Upah Borongan Pak Marna Proyek Tanjung Moara - Kuala Namu

NO URAIAN PEKERJAAN SAT BANYAK VOLUME HARGA SATUAN JUMLAH

1 Pembesian AA Kelas 3 set 3 1,423.05 250.00 1,067,287.50


2 Pembesian AA Kelas 6 set 3 939.57 250.00 704,677.50
3 Pembesian CC Kelas 3 set 1 4,479.31 250.00 1,119,827.50
4 Pembesian DD Kelas 6 set 1 2,680.42 250.00 670,105.00
5 Begisting AA 6 ped set 3 15.84 11,000.00 522,720.00
6 Begisting AA 6 kolom set 3 5.40 15,000.00 243,000.00
7 Begisting CC 3 ped set 1 41.76 11,000.00 459,360.00
8 Begisting CC 3 kolom set 1 30.48 15,000.00 457,200.00
9 Lansiran tower 33 / 150m ls 1 20.60 60,000.00 1,236,000.00
10 Lansiran tower 46 / 130m ls 1 29.10 52,000.00 1,513,200.00
11 Lansiran tower 47 / 70m ls 1 32.80 28,000.00 918,400.00

8,911,777.50

Tanggerang Selatan, 22 Juni 2010

Nicko h Hidayat SE ME