been prioritized for further widening to six lanes under DBFO(Design,Build,Finance,Operate) pattern and more sections would be six-laned in the near future. On NH-8 Six lanes work is completed from Vadodara to Surat and now the highway is 6-track CORRUPTION ALLEGATIONS In August 2003, Jharkhand -based project director Satyendra Dubey , in a letter to the Prime Minister, outlined a list of malafide actions in a segment of this highway in Bihar . Dubey's claims included that big contractors had inside information from NHAI officials that the contractors for this stretch were not executing the project themselves (as stipulated in the contract) but subcontracting the work small builders who lacked technical expertise and that no follow-up was performed after awarding advances. Dubey's name was leaked by the PMO to the NHAI, and he was transferred against his wishes to Gaya ,Bihar , where he was murdered on November 27. The NHAI eventually admitted that Dubey's charges were substantiated, and implemented "radical reforms" in selection and contract procedures.After a lengthy CBI investigation, Mantu Kumar and three accomplices were arrested and charged with murder; however, Mantu escaped from court on September 19, 2005 and remains on the run. ACCIDENTS
In February 2006, a 600 meter stretch of the
highway connecting Kolkata to Chennai subsided into the ground, opening up ten meter gorges near Bally , West Bengal . This stretch had been completed a year back by a Malaysian multinational firm, selected after global tendering