The document reports on an accident that occurred during diaphragm wall excavation work at a construction site in Singapore, where an existing SingTel cable was damaged. It provides details of the excavation work conducted from April 27th to 30th, including trial trenching, first and second bite excavations. On April 29th during the second bite excavation, the excavator operator discovered an unknown cable that was struck by the cutting wheel. An investigation found that the second bite excavation had exceeded the approved panel length and encroached into an adjacent panel, damaging two live SingTel cables in the process. Photos of the damaged area were enclosed with the report.
The document reports on an accident that occurred during diaphragm wall excavation work at a construction site in Singapore, where an existing SingTel cable was damaged. It provides details of the excavation work conducted from April 27th to 30th, including trial trenching, first and second bite excavations. On April 29th during the second bite excavation, the excavator operator discovered an unknown cable that was struck by the cutting wheel. An investigation found that the second bite excavation had exceeded the approved panel length and encroached into an adjacent panel, damaging two live SingTel cables in the process. Photos of the damaged area were enclosed with the report.
The document reports on an accident that occurred during diaphragm wall excavation work at a construction site in Singapore, where an existing SingTel cable was damaged. It provides details of the excavation work conducted from April 27th to 30th, including trial trenching, first and second bite excavations. On April 29th during the second bite excavation, the excavator operator discovered an unknown cable that was struck by the cutting wheel. An investigation found that the second bite excavation had exceeded the approved panel length and encroached into an adjacent panel, damaging two live SingTel cables in the process. Photos of the damaged area were enclosed with the report.
Subject;Accident at Marina Way on today(08/02/2009)
We would like to make report for Accident which damaged the existing Sing-Tel cable along Changi Business Park Crescent during diaphragm wall excavation work at Panel OS30A on early hour of this morning. In the event of diaphragm wall excavation work and accident are mention as following ;
Time/date Work activity - 27-April, 14:00hrs~16:00hr Trial Trench At Panel OS030A & Pre-Excavated by Excavator) - (0~3.0m)
-30-April, 01:30~07:30hr Investigate near the OS30A existing Singtel Cable line and carried out trial trench. Pumping out the bentonite slurry inside the OS03A panel to expose the damage cable level. Found that SingTel cable across the Panel 30 were damaged which may happened during 2nd bite excavation of Panel OS030A. -30-Aprl, 07:30hr to 09:30hr Further investigation was carried out to conclude root cause of damage. -30-April, 09:30hr to 10:00hr based on further investigation, found that 2nd bite was excavated based on panel length 6000m instead of approved panel length 4.823m.Therefore excavation encroached into the OS030 panel and hit existing cable that caused Two live existing cable damage.
Best regards
Mr. Kim Ks Project Manager Tuksu C922
Enclosure:
1.Photos record on OS030A panel and damaged Singtel Cable.
Automation and Robotisation in Welding and Allied Processes: Proceedings of the International Conference Held at Strasbourg, France, 2-3 September 1985, under the Auspices of the International Institute of Welding