COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

COMMON DU & ETC -


ISP AND OSP DESIGN
GUIDELINES

Version control‐Revision‐0‐25‐10‐2016 

 
1
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

Technical Specifications

1 Introduction

Etisalat and Du has joined together in “Common” agreement to cooperate in the


development of the Passive Telecommunication Infrastructure in all the Greenfield
projects in UAE.
This document is to provide the Technical guidelines and standard on In-Building
Infrastructure, Outside Network, Meet-Me-Room and electro-mechanical specification
for Master Plan developments, which include Buildings, Villas, Universities, Schools,
shopping Malls, Hospitals, etc.. For the projects where both Etisalat and Du are sharing
the OSP network under the framework of Common agreement.
The Master plan Developers, Consultants and Contractors will be using this documents as their
main reference, while designing and building ISP & OSP cabling infrastructure within their
development plan. These design guidelines will enable the property developers to deliver high-
quality, future-proof telecommunications and multimedia services to their tenants.

The infrastructure guidelines will cover all the OSP & ISP standards that are applicable to
villas, buildings and Meet-Me- Room scenarios.
One of the operator shall be assigned as the Lead Operator to the Greenfield project and
accordingly shall take responsibility of coordination with the developer for Common
infrastructure requirements. The Lead Operator will assist the property developers through a
“No Objection Certificate” (NOC) process that includes OSP design drawing validation, ISP
design drawing validation, Validating ISP material to be from the Pre-Approved
Manufacturer list and Site inspections during implementation.

Developers are encouraged to engage with Lead Operator at an early stage so that any process
and / or design issues may be resolved. If property developers or tenants have special
requirements that may not be covered by these guidelines it is necessary to engage with Lead
Operator’s design teams at an early stage of development planning, to enable seamless delivery
of premium telecommunications services at launch.
We look forward for the feedback from developers as it helps us understand your issues and
incorporate valid suggestions in future designs.
For information on obtaining NOCs or for any design-related queries, please contact:
Etisalat: +971-4-2022442, email USERS-NOI-AUH@etisalat.ae or
mabdulal@etisalat.ae or visit www.gis4me.ae
du: +971-4-3915018, email noc.request@du.ae or visit
http://www.du.ae/personal/helpandsupport/no-objection-certificate
Warm regards,
du / Etisalat
2
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

This document covers the following ISP building types:

 Villa complexes
 residential towers and groups of residential towers
 commercial towers and groups of commercial towers
 shopping malls
 groups of shops and retail outlets
 hospitals, hotels and other bulk service applications
 warehouses and sheds
Note – However the above mentioned Buildings types are not limited.
The document is structured to cover all aspects of infrastructure for:

 Meet-Me-Room spaces/Plot
 Civil Infrastructure and Entry ducts
 Telecom rooms
 Mobile service and Roof-top rooms
 Building pathways
 OSP cables
 ISP cables

Infrastructure Specification

1.1 Meet-Me-Room (MMR)


In any Project or a master plan development, which includes villas, buildings or mix of
both, the property owner/developer will provide one plot of 10 X 10 meter or more than
one plots of 10 X 10 meter to the Lead Operators and build a dedicated standalone
facility called MMR, where the OSP cables coming from the buildings or villas will be
terminated. The number and size of MMRs located in each Project is to be decided by
the Lead Operators based on the geographical size of the Project as well as the total
number of users to be served. Refer to the conceptual schematic representation of
Common passive infrastructure Appnedix-1-Figure-1,2 and 3. MMRs will be purely
passive rooms with no major electromechanical requirements. Passive
Telecommunication equipment can be located in the MMR depending on the design
requirements. Based on the allotted plot area to the Lead Operator, the developer will
discuss in detail on plot layout with Lead Operator.
These type of meet me rooms can be used dedicated land were provided by the master
developer, it allows for future expansion.
Please refer to Appendix-6- for detail MMR layouts, which describe the following
section layouts

3
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

 Architectural layouts - Appendix-6- Architectural

 Structural layouts - Appendix-6- Structural

 Electrical layout - Appendix-6- Electrical

 Mechanical layout - Appendix-6- Mechanical

1.2 LEAD-IN DUCTS


The building developer must provide lead-in ducts from the main telecom room to the
plot boundary. The exact connection points at the plot boundary will depend on whether
the Lead Operator’s network already reach the plot.

 Scenario 1 – Duct network already exists


o The building/Villa owner/contractor will be responsible to connect to the
Lead Operator duct systems.
o The Lead Operator will identify the location and quantity of their lead-
in ducts.

 Scenario 2 – Duct network is still to be built


o The building developer will be responsible to extend the lead-in duct to
1m outside the plot boundary. The building developer is responsible for
locating and clearly identifying lead-in ducts.
It should be noted that the Lead Operator may have different connection points for the
specific development. In all cases the building developer will be responsible for the
maintenance and repair of lead-in ducts.
The lead-in ducts will be reserved for the use of the Lead Operator. The quantity and
size of these ducts are detailed in Appendix-2-Table-1 and Appendix-5- Summary
Table- ISP specification
The lead-in duct specifications are as follows:
(a) Made from black uPVC or HDPE;
(b) The uppermost part of ducts to be buried to a depth of 600mm below the finished
ground level;
(c) Sloping away from the building;
(d) Protected by concrete when running under permanent paved surfaces;
(e) Sealed at each end to prevent the ingress of any materials such as water, sub-soil,
gas, or pests;

4
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

(f) An entry/pull box must be installed for any right-angled or sharp bends in the
lead-in duct route;
(g) If required, at the entry to the main telecom room, a wide-angle long radius bend
(factory made) may be provided; alternatively an entry box may also be
provided; and
(h) All ducts must include a draw rope made of twisted mildew and resistant
polypropylene; minimum outside diameter of 6mm; minimum tensile strength of
2400lbs / 1000kg.

1.3 LEAD-IN DUCTS - building entry


Where lead-in ducts cannot be routed directly into the main telecom room, Hot-Dip
Galvanised (HDG) slotted steel cable trays must be provided as an alternative. These
trays must be easily accessible in common areas to facilitate any future provision of
additional cables. However, if these trays are in an area accessible to the public and are
less than 4.8 m above the floor, then the trays must be covered.
A cable tray of minimum dimensions 300 mm x 100 mm (W x H) with Heavy Duty
Return Flange (HDRF) will be required for each plot entry point

1.4 LEAD-IN DUCTS – entry box


Entry boxes are required for the Lead Operator to install their cables through the lead-
in duct inside the plot. The type and size of entry/pull boxes will depend on the
characteristics of the building development. The details for entry boxes are included in
the text below and summarised in Appendix-2-Table-1 and Appendix-5- Summary
Table- ISP specification

The quantity and location of the entry boxes will depend on the route from the main
telecom room to the Lead Operator networks. Entry boxes must be included wherever
the duct system has right-angle or sharp bends where there are other factors that might
restrict cable pulling.
The following specifications must be followed:
(a) Constructed of reinforced concrete;
(b) Fitted with a ductile iron frame and cover;
(c) Minimum load rating 400 kN;
(d) Cover to be marked ‘Telecoms’; and
(e) An earth rod must be provided with a resistance of less than 5 ohms.

5
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

2 Inside Plant Common Infrastructure Specifications (ISP)

2.1 TELECOM SPACES

2.1.1 TELECOM ROOMS - general


A number of telecom rooms will be required in a development depending on the
characteristics of the buildings. The following room types are required and the details
of these rooms are included in the text below and summarised in Appendix-2-Table-2
and Appendix-5- Summary Table- ISP specification
The height measurement specified are the minimum finished clearance after taking into
account allowances for overhead cable trays and any other obstructions. A minimum
headroom access of 300 mm is required above the tray.

The following room types are covered:


(a) Meet-Me-Room;
(b) Main telecom room;
(c) Floor telecom space.
(d) Mobile service and Roof-top rooms

In multi-story buildings the telecom rooms must be vertically aligned and linked by a
shared containment system. This containment system must not reduce the minimum
requested room space.
All telecom rooms must be dedicated for the use of the Lead Operator. The rooms must
be easily accessible to the Lead Operator personnel 24 hours a day and secured from
unauthorised entry.
Telecom rooms must not be in close proximity to any sources of the following:
(a) Heat;
(b) Moisture;
(c) Corrosive atmospheric or environmental conditions;
(d) High voltages;
(e) Radio frequency interference (RFI); and
(f) Electro-magnetic interference (EMI).
The rooms must not be directly beneath or next to wet areas such as:

6
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

(a) Showers;
(b) Washrooms;
(c) Swimming pools; and
(d) Garbage areas.
If for any reason it is proposed that any part of a telecom room will be located below
any kind of water source then this must be raised at the design stage. This situation will
require a floor (Attic slab) drain fitted with an automatic submersible pump to counter
any risk of water ingress. The rooms must be clean and free from any of the following
items unless otherwise specified in this document.
(a) Equipment
(b) Utility pipes
(c) Cables
(d) Sprinkler systems
(e) Windows
(f) Pests
In case of pests it should be noted that rodents often gnaw cables resulting in cable
damage and possibility of service disruption. Special attention must be given to prevent
pests entering telecom spaces and pathways. This should be through the use of best
practiced pest control methods. An additional measure could involve the installation of
covers to cable trays; if this is the case these covers must be removable to allow for the
installation of additional cables.
In order to move equipment into and out of telecom rooms no access from outside of
the building to these rooms must be less than 1000mmx 2100mm (W x H)
Floor Loading of Telecom room shall be 10kNm2 (distributed load)

2.1.2 General Electromechanical (EM) requirements for Main Telecom room


(MTR) - Residential Buildings

 4 x 13A Twin Socket distributed on the walls of the MTR

 One number of AC and DC Earth bars

 A/C Unit – to maintain the temperature at 24°C

 2 nos. handheld CO2 cylinder extinguishers to be provided inside the room.

7
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

 Room should be provided with adequate lighting with minimum of 200 Lux at
table level

 Room shall be comply with the fire and safety requirements like smoke detector,
fire alarm, emergency light etc. as per local authority standards. Any water
sprinklers to be avoided.
Also refer to Appendix-5- Summary Table- Electromechanical Specification, for
consolidated EM requirements

2.1.3 General Electromechanical (EM) requirements for Main Telecom room


(MTR) -Commercial and Mixed Used Buildings
All the telecom rooms, with the exception of the floor telecom space, must be provided
with an air conditioning system to maintain the temperature at 21°C ± 1°C and the
relative humidity at 50% ± 10%.
The following design principles must be followed while designing air conditioning
system for commercial and Mixed Used buildings only.
(a) 4 x13A twin sockets fed from the essential power supply with dedicated 20A
circuit breaker.
(b) 2 number of AC & DC earth bars connected to the dedicated earth pits with
resistance less than 1ohm.
(c) Provide 2 x 63A TP isolator fed with dedicated feeder from essential power
supply (EDB)
(d) Dedicated A/C system (ducted split FCU) with duty & standby units with proper
interlocking, to maintain the room temp. at 21°C ± 1°C
(e) Heat dissipation can be considered at 300 Watts/sq. meter. + 3kW per rack.
(f) 2 nos. handheld CO2 cylinder extinguishers to be provided inside the room.
(g) Room should be provided with adequate lighting with minimum of 200 Lux at
table level
(h) Room shall be comply with the fire and safety requirements like smoke detector,
fire alarm, emergency light etc. as per local authority standards. Any water
sprinklers to be avoided.
(i) Raised Flooring system requirement shall be advice during design NOC stage by
Lead Operator.
Also refer to Appendix-5- Summary Table- Electromechanical Specification, for
consolidated EM requirements

8
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

2.1.4 TELECOM ROOMS - main telecom room


A main telecom room must be provided on the ground floor or Basement floor. This
room will be used for the termination of telecom cables and to house telecom equipment
both now and in the future.
The minimum room dimensions will depend on the function and features of the
building. The doors to this room must be open outwards and have a minimum opening
of 1000mm x 2100mm (W x H).
Refer to the standard MTR sizes with respective number of Tenants per building in
Appendix-1-Figure-4, 5, 6 and 7.
The detail specifications are mentioned in required and the details of these rooms are
included in the text below and summarised in Appendix-2-Table-2 and Appendix-5-
Summary Table- ISP specification
Rack and ODF elevations details are provided in Appendix-1-Figure-9, 10, 11 and 12.

2.1.5 TELECOM ROOMS -floor telecom room


Floor telecom room with minimum of 2m x 2m x 3m spaces must be provided on all
the floors of multi-tenant buildings (residential/commercial buildings) for the routing or
Splicing or Termination of telecom cables.
The floor telecom room must be provided with two doors that open outwards with a
total minimum opening of 1500mm x 2100mm (W x H).
Refer to the FTR sizes with Wall mount Mini ODF (splice cabinet) mounting detail in
Appendix-1-Figure-13 and 14

Refer to the Mini ODF (Splice cabinet) detail in Appendix-1-Figure-15

2.1.6 TELECOM ROOMS – safety and general fit-out


All telecom rooms must comply with all municipality and national authority standards
and regulations; such as those issued by civil defence and utility companies.
Notwithstanding this, it is expected that following will be provided:
(a) All main telecom rooms must be fitted with smoke detectors connected to the
building management system;
(b) All telecom spaces must be fitted with normal and emergency lighting;
(c) All containment openings of telecom rooms must be sealed with a regulation fire
retardant material;

9
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

(d) All doors of telecom rooms to be of solid wood core or steel construction, fire
retardant with a minimum rating of 2 hours;
(e) All doors of telecom rooms must be outward opening with an automatic door
closer system fitted on the hinged edge;
(f) All doors of telecom rooms to be labelled with both du / Etisalat telecom room,
Refer to the Appendix-3 and;
(g) The room must be free from contaminants and pollutants
If the building developer has any concerns over safety, especially fire protection and
suppression systems, this should be raised with the Lead operator at the design stage.
The walls, floor, and ceiling must be finished so as to minimise dust and static electricity
and the walls and ceilings must be painted with a primer and light coloured finish coat.

2.1.7 Roof-Top and Mobile Service Room


2.1.7.1 TELECOM ROOMS - Roof-Top Room
Roof-Top rooms must be provided on the roof of all multi-tenant buildings, which are
up to G+10 floors or less. The specifications are detailed in Appendix-2-Table-4 and
drawings are provided in Appendix-1-Figure-16,
Also refer to Appendix-1-Figure-17 and 18 for Cross connect cabinet Mounting detail
(inside Roof-Top room) and Cross connect cabinet- Elevation layout respectively
The following design principles must be followed while designing Roof-top room for
building, which are having G+10 floors or less
a) The dedicated 3m x 3m x3m Roof-Top room shall be provided on the Roof of
the Building
b) The Roof-Top room shall be connected to building riser through 300mm x
50mm Vertical cable tray
c) The doors of this room shall open outwards and have a minimum opening of
1000mm x 2100mm (WxH).
d) The following electromechanical must be provided while designing Roof-Top
room

 4 x13A twin sockets fed from the essential power supply with dedicated
20A circuit breaker.

 2 number of AC & DC earth bars connected to the dedicated earth pits


with resistance less than 1ohm.

10
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

 Add 2 x 63A TP isolator fed with dedicated feeder from essential power
supply (EDB)

 Dedicated A/C system (ducted split FCU) with duty & standby units
with proper interlocking, to maintain the room temp. at 21°C ± 1°C

 Heat dissipation can be considered at 36kW for Roof-Top Room

 2 nos. handheld CO2 cylinder extinguishers to be provided inside the


room.

 Room should be provided with adequate lighting with minimum of 200


Lux at table level

 Room shall be comply with the fire and safety requirements like smoke
detector, fire alarm, emergency light etc. as per local authority standards.
Any water sprinklers to be avoided.
Roof-Top room design consideration
a) The floors of the Roof-Top rooms must have a minimum distributed load rating
of 10kN/m2.
b) Openings must be provided to the room to allow for cables to connect to external
antennas. These openings must be 600mm x 400mm (W x H), 500mm below the
room ceiling in walls facing the building’s roof-top area.
c) Space must be reserved on the roof-top of the building for the installation of
mobile-service antennas. This setup may vary from building to building
scenario, but this will be typically at the corners of the building or on any raised
structure on the roof-top. The exact details will be advised at the design NOC
stage with Lead Operator

2.1.7.2 TELECOM ROOMS – Mobile-service rooms (more than G+10 floors)


Mobile-service rooms must be provided in all multi-tenant buildings, which are above
G+10 floors. The Mobile service room must be provided for every 10 floors, starting
from the basement/Ground floors.
The specifications are detailed in Appendix-2-Table-4 and drawings are provided in
Appendix-1-Figure-16
Also refer to Appendix-1-Figure-17 and 18 for Cross connect cabinet Mounting detail
(inside Mobile service room) and Cross connect cabinet- Elevation layout respectively
The following design principles must be followed while designing Mobile service room
for building, which are having more than G+10 floors

11
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

a) The dedicated 3m x 3m x3m space shall be provided for every 10 floor, starting
from basement or Ground floor
b) The Location of the Mobile Service room must be close to the Floor Telecom
Room (FTC)
c) The Mobile service room shall be connected to building riser through 300mm
x 50mm Vertical cable tray
d) The doors to this room shall open outwards and have a minimum opening of
1000mm x 2100mm (W x H).
e) The following electromechanical must be provided while designing Mobile
service rooms

 4 x13A twin sockets fed from the essential power supply with dedicated
20A circuit breaker.

 2 number of AC & DC earth bars connected to the dedicated earth pits


with resistance less than 1ohm.

 Provide 2 x 63A TP isolator fed with dedicated feeder from essential


power supply (EDB)

 Dedicated A/C system (ducted split FCU) with duty & standby units
with proper interlocking, to maintain the room temp. at 21°C ± 1°C

 Heat dissipation can be considered at 26KW for mobile service room

 2 nos. handheld CO2 cylinder extinguishers to be provided inside the


room.

 Room should be provided with adequate lighting with minimum of 200


Lux at table level

 Room shall be comply with the fire and safety requirements like smoke
detector, fire alarm, emergency light etc. as per local authority
standards. Any water sprinklers to be avoided.
f) The floors of the Mobile-service rooms must have a minimum distributed load
rating of 10kN/m2.

12
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

2.2 HOME AND OFFICE CONSOLIDATION CABINETS – Residential &


Commercial
A consolidation cabinet must be provided in each home. The cabinet is specified to
accommodate both Telecom operator’s requirements at the same time. The minimum
specifications are as follows, depending on the apartment/villa size:

2.2.1 Home Consolidation Cabinet – Serving up to 24 port of RJ-45 per Tenant


Minimum internal dimensions 600mm x 600mm x150 mm (H x W x D)

(a) Concealed in the wall with the front of the cabinet flush with the wall;
(a) Located in an accessible area inside the home close to the entrance and not inside
the kitchen, laundry room or bedroom;
(b) Installed at a height of 1200mm (between finished floor level and the bottom
edge of the cabinet);
(c) An adequate safe working space around the location;
(d) Adequate lighting;
(e) Not close to the sources of water or heat;
(f) Not close to any electrical distribution or bus bars;
(g) Adequate ventilation must be provided; minimum of one air change per hour;
(h) Fitted with 24 port Copper patch panel;
(i) 24 number of CAT6 Cables or less per Tenant;
(j) Fiber terminal box fitted with 2 port of LC/APC adaptor & pigtails and with 2
port of SC/APC adaptor & pigtails for 4 core SM Fiber drop cable termination.
Refer to the Appendix-1-Figure-19
(k) Lockable front door;
(l) Horizontal cable management for unshielded twisted pair (UTP) patch cables;
(m) Sufficient cable entries to accommodate the incoming Fiber optic and UTP
cables;
(n) 13A dual socket must be provide inside consolidation cabinet with dedicated
circuit breaker on the domestic supply and not loop with other power sockets;
(o) Labelled with villa or floor/flat number.
Refer to the Appendix-1-Figure-20 for home consolidation elevation layout

13
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

2.2.2 Home Consolidation Cabinet- Serving more than 24 port of RJ-45 per Tenant
Minimum internal dimensions 600mm x 600mm x300 mm (H x W x D)

a) Concealed in the wall with the front of the cabinet flush with the wall;
b) Located in an accessible area inside the home close to the entrance and not inside the
kitchen, laundry room or bedroom;
c) Installed at a height of 1200mm (between finished floor level and the bottom edge of
the cabinet);
d) An adequate safe working space around the location;
e) Adequate lighting;
f) Not close to the sources of water or heat;
g) Not close to any electrical distribution or bus bars;
h) Adequate ventilation must be provided; minimum of one air change per hour;
i) Fitted with 24 port Copper patch panels;
j) More than 24 number of CAT6 Cables per Tenant;
k) Fiber terminal box fitted with 2 port of LC/APC adaptor & pigtails and with 2 port of
SC/APC adaptor & pigtails for 4 core SM Fiber drop cable termination. Refer to the
Appendix-1-Figure-19
l) Lockable front door;
m) Horizontal cable management for unshielded twisted pair (UTP) patch cables;
n) Sufficient cable entries to accommodate the incoming Fiber optic and UTP cables;
o) 13A dual socket must be provided inside consolidation cabinet with dedicated circuit
breaker on the domestic supply; and not loop with other power sockets;
p) Labelled with villa or floor/flat number.
Refer to the Appendix-1-Figure-21 for Home consolidation elevation layout

14
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

2.3 BUSINESS CONSOLIDATION CABINETS – Commercial Predefined Rooms


A consolidation cabinet must be provided in each office or business area. The cabinet is
specified to accommodate both Telecom operator’s requirements at the same time. The
minimum specifications are as follows:
(a) Minimum internal dimensions 12U (H) 600mm x 600mm x 350 mm (H x W x
D)
(b) Located in an accessible area inside the business area close to the entrance and
not inside a pantry, washroom, etc;
(c) Installed at a height of 1200mm (between finished floor level and the bottom
edge of the cabinet);
(d) An adequate safe working space around the location;
(e) Adequate lighting;
(f) Not close to sources of water or heat;
(g) Not close to any electrical distribution or bus bars;
(h) Adequate ventilation must be provided; minimum of one air change per hour;
(i) 24 number of CAT6 Cables or More per Tenant;
(j) Fiber terminal box fitted with 2 port of LC/APC adaptor & pigtails and with 2
port of SC/APC adaptor & pigtails for 4 core SM Fiber drop cable termination.
Refer to the Appendix-1-Figure-19
(k) Lockable front door;
(l) Vertical and horizontal cable management for UTP patching cables;
(m) Sufficient cable entries to accommodate the incoming Fiber optic and UTP
cables;
(n) 13A dual socket must be provide inside consolidation cabinet with dedicated
circuit breaker on the domestic supply; and
(o) Labelled with office/room number.
Refer to the Appendix-1-Figure-22 for Office consolidation elevation layout

15
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

2.3.1 BUSINESS CONSOLIDATION CABINETS - Commercial Shell and Core


In the case of a shell and core development, provide the following requirements
a) One number of dedicated indoor wall mounted fully loaded Mini ODF (Splice
Cabinet) must be provide in each FTR.
b) Pull 4 core Singlemode drop fiber cables for every 200 square meter of
Leasable floor space
c) Multicore SM fiber cable capacity, which are extended from MTR, will
depends on the number of 4 core SM drop fiber cables will be pulled from
Leasable floor space.
If du is the Lead Operator - The Mini ODF (Splice Cabinet) specifications are as
follows:
a) Fully Loaded with Pre- Terminated LC/APC pigtail and LC/APC duplex adaptors

b) Pull 4 core SM drop Fiber cables from Tenant’s telecom cabinet to Mini-ODF inside
FTR
c) Multicore Fiber cables must be spliced on the dedicated splice trays, which are
reserved for Multicore SM Fiber cables splicing unit
d) Drop Fiber cables must be spliced on the dedicated splice trays, which are reserved
for drop fiber cables splicing
e) Sufficient cable entries to accommodate the multicore SM Fiber cables and drop
Fiber cables
f) Lockable panels all round lockable front door
g) Sufficient cable entries to accommodate the incoming Fiber optic cables;
h) Labelled with floor number
i) All Fiber cores must be clearly labelled per Lead operator specification and
standards
If Etisalat is the Lead Operator - The Mini ODF (Splice Cabinet) specifications are as
follows:
a) Fully Loaded with Pre- Terminated SC/APC pigtail and SC/APC adaptors
b) Pull 4 core drop Fiber cables from Tenant’s telecom cabinet to Mini-ODF cabinet
inside FTR
c) Multicore Fiber cables must be spliced on the dedicated splice trays, which are
reserved for multicore fiber cables splicing

16
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

d) Drop Fiber cables must be spliced on the dedicated splice trays, which are reserved
for drop fiber cables splicing
e) Sufficient cable entries to accommodate the multicore SM Fiber cables and drop
Fiber cables
f) Lockable panels all round lockable front door
g) Sufficient cable entries to accommodate the incoming Fiber optic cables;
h) Labelled with floor number
i) All Fiber cores must be clearly labelled per Lead operator specification and
standards
Refer to the Mini- ODF Cabinet detail in Appendix-1-Figure-23
Internal cable distribution to be coordinated directly between the building owner and
the tenant.

2.4 PATHWAYS
2.4.1 CONTAINMENT – General
The following requirements must be applied to all containment systems:
(a) The containment system must be designed such that installed cables do not
exceed the minimum specified bend radius;
(b) All metal containment parts must be free from sharp edges and should be earth
bonded;
(c) Telecom riser openings must be sealed with a suitable fire retardant material;
(d) Cable trays must be easily accessible in common areas to facilitate any future
provision of additional cables;
(e) Any cable trays that are in publically accessible areas less than 4.8 m above the
floor must be covered;
(f) Containment systems must not run through areas exposed to excessive heat,
moisture, corrosive atmospheric or environmental conditions, high voltages,
radio frequency interference (“RFI”) or electro-magnetic interference (“EMI”);
(g) For all containment systems a minimum separation must be maintained from
sources of electromagnetic interference.
(h) The building developer may want to consider redundant containment systems,
particularly in commercial or prestigious developments. The Lead Operator must
be contacted at the design stage to discuss any such requirements.

17
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

2.4.2 VERTICAL CONTAINMENT - Multi-Tenant Buildings


Risers must be provided in multi-story multi-tenant buildings to allow the installation
of telecom cables from the main telecom room to the floor telecom space, mobile-
service rooms and Roof-Top rooms.
The Following Hot-Dip Galvanised (HDG) slotted steel cable trays must be provided in
the risers to accommodate the fiber optic cables and IBS cables

 The vertical cable tray size must be 450mm x 50mm (HDRF) inside the building
riser to accommodate building fiber optic cables

 The vertical cable tray size must be 300mm x 50mm (HDRF) inside the building
riser to accommodate IBS cables to provision IBS-solution (GSM).

2.4.3 VERTICAL CONTAINMENT – Within the Home/Villa/Warehouse


All UTP cables between the floors inside a home must run through 2 x 50 mm diameter
PVC conduits via a junction / pull box located on each floor. The junction/ pull box
must be of minimum dimensions 300 mm x 300 mm x 150 mm (W x H x D). The slab
opening (if required) for these conduits must be in a suitable and accessible location in
every floor. It is recommended that all vertical conduit runs be aligned to ease the
installation of cables.
2.4.4 HORIZONTAL CONTAINMENT - From floor telecom space to
consolidation points
The horizontal containment for routing cables from the floor telecom space to
consolidation points on the served floor can use a number of systems (cable trays,
conduit etc.). The solution will depend on the characteristics of the building type;
Conduits must only be used when the consolidation point locations are permanent, the
cable density is low, the flexibility to modify the routing is not required and dedicated
individual runs of 50 mm conduit to be installed from Floor Telecom Space to each
Tenant.
The Horizontal cable tray size must be 200mm x 50mm (HDRF) inside the building
corridor

18
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

2.4.5 HORIZONTAL CONTAINMENT – Mobile service Antenna


Horizontal containment must be provided to route mobile-service antenna cables from
the floor telecom closets to all common corridors including all lift lobbies, podium
levels and basement levels.

 The Horizontal cable tray size must be 150mm x 50mm (HDRF) inside the
building corridor to accommodate mobile-service antenna cables to provision
IBS solution (GSM)

2.4.6 HORIZONTAL CONTAINMENT – Within the Home/Villa/Warehouse


All UTP cables inside the home must run through PVC conduit with a minimum 25 mm
diameter from the home consolidation point to each dual outlet. If more than one dual
outlet is fed by a conduit then the size of the conduit may need to be up rated.
Intermediate PVC junction / pull boxes must be provided on individual runs that exceed
30 m. PVC junction /pull boxes must also be provided where an individual conduit run
has a sharp change in direction.
The conduit boxes referred to above must have the following minimum internal
dimensions:

 300 mm x 300 mm x 150 mm (L x W x D)

2.4. 7 HORIZONTAL CONTAINMENT – Groups of Towers


When a plot consists of a group of towers, all of the requirements of a single tower still
apply. The additional cable trays must be provided linking the main telecom rooms of
the towers. One cable tray following minimum dimensions must be provided:

 300 mm x 100 mm (W x H) with Heavy Duty Return Flange (HDRF)


This tray must be easily accessible in common areas to facilitate any future provision of
additional cables. However, if these trays are in publically accessible areas less than 4.8
m above the floor then the trays must be covered.
In case of no common Basement Levels / Podium Levels between Group of Towers,
then underground duct system must be installed in a ring topology (between the Group
of Towers/buildings). Minimum of 2 way D54 (100 mm) duct must be provided between
the Towers/Buildings

19
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

2.5 Fiber Termination Components and PON splitters

The following Fiber Termination components are to be provided to splice multicore SM


Fiber cables with 4 core SM drop cables

 4 Port Fiber terminal box (with LC/APC and SC/APC pigtails & adaptors) inside
12U Cabinet of tenant premises (Home/Office/Retail/Villa/Warehouse)

 Fully Loaded high density or Low density Fiber patch panels with SC/APC
adaptors and pigtails inside MTR– if Etisalat is the lead operator

 Fully Loaded high density or Low density Fiber patch panels with LC/APC
adaptors and pigtails – if du is the lead operator

 Wall Mount Mini ODF (direct splice cabinet) inside FTR are to be Used to splice
the multicore SM fiber cables with respective 4 core SM drop cables**
**The Capacity of the Mini ODF (direct splice Cabinet) depends on the
number of splice tray required per Mini ODF to accommodate minimum of 12
core fiber per splice tray

2.5.1 General GPON Optical Splitter Specification

 Optical Splitter shall be made of Planar Lightwave Circuit (PLC) type

 Manufacturer of Optical Splitters shall be fully compliant with Telcordia GR-


1209, GR-1221 or with IEC 61300, IEC 67153-031-6

 All metal plating’s and plastic materials of Optical splitter shall be RoHS
compliant

 Optical Splitters shall have the operating wavelength (nm) range from 1260 nm
~1635 nm

 Optical Splitters shall have the operating temperature range from -24°C to
+85°C

 2 (in) x 32 (out)- Optical Splitters shall have the maximum insertion loss +
Connector loss (@ Operating wavelength from 1260 ~1635 nm) to ≤ 18 dB

 Optical splitter shall have dust covers on the uplink and downlink connectors.

20
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

2.5.2 High density (2 in x 32 out) Connectorized Modular Splitter Specification

 High density modular splitters shall be used for a building, which


has more than 100 units.

 The modular splitters will be fitted inside the splitter chassis.(Sub-


rack)

 Splitter chassis (Sub-rack) shall be 19th inch with in-built cable


management facility to route the uplink and downlink fiber patch
cords

 Each Splitter Chassis (Sub-rack) shall have 8 numbers of (2 in x 32


out) Modular Splitters with LC/APC connector type

 Each Splitter Chassis (Sub-rack) shall have 4 numbers of (2 in x 32


out) Modular Splitters with SC/APC connector type

 Each Splitter Chassis (Sub-rack) shall be 3U to 4U in height

 Each Modular Splitter shall have visible label holder for unique
identification

 The modular splitters shall have an easy snap-in design which


requires no tools.

 Uplink and Downlink ports of (2 in x 32 out) Modular splitter shall


have LC/APC connector type – If du is the Lead Operator*

 Uplink and Downlink ports of (2 in x 32 out) Modular splitter shall


have SC/APC connector type – If Etisalat is the Lead Operator*

2.5.3 Low density (2 in x 32 out) Connectorized Splitter Specification

 Low density splitters shall be used for a building or Villas scenario,


which has less than 100 units

 Low density splitters shall be 19th inch , 1U,rack mountable

 Low density splitters shall have in-built cable management facility


to route the uplink and downlink fiber patch cords

 Uplink and Downlink ports of (2 in x 32 out) splitter shall have


LC/APC connector type – If du is the Lead Operator*

 Uplink and Downlink ports of (2 in x 32 out) splitter shall have


SC/APC connector type – If Etisalat is the Lead Operator*

21
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

Note – * The Building Owner is responsible for supplying splitters, fiber patch cords,
and its related racks
* The Building Owner is responsible to installed the splitters and its related
Fiber patch cords to make neat pre-patching between Uplink ports and Outside
plant fiber patch panel & between the downlink ports and Inside plant fiber patch
panels
* The Building Owner shall supply the splitters only from the Pre-approved
manufacturer of du and Etisalat

2.5.4 GPON Splitter Calculation per building


Number of GPON splitters required per Buildings = Number of Tenants of
building ÷ 30 {Where 30 are the downlink ports of (2 in x 32 out) splitter and
2 downlink ports of (2 in x 32 out) splitter shall be left out as spare ports for
operational maintenance}

2.6 Fiber and Copper Cables

2.6.1 CABLES - general


The Proposed Specifications of all the cables (and its related connecting accessories)
must be from Pre-approved Manufacturer’s* list of Lead Operator.
*Manufacturers must approach du and Etisalat to list their brand name under Pre-
approved Manufacturer list of du and Etisalat.

2.6.2 FIBER OPTIC CABLE - Specification


The following type of Fiber must be provided:
(a) Drop Fiber Cable:

 Single mode with 4 core

 Flexible Indoor drop Fiber

 Cable to be of flat cross-section

 Bend insensitive

 Comply with ITU-T G.657 A1/A2

 Backward comply with ITU-T G.652 D

22
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

 Jacket to be halogen free and flame retardant material (which is LSZH type)
(b) Multicore Fiber Cable:

 Single mode

 Indoor type

 Compliant with ITU-T G.657 A1/A2

 Backward comply with ITU-T G.652 D

 Tight Buffer structure up to 12 Fiber core

 Flexi Tube (Gel free) Micro Module cable/Micro bundle cable from 24 Fiber
core and above

 Jacket to be halogen free and flame retardant material (which is LSZH type)

 Fiber optic colour coding shall be in accordance to EIA/TIA-598

2.6.3 FIBER OPTIC CABLES REQUIREMENTS


For single or complex of villas/warehouses scenario the Fiber optic cables will be
provided by the Lead Operator, However 4 core Fiber Terminal Box shall be supplied
and installed inside Consolidation cabinet (CP) by Villa/Warehouse developer. For all
other buildings scenario, Fiber optic cables should be supplied, Spliced, labelled and
tested inside the Main Telecom Room, inside the Floor Telecom room, and inside
Consolidation cabinet (CP) by the building developer. This should include the supply
and installation of the following Fiber optic cables and its related accessories:

2.6.4 FIBER OPTIC CABLES – from main telecom room to Mini ODF (Splice
Cabinet) Floor Telecom room
The number of Fiber cores required will be dependent on the number of tenant in each
serving floors. The multicore Fiber cable must be provided from the main telecom room
to Mini ODF (Splice Cabinet) inside the floor telecom room
These Multicore Fiber cables must be continuous lengths free from joints, branches or
patching from main telecom room to each Mini ODF (Splice Cabinet) unit.
Location of multicore Mini ODF (Splice Cabinet) must always start from 1st floor to
cover maximum of three floor, for example- Mini ODF (Splice Cabinet) installed at 1st
floor will cover the 1st, 2nd and 3rd floor, next Mini ODF (Splice Cabinet) location must

23
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

be at 4th floor, this Mini ODF (Splice Cabinet) will cover, 4th, 5th and 6th floor, next Mini
ODF (Splice Cabinet) location must be at 7th floor, so on and so forth,
Refer to Appendix-1-Figure-15, 24, 25 and 26 and Appendix-2- Table-3 for more detail
Multicore Fiber cables must be directly spliced with 4 core SM Fiber cables using Mini
ODF (Splice Cabinet) cabinet inside FTR. Minimum 25% spare Fiber must be
considered while calculating multicore Fiber capacity for maintenance and additional
service demands. All Fiber optic cables should be supplied, spliced, labelled and tested
inside the Main Telecom Room and floor telecom room.

2.6.5 FIBER OPTIC CABLES – from Mini ODF (Splice Cabinet) Floor telecom
room to consolidation point (CP)
The 4 core SM Fiber cables must be provided from each CP Unit to its respective Mini
ODF (Splice Cabinet) inside the floor telecom room
These 4 core SM Fiber cables must be continuous lengths free from joints, branches or
patching from each CP Unit to its respective Mini ODF (Splice Cabinet) inside the floor
telecom room
All these 4 core SM Fiber cables must be directly splice with Multicore Fiber cables
using Mini ODF (Splice Cabinet) inside FTR. Refer to the Mini ODF (Splice Cabinet)
detail Appendix-1-Figure 15 and 24

Table A - 4 core SM Fiber cables-Core assignment matrix

Fiber Cores Port No Assign to


Residential or 1 - Blue 1-SC/APC Etisalat
Commercial
2 – Orange 2-SC/APC Etisalat
Unit/Tenant
3 - Green 3-LC/APC du

4 - Brown 4-LC/APC du

24
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

2.6.6 FIBER OPTIC CABLES – from Main telecom room to each Mobile service
rooms and Roof Top room

2.6.6.1 Fiber Optic cables – If du is the Lead Operator then the following
Specifications shall be provided by building Owner to have IBS-connectivity (GSM)
within premises/buildings/high rise towers

 24 core SM Indoor tight buffer fiber cables must be installed from main telecom
to each Mobile service rooms and Roof-Top

 Install Pre- Terminated Cross connect Cabinet at each Mobile service room and
Roof-Top room.

 Terminate the 24 core SM Indoor tight buffer fiber cables inside the rack at MTR
side by using 19th inch, 24 port LC/APC fiber patch panel

 Terminate the 24 core SM Indoor tight buffer fiber cables inside the Pre-
Terminated Cross connect cabinet at Mobile service room side and Roof-Top
side

 Pre- Terminated Cross connect Cabinet shall be minimum size of 600mm (W)
X 150mm (D)

 Pre-Terminated Cross Cabinet shall accommodate 24 LC/APC pigtail and


adaptors

 1 to 12 core will be dedicated to connect Etisalat IBS equipment and 13 to 24


core will be dedicated to connect du IBS equipment.
Refer to the Appendix-1-Figure- 16, 17 and 18 for Cross connect cabinet mounting
detail and Cross connect cabinet Elevation layout.

2.6.6.2 Fiber Optic cables –If Etisalat is the Lead Operator then the following
Specifications shall be provided by building Owner to have IBS-connectivity (GSM)
within premises/buildings/high rise towers

 24 core SM Indoor tight buffer fiber cables must be installed from main telecom
to each Mobile service rooms and Roof-Top

 Install Pre-Terminated Cross connect Cabinet at each Mobile service room and
Roof-Top room.

 Terminate the 24 core SM Indoor tight buffer fiber cables inside the rack at MTR
side by using 19th inch, 24 port SC/APC fiber patch panel

25
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

 Terminate the 24 core SM Indoor tight buffer fiber cables inside the Pre-
Terminated Cross connect cabinet at Mobile service room side and Roof-Top
side

 Pre- Terminated Cross connect Cabinet shall be minimum size of 600mm (W)
X 150mm (D)

 Pre-Terminated Cross Cabinet shall accommodate 24 LC/APC pigtail and


adaptors

 1 to 12 core will be dedicated to connect Etisalat IBS equipment and 13 to 24


core will be dedicated to connect du IBS equipment
Refer to the Appendix-1-Figure- 16, 17 and 18 for Cross connect cabinet mounting
detail and Cross connect cabinet Elevation layout.

2.7 CAT6 COPPER CABLES – from consolidation points to building outlets


To deliver services from the consolidation points the building outlets unshielded twisted
pair (UTP) copper cables must be provided. The full design is the responsibility of the
building developer, however, the following minimum requirements must be followed
for the efficient and effective provision of services:
(a) The cables must conform to a minimum of CAT6 with 23 AWG and as per
TIA/EIA-568-B specification;
(b) The wiring must be in a ‘star’ topology fanning out from the consolidation point;
(c) Dual RJ45 outlets with spring load sliding shutters must be provided where ever
service is required;
(d) Each socket in the dual RJ45 outlet must be wired back to the consolidation
point;
(e) Outlets must not be cascaded or looped and there must be no splitting of cable
pairs;
(f) The maximum cable length from consolidation point to outlet must not exceed
90 m;
(g) At the consolidation point the cables must be terminated on an RJ45 patch panel
and labelled with the socket and outlet served;
(h) In each outlet each cable must be terminated to maintain the twists in each pair
up to 5 mm of the termination;
(i) Proper strain relief must be provided at the terminated ends of the cable;

26
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

(j) The components of the CAT6 system must compatible and it is preferred that
they are from a single manufacturer to insure optimum performance;
(k) Design must incorporate built-in flexibility to meet the growing needs of the
occupants; and
(l) Test result for CAT6 to be saved and recorded for reference purpose in future,
The Lead Operator to maintain the records for future reference

3. Bulk service
This kind of service solution usually applied to projects/buildings that are having their
own IT network (single tenant) and system operator such as Hotels, Hospitals, Schools,
Universities, Banks, Airports and other similar establishments. In this type of buildings,
the client will have his/her own IT server room and dedicated Main telecom room with
the size of 3m x 3m x 3m (L x B x H) to be allocated for the Parties for telecom/network
equipment installation. Letter from the client should be provided during the design stage
confirming the bulk service and explaining the service required to be provided up to the
client IT room.
The exact requirements related to telecom cabling and EM requirements will be
determined during the design stage based on the client’s service requirements.
However client shall provide the following minimum requirements for bulk services
setup

 Dedicated MTR room with minimum size of 3m x 3m x 3m (L x B x H).

 Installed 19 inch 42U free standing rack at MTR.

 Installed and test 12 core SM Indoor tight buffer fiber cable between MTR &
Client Server room, terminate the 12 core SM fiber cables at both end by using
12 port Pre-Terminated fiber patch panel.

 1 to 6 core must be dedicated to connect Etisalat equipment.

 7 to 12 core must be dedicated to connect du equipment.

 Installed and test 24 number of Cat6 UTP Copper cables between MTR and
Client Server room.

 1 to 12 port of copper patch panel must be dedicated to connect Etisalat


equipment.

 13 to 24 port of copper patch panel must be dedicated to connect du equipment

 Installed 12 port Pre-Terminated fiber patch panel for Lead Operator’s uplink
fiber.

27
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

 Client shall provide LC/APC adaptors and pigtail for fiber interfaces, if the Lead
Operator is du.

 Client shall provide SC/APC adaptors and pigtail for fiber interfaces, if the Lead
Operator is Etisalat

 Distance between MTR and Client server room must be maintain within 70
meter (to avoid 90 meter distance limitation, while provisioning fixed services
over Cat6 copper cables)

 Extend 300mm x 50mm HDRF cable tray from MTR to Client server room

 4 x13A twin sockets fed from the essential power supply with dedicated 20A
circuit breaker.

 2 number of AC & DC earth bars connected to the dedicated earth pits with
resistance less than 1ohm.

 Provide 2 x 40A TP isolator fed with dedicated feeder from essential power
supply (EDB)

 Dedicated A/C system (ducted split FCU) with duty & standby units with proper
interlocking, to maintain the room temp. at 21°C ± 1°C.

 Heat dissipation can be considered at 300 Watts/sq. meter. + 3kW per rack.

 2 nos. handheld CO2 cylinder extinguishers to be provided inside the room.

 Room should be provided with adequate lighting with minimum of 200 Lux at
table level.

 Room shall be comply with the fire and safety requirements like smoke detector,
fire alarm, emergency light etc. as per local authority standards. Any water
sprinklers to be avoided.

 Raised Flooring system requirement shall be advice during design NOC stage
by Lead Operator.
Refer to Appendix-1-Figure-27 for Bulk service set-up layout

In case of any building transformation that would result in changing the type of service
required, the building owner should obtain the Lead Operator’s approval by submitting
amendment design.

28
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

4 Labelling Scheme
4.1 GAID and EID Identification plate for each Unit/Tenant

The Identification plate must be installed at the door entrance of the residential /
commercial units. The Identification plate material could be made of plastic plate or
light metal plate. The Sample on Identification plate must be submitted during NOC
stage to Lead Operator for final approval.

The GAID and EID reference number detail will be made available by Lead Operator
during inspection stage.

0.50cm.
0.30cm. 0.30cm.

GAID – DXB_E3177U_12622_001001001
0.60cm.

7.00cm.
EID – AU007540000

0.30cm. 0.30cm.

10.00cm.

4.2 SLD and Connectivity/Wiring detail


The Single Line diagram (SLD) detail must be pasted inside Main Telecom Room to
trace End to End ISP connectivity
Refer to the Appendix-4—for the detail Connectivity/Wiring detail

29
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

Table B-Summary of responsibility matrix for Building Scenario

Master Plan Building Lead


Item description Developer owner Operator?
Lead-in ducts, including connections to JV manholes outside
1 building/single villa boundaries √
Installation of Manholes and ducts outside the building /
2 boundaries (including cover) √
Entry box inside the building/villa/complex of villas boundaries
3 (including the cover) √
Supply and Installation of 4 core SM Fiber Terminal Box with
duplex LC/APC adaptors and pigtail and 2 number of SC/APC
4 adaptors √
Fiber optic cables supply, pulling, termination and testing from
the Main Telecom Room to FTR and drop Fiber cables supply,
5 pulling, termination and testing from the FTR to CP Cabinet. √
Fiber optic cables supply, pulling, termination and testing from
the Main Telecom Room to FTR and drop Fiber cables supply,
pulling, termination and testing from the FTR to CP Cabinet (In
6 case of Shell and core) √
Supply and Installation of Mini ODF (Splice Cabinet) Cabinet at
7 Splice point Location √
Splicing and Labelling Multicore Fiber cables with 4 core drop
8 cables using Wall Mount Mini ODF (Splice Cabinet) Cabinet √

9 Horizontal cabling work inside the unit/apartment/office/retail √


FTTH components such as the Fiber cables, 42U 800 X 800mm
Free standing racks, Optical distribution frame (ODF), high
density Fiber patch panel, low density Fiber patch panel, Mini
ODF (Splice Cabinet) for splice point, Mini ODF (Splice Cabinet)
cabinet for shell and core, 4 Port Fiber terminal box (with
LC/APC and SC/APC pigtails & adaptors), GPON Splitters, Open
10 rack for splitters and Fiber patch cords. √
Fiber optic splitter supply and installation (from the approved lists
11 of suppliers/vendors of both du and Etisalat) √
Supply of Fiber patch cords and Pre-patching the fiber patch cords
between splitter’s downlink ports to building fiber patch panels
(ISP) and between splitter’s uplink port to Outside plant fiber
12 patch panel √
CP cabinet supply & installation (including accessories including
13 related elements) √

14 Vertical and horizontal cable trays/pathways supply & installation √

15 Telecom rooms/spaces and related EM and civil requirements √



16 Plot of 10 x 10 meter to be provided for each MMR

30
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES


17 Construction of Meet-Me-Room

18 Commissioning of Meet-Me-Room √
Fiber optic cables supply, pulling, termination and testing from
the Main Telecom Room to each Mobile service room and Roof-
19 Top room √
Fiber Optic components for IBS-Connectivity (GSM) : Supply
and Installation of Fiber optic pre-terminated patch panels, Cross
20 connect Cabinets and Fiber patch cords √

Table C-Summary of responsibility matrix for Villa Scenario

Master
Villa’s
Item description Plan Lead Operator?
Developer
Developer
Lead-in ducts including
connection to manhole outside
1 villa boundaries √

2 Manholes outside villa


boundaries (including cover) √
Pull box inside the villa
boundaries (including the
3 cover) √
OSP Fiber optic cables for
single villa or complex villas
connections (including supply,
4 termination and testing) √
Supply and Installation of 4
5 core SM Fiber Terminal Box √

6 Patch cords supply √


CP cabinet supply &
installation (including
accessories, power outlet and
7 related elements) √
Supply and Installation of
splitters inside the stand alone
8 Meet-me-Room’s racks √
Plot of 10 x 10 meter to be
9 provided for each MMR √
Construction and
Commissioning of Meet-Me-
10 Room √

31
COMMON DU & ETC - ISP AND OSP DESIGN GUIDELINES

Following are the Appendixes

32
Etisalat
Schematic Representation of Villas Scenario – Green Field
nearest POP
Appendix-1-Figure-1

Etisalat
nearest POP

2 Core For du and 2 Core Etisalat (by Lead Operator)


4 Core SM drop Fiber Cables from each Villa –
Feeder Cables by 
Etisalat
‐Me 
Point
Meet
du/
Meet‐Me‐Room

Meet‐Me‐
du/Etisalat 

Room
(MMR)
POP

Feeder Cables 
by du

du nearest POP

Distribution Cables inside the development for Villas by Lead Operator
Appendix-1-Figure-2 Schematic Representation of Buildings Scenario –
Green Field

Feeder Cables by Etisalat
Etisalat
du nearest POP nearest POP

 Feeder Cables by du

Meet‐Me‐Room
(MMR)
Connected to building 
Connected to building  splitters inside MTR
splitters inside MTR

SM Fiber Cables from Each 
Building MTR to MMR
Schematic Representation of Buildings and Villas
Scenarios – Green Field

Feeder Cables by Etisalat
Appendix-1-Figure-3 Etisalat
du nearest POP nearest POP

 Feeder Cables by du

Meet‐Me‐Room
(MMR)
Connected to building 
splitters inside MTR

Distribution Cables

Villas 
Plot

Distribution Cables Cables  Connected to building 
splitters inside MTR
for Villas by Lead Operator
Legends
MTR -3m x 3m

800x800

RACK
42U Rack – 800mm (W) X 800mm(D) X 42 U (H)

mm
3m.

AC Clean earth bar
Design Consideration
1) Targeting maximum of 150 Tenants per 
Building

2) Terminate the Building Fiber cables into 42U   
Rack‐1

OSP Fiber cable Entry by  3)  Rack‐2 to be used for installing splitters
Lead Operator
4) Installed Overhead raceways over the Rack‐1 
600mm. 13A twin socket fed from utility power with  and Rack‐2 for proper routing of fiber patch 
dedicated circuit breaker  cords
800x800

RACK 2
mm
3m.

Smoke Detector
connected to BMS
5) Use SC/APC type Optical patch panel, if 
Etisalat is the Lead Operator 
800x800

RACK 1
mm

6) Use LC/APC type Optical patch panel, if du is 
the Lead Operator 

7) Cable tray must be installed at high level for 
proper cables routing

8) Supply and Pre‐ Patching of Splitters 
uplink and downlink ports will be under 
Building Riser the Building Owner scope

9) Adequate lighting fixtures must be provided
450mm X 50mm Cable tray at high level

10) Refer to the Electromechanical (EM) notes 
for detail EM requirements

Appendix-1-Figure-4
Legends
MTR -3m x 3m
3m.

Building
ODF
Building ODF Size – 900mm (W) X 450mm(D) X 47 U (H)

AC Clean earth bar

Open Rack
Open Rack – 900mm (W) X 450mm(D) X 47 U (H)

13A twin socket fed from utility 
power with dedicated circuit 
OSP Fiber cable Entry by 
Lead Operator Design Consideration
1) Targeting maximum of 300 Tenants per 

Open Rack

breaker 
Building

2) Terminate the Building Fiber cables into 47U   
3m.

Optical distribution Frame (ODF)

Building
3) Open rack to be used for installing splitters

ODF
4) Installed Overhead raceways over the ODF 
and Open rack for proper routing of fiber patch 
cords

5) Use SC/APC type Optical patch panel, if 
Etisalat is the Lead Operator 

Building Riser 6) Use LC/APC type Optical patch panel, if du is 


the Lead Operator 

450mm X 50mm Cable tray at high level 7) Cable tray must be installed at high level for 
proper cables routing

8) Supply and Pre‐ Patching of Splitters 
uplink and downlink ports will be under 
the Building Owner scope

9) Adequate lighting fixtures must be provided
Appendix-1-Figure-5
10) Refer to the Electromechanical (EM) notes 
for detail EM requirements
Legends
MTR -4m x 3m
3000mm.

Building
ODF
Building ODF Size – 900mm (W) X 450mm(D) X 47 U (H)
AC Clean earth bar

Open Rack
Open Rack – 900mm (W) X 450mm(D) X 47 U (H)

13A twin socket fed from utility power with 
dedicated circuit breaker 
OSP Fiber cable Entry by 
4000mm.

Lead Operator Design Consideration
1) Targeting maximum of 600 Tenants per 

Open Rack
Building

2) Terminate the Building Fiber cables into 47U   
Optical distribution Frame (ODF)

Building
ODF
3) Open rack to be used for installing splitters

4) Installed Overhead raceways over the ODF 
and Open rack for proper routing of fiber patch 
cords

5) Use SC/APC type Optical patch panel, if 
Etisalat is the Lead Operator 
Building Riser
6) Use LC/APC type Optical patch panel, if du is 
the Lead Operator 
450mm X 50mm Cable tray at high level
7) Cable tray must be installed at high level for 
proper cables routing

8) Supply and Pre‐ Patching of Splitters 
uplink and downlink ports will be under 
the Building Owner scope

9) Adequate lighting fixtures must be provided
Appendix-1-Figure-6
10) Refer to the Electromechanical (EM) notes 
for detail EM requirements
Legends
MTR -4.5m x 3m

Building
ODF
Building ODF Size – 900mm (W) X 450mm(D) X 47 U (H)

Open Rack
Open Rack – 900mm (W) X 450mm(D) X 47 U (H)

Open Rack
1.1m.

Building
ODF-3
1

Open Rack
Building -
ODF-1

3
Design Consideration
4.5m.

13A twin socket fed from utility 

Open Rack

Building
power with dedicated circuit  1) Targeting minimum of 1200 Tenants per 

ODF-4
breaker  Building

2
Earth bar

500mm. 2) Terminate the Building Fiber cables into 

Open Rack
Optical distribution Frame  Cabinet 
Building
ODF-2

500mm.

4
3) Use SC/APC type High density Optical patch 
panel, if Etisalat is the Lead Operator 
OSP Fiber cable by Lead 
Operator 4) Use LC/APC type High density Optical patch 
panel, if du is the Lead Operator 

5) Cable tray must be installed at high level for 
proper cables routing

Building Riser 5) Supply and Pre‐ Patching of Splitters 


uplink and downlink will be under 
the Building Owner scope

6) Adequate lighting fixtures must be provided

Appendix-1-Figure-7 7) Refer to the Electromechanical (EM) notes 
for detail EM requirements
Building Fiber Termination by Using LC/APC Optical Patch Panel
( if du is the Lead Operator )
Appendix-1-Figure-9 High Level Overhead Fiber raceways

Rack No -2 Rack No -1
1 1
Uplink Fiber Patch Panel 1
2 2
LC/APC by Client 3 3 48 port LC/APC optical patch panel-
4 2
4
1U by Client
5 3
5
6 6

Building Fiber Cables


7 4
7
8 5 8
Cable Manager-1U

Termination
9 9
10 6 10
2 x32 LC/APC Splitters for du 11 7 11
by Client 12 12
13 8 13
14 9 14
15 15
16 10 16
17 11
17
18 18
19 19
Design Consideration
12
20 20
13
21 21
22 22 1) Targeting maximum of 150 Tenants
2 x32 SC/APC Splitters for 23 23 per Building
24 24
Etisalat by Client 25 25
26 26
2) 13 number of LC/APC Optical Patch Panel
27 27 required to terminate 600 core of building
28 28 Fiber Cables
29 29
30 30 3) 5 number of 2 x 32 LC/APC Low density
31 31 splitters required
32 32
33 33
4) 5 number of 2 x32 SC/APC Low density
34 34
35 35 splitter required
36 36
Note- Supply and Pre-Patching of 37 37 5) The Capacity of the Uplink Fiber patch panel LC/
Splitters 38 38 APC = [Total number of Splitters installed for du and
uplink and downlink ports with 39 39 Etisalat] X 2
respective fiber patch cords shall be 40 40
under the Building Owner scope 41 41
42 42 6) For 150 Tenants-
The Capacity of the Uplink Fiber patch panel LC/APC
= [10 splitters] X 2
= 20 core ~ 24 core LC/APC Fiber
patch panel
Building Fiber Termination by Using SC/APC Optical Patch Panel
( if Etisalat is the Lead Operator )
Appendix-1-Figure-10 High Level Overhead Fiber raceways

Rack No -2 Rack No -1

Uplink Fiber Patch Panel 1 1


SC/APC by Client 2 2
3 1 3
4 4
5 2 5 24 port SC/APC optical patch panel-
6 3 6 1U by Client
7 4
7
8 4 8
9 5 9
10 10
2 x32 SC/APC Splitters for Etisalat by 11 6 11
12 12
Client 7

Building Fiber Cables Termination


13 13
14 8 14
15 9 15
16 16
2 x32 LC/APC Splitters 17 10 17
for du by Client 18 11 18
Design Consideration 19 19
20 12 20
1) Targeting maximum of 150 Tenants 21 13 21
per Building 22 22
23 14 23
24 15 24
2) 25 number of SC/APC Optical Patch Panel 25 25
required to terminate 600 core of building 26 16 26
Fiber Cables 27 17 27
28 28
3) 5 number of 2 x 32 LC/APC Low density 29 18 29
splitters required 30 19 30
31 31
32 32
4) 5 number of 2 x32 SC/APC Low density
20

33 33
splitter required
21

34 34
Cable Manager-1U
35 22
35
5) The Capacity of the Uplink Fiber patch panel 36 23
36
SC/APC = [Total number of Splitters installed 37 37
for du and Etisalat] X 2 38 24
38
39 25
39
40 40
6) For 150 Tenants- 41 41
The Capacity of the Uplink Fiber patch panel 42 42 Note- Supply and Pre- Patching of Splitters
SC/APC = [10 splitters] X 2 uplink and downlink ports with respective
= 20 core ~ 24 core SC/APC fiber patch cords shall be under the
Fiber patch panel Building Owner scope
Appendix-1-Figure-11 Open Rack Elevation using SC/APC ODF ( if Etisalat is the Lead Operator )
High Level Overhead Fiber raceways
ODF Open Rack

Uplink Fiber patch panel SC/APC by


FIBER SHELF
Client

Cables Guide

144 port High density 10 Number of High density connectorized 2 x32


SC/APC Optical Patch SC/APC GPON Splitters for Etisalat by client
Panel by Client
10 Number of High density connectorized 2 x32
LC/APC GPON Splitters for du by Client

Design Consideration

1) Targeting maximum of 300 Tenants


per Building per ODF

2) 9 number of 144 port SC/APC Optical Patch


Cable Holder/ Panel are required to terminate 1200 core of
Lacing Bar building Fiber Cables

3) 10 number of 2 x 32 SC/APC high density


splitters required

4) 10 number of 2 x32 LC/APC high density


splitter required

5) Supply and Pre- Patching of Splitters


uplink and downlink ports with respective fiber patch
cords shall be under the Building Owner scope

6) To Calculate the Capacity of the Uplink Fiber patch


panel -SC/APC, follow the below steps

7) The Capacity of the Uplink Fiber patch panel SC/


APC = [Total number of Splitters installed for du and
Etisalat] X 2

8) For 300 Tenants-


The Capacity of the Uplink Fiber patch panel SC/APC
=[20 splitters] X 2
= 40 core ~ 48 core SC/APC Fiber
patch panel
47 U (H) - 900mm (W) X 450mm (D) 47 U (H) - 900mm (W) X 450mm (D)
Open Rack Elevation using LC/APC ODF ( if du is the Lead Operator )
Appendix-1-Figure-12
High Level Overhead Fiber raceways
ODF Open Rack

FIBER SHELF
Uplink Fiber Patch Panel LC/APC by
Client

Cables Guide

10 Number of High density connectorized


288 port High density 2 x32 SC/APC GPON Splitters for Etisalat
LC/APC Optical Patch by Client
Panel by Client
10 Number of High density connectorized 2
x32 LC/APC GPON Splitters for du by Client

Design Consideration

1) Targeting maximum of 300 Tenants


per Building per ODF

2) 5 number of 288 port LC/APC Optical Patch


Panel are required to terminate 1200 core of
Cable Holder/
building Fiber Cables
Lacing Bar
3) 10 number of 2 x 32 SC/APC high density
splitters required

4) 10 number of 2 x32 LC/APC high density


splitter required

5) Supply and Pre- Patching of Splitters


uplink and downlink ports with respective fiber
patch cords shall be under the Building Owner
scope

6) To Calculate the Capacity of the Uplink Fiber


patch panel -LC/APC, follow the below steps

7) The Capacity of the Uplink Fiber patch panel


LC/APC = [Total number of Splitters installed for
du and Etisalat] X 2

8) For 300 Tenants-


The Capacity of the Uplink Fiber patch panel LC/
APC
= [20 splitters] X 2
= 40 core ~ 48 core LC/APC Fiber
patch panel
47 U (H) - 900mm (W) X 450mm (D) 47 U (H) - 900mm (W) X 450mm (D)
FTR -Residential and Commercial Buildings

2m.

Building Riser
2m.

Mini ODF
(Splice Cabinet)

13A twin socket fed from utility power


with dedicated circuit breaker

150 mm opening

Appendix-1-Figure-13
Appendix-1-Figure-14

450mm x 50mm cable tray – Fiber

300mm x 50mm cable tray –


GSM Cables
Cables
Mini
ODF

Building Riser
1.5 meter from FFL

Floor Telecom Room (FTR) with Mini ODF –


Wall Mount illustration

Finish Floor Level (FFL)


Cable Entry for Multicore 
Indoor Fiber cables

Mini ODF (Splice Cabinet ) 
Opening for Drop Fiber 
Cables from Building Riser

Flip type splice tray with 
storage capacity of 12 core 
fibers

1 Cable/Tube Holder
2
3

Storage space for Drop Fiber Cables
4

 Storage space for Fiber Tubes
5
6

600mmm
1
2
3
Mini ODF 4
5
6
(Wall Mount)
1
2
3 Notes –
4   Reserved 
5
6 minimum of 1m X 
1m space on the 
side wall to mount 
Mini ODF
 Mount the Mini 
Opening for Drop Fiber  ODF at 1.5 m 
Cables from Building Riser height from Finish 
600mmm Floor Level (FFL)
 Extend the Cable 
tray at high level 
from building riser 
Cable Holder to Mini ODF 
Appendix-1-Figure-15
Cable Entry for Multicore 
Indoor Fiber cables
3m. Roof‐Top room/Mobile 
Service room (Typical 

AC Clean earth

DC Clean earth
Layout)

bar

bar
Cross Connect
cabinet

13A twin socket fed from utility power


with dedicated circuit breaker

300mm width cable


3m.

Smoke Detector connected to BMS


ladder at high level

2 x 63A Three Phase Isolator fed from


essential building power

2 x handheld CO2 cylinder


extinguishers
Design Consideration
1) For Building which has G+10 floors or
less, provide Roof-Top room with
minimum size of 3m x 3m x 3m
Opening for containments

2) For Building which has G+11 floors or


more, provide 3m X 3m x 3m mobile
service room for every 10 floors, starting
from the lowest basement
Appendix-1-Figure-16
3) Refer to the Electromechanical (EM)
notes for detail EM requirements
Top cable entry
Top entry for
Cross connect for fiber cables
fiber patch
cabinet (Wall cords

PVC Trunking to route fiber patch cords


Mount)

Cross connect
cabinet
Cable tray

Bottom entry for fiber


patch cords
Bottom cable
entry for fiber 1.5 meter from FFL
cables Finish Floor
Level (FFL)
Appendix-1-Figure-17
Cable Entry for 24 core Fiber 
cables from MTR 
Cross Connect Cabinet ‐
Appendix-1-Figure-18
Opening for fiber 
patch cords
Elevation

Splice tray 
Designated Splice tray 
for Etisalat (1 to 12 core 
of Indoor fiber cable) 
600mmm

Splice tray 
Designated Splice tray 
Velcro
24 for du (13 to 24 core 
23 of Indoor fiber cable) 
22
21
20
Tube holder
19
18
Adaptors and Pigtails
17
16

Door  15
14
13
12
11
Ring to Manage Fiber 
10 Patch cords and 
9 Buffer Tubes
8
7
6
5
4
Design Consideration
3 1) Pre‐Terminated Cross connect cabinet capacity must be 
2 suitable to splice
1  24 core SM Indoor tight buffer fiber cables

2) Splice tray capacity ‐12 slot per splice tray

3)  Connector type must be LC/APC (if du is the Lead 
Operator)

Cable holder LC/APC or  Opening for fiber  4) Connector type must be SC/APC (if Etisalat is the Lead 


Operator)
SC/APC  patch cords
Cable Entry for 24 core Fiber  Pigtails and  5) To be installed at 1.5 meter from Finish floor Level (FFL)
cables from MTR  adaptors
Appendix-1-Figure-19
SLD for Fiber Connectivity Inside Tenants/Units
12 Cm

8 Cm
Fiber Terminal Box with 2 Port 4 core SM Indoor drop Fiber Cable
SC/APC and 2 Port LC/APC – Flat Cross section

Port-1 for Etisalat

Port-2 for Etisalat

Port-3 for du

Port-4 for du
SC/ SC/ LC/ LC/
APC APC
APC APC

LC/APC to SC/APC simplex Patch Cord


SC/APC to SC/APC simplex Patch
Cord

SC/ SC/
APC APC

Optical Network Terminal Optical Network Terminal


12 U Consolidation Cabinet
With 150 mm depth

600mm

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
24 Port Cat 6 Patch Panel– 1U
Cable Manager – 1U
Fiber Terminal Box
with 4 port (with 2 port of SC/APC
FTB and 2 port of LC/APC)
12 U
13 A twin Socket
PERFORATED
3 U – Metallic Support to hold du
DOOR
and Etisalat ONTs
150mm

Design Consideration
1) Home Consolidation
cabinet – Serving up to 24
port of RJ-45 per Tenant

Appendix-1-Figure-20 2) Home consolidation


cabinet depth must be
minimum 150mm
12 U Consolidation Cabinet
With 300 mm depth

600mm

12 U

1 U – Metallic Shelf for Etisalat


Fiber Terminal Box
FTB with 4 port (with 2 port of SC/APC and 2 port of
LC/APC)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

24 Port Cat 6 Patch Panel– 1U


Cable Manager – 1U
PERFORATED
DOOR 1 U – Metallic Shelf for du

300 mm

Design Consideration
1) More Consolidation
13 A twin Socket cabinet – Serving more
than 24 port of RJ-45 per
Tenant

Appendix-1-Figure-21 2) Home consolidation


cabinet depth must be
minimum 300mm
12 U Consolidation Cabinet
With 350 mm depth

600mm

12 U

1 U – Metallic Shelf for Etisalat


Fiber Terminal Box
FTB with 4 port (with 2 port of SC/APC and 2 port of
LC/APC)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

24 Port Cat 6 Patch Panel– 1U


Cable Manager – 1U
PERFORATED
DOOR 1 U – Metallic Shelf for du

350 mm

Design Consideration
1) Business Consolidation
13 A twin Socket cabinet – Serving up to 24
port of RJ-45 per Tenant or
more

Appendix-1-Figure-22 2) Business consolidation


cabinet depth must be
minimum 350mm
Cable Entry for Multicore 
Fiber cables from MTR 
Appendix-1-Figure-23 Opening for drop Fiber Cables  Mini ODF (Splice Cabinet) 
from tenants 
for Shell and Core inside 
FTR
600mmm
Splice Tray for splicing 
24
23
24
23
drop fiber cables
22 22
21 21

Splice tray

Splice tray
20 20
19 19
18 18
17 17
16 16
15 15
14 14
13 13
12 12
11 11
10 10
9
8
9
8 Splice Tray for splicing 
7 7

Door  6
5
4
3
2
6
5
4
3
2
Multicore fiber cables

1 1
24 24
23 23
22 22
21 21
20 20
19 19
18 18
17 17 Adaptor holder
Splice tray

Splice tray
16 16
15 15
14 14
13 13
12 12
11 11
10 10
9 9
8 8
7 7
6 6
5 5
4 4
3 3
2 2
1 1

LC/APC or  Opening for drop 
SC/APC  Fiber Cables from 
Cable Entry for Multicore  Pigtails tenants 
Fiber cables from MTR 
1 2 3 x
Schematic diagram for  FTR‐7th floor
Mini ODF
Buildings (Splicing point)

4 core SM drop fiber cables from each unit to respective  Mini ODF (Splicing Point) at FTR
1 2 3 x

Appendix-1-Figure-24
FTR‐6th  floor
 
1 2 3 x

FTR‐5th  floor
 
1 2 3 x

FTR‐4th floor 
Mini ODF
Multicore Indoor fiber cables from MTR  (Splicing point)
to respective splicing point at FTR
1 2 3 x

FTR‐3rd floor
 
ETC 1 2 3 x
Du POP
POP

FTR‐2nd  floor

1 2 3 x

FTR‐1st floor
Mini ODF
(Splicing point)

1 2 3 x
MTR room with splitters 
Meet‐Me‐Room (Supply of splitters will be 
by Building Owner)
(MMR) Ground Floor
Core Assignment SLD – with SC/APC Fiber
Patch Panel 2 X 32 LC/APC GPON Splitter for du
SC/APC Up Link Down Link Ports
Port-1,2 Tenant-6
Ports
1 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
LC/APC
Port-3,4

SC/APC
Port-1,2 Tenant-5 Simplex Fiber patch cords -(LC/APC to
SC/APC)
LC/APC
Port-3,4
Mini ODF
SC/APC (Splice Cabinet) Tenant-1 Tenant-2 Tenant-3 Tenant-4 Tenant-5 Tenant-6
Port-1,2 2 4 6 8 10 12 14 16 18 20 22 24
Tenant-4
LC/APC 1 3 5 7 9 11 13 15 17 19 21 23
Port-3,4
24 port SC/APC
Fiberl patch Panel
SC/APC
Port-1,2 Tenant-3

LC/APC
Port-3,4 Simplex Fiber patch cords -(SC/APC to
SC/APC)
Up Link
SC/APC Ports
Port-1,2 Tenant-2 1 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

LC/APC
Down Link Ports
Port-3,4

2 X 32 SC/APC GPON Splitter for Etisalat


SC/APC
Port-1,2 Tenant-1
LC/APC
Port-3,4
Tight Buffer or Micro Modules LSZH Indoor Multi-Core
Fiber Cable

Appendix-1-Figure-25 4 core Flat type LSZH Indoor Drop Fibers Cables


Core Assignment SLD – with LC/APC Fiber 2 X 32 LC/APC GPON Splitter for du
Patch Panel
SC/APC Tenant
Port-1,2 -1 1 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
LC/APC
Port-3,4 Down Link Ports
Up Link
SC/APC
Ports
Tenant
Port-1,2 -2

Optical patch Panel


LC/APC

24 port LC/APC
Port-3,4

SC/APC Tenant
Port-1,2 -3
LC/APC
Port-3,4
Simplex Fiber patch cords -(LC/APC to
SC/APC Tenant LC/APC)
Port-1,2 -4 Mini ODF
LC/APC
Port-3,4 (Splice Cabinet)
SC/APC
2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48
Tenant
Port-1,2 -5
LC/APC
Port-3,4 1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 33 35 37 39 41 43 45 47
Tenant- Tenant- Tenant- Tenant- Tenant- Tenant- Tenant- Tenant- Tenant- Tenant- Tenant- Tenant-
1 2 3 4 5 6 7 8 9 10 11 12
SC/APC Tenant
Port-1,2 -6
LC/APC
Port-3,4

SC/APC Tenant
Port-1,2

Simplex Fiber patch cords -


-7
LC/APC

(LC/APC to SC/APC)
Port-3,4
1 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
SC/APC Tenant Up Link
Port-1,2 -8 Down Link Ports
LC/APC Ports
Port-3,4

SC/APC
Port-1,2
Tenant
-9
2 X 32 SC/APC GPON Splitter for Etisalat
LC/APC
Port-3,4

SC/APC Tenant
Port-1,2 -10
LC/APC
Port-3,4
Tight Buffer or Micro Modules LSZH Indoor Multi-Core
Fiber Cable
SC/APC Tenant
Port-1,2 -11
LC/APC
Port-3,4
4 core Flat type LSZH Indoor Drop Fibers Cables
SC/APC Tenant
Port-1,2 -12
LC/APC
Port-3,4
Appendix-1-Figure-26
MTR Room Client server Room
10U Space reserved for
OSP link (from MMR to
Building MTR) and ISP
link ( Building MTR to 01
02
01
02
Client Server room) 03 03 300mm x 50mm
04 04 Cable tray
05 05

Client’s Server Rack
06 06
07 07
08 08
09 09
10 10
11 11
12 12
16 U Space Reserved for 13
14
13
14
Lead Operator’s Active 15 15
16 16
Equipment 17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36 Raised Floor
37 37
16 U Space Reserved 38 38 Tiles
39 39
for Other Operator’s 40
41
40
41
Active Equipment 42 42

300mm.
Finished Floor Level
Appendix-1-Figure-27
Bulk Service design consideration
1) Client shall provide 3m x 3m x 3m telecom room to Lead Operator
2) Client Shall install and terminate 12 core SM Indoor Tight Buffer fiber cables between MTR and Client server room
3) Client Shall install and terminate 24 number of Cat6 UTP Copper cables between MTR and Client server room
4) Client shall provide 19 inch, 42 U Free standing rack and 12 port Pre-Terminated fiber patch panel for Lead Operator’s Uplink fiber
5) If the du is the Lead Operator, then Client shall provide LC/APC adapters and pigtails for Fiber Interfaces
6) If the Etisalat is the Lead Operator, then Client shall provide SC/APC adapters and pigtails for Fiber Interfaces.
7) Client shall provide 300mm X 50mm Cables tray between Lead Operator’s MTR and Client Server room
Appendix‐2 Table‐1
Single Villa Complex of Villas For Multi‐tenant Buildings shopping Mall Warehouse and Shed Bulk Service

2 xD56 (50mm) per Warehouse  
2 XD54(100mm) Primary  2 XD54(100mm) Primary Route 
2 xD56 (50mm) per Villa  2 XD54(100mm) Primary Route and  2xD54(100mm) Primary plot Entry 
Ducts 2 xD56 (50mm) Route and 2 XD54(100mm)  and 2XD54(100mm) Secondary 
2xD54(100mm) for plot Entry 2 XD54(100mm) Secondary Route 2xD54(100mm) Secondary plot 
Secondary Route Route
Entry 

600mm x600mm  600mm x600mm X800mm(LXBxD)per  600mm x600mm 


Entry Box Not Required  Not Required  Not Required 
X800mm(LXBxD)per Villa Villa X800mm(LXBxD)per Warehouse
JRC 12 for every 12 Villas + JRC 12 for  JRC 12 for every 12 warehouses + 
Manhole Not Required  JRC 12 JRC 12 JRC 12
plot Entry JRC 12 for plot Entry
Appendix‐2‐Table‐2 ‐ Main Telecom Room Sizes‐For Fixed Services 
 
         
Number of  Number of Fiber core Per  Fiber Patch Panel   Fiber Patch Panel   Number of Splitter Per Buildings     MTR minimum Size in 
Tenants per  Building   (Port Capacity Planning  ‐ If Etisalat is the   (Port Capacity Planning  ‐ If du is the  (Provide equal number splitters to each Operators)  Rack/ODF Size  Meter 
building  (Dedicate 2 core Fiber for  Lead Operator)  Lead Operator)   
Lead Operator and 2 core       (L X B X H) 
Fiber for Other Operator)   
       
Up to 150  Number of Tenants X 4 core   Total Number of Fiber core Per   Total Number of Fiber core Per   [Number of Tenants / 30 Output ports of Splitter]  X 2 times   Free Standing Rack  3m x 3m X 3m 
Tenants  Building /24 port SC/APC Fiber Patch Panel  Building /48 port LC/APC Fiber Patch Panel  42 U  
800mm (W) X 800mm (D) 
       
Up to 300  Number of Tenants X 4 core  Total Number of Fiber core Per   Total Number of Fiber core Per  [Number of Tenants / 30 Output ports of Splitter]  X 2 times  Floor Mount Optical  3m x 3m X 3m 
Tenants  Building /144 port SC/APC Fiber Patch Panel  Building /288 port LC/APC Fiber Patch  Distribution Frame (ODF) 
Panel  47U 
900mm (W) X 450mm (D) 
       
Up to 600  Number of Tenants X 4 core  Total Number of Fiber core Per   Total Number of Fiber core Per  [Number of Tenants / 30 Output ports of Splitter]  X 2 times  Floor Mount Optical  4m x 3m X 3m 
Tenants  Building /144 port SC/APC Fiber Patch Panel  Building /288 port LC/APC Fiber Patch  Distribution Frame (ODF) 
Panel  47U 
900mm (W) X 450mm (D) 
       
Up to 1200  Number of Tenants X 4 core  Total Number of Fiber core Per   Total Number of Fiber core Per  [Number of Tenants / 30 Output ports of Splitter]  X 2 times  Floor Mount Optical  4.5m x 3m X 3m 
Tenants  Building /144 port SC/APC Fiber Patch Panel  Building /288 port LC/APC Fiber Patch  Distribution Frame (ODF) 
Panel  47U 
900mm (W) X 450mm (D) 
       
More than  Number of Tenants X 4 core  Total Number of Fiber core Per   Total Number of Fiber core Per  [Number of Tenants / 30 Output ports of Splitter]  X 2 times  Will be Advised at NOC Stage  Will be Advised at 
1200 Tenants  Building /288 port SC/APC Fiber Patch Panel  Building /288 port LC/APC Fiber Patch  NOC Stage 
Panel 

        

 
Appendix-2-Table-3-Core Assignment Mapping detail-LC Type
Fiber Core Assignment for Building Fiber Cable Termination By Using 19" 1U - 48 Port LC/APC Optical
Patch Panel
Apartment/Office/Retail Horizontal Distribution Vertical Distribution Building MTR

2 number of 24 Core Indoor SM


Tenant 4 Port Fiber Terminal Box with 2 4 core Indoor SM Drop Wall Mount Splice Cabinet with 24 24 Port LC/APC Etisalat - 2 x 32 SC/APC GPON
Multicore Fiber Cables -Micro du - 2 x 32 LC/APC GPON Splitter
Number LC/APC and 2 SC/APC Fiber Cables Fiber Splice Tray Capacity Optical Patch Panel Splitter
Module/ Flexi Tube

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Blue - Core - 1 LC/APC-Port-1 ETC -Splitter Downlink Port-1

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 Orange - Core - 2 LC/APC-Port-2
Tenant - 1
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Green - Core - 3 LC/APC-Port-3 du -Splitter Downlink Port-1

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Brown - Core - 4 LC/APC-Port-4

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Slate - Core - 5 LC/APC-Port-5 ETC -Splitter Downlink Port-2

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 White - Core - 6 LC/APC-Port-6
Tenant - 2
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Red - Core - 7 LC/APC-Port-7 du -Splitter Downlink Port-2

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Black - Core - 8 LC/APC-Port-8

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Yellow - Core - 9 LC/APC-Port-9 ETC -Splitter Downlink Port-3

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 Purple - Core - 10 LC/APC-Port-10
Tenant - 3
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Pink - Core - 11 LC/APC-Port-11 du -Splitter Downlink Port-3

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Aqua - Core - 12 LC/APC-Port-12

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Blue/Black Stripe - Core - 13 LC/APC-Port-13 ETC -Splitter Downlink Port-4

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 Orange/Black Stripe - Core - 14 LC/APC-Port-14
Tenant - 4
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Green/Black Stripe - Core - 15 LC/APC-Port-15 du -Splitter Downlink Port-4

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Brown/Black Stripe - Core - 16 LC/APC-Port-16

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Slate/Black Stripe - Core - 17 LC/APC-Port-17 ETC -Splitter Downlink Port-5

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 White/Black Stripe - Core - 18 LC/APC-Port-18
Tenant - 5
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Red/Black Stripe - Core - 19 LC/APC-Port-19 du -Splitter Downlink Port-5

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Black/Yellow Stripe - Core - 20 LC/APC-Port-20

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Yellow/Black Stripe - Core - 21 LC/APC-Port-21 ETC -Splitter Downlink Port-6

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 Purple/Black Stripe - Core - 22 LC/APC-Port-22
Tenant - 6
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Pink/Black Stripe - Core - 23 LC/APC-Port-23 du -Splitter Downlink Port-6

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Aqua/Black Stripe - Core - 24 LC/APC-Port-24

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 2 Blue - Core - 1 LC/APC-Port-25 ETC -Splitter Downlink Port-7

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 2 Orange - Core - 2 LC/APC-Port-26
Tenant - 7
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 2 Green - Core - 3 LC/APC-Port-27 du -Splitter Downlink Port-7

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 2 Brown - Core - 4 LC/APC-Port-28

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 2 Slate - Core - 5 LC/APC-Port-29 ETC -Splitter Downlink Port-8

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 2 White - Core - 6 LC/APC-Port-30
Tenant - 8
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 2 Red - Core - 7 LC/APC-Port-31 du -Splitter Downlink Port-8
Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 2 Black - Core - 8 LC/APC-Port-32

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 2 Yellow - Core - 9 LC/APC-Port-33 ETC -Splitter Downlink Port-9

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 2 Purple - Core - 10 LC/APC-Port-34
Tenant - 9
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 2 Pink - Core - 11 LC/APC-Port-35 du -Splitter Downlink Port-9

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 2 Aqua - Core - 12 LC/APC-Port-36

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 2 Blue/Black Stripe - Core - 13 LC/APC-Port-37 ETC -Splitter Downlink Port-10

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 2 Orange/Black Stripe - Core - 14 LC/APC-Port-38
Tenant - 10
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 2 Green/Black Stripe - Core - 15 LC/APC-Port-39 du -Splitter Downlink Port-10

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 2 Brown/Black Stripe - Core - 16 LC/APC-Port-40

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 2 Slate/Black Stripe - Core - 17 LC/APC-Port-41 ETC -Splitter Downlink Port-11

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 2 White/Black Stripe - Core - 18 LC/APC-Port-42
Tenant - 11
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 2 Red/Black Stripe - Core - 19 LC/APC-Port-43 du -Splitter Downlink Port-11

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 2 Black/Yellow Stripe - Core - 20 LC/APC-Port-44

Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 2 Yellow/Black Stripe - Core - 21 LC/APC-Port-45 ETC -Splitter Downlink Port-12

Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 2 Purple/Black Stripe - Core - 22 LC/APC-Port-46
Tenant - 12
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 2 Pink/Black Stripe - Core - 23 LC/APC-Port-47 du -Splitter Downlink Port-12

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 2 Aqua/Black Stripe - Core - 24 LC/APC-Port-48
Appendix-2-Table-3-Core Assignment Mapping detail-SC Type
Fiber Core Assignment for Building Fiber Cable Termination By Using 19" 1U - 24 Port SC/APC Optical
Patch Panel
Apartment/Office/Retail Horizontal Distribution Vertical Distribution Building MTR

4 Port Fiber Terminal Box with 2 4 core Indoor SM Drop Wall Mount Splice Cabinet with 24 24 Core Indoor SM Multicore Fiber Cable - 24 Port SC/APC Etisalat - 2 x 32 SC/APC du - 2 x 32 LC/APC GPON
Tenant Number
LC/APC and 2 SC/APC Fiber Cables Fiber Splice Tray Capacity Micro Module/ Flexi Tube Optical Patch Panel GPON Splitter Splitter

ETC -Splitter Downlink


Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Blue - Core - 1 SC/APC-Port-1
Port-1
Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 Orange - Core - 2 SC/APC-Port-2
Tenant - 1
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Green - Core - 3 SC/APC-Port-3 du -Splitter Downlink Port-1

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Brown - Core - 4 SC/APC-Port-4


ETC -Splitter Downlink
Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Slate - Core - 5 SC/APC-Port-5
Port-2
Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 White - Core - 6 SC/APC-Port-6
Tenant - 2
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Red - Core - 7 SC/APC-Port-7 du -Splitter Downlink Port-2

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Black - Core - 8 SC/APC-Port-8


ETC -Splitter Downlink
Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Yellow - Core - 9 SC/APC-Port-9
Port-3
Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 Purple - Core - 10 SC/APC-Port-10
Tenant - 3
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Pink - Core - 11 SC/APC-Port-11 du -Splitter Downlink Port-3

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Aqua - Core - 12 SC/APC-Port-12


ETC -Splitter Downlink
Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Blue/Black Stripe - Core - 13 SC/APC-Port-13
Port-4
Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 Orange/Black Stripe - Core - 14 SC/APC-Port-14
Tenant - 4
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Green/Black Stripe - Core - 15 SC/APC-Port-15 du -Splitter Downlink Port-4

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Brown/Black Stripe - Core - 16 SC/APC-Port-16
ETC -Splitter Downlink
Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Slate/Black Stripe - Core - 17 SC/APC-Port-17
Port-5
Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 White/Black Stripe - Core - 18 SC/APC-Port-18
Tenant - 5
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Red/Black Stripe - Core - 19 SC/APC-Port-19 du -Splitter Downlink Port-5

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Black/Yellow Stripe - Core - 20 SC/APC-Port-20
ETC -Splitter Downlink
Port-1 - SC/APC - Etisalat Blue - Core - 1 Splice Tray - 1 Yellow/Black Stripe - Core - 21 SC/APC-Port-21
Port-6
Port-2 - SC/APC - Etisalat Orange - Core - 2 Splice Tray - 1 Purple/Black Stripe - Core - 22 SC/APC-Port-22
Tenant - 6
Port-3 - LC/APC - du Green - Core - 3 Splice Tray - 1 Pink/Black Stripe - Core - 23 SC/APC-Port-23 du -Splitter Downlink Port-6

Port-4 - LC/APC - du Brown - Core - 4 Splice Tray - 1 Aqua/Black Stripe - Core - 24 SC/APC-Port-24
Appendix‐2‐Table‐4‐ Telecom Room Sizes‐For Mobile Services (IBS) 
 
     
Number of Floors   Mobile service room Sizes in Meter                            Roof‐Top room Sizes in Meter  
(L X B X H)  (L X B X H) 
 
 
Up to G+10  Not Applicable  3m x 3m x 3m 

     
G+11 to G+100  3m x 3m x 3m  3m x 3m x 3m 
(Every 10 floors starting from the  
basement level /Ground floor) 
     
Shopping malls and Bulk services  Will be Advised at NOC Stage  Will be Advised at NOC Stage 
buildings   
Cluster of buildings with each having     
more than G+5 floors  Will be Advised at NOC Stage  Will be Advised at NOC Stage 

 
 

                               
 
Appendix-3- du and ETC Telecom room Label

&
Telecom Room
Appendix‐4‐ Connectivity Wiring detail
Project Name:

Meet-Me- Room Main Telecom Room (MTR) Floor Telecom Room Tenant/Unit Notes

Fiber Termination Splitter Uplink Splitter Splitter downlink Splicing Point Fiber Terminal Box (FTB)

Uplink Fiber Uplink Fiber


Fiber patch Fiber patch Uplink Fiber patch panel Splitter Rack Splitter Fiber Patch Fiber Patch Fiber Patch Panel Floor Number of Splice Tray Number of Operator assignment
Room No ODF No patch panel patch panel Splitter No. Mini ODF No Floor No Flat no FTB Port No
panel no panel Port no Rack no No Port No Panel Rack No Panel No Port No Mini ODF Mini ODF Name
no Port no
Appendix-5 Summary Table- Electromechanical (EM) Specification
Mobile Service
EM Room
S. MTR of Mixed Used and MTR of Bulk Service Buildings
Components MTR of Residential MTR of Shopping Mall Roof-Top Room
No Commercial Building
Name Building

 4 x 13A twin
socket with  4 x 13A twin socket
 4 x 13A twin socket with  4 x 13A twin socket with
dedicated with dedicated
dedicated circuit dedicated circuit
circuit circuit
 4 x 13A twin socket
 Two number of AC and DC  Two number of AC and DC
with dedicated circuit  Two number  Two number of
Earth Bar Earth Bar
Electrical To be determined during of AC and DC AC and DC Earth
1
Supply  One number of AC and NOC design stage Earth Bar Bar
 2 x 63A TP isolator fed from  2 x 40A TP isolator fed from
DC Earth Bar
EDB EDB
 2 x 63A TP  2 x 63A TP isolator
isolator fed fed from EDB
from EDB

To be determined during 26kW for Mobile 36kW for Mobile Service


2 Heat dissipation Commercial Commercial
Not Applicable NOC design stage Service room room
300W/sq.mtr + 3kW/rack 300W/sq.mtr + 3kW/rack

To be determined during NOC To be determined during To be determined during NOC design


3 Raised Flooring Not Applicable Not Applicable Not Applicable
design stage NOC design stage stage

To be determined
To be determined during To be determined during
3 Floor Loading 10kNm2 (distributed load) 10kNm2 (distributed load)- 10kNm2 (distributed load)- during NOC design
NOC design stage NOC design stage
stage

Dedicated A/C system


Dedicated A/C system
Dedicated A/C system (ducted split (ducted split FCU)
Dedicated A/C system (ducted split (ducted split FCU) with
FCU) with duty & standby units with duty & standby
FCU) with duty & standby units with duty & standby units with
Air A/C Unit - To maintain the with proper interlocking, to To be determined during units with proper
4 proper interlocking, to maintain the proper interlocking, to
Conditioning temperature at 24°C maintain the room temp. at 21°C ± NOC design stage interlocking, to
room temp. at 21°C ± 1°C maintain the room temp.
1°C maintain the room
at 21°C ± 1°C
temp. at 21°C ± 1°C

 2 x handheld CO2  2 x handheld CO2 cylinder  2 x handheld CO2 cylinder  2 x handheld  2 x handheld CO2
cylinder extinguishers extinguishers extinguishers CO2 cylinder cylinder
To be determined during
5 Fire protection  1 x smoke detectors per  Room shall be comply with  Room shall be comply with the extinguishers extinguishers
NOC design stage
room connected to the fire and safety fire and safety requirements like  Room shall be  Room shall be
BMS/FACP requirements like smoke smoke detector, fire alarm, comply with comply with the
Appendix-5 Summary Table- Electromechanical (EM) Specification
detector, fire alarm, emergency light etc. as per local the fire and fire and safety
emergency light etc. as per authority standards. Any water safety requirements like
local authority standards. sprinklers to be avoided. requirements smoke detector, fire
Any water sprinklers to be like smoke alarm, emergency
avoided. detector, fire light etc. as per
alarm, local authority
emergency standards. Any
light etc. as per water sprinklers to
local authority be avoided.
standards. Any
water
sprinklers to
be avoided.
Appendix-5- Summary Table- ISP Specification
Bulk Service
Building with Buildings – Group of Warehouses and
S. Infrastructure Building with Building with up
Building with up to 1200 Shopping Hotels, Factories
N Components Single Villa Complex of Villa up to 300 to 600 Tenant
up to 150 Tenant Mall Palaces and
o Name Tenant
Tenant Hospitals

JRC 12 for every 12 Villas +


600mmX600m JRC 12 for plot Entry JRC12 JRC12 JRC12 JRC12 JRC12 JRC 12 for every 12 warehouses +
1 Entry Box JRC12
mX800mm 600mmX600mmX800mm per JRC 12 for plot Entry
Villa 600mm x600mm X800mm(L X B
x D)per Warehouse
2 XD54(100mm) 2
Primary Route and XD54(100m
2 XD54(100mm) m) Primary 2 XD54(100mm)
2x100mm primary 2x100mm primary 2 XD54(100mm)
Secondary Route Route and Primary Route 2x50mm per warehouse
2 xD56 (50mm) per Villa route route Primary Route and
2 Entry duct 2X50mm 2 and 2x100mm primary plot entry
2xD54(100mm) for plot Entry 2x100mm 2x100mm 2 XD54(100mm)
XD54(100m 2 XD54(100mm) 2x100mm secondary plot entry
secondary route secondary route Secondary Route
m) Secondary Route
Secondary
Route
4.5m X 3m X
3m (final
Main Telecom 4.5m X 3m X 3m room size to
3 Not applicable Not applicable 3m X 3m X 3m 3m X 3m X 3m 4m X 3m X 3m 3m X 3m X 3m Not applicable
Room be discussed
during design
NOC stage)
3mx3mx3m 3mx3mx3m To be
3mx3mx3m To be determined
Rooftop Mobile (Considering (Considering To be determined determined
4 Not applicable Not applicable (Considering G+10 during design Not applicable
Service Room G+10 floors or G+10 floors or during design during design
floors or More) NOC stage
Less) More) NOC stage NOC stage
3mx3mx3m every 3mx3mx3m every
10 floors starting 10 floors starting
To be
from the lowest from the lowest To be determined
Mobile Service determined
5 Not applicable Not applicable Not applicable Basement/Ground Basement/Ground To be determined during design Not applicable
Room during design
floor (Considering floor (Considering during design NOC stage
NOC stage
G+10 floors or G+10 floors or NOC stage
More) More)

Not applicable Not applicable 2m X 2m X 3m 2m X 2m X 3m 2m X 2m X 3m To be To be determined


Floor Telecom
6 2m X 2m X 3m determined during design Not applicable
Space
during design NOC stage
NOC stage
1 no of
1 no of 450mm X
1 no of 450mm X 1 no of 450mm X 1 no of 450mm X 450mm X To be
Riser Cable 50mm Cable tray
2 no of 50mm 50mm Cable tray 50mm Cable tray for 50mm Cable tray 50mm Cable determined
7 Containment 2 no of 50mm conduit for Fixed Services 2 no of 50mm conduit
conduit for Fixed Services Fixed Services and for Fixed Services tray for Fixed during design
Main Risers and 1 no of
and 1 no of 1 no of 300mm X and 1 no of Services and NOC stage
300mm X 50mm
300mm X 50mm 300mm X 50mm 1 no of
Appendix-5- Summary Table- ISP Specification
Cable tray for IBS Cable tray for IBS 50mm Cable tray for Cable tray for IBS 300mm X
(GSM) (GSM) IBS (GSM) (GSM) 50mm Cable
tray for IBS
(GSM)

200mm X
200mm X 50mm 200mm X 50mm 200mm X 50mm 50mm Cable
Cable Tray for Cable Tray for Cable Tray for Fixed 200mm X 50mm Tray for To be
Horizontal Cable Not applicable Not applicable Cable Tray for
Fixed Services Fixed Services Services Fixed determined
8 tray (Floor Fixed Services Not applicable
and 150 mm X and 150 mm X and 150 mm X Services during design
corridor) and 150 mm X
50mm for IBS 50mm for IBS 50mm for IBS and 150 mm NOC stage
(GSM) (GSM) (GSM) 50mm for IBS X 50mm for
(GSM) IBS (GSM)
For residential For residential
For residential
12U (H) X For residential 12U 12U (H) X
12U (H) X
600mm (W) X (H) X 600mm (W) X
600mm (W) X
150mm(D) for up 600mm (W) X 150mm(D) for up
150mm(D) for up
to 24 Cat6 Cables 150mm(D) for up to to 24 Cat6 Cables
to 24 Cat6 Cables
24 Cat6 Cables
For residential For residential
For residential
12U (H) X For residential 12U 12U (H) X For Retail
12U (H) X
12U (H) X 600mm (W) X (H) X 600mm (W) X 12U (H) X 12U (H) X
Consolidation 12U (H) X 600mm (W) X
9 600mm (W) X 300mm(D) for 600mm (W) X 300mm(D) for 600mm (W) Not applicable 600mm (W) X 150mm(D)
Point (Cabinet) 600mm (W) X 150mm(D) 300mm(D) for
150mm(D) above 24 Cat6 300mm(D) for above above 24 Cat6 X 300mm(D)
above 24 Cat6
Cables 24 Cat6 Cables Cables
Cables
For Commercial For Commercial For Commercial
For Commercial
12U (H) X 12U (H) X 12U (H) X
12U (H) X
600mm (W) X 600mm (W) X 600mm (W) X
600mm (W) X
350mm(D) 350mm(D) 350mm(D)
350mm(D)

Optical Optical Optical Distribution Optical Optical


Free-standing 42U Distribution Frame Frame (ODF) Distribution Frame Distribution Free-standing
10 Distribution Not applicable
Not applicable Not applicable Rack (ODF) (ODF) Frame (ODF) 42U Rack
Frame (ODF)
Multicore
Multicore fiber Multicore fiber Multicore fiber fiber cable Direct Multicore
Multicore fiber cable
Not applicable Not applicable cable +Splice cable +Splice cable +Splice +Splice point fiber cable Not applicable
Fiber Network +Splice point on
11 point on every point on every point on every on every between MTR
Architecture every three floor +
three floor + three floor + three floor + three floor + and Client server
Indoor drop cables
Indoor drop cables Indoor drop cables Indoor drop cables Indoor drop room
cables
4 core SM Indoor
drop Cable – 2 4 core SM
4 core SM 4 core SM Indoor 4 core SM Indoor 4 core SM Indoor
core for du and 2 Indoor drop
Fiber drop cable Outdoor drop 4 core SM Outdoor drop drop Cable – 2 drop Cable – 2 drop Cable – 2 core 4 core SM Outdoor drop Cable
12 core for Etisalat Cable – 2 Not applicable
Cable from Cable from drop enclosure core for du and 2 core for du and 2 for du and 2 core for from drop enclosure
core for du
drop enclosure core for Etisalat core for Etisalat Etisalat
and 2 core
for Etisalat
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE

COMMON MMR ROOM


ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

LIST OF ARCHITECTURAL DRAINGS LIST OF ELECTRICAL DRAWINGS LIST OF MECHANICAL DRAWINGS


S.No. DWG.NO. DRAWING TITLE. SCALE REV. S.No. DWG.NO. DRAWING TITLE. SCALE REV. S.No. DWG.NO. DRAWING TITLE. SCALE REV.

GENERAL ELECTRICAL DRAWINGS MECHANICAL DRAWINGS


01 70031-SCL-GN-A-003 DRAWING LIST N.T.S 03 A1 -- -- 01 70037-SCL-EL-100 SITE PLAN - LIGHTING LAYOUT 1:50 01 A1 -- -- 01 70037-SCL-AC-101 GROUND FLOOR AC LAYOUT 1:50 02 A1 -- --

02 70031-SCL-B00-A-100 SITE PLAN 1 : 100 03 A1 -- -- 02 70037-SCL-EP-100 SITE PLAN - POWER LAYOUT 1:50 01 A1 -- -- 02 70037-SCL-DR-101 GROUND AND ROOF FLOOR DRAINAGE LAYOUT 1:50 02 A1 -- --

03 70037-SCL-CC-100 SITE PLAN - CCTV & ACCESS CONTROL SYSTEM LAYOUT 1:50 01 A1 -- -- 03 70037-SCL-FF-101 GROUND FLOOR FIRE FIGHTING LAYOUT 1:50 02 A1 -- --

EQUIPMENT BUILDING 04 70037-SCL-DA-100 SITE PLAN - DATA CONTAINMENT LAYOUT 1:50 00 A1 -- --

03 70031-SCL-B01-A-101 GROUND FLOOR PLAN & ROOF PLAN 1 : 50 03 A1 -- -- 05 70037-SCL-EL-101 LIGHTING LAYOUT 1:50 01 A1 -- --

04 70031-SCL-B01-A-201 ELEVATIONS & SECTION 1 : 50 03 A1 -- -- 06 70037-SCL-EP-101 POWER LAYOUT 1:50 01 A1 -- --

05 70031-SCL-B01-A-801 DOOR AND WINDOW SCHEDULE 1 : 50 03 A1 -- -- 07 70037-SCL-EP-102 POWER SCHEMATIC DIAGRAM & LOAD SCHEDULE N.T.S 00 A1 -- --

08 70037-SCL-FA-101 FIRE ALARM & EMERGENCY LIGHTING LAYOUT 1:50 01 A1 -- --

BOUNDARY WALL 09 70037-SCL-CC-101 CCTV & ACCESS CONTROL SYSTEM LAYOUT 1:50 01 A1 -- --

06 70031-SCL-B01-A-101 BOUNDARY WALL PLAN 1 : 100 03 A1 -- -- 10 70037-SCL-DA-101 DATA CONTAINMENT LAYOUT AS SHOWN 01 A1 -- --

07 70031-SCL-B01-A-702 BOUNDARY WALL ELEVATIONS AND SECTIONS 1 : 100 03 A1 -- -- 11 70037-SCL-LP-101 EARTHING & LIGHTNING PROTECTION LAYOUT 1:50 01 A1 -- --

TYPICAL DETAILS
04 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
08 70031-SCL-TY-A-901 MISCELLANEOUS DETAILS 03 A1 -- --
03 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
02 07.06.2016 CORRECTED AS PER CLIENT'S COMMENT MA UB
01 28.04.2016 DETAILED DESIGN MA UB
00 14.04.2016 PRELIMINARY DESIGN MA UB
Rev Date Description Rev by Ckd by
Client
LIST OF STRUCTURAL DRAWINGS
01 70037-SCL-S-001 GENERAL NOTES 01 A1 -- --

02 70037-SCL-S-002 STANDARD DETAILS-1 01 A1 -- --

03 70037-SCL-S-003 STANDARD DETAILS-2 01 A1 -- --

EQUIPMENT BUILDING MEP CONSULTANT

04 70037-SCL-S-101 BOUNDARY WALL LAYOUT 01 A1 -- --


SHANKLAND COX
05 70037-SCL-S-102 FOUNDATION LAYOUT AND TIE BEAM LAYOUT 01 A1 -- --
PO Box 80670 PO Box 44936 PO Box 37133
01 AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
06 70037-SCL-S-103 ROOF PLAN A1 -- --
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
ARCHITECTURAL DETAILED DESIGN
Drawing Title

LIST OF DRAWING

Drawn RM Date 14.04.2016


Checked RM Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-GN-A-003 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
10000 ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan
PLOT LIMIT 2000 5500 2500 PLOT LIMIT

PLOT BOUNDARY

GRAVEL

2000
INTERLOCK

RWO

0
:10
:1

GRAVEL
E

PLOT BOUNDARY
P
O
L
S
PROPOSED

5000
MMR

GRAVEL
10000
INTERLOCK +4950 INTERLOCK
SSL.

CANOPY
+0.300 INTERLOCK
3000

+0.200 GRAVEL +0.300


PAVEMENT RAMP
60mm THK.

ROAD LVL. 3400


PLOT LIMIT PLOT LIMIT 04 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
MAIN 03 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
ENTRANCE 02 07.06.2016 CORRECTED AS PER CLIENT'S COMMENT MA UB
01 28.04.2016 DETAILED DESIGN MA UB
00 14.04.2016 PRELIMINARY DESIGN MA UB
Rev Date Description Rev by Ckd by
Client

1 SITE LAYOUT
A-100 SCALE: 1:50

MEP CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
ARCHITECTURAL DETAILED DESIGN
Drawing Title

MMR ROOM

SITE PLAN

GRAVEL MINIMUM SIZE 1-1 1/2 " PAVEMENT 60mm THICK.


Drawn RM Date 14.04.2016
Checked RM Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-A-100 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan
A B C A B C
-- -- -- -- -- --
5500
5300 5300

3850 5500 1450 3850 1450


LEGEND
A A 200MM THK. HOLLOW CONC.
BLOCKWORK
A-201 A-201 A-201 A-201 200MM THK. INSULATED CONC.
BLOCKWORK
200MM THK. REINFORCED
CONCRETE

1 1

200
-- -- SCHEDULE OF FINISHES
RWO WALLS
W1 JOTUN - DURATHENE EPOXY PAINT SNOW WHITE COLOR GLOSSY

200 5100 200 200mm THICK 100 FLOORS


: 1: F1 EPOXY COATING WITH HARDENER

INSULATED BLOCK INSULATED BLOCK P


E +6050
TOP LVL.
3350

3350
3200
+6050 O SKIRTING
TOP LVL. L
S S1 FOSROC - SL 4000 LIGHT GREY

CEILINGS
MMR
5000

4800

5000

4800
A-201 A-201 A-201 ROOF A-201
C1 EPOXY PAINT - DURATHENE 50% LITE- GLOSS FINISH GREY (0115)
+0.750 +4950
SSL.

2 2

100
-- --
D02 +0.750

1300
1450

1450
200 3700 100 1300 200

3 3
200
-- D01 --
4200 +0.750 300
1000

CANOPY CANOPY
A A
A-201 +0.300 A-201

A-201 A-201

RAMP

1 GROUND FLOOR PLAN 2 ROOF PLAN


A-101 SCALE: 1:50 A-101 SCALE: 1:50

04 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB


03 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
02 07.06.2016 CORRECTED AS PER CLIENT'S COMMENT MA UB
01 28.04.2016 DETAILED DESIGN MA UB
00 14.04.2016 PRELIMINARY DESIGN MA UB
Rev Date Description Rev by Ckd by
Client

BRUSHED STAINLESS STEEL


BRACKET FIX TO BEAM
BRUSHED STAINLESS STEEL
THREADED SHOE AS PER MFTR.

BRUSHED STAINLESS STL.TENSION BRUSHED STAINLESS STEEL MEP CONSULTANT


CABLE / ROD CANOPY SUPPORT

BLDG. LINE CLADDING LINE


1000
75 x 75mm GALV. STL.
600

5 x 75 x 75mm GALV.
TENSION CABLE / ROD
BRUSHED STAINLESS
STL. THREADED SHOE
SHANKLAND COX
ANGLE STIFFENER
75 x 75mm GALV. STL. STL. TUBULAR FRAME AS PER MFTR. PO Box 44936
PO Box 80670 PO Box 37133
ANGLE STIFFENER AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
SILICONE SEALANT BRUSHED STAINLESS STL. T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
75 x 75mm GALV. STEEL CHANNEL F +971 2 671 5362
W/ BACK ROD BRACKET FASTEN TO F +971 3 766 0032 F +971 4 338 0133
FIX TO WALL WITH EXPANSION BOLT alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com
75 x 75mm GALV. STEEL 5 x 75 x 75mm GALV. ALUMINUM FRAME
AND FASTEN CANOPY FRAME WITH
EQ EQ EQ EQ STL. TUBULAR FRAME
THREADED BOLT (APPLIES TO OPPOSITE SIDE) CLADDING LINE CHANNEL FIX TO WALL SILICONE SEALANT AT GAP Project
WITH EXPANSION BOLT 75 x 75mm GALV. STL.
5 x 75 x 75mm GALV. AS PER MFTR. ANGLE STIFFENER RIGID FIXING SCREW
STL. TUBULAR FRAME RIGID FIXING SCREW 4mm THK. ALUM.
75 x 75mm GALV. STL. EL. +5.550 SHEET CLADDING
ANGLE STIFFENER ROOF T.O.SS

150
1900

50 x 50mm GALV. STL. 50 x 50mm GALV. STL. CLADDING FASTENER


ANGLE STIFFENER ANGLE STIFFENER AS PER MFTR.
THREADED BOLT TO FASTEN FRAME 5x75x75mm GALV.
1000

SILICONE SEALANT W/ BACK ROD STL. TUBULAR FRAME


BRUSHED STAINLESS STL. BLDG. LINE
TENSION CABLE / ROD 50 x 75mm GALV. STL. 75 x 75mm GALV. STL. DISICIPLINE STATUS
CANOPY SUPPORT CHANNEL SUBFRAME ANGLE STIFFENER ARCHITECTURAL DETAILED DESIGN
1000 600 Drawing Title

1600
4mm THK. ALUM. MMR ROOM
1600 SHEET CLADDING
SL - 4000 FLOOR (INTERNAL) EXTERNAL PAINT LIKE STONE GROUND FLOOR PLAN &
ROOF PLAN
DETAILED PLAN DEATILED SECTION
Drawn MA Date 14.04.2016
Checked RM Scale 1:100
Approved BHATT Job no. 70037
3 CANOPY DETAIL Sheet Size Drawing No. Rev. No.
A-101 SCALE: 1:20

A1 70037-SCL-A-101 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

D01 D02
1200
200 800 200 1200
400 300
2500

2500
1800

200

200
1.5mm THK., 200mm (H) 1.5mm THK., 200mm (H)
STAINLESS STEEL KICK PLATE STAINLESS STEEL KICK PLATE
LOCATION: LOCATION:
MMP ROOM MMP ROOM
DESCRIPTION:
DESCRIPTION: PROVIDE 2 HOUR FIRE RATED SINGLE LEAF
SINGLE LEAF POWDER COATED GALVANIZED POWDER COATED GALVANIZED STEEL DOOR ON
STEEL DOOR (SANDWICH PANEL) POWDER COATED GALVANIZED STEEL FRAME
POWDER COATED GALVANIZED STEEL FRAME

PROVIDE BRUSHED SSTL. MFTR. STANDARD


4 BUTT HINGES PROVIDE BRUSHED SSTL. MFTR. STANDARD
1 OVERHEAD DOOR CLOSER 4 BUTT HINGES
1 MORTISE LOCK SET ANSI F07 WITH LEVER 1 OVERHEAD DOOR CLOSER WITH HOLD
HANDLE BOTH SIDES OPEN DEVICE
1 DOOR STOP 1 MORTISE LOCK SET ANSI F07 WITH LEVER
HANDLE BOTH SIDES AND CARD ACCESS
SADDLE TYPE 1 CONTROL LOCK SET OUTSIDE

SADDLE TYPE 2

(ALL ACCESSORIES TO BE MAT SS FINISH)

SADDLE TYPES
04 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
03 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
02 07.06.2016 CORRECTED AS PER CLIENT'S COMMENT MA UB
01 28.04.2016 DETAILED DESIGN MA UB
TYPE 1 TYPE 2 TYPE 3 00 14.04.2016 PRELIMINARY DESIGN MA UB
Rev Date Description Rev by Ckd by
FIRE & SMOKE SEAL DOORS EXTERNAL DOOR WET AREA DOORS Client

DOOR JAMB DOOR HARDWARE


DOOR JAMB
NOTES:
DOOR 1. UNO ALL EXPOSED PARTS SHALL BE
DOOR
DOOR
30 WHERE BRUSHED STAINLESS STEEL FINISH.
UNDERCUT
FIRE & SMOKE REQUIRED 2. HARDWARE SHALL HAVE THE SAME
SEAL WEATHER FIRE RATING REQUIRED FOR THE DOOR.
FLOOR FIN. FLOOR 20
STRIPPING
13 12

FLOOR FIN
10

OUTDOOR FIN
15 12

FLOOR FIN 3. ALL FIRE DOORS SHALL BE EQUIPPED


SLOPE
12

FLOOR FIN
T.O.SS WITH OVER HEAD DOOR CLOSERS.
METAL SADDLE 175 GROUT GROUT
30 100 WATERPROOFING DOOR CONC SCREED
MEP CONSULTANT
MEMBRANE 30mm THK.
METAL THRESHOLD
WITH DRIP EDGE
WIDTH MARBLE
THRESHOLD
SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
ARCHITECTURAL DETAILED DESIGN
Drawing Title

DOORS SCHEDULE

Drawn MA Date 14.04.2016


Checked RM Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-A-801 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
3 2 1 ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.
- - -
A B C C B A
- - - - - -
100 1450 3350 100 key plan
100 3850 1450 100 CAT LADDER REMOVED 100 1450 3850 100

+6050 +6050 +6050


TOP LVL. TOP LVL. TOP LVL. CAT LADDER REMOVED

200
EXTERNAL FINISHES SCHEDULE
LEGEND:
1100

1100

1100
A A
+4950 +4950 +4950 A JOTUN - DURATHENE PAINT ON CEMENT PLASTER (COLOUR-1)
ROOF SSL. ROOF SSL. ROOF SSL. 15 mm WIDE GROOVE WITH ALUMINUM CHANNEL FIXED BY
B
B B SS SCREW

2600
D01 B
5750

5750
5750
4200

4200

4200
B

2500
+0.750 +0.750 +0.750
GF LEVEL GF LEVEL GF LEVEL

+0.300 +0.300 +0.300


450

450

450

450
PAV. LEVEL PAV. LEVEL PAV. LEVEL

A A A

3 ELEVATION - 1 4 ELEVATION - 2 5 ELEVATION - 3


A-101 SCALE: 1:50 A-101 SCALE: 1:50 A-101 SCALE: 1:50

04 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB


03 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
02 07.06.2016 CORRECTED AS PER CLIENT'S COMMENT MA UB
01 28.04.2016 DETAILED DESIGN MA UB
00 14.04.2016 PRELIMINARY DESIGN MA UB

1 2 3 Rev Date Description Rev by Ckd by


- - - 1 ROOF 3 2 1 Client
TY-A901 DETAIL - - -
100 3350 1450 100

+6050
100 1450 3350 100 DET "R"
TOP LVL. +6050
TOP LVL. PAINTED CONCRETE
400 COPING
T.O.PARAPET
1100

A
1100

1300

+4950
+4950

100
ROOF SSL.
B ROOF SSL.

100

100
WALL FINISH
100 DRIP MOULD
MEP CONSULTANT

B WALL FINISH SHANKLAND COX


5750

5750

PO Box 80670 PO Box 44936 PO Box 37133


PLASTER ABU DHABI, UAE
4200

AL AIN, UAE DUBAI, UAE


4200

STOPPER CONCRETE PARAPET T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
4000

F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133


IN OUT alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

200

+0.750
+0.750
MMP ROOM
GF LEVEL
GF LEVEL
+0.300
450

+0.300
450

PAV. LEVEL
PAV. LEVEL

A
DISICIPLINE STATUS
ARCHITECTURAL DETAILED DESIGN
Drawing Title

ELEVATIONS & SECTION


6 ELEVATION - 4 6 SECTION A-A 7 DETAIL "R"
A-101 SCALE: 1:50 A-101 SCALE: 1:50 A-101 SCALE: AS SHOWN

Drawn MA Date 14.04.2016


Checked RM Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-A-201 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

WALL FINISH 2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER
VARIES DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

SEALANT 3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


200x200x20mm GRAVEL GUARD IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
POLISHED PRECAST THE ENGINEER.
GRAVEL FILL
SEALANT TERRAZZO ROOFING TILES
400x400 MEMBRANE FLASHING WALL FINISH METAL FLASHING 4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
METAL FLASHING
100x20mm PRECAST TERRAZZO SKIRTING TILES
1 ROOFING WATER PROOFING
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
- MEMBRANE OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
WATERPROOF MEMBRANE WATER PROOFING CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
CONCRETE SCREED SEALANT NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
BASE FLASHING FLASHING COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
WATERPROOFING MEMBRANE GRAVEL ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.
SEPARATION SHEET PRECAST CONCRETE METAL STRAINER SURFACING
SCUPPER
50mm THK THERMAL key plan
RIGID INSULATION 200x200x20mm INSULATION
CONCRETE SCREED POLISHED PRECAST
TERRAZZO ROOFING TILES SEALANT
(SLOPE TO DRAIN)

250 PAINTED PRECAST


CONCRETE
350

LIQUID APPLIED
MEMBRANE 50 150 50 T.O.S.S
100

80
130
250

90 30
TOP OF ROOF
MIN

STRUCTURE SLAB
50

DRIP MOULD
DOWN SPOUT
100 150 STEEL DOWEL CONCRETE SCREED
(SLOPE TO SCUPPER)
ELEVATION 1:10 SECTION 1:5
2 ROOF DRAIN DETAIL
1 ROOF DETAIL G-A91 1:5 3 SCUPPER DETAIL
G-A91 1:5 G-A91 AS SHOWN

PAINTED CONCRETE
400
COPING
T.O.PARAPET
100

100
100

WALL FINISH
100 DRIP MOULD

CMU/CONC.
WALL FINISH WALL

PLASTER
STOPPER CONCRETE PARAPET 20
IN OUT

20
04 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
03 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
200 30
02 07.06.2016 CORRECTED AS PER CLIENT'S COMMENT MA UB
PAINTED CEMENT PAINTED FAIR FACE 01 28.04.2016 DETAILED DESIGN MA UB
PLASTER GROOVE
PALSTER CONCRETE 00 14.04.2016 PRELIMINARY DESIGN MA UB
PAINTED BEAD WITH ALUMINUM Rev Date Description Rev by Ckd by
U SHAPE EXTERNAL GROOVE CHANEL Client

4 PARAPET DETAIL 5 PLASTER GROOVE DETAIL 6 FAIR FACE CONC. GROOVE DETAIL
G-A91 1:10 G-A91 1:2 G-A91 1:2

MEP CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
ARCHITECTURAL DETAILED DESIGN
Drawing Title

TYPICAL DETAILS

Drawn RM Date 12.04.2016


Checked RM Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-TY-A-901 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

A-702

10000
200 3267 3067 3267 200

BOUNDARY WALL

100

100
3300

3300
RWO

0
:10
:1
BOUNDARY WALL
E
P
O
L
S
A-702
10000

10000
3200

3200
A-702

04 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB


03 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
CANOPY 02
01
07.06.2016 CORRECTED AS PER CLIENT'S COMMENT
28.04.2016 DETAILED DESIGN
MA
MA
UB
UB
00 14.04.2016 PRELIMINARY DESIGN MA UB
3300

3300
Rev Date Description Rev by Ckd by
Client

RAMP
100

100
200 2125 1825 3700 100 1950 200
MEP CONSULTANT

10000 ROAD LVL. SHANKLAND COX


PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
A-702 F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
1 BOUNDARY WALL PLAN alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com
A-100 SCALE: 1:50

Project

DISICIPLINE STATUS
ARCHITECTURAL DETAILED DESIGN
Drawing Title

BOUNDARY WALL PLAN

Drawn MA Date 14.04.2016


Checked RM Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-BW-A-701 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan
+6050
TOP LVL.
+6050
TOP LVL.

+4950
ROOF SSL.
+4950
ROOF SSL.

75x40MM DIE CAST ALUMINUM


POWDER COATED TUBE

EL. +2.800
T.O.WALL EL. +2.800
T.O.WALL
2500
2800

2500
2800
EL. +0.300
PAV. LEVEL EL. +0.300
300

PAV. LEVEL

300
ROAD LEVEL
HINGED EMBEDDED IN ROAD LEVEL
PLASTER GROOVES
BARBED WIRE IN CONCRETE COLUMN
PLASTER GROOVES BARBED WIRE IN
ROLL FORM DOUBLE SHUTTER MOTORIZED ROLL FORM
EPOXY PAINT ON GATE 25MM SQ. ALUMINUM EPOXY PAINT ON
CEMENT PLASTER TUBE POWDER COATED CEMENT PLASTER

1 ELEVATION - 1 2 ELEVATION - 2
A-701 SCALE: 1:50 A-701 SCALE: 1:50

CEMENT PLASTER

04 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB


03 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT MA UB
02 07.06.2016 CORRECTED AS PER CLIENT'S COMMENT MA UB
01 28.04.2016 DETAILED DESIGN MA UB
00 14.04.2016 PRELIMINARY DESIGN MA UB
Rev Date Description Rev by Ckd by
GALVANIZED STEEL Client
+6050 ANGLE
+6050 250
TOP LVL. TOP LVL.

300
BEAM REF TO STRUC

150
DWG EL. +2.800
+4950 +4950 T.O.WALL

200
ROOF SSL. ROOF SSL.

400
GROOVES IN PLASTER

EPOXY PAINT ON
CEMENT PLASTER

MEP CONSULTANT

EL. +2.800 EL. +2.800


SHANKLAND COX
T.O.WALL T.O.WALL PO Box 44936
PO Box 80670 PO Box 37133

2600
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
200mm THK HOLLOW F +971 2 671 5362
F +971 3 766 0032 F +971 4 338 0133
BLOCK alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com
2500
2500

2800
2800

Project

EL. +0.300 EL. +0.300 GROOVES IN PLASTER


PAV. LEVEL PAV. LEVEL
300
300

FINISH GRADE LEVEL

400
REF TO CIVIL DWGS.
ROAD LEVEL ROAD LEVEL
ROAD LEVEL
PLASTER GROOVES BARBED WIRE IN PLASTER GROOVES BARBED WIRE IN
ROLL FORM ROLL FORM DISICIPLINE STATUS
WATER PROOFING
EPOXY PAINT ON EPOXY PAINT ON
ARCHITECTURAL DETAILED DESIGN
CEMENT PLASTER CEMENT PLASTER
Drawing Title

BOUNDARY WALL
3 ELEVATION - 3 4 ELEVATION - 4 5 TYPICAL SECTION ELEVATIONS & SECTION
A-701 SCALE: 1:50 A-701 SCALE: 1:50 A-702 SCALE: AS SHOWN

Drawn MA Date 14.04.2016


Checked RM Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-BW-A-702 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

03 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT LV UB


02 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT LV UB
01 28.04.2016 DETAILED DESIGN LV UB
00 14.04.2016 FOR APPROVAL LV UB
Rev Date Description Rev by Ckd by
Client

MAIN CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
STRUCTURAL DETAILED DESIGN
Drawing Title

GENERAL NOTES

Drawn TJ Date 12.04.2016


Checked LV Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-S-001 03
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

1 03 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT LV UB


2
02 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT LV UB
01 28.04.2016 DETAILED DESIGN LV UB
00 14.04.2016 FOR APPROVAL LV UB
Rev Date Description Rev by Ckd by
Client

MAIN CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
STRUCTURAL DETAILED DESIGN

SYMMETRICAL COLUMN Drawing Title


INTERNAL COLUMN ASYMMETRICAL SUPPORTED ON WALL
TERMINATION DETAILS COLUMN JUNCTION 3 COLUMN JUNCTION 4 5 COLUMN JUNCTION DETAIL
1 2 STANDARD DETAILS-1
Ta= FULL TENSION ANCHORAGE LENGTH SHOWN WITH STEP GREATER THAN 100mm SHOWN WITH STEP 100mm OR LESS

Drawn TJ Date 12.04.2016


Checked LV Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-S-002 03
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

WALL OPENING GREATER THAN WALL OPENING GREATER THAN


WALL OPENING 150mm AND LESS THAN 450mm SECTION - C SECTION - D
01b SECTION - A 450mm AND LESS THAN 900mm 01f 01g
01a LESS THAN 150 mm 01c 01e

WALL OPENING GREATER


01d SECTION - B 01h THAN 900mm

01 TRIMMING REINFT. FOR OPENING IN WALLS


(NOTE: FOR OPENING GREATER THAN 900mm IN SIZE-REFER REINFORCEMENT DETAIL DRGS.)

02a OPENING LESS THAN 150 mm

OPENING MORE THAN 450mm


02c AND LESS THAN 900 mm

OPENING MORE THAN 150mm 07 TYPICAL DETAIL OF ISOLATION JOINT - IJ 03 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT LV UB
02b AND LESS THAN 450mm 02 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT LV UB
01 28.04.2016 DETAILED DESIGN LV UB
00 14.04.2016 FOR APPROVAL LV UB
Rev Date Description Rev by Ckd by
Client

02 TRIMMING REINFT. FOR OPENING IN SLABS

B
MAIN CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

09a SECTION-A Project

08a DETAIL-B
TYPICAL DETAILS OF PLINTH TYPICAL COVERED ROOF PENETRATION
06 FOR MEP SERVICES
05 ON SOLID SLAB
(UNLESS OTHERWISE INDICATED ON DRGS.)

08 TYPICAL DETAIL OF LONGITUDINAL JOINT - LJ DISICIPLINE STATUS


STRUCTURAL DETAILED DESIGN
Drawing Title

STANDARD DETAILS-2

Drawn TJ Date 12.04.2016


Checked LV Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-S-003 03
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

03 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT LV UB


02 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT LV UB
01 28.04.2016 DETAILED DESIGN LV UB
00 14.04.2016 FOR APPROVAL LV UB
Rev Date Description Rev by Ckd by
Client

2 SECTION - A 3 SECTION - B
S-101 SCALE: 1:25 S-101 SCALE: 1:25
1 BOUNDARY WALL LAYOUT
S-101 SCALE: 1:50

MAIN CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project
4 COLUMN - C1 5 COLUMN - C2
S-101 SCALE: 1:25 S-101 SCALE: 1:25

DISICIPLINE STATUS
STRUCTURAL DETAILED DESIGN
Drawing Title

BOUNDARY WALL LAYOUT

Drawn TJ Date 12.04.2016


Checked LV Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-S-101 03
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
A B C A B C OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
-- -- -- -- -- -- CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
5300 5300 COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.
3850 1450 3850 1450
3 COLUMN - C1 key plan
S-102 SCALE: 1:25

1 1
-- --

+0.750
3350

3350
SSL.
4800

4800
2 2
-- --
1450

1450
3 3
-- --

1 FOUNDATION LAYOUT 2 TIE BEAM LAYOUT 4 SECTION - A


S-102 SCALE: 1:50 S-102 SCALE: 1:50
S-102 SCALE: 1:25

03 25.10.2016 TITLE CHANGE AS PER CLIENT'S COMMENT LV UB


02 24.07.2016 TITLE CHANGE AS PER CLIENT'S COMMENT LV UB
01 28.04.2016 DETAILED DESIGN LV UB
00 14.04.2016 FOR APPROVAL LV UB
Rev Date Description Rev by Ckd by
Client

5 SECTION - B
S-102 SCALE: 1:25

MAIN CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
STRUCTURAL DETAILED DESIGN
6 SECTION - D 5 SECTION - C Drawing Title
S-102 SCALE: 1:25 S-102 SCALE: 1:25
FOUNDATION LAYOUT AND
TIE BEAM LAYOUT

Drawn TJ Date 12.04.2016


Checked LV Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-S-102 03
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

A B C
-- -- --

5300

3850 1450

1
--

+6.050
TOP OF PARAPET

3350
+4.950
SSL.
4800

2
--
1450

3
--

1 ROOF PLAN 03
02
25.10.2016
24.07.2016
TITLE CHANGE AS PER CLIENT'S COMMENT
TITLE CHANGE AS PER CLIENT'S COMMENT
LV
LV
UB
UB
S-103 SCALE: 1:50 2 SECTION - A 01
00
28.04.2016
14.04.2016
DETAILED DESIGN
FOR APPROVAL
LV
LV
UB
UB
S-103 SCALE: 1:25 Rev Date Description Rev by Ckd by
Client

MAIN CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
STRUCTURAL DETAILED DESIGN
Drawing Title

ROOF PLAN

Drawn TJ Date 12.04.2016


Checked LV Scale 1:100
Approved BHATT Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-S-103 03
NOTES
LEGEND 1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


SYMBOLS DESCRIPTION DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


DOME TYPE FIXED CCTV CAMERA IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.
WALL MOUNTED WEATHER PROOF
DOME TYPE CAMERA 4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
CARD READER OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
DOOR CONTACT COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.
MAGNETIC LOCK
key plan
BREAK GLASS

10000

PLOT LIMIT 2000 5500 2500 PLOT LIMIT

PLOT BOUNDARY

GRAVEL

2000
INTERLOCK

RWO

0
:10
:1

GRAVEL
PLOT BOUNDARY E
P
O
L
S
PROPOSED
5000

MMR

GRAVEL
10000

INTERLOCK INTERLOCK

CANOPY 04
03
25.10.2016
24.07.2016
CORRECTED AS PER CLIENTS COMMENTS
CORRECTED AS PER CLIENTS COMMENTS
LM
LM
UB
UB
INTERLOCK 02 06.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
01 28.04.2016 DETAILED DESIGN LM UB
00 14.04.2016 PRELIMINARY DESIGN LM UB
3000

Rev Date Description Rev by Ckd by


Client
GRAVEL
PAVEMENT RAMP
60mm THK.

3400
PLOT LIMIT PLOT LIMIT
MAIN
ENTRANCE

1 SITE LAYOUT - CCTV & ACCESS CONTROL LAYOUT MEP CONSULTANT


A-100 SCALE: 1:50
SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
ELECTRICAL DETAILED DESIGN
Drawing Title

SITE PLAN
CCTV & ACCESS CONTROL SYSTEM LAYOUT

Drawn NS Date 12.04.2016


Checked LM Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-CC-100 04
NOTES
LEGEND 1. NO DIMENSIONS ARE TO BE SCALED.

SYMBOL DESCRIPTION 2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER
DRAWINGS PRIOR TO WORK COMMENCING ON SITE.
13A SINGLE SWITCHED SOCKET OUTLET
3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT
15A SINGLE SWITCHED SOCKET IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
OUTLET FOR FCU THE ENGINEER.

THREE PHASE ISOLATOR 4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
SINGLE PHASE ISOLATOR OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
FLEX OUTLET FOR ACCESS CONTROL PANEL NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.
FLEX OUTLET FOR FACP

FLEX OUTLET FOR CCTV CAMERA key plan

10000

PLOT LIMIT 2000 5500 2500 PLOT LIMIT

PLOT BOUNDARY

GRAVEL

2000
INTERLOCK

RWO

0
:10
:1

GRAVEL
PLOT BOUNDARY E
P
O
L
S
PROPOSED
5000

MMR

GRAVEL
10000

INTERLOCK INTERLOCK

Y7/DB-GF
CANOPY 04
03
25.10.2016
24.07.2016
CORRECTED AS PER CLIENTS COMMENTS
CORRECTED AS PER CLIENTS COMMENTS
LM
LM
UB
UB
INTERLOCK 02 06.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
01 28.04.2016 DETAILED DESIGN LM UB
00 14.04.2016 PRELIMINARY DESIGN LM UB
3000

Rev Date Description Rev by Ckd by


Client
4C x 50mm XLPE/SWA/PVC
1C x 25mm PVC/CU ECCGRAVEL
PAVEMENT
C10/DB-U-GF RAMP
60mm THK.

3400
PLOT LIMIT PLOT LIMIT
MAIN
ENTRANCE

1 SITE LAYOUT - POWER LAYOUT MEP CONSULTANT


A-100 SCALE: 1:50
SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
ELECTRICAL DETAILED DESIGN
Drawing Title

SITE PLAN
POWER LAYOUT

Drawn NS Date 12.04.2016


Checked LM Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-EP-100 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

10000

PLOT LIMIT 2000 5500 2500 PLOT LIMIT

PLOT BOUNDARY

C GRAVEL C
2000

INTERLOCK

RWO

100
: 1:
GRAVEL

E
PLOT BOUNDARY

P
O
L
S
PROPOSED
5000

GRAVEL
10000

INTERLOCK INTERLOCK 04 25.10.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB


03 24.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
02 06.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
01 28.04.2016 DETAILED DESIGN LM UB
00 14.04.2016 PRELIMINARY DESIGN LM UB
Rev Date Description Rev by Ckd by
Client

CANOPY
INTERLOCK
3000

LIGHT FIXTURE MOUNTED ON


GRAVEL 6 METER HIGH POLE (TYP.)
PAVEMENT RAMP MEP CONSULTANT
C 60mm THK. C
SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 2 671 5411
3400 T +971 3 766 9334
F +971 3 766 0032 F +971 2 671 5362
T +971 4 338 0144
F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

PLOT LIMIT PLOT LIMIT


MAIN Project
ENTRANCE

1 SITE PLAN - LIGHTING LAYOUT


- SCALE: 1:50

DISICIPLINE STATUS
ELECTRICAL DETAILED DESIGN
Drawing Title

SITE PLAN
LIGHTING LAYOUT

Drawn NS Date 12.04.2016


Checked LM Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-EL-100 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

10000

PLOT LIMIT 2000 5500 2500 PLOT LIMIT

PLOT BOUNDARY

GRAVEL

2000
INTERLOCK

RWO

100
: 1:

GRAVEL
E
PLOT BOUNDARY
P
O
L
S
PROPOSED
5000

MMR

GRAVEL
10000

INTERLOCK INTERLOCK

04 25.10.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB


03 24.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
02 06.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
01 28.04.2016 DETAILED DESIGN LM UB

Rev Date Description Rev by Ckd by


CANOPY Client
INTERLOCK
3000

GRAVEL
PAVEMENT RAMP
60mm THK.

3400 MEP CONSULTANT

PLOT LIMIT
MAIN
PLOT LIMIT SHANKLAND COX
ENTRANCE
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
1 SITE LAYOUT -DATA CONTAINMENT LAYOUT T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
- SCALE: 1:50 F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
ELECTRICAL DETAILED DESIGN
Drawing Title

SITE PLAN
DATA CONTAINMENT LAYOUT

Drawn NS Date 12.04.2016


Checked LM Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-DA-101 04
NOTES
LEGEND 1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


SYMBOLS DESCRIPTION DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


DOME TYPE FIXED CCTV CAMERA IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.
WALL MOUNTED WEATHER PROOF
DOME TYPE CAMERA 4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
CR CARD READER OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
DC DOOR CONTACT COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.
M MAGNETIC LOCK
key plan
BG BREAK GLASS

A B C A B C
-- -- -- -- -- --

5300 5300

3850 5500 1450 3850 5500 1450

1 1
-- -- ACP
CCTV RACK /
ACCESS CONTROL
SERVER
PANEL
3350

3350
MMR MMR
5000

4800

5000

4800
BG
CR
2 2 M DC
-- --
CR
04 25.10.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
1450

1450
03 24.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
02 06.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
BG 01 28.04.2016 DETAILED DESIGN LM UB
CR 00 14.04.2016 PRELIMINARY DESIGN LM UB
3 3 M DC Rev Date Description Rev by Ckd by
-- --
CR Client

CANOPY CANOPY

RAMP RAMP
1 GROUND FLOOR PLAN CCTV LAYOUT 2 GROUND FLOOR PLAN ACCESS CONTROL LAYOUT
- SCALE: 1:50 - SCALE: 1:50
MEP CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
ELECTRICAL DETAILED DESIGN
Drawing Title

MMR ROOM
CCTV & ACCESS CONTROL SYSTEM LAYOUT

Drawn NS Date 12.04.2016


Checked LM Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-CC-101 04
NOTES

LEGEND 1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


SYMBOL DESCRIPTION DRAWINGS PRIOR TO WORK COMMENCING ON SITE.
FACP FIRE ALARM CONTROL PANEL 3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT
IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
MANUAL PULL STATION DUAL ACTION TYPE THE ENGINEER.

S PHOTO ELECTRIC SMOKE DETECTOR 4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
SOUNDER STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
FIRE RATED DOOR NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
EXIT EMERGENCY EXIT LIGHT - SELF CONTAINED - MAINTAINED ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

IFU INTERFACEING UNIT


SURFACE MOUNTED EMERGENCY LIGHT - key plan
SELF CONTAINED - NON MAINTAINED.
WP WEATHER PROOF
NOTE:
FACP SHOULD BE INTEGRATED TO REMOTE MONITORING NETWORK
THROUGH SNMP FOR FIRE DETECTION, CONTROL OF ALARM INDICATING
DEVICES AND SUPERVISION OF INITIATING AND INDICATING CIRCUITS.
PROVIDE THE REQUIRED COMMUNICATION INTERFACE/ PROTOCOL.

A B C A B C
-- -- -- -- -- --

5300 5300

3850 5500 1450 3850 5500 1450

1 1
-- --
3350

3350
IFU
MMR MMR
5000

4800

5000

4800
2 2
-- --
1450

1450
IFU
3 3
-- --

CANOPY CANOPY

04 25.10.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB


RAMP RAMP 03
02
24.07.2016
06.07.2016
CORRECTED AS PER CLIENTS COMMENTS
CORRECTED AS PER CLIENTS COMMENTS
LM
LM
UB
UB
01 28.04.2016 DETAILED DESIGN LM UB
00 14.04.2016 PRELIMINARY DESIGN LM UB
1 GROUND FLOOR PLAN FIRE ALARM LAYOUT 2 GROUND FLOOR PLAN EMERGENCY LIGHTING LAYOUT Rev Date Description Rev by Ckd by
- SCALE: 1:50 - SCALE: 1:50
Client

NOTE:
S S S IFU IFU 01. THE RISER REPRESENTS A TYPICAL SYSTEM AND IS NOT INTENDED FOR MEP CONSULTANT
INSTALLATION SYSTEM SUPPLIER SHALL PROVIDE INSTALLATION DRAWINGS AND
2Lx2.5sq.mm
FIRE ALARM CABLE
WIRING DIAGRAMS BASED UPON CONTRACT DRAWING.
02. THIS DIAGRAM IS NOT INTENDED TO SHOW EXACT QUANTITIES OF DEVICES. REFER
SHANKLAND COX
TO DRAWINGS FOR DEVICES QUANTITIES AND LOCATIONS.
2Lx1.5sq.mm PO Box 80670 PO Box 44936 PO Box 37133
03. FIRE ALARM CABLE SHALL BE FP200 (2c 1.5 OR 2c 2.5) OR APPROVED EQUIVALENT. AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
FIRE ALARM CABLE
04. ELECTRICAL & MECHANICAL OPENING SHALL BE FILLED WITH FIRE RETARDANT T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
MATERIAL. abudhabi@shanklandcox.com
CIRCUIT-1 CIRCUIT-2 LOOP-2 LOOP-1 alain@shanklandcox.com dubai@shanklandcox.com
05. DURING FIRE CONDITION CCU SHALL BE SWITCHED OFF.
06. EXIT LIGHT SHALL BE MAINTAINED TYPE. Project
AUTO DIALER
07. ISOLATOR MODULES SHALL BE PROVIDED AS PER MANUFACTURER'S INSTRUCTION.
08. LOCATION OF INTERFACING MODULES SHALL BE COORDINATED AT SITE.
09. FIRE ALARM CONTROL PANEL SHALL BE EQUIPPED WITH STANDARD BATTERIE WHICH
WILL POWER THEM FOR 24 HOURS IN QUIESCENT CONDITION AND 15 MIN. IN ALARM
CONDITION.
10. FIRE ALARM SYSTEM SHALL BE INTERFACED WITH THE FOLLOWING EQUIPMENT :
230V 50Hz SUPPLY
HVAC SYSTEM, (CCU,DX UNITS, DAMPERS) ACCESS CONTROL SYSTEM
11. SEE MECHANICAL & ELECTRICAL DRAWINGS FOR LOCATION OF EQUIPMENTS TO BE
FIRE & FAULT SIGNAL TO SNMP
INTERFACED WITH THE FIRE ALARM SYSTEM.
12. ALL CONTROL CABINETS SHALL BE GROUNDED AS PER NEC REQUIREMNTS AND
SPECIFICATIONS.
13. EMERGENCY LIGHT MONITORING PANEL TO BE PROVIDED IF REQUIRED BY DISICIPLINE STATUS
AUTHORITY HAVING JURISDICTION.
ELECTRICAL DETAILED DESIGN
Drawing Title

MMR ROOM
FIRE ALARM & EMERGENCY LIGHTING LAYOUT

Drawn NS Date 12.04.2016


Checked LM Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-FA-101 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

40A TP
ISO
+1c-16mm2 PVC Y/G AS ECC

+1c-10mm2 PVC Y/G AS ECC


1x4c-16mm2 XLPE/SWA/PVC

1x4c-10mm2 XLPE/SWA/PVC
TCL=22.30kW TCL=10.0kW
FUTURE FIRST FUTURE FIRST
FLOOR DB FLOOR CCU SPACE SPACE

R Y B

A A A V S/S

8' Or More deep cu rod earthing in 30x30x30cm


earth pit manhole.
(Earth value not more than 1 )

04 25.10.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB


03 24.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
2x6" PVC DUCTS
02 06.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
01 28.04.2016 DETAILED DESIGN LM UB
00 14.04.2016 PRELIMINARY DESIGN LM UB
Rev Date Description Rev by Ckd by
Client

MEP CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
ELECTRICAL DETAILED DESIGN
Drawing Title

MMR ROOM
POWER SCHEMATIC DIAGRAM &
LOAD SCHEDULE

Drawn NS Date 12.04.2016


Checked LM Scale N.T.S
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-EP-102 04
NOTES
LEGEND 1. NO DIMENSIONS ARE TO BE SCALED.

SYMBOL DESCRIPTION 2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER
DRAWINGS PRIOR TO WORK COMMENCING ON SITE.
13A SINGLE SWITCHED SOCKET OUTLET
3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT
15A SINGLE SWITCHED SOCKET IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
OUTLET FOR FCU THE ENGINEER.

THREE PHASE ISOLATOR 4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
SINGLE PHASE ISOLATOR OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
SPLIT UNIT A/C CONTROL PANEL NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.
FLEX OUTLET FOR ACCESS CONTROL PANEL

FLEX OUTLET FOR FACP key plan

FLEX OUTLET FOR CCTV CAMERA

5500

A B C A B C
-- 5500 -- -- -- -- --

5300 5300

RYB4/DB-GF 3850 1450 3850 1450


C7/DB-U-GF
RYB3/DB-GF

C6/DB-U-GF

1 1
-- ACP
--
CCTV RACK /
SERVER
C5/DB-U-GF RWO
C1/DB-U-GF
0
10
RYB5/DB-GF RYB6/DB-GF : 1:
RYB2/MDB-MMR E
P
3350

3350
R7/DB-GF O Y8/DB-GF
L
S

MMR
5000

4800

5000

4800
ROOF
C11/DB-U-GF
2 2 04 25.10.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
-- --
C8/DB-U-GF 03 24.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
02 06.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
C2/DB-U-GF C3/DB-U-GF 01 28.04.2016 DETAILED DESIGN LM UB
1450

1450
00 14.04.2016 PRELIMINARY DESIGN LM UB
Rev Date Description Rev by Ckd by
Client
3 C4/DB-U-GF 3
-- --

CANOPY
C9/DB-U-GF CANOPY

RAMP RAMP
MEP CONSULTANT
1 GROUND FLOOR PLAN POWER LAYOUT 2 ROOF PLAN POWER LAYOUT
- SCALE: 1:50 - SCALE: 1:50
SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
ELECTRICAL DETAILED DESIGN
Drawing Title

MMR ROOM
POWER LAYOUT

Drawn NS Date 12.04.2016


Checked LM Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-EP-101 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

RZB-Germany 3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


Model No. IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.
451164.009
4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

5500

A B C A B C
-- 5500 -- -- -- -- --

5300 5300

3850 1450 3850 1450

1 1
-- --
RWO

100
: 1:
E
P
3350

3350
O
L
S

MMR
5000

4800

5000

4800
ROOF

2 2
-- --
04 25.10.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
Y1/DB-GF
1450

1450
03 24.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
R1/DB-GF
02 06.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
01 28.04.2016 DETAILED DESIGN LM UB
00 14.04.2016 PRELIMINARY DESIGN LM UB
3 3 Rev Date Description Rev by Ckd by
-- --
Client

CANOPY CANOPY

RAMP RAMP
1 GROUND FLOOR PLAN LIGHTING LAYOUT 2 ROOF PLAN LIGHTING LAYOUT
- SCALE: 1:50 - SCALE: 1:50
MEP CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
ELECTRICAL DETAILED DESIGN
Drawing Title

MMR ROOM
LIGHTING LAYOUT

Drawn NS Date 12.04.2016


Checked LM Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-EL-101 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

A B C
-- -- --

5300

3850 5500 1450


10000

3000 5000 2000


A
-

763 300 300 800 300 300 2338


1

600
--

800
300
1200

600

600
B B
-

-
3350

1200
1000

4800
MMR
5000

4800

900 1200 1000 1200 300

3400
1200

2
--

2200
938
1450

MMP ROOM
900

300
--
-

A
CANOPY

1000
2 SECTION A-A
1 RAMP LAYOUT
GROUND FLOOR PLAN DATA CONTAINMENT - SCALE: 1:50

- SCALE: 1:50

04 25.10.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB


03 24.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
02 06.07.2016 CORRECTED AS PER CLIENTS COMMENTS LM UB
01 28.04.2016 DETAILED DESIGN LM UB
00 14.04.2016 PRELIMINARY DESIGN LM UB
Rev Date Description Rev by Ckd by
Client
10500

3000 5500 2000


600
800

SCREWED
EXPANSION INSERT
600

THREADED SUSPENSION MEP CONSULTANT


ROD SUPPORTS
SHANKLAND COX
1200

HEAVY DUTY CABLE


PO Box 80670 PO Box 44936 PO Box 37133
763 300 300 800 300 300 2337 LADDER
4800

AL AIN, UAE ABU DHABI, UAE DUBAI, UAE


T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
GALVANIZED STEEL abudhabi@shanklandcox.com
4000

alain@shanklandcox.com dubai@shanklandcox.com
SLOTTED 'U' CHANNEL
Project
2200

MMP ROOM 3 CABLE LADDER HANGING DETAIL


- SCALE: N.T.S
300

DISICIPLINE STATUS
ELECTRICAL DETAILED DESIGN
2 SECTION B-B Drawing Title
- SCALE: 1:50

MMR ROOM
DATA CONTAINMENT LAYOUT

Drawn NS Date 12.04.2016


Checked LM Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-DA-101 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

A B C A B C
-- -- -- -- -- --
5500
5300 5300

3850 5500 1450 3850 1450

1 1
-- --
RWO

100
: 1:
E
P
3350

3350
O
L
S

MMR
5000

4800

5000

4800
ROOF

2 2
-- --
1450

1450
04 25.10.2016 CORRECTED AS PER CLIENT'S COMMENT SR UB
03 24.07.2016 CORRECTED AS PER CLIENT'S COMMENT SR UB
02 07.06.2016 CORRECTED AS PER CLIENT'S COMMENT SR UB
3 3 01 28.04.2016 DETAILED DESIGN SR UB
-- -- 00 12.04.2016 PRELIMINARY DESIGN SR UB
Rev Date Description Rev by Ckd by
CANOPY CANOPY Client

RAMP

M GROUND FLOOR AC LAYOUT M ROOF FLOOR AC LAYOUT


01 SCALE : 1:50 02 SCALE : 1:50 MEP CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
MECHANICAL DETAILED DESIGN
Drawing Title

GROUND AND ROOF FLOOR AC LAYOUT

Drawn CLE Date 12.04.2016


Checked SR Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-AC-101 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

A B C
-- -- --

5300

3850 5500 1450

1
--

3350
MMR
5000

4800
2
-- 1450

04 25.10.2016 CORRECTED AS PER CLIENT'S COMMENT SR UB


03 24.07.2016 CORRECTED AS PER CLIENT'S COMMENT SR UB
3 02 07.06.2016 CORRECTED AS PER CLIENT'S COMMENT SR UB
--
01 28.04.2016 DETAILED DESIGN SR UB
00 12.04.2016 PRELIMINARY DESIGN SR UB

CANOP Rev
Client
Date Description Rev by Ckd by

RAMP

M GROUND FLOOR FIRE FIGHTING LAYOUT


01 SCALE : 1:50
MEP CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
MECHANICAL DETAILED DESIGN
Drawing Title

GROUND FLOOR FIRE FIGHTING LAYOUT

Drawn CLE Date 12.04.2016


Checked SR Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-FF-101 04
NOTES

1. NO DIMENSIONS ARE TO BE SCALED.

2. ALL DIMENSION ARE TO BE CHECKED AND CO-RELATED WITH OTHER


DRAWINGS PRIOR TO WORK COMMENCING ON SITE.

3. DRAWINGS TO BE READ IN CONJUNCTION WITH WRITTEN SPECIFICATION, IT


IS THE CONTRACTOR'S RESPONSIBILITY TO BRING THIS TO THE ATTENTION OF
THE ENGINEER.

4. THIS DRAWING AND ALL ITS DESIGNS AND DETAILS WERE CREATED BY THE
ARCHITECTS SHANKLANDCOX ON THE DATE SHOWN BELOW AND (UNLESS
STATED OTHERWISE BY CONSULTANCY AGREEMENT) MAY NOT BE COPIED
OR REPRODUCED IN WHOLE OR PART SAVED WITHOUT PRIOR WRITTEN
CONSENT. FOR THE PURPOSE OF UNITED ARAB EMIRATES FEDERAL LAW
NUMBER 40 FOR 1992 CONCERNING INTELLECTUAL PROPERTY RIGHTS AND
COPY RIGHTS SUCH DRAWINGS, DESIGN AND DETAILS WERE PUBLISHED,
ON THAT DATE, IN THE UNITED ARAB EMIRATES FOR THE FIRST TIME.

key plan

A B C A B C
-- -- -- -- -- --
5500
5300 5300

3850 5500 1450 3850 1450

1 1
-- --
RWO

100
: 1:
E
P
3350

3350
O
L
S

MMR
5000

4800

5000

4800
ROOF

2 2
-- --
1450

1450
04 25.10.2016 CORRECTED AS PER CLIENT'S COMMENT SR UB
03 24.07.2016 CORRECTED AS PER CLIENT'S COMMENT SR UB
02 07.06.2016 CORRECTED AS PER CLIENT'S COMMENT SR UB
3 3 01 28.04.2016 DETAILED DESIGN SR UB
-- -- 00 12.04.2016 PRELIMINARY DESIGN SR UB
Rev Date Description Rev by Ckd by
CANOPY CANOPY Client

RAMP

M GROUND FLOOR AC LAYOUT M ROOF FLOOR AC LAYOUT


01 SCALE : 1:50 02 SCALE : 1:50 MEP CONSULTANT

SHANKLAND COX
PO Box 80670 PO Box 44936 PO Box 37133
AL AIN, UAE ABU DHABI, UAE DUBAI, UAE
T +971 3 766 9334 T +971 2 671 5411 T +971 4 338 0144
F +971 3 766 0032 F +971 2 671 5362 F +971 4 338 0133
alain@shanklandcox.com abudhabi@shanklandcox.com dubai@shanklandcox.com

Project

DISICIPLINE STATUS
MECHANICAL DETAILED DESIGN
Drawing Title

GROUND AND ROOF FLOOR AC LAYOUT

Drawn CLE Date 12.04.2016


Checked SR Scale 1:50
Approved UB Job no. 70037
Sheet Size Drawing No. Rev. No.

A1 70037-SCL-DR-101 04