PURAVANKARA LIMITED/PROVIDENT HOUSING LIMITED

CHECKLIST FOR WIRING


ACTIVITY : ELECTRICAL
Checklist No:CL-QA-21C
Project :
Rev. No:01
Location : Date:
Contractor : Dwg No:
Note : Please appropriate box as per requirements
Sl No DESCRIPTION YES NA REMARKS
Checked and ensured the availability of GFC drawing with Name, date
1 [ ] [ ]
and no.?
Pre installation of wiring
2 Make /Model/Size [ ] [ ]
3 Number of Cores and sizes [ ] [ ]
4 Material of construction of condutor [ ] [ ]
5 Type of insulation [ ] [ ]
6 Colour code of insulation [ ] [ ]
7 Are there any visual damages [ ] [ ]
8 Ensure specified strand and gauge [ ] [ ]
9 Are there any minor rerouting as per site requirements [ ] [ ]
10 Check colour code of each phases [ ] [ ]
Post installation of wiring

11 Level, line & Alignment and routing of the conduits/wiring [ ] [ ]


12 Are there any minor rerouting as per site requirements [ ] [ ]
13 If yes, have the details of rerouting been noted [ ] [ ]
14 Clearance given for the drawing of the circuit [ ] [ ]
15 Is the type, make and size of socket as per requirement [ ] [ ]
Ensure number of circuits in the conduits as per specifications/
16 [ ] [ ]
Standards
Ensure two or more circuits of same phase are not allowed in the same
17 [ ] [ ]
conduit
18 Ensure no joints allowed [ ] [ ]
Termination
19 Is the socket fixed as per drawing/ Technical specifications [ ] [ ]

20 Is the quality of socket crimping is acceptable [ ] [ ]

21 Are the sockets properly fixed at the terminals [ ] [ ]


22 Is enough looping provided at both ends of the circuit [ ] [ ]
Has the circuit details ferrules attached to the wires at both ends of the
23 [ ] [ ]
circuit

24 Has the earth wire been provided / terminated for each of the circuits [ ] [ ]

25 Ensure correct size lugs and ferrules provided [ ] [ ]

Joint Measurement Record (JMR) / Record of Details for As Built Drawings

26 Have all the details been noted and sketched for signoff on JMR [ ] [ ]

Have all the details been noted and sketched for preparation of asbuilt
27 [ ] [ ]
drawing
Note: Please record NA where not applicable
Contractor PL/PHL

Site In Charge QC Engineer Site In Charge QA & PE

Name:

Signature:

Date: