"x3/
(40x10mm) fixed with M.S. chowkhat (frame),
including chromium plated fittings, etc. co
all respects (without sliding bolt or lock)
M.S. Angle Iron 1"x1"x" welded with M.S.
flat 2"x"

a)

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Angle Iron 1"x1"x"
Vetical 2x7
Horizontal 1x4

14 Rft
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
43.85 Lbs
M.S. flat 2"x" (50x6mm)
Vetical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft
18.90 Rft @ 1.68 Lbs/Rft
31.75 Lbs
M.S. flat patti 1"x1/8" (25x3mm) at bott
1.68 Lbs
77.28Lbs (35.06 Kg.
Deodar Wood
Vertical Style 2x6'-8"x4"x1"
0.47 Cft
Vertical Style 3x6'-8"x2"x1"
0.35 Cft
Horizontal Style 1x3'-11"x4"x1"
0.14 Cft
Middle Style 1x3'-11"x4"x1"
0.14 Cft
Lock Style 1x3'-11"x6"x1"
0.21 Cft
Bottom Style 1x3'-11"x8"x1"
0.27 Cft
Side Strip 2x6'-8"x1"x1/8"
0.02 Cft
Side Strip 2x3'-8"x1"x1/8"
0.01 Cft
1.61 Cft
Wastage 35%
0.56 Cft
2.17 Cft

Page 145

0.00 P. Kg

0.00 P. Cft

Detail

Unit Rate (British System) per Sft


Qty

Fitting
Hinges 4" (100mm)
Tower bolt 9: (225mm)
Handle 6" (150mm)
Iron hold fast
Rubber chocks
Hook & clamp
Screws
Glue
Spikes
Sawing charge

4.00
2.00
2.00
6.00
1.00
1.00
2.50
0.75
0.20
21.70

Commercial Ply (3mm)


2x3'-11"x6'-8"
Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

Nos
Nos
Nos
Nos
No
No
Doz
Kg.
Kg.
Sft

53.38 Sft
8.01 Sft
61.39 Sft
20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P.Kg.
P.Kg.
Sft

0.00 Sft

1 No
1 Nos

0.00 Each
0.00 Each

1 Nos
1 No

0.00 P. Day
0.00 P. Day

0.00
27

Rs.
Rs.

Percent
0.00
27

Labour
Welder for making frame
Black Smith
For Panelling pressing and erecting door
Carpentre
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Rs.
Rs.

Page 146

#####
#####

Say
Say

Say
Say

(1.30)
(14.10)

DESCRIPTION

OF

ITEM NO

49:

Providing and fixing 1" (40mm) thick hollo


doors and windows, with commercial ply (3mm
both faces of deodar wood shutter frame 1"
(32mm) thick and partal wood braces at abou
(76mm) apart and deodar wood lipping 1"x3/
(40x10mm) fixed with M.S. chowkhat (frame),
including chromium plated fittings, etc. co
all respects (without sliding bolt or lock)
M.S. Tee Iron 1"x1"x" welded with M.S.
flat "x"

b)

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

4' x 6.75'

Rate
Per Unit (Rs.)Amount (Rs.)

27 Sft

Material
Tee Iron 1"x1"x"
Vetical 2x7
Horizontal 1x4

14 Rft
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft @ 2.36
44.60
M.S. flat "x" (40x6mm)
Vetical 2x7
14 Rft
Horizontal 1x4
4 Rft
18.00 Rft
Wastage 5%
0.90 Rft
8.03
18.90 Rft @ 0.423L
M.S. bar " dia = 4 Rft @ 0.67 Lbs
2.68
55.31Lbs (
Deodar Wood
Vertical Style 2x6'-8"x4"x1"
0.47
Vertical Style 3x6'-8"x2"x1"
0.35
Horizontal Style 1x3'-11"x4"x1"
0.14
Middle Style 1x3'-11"x4"x1"
0.14
Lock Style 1x3'-11"x6"x1"
0.21
Bottom Style 1x3'-11"x8"x1"
0.27
Side Strip 2x6'-8"x1"x1/8"
0.02
Side Strip 2x3'-8"x1"x1/8"
0.01
1.61
Wastage 35%
0.56
2.17

Page 147

Lbs

Lbs
Lbs
25.10 Kg

0.00 P. Kg

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft

0.00 P. Cft

Detail

Unit Rate (British System) per Sft


Qty

Fitting
Hinges 4" (100mm)
Tower bolt 9: (225mm)
Handle 6" (150mm)
Iron hold fast
Rubber chocks
Hook & clamp
Screws
Glue
Spikes
Sawing charge

4.00
2.00
2.00
6.00
1.00
1.00
2.50
0.75
0.20
21.70

Commercial Ply (3mm)


2x3'-11"x6'-8"
Wastage 15%
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

Nos
Nos
Nos
Nos
No
No
Doz
Kg.
Kg.
Sft

53.38 Sft
8.01 Sft
61.39 Sft
20

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each
P. Doz
P.Kg.
P.Kg.
Sft

0.00 Sft

1 No
1 Nos

0.00 Each
0.00 Each

1 Nos.
1 No.

0.00 P. Day
0.00 P. Day

0.00
27

Rs.
Rs.

Percent
0.00
27

Labour
Welder for making frame
Black Smith
For Rendring & Erection Door
Carpentre
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 27 Sft.
Rate Per Sft

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Rs.
Rs.

Page 148

#####
#####

Say
Say

Say
Say

(1.30)
(14.10)

DESCRIPTION

OF

ITEM NO

50:

Providing and fixing 1" (40mm) thick solid


door shutter sterling or equivalent with co
ply (5mm thick) on both sides double presse
deodar wood lipping 1"x3/8" (40x10mm) arou
shutter including chromium plated fittings,
hinges with aluminium kick plate 22SWG on b
sides & finger plate complete in all respec

Remarks :

If C.I. finger plate and kick plate are not


provided/ fixed the composite rate will be
by Rs. 7.60 Per Sft
(81.76M).

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis for

3.5' x 7' =

Rate
Per Unit (Rs.)Amount (Rs.)

24.5 Sft

Material
Solid flush
Door leaf 1" (40mm) thick sterling
or equivalent with commerical ply
(5mm) thick both sides.
3"x7'-0' = 24.50 Sft

24.50 Sft

0.00 Sft

Deodar Wood Lipping 3/8"


(3.5+3.5+7.0+7.0)

21.00 Rft

0.00 per/ft.

0.00
0.00
0.00
0.00
0.00
0.00

Hinges 4" (100mm)


Tower bolt C.P.
C.P. Handle best quality
Door stopper
C.P. finger plate with screws
Kick plate 22 SWG on both sides
Total
Contractor's Profit & Ove
Total for 24.5 Sft.
Rate Per Sft

20

4.00
2.00
2.00
1.00
1.00
2.00

Nos
Nos
Nos
No
No
Nos

Percent
0.00
24.5

Page 149

Each
Each
Each
Each
Each
Each

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
For planning & fixing of lipping with
door fitting complete.
Carpentre
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 24.5 Sft.
Rate Per Sft

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

1.00 No
1.00 No

0.00 P. Day
0.00 P. Day

0.00
24.5

Rs.
Rs.

Rs.
Rs.

Page 150

#####

Say
Say
Say
Say

(0.20)

DESCRIPTION

OF

ITEM NO

51:

Providing and fixing panelled door of M.S.


with forged door leaves of M.S. Sheet 22 SW
in hollow frame chowkhat 3"x4" (76x114mm)
made of M.S. sheet 18 SWG, filled with plai
concrete 1:3:6 etc. complete, with all fitt
hammer painting, including carriage to site
fixing in position.

Detail

Unit Rate (British System) per Sft


Qty

Rate

Analysis

for

4' x 7'

Rate
Per Unit (Rs.)Amount (Rs.)

28 Sft

Material
M.S. Sheet 18 SWG
for chowkhat
18'x15"
Wastage 20%
M.S. Sheet 22 SWG
for shutter
26x7 1/8
Wastage 20%
M.S. Flat 1"x1/16" (25x2mm)
6'-9"x0.21

23.44 Sft
4.69 Sft
28.13 Sft

0.00 Sft

31.50 Sft
6.30 Sft
37.80 Sft

0.00 Sft

0.00 P. Kg

1.43Lb (065) Kg

Fitting
Hinges 4" (100mm)
Tower bolt 9: (225mm)
Handle 6" (150mm)
Iron hold fast
Screws
Welding electrode
Electricity Charges

6.00 Nos
2.00 Nos
2.00 Nos
6.00 Nos
L.S.
4.00 Nos
L.S.

Cement concrete (1:3:6)


Cement
Sand
Bagri

0.21 Bag
0.76 Cft
1.52 Cft

Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

20

0.00
0.00
0.00
0.00

0.00 Each

0.00 Each
0.00 P. Cft
0.00 P. Cft

Percent
4.80
28

Page 151

Each
Each
Each
Each

4.00
-

4.00
0.80
4.80
0.17

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Welder
Blacksmith
Mason
Coolies
Total
Sundries
Total
Contractor's Profit & Ove
Total for 28 Sft.
Rate Per Sft

0.50
2.50
0.25
0.75

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 152

No
Nos
No
No

0.00
0.00
0.00
0.00

P.
P.
P.
P.

Day
Day
Day
Day

0.00
28

Rs.
Rs.

Say
Say

Rs.
Rs.

0.17
1.84

Say
Say

0.15
1.85

DESCRIPTION

OF

ITEM NO

52:

Providing and laying 24 SWG aluminium kick


plate 4" (100mm) high fixed with screws 4"
(100mm) Centre to Centre on bottom rail of
doors only. of commercial ply.

Detail

Unit Rate (British System) per Rft


Qty

Rate

Analysis

for 4

Rate
Per Unit (Rs.)Amount (Rs.)

Rft

Material
Aluminium plate 4" (100mm) wide
and 24 SWG

Total
Contractor's Profit & Ove
Total for 4 Rft.
Rate Per Rft

20

0.18 Kg

0.00 P. Kg

0.00 P. Day

Percent
0.00
4

Labour
Carpenter

Total
Sundries
Total
Contractor's Profit & Ove
Total for 4 Rft.
Rate Per Rft

0.12 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rqm

Page 153

0.00
4

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION

OF

ITEM NO

53:

Providing and fixing curtain railing to doo


windows, comprising of TOSO-elite Japan mad
superior type of railing or equivalent, fix
4"x" (100x20mm) deodar wood strip, includi
painting.

Detail

Unit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
Rate For 10 Rft
Railing
Cutting of Railing
Screws
Guttis
Deodar wood
Total
Contractor's Profit & Ove
Total for 10 Rft.

10.00 Rft
1.00 Dozen
6.00 Nos
0.21 Cft

20

0.00 P. Rft
0.00 P, Doz
0.00 Each
0.00 P. Cft

Percent

Material Rate Per Rft.

0.00
10

0.00 P. Day

Labour
Rate For
Carpenter

80 Rft

Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

1.00 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Rft
Labour Rate Per Rm
Composite Rate Per Rft
Composite Rate Per Rm

Page 154

0.00
80

Rs.
Rs.

Say
Say

Rs.
Rs.

0.15
0.54

Say
Say

0.15
0.55

DESCRIPTION

OF

ITEM NO

54:

Providing and fixing M.S. flat "1/8" (12x3


grill including "x1/8" (20x3mm) M.S. Flat
of windows of approved design including pai
coat complete in all respect.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

2 x 3

Rate
Per Unit (Rs.)Amount (Rs.)

8.75 Sft

Material
M.S. Flat Frame for Grill "x1/8"
(20x3mm)
2'+3'+2'+3'
12 Sft
@ 0.32 Lbs/Rft
M.S. Flat "x1/8" (12x3mm)
Straight 3x2x3
Flower 6x4x1
Side 6x4x
Front 6x1x2
Total
Wastage 5%

Hold fast 6" (150mm) long


Electrical Charges
Electrod
Paint
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

3.84 Lbs (1 .88)Kg

21.00 Rft.
30.00 Rft.
6.00 Rft.
12.00 Rft.
69.00 Rft.
3.45 Rft.
72.45Lb (7.0 )Kg
0.00 P. Kg
@ 0.21 lbs/rft 15.21 lbs
6.00 Nos
L.S.
0.33 Pkt
0.098Lb (0. 08) Gl

20

0.00 P. Kg

0.00 Each

Page 155

154.00

0.00 Pkt
0.00 P. Gl

(11.00)
21.12
-

164.12
32.82
196.94
22.51

Percent
196.94
8.75

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Welder
Blacksmith
Masson
Painter
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

0.17
0.17
0.20
0.09

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Nos
No
Nos
No

P.
P.
P.
P.

Day
Day
Day
Day

0.00
8.75

Rs.
Rs.

Rs.
Rs.

Page 156

0.00
0.00
0.00
0.00

#####
#####

Say
Say
Say
Say

22.45
241.80

DESCRIPTION

OF

ITEM NO

55:

Providing and fixing G.I. Wire gauge 22 SWG


12x12 meshes per Sq Inch (625mm) fixed to s
window complete with flat iron putti "x1/8
(12x3mm) and machine made screws.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

4 x 3

Rate
Per Unit (Rs.)Amount (Rs.)

12 Sft

Material
Wire Gauge 144 (12x12) Mesh
Wastage 10%

12.00 Sft
1.20 Sft
13.20 Sft

0.00 Sft

0.00 P. Kg
0.00 P. Doz

0.00 P. Day
0.00 P. Day

0.00
55

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Flat Iron "x1/8" (12x3mm)


3+3+4+4+4
18.00 Rft
Wastage 5%
0.90 Rft
18.90 Rft @ 0.21 4 Lbs (1. 82) Kg
Screws
6.70 Dozen
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

20

Percent
0.00
12

Labour Rate for 55 Sft.


Blacksmith
Skilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total for 100 Sft.
Rate Per Sft

1.00 No
0.40 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 157

DESCRIPTION

OF

ITEM NO

56:

Providing and fixing wooden moulding stoppe


2"x5/8" (63x16mm) on door frame fitted wit
of approved quality complete in all respect
Teak Wood Moulding.

a)
Detail

Unit Rate (British System) per Rft


Qty

Rate Analysis for

Rate
Per Unit (Rs.)Amount (Rs.)

16 Sft

Material Teak Wood


2x(6'-10')+2'-3"
16x2"x5/8"
Wastage 25%

16.00
0.17
0.04
0.22
0.19
0.116

Glue
Nails
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft

20

Contractor's Profit & Ove


Total for 16 Sft.
Rate Per Sft

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.00 P. Day

Percent
0.00
16

Labour
Labour for sawing, planning and fixing
16 Rft (4.876Rm) moulding in position
carpenter.
Total
Sundries
Total

Rft
Cft
Cft
Cft
Kg.
Kg.

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 158

0.50 No

0.00
16

Rs.
Rs.

0.05

Say
Say

0.05

Rs.
Rs.

#####

Say
Say

(0.10)

Item No.

56

Providing and fixing wooden moulding stoppe


2"x5/8" (63x16mm) on door frame fitted wit
of approved quality complete in all respect
Deodar Wood Moulding.

b)
Detail

Unit Rate (British System) per Rft


Qty

Rate Analysis for

Rate
Per Unit (Rs.)Amount (Rs.)

16 Sft

Material
Deodar wood 2x(6'-10')+2'-3"
16x2"x5/8"
Wastage 25%

16.00
0.17
0.04
0.22
0.26
0.116

Glue
Nails
Total
Contractor's Profit & Ove
Total for 16 Sft.
Rate Per Sft

20

Contractor's Profit & Ove


Total for 16 Sft.
Rate Per Sft

0.00 P. Cft
0.00 P. Cft
0.00 P. Cft

0.00 P. Day

Percent
0.00
16

Labour
Labour for sawing, planning and fixing
16 Rft (4.876Rm) moulding in position
carpenter.
Total
Sundries
Total

Rft
Cft
Cft
Cft
Kg.
Kg.

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 159

0.50 No

0.00
16

Rs.
Rs.

0.05

Say
Say

0.05

Rs.
Rs.

0.05
0.14

Say
Say

0.05
0.15

DESCRIPTION

OF

ITEM NO

57:

Providing and fixing deodar wood dolly fram


having 1"x1" (40x40mm) vertical and
horizontal double posts with 1"x" (40x40m
full width of jamb braces at 12" (300mm)
including filling of hollow space in betwee
with 1:3:6 P.C.C. fixing of ply of approved
quality there upon & hold fasts complete in
respects.
Teak Wood Ply

a)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

Rate
Per Unit (Rs.)Amount (Rs.)

13 Sft

Material (Daodar Wood)


Vertical 2x2x7x1"x1"
Horizontal 2x3.5x0.125x0.125
Braces 12"x17.25x0.125

0.44
0.11
0.20
0.75
0.19
0.94
0.82
0.08
0.90
12.94
1.29
14.23
0.29
0.116
4.00

Wastage 25%
PCC (1:3:6) 6"x10"x1"
Wastage 10%
Teak Wood Ply
Wastage 10%

17.25 x 0.75

Glue
Nails
Hold fast
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft

20

Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Cft
Sft
Sft
Sft
Kg.
Kg.
Nos

0.00 P. Cft

0.00 P. Cft

0.00
0.00
0.00
0.00

Percent
0.00
13

Page 160

Sft
P. Cft
P. Cft
Each

Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft

0.50 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 161

0.00 P. Day
0.00 P. Day

0.00
13

Rs.
Rs.

#####

Say
Say

(0.10)

Rs.
Rs.

0.05

Say
Say

0.05

Item No.

57

Providing and fixing deodar wood dolly fram


1"x1" (40x40mm) vertical and horizontal d
with 1"x" (40x40mm) full width of jamb br
(300mm) including filling of hollow space i
braces with 1:3:6 P.C.C. fixing of ply of a
there upon & hold fasts complete in all res
b)

With Commercial Ply.

Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

Rate
Per Unit (Rs.)Amount (Rs.)

13 Sft

Deodar wood
PCC (1:3:6)
Commercial ply
Glue
Nails
Hold fast
Total
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft

0.94 Cft
0.90 Cft
14.23 Sft
0.29 Kg.
0.116 Kg.
L.S.
20

Percent

20

Percent
0.33
13

0.00
0.31
0.00
0.00
0.00

P.
P.
P.
P.
P.

Cft
Cft
Sft
Cft
Cft

0.28
0.28
0.06
0.33
0.33
0.03

Labour
Carpenter
Cooly Skilled
Total
Sundries
Total
Contractor's Profit & Ove
Total for 13 Sft.
Rate Per Sft

0.50 No
0.50 No

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 162

0.00 P. Day
0.00 P. Day

0.00
13

Rs.
Rs.

#####

Say
Say

(0.10)

Rs.
Rs.

#####
#####

Say
Say

(0.60)
(6.40)

DESCRIPTION

OF

ITEM NO

58:

Providing and fixing ornamental wooden


architrave 3"x" (75x12mm) tapered to "
(6mm) all along the door frame complete in
respects.
Teak Wood Architrave.

a)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for

3.5 x 7

24.50 Sft

Material
Length of Architrave
2(7'-0")+3'-6"
17.50 Rft
quantity (3/12'x'x1/12')x17.5'
Wastage 25%
Teak Wood
Nails
Total
Contractor's Profit & Ove
Total for 24.50 Sft.
Rate Per Sft

20

Contractor's Profit & Ove


Total for 24.50 Sft.
Rate Per Sft

0.18 Cft
0.05 Cft
0.23 Cft

0.00 P. Cft

0.093 Kg.

0.00 P. Kg.

Percent
0.00
24.50

Labour
Carpenter
Fixing in position
Total
Sundries
Total

Rate
Per Unit (Rs.)Amount (Rs.)

0.25 No
L.S.

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 163

0.00 P. Day

0.00
24.50

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

58

Providing and fixing ornamental wooden


architrave 3"x" (75x12mm) tapered to "
(6mm) all along the door frame complete in
respects.
Deodar Wood Architrave.

b)
Detail

Unit Rate (British System) per Sft


Qty

Rate Analysis for 3.5 x 7

24.50 Sft

Material
Length of Architrave
2(7')+3'-6"
17.50 Rft
quantity (3/12'x'x1/12')x17.5'
Wastage 25%
Deodar wood
Nails
Total
Contractor's Profit & Ove
Total for 24.50 Sft.
Rate Per Sft

20

0.18 Cft
0.05 Cft
0.23 Cft

0.00 P. Cft

0.186 Kg.

0.00 P. Kg.

Percent
0.00
24.50

Labour
Carpenter
Fixing in position
Total
Sundries
Total
Contractor's Profit & Ove
Total for 24.50
Rate Per Sft

Rate
Per Unit (Rs.)Amount (Rs.)

0.25 No
L.S.

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

Page 164

0.00 P. Day

0.00
24.50

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Item No.

Providing and fixing vin board cabinet in k


proofing and polishing / painting with synt
specific with handle and draws screw comple
respects as per drawing

58

2'8'Take Qty 8 x 2 = 16 Sft.


Detail

Unit Rate (British System) per Sft


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Material
a) Vin Board 3/4
Vin Board
Total
Wastage 20%
Total

2x8x1 =
5x2x1 =

24.00
15.00
39.00
7.80
46.80

Sft.
Sft.
Sft.
Sft.

0.00 P. Sft.

16.00 Sft.

0.00 P. Sft.

0.65 Ft.

0.00 P. Cft.

0.08 Litre

0.00 P. Litr

0.00 P. Ft.

0.00 P. Gall
0.00 P. Day
0.00
0.00

0.00 Each

b) Front Shutter Vin Board


4 x 2 x 2 = 16
c) Frame Deodar Wood 3"x1"
2 x 8 = 16
2 x 5 = 10
Total
Wastage 20%
Total

16.00
10.00
26.00
5.20
31.2
31.2 x 1 x 3"
12 x 12

d) Termite
e) Gola
Wastage 20%
Total

8x2x2

Ft.
Ft.
Ft.
Ft.

32.00 Ft.
6.40
38.40 Ft.

f) Painting / polishing including material + labour


Enamal Paint
0.011 Gallon
Painter
0.041 No.
16.00 Ft.
g) Handle

4.00 Nos.

Page 165

h) Screws

3.75 Dozen

0.00 P. Doz

i) Hinges

2.00 Nos.

0.00 Each

Total
Contractor's Profit & Ove
Total

20

Percent

Labour
Carpenter
Helper
Total
Sundries
Total
Contractor's Profit & Ove
Total
Rate Per Sft

1.50 Nos.
1.25 Nos.

10

Percent

20

Percent

Item Rates
Labour Rate Per Sft
Labour Rate Per Sqm
Composite Rate Per Sft
Composite Rate Per Sqm

0.00 P. Day
0.00 P. Day

0.00
16

Rs.
Rs.

Rs.
Rs.

Page 166

Say
Say

Say
Say

37

Providing and Installing PVC Bends of BSS.


(i)

Sr.

Class "B" Working Pressure


Size

No.

MATERIAL

LABOUR

Rate Contractor's Total

SOLVENT

Each

Profit

Percent
4

(3 + 4) Quantity

Rate

Total Contractor

20
1

JOINTING
Daily
Total

Daily

Amount

progress Charges

Grand

RATE

Total

Labour Composite

(10 + 13)

(5 + 15)

Profit
5

Kgs.
6

Per Kg.
7.00

20.00
9

(8 + 9)
10

(Joints)
11

12

13

14

15

16

3" (75mm)

0.00

0.00

1/27

0.00

0.00

0.00

50.00

0.01

0.00

0.00

0.00

4" (100mm)

0.00

0.00

1/20

0.00

0.00

0.00

50.00

0.01

0.00

0.00

0.00

3
4

5" (125mm)
6" (150mm)

0.00
0.00

0.00
0.00

1/16
1/15

0.00
0.00

0.00
0.00

0.00
0.00

40.00
40.00

0.01
0.01

0.00
0.00

0.00
0.00

0.00
0.00

0.00

1/64

0.00

0.00

0.00

60.00

0.01

0.00

0.00

0.00

(ii) CLASS "D" WORKING PRESSURE


1

1" (32mm)

0.00

1" (40mm)

0.00

0.00

1/50

0.00

0.00

0.00

60.00

0.01

0.00

0.00

0.00

2" (50mm)

0.00

0.00

1/40

0.00

0.00

0.00

60.00

0.01

0.00

0.00

0.00

3" (75mm)

0.00

0.00

1/27

0.00

0.00

0.00

50.00

0.01

0.00

0.00

0.00

4" (100mm)

0.00

0.00

1/20

0.00

0.00

0.00

50.00

0.01

0.00

0.00

0.00

6
7

5" (125mm)
6" (150mm)

0.00
0.00

0.00
0.00

1/16
1/15

0.00
0.00

0.00
0.00

0.00
0.00

40.00
40.00

0.01
0.01

0.00
0.00

0.00
0.00

0.00
0.00

DAILY PROGRESS
Plumber 1 N
Cooly
0.9
Total

0.00 Per day


0.00 Per day

0.00
0.00
0.00

Sundries
Total
Contractor Profit

10.00 Percent
20.00 Percent

0.00
0.00
0.00

Total
Say

0.01
0.01

38

Providing and Installing PVC Tee of BSS.


20
(i)

Class "B" Working Pressure

Sr.
No.

Size

1
1
2
3
4

2
3" (75mm)
4" (100mm)
5" (125mm)
6" (150mm)

MATERIAL
LABOUR
JOINTING
Grand
RATE
SOLVENT
Daily
Daily Amount Total
Labour Composite
Rate Contractor's Total
Each
Profit
(3 + 4) Quantity Rate
TotalContractor's Total progress Charges
(10 + 13)
(5 + 15)
20.00
Kgs. Per Kg.
20.00 (8 + 9)
(Joints)
3
4
5
6
7
8
9
10
11
12
13
14
15
16
0.00
0.0 1/18
0.00
0.00
0.00 50.00
0.01
0.00
0.00
0.00
0.00
0.0 1/13
0.00
0.00
0.00 50.00
0.01
0.00
0.00
0.00
0.00
0.0 1/11
0.00
0.00
0.00 40.00
0.01
0.00
0.00
0.00
0.00
0.0 1/10
0.00
0.00
0.00 40.00
0.01
0.00
0.00
0.00

(ii) CLASS "D" WORKING PRESSURE


1
2
3
4
5
6
7

1" (32mm)
1" (40mm)
2" (50mm)
3" (75mm)
4" (100mm)
5" (125mm)
6" (150mm)

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.0
0.0
0.0
0.0
0.0
0.0
0.0

1/40
1/33
1/27
1/18
1/13
1/11
1/10

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

60.00
60.00
60.00
50.00
50.00
40.00
40.00

0.01
0.01
0.01
0.01
0.01
0.01
0.01

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

DAILY PROGRESS
Plumber 1 N
Cooly
0.9
Total

0.00 Per day


0.00 Per day

0.00
0.00
0.00

Sundries
Total
Contractor Profit

10.00 Percent
20.00 Percent

0.00
0.00
0.00

Total
Say

0.01
0.01

0.00
0.00
0.00
0.00
0.00
0.00
0.00

39

Providing and Installation of PVC Sockets B.S.S


(i)

Sr.
No.

1
1
2
3
4
5
6
7
8
(ii)
1
2
3
4
5
6
7

Class "B" Working Pressure

Size
Rate
Each

2
3" (75mm)
4" (100mm)
5" (125mm)
6" (150mm)
8" (200mm)
10" (250mm)
12" (300mm)
14" (350mm)

3
-

MATERIAL
LABOUR
ContrTotal
SOLVENT
Total Contraactor's
(3 + 4) Quantity Rate
10.00
Kgs. Per Kg.
ctor's
10.00
4
5
6
7
8
9
0.00
0.00 1/27
0.00
0.00
0.00
0.00 1/20
0.00
0.00
0.00
0.00 1/16
0.00
0.00
0.00
0.00 1/15
0.00
0.00
0.00
0.00 1/10
0.00
0.00
0.00
0.00
1/8
0.00
0.00
0.00
0.00
1/7
0.00
0.00
0.00
0.00
1/6
0.00
0.00

Total
(8 + 9)

No. of
Joints

JOINTING
Grand
RATE
Daily Amount Total
Labour Composite
Charges
(10 + 13)
(5 + 15)

10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

11
50.00
50.00
40.00
40.00
30.00
30.00
25.00
25.00

12
0.01
0.01
0.01
0.01
0.01
0.01
0.01
0.01

13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15
-

0.00
0.00
0.00
0.00
0.00
0.00
0.00

60.00
60.00
60.00
50.00
50.00
40.00
40.00

0.01
0.01
0.01
0.01
0.01
0.01
0.01

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

CLASS "D" WORKING PRESSURE


1" (32mm)
1" (40mm)
2" (50mm)
3" (75mm)
4" (100mm)
5" (125mm)
6" (150mm)

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1/64
1/50
1/40
1/27
1/20
1/16
1/15

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

DAILY PROGRESS
Plumber 1 N
Cooly
0.9
Total

0.00 Per day


0.00 Per day

0.00
0.00
0.00

Sundries
Total
Contractor Profit

10.00 Percent
20.00 Percent

0.00
0.00
0.00

Total
Say

0.01
0.01

0.00
0.00
0.00
0.00
0.00
0.00
0.00

40 -

Providing and installing PVC Tappered Core BSS


41 (i)

Sr.
No.

1
1
2
3
4
5
6
7
8

Class "B" Working Pressure

Size
Rate
Each

2
3" (75mm)
4" (100mm)
5" (125mm)
6" (150mm)
8" (200mm)
10" (250mm)
12" (300mm)
14" (350mm)

3
-

MATERIAL
LABOUR
ContraTotal
SOLVENT
Total Contractor's
(3 + 4) Quantity Rate
Profit
Kgs. Per Kg.
ctor's
20.00
Profit
20.00
4
5
6
7
8
9
0.00
0.00 1/27
0.00
0.00
0.00
0.00 1/20
0.00
0.00
0.00
0.00 1/16
0.00
0.00
0.00
0.00 1/15
0.00
0.00
0.00
0.00 1/10
0.00
0.00
0.00
0.00
1/8
0.00
0.00
0.00
0.00
1/7
0.00
0.00
0.00
0.00
1/6
0.00
0.00

Total
(8 + 9)

JOINTING
Grand
Daily
Daily Amount Total
Progress Charges
(10 + 13)

RATE
Labour Composite
(5 + 15)

10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

11
50.00
50.00
40.00
40.00
30.00
30.00
25.00
25.00

12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

15
-

0.00
0.00
0.00

60.00
60.00
60.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

36 (ii) CLASS "D" WORKING PRESSURE


1
2
3

1" (32mm)
1" (40mm)
2" (50mm)

0.00
0.00
0.00

0.00
0.00
0.00

1/64
1/50
1/40

0.00
0.00
0.00

0.00
0.00
0.00

DAILY PROGRESS
Plumber 1 N
Cooly
0.9
Total

0.00 Per day


0.00 Per day

0.00
0.00
0.00

Sundries
Total
Contractor Profit

10.00 Percent
20.00 Percent

0.00
0.00
0.00

Total
Say

0.00
0.00

0.00
0.00
0.00

1- Boring for tube well in all types of soil except shingle and rock from ground level to 100 Ft (30 Metre) depth

including sinking and with-drawing of casing pipe complete.


S.
No.

Dia of
bore

Time (Day)
required to
complete
100' (30M)

Daily
labour
charges

Labour
per foot

Hire charges
of boring
material
installation
and carriage

Loading Expenses
Per Foot
No. of Rate per Amount
day
day

3"

#VALUE! #VALUE!

0.00 0.02

0.00

0.00

4"

#VALUE! #VALUE!

0.00 0.04

0.00

0.00

5"

#VALUE!

#VALUE!

0.00 0.10

0.00

6"

#VALUE!

#VALUE!

0.00 0.20

8"

11

#VALUE!

#VALUE!

10"

13

#VALUE!

12"

14

15"

18"

Repair
charges
of T & P

10

Petty store
bolts &
nuts etc.

11

Total
Column (6,
9, 10, 11)

12

0.00

0.00

0.00

0.00

0.00 0.30

0.00

#VALUE!

0.00 0.40

#VALUE!

#VALUE!

17

#VALUE!

18

#VALUE!

Contractors,
Profit& over heads 20%
on Column
No.12

Total

Grand Total
Rate per Ft/

Rs. per
foot

Rate per
Metre

(12 + 13)

(5 + 14)

Say

13

14

15

16

17

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00 0.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00 0.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00 0.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

2- Boring for tube well in all types of soil except shingle gravel and rock from a depth of 100.10 to 200 Ft (30 to 60 Metre)

below ground level, including sinking and with drawing of casing pipe complete.
S.

Dia of

Time (Day)

Daily

Labour

Hire charges

Loading Expenses

Repair

Petty store

Total

Contractors'

No.

bore

required to

labour

per foot

of boring

Per Foot

charges

bolts &

Column (6,

Profit& overheads 20%

complete

charges

of T & P

nuts etc.

9, 10, 11)

on Column

100' (30M)

material

No. of

Rate per

installation

day

day

Amount

Total

Grand Total

Rate per

Rate per

Rate per Ft/

Rft

Metre

16

17

No.12

(12 + 13)

(5 + 14)

13

14

15

and carriage

5"

10

#VALUE!

#VALUE!

0.00 0.30

0.00

6"

14

#VALUE!

#VALUE!

0.00 0.40

8"

15

#VALUE!

#VALUE!

10"

16

#VALUE!

12"

17

15"

18"

10

11

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00 0.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00 0.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00 0.50

0.00

0.00

20.00

0.00

20.00

2.00

22.00 #VALUE!

#VALUE!

#VALUE!

20

#VALUE!

#VALUE!

0.00 0.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

21

#VALUE!

#VALUE!

0.00 0.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

12

3- Boring for tube well in all types of soil except shingle gravel and rock from a depth of 200.10 to 300 Ft (60 to 90 Metre)

below ground level including sinking and with drawing of casing pipe complete.
S.

Dia of

Time (Day)

Daily

Labour

Hire charges

Loading Expenses

Repair

Petty store

Total

Contractors,

No.

bore

required to

labour

per foot

of boring

Per Foot

charges

bolts &

Column (6,

Profit& over heads 20%

complete

charges

of T & P

nuts etc.

9, 10, 11)

on Column

100' (30M)

material

No. of

Rate per

installation

day

day

Amount

Total

Total

Rate per

Rate per

Rate per Ft/

Rft

Metre

No.12

(12 + 13)

(5 + 14)

Say

13

14

15

16

17

and carriage

5"

14

#VALUE!

#VALUE!

0.00 0.40

0.00

6"

18

#VALUE!

#VALUE!

0.00 0.50

8"

19

#VALUE!

#VALUE!

10"

20

#VALUE!

12"

21

15"

18"

10

11

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00 0.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00 0.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00 0.60

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

22

#VALUE!

#VALUE!

0.00 0.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

23

#VALUE!

#VALUE!

0.00 0.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

12

4- Boring for tube well in all types of soil except shingle gravel and rock from a depth of 300.10 to 400 Ft (90 to 120 Metre)

below ground level including sinking and with drawing of casing pipe complete.
S.
No.

Dia of
bore

Time (Day)
required to
complete
100' (30M)

Daily
labour
charges

Labour Hire charges


Loading Expenses
per foot
of boring
Per Foot
material
No. of Rate per Amount
installation
day
bag
(7 x 8)
and carriage

8"

23

#VALUE!

#VALUE!

0.00 0.60

0.00

10"

24

#VALUE!

#VALUE!

0.00 0.70

12"

25

#VALUE!

#VALUE!

15"

27

#VALUE!

18"

27

#VALUE!

Repair
charges
of T & P

Petty store
Total
bolts & Column (6,
nuts etc. 9, 10, 11)

Grand Total
Rate per Ft/

No.12

(12 + 13)

(5 + 14)

Say

13

14

15

16

17

on Column

10

11

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

0.00 0.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00 0.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00 0.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00 #VALUE!

#VALUE!

#VALUE!

12

Rate per
Metre

Total

Contractors'
Profit& overheads 20%

Daily Labour Charges for :


Daily charges for boring of tube well per 100 ft
(30 M) depth including sinking and with drawing
of casing pipe.
a)
Detail

For 3" to 4"

(75 to 100mm)

dia bore.

Unit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour for 30 M
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar
Total
Sundries
Total

1.00
2.00
1.00
1.00

No
Nos
No
No RATE

0 P. Day
0 P. Day
0 P. Day
P. Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#### Percent

Contractor's Profit & Ove #### Percent


Total rate for 100 Rft
Say

#VALUE!
#VALUE!
#VALUE!

Daily Labour Charges for :


Daily charges for borring of tube well per 100 ft
(30 M) depth including sinking and with drawing
of casing pipe.
20
b)
Detail

For 5" to 6"

(125 to 150mm)

dia bore.

Unit Rate (British System) per Rft


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar
Total
Contractor's Profit
Total

1.00
4.00
1.00
1.00

No
0.00
Nos
0.00
No
0.00
No RATE

P. DAY
P. DAY
P. DAY
P. DAY

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#### Percent

Contractor's Profit & Ove #### Percent


Total rate for 100 feet
Say

#VALUE!
#VALUE!
#VALUE!

Daily Labour Charges for :


Daily charges for borring of tube well per 100 ft
(30 M) depth including sinking and with drawing
of casing pipe.
c)
Detail

For 8" (200mm)

dia bore.

Unit Rate (British System) per Foot


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar
Total
Sundries
Total

1.00
6.00
1.00
1.00

No
0.00
Nos
0.00
No
0.00
No RATE

P. Day
P. Day
P. Day
P. Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!

#### Percent

Contractor's Profit & Ove #### Percent


Total rate for 100 feet
Say

#VALUE!
#VALUE!
#VALUE!

Daily Labour Charges for :


Daily charges for borring of tube well per 100 ft
(30 M) depth including sinking and with drawing
of casing pipe.
d)
Detail

For 10" to 12"

(250 to 300mm)

dia bore.

Unit Rate (British System) per Foot


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar

1.00
6.00
2.00
1.00

No
0.00
Nos
0.00
Nos
0.00
No RATE

P. Day
P. Day
P. Day
P. Day

#VALUE!

Total
#### Percent

#VALUE!
#VALUE!
#VALUE!

Contractor's Profit & Ove #### Percent


Total rate for 100 feet

#VALUE!
#VALUE!
#VALUE!

Sundries
Total

Say

Daily Labour Charges for :


Daily charges for borring of tube well per 100 ft
(30 M) depth including sinking and with drawing
of casing pipe.
e)
Detail

For 15" to 18"

(375 to 450mm)

dia bore.

Unit Rate (British System) per Foot


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Foreman
Skilled Cooly
Unskilled Cooly
Chowkidar

1.00
8.00
2.00
1.00

No
0.00
Nos
0.00
Nos
0.00
No RATE

P. Day
P. Day
P. Day
P. Day

#VALUE!

Total
#### Percent

#VALUE!
#VALUE!
#VALUE!

Contractor's Profit & Ove #### Percent


Total rate for 100 feet

#VALUE!
#VALUE!
#VALUE!

Sundries
Total

Say

DESCRIPTION OF ITEM NO 5:

(a)
i)
Detail

Direct rotary/ reverse rotary drilling of bore for


tube wells in all type of soil except shingle, gravel
and rock.
From ground level to 250 ft. below ground level.
15" to 18" i/d
Unit Rate (British System) per Foot bore
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Material
1 Reg pumps etc.
24.00 Hrs
2 Generator set light arrangement
8.00 Hrs
3 Carriage from store to site of work for
reverse rotary drilling reg complete set
and generator set etc.
L. S.
Total
Labour
Foreman for 3 shifts (One No. per shift 3.00
Driller for 3 shifts (One No. per shift 3.00
Helper for 3 shifts (One No. per shift) 54.00
Electrician for 8 hours
1.00
Mechanic for 3 shifts
3.00
Total
Sundries
Total

Nos
Nos
Nos
No
Nos

0.00 Ph
0.00 Ph

0.00
0.00
0.00
0.00
0.00

P. Shi

Say

P. Shi
P. Shi
P. Shi
P. Shi

#### Percent

Detail

Unit Rate (British System) per Foot bore


Qty

Material
( P.O.L )
H.S.D. for rig for 24 hours
H.S.D. for generator for 8 hours
Cotton waste for rig for 24 hours
Mobil oil
Mix. Expenditure
Total

Rate
Per Unit (Rs.) Amount (Rs.)

##### Ltr
0.00
72.64 Ltr
0.00
7.90 Kg RATE
22.70 Ltr
0.00
L. S.

Ltr
Ltr
Kg
Ltr

#VALUE!
#VALUE!

Machinery
Labour
Material (lubricate P.O.L)

#VALUE!

Total
Contractor's Profit&overhe #### Percent
Total

#VALUE!
#VALUE!
#VALUE!

Daily Expenditure
Daily Progress
Charges Per Feet

#VALUE!
##### Ft
#VALUE!
121
say

Rate Charges Per Metre

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Item No.

Direct rotary/ reverse rotary drilling of bore for


tube wells in all type of soil except shingle, gravel
and rock.
a.
( ii)

Detail

From ground level to 250 ft. below ground level.


20" to 26" (500 to 650mm) dia

Unit Rate (British System) per Rft of bore


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Daily Expenditure
Daily Progress

#VALUE!
##### Ft

Charges Per Foot

#VALUE!
115
say

Rate Per Metre


say

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Item No.

Direct rotary/ reverse rotary drilling of bore for


tube wells in all type of soil except shingle, gravel
and rock.
b.
( i)

Detail

Exceeding 250 ft (75 M) below ground level.


15" to 18" (375 to 450mm) dia

Unit Rate (British System) per Rft of bore


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Daily Expenditure
Daily Progress

#VALUE!
92.00 Ft

Rate Per Rft


#VALUE!
92
say
Rate Per Metre
say

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Item No.

Direct rotary/ reverse rotary drilling of bore for


tube wells in all type of soil except shingle, gravel
and rock.
b.

Detail

Exceeding 250 ft (75 M) below ground level.


(ii) 20" to 26" (500 to 650mm) dia

Unit Rate (British System) per Rft of bore


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Daily Expenditure
Daily Progress

#VALUE!
88.40 Ft

Boring Charges Per Foot

#VALUE!
88.40
say

Rate Per Metre


say

10

#VALUE!
#VALUE!
#VALUE!
#VALUE!

DESCRIPTION OF ITEM NO 6:

Boring for tube well in shingle, gravel and rock,


including sinking and with drawing of casing
pipe.
a.

Detail

From ground level to 200 ft (60 M) below


ground level.
(i) 12" to 18" (300 to 450mm) dia
Unit Rate (British System) per Ft of bore
Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Daily Expenditure as per Item No. 5


Daily Progress

#VALUE!
46.00 Ft

Charges Per Foot

#VALUE!
46
say

Rate Per Metre


say

11

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Item No.

Boring for tube well in shingle, gravel and rock,


including sinking and with drawing of casing
pipe.
a.

From ground level to 200 ft (60 M) below


ground level.
(ii) 20" to 26" (500 to 650mm) dia

Detail

Unit Rate (British System) per Ft of bore


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Daily Expenditure as per Item No. 5


Daily Progress

#VALUE!
42.58 Ft

Charges Per Foot

#VALUE!
42.58
say

Rate Per Metre


say

12

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Item No.

Boring for tube well in shingle, gravel and rock,


including sinking and with drawing of casing
pipe.
b.

Detail

Exceeding 200 ft depth (70 M) below ground level.


(i) 12" to 18" (300 to 450mm) dia

Unit Rate (British System) per Ft of bore


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Daily Expenditure
Daily Progress

#VALUE!
38.68 Ft

Boring Charges Per Foot

#VALUE!
38.68
say

Rate Per Metre


say

13

#VALUE!
#VALUE!
#VALUE!
#VALUE!

Item No.

Boring for tube well in shingle, gravel and rock,


including sinking and with drawing of casing
pipe.
b.

Exceeding 200 ft depth (70 M) below ground level.


(ii) 20" to 26" (500 to 650mm) dia

Detail

Unit Rate (British System) per Ft of bore


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Daily Expenditure as per Item No. 5


Daily Progress

#VALUE!
28.73 Ft

Charges Per Foot

#VALUE!
28.73
say

Rate Per Metre


say

14

#VALUE!
#VALUE!
#VALUE!
#VALUE!

DESCRIPTION OF ITEM NO 7:

Providing strong substantially built box of deodar


wood (2nd class) 4'x2'x9' (1.22x0.76x0.228)
with compartments, lock and locking arrangement
for preserving samples of strata from bore hole.

Detail

Unit Rate (British System) per Job for Complete


Bore.
Qty
Rate
Per Unit (Rs.) Amount (Rs.)

Material
Deodar Wood (2nd Class)
Top and bottom 2x4'x2.5'x1/12' 1.66 Cft
Sides 2(4'+2'-4")x1/12'x'
0.79 Cft
Partition 9x2'-4"x'x1/24'
0.44 Cft
Strips 6x3'x6"xx1/24
0.44 Cft

3.33 Cft
Wastage
15%
Total
Lock
Hinges
Steel Handle 4" (100mm)

0.50 Cft
3.83
1.00
2.00
2.00

Cft
No
No.
Nos

0.00
0.00
0.00
0.00

P. Cf
Each
Each
Each

Total
Contractor's Profit & ove #### Percent
Total

Labour
Sawing charges
Carpenter

(3.83Cft x 10)

38.30 Sft
0.75 No
15

0.00 Sft
0.00 P. Day

Detail

Unit Rate (British System) per Job for Complete


Bore.
Qty
Rate
Per Unit (Rs.) Amount (Rs.)

Taking and preserving box 2 lbs


sample of strata.
Total
Sundries
Total

L. S.

####

Contractor's Profit & ove #### Percent


Total

Labour Rate Per Job for complete bore.

Rs.

say

Composite Rate per Job for complete bore

Rs.
Say

16

DESCRIPTION OF ITEM NO 8:
Detail

Furnishing Sample of Water from Bore Hole.


Unit Rate (British System) per Set of 2 bottles
Qty

Material
Bottle 2 lbs capcity

Rate
Per Unit (Rs.) Amount (Rs.)

2.00 Nos

0.00 Each

Total
Contractor's Profit & ove #### Percent
Total
Labour
Taking samples of water from bore
hole including bailing or pumping.
Sealing the water sample and
providing necessary packing etc.
Handling charges

L. S.

L. S.
L. S.

Total
Contractor's Profit & ove #### Percent
Total

Labour Rate Per Set of 2 bottles

Rs.

Composite Rate per Set

Rs.

say
Say

17

9-

S.
No.

Providing and installing Brass Strainer in Tube Well Bore Hole including Socket, special Socket, Studs
etc. complete.
Dia of
Strainer

Thickness
Rate of
of
strainer
Strainer (Per Ft i/c
Specials
Stud, and
Socket)

Contractor's
Profit
20.00
Percent

Total
Material

LABOUR

4+5

Daily
Progress
in Ft

Daily
Expenses
Rs.

Labour Lowering Contractor's Total


Per Ft Equipment Profit & over Labour
Charges
20.00
9 + 10
Percent
+ 11

10

2"

5/32"

0.00

0.00

0.00

200.00

#VALUE!

#######

0.00

3"

5/32"

0.00

0.00

0.00

200.00

#VALUE!

#######

4"

3/16"

0.00

0.00

0.00

150.00

#VALUE!

5"

3/16"

0.00

0.00

0.00

130.00

6"

3/16"

0.00

0.00

0.00

7"

3/16"

0.00

0.00

8"

3/16"

0.00

9"

3/16"

10"

10

Rate
per Metre

16

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

120.00

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

0.00

100.00

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

0.00

0.00

80.00

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

0.00

0.00

0.00

80.00

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

3/16"

0.00

0.00

0.00

70.00

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

10"

1/4"

0.00

0.00

0.00

70.00

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

11

12"

1/4"

0.00

0.00

0.00

70.00

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

12

15"

1/4"

0.00

0.00

0.00

60.00

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

13

18"

1/4"

0.00

0.00

0.00

60.00

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

14

20"

1/4"

0.00

0.00

0.00

50.00

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

15

22"

1/4"

0.00

0.00

0.00

50.00

#VALUE!

#######

0.00

0.00 ###### #VALUE!

#VALUE!

######

#VALUE!

13

Composite

15

20

12

Composite Labour
Rate/Ft
Rate
6 + 12
per Metre

14

Contractor's Profit

11

Labour
Rate
Per Ft.

Daily Labour Charges


Detail

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Foreman
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00
1.00
4.00
1.00

No
0.00
No
0.00
Nos
0.00
No RATE

P.
P.
P.
P.

Day
Day
Day
Day #VALUE!
#VALUE!
#VALUE!
#VALUE!

10.00 Percent

20.00 Percent

#VALUE!
#VALUE!

Daily Labour Charges P. Day

Rs.

#VALUE!

Daily Labour Charges


Detail

Unit Rate (British System) per Day Charges


Qty

Rate
Per Unit (Rs.)Amount (Rs.)
20

Labour
Foreman
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total
Contractor's Profit & ove
Total

1.00
2.00
6.00
1.00

No
0.00
Nos
0.00
Nos
0.00
No RATE

P. Day
P. Day
P. Day
P. Day

#VALUE!
#VALUE!
#VALUE!
#VALUE!

10.00

20.00

#VALUE!
#VALUE!

Daily Labou

Rs.

#VALUE!

10

Providing and Installing M. S. Bail Plug in Tube Well Bore Hole (Eac
M A T E R I A L

S.
No.

Dia of
bore

Plug
Rate
Length Per Foot

Total

(3 x 4)

Wt. of Size of Wt. of Total Wastage Total


Disc Bars Bars Wt.
10%
Wt.
Lbs.
(Lbs.) (Lbs.)
in Lbs
(6 + 8)
(9 + 10)

12

13

14

15

2"

1.50

0.00

0.00

0.14 1/4"

0.53

0.67

0.07

0.74

0.33

0.00

0.00

0.00

3"

1.50

0.00

0.00

0.30 1/4"

0.53

0.83

0.08

0.91

0.41

0.00

0.00

0.00

4"

2.00

0.00

0.00

0.51 3/8"

1.50

2.01

0.20

2.21

1.00

0.00

0.00

0.00

5"

2.00

0.00

0.00

1.22 3/8"

1.50

2.72

0.27

2.99

1.36

0.00

0.00

0.00

6"

2.00

0.00

0.00

1.72 3/4"

6.00

7.72

0.77

8.49

3.85

0.00

0.00

0.00

7"

2.00

0.00

0.00

2.30 3/4"

6.00

8.30

0.83

9.13

4.14

0.00

0.00

0.00

8"

2.00

0.00

0.00

2.97 3/4"

6.00

8.97

0.90

9.87

4.48

0.00

0.00

0.00

9"

2.00

0.00

0.00

3.72 3/4"

6.00

9.72

0.97

10.69

4.85

0.00

0.00

0.00

10"

2.00

0.00

0.00

6.23 3/4"

6.00 12.23

1.22

13.45

6.10

0.00

0.00

0.00

10

12"

2.00

0.00

0.00

8.83 3/4"

6.00 14.83

1.48

16.31

7.40

0.00

0.00

0.00

10

11

Wt. in Rate Amount


Kg Per Kg Rs. Bolts &
Nuts

11

15"

2.00

0.00

0.00 13.57 3/4"

6.00 19.57

1.96

21.53

9.76

0.00

0.00

0.00

12

18"

2.00

0.00

0.00 19.34 3/4"

6.00 25.34

2.53

27.87 12.64

0.00

0.00

0.00

13

20"

2.00

0.00

0.00 23.74 3/4"

6.00 29.74

2.97

32.71 14.84

0.00

0.00

0.00

14

22"

2.00

0.00

0.00 28.60 3/4"

6.00 34.60

3.46

38.06 17.26

0.00

0.00

0.00

ch).
L A B O U R
Material
Welding Cutting
Total Threading Disc
Disc

Total

Grand
Total

Say

Clamp
(5 + 14
+ 15)

16

(18 + 19) (16 + 20)

17

18

19

20

21

22

Contractor's
Profit
20.00

23

C O S T

Labour for Labour


Total ProgrDaily
Rate
Lowering Contraess
Charges Per Rft
Equipctor's
Daily @ Rs.
of Each
(22 + 23)
ment
Profit (25 + 26)
#VALUE! Plug
20.00
per No. (27 + 29)
Percent
Total

24

25

26

27

28

29

30

Say

31

Rate
Labour
Per Plug Rate
Length
(31 x 3)

32

33

(Rs.)
Composite
(24 + 33)

34

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

80

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

80

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

56

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

56

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

48

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

48

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

48

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

40

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

40

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

32

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30

#VALUE! ###### #VALUE! #VALUE! ######

#VALUE!

11- Providing and installing PVC Strainer BSS Class "B" in Tube Well Bore Hole including Sockets and Solvents etc. complete.

S.
No.

Dia of
Strainer

Rate Contractor's
Per Ft
Profit
20.00
Percent

Total

Labour
Charges
Per Day

Labour
Cost
Per Ft

Solvent

(3 + 4)

Daily
Progress
in Ft

Lowering Contractor's
Charges
Profit
20.00
Percent

11

Say

12

13

Rate per Rft

Rate per Metre

Labour

Composite
(5 + 14)

Labour

Composite

14

15

16

17

3"

0.00

0.00

0.00

200.00 ####### #VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

4"

0.00

0.00

0.00

180.00 ####### #VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

5"

0.00

0.00

0.00

180.00 ####### #VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

6"

0.00

0.00

0.00

160.00 ####### #VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

8"

0.00

0.00

0.00

128.00 ####### #VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

10"

0.00

0.00

0.00

128.00 ####### #VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

12"

0.00

0.00

0.00

104.00 ####### #VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

14"

0.00

0.00

0.00

104.00 ####### #VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

10

Total
(8 + 9 +
10 + 11)

0.00

#VALUE!

0.00

12- Providing and installing PVC Strainer BSS Class "D" in Tube Well Bore Hole including Sockets and Solvents etc. complete.
MATERIAL
S.
No.

Dia of
Pipe

Rate for Contractor's


Per Ft
Profit
20.00
Percent

Total

Daily
Progress

Labour
Charges
Per Day

Labour
Cost
Per Ft

3+4

LABOURE
Solvent
Lowering
Charges

Rate per Metre

Contractor's
Profit
20.00
Percent

Total
(8 + 11
+ 12)

Labour

Composite
(5 + 13)

Labour

Composite

11

13

14

15

16

17

1"

0.00

0.00

0.00

200.00 ####### #VALUE!

0.00

0.00

0.00

0.00 #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

1"

0.00

0.00

0.00

200.00 ####### #VALUE!

0.00

0.00

0.00

0.00 #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

2"

0.00

0.00

0.00

200.00 ####### #VALUE!

0.00

0.00

0.00

0.00 #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

3"

0.00

0.00

0.00

200.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

180.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5"

0.00

0.00

0.00

180.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6"

0.00

0.00

0.00

160.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

Rate per Rft


Total
Labour
(9 + 10)

13 - i - Providing and installing PVC Bail/ End Plug in Tube Well Bore Hole:
MATERIAL
S. No.

Dia of
Bail /
End Plug

Cost of Contractor's Total


Bail/
Profit
End Plug
20.00 (3 + 4)
Percent

LABOURE
Solvent Contractor's
Total
Lowering
Profit
Charges
20.00
6+7
Percent

Rate
Total
Labour
8+9

Labour

10

11

Composite
5 + 10

say

3"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

BSS Class "B".

12

13 - ii Providing and installing PVC Bail/ End Plug in Tube Well Bore Hole:
MATERIAL
S. No.

Dia of
Bail /
End Plug

Cost of Contractor's Total


Bail/
Profit
End Plug
20.00 (3 + 4)
Percent

LABOURE
Solvent Contractor's
Total
Lowering
Profit
Charges
20.00
(6 + 7)
Percent

Rate
Total
Labour
(8 + 9)

Labour

10

11

Composite
(10 + 5)

say

1"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

BSS Class "D".

12

14- Providing and installing M.S. blind pipe socketed/ welded joint M.S. reducer (where necessary) in
Tube Well Bore Hole including jointing/ welding with strainer etc. complete.
S.
No.

Dia of
Pipe

Thickness
of Pipe

Rate
Per Ft

Contractor's
Profit
20.00
Percent

Total

Daily
Daily
Progress Charges

Lowering Contractor's
Charges Profit 20%

Rs.
#VALUE!

(4 + 5)

Total

Rate per Rft

Rate per Metre

Labour

Composite
(6 + 13)

Labour

Composite

(9 + 10)

Grand
Total
(8 + 11)

11

12

13

14

15

16

say
1

2"

1/8"

0.00

0.00

3"

1/8"

0.00

4"

1/8"

5"

0.00

100

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00

0.00

100

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

0.00

0.00

0.00

80

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

3/16"

0.00

0.00

0.00

80

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

6"

3/16"

0.00

0.00

0.00

56

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

7"

3/16"

0.00

0.00

0.00

56

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

8"

3/16"

0.00

0.00

0.00

48

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

9"

3/16"

0.00

0.00

0.00

48

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

10"

"

0.00

0.00

0.00

48

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

10

12"

"

0.00

0.00

0.00

40

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

11

15"

"

0.00

0.00

0.00

40

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

12

18"

"

0.00

0.00

0.00

32

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

13

20"

"

0.00

0.00

0.00

30

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

14

22"

"

0.00

0.00

0.00

30

#VALUE!

0.00

0.00

0.00 #VALUE! #VALUE! #VALUE!

#VALUE!

#VALUE!

#VALUE!

10

10

Daily Labour Charges


3" - 6" dia
Detail

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

1.00
0.50
0.75
1.00

No
0.00
Nos
0.00
Nos
0.00
No RATE

P. Day
P. Day
P. Day
P. Day

#VALUE!

##### Percent

#VALUE!
#VALUE!
#VALUE!

Contractor's Profit & Ove ##### Percent


Total

#VALUE!
#VALUE!

Daily Labour Charges P. Day

Rs.
say

#VALUE!
#VALUE!

Daily Labour Charges


8" - 14" dia
Detail

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

1.00
0.50
1.50
1.00

No
0.00
Nos
0.00
Nos
0.00
No RATE

P. Day
P. Day
P. Day
P. Day

#VALUE!

##### Percent

#VALUE!
#VALUE!
#VALUE!

Contractor's Profit & Ove ##### Percent


Total

#VALUE!
#VALUE!

Contractor's Profit & Overheads

Rs.
say

#VALUE!
#VALUE!

20

Daily Labour Charges


11/4" - 3" dia
Detail

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

0.50
0.60
1.00
1.00

No
0.00
Nos
0.00
Nos
0.00
No RATE

P. Day
P. Day
P. Day
P. Day

#VALUE!

##### Percent

#VALUE!
#VALUE!
#VALUE!

Contractor's Profit & Ove ##### Percent


Total

#VALUE!
#VALUE!

Daily Labour Charges P. Day

Rs.

#VALUE!
#VALUE!

Daily Labour Charges

Detail

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Foreman
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

1.00
2.00
6.00
1.00

No
0.00
Nos
0.00
Nos
0.00
No RATE

P. Day
P. Day
P. Day
P. Day

#VALUE!

##### Percent

#VALUE!
#VALUE!
#VALUE!

Contractor's Profit & Ove ##### Percent


Total

#VALUE!
#VALUE!

Daily Labour Charges P. Day

Rs.

#VALUE!

15- Providing and installing PVC blind pipe BSS Class "B" in Tube Well Bore Hole including Sockets and
Solvents and jointing with strainer etc. complete.
S.
No.

Dia of
Strainer

Rate
Per Ft

Contractor's
Profit
20.00
Percent

Total
(3 + 4)

Daily
Labour Labour Lowering
Progress Charges Per Ft Charges
Per Day

Solvent

Total
(9 + 10)

10

11

Rate per Rft


Rate per Metre
Contractor's Total
Profit
(8 + 11 Labour Composite Labour Composite
20.00 + 12)
(5 + 13)
Percent
4
13
14
15
16
16

3"

0.00

0.00

0.00

200

###### ######

0.00

0.00

0.00

0.00 ##### ##### #VALUE! ######

#VALUE!

4"

0.00

0.00

0.00

180

###### ######

0.00

0.00

0.00

0.00 ##### ##### #VALUE! ######

#VALUE!

5"

0.00

0.00

0.00

180

###### ######

0.00

0.00

0.00

0.00 ##### ##### #VALUE! ######

#VALUE!

6"

0.00

0.00

0.00

160

###### ######

0.00

0.00

0.00

0.00 ##### ##### #VALUE! ######

#VALUE!

8"

0.00

0.00

0.00

128

###### ######

0.00

0.00

0.00

0.00 ##### ##### #VALUE! ######

#VALUE!

10"

0.00

0.00

0.00

128

###### ######

0.00

0.00

0.00

0.00 ##### ##### #VALUE! ######

#VALUE!

12"

0.00

0.00

0.00

104

###### ######

0.00

0.00

0.00

0.00 ##### ##### #VALUE! ######

#VALUE!

14"

0.00

0.00

0.00

104

###### ######

0.00

0.00

0.00

0.00 ##### ##### #VALUE! ######

#VALUE!

20

Daily Labour Charges


a)

3" to 6" (75mm to 150mm) dia.

Detail

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

1.00
2.00
1.00
1.00

No
0.00
Nos
0.00
No
0.00
No RATE

P.
P.
P.
P.

Day
Day
Day
Day #VALUE!

10.00 Percent

#VALUE!
#VALUE!
#VALUE!

Contractor's Profit & ove 20.00 Percent


Total

#VALUE!
#VALUE!

Daily Labour Charges P. Day

Rs.

#VALUE!

Daily Labour Charges


b)

8" to 14" (200mm to 350mm) dia.


20

Detail

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.)Amount (Rs.)

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

1.00
2.00
2.00
1.00

No
0.00
Nos
0.00
Nos
0.00
No RATE

P.
P.
P.
P.

Day
Day
Day
Day #VALUE!

10.00 Percent

#VALUE!
#VALUE!
#VALUE!

Contractor's Profit & ove 20.00 Percent


Total

#VALUE!
#VALUE!

Daily Labour Charges P. Day

Rs.

#VALUE!

16- Providing and installing PVC blind pipe BSS Class "D" in Tube Well Bore Hole including Sockets and Solvents
and jointing with strainer etc. complete.
S.
No.

Dia of
Strainer

Rate Contractor's Total


Per Ft
Profit
20.00 (3 + 4)
Percent

Daily
Daily
Labour Solvent
Progress Charges Rate
Per Ft

Total
(9 + 10)

10

11

Contractor's Total
Rate per Rft
Rate per Metre
Profit
(8 + 11 Labour Composite Labour Composite
20.00
12)
(5 + 13)
Percent
4
13
14
15
16
17

1"

0.00

0.00

0.00

260

###### ######

0.00

0.00

0.00

0.00 ###### #### #VALUE! ###### #VALUE!

1"

0.00

0.00

0.00

260

###### ######

0.00

0.00

0.00

0.00 ###### #### #VALUE! ###### #VALUE!

2"

0.00

0.00

0.00

240

###### ######

0.00

0.00

0.00

0.00 ###### #### #VALUE! ###### #VALUE!

3"

0.00

0.00

0.00

200

###### ######

0.00

0.00

0.00

0.00 ###### #### #VALUE! ###### #VALUE!

4"

0.00

0.00

0.00

180

###### ######

0.00

0.00

0.00

0.00 ###### #### #VALUE! ###### #VALUE!

5"

0.00

0.00

0.00

180

###### ######

0.00

0.00

0.00

0.00 ###### #### #VALUE! ###### #VALUE!

6"

0.00

0.00

0.00

160

###### ######

0.00

0.00

0.00

0.00 ###### #### #VALUE! ###### #VALUE!

Lowering
Charges

Contractor's Profit

Daily Labour Charges


a)

1" to 3" (32mm to 75mm) dia.

Detail

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

1.00
1.00
1.00
1.00

No
No
No
No

0.00 P.
0.00 P.
0.00 P.
RATE
P.

Day
Day
Day
Day

#VALUE!

10.00 Percent

#VALUE!
#VALUE!
#VALUE!

Contractor's Profit & Ove 20.00 Percent


Total

#VALUE!
#VALUE!

Daily Labour Charges P. Day

Rs.

#VALUE!

Daily Labour Charges


b)

4" to 6" (100mm to 150mm) dia.


20

Detail

Unit Rate (British System) per day


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Plumber
Skilled Coolies
Unskilled Coolies
Chowkidar
Total
Sundries
Total

1.00
2.00
1.00
1.00

No
0.00
Nos
0.00
No
0.00
No RATE

P.
P.
P.
P.

Day
Day
Day
Day

#VALUE!

10.00 Percent

#VALUE!
#VALUE!
#VALUE!

Contractor's Profit & Ove 20.00 Percent


Total

#VALUE!
#VALUE!

Daily Labour Cha

Rs.

#VALUE!

DESCRIPTION OF ITEM NO 17:

Testing and developing of tube well of size


6" (150mm) inner dia and above Continuously.
i)

Upto 1.5 cusacs Discharge.

Detail

Unit Rate (British System) per Hours


Qty

Material

(P. O.

L.)

Rate
Per Unit (Rs.) Amount (Rs.)

For 100 Hours

Diesel Oil 2.50 gallon per hour


for 3 days (72 Hours).
Mobil Oil
3 gallon (for 72 hrs.)
Grease
2.5 Lbs
C. Oil

##### Ltr
13.62 Ltr
1.13 Kg
L.S.

0.00 P. Ltr
0.00 P. Ltr
0.00 P. Kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

Composite Rate P

Rs.

0.00
100
Say

Item No.

17

Testing and developing of tube well of size


6" innner dia and above Continuously.
ii)

Upto 1.5 cusacs Discharge.

Detail

Unit Rate (British System) per Hour


Qty

Material

(P. O.

L.)

Rate
Per Unit (Rs.) Amount (Rs.)

For 100 Hours

Diesel Oil 3 gallon per hour


for 3 days (72 Hours).
Mobil Oil
4 gallon (for 72 hrs.)
Grease
3 Lbs (for 72 hrs.)
C. Oil

##### Ltr
18.16 Ltr
1.36 Kg
L.S.

0.00 P. Ltr
0.00 P. Ltr
0.00 P. Kg

Total
Contractor's Profit & Ove 20.00 Percent
Total

Composite Rate P

Rs.

0.00
100
Say

DESCRIPTION OF ITEM NO 18:

Shrouding with graded pea gravel 3/8" - 1/8"


(10-3mm) around tube well in bore hole.

Detail

Unit Rate (British System) per Cft


Qty
Analysis for

Material
Bajri 3/8" - 1/8" (10-3mm)
Wastage
5%

100 Cft

Bajri 3/8" - 1/8 ##### Cft


Wastage
5%

Rate
Per Unit (Rs.) Amount (Rs.)
0.00 % Cft

Total
Contractor's Profit & Ove 20.00 Percent
Total

Labour
Washing and Pouring bag
Skilled Coolies
Unskilled Coolies
Total
Sundries
Total

3.30 Nos
1.00 No

0.00 P. Day
0.00 P. Day

10.00 Percent

Contractor's Profit & Ove 20.00 Percent


Total

Labour Rate Per


Labour Rate Per

Rs.
Rs.

Composite Rate P
Composite Rate P

Rs.
Rs.

19- Laying, cutting, jointing, testing and disinfecting cast iron pipe line in trenches with spigot and socket
caulked lead joint, including cost of materials, such as lead, yarn, etc. complete in all respects.
S. nterna Weight of
No. dia of 18' length
pipe of pipe in
lbs

Weight of Carriage of
Lowering
Cutting
Pluging
Testing
100' length 100' pipe
into
ends
with
and
of pipe in
from field
trenches
chipping, temporary disinfecting
ton
store to site strin- ging & fini- shing wooden
lead four
laying to surface to
plug
chain @ Rs.
correct
uniform
alignment
finish
Tons
and grade

3"

170.00

0.429

0.00

0.00

4"

190.00

0.48

0.00

0.00

5"

324.00

0.82

0.00

0.00

6"

410.00

1.03

0.00

8"

591.00

1.49

10"

794.00

12"

8
9

0.00

Jointing
with lead
joint

Total
charges for
100' (30 M)
(5 + 6 + 7 +
+8+9+
10)

Composite

Composite

rate Per Ft

rate Per
Metre

10

11

12

13

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1018.00

2.57

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15"

1389.00

3.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18"

1834.00

4.62

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

19 - a

- Lowering into trenches, stringing and laying C.I. pipe line to correct alignment and gradient.

S. nterna
No. dia

LABOUR
Daily
Progress

Daily
Charges

Amount per Rate 100 ft


100 ft

Analysis for daily charges

3"

400

0.00

0.00

Plumber

1 No

0.00

0.00

4"

400

0.00

0.00

Coolies

2 Nos

0.00

0.00

5"

300

0.00

0.00

6"

300

0.00

0.00

8"

225

0.00

0.00

Total

10"

175

0.00

0.00

Contractor's Profit & Overheads

12"

150

0.00

0.00

Total

15"

125

0.00

0.00

18"

100

0.00

0.00

Total
Sundries

0.00
10.00 Percent

20.00
20.00 Percent

0.00

0.00

19 - bCutting cast iron pipe, chipping & finishing the face to uniform finish =

Cut at every 200ft (60 M)


For 200' (60 M)

S.
No.

I/D
of
Pipe

Labour for Cutting & finishing


No. of
Daily
Rate per
cut P. day
Charges
200 ft
per cut

3"

8.00

0.00

0.00

0.00

4"

6.00

0.00

0.00

0.00

LABOUR

5"

4.00

0.00

0.00

0.00

Pipe fitter

6"

3.00

0.00

0.00

0.00

Unskilled Cooly

8"

2.00

0.00

0.00

0.00

Total

10"

1.50

0.00

0.00

0.00

Sundries

12"

1.25

0.00

0.00

0.00

Total

15"

1.10

0.00

0.00

0.00 Contractor's Profit & Overheads

18"

1.00

0.00

0.00

0.00

Rate per
100 ft
per cut

Analysis of Daily Charges

1 No

0.00

0.00

2 Nos

0.00

0.00
0.00

10.00

Percent

0.00

20.00

Percent

0.00

19 - c
S.
No.

Providing and fixing temporary wooden tapered plug of hard wood to each end of pipe line.
Assume for 500 ft.
Size
of
plug

Area of
plug

3"

4"

9x(3)2
4x144
9x(4)2
4x144

5"

9x(5)2
4x144

6"

8"

Length

9x(6)2
4x144
9x(8)2
4x144

PLUG
Content
in
Cft

Rate Per
Cft

Amount
(5 X 6)

LABOUR FOR MAKING PLUG


Daily
Daily
Amount
Progress
Charges
in No.
(9 / 8)

10

L. S.

LABOUR FOR FIXING


Sundries
Total
10.00
(11+12)

11

12

13

Rate for 100 ft.

Grand
Total
for 500'
(15+10
+ 7)

Rate for
100'

16

17

18

0.50

0.02

0.00

0.00

34.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.50

0.04

0.00

0.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Hard Wood
1 Cft @
0.00 Rs.

0.00

0.00

20.00

0.00

0.50

0.07

0.00

0.00

25.00

0.00

0.00

0.00

0.00

0.00

Rate of Hard Wood

0.50

0.10

0.00

0.00

19.00

0.00

0.00

0.00

0.00

0.00

0.00

Contractor's
Profit &
0.00 Overheads

0.50

0.17

0.00

0.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.75

0.41

0.00

0.00

12.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

0.00

10"

12"

15"

18"

9x(10)
4x144
9x(12)2
4x144
9x(15)2
4x144
9x(18)2
4x144

Daily Charges

0.75

0.59

0.00

0.00

9.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

1.23

0.00

0.00

7.00

0.00

0.00

0.00

0.00

0.00

0.00

Carpenter
0.00 1
Turner
0.00 1

1.00

1.77

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total
Sundries
Total
Contractor's
Profit
Total

0.00

0.00

0.00

0.00

10.00

20.00

0.00
0.00
0.00
0.00
0.00

19 - d

Testing and disinfecting C.I. Pi


Assume for 1000' (300 M)

S. I/D of Volume
No. pipe in of Water
Inch required
in Gallon

Amount
@ Rs

0.00
Per
Gallons

Disinfecting
Agent
Lbs/Kg

Amount
@ Rs.

Hire
Charges
0.00
of testing
Per Lbs/Kg operatus

Total
(7 + 6
+ 4)

Contractor's
Profit
20.00
Percent

Total
(8 + 9)

10

Plugging
of Pipe

11

Rate for 100 ft.

LABOUR
Labour for
testing &
disinfecting

(11 + 12)

12

13

Rate Charges
for 200 Rft

Total

16

3"

310.00

0.00

0.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 Mechanic

1 No.

0.00

0.00

4"

720.00

0.00

1.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 Coolies

2 Nos

0.00

0.00

5"

850.00

0.00

1.40

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6"

1830.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 Sundries

8"

2180.00

0.00

3.65

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

10"

3410.00

0.00

5.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 Contractor's 20.00

Percent

12"

4910.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

15"

8730.00

0.00

14.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Rate per
0.00 100 Rft

18"

11000.00

0.00

18.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total
10.00

Percent

0.00

0.00

0.00
0.00

19 - e

Jointing cast iron pipe line in trenches with spigot and socket. Caulked lead joints
including cost of material such as lead, yarn etc., complete in all respect.

Length of pipe Detail


18' (6 per
M) P.
joint
Joint.
= Unit of Rate 100'
S. I/D of
No. pipe in
Inch

1
1
2
3
4
5
6
7
8
9

2
3"
4"
5"
6"
8"
10"
12"
15"
18"

Lead
Lbs/Kg

Rate
Lbs/Kg

4.10
5.20
6.30
7.90
10.80
15.00
17.30
23.00
31.50

Material Per Joint


Amount
Yarn
3x4
Lbs

5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.25
0.38
0.44
0.44
0.63
0.75
1.06
1.50
2.07

Fuel
Rate P.
Lbs

7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Amount
6x7

8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total
5+8
+9

9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Contractor's
Profit
20.00
Percent

Total
Material
Per Joint
10 + 11

11

12

abour Per Join Composite


No. of
rate for 18'
Days
length in
P. Joint
12 + 15

0.15
0.19
0.24
0.28
0.30
0.50
0.59
0.76
0.99

16
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Sundires
Total
Contractor's Profit & Overheads
Total

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

13
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Daily Charges
Plumber
Cooly
Assistant Plumber (skilled cooly)

1 No
3 Nos
1 No

0.00
0.00
0.00
Total

0.00
0.00
0.00
0.00

Composite
rate for
100' length
16 x 100
18

17

Composite Composite
rate for
rate for
Rft
Metre

18
-

18
-

20- Laying cutting, jointing, testing and disinfecting cast iron pipe line in trenches with flanged and flanged
complete in all respects.
S.
No.

1
1
2
3
4
5
6
7
8
9

Internal Weight of
dia of 12' length
pipe
of pipe in
lbs

2
3"
4"
5"
6"
8"
10"
12"
15"
18"

20 - a
S.
No.

1
2
3
4
5
6
7
8
9

3
-

Weight Carriage of Lowering into Cutting ends


of 100'
100' pipe
trenches strin- chipping, finilength from field storeging & laying to shing surface
of pipe
to site lead correct alignmen to uniform
in ton. four chain Ton and grade
finish
@ of Rs.

4
0.50
0.65
0.85
1.05
1.49
2.05
2.60
3.55
4.70

Pluging
with
temporary
wooden plug

Testing and
disinfecting

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Jointing Total charges Composite


with lead
for 100'
rate per Ft
joint
(30 M)
(5 + 6 + 7 +
8 + 9 + 10)

10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

11

12

Composite
rate per
Metre

13
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Lowering into trenches, stringing and laying C.I. pipe line to correct alignment and gradient.
Internal
dia

3"
4"
5"
6"
8"
10"
12"
15"
18"

LABOUR
Daily
Progress

400
400
300
300
225
175
150
125
100

Daily
Charges

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Amount per
100 ft

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rate 100 ft

Analysis for daily charges

Plumber
Coolies

1 No
2 Nos

0.00
0.00

Total
Sundries

10.00 Percent

20.00 Percent

Total
Contractor's Profit & Overheads

say

0.00

Total

say

20 - b Cutting cast iron pipe, chipping & finishing the face to uniform finish =
S.
No.

I/D
of
Pipe

1
1
2
3
4
5
6
7
8
9

2
3"
4"
5"
6"
8"
10"
12"
15"
18"

20 - c -

Labour for Cutting & finishing


No. of
Daily
Rate per
cut P. day Charges
200 ft
per cut

3
8.00
6.00
4.00
3.00
2.00
1.50
1.25
1.10
1.00

4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cut at every 200ft (60 M)


For 200' (60 M)

Rate per
100 ft
per cut

6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Analysis of Daily Charges

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

LABOUR
Pipe fitter
Unskilled Cooly

1 No
2 Nos

Total
Sundries
Total
Contractor's Profit & Overheads

0.00
0.00

0.00
0.00
0.00

10.00

Percent

20.00

Percent

0.00
0.00

Providing and fixing temporary wooden tapered plug of hard wood to each end of pipe line.
Detail

S.
No.

Size
of
plug

3"

Area of
plug

Length

PLUG
Contant
in
Cft

Rate Per
Cft

Amount
(5 X 6)

LABOUR FOR MAKING PLUG


Daily
Daily
Amount
Progress
Charges
in No.
(9 / 8)

10

LABOUR FOR FIXING


Sundries
Total
Contra10.00
ctor's
(11+12)
profit
20.00

L. S.

11

12

13

14

Total
(13+14)

15

Grand
Total
for 500'
(15+10
+ 7)

Rate for
100'

16

17

500'

Rate for 100'

3
x(3)2

18

4x144

0.50

0.02

0.00

0.00

34.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.50

0.04

275.00

11.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.50

0.07

275.00

19.25

25.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Hard Wood
0.00 Cft @ Rs.

0.50

0.10

275.00

27.50

19.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 Contractor's Profit & Overheads

0.50

0.17

275.00

46.75

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.75

0.41

275.00

112.75

12.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.75

0.59

275.00

162.25

9.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Carpenter 1 No.

0.00

0.00

1.00

1.23

275.00

338.25

7.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Turner 1 No.

0.00

0.00

1.00

1.77

275.00

486.75

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Daily Charges

x(4)2
2

4"

4x144

x(5)2
3

5"

6"

8"

4x144
x(6)2
4x144
x(8)2
4x144

0.00

0.00

20.00

0.00

Total

0.00

x(10)2
6

10"

4x144

x(12)2
7

12"

4x144

x(15)2
8

15"

4x144

x(18)2
9

18"

4x144

Total
Sundries
Total
Contractor's
Profit &
Overheads
Total

0.00

10.00 Percent

0.00

20.00 Percent

0.00

20 - d -

Testing and disinfecting C.I. Pipe.


Assume for 1000' (300 M)

S.
No.

I/D of
pipe in
Inch

Volume
of Water
required
in Gallon

Amount
@ Rs

Per
Gallons

1
1
2
3
4
5

2
3"
4"
5"
6"
8"

3
310.00
720.00
850.00
1830.00
2180.00

4
0.00
0.00
0.00
0.00
0.00

6
7

10"
12"

3410.00
4910.00

8
9

15"
18"

8730.00
11000.00

20 - e

Disinfecting
Agent
Lbs/Kg

Amount
@ Rs
Per Lbs/Kg

Hire
Charges
of testing
operatus

(7 + 6
+ 4)

0.00

Total

Contractor's
Profit
20.00
Percent

Total
(8 + 9)

0.50
1.20
1.40
2.00
3.65

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

9
0.00
0.00
0.00
0.00
0.00

10
0.00
0.00
0.00
0.00
0.00

0.00
0.00

5.70
8.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

14.50
18.50

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

Plugging
of Pipe

11

Rate for 100'

LABOUR
Labour for
testing &
disinfecting

Total

Composite
for 1000 Rft

(11+12)

(10 + 13)

12

13

14

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

1
1
2
3
4
5
6
7
8
9

Rate Charges
for 200 Rft

15

16
1 No.
0.00 Mechanic
2 Nos
0.00 Coolies
0.00
10.00
0.00 Sundries
0.00
Contractor's
Profit &
0.00 Overheads 20.00
0.00
Rate per 100
0.00 Rft
0.00

Rate for 10'

0.00
0.00

0.00
0.00
0.00

Total
Percent
Total

0.00

Percent
Total

0.00
0.00

Laying, cutting, jointing, testing & disinfecting C.I. pipe line in trenches with flanged &
flanged joint complete in all respects.

Length of pipe 12' (4 M).


S.
No.

Rate for
100'

I/D of
pipe

2
3"
4"
5"
6"
8"
10"
12"
15"
18"

Bolts & Nuts Per Joint


Size
No
Rate
Dia
Length
of
Bolts

3
5/8"
5/8"
5/8"
5/8"
3/4"
3/4"
3/4"
7/8"
7/8"

4
2"
2"
3"
3"
3"
3"
3"
4"
4"

Amount
5x6

6
4.00
4.00
6.00
6.00
8.00
12.00
12.00
12.00
12.00

7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rubber insertion 1/8"


thick per joint.
Weight in
Amount
Lbs/kg
7x8

8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total
7+9

9
0.46
0.61
1.00
1.18
1.20
1.86
2.50
2.84
3.42

0.00
0.00
24.00
28.32
28.80
44.86
60.24
69.36
82.08

10
0.00
0.00
24.00
28.32
28.80
44.86
60.24
69.36
82.08

Rate for 100'

Contractor's
Profit
20.00
Percent

Total
Material
P. Joint
10 + 11

11

12
0.00
0.00
1.20
1.42
1.44
2.24
3.01
3.47
4.10

0.00
0.00
25.20
29.74
30.24
47.10
63.25
72.83
86.18

No. of
Joints in
One Day

13
11.00
10.00
9.00
8.00
8.00
6.00
5.00
3.00
2.00

Labour
Daily
Charges

14
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Daily Charges
Plumber
Cooly

1 No
1 No

0.00
0.00
0.00

Sundires
Total
Contractor's Profit & Overheads
Total

10.00 Percent
20.00 Percent

0.00
0.00
0.00
0.00

14 / 13

Composite
rate
P. Joint
for 12'

15

16

Amount

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rate Per
100' pipe
length
16 x 100
12

17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Composite
rate per
Ft

Composite
rate per
Metre

18

18
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

21complete in all respects.


S.
No.

Internal Weight of
dia of 12' length
pipe
of pipe in
lbs

Weight
of 100'
length
of pipe
in ton.

Carriage of
Lowering into
Cutting ends
100' pipe
trenches strin- chipping, finifrom field store ging & laying to shing surface
to site lead correct alignment to uniform
four chain Ton
and grade
finish
@ of Rs.

10

Composite

Composite

rate per Ft

rate per
Metre

12

13

3"

0.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.48

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5"

0.80

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6"

1.02

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8"

1.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10"

1.97

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12"

2.52

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15"

3.45

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18"

4.55

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

S.
No.

Jointing Total charges


with lead
for 100'
joint
(30 M)
(5 + 6 + 7 +
8 + 9 + 10)

21 - a

Pluging
Testing and
with
disinfecting
temporary
wooden plug

11

Lowering into trenches, stringing and laying C.I. pipe line to correct alignment and gradient.
Internal
dia

LABOUR
Daily
Progress

Daily
Charges

Amount per
100 ft

3"

400

0.00

0.00

4"

400

0.00

0.00

5"

300

0.00

0.00

6"

300

0.00

0.00

8"

225

0.00

0.00

10"

175

0.00

0.00

12"

150

0.00

0.00

15"

125

0.00

0.00

18"

100

0.00

0.00

Rate 100 ft

Analysis for daily charges

Plumber

1 No

Coolies

2 Nos

0.00
0.00

Total
Sundries

10.00 Percent

20.00 Percent

Total
Contractor's Profit & Overhe

Total

21 - b Cutting cast iron pipe, chipping & finishing the face to uniform finish =
S.
No.

I/D
of
Pipe

1
1
2
3
4
5
6
7
8
9

2
3"
4"
5"
6"
8"
10"
12"
15"
18"

21 - c -

Labour for Cutting & finishing


No. of
Daily
Rate per
cut P. day Charges
200 ft
per cut

3
8.00
6.00
4.00
3.00
2.00
1.50
1.25
1.10
1.00

4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Cut at every 200ft (60 M)


For 200' (60 M)

Rate per
100 ft
per cut

6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Analysis of Daily Charges

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

LABOUR
Pipe fitter
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Overheads

1 No
2 Nos

0.00
0.00

0.00
0.00
0.00

10.00

Percent

20.00

Percent

0.00
0.00

Providing and fixing temporary wooden tapered plug of hard wood to each end of pipe line.
Detail

S.
No.

Size
of
plug

Area of
plug

Length

PLUG
Contant
in
Cft

Rate Per
Cft

Amount
(5 X 6)

LABOUR FOR MAKING PLUG


Daily
Daily
Amount
Progress
Charges
in No.
(9 / 8)

10

L. S.

11

LABOUR FOR FIXING


Sundries
Total
Contra10.00
ctor's
(11+12)
profit
20.00
12
13
14

Total
(13+14)

15

Grand
Total
for 500'
(15+10
+ 7)
16

500'

Rate for 100'

Rate for
100'

17

18

x(3)2
1

3"

4x144

0.50

0.02

0.00

0.00

34.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.50

0.04

0.00

0.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.50

0.07

0.00

0.00

25.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Hard Wood
0.00 Cft @ Rs.

0.50

0.10

0.00

0.00

19.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 Contractor's Profit & Over

0.50

0.17

0.00

0.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.75

0.41

0.00

0.00

12.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.75

0.59

0.00

0.00

9.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Carpenter 1 No.

0.00

0.00

1.00

1.23

0.00

0.00

7.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Turner 1 No.

0.00

0.00

1.00

1.77

0.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Daily Charges

x(4)2
2

4"

4x144

x(5)

5"

6"

8"

4x144
x(6)2
4x144
x(8)2
4x144

0.00

0.00

20.00

0.00

Total

0.00

x(10)2
6

10"

4x144

x(12)2
7

12"

4x144

x(15)2
8

15"

4x144

x(18)2
9

18"

4x144

Total
Sundries
Total
Contractor's
Profit &
Overheads
Total

0.00

10.00 Percent

0.00

10.00 Percent

0.00

20 - d -

Testing and disinfecting C.I. Pipe.


Assume for 1000' (300 M)

S.
No.

1
1
2
3
4
5

I/D of
pipe in
Inch

2
3"
4"
5"
6"
8"

Volume
of Water
required
in Gallon

3
310.00
720.00
850.00
1830.00
2180.00

Amount
@ Rs

Per
Gallons
4
0.00
0.00
0.00
0.00
0.00

Disinfecting
Agent
Lbs/Kg

5
0.50
1.20
1.40
2.00
3.65

Amount
@ Rs.
Per Lbs/Kg

Hire
Charges
of testing
operatus

(7 + 6
+ 4)

0.00

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Total

0.00
0.00
0.00
0.00
0.00

Contractor's
Profit
20.00
Percent
9
0.00
0.00
0.00
0.00
0.00

Total
(8 + 9)

10
0.00
0.00
0.00
0.00
0.00

Plugging
of Pipe

11
0.00
0.00
0.00
0.00
0.00

Rate for 100'

LABOUR
Labour for
testing &
disinfecting

Total

Composite
for 1000 Rft

(11+12)

(10 + 13)

12

13

14

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

Rate Charges
for 200 Rft

15
0.00
0.00
0.00
0.00
0.00

6
7

10"
12"

3410.00
4910.00

0.00
0.00

5.70
8.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

8
9

15"
18"

8730.00
11000.00

0.00
0.00

14.50
18.50

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

Rate for
100'

16
0.00 Mechanic
0.00 Coolies
0.00
0.00 Sundries
0.00

1 No.

0.00
0.00

2 Nos

10.00

Contractor'
s Profit &
0.00 Overheads 10.00
0.00
Rate per
0.00 100 Rft
0.00

0.00
0.00
0.00

Total
Percent
Total

Percent
Total

0.00

0.00
0.00

21

Laying, cutting, jointing, testing & disinfecting cast iron pipe line in trenches with tyton joints
complete in all respect.

S.
No.

I/D of
pipe in
Inche

1
1
2
3
4
5
6
7
8
9

2
3"
4"
5"
6"
8"
10"
12"
15"
18"

Length of pipe 18' (5.4 M).Rate for 100'


Rate
of ring

Cost of Ring
Amount Contra ctor's
Profit
20.00
Percent

4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total
Material
P. joint

Total
Material
for 100'
6 x 100
18

Composite
rate per
100 ft

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

21

Laying,cutting,jointing,testing and disinfecting Cast Iron Pipe line in trenches with Tyton joints,complete in all respect.
S.
No.

Internal
dia of
pipe

1
2
3
4
5
6
7
8
9

3"
4"
5"
6"
8"
10"
12"
15"
18"

eight of 10 Carriage of
Lowering into
Cutting ends
length of
100' pipe
trenches strin- chepping, finipipe in ton from field store ging & laying to shing surface
to site lead correctalignment to uniform
four chain @
and grade
finish
Rs. Tons

3
0.47
0.48
0.80
1.02
1.47
1.97
2.52
3.45
4.55

5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

6
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Pluging
Testing and Jointing Total charges
with
disinfecting with rubber
for 100'
temporary
ring
(30 M)
wooden plug
(4 + 5 + 6 +
7 + 8 +9)

7
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

8
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

9
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

10
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Composite

Composite

rate Per Ft

rate Per
Metre

11

12
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

21 - a

S.
No.

Internal
dia

1
2
3
4
5
6
7
8
9

3"
4"
5"
6"
8"
10"
12"
15"
18"

Lowering into trenches, stringing and laying C.I. pipe line to correct alignment and gradient.
LABOUR
Daily
Progress

400
400
300
300
225
175
150
125
100

Daily
Charges

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Amount per
100 ft

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rate 100 ft

Analysis for daily charges

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Plumber
Coolies
Total
Sundries
Total
Contractor's Profit & Overhe
Total

0.00
0.00

1 No
2 Nos

0.00
0.00
0.00

10.00 Percent

20.00 Percent

0.00
0.00

21 - b Cutting cast iron pipe, chipping & finishing the face to uniform finish =
S.
No.

I/D
of
Pipe

Labour for Cutting & finishing


No. of
Daily
Rate per
cut P. day Charges
200 ft
per cut

3"

8.00

0.00

0.00

0.00

4"

6.00

0.00

0.00

0.00

LABOUR

5"

4.00

0.00

0.00

0.00

Pipe fitter

6"

3.00

0.00

0.00

0.00

Unskilled Cooly

8"

2.00

0.00

0.00

0.00

Total

10"

1.50

0.00

0.00

0.00

Sundries

12"

1.25

0.00

0.00

0.00

Total

15"

1.10

0.00

0.00

0.00

18"

1.00

0.00

0.00

0.00

Cut at every 200ft (60 M)


For 200' (60 M)

Rate per
100 ft
per cut

Analysis of Daily Charges

Contractor's Profit & Overheads

1 No

0.00

0.00

2 Nos

0.00

0.00
0.00

10.00

Percent

0.00

20.00

Percent

0.00

22 Providing, laying, cutting, jointing, testing and disinfecting GI pipeline in trenches, with socket joint, using GI pipes of BSS 1387 - 1967
complete in all respects, with specials and valves.

(I) Light Quality


Length of pipe 18' (5.4 M).

Rate for 100'


Labour

Material
S. Dia of Rate per
No. pipe in 100' for
Inche
light
quality

"

Adust- Wastage
orum
2%
1%

Special
10%

Total
3+4+
5+6

Contractor's
Profit
20.00
Perfect

Total

No of
Joints
in line

18

19

Composite

18 / 100 19 / 100

0.00

0.00

10.00

40.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

35.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

28.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

28.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.00

25.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.00

23.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total
Contractor's Profit & Overheads

Total

0.00

20.00 Percent

Sundries

0.00

20.00 Percent

Total

0.00

17

Rate per Metre

Labour Composite Labour


for Per ft for per ft

0.00

0.00

16

15 + 16
+ 17

Composite for
100'
9 + 18

0.00

2 Nos.

15

Testing Labour

0.00

Cooly

14

Carriage

0.00

0.00

13

Total
13 + 14
x 10

0.00

0.00

12

Total
jointing
material

1 No.

11

Daily
Cost
Charges per
Joint

Plumber

10

Progress

Rate

20

21

22

23

22 Providing, laying, cutting, jointing, testing and disinfecting GI pipeline in trenches, with socket joint, using GI pipes of BSS 1387 - 1967
complete in all respects, with specials and valves.

(ii) Medium Quality


Length of pipe 18' (5.4

20

Rate for 100'


Labour

Material
S. Dia of Rate per
No. pipe in 100' for
Inche
light
quality

"

Adust- Wastage
orum
2%
1%

Special
10%

Total
3+4+
5+6

Contractor's
Profit
20.00
Perfect

Total

No of
Joints
in line

18

19

Composite

18 / 100 19 / 100

0.00

0.00

10.00

40.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

35.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

28.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

28.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.00

25.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.00

23.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

5"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11

6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total
Contractor's Profit & Overheads

Total

0.00

20.00 Percent

Sundries

0.00

10.00 Percent

Total

0.00

17

Rate per Metre

Labour Composite Labour


for Per ft for per ft

0.00

0.00

16

15 + 16
+ 17

Composite for
100'
9 + 18

0.00

2 Nos.

15

Testing Labour

0.00

Cooly

14

Carriage

0.00

0.00

13

Total
13 + 14
x 10

0.00

0.00

12

Total
jointing
material

1 No.

11

Daily
Cost
Charges per
Joint

Plumber

10

Progress

Rate

20

21

22

23

22 Providing, laying, cutting, jointing, testing and disinfecting GI pipeline in trenches, with socket joint, using GI pipes of BSS 1387 - 1967
complete in all respects, with specials and valves.

(iii Heavy Quality


Length of pipe 18' (5.4 M).

Rate for 100'


Labour

Material
S. Dia of Rate per
No. pipe in 100' for
Inche
light
quality

"

Adust- Wastage
orum
2%
1%

Special
10%

Total
3+4+
5+6

Contractor's
Profit
20.00
Perfect

Total

No of
Joints
in line

18

19

Composite

18 / 100 19 / 100

0.00

0.00

10.00

40.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10.00

35.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

28.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

28.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.00

25.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7.00

23.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

5"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11

6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total
Contractor's Profit & Overheads

Total

0.00

20.00 Percent

Sundries

0.00

10.00 Percent

Total

0.00

17

Rate per Metre

Labour Composite Labour


for Per ft for per ft

0.00

0.00

16

15 + 16
+ 17

Composite for
100'
9 + 18

0.00

2 Nos.

15

Testing Labour

0.00

Cooly

14

Carriage

0.00

0.00

13

Total
13 + 14
x 10

0.00

0.00

12

Total
jointing
material

1 No.

11

Daily
Cost
Charges per
Joint

Plumber

10

Progress

Rate

20

21

22

23

10

23

Providing laying, cutting, jointing, testing & disinfecting AC pipeline of BSS with "B" Class working pressure pipe in
trenches with cement joint & rubbering complete in all respect.
Labour for 100'

Material
S. Dia Cost of WastNo. of pipe with age
pipe coment
2%
joint &
rubber
ring

Total
(3 + 4)

Contractor's
Profit
20.00
Percent

Total

(5 + 6)

Carriage
for 100'
Per ft
AC pipe
length
(4 chain)

Grand
Lowering Cutting Cleaning
Total
into
end
end of
for 100 Ft trenches
pipe
& laying

10

11

12

Plugging
wooden
plug

14

15

Labour

Composite

Rate per Ft Rate per Metre


Labour Composite Labour Composite
for
for per
Per ft
ft

10 + 16

3"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

20"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11

24"

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13

Rate per 100 Ft

Testing
and
disinfecting

16

17

18

19

20

21

24

Providing laying, cutting, jointing, testing & disinfecting AC pipeline of BSS with "C" Class working pressure pipe in
trenches with cement joint & rubbering complete in all respect.
Labour for 100'

Material
S. Dia Cost of WastNo. of pipe with age
pipe coment
2%
joint &
rubber
ring

Total
(3 + 4)

Contractor's
Profit
20.00
Percent

Total

(5 + 6)

Carriage
for 100'
Per ft
AC pipe
length
(4 chain)

Grand
Lowering Cutting Cleaning
Total
into
end
end of
for 100 Ft trenches
pipe
& laying

Rate per 100 Ft

Testing
and
disinfecting

Plugging
wooden
plug

14

15

Labour

Composite

Rate per Ft Rate per Metre


Labour Composite Labour Composite
for
for per
Per ft
ft

10 + 16

20

10

11

12

3"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

20"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11

24"

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13

16

17

18

19

20

21

25

Providing laying, cutting, jointing, testing & disinfecting AC pipeline of BSS with "D" Class working pressure pipe in
trenches with commet joint & rubbering complete in all respect.
Labour for 100'

Material
S. Dia Cost of WastNo. of pipe with age
pipe coment
2%
joint &
rubber
ring

Total
(3 + 4)

Contractor's
Profit
20.00
Percent

Total

(5 + 6)

Carriage
for 100'
Per ft
AC pipe
length
(4 chain)

Grand
Lowering Cutting Cleaning
Total
into
end
end of
for 100 Ft trenches
pipe
& laying

10

11

12

Plugging
wooden
plug

14

15

Labour

Composite

Rate per Ft Rate per Metre


Labour Composite Labour Composite
for
for per
Per ft
ft

10 + 16

3"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

20"

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13

Rate per 100 Ft

Testing
and
disinfecting

16

17

18

19

20

21

re

re

re

23.Cleaning pipe placing rubber in position pressing with assembling machine, of AC pipe.
S.
#

I/D
of
Pipe

No of
joining
per day

1
1
2

2
3"
4"

3
36.00
32.00

3
4
5
6
7
8
9
10
11

6"
8"
10"
12"
14"
16"
18"
20"
24"

28.00
24.00
20.00
16.00
14.00
13.00
12.00
10.00
8.00

Labour
charges
per day

Amount

Hire
Charges
of Machine

Total

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00 machine, and jointing.

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00 LABOUR
0.00 Plumber
1 No
0.00 Skilled Cooly
1 No
0.00
Total
0.00
Sundries
0.00
0.00
Total
0.00
Contractor's Profit & Overheads
0.00

0.00
0.00
10.00

Percent

20.00

Percent

0.00
0.00
0.00
0.00
0.00
0.00
0.00

23 - Lowering into trenches, stringing and laying to correct alignment AC pipe "Class B" etc.
S.
No.

Size
of
pipe

No. of
Days
for 100'

Labour for
Charges
per day

Amount

3"

0.500

0.00

0.00

4"

0.515

0.00

0.00

6"

0.703

0.00

0.00

8"

0.974

0.00

0.00

Plumber

10"

1.289

0.00

0.00

Unskilled Cooly

12"

1.673

0.00

0.00

14"

1.915

0.00

0.00

16"

2.157

0.00

0.00

18"

2.555

0.00

0.00

10

20"

2.981

0.00

0.00

11

24"

3.480

0.00

0.00

Daily Labour Charges

1 No

0.00

0.00

2 Nos

0.00

0.00

Total
Sundries

0.00
10 Percent

Total
Contractor's Profit & Overheads

0.00
0.00

20 20.00

0.00
0.00

23 Providing, laying, cutting, jointing testing & disinfecting A.C. pipe line of BSS with "B Class" working

pressure pipe in trenches with cement joint and rubber ring complete in all respect.
Detail for 1000'
(Disinfecting and testing Rate
rate for 100'
S.
#

Dia Volume of
of
Water in
pipe P. Gallon

Amount
@ Rs

0
Per
Gallons

Disinfecting
agent
in Lbs

Amount
Hire
@ Rs. Charges
of testing
0
Per
apparatus
Lbs

Total
4+6
+7

Contractor's
Profit
20.00
Percent

Total
8+9

10

Labour Per Joint


Plugging
Labour
Total
of pipe
for testing
and disin11 + 12
fecting

11

12

13

Composite
rate for
ft
10 + 13

14

Composite
Composite Rate
rate for
Rate per
Rate per
% ft.
Rft
Metre

15

16

17

3"

310.00

0.00

0.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

720.00

0.00

1.20

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6"

1820.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8"

2180.00

0.00

3.65

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10"

3410.00

0.00

5.70

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12"

4910.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14"

6810.00

0.00

11.15

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

16"

8710.00

0.00

14.30

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

18"

11000.00

0.00

18.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

20"

13600.00

0.00

22.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11

24"

19600.00

0.00

32.15

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Labour for Testing 2000 ft


Mechanic

1 No.

0.00

0.00

Sundires

Cooly

2 Nos

0.00

0.00

Total

0.00

Contractor's Profit & Overheads

Total

Total

10.00

0.00
0.00

20.00

0.00
0.00

0
2

0.00

Providing and fixing temporary wooden plug.

Assume
S.
#

Size
of
pipe

Area of
Plug Sft

3"

4"

9x(3)2
4x144
9x(4)2
4x144

6"

9x(6)2
4x144

8"

10"

12"

14"

16"

18"

10

20"

11

24"

9x(8)2
4x144
9x(10)2
4x144
9x(12)2
4x144
9x(14)2
4x144
9x(16)2
4x144
9x(18)2
4x144
9x(20)2
4x144
9x(20)2
4x144

PLUG
Length

Rate
per Cft

MATERIAL
Contents Amount
in Cft
5x6

LABOUR FOR MAKING PLUG


Daily
Daily
Amount
Progress
Rate
20
in No.
9/8

10

for

500'

L.S.

Sundries
10
Percent

Total

11

12

13

Rate for 100'

LABOUR FOR FIXING


ContraTotal
ctor's
Profit
13 + 14
20
Percent

14

15

Grand
Total
for 500'
7 + 10
+ 15

Rate
for 100'

Rate
per Metre

16

17

18

19

0.50

0.00

0.02

0.00

34.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.50

0.00

0.04

0.00

30.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.50

0.00

0.10

0.00

19.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Hard Wood
0.00 1 Cft

0.00

0.00

20.00

0.00

Daily Charges

0.50

0.00

0.17

0.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Contractor'
s Profit &
0.00 Overheads

0.75

0.00

0.41

0.00

12.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.75

0.00

0.59

0.00

9.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.75

0.00

1.07

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

1.40

0.00

7.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Carpenter
0.00 1 No.
Turner
0.00 1 No.

1.00

0.00

1.77

0.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

2.18

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 Sundries

1.25

0.00

3.93

0.00

3.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Total

0.00

0.00

0.00

0.00

Total

0.00
20.00

Total
Contractor'
s Profit &
Overheads
Total

0.00

0.00
0.00

20.00

0.00
0.00

Lowering into trenches, stringing and laying to correct alignment AC pipe "Class D" etc.
S.
No.

Size
of
pipe

1
1
2
3
4
5
6
7
8
9
10
11

2
3"
4"
6"
8"
10"
12"
14"
16"
18"
20"
24"

No. of Labour for Amount


Days
Charges
for 100' per day

3
0.500
0.515
0.703
0.974
1.289
1.673
1.920
2.157
2.555
2.981
3.480

4
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5
Lowering into trenches stringing and laying to correct alignment.
0.00
0.00
Daily Labour Charges
0.00
0.00
Plumber
1 No
0.00
0.00
0.00
Unskilled Cooly
2 Nos
0.00
0.00
0.00
Total
0.00
0.00
Sundries
10
Percent
0.00
0.00
Total
0.00
0.00 Contractor's Profit & Overheads
20
Percent
0.00
0.00
0.00
0.00

26

S.
No.

Providing, laying cutting jointing testing and disinfecting PVC pipeline of BSS with Class "B" working
pressure pipe in pipes trenches complete in all respect.
Assume for 500'
Rate for P. ft
Dia
of
pipe

Rate
for 100'

Wastage
2%

MATERIAL
Total
Contractor's
Profit
20.00
Percent

Total
(5 + 6)

Weight
in
Kg

Rate
Amount
of
Lubricant (8 x 9)
in Kg

LABOUR
ContraTotal
Labour
ctor's
as per
Profit
(10 + 11) detail
20.00
Percent

10

11

13

(12 +13)

14

Rate per 100'


Labour
Composite
for 100'
for 100'
(7 + 15)

15

17

18

Rate per Metre


Labour Composite
rate
rate

3"

0.00

0.00

0.00

0.00

0.00

0.303

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

0.00

0.00

0.339

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5"

0.00

0.00

0.00

0.00

0.00

0.464

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6"

0.00

0.00

0.00

0.00

0.00

0.544

0.00

0.00

0.00

0.00

20.00

20.00

20.00

0.20

0.20

0.66

0.66

8"

0.00

0.00

0.00

0.00

0.00

0.789

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10"

0.00

0.00

0.00

0.00

0.00

0.865

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12"

0.00

0.00

0.00

0.00

0.00

1.037

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14"

0.00

0.00

0.00

0.00

0.00

1.179

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

#####

16

Rate per Rft


Labour Composite
rate
rate

12

Total

19

20

Labour for laying, cutting, jointing, pipeline in trenches with PVC pipes of BSS with
"B" Class working pressure, complete in all respect.

Rate for
S. #

Dia
of
pipe

100

CarriageLAYING, FIXING, CUTTING, JOINTING Testing


for lead Time for
Daily
Amount
&
4 chains
100'
Expenses
Disinfecting

ft
Total

Rate
for 100'

6+7

2"

0.00

0.10

0.00

0.00

-0.22

-0.22

3"

0.00

1/8

0.00

0.00

0.00

0.00

4"

0.00

1/6

0.00

0.00

0.00

0.00

5"

0.00

1/5

0.00

0.00

0.00

0.00

6"

0.00

1/5

0.00

0.00

0.00

0.00

8"

0.00

2/7

0.00

0.00

0.00

0.00

10"

0.00

2/5

0.00

0.00

0.00

0.00

12"

0.00

1/2

0.00

0.00

0.00

0.00

14"

0.00

2/3

0.00

0.00

0.00

0.00

#####
#####
-

Plumber

1 No

0.00

0.00

S. Coolies

2 No

0.00

0.00

Total
Sundries

0.00
10.00 Percent

0.00

20.00 Percent

0.00

Total
Contractor's P
Total

0.00
0.00

27

Providing, laying, cutting, jointing, testing & disinfecting pipeline in trenches with PVC pipes of BSS with "D"
Class working pressure, complete in all respect.

Unit of rate per ft.


S.
#

Dia
of
pipe

Material
Rate for
100'

Wastage
2%

Total
(3 + 4)

Labour
Contractor's
Profit
20.00
Percent
6

Total
(5 + 6)

Lubri- Rate Amount


cant per Kgs
Kgs
(8 x 9)

10

Contractor's
Profit
20.00
Percent
11

Total
(10+11)

13

14

Rate per 100'


Rate per Ft
Rate per Metre
Labour
Composite Labour Composite Labour Composite
(7 + 15)

2"

0.00

0.00

0.00

0.00

0.00 0.259

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3"

0.00

0.00

0.00

0.00

0.00 0.303

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

0.00

0.00 0.339

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5"

0.00

0.00

0.00

0.00

0.00 0.464

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6"

0.00

0.00

0.00

0.00

0.00 0.544

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12

Labour Total
as per
detail (12+13)
24

15

16

17

18

19

20

28
a-

Providing and fixing cast iron special of BSS class "B" (such as bend, tee, cross collar, reducer, tail piece, flanged spigot,
cap, flanged socket, taper, angle branch, plug, etc.) for cast iron pipe line, complete.
C-I specials with spigot and socket joint.
Labour

S.
No.

Dia
of
pipe

Average
Waight
in
Lbs

3"

46.00

0.00

4"

61.00

0.00

5"

88.00

0.00

Labour Material
Total
Total
for
for
Labour for weight
2 Joints 2 Joints
2 Joints of special
4+5

6"

111.00

or
138.84
Kg
0.00

8"

182.00

0.00

10"

273.00

0.00

12"

392.00

or
396.55
Kg
0.00

15"

540.00

0.00

746.00

or
583.48
Kg
0.00

18"

Casting material (Supply of specials i/c moulding, painting,

Total
Cost

Rate
per Kg

carriage to site of work.


Rate
Contractor's Total
per Cwt
Profit
20.00
Percent

10

11

12

Rate
per Kg

13

Rate per Kg
Labour
Composite
13 + 14

14

15

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

28 b-

Providing and fixing cast iron special of BSS class "B" (such as bend, tee, cross collar, reducer, tail piece, flanged spigot,
cap, flanged socket, taper, angle branch, plug, etc.) for cast iron pipe line, complete.
CI flanged special with flanged and flanged joints.
Labour

S.
No.

Dia
of
pipe

Average
Weight
in
Lbs/Kg

Labour rate for 2


joints.
Labour Material
Total
(4 + 5)

3"

32.00

4"

48.00

5"

83.00

6"

93.00

8"

161.00

10"

250.00

12"

376.00

15"

453.00

18"

646.00

Material

Labour rate per Lbs


weight.
Total
Total
Rate
weight
Amount
per Kg
20

Supply of special (cost of material,


with moulding, painting, and carriage to
site of work.
Rate
Contractor's Total
Rate
P/ Cwt
Profit
per Kg
20.00

10

11

12

13

Rate
Rate per Kg
Labour
Composite
rate per
rate per
Kg
Kg

14

15

or
116.15
Kg

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

or
357.08
Kg

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

or
498.00
Kg

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

28
c-

Providing and fixing cast iron special of BSS class "B" (such as bend, tee, cross collar, reducer, tail piece, flanged spigot,
cap, flanged socket, taper, angle branch, plug, etc.) for cast iron pipe line, complete.
CI specials with tyton joints.
Weight

S.
No.

Dia
of
pipe

Labour

Average
Weight
in
Lbs

3"

42.00

4"

60.00

5"

84.00

6"

109.00

8"

175.00

10"

265.00

12"

374.00

15"

654.00

18"

898.00

Labour rate for 2


joints.
Labour Material
Total

Material

Labour rate per Lbs


weight.
Total
Total
Rate
per
weight of
cost
Kg
specials

Supply of special (cost of material


with moulding, painting, and
carriage to site of work.
Rate
per Cwt

10

Contractor's
Profit
20.00

11

Rate
per
Kg

Total

12

13

Rate
Rate per Kg
Labour
Composite
rate per
rate per
Kg
Kg

14

15

324.76
Lbs or
147.62
Kg

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Lbs or
244.20
Kg

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

921.80
Lbs or
419.00
Kg

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

29

Providing and fixing C.I. special of BSS Class "B" (such as bend, tee, cross, collar, reducer, tail piece, flanged socket, flanged
spigot, cap, taper, angle branch plug etc.) for AC pipe line with comet joint and rubber ring complete.
Labour

S.
#

Dia
of
pipe

Average
Weight
in
Lbs

3"

46.00

4"

61.00

6"

97.00

8"

175.00

10"

250.00

12"

370.00

16"

549.00

18"

693.00

20"

937.00

24"

1317.00

Labour rate for 2


joints.
Labour Material
Total

Material

Labour rate per


Kg.
Total
Total
Rate
weight
Amount
per Kg

Supply of special (cost of material,


with moulding, painting, and carriage to
site of work.
Rate P. Contractor's Total
Rate
Cwt
Profit
per Lbs
20.00

10

11

12

13

Rate per Kg
Labour
Composite
rate per
rate per
Kg
Kg

14

15

204 Lbs
or 92.56
Kgs

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2037 Lbs
or
927.23
Kgs

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2254 Lbs
or 1022
Kgs

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

30 - Providing and fixing sluice valve of BSS quality and weight Class "B" for cast iron pipe
Each
Material
S. Dia of
No. sluice
valve

Labour

Cost of
sluice
valve

Contractor's
Profit
20
Percent

Total

No of
day

Daily
Labour

Rate
Total

Labour

(3 + 4)

3"

0.00

0.00

4"

0.00

5"

6"

Composite
(5 + 9)

10

0.340

0.00

0.00

0.00 Labour

3" to 8"

0.00

0.370

0.00

0.00

0.00 Plumber

1 No

0.00

0.00

0.00

0.00

0.666

0.00

0.00

0.00 Skilled Coolies

2 No

0.00

0.00

0.00

0.00

0.710

0.00

0.00

0.00

8"

0.00

0.00

0.829

0.00

0.00

0.00 Sundries

10"

0.00

0.00

0.889

0.00

0.00

0.00

12"

0.00

0.00

0.999

0.00

0.00

0.00 Contractor's Profit & O

15"

0.00

0.00

1.325

0.00

0.00

0.00

18"

0.00

0.00

1.525

0.00

0.00

0.00 Labour

Total

0.00
10.00 Percent

Total

0.00
20.00 Percent

Total

0.00
0.00

10" to 18"

Plumber

1 No

0.00

0.00

Skilled Coolies

2 No

0.00

0.00

Unskilled Coolies

2 No

0.00

0.00

Total
Sundries

0.00
10.00 Percent

Total
Contractor's Profit & O
Total

0.00

0.00
0.00

20.00 Percent

0.00
0.00

31

S.
No.

Providing and fixing sluice valve of BSS quality & weight for AC pipeline with
commet joint & rubber ring complete i/c cost of jointing material.
Dia
of
sluice

Material
Cost of
sluice
valve

Contractor's
Profit
20.00
Percent
4

Labour for 2 joints


Total

Labour

Material

Total
6+7

Labour
rate

(3 + 4)

Rate
Composite
rate
5+8

3"

0.00

0.00

0.00

0.00

0.00

0.00

4"

0.00

0.00

0.00

0.00

0.00

0.00

6"

0.00

0.00

0.00

0.00

0.00

0.00

8"

0.00

0.00

0.00

0.00

0.00

0.00

10"

0.00

0.00

0.00

0.00

0.00

0.00

12"

0.00

0.00

0.00

0.00

0.00

0.00

16"

0.00

0.00

0.00

0.00

0.00

0.00

18"

0.00

0.00

0.00

0.00

0.00

0.00

10

31a Providing and fixing sluice valve of BSS quality and weight for A.C. pipe line with cement joint
and rubber ring complete including cost of jointing material.
Labour
Charge
per day

Sr.
No.

Size

No. of
Day

Amount

3"

12.30

0.00

0.00

4"

11.40

0.00

0.00

6"

10.35

0.00

0.00

8"

7.40

0.00

0.00

10"

9.30

0.00

0.00

12"

6.93

0.00

0.00

16"

6.10

0.00

0.00

18"

5.78

0.00

0.00

Daily Charge

Labour 3' to 8'


Plumber
Skilled Cooly

10' to 18"
Plumber
Skilled Cooly
Coolies

1 No.
2 Nos.
Total
Sundries
Total
Contractor's Pro

1 No.
2 Nos.
2 Nos.
Total
Sundries
Total
Contractor's Pro

0.00
0.00
10.00 Percent
20.00 Percent

0.00
0.00
0.00
10.00 Percent
20.00 Percent

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

32 Providing and fixing fire hydrant BSS quality and weight of 2" dia including cost of
jointing material.

Sr.
No.

Dia of
Pipe

2"

Material
Cost of Contractor's
Hydrant
Profit
20.00

Fixing (Labour)

Rate
Labour Composite

Total
Labour Material

Total

0.00

33 Providing and fixing Air Valve 3" (75mm) internal dia of BSS quality and weight complete
with jointing material.

Material
Cost of Contractor's
Air Valve
Profit
20.00

Fixing (Labour)

Rate
Labour Composite

Total

Sr.
No.

Dia of
Pipe

Single

0.00

Double

0.00

Labour Material

Total

20

34 Providing and fitting CI flanges on pipes, including turning, threading, facing and fitting etc.
complete in all respects.

S.
#

Dia
of
pipe

3"

No of
end
thread
P. day

Per Flange
Labour
Daily
End
Cutting
Total
Charges thread
end
per end
(5 + 6)

Material
Weight cost per cwt
of
flange
in Lbs

Total

10

Rates
Per Flange
Per Kgs
Labour
Compo- Labour Composite
site
(10 + 11)

11

12

13

14

15.00

0.00

0.00

0.00

0.00

8.40

0.00

0.00

0.00

0.00

0.00

0.00 Labour

4"

14.00

0.00

0.00

0.00

0.00

12.60

0.00

0.00

0.00

0.00

0.00

0.00 Turner

1 No

0.00

0.00

5"

12.00

0.00

0.00

0.00

0.00

17.00

0.00

0.00

0.00

0.00

0.00

0.00 Unskilled Coolies 1 No

0.00

0.00

6"

11.00

0.00

0.00

0.00

0.00

21.00

0.00

0.00

0.00

0.00

0.00

0.00

Average
b

Sundries

0.00
10.00 Percen

0.00

8"

9.00

0.00

0.00

0.00

0.00

35.70

0.00

0.00

0.00

0.00

0.00

0.00

Total

0.00

10"

7.00

0.00

0.00

0.00

0.00

52.50

0.00

0.00

0.00

0.00

0.00

0.00 Contractor's Profi 10.00 Percen

0.00

12"

5.00

0.00

0.00

0.00

0.00

74.55

0.00

0.00

0.00

0.00

0.00

0.00 Mechanic &Total


Electrical
charges

0.00

Average
c

Total

15"

3.00

0.00

0.00

0.00

0.00

110.00

0.00

0.00

0.00

0.00

0.00

0.00

18"

2.00

0.00

0.00

0.00

0.00

153.00

0.00

0.00

0.00

0.00

0.00

0.00

Average

Total

L.S.
0.00

35

Cutting C.I. Pipe and welding spigot or socket, flanged or tyton end after finishing ends of pipes.
Circumference Welding Charges
of Pipe in
Rate per Total
Inch.
Inch.
(4 + 5)

Cutting
2 Ends and
Finishing
(Double Col. 3)

G.Total

Say

Rate per
inch bore

Rate per
cm bore

10

11

Sr. No.

Dia of
Pipe Inch.

Cutting
End

3" (75mm)

0.00

9.42

0.00

0.00

0.00

0.00

0.00

4" (100mm)

0.00

12.57

0.00

0.00

0.00

0.00

0.00

5" (125mm)

0.00

15.71

0.00

0.00

0.00

0.00

0.00

6" (150mm)

0.00

18.85

0.00

0.00

0.00

0.00

0.00

Average
5

8" (20mm)

0.00

25.13

0.00

0.00

0.00

0.00

0.00

10" (250mm)

0.00

31.42

0.00

0.00

0.00

0.00

0.00

12" (300mm)

0.00

37.70

0.00

0.00

0.00

0.00

0.00

Average
8

15" (385mm)

0.00

47.12

0.00

0.00

0.00

0.00

0.00

18" (450mm)

0.00

56.55

0.00

0.00

0.00

0.00

0.00

Average

36 Providing, laying, cutting, jointing, testing and disinfecting G.I. Pipe Line in trenches, with flanged joints, using G.I. pipe of BSS 1387-1967 Heavy Quality complete in a
respects, including specials and valves:i)

G.I. FLANGED JOINTS

Sr.
Dia of
No. Pipe Inch

1
a
b
c
d
e
f
g

2
1" (40mm)
2" (50mm)
2" (63mm)
3" (75mm)
4" (100mm)
6" (125mm)
8" (150mm)

Cost
100'
heavy
quality
3
-

Speical
10%

Advot
1%

4
0.00
0.00
0.00
0.00
0.00
0.00
0.00

5
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Wastage
2%

Total Contractor
(3 + 4 +
Profit
+ 5 + 6)
10%

7
0.00
0.00
0.00
0.00
0.00
0.00
0.00

DAILY PROGRESS
Mechanic 1 No. 170
0.00
Cooly
2 No. 75
0.00
Total
Sundries
10.00 Percent
Total

Total

Daily
Progress

10

11

Daily
Charges

Total
Size

(7 + 8)

8
0.00
0.00
0.00
0.00
0.00
0.00
0.00

No. of
Joints

9
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

8
8
8
6
6
6
6

20
20
20
15
12
10
10

12
0.00
0.00
0.00
0.00
0.00
0.00
0.00

13
0.00
0.00
0.00
0.00
0.00
0.00
0.00

14
3/8
3/8
5/8
5/8
5/8
5/8
5/8

Material Per Ft. Length


No. Rate Amount
(15 x 16)

15
3.00
3.00
3.00
4.00
4.00
4.00
4.00

16
-

17
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

36 Providing, laying, cutting, jointing, testing and disinfecting G.I. Pipe Line in trenches, with flanged joints, using G.I. pipe of BSS complete in all 1387-1967 Medium Qua
respects, including specials and valves:ii)
Sr.
No.

Dia of
Pipe
Inch.

1
a
b
c
d
e
f
g

2
1" (40mm)
2" (50mm)
2" (63mm)
3" (75mm)
4" (100mm)
6" (125mm)
8" (150mm)

G.I. FLANGED JOINTS


Cost of Speical
Flanged
20.00
Pipe

3
-

4
0.00
0.00
0.00
0.00
0.00
0.00
0.00

20

Advot
1%

5
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Wastage
2%

Total

Contractor's
Profit
20.00

Total

No. of
Joints

Daily
Progress

10

11

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

DAILY PROGRESS
Mechanic 1 No. 170
0.00
Cooly
2 No. 75
0.00
Total
Sundries
10.00 Percent
Total

0.00
0.00
0.00
0.00
0.00

8
8
8
6
6
6
6

20
20
20
15
12
10
10

Daily
Charges

12
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Labour
for
Size
100'

13
0.00
0.00
0.00
0.00
0.00
0.00
0.00

14
3/8
3/8
5/8
5/8
5/8
5/8
5/8

Bolts and Nuts


No. Rate Amount

15
3.00
3.00
3.00
4.00
4.00
4.00
4.00

16
-

17
0.00
0.00
0.00
0.00
0.00
0.00
0.00

all

h of Pipe
Wt. Amount
Lbs.
Rs.
0.00
per Lbs.
18
19
0.35
0.00
0.35
0.00
0.50
0.00
0.50
0.00
0.60
0.00
0.60
0.00
0.60
0.00

Total
(13 +
17 +
19)
20
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Contrator
Profit
10%

21
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Total

Carriage

(20 +
21)
22

23
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

Testing
Grand
&
Total
Disfi- (22 + 23
necting
+ 24)
24
0.00
0.00
0.00
0.00
0.00
0.00
0.00

25
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rate Per 100 Ft


Rate Per Foot
Labour Composte Labour Composite
(9 + 26)

26
-

27
0.00
0.00
0.00
0.00
0.00
0.00
0.00

28
0.00
0.00
0.00
0.00
0.00
0.00
0.00

29
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rate Per Metre


Labour
Composite

30
0.00
0.00
0.00
0.00
0.00
0.00
0.00

31
0.00
0.00
0.00
0.00
0.00
0.00
0.00

uality

Rubber Insertion Total


ContrTotal
Wt. Amount (13 + 17
ator's
(20 + 21)
Lbs.
Rs.
+ 19)
Profit
10%
per Lbs.
18
19
20
21
22
0.35
0.00
0.00
0.00
0.00
0.35
0.00
0.00
0.00
0.00
0.50
0.00
0.00
0.00
0.00
0.50
0.00
0.00
0.00
0.00
0.60
0.00
0.00
0.00
0.00
0.60
0.00
0.00
0.00
0.00
0.60
0.00
0.00
0.00
0.00

Carriage

23
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Testing
Grand
and
Total
disin- (22 + 23
fection
+ 24)
24
0.00
0.00
0.00
0.00
0.00
0.00
0.00

25
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rate Per 100 Ft.


Labour
Composite
(26 + 9)
26
-

27
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rate Per Ft.


Labour Composite

28
0.00
0.00
0.00
0.00
0.00
0.00
0.00

29
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Rate Per Metre.


Labour
Composite

30
0.00
0.00
0.00
0.00
0.00
0.00
0.00

31
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Sr. No. 41
Making Connection for new Water Supply lines with the running main, including excavation of
trench and refilling, complete, but excluding cost of pipe and specials, etc.
i)

Upto 150mm (6") i/d

Detail

Unit Rate (British System) per Connection


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting, connecting
pipe, etc. 2 cuts
0.25 No
Total
Sundries
Total

0.00 P. Day

0.00 P. Day

10.00 Percent

Contractor's 20.00 Percent


Total

Bailing out water from the trench


after cutting running main, taking
average quantity of water as 500
Cft. (14 Cum) @ Rs. 272.25% Cft
(Item No. 35, Chap: Miscellaneous)

Rate Per Connection

Say

Rs.

0.00
20

ii)

Upto 200mm (8") i/d

Detail

Unit Rate (British System) per Connection


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting, connecting
pipe, etc. 2 cuts
0.25 No
Total
Sundries
Total

0.00 P. Day

0.00 P. Day

10.00 Percent

Contractor's#REF!
Total

Percent

Bailing out water from the trench


after cutting running main, taking
average quantity of water as 700
Cft. (19.60 Cum) @ Rs. 272.25% Cft
( Item No. 35, Chap: 26 )

Rate Per Connection

Say

Rs.

0.00

iii)

Upto 250mm (10") i/d

Detail

Unit Rate (British System) per Connection


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting pipe, etc.
2 cuts
0.50 No
Total
Sundries
Total

0.00 P. Day

0.00 P. Day

10.00 Percent

Contractor's 20.00 Percent


Total

Bailing out water from the trench


after cutting running main, taking
average quantity of water as 1000
Rs. %o Cft.
Cft. (28 Cum
( Item No. 35, Chap: 26 )

Labour Rate Per Connection

Say

Rs.

0.00

iv)

Upto 300mm (12") i/d

Detail

Unit Rate (British System) per Connection


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting pipe, etc.
2 cuts
0.50 No
Total
Sundries
Total

0.00 P. Day

0.00 P. Day

10.00 Percent

Contractor's 20.00 Percent


Total

Bailing out water from the trench


after cutting running main, taking
average quantity of water as 1500
Rs. %o Cft.
Cft. (48 Cum
( Item No. 35, Chap: 26 )

Labour Rate Per Connection

Say

Rs.

0.00

v)

Upto 400mm (16") i/d

Detail

Unit Rate (British System) per Connection


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting pipe, etc.
2 cuts
0.75 No
Total
Sundries
Total

0.00 P. Day

0.00 P. Day

10.00 Percent

Contractor's 20.00 Percent


Total

Bailing out water from the trench


after cutting running main, taking
average quantity of water as 1825
Rs. %o Cft.
Cft.(51.10 Cu
( Item No. 35, Chap: 26 )

Labour Rate Per Connection

Say

Rs.

0.00

vi)

Upto 500mm (20") i/d

Detail

Unit Rate (British System) per Connection


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting pipe, etc.
2 cuts
0.75 No
Total
Sundries
Total

0.00 P. Day

0.00 P. Day

10.00 Percent

Contractor's 20.00 Percent


Total

Bailing out water from the trench


after cutting running main, taking
average quantity of water as 2500
%o Cft.
Cft.(70 Cum) Rs.
@
( Item No. 35, Chap: 26 )

Labour Rate Per Connection

Say

Rs.

0.00

vii)

Upto 600mm (24") i/d

Detail

Unit Rate (British System) per Connection


Qty

Rate
Per Unit (Rs.) Amount (Rs.)

Labour
Cooly for excavating/ refilling the
trench
0.50 No
Plumber for cutting pipe, etc.
2 cuts
1.00 No
Total
Sundries
Total

0.00 P. Day

0.00 P. Day

10.00 Percent

Contractor's 20.00 Percent


Total

Bailing out water from the trench


after cutting running main, taking
average quantity of water as 3000
%o Cft.
Cft. (85 Cum)Rs. ( Item No. 35, Chap: 26 )

Labour Rate Per Connection

Say

Rs.

0.00

DESCRIPTION OF ITEM NO. 15-A

Detail

Providing and fixing, 6" (150mm) thick RCC


manhole as per standard drawing STD/PD No.6
of 1977, complete in all respects.

Gully trap frame hinged saUnit Rate (British System) per Set
Rate Per
Unit (Rs.)

Qty.

Amount
(Rs.)

1. RCC Cover
a) 2"x22"x2" size angle iron rings =
1 x 22 x 26 = 6.81 Rft.
7 12
Weight @ 4.04 Lbs/Ft = 27.51 Lbs (12.43) Kg
b) M.S. round bars " dia
Straight bras
1 x 26 = 26 inch
2 x 24 = 48 inch
2 x 18 = 36 inch
bent up bars
1 x 2 = 28 inch
2 x 26 = 52 inch
2 x 20 = 40 inch
230 inch or 19.17 ft.
Bars in upper distribution ring 1x22/7x1.5 =
Bar in lower distribution ring 1x22/7x1.25 =
in overlaps distribution ring 2x =
28.81 Ft. @ 0.667 Lbs/Rft. = 19.22 Lbs
a + b = 27.51 + 19.22 = 46.73 Lbs or
21.20 Kg

19.17
4.71
3.93
1.00
28.81

Ft.
Ft.
Ft.
Ft.
Ft.

21.20

Kg

2. Tee Shaped @ 1 frame 37.324 Kg


Material
Steel
Total
Contractor's Profit & overhead chg: 20%
Total

58.524

P. Kg

C.O.
RCC (1:2:4) in situ or precast
1 x 22 x 26 x 26 x x 6+5+5 x 1
7 12 12
3
12

D/d for triangular portion


2xx1/6x = 0.04 Cft
Rectangular portion
2xx5/24
= 0.10 Cft
0.14 Cft
(Item 6 b(i) Chapter No. 6) Total

1.74

Cft.

0.14
1.60

Cft
Cft

P. Cft
-

Labour
1. Welding ends of engle iron rings
2. Welding ends of M.S. bar to angle iron
3. Fixing manhole cover and frame
including carriage to site complete in all
respect.
4. Labour for RCC 1:2:4 concrete
(Item 6 b(i) Chapter No. 6)
Total
Contractor's profit & overhead chg:20% on 1.2 Rs.
Total
Item Rates
Labour Rate Per Set
Composite Rate Per Set

1.00
20.00

L.S.
1.74

No.
Nos.

Each
Each

Cft

P. Cft

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM
1.

Providing and Laying RCC Pipe moulded with cement concrete 1:1:3 with spigot socket or collar joint etc. including cost of reinforcement,
conforming to B.S. 5911 Part 1.1981, Class "L", including Carriage of Pipe from factory to site of work, lowering in trenches to correct
alignment and grade, jointing, cutting pipes where necessary, finishing and testing etc. complete.

h C.I. Gully trap frame hinged safety type.


Dia

Material Per Meter Length

of Pipe
mm

Market Wastage Rubber


Rate per

2%

Ring -

Total

Per Inc

Meter
2

Profit

Carriage
Total

Per Pipe

Laying Jointing
Daily

Daily

Amount (Rs)Progress Expenses

20

Dia Pipe
1

LABOUR PER PIPE OF 6 FEET

Contractor

Testing

Labour

Charges

Labour Composite
Total

Per Pipe

Per

Per Foot

Foot

Labour

Composite

Rate

Rate

Per

Per

Metre

Metre

17

18

Percent

10

11

12

13

14

15

16

4" (100mm)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

180.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6" (150mm)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

150.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9" (225mm)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

120.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

DESCRIPTON OF ITEM

Providing and laying non-reinforced concrete pipe moulded with Cement Concrete 1:1:3 Conforming to ASTM specification 14-73 Class-I including Carriage of
Pipe from Factory to Site of Work, Lowering in Trenches to Correct Alignment and Grade Jointing Cutting Pipe where necessary, finishing and testing etc.

complete.

Dia of

Material Per Meter Length of Pipe


Market Wastage Rubber

Pipe
mm

Rate per

3%

Ring -

Total

Per Inc

Metre
2

Profit

Carriage
Total

20

Dia Pipe
1

LABOUR Per Pipe of 6 Ft. Length

Contractor

Wt. in

Laying Jointing

Amount

Testing

Daily

Daily

Per

Progress

Expenses

Pipe

10

11

12

Ton

Charges

Total

Labour

Composite

Labour

Composite

Rate

Rate

Per

Per

Per

Per

Foot

Foot

Metre

Metre

15

16

17

18

Percent

13

14

4" (100mm)

0.00

0.00

0.00

0.00

0.00

0.00

0.043

0.00

180.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6" (150mm)

0.00

0.00

0.00

0.00

0.00

0.00

0.061

0.00

150.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8"(200mm)

0.00

0.00

0.00

0.00

0.00

0.00

0.094

0.00

144.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9" (225mm)

0.00

0.00

0.00

0.00

0.00

0.00

0.127

0.00

136.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10"(250mm

0.00

0.00

0.00

0.00

0.00

0.00

0.133

0.00

135.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 1

DESCRIPTION OF ITEM
3 Providing and laying RCC Pipe Sewers, Moulded with Cement Concrete 1:1:3 Confirming to ASTM Specification C-76-79 Class-II, Wall B, Including Carriage of
Pipe from Factory to tWith C.I. Gully trap frame hinged safety type.
etc. Complete.

Sr.
No.

Dia of
Pipe
Inch.

Length
of Pipe
Ft.

Thicknes
of
Pipe
(Inches)

Rate Per
Ft.

Wastage
2%

MATERIAL

Rubber
Ring Per
Inch Rs.
0.00
6

Total

Contractors
Profit
20.00

Total

Carriage
Daily
Progress Amount
10

11

LABOUR FOR 8 FT. PIPE


Laying Jointing
Daily
Daily
Per
Progress Expenses
Pipe
12

13

14

Testing
Charges

15

Total

16

1. 12" (300mm)

2.439

2.00

0.00

0.00

0.00

0.00

0.00

0.00

23.00

0.00

15.00

0.00

0.00

0.00

2. 15"(380mm)

2.439

2.25

0.00

0.00

0.00

0.00

0.00

0.00

17.00

0.00

12.00

0.00

0.00

0.00

3. 18"(460mm)

2.439

2.50

0.00

0.00

0.00

0.00

0.00

0.00

13.00

0.00

10.00

0.00

0.00

0.00

4. 21"(535mm)

2.439

2.75

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

8.00

0.00

0.00

0.00

5. 24"(1610mm

2.439

3.00

0.00

0.00

0.00

0.00

0.00

0.00

8.00

0.00

7.00

0.00

0.00

0.00

6. 27"(685mm)

2.439

3.25

0.00

0.00

0.00

0.00

0.00

0.00

7.00

0.00

6.00

0.00

0.00

0.00

7. 30"(760mm)

2.439

3.50

0.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

5.00

0.00

0.00

0.00

8. 33"(800mm)

2.439

3.75

0.00

0.00

0.00

0.00

0.00

0.00

5.00

0.00

4.00

0.00

0.00

0.00

9. 36"(915mm)

2.439

4.00

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

3.25

0.00

0.00

0.00

10. 42"(1070mm

2.439

4.50

0.00

12.50

0.00

12.50

2.50

15.00

3.00

0.00

2.50

0.00

0.00

0.00

11. 48"(1220mm

2.439

5.00

0.00

14.50

0.00

14.50

2.90

17.40

2.00

0.00

7.00

0.00

0.00

0.00

12. 54"(1370mm

2.439

5.50

0.00

16.80

0.00

16.80

3.36

20.16

2.00

0.00

5.00

0.00

0.00

0.00

13. 60"(1520mm

2.439

6.00

0.00

22.60

0.00

22.60

4.52

27.12

1.00

0.00

4.00

0.00

0.00

0.00

14. 66"(1680mm

2.439

6.50

0.00

27.50

0.00

27.50

5.50

33.00

1.00

0.00

2.50

0.00

0.00

0.00

15. 72"(1830mm

2.439

7.00

0.00

32.50

0.00

32.50

6.50

39.00

1.00

0.00

2.00

0.00

0.00

0.00

Page 2

Composite Labour Composite


Labour Rate Per Ft. Rate Per Rate Per
rate per
Metre
Metre
ft.
17
18
19
20

DESCRIPTION OF ITEM

4 Providing and laying RCC Pipe Sewers, Moulded with Cement Concrete 1:1:3 Confirming to ASTM Specification C-76-79 Class-III wall B, Including Carriage of
Pipe from Factory to the Site of Work, Lowering in Trenches to Correct Alignment and Grade Jointing with Rubber Ring, Cutting Pipes where necessary, Testing
etc. Complete. in all respects.

Sr.
No.

Dia of
Pipe
Inch

Market
Rate
Meter
2

Material Per Metre Length of Pipe


Wastage
Rubber
Contractor
2%
Ring Per
Total
Profit
Inch Rs.
20.00
0.00
3
4
5
6

LABOUR FOR 8' PIPE


Carriage
Laying Jointing
Daily
Amount
Daily
Daily
Progress
Rs.
Progress Expenses
(Pipe)
(Pipe)
8
9
10
11

Total

Rate
per Pipe
12

Total
Testing
Charges
Per Pipe
13

Total
per
Pipe

Labour
rate per
ft.
15

14

1. 12" (300mm)

0.00

0.00

0.00

0.00

0.00

0.00

23.00

0.00

15.00

(0.25)

2. 15"(380mm)

0.00

0.00

0.00

0.00

0.00

0.00

17.00

0.00

12.00

(0.25)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3. 18"(460mm)

0.00

0.00

0.00

0.00

0.00

0.00

13.00

0.00

10.00

(0.25)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

4. 21"(535mm)

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

8.00

(0.25)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

5. 24"(1610mm

0.00

0.00

0.00

0.00

0.00

0.00

8.00

0.00

7.00

(0.25)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6. 27"(685mm)

0.00

0.00

0.00

0.00

0.00

0.00

7.00

0.00

6.00

4.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7. 30"(760mm)

0.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

5.00

4.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8. 33"(800mm)

0.00

0.00

0.00

0.00

0.00

0.00

5.00

0.00

4.00

4.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9. 36"(915mm)

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

3.25

4.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10. 42"(1070mm

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

2.50

4.75

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11. 48"(1220mm

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

7.00

(1.25)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12. 54"(1370mm

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

5.00

(1.25)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13. 60"(1520mm

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

4.00

(1.25)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14. 66"(1680mm

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

2.50

(1.25)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15. 72"(1830mm

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

2.00

(1.25)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 3

DESCRIPTION OF ITEM
5 Providing and laying RCC Pipe Sewers, Moulded with Cement Concrete 1:1:3 Confirming to ASTM Specification C-76-79 Class-IV, Wall B, Including Carriage of
Pipe from Factory to the Site of Work, Lowering in Trenches to Correct Alignment and Grade Jointing with Rubber Ring, Cutting Pipes where necessary, Testing
etc. Complete.

Sr.
No.

Dia of
Pipe
mm

Market
Rate
Per
Metre
2

Wastage
2%

MATERIAL PER METRE LENGTH


Rubber
Contractors
Ring Per
Total
Profit
Inch Rs.
20.00
0.00
4
5
6

Carriage
Daily
Amount
Progress
(Rs.)

Total

LABOUR FOR 8' FT. PIPE


Laying Jointing
Daily
Daily
Rate
Progress Expenses
Per
Pipe
Pipe
10
11
12

Total
Testing
Charges
Per Pipe
13

Total
Per
Pipe
14

Labour Labour Composite Labour Composite


Rate Per Rate Per Rate Per Rate Per Rate Per
Metre
Metre
Metre
Metre
Metre
15

15

16

17

18

1. 12" (300mm)

0.00

0.00

0.00

0.00

0.00

0.00

23.00

0.00

15.00

0.00

0.00

0.00

0.00

0.00

0.00

2. 15"(380mm)

0.00

0.00

0.00

0.00

0.00

0.00

17.00

0.00

12.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3. 18"(460mm)

0.00

0.00

0.00

0.00

0.00

0.00

13.00

0.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00

4. 21"(535mm)

0.00

0.00

0.00

0.00

0.00

0.00

10.00

0.00

8.00

0.00

0.00

0.00

0.00

0.00

0.00

5. 24"(1610mm

0.00

0.00

0.00

0.00

0.00

0.00

8.00

0.00

7.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

6. 27"(685mm)

0.00

0.00

0.00

0.00

0.00

0.00

7.00

0.00

6.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

7. 30"(760mm)

0.00

0.00

0.00

0.00

0.00

0.00

6.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

8. 33"(800mm)

0.00

0.00

0.00

0.00

0.00

0.00

5.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

9. 36"(915mm)

0.00

0.00

0.00

0.00

0.00

0.00

4.00

0.00

3.25

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10. 42"(1070mm

0.00

0.00

0.00

0.00

0.00

0.00

3.00

0.00

2.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11. 48"(1220mm

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

7.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12. 54"(1370mm

0.00

0.00

0.00

0.00

0.00

0.00

2.00

0.00

5.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

13. 60"(1520mm

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

4.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

14. 66"(1680mm

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

2.50

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15. 72"(1830mm

0.00

0.00

0.00

0.00

0.00

0.00

1.00

0.00

2.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 4

6 Lowering of Sub Soil Water table by Installation of Tubewell along Sewer Line and Pumping Out Water, for Excavation in Open Cutting below Sub Soil Water Level,
Concreting, Curing, Laying and Jointing Pipes, Filling hauncher etc, till the Completion of Sewer Line, including Disposal of Pumped Out Water

Depth of Distance
Seria Lowering Between
No.
of
Bore Hole
Meter
Meter

Hours

PUMPING
Rate
per
Hour

Amount

Shifting
Pump &
Installation
at New
Site (Rs.)
7

Depreciation
Charges of
Pumping
Depth of
Machinery
Bore
Boring
Equipment
8
9

BORING
Rate
Per
Meter
10

Disposal of Charges
pumped out by Pump
Amount
water
Rate Per
per 30 M
Hour
distance
11

12

14

Total
6+7+8+
11+12+14
15

Grand
Total

Rate
Per
Ft.

Adopted
in
CSR 1998

18

19

15+16

0-1'

100.00

20

0.00

0.00

20.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0-2'

76.00

64

0.00

0.00

29.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0-3'

62.00

70

0.00

0.00

45.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0-4'

52.00

75

0.00

0.00

57.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0-5'

550.00

80

0.00

0.00

60.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0-6'

43.00

88

0.00

0.00

64.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0-7'

38.50

92

0.00

0.00

69.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0-8'

34.00

94

0.00

0.00

70.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0-9'

33.00

96

0.00

0.00

55.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

10

0-10'

31.00

99

0.00

0.00

60.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

11

0-11'

30.00

102

0.00

0.00

65.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

12

0-12'

29.00

106

0.00

0.00

70.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 5

13

Amount

Contractor
Profit
20.00

16

17

SEWERAGE
DESCRIPTION OF ITEM NO 7:
a)

Constructing gully grating chamber 12"x12"(300x300mm)


With C.I. Gully trap frame hinged safety type.

Detail

Unit Rate (British System) per Each


Qty.
Labour

Excavation in ordinary soil upto 5'(1.5m)


7
5
depth 1x3'x2 /8'x2 /8'= 24.5
24.50 Cft
Item 7 (i) of Chapter No. 3
Cement concrete brick or stone ballast 1"
to 2" (40 to 50mm) gauge (1:6:12)
7
1x3'x2 /8'x = 2.34 Cft
2.34 Cft
Item 3 (d) of Chapter No. 6
Pacca brick work in foundation and plinth
in cement, sand, mortar (1:3)
3
1x2'xx2 /8'
= 4.45'
1x2x3/8x2
2x1xx2

/8

Rate
Composite

Amount
Labour Composite

0.00 %0 Cft

0.00

0.00 % Cft

0.00 % Cft

0.00

0.00

0.00 % Cft

0.00

0.00

-0.01 % Sft

0.00

0.00

0.00 % Cft

0.00

0.00

= 2.23'

/8

= 3.56'
10.24 Cft

Total
Deduction
Sewer
'x'x22/7x

0.60

Drain
1x'x'x22/7x'

0.10
0.70 Cft

0.00 % Cft
Net ( 10.24 - 0.70 ) =
9.5 9.54 Cft
Item No. 4(i) of Chap. 7
Cement Plaster (1:3) " thick
inside chamber 1x4x2 3/8'
=
9.50
outside chamber 2x2'x'
=
3.75
2x2 1/8'x' =
3.19
16.44
Top
1x2'x'
1.87
3
1x1 /8'x'
1.00
3

1x2'x /8'

1.00
20.31 Sft -0.01 % Sft

Item No. 8(b) Chapter 11


Cement concrete plain 1:2:4 including
placing, compacting finishing and curing
complete.
1

Floor bed
1x1x /12
Item 5 (f) Chap. No. 6

0.08 Cft

Detail

0.00 % Cft

Unit Rate (British System) per Each


Qty.
Labour

Rate
Composite

Amount
Labour Composite

Supplying and fixing C.I. gully grating


12"x12" with hinged safety. Type
weighing 81 Lbs
Supplying and fixing 12"x6" iron

1.00 No

0.00 P. No

0.00

2.00 Nos

0.00 P. No

0.00

0.00
0.00

0.00
0.00

Total Rate for Each


Say

Page 7

Item No.

Constructing gully grating chamber 12"x12" (300x300mm)


b)

Concrete Gully Trap.

Detail

Unit Rate (British System) per Each


Qty.
Labour

Excavation in ordinary soil upto 5'(1.5m)


7
5
depth 1x3x2 /8x2 /8 = 24.5 Cf 24.50 Cft
(As per item 7 (a))
Cement concrete 1:6:12 of brick or stone
7
ballast 1x3x2 /8x = 2.34 Cft 2.34 Cft
(As per item 7 (a))
Pacca brick work in foundation and
plinth (1:3)
3
1x2x'x2 /8
= 4.45
3

1x2x /8x2
2x1x'x2

/8

/8

Rate
Composite

Amount
Labour Composite

0.00 %0 Cft

0.00

0.00 % Cft

0.00 % Cft

0.00

0.00

0.00 % Cft

0.00

0.00

-0.01 % Sft

0.00

0.00

0.00 % Cft

0.00

0.00

2.23
= 3.56
10.24 Cft

Deduction as per 3 (a)


Net ( 10.24 - 0.70 ) =
9.5 9.54 Cft
0.00 % Cft
(As per item 4(i) Chapter 7
Cement Plaster (1:3)" thick
3
inside chamber 1x4x2 /8 =
9.50
outside chamber 2x2x =
3.75
1
2x2 /8 x =
3.19
16.44
Top
1x2x
1.87
3
1x1 /8 x
1.00
3

1x2x /8

1.00
20.31 Sft -0.01 % Sft

As per item 8(b) Chapter 11


Cement concrete plain 1:2:4 including
placing, compacting finishing and curing
complete.
1

Floor bed
1x1x /12
As per item No. 5 of Chapter 6

0.08 Cft

0.00 % Cft

Page 8

Detail

Unit Rate (British System) per Each


Qty.
Labour

Supplying and fixing 12"x12"


(300x300mm) concrete gully trap.

1.00 No

Supplying and fixing 12"x6" (300x150mm)


iron bolt etc.
2.00 Nos

Rate
Composite

Amount
Labour Composite

0.00 P. No

0.00

P. No

0.00

0.00

0.00

0.00

0.00

Total Rate for Each


Say

Page 9

DESCRIPTION OF ITEM NO 8:

Constructing standard gully grating chamber 3.0'x1.5'x2.5'


china ware trap as per PHED drawing
No. STD/PD No. 3 of 1977 complete in all respect.

Detail

Unit Rate (British System) per Each


Qty.
Labour

Excavation in foundation
1x5'x3'x3' = 53 Cft

53.00 Cft

Cement Concrete (1:6:12)


1
1x5'x3'x /3' = 5.83 Cft

5.83 Cft

Providing and laying 2" (50mm) thick CC


1:2:4 in bed of gully grating.
1
1x2.5'x1.5'x /6'
=
Foundation block 1x1'x'x1.0' = 0.75
To 1.37 Cft

Rate
Composite

Amount
Labour Composite

0.00 %0 Cft

0.00

0.00 % Cft

0.00 % Cft

0.00

0.00

0.00 % Cft

0.00

0.00

0.62
0.00 % Cft

Pacca brick work (1:3) other than building


in foundation & plinth.
short wall 2x1'x'x2' =
5.62
Long wall 2x4'x'x2' = 16.88
Total
22.50 Cft
D/d opening
1x1x1x0.75
1x0.5x0.5x0.75

0.75
0.19
Total
0.94 Cft
22.50 - 0.94 = 21.56 Cft 21.56 Cft

0.00 % Cft

0.00 % Cft

0.00

0.00

Item No. 4(i) Chapter 7


Cement Plaster " (12mm) thick (1:3)
1
inside chamber 2(3+1)x2 /3 = 2 21.00 Sft

% Sft

% Sft

0.00

0.00

% Cft

0.00

0.00

0.00 P. Kg

0.00

0.00

Net

=
=

Precast RCC (1:2:4) slab excluding cost


of steel.
1
Top slab 1x4x3'x /3' = 4.5 C
4.50 Cft
0.00 % Cft
(Item 6(b.1) of Chap. 6)
Fabrication of steel including cost of steel
bending, binding complete.
4.5 Cft @ 4.5 cwt/100 Cft
=
0.20 cwt or 10.16 Kg
10.16 Kg
0.00 P. Kg
(Item 9 (b) Chap. 6)
Small iron work such as gusset plate
knees, bends, stirrups, straps rings etc.
including cutting drilling reviting
handling assembling and fixing M.S.
grating.
a.M.S. flat iron (1"x1/8")= 2x1 = 3.5'
Weight= 3.5 ft @ 0.78 Lbs/ft = 2.73 Lbs

Detail

Unit Rate (British System) per Each


Qty.
Labour

b." dia M.S. bars 2" centre to centre


4x1.0 = 4 ft
Weight @ 0.67 Lbs/ft = 2.68 Lbs
= 2.73 + 2.68 Lbs =
5.41 Lbs
2.46 Kg
(Item 10 of Chap. 25)
Supply and fixing China ware trap with
C.I. screen.
1.00 No

Rate
Composite

0.00 P. Kg

0.00 P. Kg

P. No

Amount
Labour Composite

0.00

0.00

0.00

Making hole in existing manhole chamber


wall and rectification of the same after pipe
connection.
1
/3 Mason @ Rs.
P. Day 56.67
Sundries 10%
=
5.67
Contractor's Profit 20%
Labour for each manhole

1.00 No

Material including Contractor's Profit


Composite rate per No. 0.00

68.57 P. No

P. No

0.00

9.16

Total Rate for Each


Say

Page 10

0.00

0.00

0.00

0.00

DESCRIPTION OF ITEM NO 9:

Extra for making and finishing benching floor work


in manhole chamber, with 1/8" (3mm) thick cement
finish.
Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs) Amount (Rs)

Material
Cement for 1/8" thick nero
100x1/8x1/12 = 1.04 Cft= 0.83 cwt
Total
Contractor's Profit & Ove
Total
Labour

0.83 Bag

Contractor's Profit & Ove


Total

20.00 Percent

Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total

0.00 P. Bag

0.60 Nos
0.60 Nos
0.13 No

P. Day
P. Day
P. Day

10.00 Percent
20.00 Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

Page 13

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 10:

Restoration of brick pavement on edge, over laid


service line, with 2" (50mm) sand cushion under
soling.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs) Amount (Rs)

Material
Total bricks required = 525 out of which
33% shall be replaced.
No: of new bricks required 175 Nos
Sand
Total
Contractor's Profit & Ove
Total

175 Nos
16.70 Cft

%0 Nos
%Cft

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.65 No
1.25 Nos
0.08 No

P. Day
P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

Page 14

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 11:

Restoration of flat brick pavement sand


grouted, over 2" (50mm) thick dry sand
cushion, under soling on laid service line.

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

100

Rate
Per Unit (Rs) Amount (Rs)

Sft

Material
Total bricks required shall be 350 Nos
New brick to be supplied in replacement 33%
1.350x1/3 = 117 Nos

117 Nos

2.100x1/6 = 16.7 Cft Sand


Total
Contractor's Profit & Ove
Total

16.70 Cft

%0 Nos

%Cft

20.00 Percent

Labour
Mason
Unskilled Coolies
Bahishti
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.40 No
0.75 No
0.05 No

P. Day
P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

Page 15

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 12:

Restoration of metalled road, on laid service


line, including compaction.
Carpeted road, with 2" (50mm) carpet and 10"
(250mm) depth of stone metal for sub base and
base.

a)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs) Amount (Rs)

Assuming 67% material received from


dismantling. New material required for
sub-base/base = 100x10x.33= 27.50 Cft
12 100
Carpetting 2" (50mm) thick = 100 Sft (9.291) Sqm

Material
Sub-base/base (Item 3(i) of Chap. 18)
Carpetting 2" (50mm) thick (Item 10 Chap. 18)
(Item 10 Chapter 18)
Total

27.50 Cft
100.00 Sft

% Cft
%Sft

Labour
Labour (Item 3(i) Chap 18)
Carpeting (Item 10 Chapter 18)

27.50 Cft
100.00 Sft

% Cft
% Sft

Total

Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

Page 16

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 12:

Restoration of metalled road, cut for laying


service line, including compaction.
Carpeted road with 1" (40mm) carpet and 6"
(150mm) depth of stone metal for sub-base and
base.

b)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs) Amount (Rs)

Assuming 67% material recovered from


dismantling, and 33% new material will be
needed
Total quantity required for= 100x 1 x 6 = 16.7 Cft
sub-base/bas
3 12
Carpetting 1" (40mm) thick = 100 Sft (9.291) Sqm
Material
Sub-base (Item No.3 (i) Chapter 18
Carpeting 1" (40mm) thick

16.70 Cft
100.00 Sft

% Cft
% Cft

Total

Labour
Sub-base (Item No. 3(i) Chapter 18
Carpeting

16.70 Cft
100.00 Sft

% Cft
% Sft

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Total
Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

Page 17

DESCRIPTION OF ITEM NO 12:

Restoration of metalled road, cut for laying


service line, including compaction.
Black topped road with two coats of surfacing and
10" (254mm) depth of stone metal for sub-base and
base.

c)

Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs) Amount (Rs)

Assuming 33% material will be required


to replanish in restoration.
Quantity = 10 x 10 x 1 =
27.78 Cft
12
3
Black topped road surfacing = 100 Sft

Material
Sub-base (Item No. 3(i) of Chpater 18
Bajri
Bituman
Total
Contractor's Profit & Ove
Item 2 & 3 on 'Rs.
Total

27.78 Cft
8.25 Cft
65Lbs (29 .50) Kg

% Cft
%Cft
P. Kg

20.00 Percent

Labour
Sub base/base (Item No. 3(i) Chap. 18
100 Sft Surfacing (two coats)
(Item 8 (1-1) & (2-1) Chap 18)
(Road and Road Structure)
Total

27.78 Cft
100.00 Sft

% Cft
% Sft

Item Rates
Labour Rate Per 100 Sft
Labour Rate P. Sqm
Composite Rate Per 100 Sft
Composite Rate P. Sqm

Page 18

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

Providing and fixing 1"x1"x3/16"


(32x32x5mm) angle iron step, in manhole
chambers, including carriage and setting the
same in work, to correct lines and levels.

DESCRIPTION OF ITEM NO 13:

Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs) Amount (Rs)

Material
Providing 1"x1"x3/16" (32x32x5mm)
angle iron step of 8"x12" (200x300mm)
5
1
outer over all dimensions 2 /16'x /12'x2' = 0.48 Sft
(0.704x0.025x0.761) = 0.013 M
0.48 Sft @ 7.65 Lbs = 3.69 Lbs or
1.68 Kg.
Total
Contractor's Profit & Ove
Total

1.68 Kg

P. Kg

20.00 Percent

Labour
Blacksmith
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.01 No
0.01 No

P. Day
P. Day

10.00 Percent

20.00 Percent

Labour for Fixing


Fixing mild iron step including carriage
and setting the same to correct line and
levels in masonry/concrete work

Page 19

Unit Rate (British System) per 100 Sft

Detail

Qty

Mason
Carriage from store to site
Total
Sundries
Total
Contractor's Profit & Ove
Total

Rate
Per Unit (Rs) Amount (Rs)

0.05 No
L.S.

Each

10.00 Percent

20.00 Percent

Item Rates
Labour Rate for Each
Composite Rate for Each

Page 20

Rs.

Say

Rs.

Say

DESCRIPTION OF ITEM NO 14:

Fixing manhole frame and cover in RCC slab


including carriage to site.

Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs) Amount (Rs)

Carriage of Manhole
Frame and cover average weight of
each set = 127 Kg.
cart load up to 4 miles (6.44 Km)
@ Rs.
per cart load.
Total

Labour
Setting the frame to correct and level on
the reinforcement of man hole chamber
top/Rcc slab/ caping.
Unskilled Coolies
Mason
Total
Sundries
Total
Contractor's Profit & Ove
Total

0.12 No
0.12 No

P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per Set

Rs.

Page 21

Say

DESCRIPTION OF ITEM NO 15:

Providing and fixing, 3" (75mm) thick RCC


manhole cover, 22" (557mm) dia with tee
shaped C.I. frame of 20" (505mm) clear i/d
(frame weighting 37.324 Kg. or one maund)
as per standard drawing STD/ PD No. 5 of
1977, complete in all respects.

Detail

Unit Rate (British System) per Set


Qty

Rate
Per Unit (Rs) Amount (Rs)

RCC Cover
1.M.S. flat iron ring 3"x" (75x6mm) =
1 x 22 x 22 x = 1.44 Sft
7
12
1.44 Sft weight @ 10.21 Lbs = 14.70 Lbs (6.67) Kg
2.M.S. round bars " dia
Straight bars 4 x 22
=
7.33 ft
12
Straight bars 4 x 1.75 = 7.00 ft
14.33 Rft
Weight of bars @ 0.667 Lbs/Rft
(0.992 Kg/Rft) = 9.60 Lbs (4.36) Kg
Total 1+2 = 6.67+4.36 = 11.03 Kg
Material
Steel required
C.I. frame
Total
Contractor's Profit & Ove
Total

11.03 Kg
1Md (37 .324)Kg

P. Kg
P. Kg

20.00 Percent

Precast or cast in situ. RCC (1:2:4)


1 x 22 x 22 x x 3+4+3 x 1 = 0.73 Cft
7
12
3
12
(Item 10 Chapter No. 6)

0.73 Cft

P. Cft

Page 22

Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs) Amount (Rs)

Labour
Welding of flat iron
Welding ends of M.S. round bars with
ring.
Fixing manhole frame & cover including
carriage to site
Labour for Precast Concrete
(Item 5 (f) Chapter No. 6)
Total
Contractor's Profit & Ove
Total

20.00 Percent on R

1.00 No

Each

16.00 Nos

Each

P. Cft

L. S.
0.73 Cft

Item Rates
Labour Rate Per Set
Composite Rate Per Set

Page 23

Rs.

Say

Rs.

Say

DESCRIPTION OF ITEM NO .16

Providing and fixing, 6" (150mm) thick RCC


manhole cover 22" as per standard drawing STD/ PD
No. 6 of 1977, complete in all respects.

Unit Rate (British System) per 100 Sft

Detail

Qty

RCC Cover
a.2"x2"x" size angle iron rings =
1 x 22 x 26 =
6.81 Rft
7
12
Weight @ 4.04 Lbs/ft = 27.51 Lbs (12.430) Kg
b.M.S. round bars " dia
Straight bras 1 x 26
=
26 inches
2 x 24
=
48
2 x 18
=
36
bent up bars 1 x 28
=
28
2 x 26
=
52
2 x 20
=
40
230 Inchs or 19.17 ft
Bars in upper distribution ring 1x22/7x1.5 =
Bar in lower distribution ring 1x22/7x1.25 =
in overlaps distribution ring 2x =
28.81 ft @ 0.667 Lbs/Rft = 19.22 Lbs
a + b = 27.51 + 19.22 = 46.73 Lbs or
21.20 Kg
Tee Shaped C.I. Frame 37.324

Rate
Per Unit (Rs) Amount (Rs)

19.17 ft
4.71
3.93
1.00
28.81 Ft
21.20

37.324

Material
Steel

Total
Contractor's Profit & Ove
Total

58.524 Kg

P. Kg

20.00 Percent

Page 24

Detail

Unit Rate (British System) per 100 Sft


Qty

RCC (1:2:4) in situ or precast


1 x 22 x 26 x 26 x x 6+5+5 x 1 =
7
12
12

1.74 Cft
3

12

D/d for traingular portion.


1
0.04 Cft
2xx /6x =
Rectangular portion
5
=
0.10 Cft
2xx /24

0.14 Cft
1.60 Cft

0.14 Cft
(Item 5 (f) Chapter No. 6)

Rate
Per Unit (Rs) Amount (Rs)
-

P. Cft

Each
Each

P. Cft

Total

Labour
1. Welding ends of engle iron rings.
1.00 No
2. Welding ends of M.S. bar to angle iron.
20.00 No
3. Fixing manhole cover and frame
including carriage to site complete in all
respect.
L. S.
4. Labour for RCC 1:2:4 concrete
1.74 Cft
(Item 5 (f) Chapter No. 6)
Total
Contractor's Profit & Ove
20.00 Percent on Rs. Item 1&2
Total
Item Rates
Labour Rate Per Set
Composite Rate Per Set

Page 25

Rs.

Say

Rs.

Say

DESCRIPTION OF ITEM NO 17:

Providing and fixing, 6" (150mm) thick RCC


manhole cover with 3"x3"x" (75x75x6mm)
angle iron frame, 22" i/d (557mm) as per standard
drawing STD/ PD No. 7 of 1977, complete in all
respects.

Detail

Unit Rate (British System) per 100 Sft


Qty

Steel :
L. iron for frame 3"x3"x"
1x 22 x 27 = 7.07 ft @ 4.89 Lbs/Rft = 34.57 Lbs
7
12
L. iron for cover 2"x2"x"
1x 22 x 26 = 6.81 ft @ 4.04 Lbs/Rft = 27.51 Lbs
7
12
62.08 Lbs
M.S. round straight bars
1 x 26
=
26 inchs
2 x 24
=
48
2 x 18
=
36
1 x 28
=
28
2 x 26
=
52
2 x 20
=
40
230 Inchs or 19.17 ft
Bars in upper distribution ring 1x22/7x1.5
Bar in lower distribution ring 1x22/7x1.25
Bar in overlaps distribution ring
2x
Bar in holdfast of frame 4x0.75
weight @ 0.667Lbs/ft x31.81 = 21.22 lbs
= 62.08 + 21.22 =
83.30 Lbs or
37.80 Kg

Rate
Per Unit (Rs) Amount (Rs)

19.17 ft
4.71 ft
3.93
1.00
3.00
31.81

ft
ft
ft
Ft

Material
Steel
Total
Contractor's Profit & Ove
Total

37.80 Kg

P. Kg

20.00 Percent

Page 26

Detail

Unit Rate (British System) per 100 Sft


Qty

RCC (1:2:4) in situ or precast laid in


position complete in all respect.
1 x 22 x 26 x 26 x x 6+5+5 x 1 =
7
12
12
3

1.74 Cft
12

D/d for traingular portion.


1
0.04
2xx /6x =
Rectangular portion
5
=
0.10
2xx /24

0.14

(Item 5 (f) Chapter No. 6)

Rate
Per Unit (Rs) Amount (Rs)

0.14 Cft
1.60 Cft

P. Cft

1.00 No
1.00 No

Each
Each

24.00 Nos

Each

P. Cft

Total

Labour
1.i. Welding ends of engle iron rings for
frame 3"x3"x"
ii. For cover 2"x2"x"
iii. Ends of MS bars to angle iron ring in
RCC cover
20 Nos
iv. End of M.S. holdfast to the ring of the
frame.
4 N
2. Fixing manhole frame and cover
including carriage from store complete
in all respects.
3. Labour for RCC 1:2:4 concrete
(Item 5 (f) Chapter No. 6)
Total
Contractor's Profit & Ove
20.00 Percent on Item 1
Total
Item Rates
Labour Rate Per Set
Composite Rate Per Set

Page 27

L.S.
1.60 Cft

Rs.

Say

Rs.

Say

DESCRIPTION OF ITEM NO 18:

Desilting of disposal work collecting tank including


removal of sludge with in 3 chains (90M).

Unit Rate (British System) per 100 Sft

Detail

Qty
Analysis Rate for

Rate
Per Unit (Rs) Amount (Rs)

2100 Cft

T & P Required :
R.S. joist 6"x12" size 25'-0"
Winch crab with steel rope and v-clamps.
M.S. bucket 2'x2'x2'
Tripod of G.I. pipe 3" (75mm) i/d
Chain pully block of one ton capacity
Wooden plank 10"x10"x1"
Cross planks
10
Longitudnal

20 x 12

1.00
1.00
1.00
1.00
1.00

No
No
No
No
No

24 Nos
=

6 Nos
30 Nos

Rental charges of equipments :


Taking average size of C. Tank
Depth of silt.
Quantity = 22 x 30' x 30' x x 3
7
Time for fitting equipment and removing.
Time for clearing silt.
Rental charges of all equipments including
carriage, fixing & removing.
Total
Contractor's Profit & Ove
Total

30.00 ft
3.00 ft
2121.50 Cft (S2100 Cft)
0.50 Day
2.00 Days
2.50 Days

P. Day

20.00 Percent

Page 28

Unit Rate (British System) per 100 Sft

Detail

Qty

Rate
Per Unit (Rs) Amount (Rs)

Labour
Coolies Unskilled
For digging
For Lifting & removing
For carrying

2.00
8.00
2.00
12.00
24.00

Unskilled Cooly for 2 days


Total
Sundries
Total
Contractor's Profit & Ove
Total

Nos
Nos
Nos
Nos
Nos

Each

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per 100 Cft
Labour Rate Per Cum
Composite Rate Per 100 Cft
Composite Rate Per Cum

Page 29

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 19:

a)

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
6" (150mm) dia 18' long.

i)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

16

Rate
Per Unit (Rs) Amount (Rs)

Cwt

Material
C.I. vantilating shaft 18' long weighing
16 cwt = 21.78 md. (813 Kg) including
column pipe, base, cowl, plates, and other
accessories including carriage to site.
Foundation bolts & nuts " dia 1' long
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total

813.00 Kg
4.00 Nos

P. Kg
No

0.37 Kg
L. S.

P. Kg

20.00 Percent

Labour
Pipe fitter
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg

1.00 No
4.00 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Composite Rate Per Cwt


Composite Rate Per 100 Kg

Page 30

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 19:

a)

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
6" (150mm) i/d shaft 24' (7.232Rm) long.

ii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

18

Rate
Per Unit (Rs) Amount (Rs)

Cwt

Material
C.I. vantilating shaft 24' long weighing
18 cwt = 24.50 md. (915 Kg) including
column pipe, base, cowl, and other plates
and accessories including carriage to site.
Foundation bolts & nuts " dia 2' long .
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total

915.00 Kg
4.00 Nos

P. Kg
No

0.37 Kg
L. S.

P. Kg

20.00 Percent

Labour
Pipe fitter for 1 day = 1 No
Unskilled Cooly for 1 day = 4 Nos
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg

1.25 Nos
5.00 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Composite Rate Per Cwt


Composite Rate Per 100 Kg

Page 31

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 19:

a)

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
6" (150mm) i/d shaft 30' (9.143Rm) long.

iii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs) Amount (Rs)

20 Cwt

Material
C.I. vantilating shaft 30' including column pipe,
base, cowl and other accessories including
carriage to site weighing 20 cwt or 1016 kg
Foundation bolts & nuts " dia 2' long .
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total

1016.00 Kg
4.00 Nos
0.37 Kg
L. S.

P. Kg
No

P. Kg

20.00 Percent

Labour
Pipe fitter 1 No for 1.5 days
Unskilled Cooly 4 No for 1.5 days
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg

1.50 Nos
6.00 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Composite Rate Per Cwt


Composite Rate Per 100 Kg

Page 32

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 19:

a)

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
6" (150mm) i/d vantilating shaft 36' (11 M) long

iv)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs) Amount (Rs)

22.3 Cwt

Material
C.I. vantilating shaft 36' long including
column pipe base, cowl, other plates,
accessories & carriage to site 22.3 Cwt
(1133.21 kg).
Foundation bolts & nuts " dia 2' long .
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total

1133.21 Kg
4.00 Nos
0.37 Kg
L. S.

P. Kg
Each

P. Kg

20.00 Percent

Labour
Pipe fitter 1 No for 1 days
Unskilled Cooly 4 No for 1 days
Total
Sundries
Total
Contractor's Profit & Ove
Total
Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg

1.75 Nos
7.00 Nos

P. Day
P. Day

10.00 Percent
20.00 Percent

Composite Rate Per Cwt


Composite Rate Per 100 Kg

Page 33

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 19:

b)

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
9" (225mm) i/d : shaft 18' (5.48M) long.

i)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs) Amount (Rs)

25 Cwt

Material
C.I. vantilating shaft 18' long including
column pipe base, cowl, plates and other
accessories including carriage to site 25 Cwt
(1270.42 kg).
Foundation bolts & nuts " dia 2' long .
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total

1270.42 Kg
4.00 Nos
0.37 Kg
L. S.

P. Kg
Each

P. Kg

20.00 Percent

Labour
Pipe fitter
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 Nos
6.00 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Page 34

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 19:

b)

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
9" (225mm) i/d : shaft 24' (7M) long.

ii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs) Amount (Rs)

29 Cwt

Material
C.I. vantilating shaft 24' long including
base, column pipe, cowl, plates, other
accessories & carriage to site 29 Cwt or
39.47 Mds: cast iron pipe. (1473.68 kg).
Foundation bolts & nuts " dia 2' long .
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total

1473.68 Kg
4.00 Nos
0.37 Kg
L. S.

P. Kg
Each

P. Kg

20.00 Percent

Labour
Pipe fitter 1 No for 1 day
Unskilled Cooly 6 Nos for 1 day
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.25 Nos
7.50 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Page 35

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 19:

b)

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
9" (225mm) i/d : shaft 30' (9M) long.

iii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs) Amount (Rs)

32.5 Cwt

Material
C.I. vantilating shaft 30' long including base,
column pipe, cowl, plates, other accessories &
carriage to site 32.5cwt or 44.24md (1651.54)
Foundation bolts " dia 2' long.
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total

1651.54 Kg
4.00 Nos
0.37 Kg
L. S.

P. Kg
Each

P. Kg

20.00 Percent

Labour
Pipe fitter 1 No for 1 day
Unskilled Cooly 6 Nos for 1 day
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.50 Nos
9.00 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Page 36

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 19:

b)

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
9" (225mm) i/d : shaft 36' (11M) long.

iv)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs) Amount (Rs)

36 Cwt

Material
C.I. vantilating shaft 36' long including
base, column pipe, cowl, plates, bolts and
other accessories 36 Cwt or 1829.40 kg.
Foundation bolts " dia 2' long.
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total

1829.40 Kg
4.00 Nos
0.37 Kg
L. S.

P. Kg
Each

P. Kg

20.00 Percent

Labour
Pipe fitter 1 No for 2 day
Unskilled Cooly 6 Nos for 2 day
Total
Sundries
Total
Contractor's Profit & Ove
Total

2.00 Nos
12.00 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Page 37

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 19:

c)

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
12" (300mm) i/d : shaft 18' (5.45M) long.

i)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs) Amount (Rs)

36 Cwt

Material
C.I. vantilating shaft including base column
pipe, cowl, plates, bolts, and other
accessories etc. 36 Cwt or 1829.40 kg.
Foundation bolts 7/8" dia 2' long.
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total

1829.40 Kg
4.00 Nos
0.37 Kg
L. S.

P. Kg
Each

P. Kg

20.00 Percent

Labour
Pipe fitter for 1 day
Unskilled Cooly for 1 day
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.00 Nos
8.00 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Page 38

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 19:

c)

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
12" (300mm) i/d : shaft 24' (7M) long.

ii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs) Amount (Rs)

42 Cwt

Material
C.I. vantilating shaft including base column
pipe, cowl, plates, bolts, and other
accessories etc. 42 Cwt or 2134 kg.
Foundation bolts 7/8" dia 2' long.

2134.00 Kg
4.00 Nos

Rubber sheets 1/8" thick 10"x8" =


0.55 Sft
@ 1.5 Lbs/Sft
Rental charges of T & P
Total
Contractor's Profit & Ove
Total

0.37 Kg
L. S.

P. Kg
Each

P. Kg

20.00 Percent

Labour
Pipe fitter 1 No for 1 day
Unskilled Cooly 8 Nos for 1 day
Total
Sundries
Total
Contractor's Profit & Ove
Total

1.50 Nos
12.00 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Page 39

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 19:

c)

Providing and installing C.I. vantilating shaft


painted with bituminous paint with foundation
bolts as per PHED standard drawing STD/PD
No. 4 of 1977 complete in all respects (except
concrete foundation block).
12" (300mm) i/d : shaft 30' (9M) long.

iii)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate

Analysis

for

Rate
Per Unit (Rs) Amount (Rs)

48 Cwt

Material
C.I. vantilating shaft 30' long including base,
cowl, column pipe, plates. studs and other
accessories etc. 48 Cwt or 65.33 Md. =
Foundation bolts 7/8" dia 3' long.
Rubber sheets 1/8" thick 10"x8" =
0.55 Sft
@ 1.5 Lbs/Sft
Hire charges of T & P
Total
Contractor's Profit & Ove
Total

2439.00 Kg
4.00 Nos
0.37 Kg
L. S.

P. Kg
Each

P. Kg

20.00 Percent

Labour
Pipe fitter 1 No for 2 day
Unskilled Cooly 8 Nos for 2 day
Total
Sundries
Total
Contractor's Profit & Ove
Total

2.00 Nos
16.00 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per Cwt
Labour Rate Per 100 Kg
Composite Rate Per Cwt
Composite Rate Per 100 Kg

Page 40

Rs.
Rs.

Say
Say

Rs.
Rs.

Say
Say

DESCRIPTION OF ITEM NO 20:

Silt clearing 10' (3M) dia wells and removal of


slush out side the compound.
Upto 10' (3M) depth of slush.

a)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs) Amount (Rs)

Labour
Drivers
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

3.00 Nos
5.50 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per Well

Rs.

Page 41

Say

DESCRIPTION OF ITEM NO 20:

Silt clearing 10' (3M) dia wells and removal of


slush out side the compound.
Beyond 10' (3M) depth of slush.

b)
Detail

Unit Rate (British System) per 100 Sft


Qty

Rate
Per Unit (Rs) Amount (Rs)

Labour
Driver
Unskilled Cooly
Total
Sundries
Total
Contractor's Profit & Ove
Total

5.00 Nos
12.00 Nos

P. Day
P. Day

10.00 Percent

20.00 Percent

Item Rates
Labour Rate Per Well

Rs.

Page 42