Professional Documents
Culture Documents
IS REQUIREMENT FIRM / or
BUDGETARY
Fuel-1 Fuel-2
APPLICATION
( SOURCE OF POLLUTION ) BOILER ? BOILER ?
CAPACITY OF BOILER TPH TPH TPH
TYPE OF BOILER Travel Grate or
Fluidized bed type
FUEL USED IN BOILER Fuel-1 Fuel-2
FUEL ANALYSIS %w/w
C
N2
H2
O2
S
Ash
VOLUME OF GAS AT BOILER
OUTLET
in cubic meter/ hour ( am3/hr )
TEMPERATURE OF GAS
in degree. centigrade
ASH ANALYSIS %
SiO2 / CaO / MgO / Al2O3 / …….
PARTICLE SIZEs OF DUST
In microns
DUST LOAD AT BOILER OUTLET
GRAMS / NM3
GAS PRESSURE AT INLET OF ESP
in mm Water Gauge
SITE CONDITIONS : -
Meters.
HEIGHT OF SITE ABOVE MSL
mm
RAINFALL
%
RELATIVE HUMIDITY
Km/hr
WIND VELOCITY
SEISMIC / EARTH QUAKE ZONE
Deg. C
AMBIENT TEMPERATURE
VOLTAGE
V +/- %
Hz +/- %
phase
CONTROL VOLTAGE
V AC
Note :
NM3 = Normal cubic meter of gas / hour @ 0 Deg C and 1 Atm ( a )
AM3 = Actual cubic meter of gas / hour @ actual temperature & actual pressure