KMV PROJECTS LTD

CHECKLIST FOR QUALITY CONTROL


ACTIVITY : MARKING

Project : Date :
Location :

NOTE : Please mark as y for yes or n for no in the appropriate box or enter readings as per requirements
SL . NO. To be checked YES NO Remarks /clarifications
1 Name,date and number of the drawing
PRE - EXECUTION CHECKS
The latest approved center line / grid line
2 drawings available [ ] [ ]
3 Cleaning and leveling of the site [ ] [ ]

Demarcation of the plot and marking of


4 the acutal boundaries has been done [ ] [ ]

Finalisation of all levels with reference to


5 a fixed bench mark has been done [ ] [ ]
6 Check for right angles [ ] [ ]
7 Grid pillars set out [ ] [ ]
8 Necessary tools avilable on site [ ] [ ]
9 Boundary wall construction started [ ] [ ]
10 Is the area properly barricaded? [ ] [ ]
CHECKED DURING EXECUTION
Locations of footings with respect to the
11 grid lines as on drawings [ ] [ ]

Allowance for the execution of footings'


12 shuttering been provided [ ] [ ]
Marking of structural members has been
13 properly done [ ] [ ]
POST -EXECUTION CHECKS
Reinforcement and shuttering are as per
14 marking [ ] [ ]

Center line distance between columns


15 and the verticality of columns [ ] [ ]

Contractor's Site Engineer's signature


Contractor's QA/QC Site Engineer's signature or remarks if any

Client's representative's signature or remarks if any