PURAVANKARA LIMITED/PROVIDENT HOUSING LIMITED

CHECKLIST FOR RETAINING WALLS, RCC WALLS & OTHERS (LINTEL, PLINTH BEAM, STAIRCASE ETC.)

ACTIVITY : REINFORCEMENT
Checklist No:CL-QA-07D
Project :
Rev.No.00
Location : Date:
Contractor : Dwg No:
Note : Please appropriate box as per requirements

Sl No DESCRIPTION YES NA REMARKS

1 Checked and ensured the availability of GFC drawing with Name,date and no.? [ ] [ ]

PRE-EXECUTION CHECKS

2 Ensured QA & PE approved work method statement is available with the team [ ] [ ]

Checked and ensured the area is prepared for starting reinforcement ( PCC complete/ slab
3 [ ] [ ]
concrete set)

4 Checked and ensured the steel bars are tested and approved as per ITP. [ ] [ ]

5 Checked and ensured availability of necessary scaffolding and safety measures are taken. [ ] [ ]

6 Checked and ensured required tools are available at the site. [ ] [ ]

Checked and ensured reinforcement is free from oil, mud, crease and other forms of
7 [ ] [ ]
contamination.

CHECKS DURING EXECUTION

Ensured the reinforcement bars are placed as per GFC drawings with provision for
8 [ ] [ ]
alternate lap zone.

Ensured that the reinforcement bars that are projecting out of the current area of
9 [ ] [ ]
concreting are parallel.

10 Ensured the cover blocks are of correct sizes and at correct spacing. [ ] [ ]

11 Ensured adequate development and anchorge lengths are provided. [ ] [ ]

12 Ensured the provision of dowels for future extensions are done are as per the drawings. [ ] [ ]

Ensured the ends of the dowels for future extension are covered properly with polythene
13 [ ] [ ]
sheets.

POST-EXECUTION CHECKS

14 Ensured the reinforcements are clean and free from any unwanted materials. [ ] [ ]

15 Ensured the reinforcements are tied properly with binding wire of necessary gauge. [ ] [ ]

16 Ensured no bars are twisted or deformed in any manner.. [ ] [ ]

17 Ensured the position of reinforcement bars are not disturbed. [ ] [ ]

Note: Please record NA where not applicable

Contractor PL/PHL
PMC
Site In Charge: QC Engineer Site In Charge: QA & PE Incharge:

Name:

Signature:

Date: