The document outlines a development plan involving physical, community, and social infrastructure projects with the following key points:
1) Physical infrastructure projects include constructing 300km of jeep tracks at a cost of total cost, 150km of paved roads at 60M total cost, 20 small dams and mini dams at 5M each, electrifying 100 remote areas through traditional/alternate energy at 1M each, and 30 drinking water supplies serving 100 households each at 2M each.
2) Organizing 600 community groups to uplift socioeconomics and benefit 10,000 members at 600M total cost.
3) Social infrastructure projects like improving 50 existing schools at 5L each, 30 health institutions at 5L each
The document outlines a development plan involving physical, community, and social infrastructure projects with the following key points:
1) Physical infrastructure projects include constructing 300km of jeep tracks at a cost of total cost, 150km of paved roads at 60M total cost, 20 small dams and mini dams at 5M each, electrifying 100 remote areas through traditional/alternate energy at 1M each, and 30 drinking water supplies serving 100 households each at 2M each.
2) Organizing 600 community groups to uplift socioeconomics and benefit 10,000 members at 600M total cost.
3) Social infrastructure projects like improving 50 existing schools at 5L each, 30 health institutions at 5L each
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
The document outlines a development plan involving physical, community, and social infrastructure projects with the following key points:
1) Physical infrastructure projects include constructing 300km of jeep tracks at a cost of total cost, 150km of paved roads at 60M total cost, 20 small dams and mini dams at 5M each, electrifying 100 remote areas through traditional/alternate energy at 1M each, and 30 drinking water supplies serving 100 households each at 2M each.
2) Organizing 600 community groups to uplift socioeconomics and benefit 10,000 members at 600M total cost.
3) Social infrastructure projects like improving 50 existing schools at 5L each, 30 health institutions at 5L each
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
• Construct Jeepable tracks of about 300 Kms unit cost total cost • Pacca Metelled Road of 150 Kms, unit cost 60 M, total cost: Water Resource Development • Provision of Mega & Mini water reservoirs in form of small dam, mini dam etc. 20 Nos, unit cost 5 M • Electrification of remote areas through • traditional / alternate energy source 100 Nos, 1 M • Provision of Drinking Water Supply. 30 Nos , 2 M serving at least 100 HH each. 2. Community Development To organize 600 communities group for socio economic uplift and this at least 10,000 members will take benefit of this activity 600, 1 M 3. Social Infrastructure • Provide missing facilities in existing schools like class rooms, boundary walls, latreens, furniture etc. 50 Nos, 5 Lac • Provide missing facilities in Health Institution 30 Nos, 5 Lac • Provide mobile dispensaries for Livestock 2 Nos, • Uplift of Border Milraty police check post1 Karor • Informal education if balance available , 2-4 karor • Provide missing facilities to Veterinary Dispensaries 20 Nos • To train farming communities for to enhance Agriculture and Livestock production with the assistance of Livestock & Agriculture extensive Departments. • Support services/ agriculture livestock 4 karor, 2 each Procurement Standby elctrcity Photocopier UPS Entertainment