Implementation Estimate

Change Request 1900798


Task Est. effort (days) Est. Duration (d)

Analysis/testing 1.5 0

Config Changes. 3 0

Development (if Required) 0 0

Dev testing 1 0

QA testing. 1 0

Security changes (if required) 0 0

Knowledge transfer / Training 0.5 0

Documentation 0.5 0

Production Landing tests. 0.5 0

Total Effort 8

Total Duration 0

Additional Comments: i.e. Estimate is based on particular assumptions (identify the assu