Proper grounding for Fhy

Quality Engineer:

Soc Classification level


1 © Nokia Siemens Networks /
Focus required

There are two grounding points in Fhy for grounding those should be
grounded with 6 mm2 cable to bus bar.
Soc Classification level
2 © Nokia Siemens Networks
Improper grounding:

Soc Classification level


3 © Nokia Siemens Networks
Action required:
So it is required to make Fhy properly grounded with 6 mm2 cable on two
specified grounding terminals.

Demand the required material which is not coming with Fhy installation kit
for proper groundin in SDR.

This could help us in saving flexi hybrid from getting faulty.