ESTIMATE FOR

CONSTRUCTION OF BGSY INFORMATORY SIGN BOARD


DEWAS BLOCK
Date
Sr. 10/01/2011
Amoun
Descriptions Qty. Unit Rate
No. t
1 2 3 4 5 6
1 Earth work in excavation in trenches
for foundations and for pipes, cables
etc. not exceeding 1.5m in width and
for shafts, cesspits and the like not
exceeding 10sqm on plan including
dressing of sides and ramming of
bottoms lift upto 1.5m including
getting out the excavated soil and
disposal of surplus excavated soil as
directed, within a lead of 50m
(b) Dense or hard soil
9*1.32=11.88 11.88 cum. 74.00 879
2 Providing concrete for
plain/reinforced concrete in open
foundations complete as per
drawings and technical specifications
Clause 802, 803, 1202 & 1203
(i) P.C.C grade M 10
Nominal mix 1:3:6 with 40 mm and
down graded metal
1928.0
9*1.32=11.88 11.88 cum. 0 22905
3 Plain/reinforced cement concrete in
substructure complete as per
drawings and technical specification
Clauses 802, 804, 805, 806, 807,
1202 and 1204
(i) P.C.C grade M 15
Nominal mix (1:2.5:5) 2282.0
9*.886=8.00 8.00 cum. 0 18256
50000.
4 Reinforcement steel for top lift 8mm 0.15 MT 00 7500
5 dia
Shuttering
9*6.69=60.21 60.21 Sqm. 115.00 6924
56464