Sub: Coal Inspection Report Over Sidings
Sub: Coal Inspection Report Over Sidings
Sub: Coal Inspection Report Over Sidings
Dear Sir,
The coal inspection report is as follows.
Around 1 trip over size coal present due to local sale unloading
Spur-I Loading supervisor Mr. Raju Sahoo was asked to arrange chain
dozer & to make those coal crushed & not to load those coal into
the rake unless & until it is crushed
He was also advised not to allow those local sale unloadings inside
the siding.
As per current information(5.15PM) one chain dozer was arranged
in spur-I for chaining purpose.
SpurIII/IV 2 trips of oversize coal was received from Hingula area trough the
transporter deployed by M/S Vedanta.
Loading supervisor Mr. A Samanta was asked not to load those coal
into any rake & to remove those towards the backside of the siding.
SpurV/VI No oversize coal transported today in the day time.
In the first shift two tippers carrying oversized coal from Ananta
OCP were returned to the Ananta CHP to make the coal crushed.
Your’s Faithfully