CHECKLIST FOR ON-SITE INSPECTION

ACTIVITY: HACKING
Doc.No : QC/CIV/SCG/001
Project name
Date/Time
Dwg Ref.No Rev
Floor
Date
Location
S. No Description Yes No NA Remarks

1 Name, date and number of the drawing [ ] [ ] [ ]

PRE-EXECUTION CHECKS

2 Is the surface cleaned off from dried mortar and loose particles? [ ] [ ] [ ]

Have proper scaffolding arrangement been done with requisite safety


3 [ ] [ ] [ ]
measures ?

4 Are the required tools available? [ ] [ ] [ ]

CHECKS DURING EXECUTION

5 Have 80 indents/sqft.each of 1cm long done? [ ] [ ] [ ]

POST-EXECUTION CHECKS

Has hacking been done on concrete columns,beams,ceiling and all contact


6 [ ] [ ] [ ]
surfaces of blockwork?
Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CG Site Engineer CG QC Engineer

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :