Project C922 involves designing compression piles for Expo Station. The piles must support a test load of 10921 kN. Based on soil analysis along the 26m pile length, the calculated geotechnical capacity is 9101 kN, exceeding the required load. Structural checks show that a 800mm diameter pile with 16T40 reinforcement provides a capacity of 14657 kN, greater than the test load at all depths. The pile design using these parameters is approved.
Project C922 involves designing compression piles for Expo Station. The piles must support a test load of 10921 kN. Based on soil analysis along the 26m pile length, the calculated geotechnical capacity is 9101 kN, exceeding the required load. Structural checks show that a 800mm diameter pile with 16T40 reinforcement provides a capacity of 14657 kN, greater than the test load at all depths. The pile design using these parameters is approved.
Project C922 involves designing compression piles for Expo Station. The piles must support a test load of 10921 kN. Based on soil analysis along the 26m pile length, the calculated geotechnical capacity is 9101 kN, exceeding the required load. Structural checks show that a 800mm diameter pile with 16T40 reinforcement provides a capacity of 14657 kN, greater than the test load at all depths. The pile design using these parameters is approved.