Professional Documents
Culture Documents
24 Has the earth wire been provided / terminated for each of the circuits [ ] [ ]
26 Have all the details been noted and sketched for signoff on JMR [ ] [ ]
Have all the details been noted and sketched for preparation of asbuilt
27 [ ] [ ]
drawing
Note: Please record NA where not applicable
Contractor PL/PHL
Name:
Signature:
Date: