The minutes summarize a meeting between Castwel Industries and Til regarding a refractory application project. Castwel Industries mobilized on site on August 14th but work did not start until September 13th due to the work front not being available. They completed painting and taping of panels 1-3 from September 13th to 15th and again work stopped until September 20th. Castwel then completed panels 2-4 from September 20th to 22nd and performed additional preparatory work on September 23rd before casting panels 1-3 and 4-6 between September 24th and 30th. Firing of panels was ongoing.
The minutes summarize a meeting between Castwel Industries and Til regarding a refractory application project. Castwel Industries mobilized on site on August 14th but work did not start until September 13th due to the work front not being available. They completed painting and taping of panels 1-3 from September 13th to 15th and again work stopped until September 20th. Castwel then completed panels 2-4 from September 20th to 22nd and performed additional preparatory work on September 23rd before casting panels 1-3 and 4-6 between September 24th and 30th. Firing of panels was ongoing.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
The minutes summarize a meeting between Castwel Industries and Til regarding a refractory application project. Castwel Industries mobilized on site on August 14th but work did not start until September 13th due to the work front not being available. They completed painting and taping of panels 1-3 from September 13th to 15th and again work stopped until September 20th. Castwel then completed panels 2-4 from September 20th to 22nd and performed additional preparatory work on September 23rd before casting panels 1-3 and 4-6 between September 24th and 30th. Firing of panels was ongoing.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
Minutes of meeting held between M/s Castwel Industries and M/s Til
Members present
TIL Castwel Industries
1) Divakar Pai 1) Ravi Meshram
Points
1. M/s Castwel industries mobilize on 14-08-10 for refractory application on site.
2. From 14-08-10 to 12-08-10 the work front is not available and work is not started, but man power is on site. 3. The refractory application work is started on 13-09-10. 4. 1st panel painting and plastic tape coating on anchor is started on 13-09-10 and completed on 15-09-10. 5. On 16-09-10 to 19-09-10 again the work is stopped due to non availability of front. 6. On 20-09-10 the 2nd, 3rd and 4th panel painting and plastic tape coating is started and completed on 22-09-10. 7. On 23-09-10 power connection for mixer machine and material shifting work is done from store to site. 8. panel no. 1st, 2nd and 3rd casting started on 24-09-10 and completed on 26-09-10. 9. On 27-09-10 panel no. 5th and 6th painting and plastic tape coating is completed. 10. On 28-09-10 panel no. 4th,5th,and 6th casting is started and finished on 30-09-10. 11. On. Panel no. firing is started and on. Firing is completed. 12. On. Panel no. firing is started and on. Firing is completed. 13. On. Panel no. firing is started and on. Firing is completed.