Estimating and Costing of Material and labour

Rate analysis for plastering work - Estimating and

Costing of Material and labour


Priv

 LCETED  ESTIMATION-AND-COSTING, RATE-ANALYSIS-FOR-CONSTRUCTION-WORK,

FOLLOW US ON

Plaster is a mixture of building materials such as cement, sand and


waterproofing admixtures (if need) which is used to coat walls and ceilings.
Cement and sand are mixed with water using a mix ratio to form a plaster  Likes

material 
 Follow

Also read: What is the cost of plastering the walls? Plastering Material &
Labour Cost  Subscribe

Thayyil Enterprises  Followe

Steel Fabricated OPEN


Builders  Followe

Types of Plastering:
·       Interior Plastering
·       Exterior Plastering
·       Ceiling Plastering
·       Water-proofing Plastering

The following points have to be considered while Plastering work Rate


analysis
1. Manpower wages + including their transportation
 

2. Labour Output per day


 

3. Material Required + wastage


 

4. Power + Water Consumption


 

5. Charges for Supervision


  Q U A N T I TY- C A L C U L AT O R

6. Scaffoldings/Equipment and Tools


 

7. Incidental expense
 
Roof Sheet Calculator | How to

Number Roof Sheets Required?

8. Contractor profit
 
 LCETED  Nov 14, 2022

GRID CEILING/SUSPENDED

Thayyil Enterprises CEILING/DROPPED CEILING MATE

Steel Fabricated OPEN CALCULATOR | LCETED

Builders  LCETED  Oct 27, 2022

Gypsum Board Partition Materi

Calculation | Drywall Material c

- Lceted

 LCETED  Oct 25, 2022

OK, Lets take rate analysis of plastering for data Bill of Quantity Excel Format | B

Area = 10 sqm Quantities Excel Sheet Free Dow

teamlceted

 LCETED  Sept 17, 2022

How to Calculate Cement and S

Required for Floor Tiling?

 LCETED  Sept 14, 2022

RECENT POPULAR COMM

How to kickstart a Construction

| Interior Fit-out Project | Const

Planning

 LCETED  Jan 29, 2023

How to Prepare HSE/Safety Plan

Construction | HSSE Requireme

Setup Requirements

 LCETED  Jan 26, 2023

How to Prepare Project Schedu

Construction Site | Project Sche

Format - Lceted

 LCETED  Jan 22, 2023

How To Prepare Construction P

material tracker? | Material tra

Format

 LCETED  Jan 21, 2023

What Is a Work Permit? Types of

permit used in Construction wo

LCETED

 LCETED  Jan 17, 2023

Mix ratio = 1:6


Thickness = 15mm - 0.015m FOR INTERIOR GENERAL

WO R K , C I V I L C O N ST RU C T

C O N T R A C T S S E RV I C E S
Rate Analysis of Plastering PROVIDED BY OUR

HOMESLIBRO TEAM.

Thayyil Enterprises
Steel Fabricated OPEN
Builders

Step 1: Material calculation


CLICK TO VISIT

Cement calculation
Volume of mortar = Area x thickness + (10% Extra for uneven surface) TA G S

Volume of mortar = (10 x 0.015) + 10% = 0.165cum



THINGS CIVIL ENGINEER SHOULD KNOW

Dry Volume of Mortar = 1.22 x Wet Volume of Mortar QUANTITY SURVEY

So,
CONSTRUCTION MATERIALS INTERIOR T

Dry Volume of Mortar = 1.22 x 0.165 = 0.2013 cum CONSTRUCTION TIPS

BAR BENDING SCHEDULE

Given a mortar mix ratio of 1:6 therefore, one part of cement is mixed with six QUANTITY-CALCULATOR

parts of sand CHECKLISTS FOR CIVIL ENGINEER

Volume of cement = 1/(1+6) = 0.142857 cum


CONSTRUCTION ELEMENTS

CONSTRUCTION MANAGEMENT

Volume of cement = 0.2013 x 0.142857 = 0.0287 cum ELECTRICAL TIPS INTERVIEW QUESTION

SURVEYING STRUCTURAL DESIGN

Cement Required in weight = Volume x density = 0.0287 x 1440 = 41.328 LABORATORY TESTS P LU M B I N G- T I P S

Cement Required in weight = weight in kg/50kg = 41.328/50 = 0.82 – 1


FORMULAS ROLES AND RESPONSIBILITI

bags CIVIL ENGINEER SOFTWARES

Sand calculation
Volume of sand = 6/(1+6) = 0.8571 cum

Volume of sand = 0.2013 x 0.8571= 0.1725 cum

Sand Required in weight = Volume x density = 0.1725 x 1650 = 284.62kg

Sand Required in Cft = 0.1725 x 35.31 = 6.0909 cft (As we know that 1m3 =
35.31 CFT)

Also use plastering material calculation excel sheet

Thayyil Enterprises
Steel Fabricated OPEN
Builders

Step 2: Labour calculation


How much plastering can be done in a day?
Wall height (noted Window, door
Labour
Wall Area for Scaffolding jambs and
Required
preparations) beam soffit
100 sqft <10ft nil 1 mason, 1
helper
100 sqft <10ft Yes 1.25 mason,
1.25 helper
100 sqft 10ft Yes 1 mason, 1
helper
100 sqft 10ft – 12ft nil 1.5 mason, 1.5
helper
100 sqft 10ft – 12ft Yes 1.5 mason, 1.5
helper


The above data his prepared for average labour used at more than 10
construction sites. Try to prepare your own labour usage
Also read: Labour management in construction
Also read: Task for an average skilled labour per day

From the above table, (10sqm – 107.6sqft)


We will take a 10 ft wall with no walls and door jambs so we need 1
mason and 1 helper.
The Most Trusted Roofers
Ad Thayyil Enterprises

House Inte
Painting -
Service Su
Ad hometriangle

Step 3: Other Expenses


1. Power + Water Consumption – 1.5%
 

2. Charges for Supervision – 5%


 

3. Scaffoldings/Equipment and Tools – 2%


 

4. Incidental expense – 2%
 

5. Contractor profit – 20%


 

Above percentage, his prepared for average labour used more than 10
construction sites. 

Have a look at What is the cost of Cement Plastering per sqft, sqm, cft
and cum?

Rate Analysis of Plaster Using Excel Sheet


Wall Plastering Rate Analysis
Area = 10 sqm
Mix ratio = 1:6
Thickness = 15mm - 0.015m

SNo. Description Qty Unit Rate Cost


Materials

1 Cement 1 bags 400 400

2 Sand 6.09 cft 60 365.4

Labours

3 Mason 1 nos 1000 1000

4 Helper 1 nos 850 850


Materials + Labout Cost 2615.4
Other Expenses
5 Power + Water Consumption 1.50% 39.231
6 Charges for Supervision 5% 130.77
7 Scaffoldings/Equipment and Tools 2% 52.308
8 Incidental expense 2% 52.308
9 Contractor profit 20% 523.08
Cost of 10.00 Sq.m. 3413.097
Cost of 1.00 Sq.m. 341.3097
Cost of 100.00 Sq.m. 34130.97

Also Use: Plastering Calculator | Calculation of Materials For


Plastering | SQFT | SQM

FAQ 
What are the Specifications Used for Plastering Work in different
countries?
Here are the lists of plastering work specifications as per the Indian
standards, British, American, and New Zealand Standards

Indian Standard (BIS codes):


IS 8112 Specification for 43 grade OPC
IS 269 Specification for 33 grade OPC
IS 1489 Specification for Portland Pozzolana Cement
IS 383 Specification for coarse and fine aggregates for natural sources for
concrete.
IS 1542 Specifications for sand for plaster
IS 2645 Specifications for integral cement waterproofing compound

British Standards:
BS EN 998-1:2016
This standard BS EN 998-1:2016 Specification for mortar for masonry is
classified in these ICS categories: 91.100.10 Cement. Gypsum. Lime. Mortar

American Standards:
ASTM C 926 - Standard Specification for Application of Portland Cement-
Based Plaster

New Zealand Standards:


NZS 4251.1:2007 - Solid plastering - Cement plasters for walls, ceilings and
soffits

The material used for plastering work should be tested as per specification.

What are the points to be considered while  Plastering work


Rate analysis?
1. Manpower wages + including their transportation
  

2. Labour Output per day


  

3. Material Required + wastage


  

4. Power + Water Consumption


  

5. Charges for Supervision


  

6. Scaffoldings/Equipment and Tools


  

7. Incidental expense
  

8. Contractor profit
  

What are the sequences of work to be done before starting the


plastering work?
Before starting interior plastering work, interior brickwork should be
completed. In external plastering work, you should first complete the
perimeter brickwork of each floor. Exterior plastering work is always started
from the top of the building and finished at the bottom, and ceiling plastering
should be completed before wall plastering begins.

Tags # ESTIMATION-AND-COSTING # RATE-ANALYSIS-FOR-CONSTRUCTION-WORK

Share This 


https://www.lceted.com/2022/09/rate-analysis-for-plastering-work.html

About LCETED

WE CREATED THIS CHANNEL FOR CIVIL ENGINEERS WANT TO KNOW ABOUT CONSTRUCTION
WORK AND INTERIOR WORK

     

 Newer Article Older Article 


How To Do Rate Analysis For Cement Mortar? - Calculator For Rectangular Hollow Structural
Estimation And Costing Sections | How To Calculate The Weight Of Hollow
Rectangular Steel Pipes?

R E L AT E D P O ST

View More
BOQ  ESTIMATION-AND-COSTING  ESTIMATION-AND-COSTING 

How to Prepare BOQ for Tile How to do Rate analysis for Rate analysis for plastering work -

Flooring, Dadoing, Wall Cladding, Cement Mortar? - Estimation and Estimating and Costing of Material

and Anti-Skid Tile Flooring? Costing and labour

 LCETED  Oct 29, 2022  LCETED  Sept 09, 2022  LCETED  Sept 08, 2022

LCETED - "WHATSAPP GROUP"


For Instant updates Join our Whatsapp Group. Save our Whatsapp contact +919840140396 as LCETED and Send us a
message “JOIN”
BLOGGER

NO COMMENTS:

POST A COMMENT

Enter Comment


C O N TA C T F O R M C O N ST RU C T I O N M AT E R I A L S ABOUT US

Name
All You Want to Know About Welding And WE CREATED THIS CHANNEL FO
Structural Steelworks - lceted ENGINEERS WANT TO KNOW
Email *  LCETED  May 06, 2022 CONSTRUCTION WORK AND I
WORK
Message * How to identify Good Teak wood For Your Learn More →
Furniture? - LCETED

C AT E G O R I E S
 LCETED  Mar 08, 2022

Teak Wood Furniture - Benefits and Drawbacks

| LCETED › BAR BENDING SCHEDULE


Send
 LCETED  Mar 07, 2022
› CONSTRUCTION MANAGEMENT

Flexible Plywood | Standard Sizes and

Thickness | Uses - lceted › ELECTRICAL TIPS

 LCETED  Mar 05, 2022


› INTERIOR TIPS

Phenolic plywood | Film-faced Concrete

Shuttering plywood - Lceted › QUANTITY SURVEY

 LCETED  Mar 05, 2022


› THINGS CIVIL ENGINEER SHOULD KNOW

P O WE R E D B Y  B Y L C E T E D | C O P Y R I G H T 202 2 L C E T E D. A L L R I G H T S R E S E RVE D LCETED INSTITUTE FOR CIVIL ENG

HOME

You might also like