CHECKLIST FOR RETAINING WALLS, RCC WALLS & OTHERS (LINTEL, PLINTH BEAM, STAIRCASE ETC.)
ACTIVITY : REINFORCEMENT
Checklist No:CL-QA-07D
Project :
Rev.No.00
Location : Date:
Contractor : Dwg No:
Note : Please appropriate box as per requirements
1 Checked and ensured the availability of GFC drawing with Name,date and no.? [ ] [ ]
PRE-EXECUTION CHECKS
2 Ensured QA & PE approved work method statement is available with the team [ ] [ ]
Checked and ensured the area is prepared for starting reinforcement ( PCC complete/ slab
3 [ ] [ ]
concrete set)
4 Checked and ensured the steel bars are tested and approved as per ITP. [ ] [ ]
5 Checked and ensured availability of necessary scaffolding and safety measures are taken. [ ] [ ]
Checked and ensured reinforcement is free from oil, mud, crease and other forms of
7 [ ] [ ]
contamination.
Ensured the reinforcement bars are placed as per GFC drawings with provision for
8 [ ] [ ]
alternate lap zone.
Ensured that the reinforcement bars that are projecting out of the current area of
9 [ ] [ ]
concreting are parallel.
10 Ensured the cover blocks are of correct sizes and at correct spacing. [ ] [ ]
12 Ensured the provision of dowels for future extensions are done are as per the drawings. [ ] [ ]
Ensured the ends of the dowels for future extension are covered properly with polythene
13 [ ] [ ]
sheets.
POST-EXECUTION CHECKS
14 Ensured the reinforcements are clean and free from any unwanted materials. [ ] [ ]
15 Ensured the reinforcements are tied properly with binding wire of necessary gauge. [ ] [ ]
Contractor PL/PHL
PMC
Site In Charge: QC Engineer Site In Charge: QA & PE Incharge:
Name:
Signature:
Date: