NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd
Design Basis Report for Dust Extraction System (Wet) for Coal Crusher House
Indira Gandhi Super Thermal Power Project
Reference: i) GA of Crusher House
SYSTEM DESCRIPTION
Venturi Scrubber type’s wet dust collection system shall be provided at Crusher House for extracting the dust
From Vibrating Screen and Shuttle Conveyors.
The systems shall operate on the principle of dust laden air with water by collision in the Venturi throat
forming a mass of larger particles and separate along in the form of slurry. The mist eliminator is provided
after the Venturi Scrubber for moisture entrainment which allows the fresh air to get escaped through the
Fan and fan exhaust duct. A water seal tank is provided below for proper sealing of the system. The
Centrifugal Fan creates a high suction through the Venturi collects the dusts from dust generation points (in
this case Vibrating Grizzly Feeder and receipt of Shuttle Conveyors) through a duct network. The dust laden
air comes in contact with water in the Venturi and encounter collision while passing through a throat
(reduced area). The pressure drop across the Venturi throat is directly proportional with the cleaning
efficiency.
The slurry is taken into a pit where the dust gets settled at the bottom and clear water over flows under
normal sedimentation process. The clear water is taken into the common pond (Client) through a surface
drainage system.
This particular system shall cover the Crusher House Dust Extraction system at EL+4.000 & EL +21.000
Levels, i.e Shuttle Conveyor and Vibrating Screen respectively. The Conveyor 1A/1B and 2A/2B shall be
covered under Dry Fog system.
The Venturi Scrubber units along with Fans and other accessories shall be located at the ground floor beside
conveyor 2A/2B as shown in the sketch. There will be a provision of twin unit dedicated for individual system. Around
16 m x 16 m is envisaged for the entire units. The duct shall be entered into the building at EL+4.000 level and
ranch out two separate ducts to cover the Shuttle Conveyors as shown in the sketch.
The main duct shall enter into the Floor at EL+15000 Level and run along the roof up to the cutout already
made available as shown. The riser duct will come to next level of EL+21.000 and cater all the Vibrating Screen
as shown in the sketch. By this way the fouling with monorail can be avoided.
The Velocity considered in the main duct as 15 to 21 m/sec and Suction Hood face velocity as 1.5 – 2.0 m/sec.
Necessary dampers shall be provided along with the hood for balancing and isolation purpose.
Fan would be with inlet damper, Flexible connection and necessary drive arrangement. The Fan exhaust
duct shall be up to a suitable height with canopy.
The Venturi would be with designed water quantity with Pipes, Valves and spraying arrangement with suitable nozzles.
The Nozzles shall be located on the ring uniformly in order to generate full water coverage in the throat of the
Venturi. Venturi throat shall have necessary throttling arrangement for creating the required pressure drop across the
Venturi. The system i.e. Fan shall be interlocked with the Conveyor drive. Depending on the loading of the
Conveyor, the control signal shall go to the Fan Motor to start.
__________________________________________________________________________________________________
_

1
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd
EXTRACTION AIR VOLUME CALCULATION

DESIGN BASIS (As per enclosed Material Handling Flow Sheet) :


Equipment Equip. Hood DE – DE – Remarks
Name No. No. 1A/1B 2A/2B
Gas Gas
Volume Volume
(M3/hr.) (M3/hr.)
Vibrating Grizzly VGS-1 H3 12000 Both under
Screen operation
Vibrating Grizzly VGS-2 H4 12000
Screen
Vibrating Grizzly VGS-3 H3‫׳‬ 12000 Both under
Screen operation
Vibrating Grizzly VGS-4 H4‫׳‬ 12000
Screen
Shuttle Conv. SC-1 H7 14500 * Both under
(Receiving End) operation
Shuttle Conv. SC-2 H7’ 14500*
(Receiving End)
Shuttle Conv. SC-3 H8 14500* Both under
(Receiving End) operation
Shuttle Conv. SC-4 H8' 14500*
(Receiving End)
Total 53000 53000
Total Gas Considering
Volume (M3/hr.) ~58300 ~ 58300 10% margin

(* Multiplying factor of 1.5 have been considered)with adjusted enhanced volume

Please note that all equipment vig. C-1A/1B, VGS-1, 2, 3, 4; CR-1, 2, 3, 4; Sc-1, 2, 3, 4; and C-2A &
2B shall be working simultaneously as per operational sequence.

1.1 Inlet Dust load (IDC): 20 gm/m3 (max.) at inlet of scrubber


1.2 Fugitive air temp.: Max. 45 0C / Min. 4 0C

1.3 Scrubber Efficiency: 95% down to 10 microns

1.4 Work Zone dust 2 mg/m3 and or less at 2 m away from suction
level: hood, over ambient dust level, when both material
handling and DE system working

2
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd
Material Handling Equipment vis – s – vis Fugitive Air Hoods
Volume Calculation

H3/H4 Screen Area = 10.3 Sq. m law used Q = 50 cfm/ft2


Exhaust Vol.= 10.3 x 915 screen area
H3‫׳‬/H4‫׳‬ = 9425 m3/hr = 50 x 1.7
~ 9500 m3/hr each 0.305 x 0.305
12000m3/hr* ~ 915 m3/hr

H7 & H8 At receiving end of BF1 & BF3 respectively.


H7‫ & ׳‬H8‫׳‬ Belt width – 1800 – 6’ ft.
Belt speed – 2.8 m/s – 550 FPM
Exhaust Volume ~ 500 x 6 = 3000 CFM
= 5100 m3/hr each. Considering multiplying factor 1.5 for
very dusty & dry material ,Exhaust volume shall be
7650 m3/hr
14500 m3/hr *
*Adjusted enhanced volume
NORMS: Above air volume flow rate calculation have been worked out based on norms &
guide lines of ACGIH, USA, Code. Please refer ANNEXURE-4 for data of materials (coal)
For processing & relevant pages of ACGIH

Extraction Air Volume Calculation

Extraction Air Volume shall be 58,300 m3/hr for one (1) Stream of
operation.

EXTRACTION AIR VOLUME CONSIDERED:


FOR DE - 1 : 58,300 m3/hr. for MHS – C1A/VGS-1&2/SC-1&4
FOR DE – 2 : 58,300 m3/hr. for MHS – C1B/VGS-3&4/SC-2&3

Refer P & I diagram drawing no. - 0000833501 R-4

DUCTWORK:

Duct work have been designed based on 15 to 18 M/sec velocity considering the

extraction air volume flow rate manually operated dampers (MOD) have been provided

for flow adjustment & velocity.

3
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd
WATER SYSTEM :

Air volume flow rate for the system is 58,300 M³/HR with approx. 7% solid contents.

Based on scrubber efficiency of 95% dust elimation up to 10microns water qty. for

recirculation shall be as under:

58,300M³/HR. X 1.2M³/HR/1000M3 = 69.96, say 70.0 m³/HR. of water

circulation.

As we have to limit 3% solid content is recirculation’s water qty., necessary factor of

1.3 have to be considered on 70m³/hr, which is (70x1.3) = 91.0m³/hr., say 90m³/hr.

BLEED WATER QTY :

Bleed water qty. shall be 12% of 90 m³/hr that is , 10.8m³/hr , say 11.0 m³hr.

Evaporation and drift loss shall be approx 3% of 90m³/hr that is 2.7m³/hr say

3.0 m³/hr.

Hence make up water qty. shall be approx (11+3.0)=14.0 m³/hr witch has to be provided

in recalculating water tank.

4
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd
TECHNICAL DATA OF EQUIPMENT

1.0 VENTURY SCRUBBER


1.1 Model MULTISCRUB –C RIECO-CGS Make
Size : 102
Type : Multi-rod deck type ventury
(adjustable)
1.2 Duty Condition :
a) Inlet Air volume flow rate : 58,300 m3/hr
b) Inlet temp. : Max. 45oC
c) Outlet air volume flow rate : 56,500 m3/hr
d) Outlet temp. : Max. 40oC
e) Inlet dust load : 20 gm/m3
f) Particle size distribution : Above 10 micron
g) Scrubber particle separation 95% down to 10 microns
efficiency :

1.3 MOC :
a) Inlet : SS 304 / 5 mm thk.
b) Pipe deck assly Ceramic coated 50 NB Pipes
c) Flooded Elbow : IS: 2062, 5 mm thk.
d) Cyclonic Scrubber : IS: 2062, 5 mm thk.
1.4 Scrubbing liquid (water) qty., 90.0 m3/hr
1.5 Make up liquid 14.0 m3/hr

1.6 Bleed off liquid rate : 11.0 m3/hr


1.7 Pressure drop thru’ Scrubber Max. 180 mm WG
Unit :
1.8 QUANTITY OF SCRUBBER : TWO (2) SETS
(For DE-1& DE-2)

2.0 RECIRCULATION WATER


PUMP
Make M&P
Liquid : Slurry water with coal dust < 500
TDS
Solid : 3 to 7%
Capacity : 100 m3/hr
Total head : 40 MWC (Approx.)
Pump type : Back pullout – Centrifugal
Efficiency : ∼ 72.5%
Motor rating : 22 kW/4 Pole
MOC :
- Casing : C.I.+ 2.5 % Ni
- Impeller : C.I.+ 2.5 % Ni
- Shaft : SS 410
- Bearing : Antifriction Type
QUANTITY OF PUMP : TWO (2) SETS

5
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd

3.0 RECIRCULATION TANK


- Location : Below Scrubber
- Capacity : 10 m3
- MOC : IS: 2062, 6 mm thk.
- Type : Cylindrical with Conical bottom for
Slurry discharge.
QUANTITY: TWO (2) SETS

4.0 ID FAN
Make FLAKT
Duty : To suck clean gas through Scrubber
Location : After Scrubber
Air volume Flow rate : 62000 m3/hr
Total Static pressure : 500 mm WG at 45oC
550 mm WG at 20oC
Location : Outdoor
Total Efficiency : Up to 82%
Operating speed : 965 RPM
Shaft power consumption (at 115 kW (approx.)
operating temp. 45oC) :
Motor rating : 132 kW / 6 Pole
MOC :

- Casing : 5 mm thk. IS : 2062


- Inlet Cone : 5 mm thk. IS : 2062
- Inlet Box : 5 mm thk. IS : 2062
- Impeller Blade : 6 mm thk (Sailma 350)
- Impeller Shroud : 6 mm thk. (Sailma 350)
- Impeller back plate : 8 mm thk. (Sailma 350)
- Shaft : EN 8 / 080M40
- Bearing : SKF – Antifriction
- Painting : HR Aluminium Paint
- Drive Coupling : Flexible
QTY. OF ID FAN : TWO (2) SETS

5.0 HOOD WORK & DUCTWORK

5.1 Hood Work :


Size : As per extraction volume
MOC : IS: 2062, 5 mm thk.
Damper : Provided for flow adjustment
manually

5.2 Duct Work


Size : As per extraction volume
MOC : IS : 2062,
Thickness 6 mm thk
System Isolation Damper : Manual for control as per operational
philosophy.

6
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd
Painting As per NTPC spec.
6.0 PIPE WORK
Size : As per flow rate
MOC : IS : 1239, Carbon Steel, ERW,
Medium
Valves : Gate valves, Non Return valves of CI
construction.

7.0 UTILITIES CONSUMPTION (For DE-1 & DE-2)


Power, KWH : 300 (For operation of 2 DE System)
Make-up water, m3/hr : 28
1.0 Duct size calculations of dust extraction system at crusher house at Aravali.
VOL. TO BE
VOLUME
EXTRACTE
HOOD EXTRACT
SI AREA AS PER NORMS OF ACGIH D AS PER
NO ED IN
CALC (IN
M3/HR
M3/HR)
M3/hr/m2
12000*
1 Screen 2A/2B H3/H4 915 of 10.3 9425
opening
Receipt of shuttle con. M3/hr/m2 5016.6x1.5= 14500*
2 H7/H8 2787 1.8
From crusher & screen belt width 7525
Total volume handled by 53000
1 system 58300
* Adjusted enhanced volume
1.1 I.D. Fan volume : (Considering 10% extra) : 62,000 m³/hr.
Fan pressure : 500 mm WC @ 45oC.
(Refer attached sheet)
1.2 Duct sizing calculation :

Section Volume c/s Area in sq m Dia of Dia of duct


extracted duct in m selected
inm³/hr In mm
Considering Q A=Q/v(pi/4)/3600 =√A D
v=18m/sec
H3/H4 12000 0.235 0.485 485
H7/H8 14500 0.284 0.533 530

Fan outlet duct 62000 1.37 1.17 1170


considering
v=16m/sec
2.0 water piping calculation :
a) Suction of pump, Q/A.V. = 100
(1.5)(3600) ~ 153 mm dia, say 200 mm dia
b) Delivery of pump,Q/V.A. = 100
(2.0)(3600) ~ 132mm dia, say 150 mm dia

Where Q is the flow rate, m³/hr.; A is the area of pipe (in final), M2; V is the fluid velocity inside the
pipe, M/S.

7
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd

ANNEXURE –1

1.0 MATERIAL DATA:

(a) Input material size in MM (Avg) to Vibrating Grizzly Screen (VGS)


(-) 250 mm ( occasionally 1 – 2% up to 400 mm)

(b) Over size material size in mm (Avg) from VGS : (+) 20 mm

(c) Under size / sized material. Size range in mm (Avg) from VGS : (-) 20 mm

(d) Input material size to Crusher in mm (Avg)


(-) 250 mm ( 1 – 2 % up to 400 mm)

(e) Output material size from Crusher in mm (Avg) (-) 20 mm

(f) Moisture Content of coal after Crusher in Vol. %


10% to 12%

(g) Hardness Index of coal : 45 to 55 HGI

2.0 ACGIH GUIDELINES (24th Edition – 2001):

Page 10 – 67 Cl. 10.50.2 Conveyors:

2nd paragraph states “Note that very dry or dusty material may require flow rates
1.5 to 2.0 times these values”.
Multiplying factor of 1.5 have been considered for dry & dusty nature of material factor
i.e. coal.
However, the material transfer above 1.0 M fall, we have considered additional hoods
(H7A, H7A’, H8A, H8A’), as per guidelines of ACGIH (VS-50-20, Pg. 10-70).
NOTE :- Relevant pages of ACGIH photocopy attached.

8
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd

OPERATION AND CONTROL PHILOSOPHY OF DUST EXTRACTION SYSTEM (WET)

Ref docs.: a) Material Handling Flow sheet indicating Hoods


b) P & ID : 0000833501/R-3) sh. 1 of 1

1. MATERIAL HANDLING & DUST EXTRACTION HOODS :

The Coal Handling Package have two (2) Nos. COAL HANDLING CIRCUITS viz. starting with
Conveyor – 1A or 1B and ending with Conveyor – 2A or 2B respectively.
Individual Dust Extraction and Treatment System (DETS) for each Coal Circuit have been
provided, viz. DE-1 and DE-2.
DETS hoods have been provided for Vibrating Grizzly Screen and Shuttle Conveyors, viz. on
equipment VGS-1/2, SC-1/3 and SC-1/3 (disch. end), for DE-1 and similarly for equipment
VGS-3/4, SC-2/4 and SC2/4 (disch. end) for DE-2.
Same concept shall be followed for both the Circuits of Coal Handling Package, starting
through Conveyor – 1A or 1B, with option of VGS – 1 OR 2 / VGS – 3 or 4 operation etc as
well as operation of SC – 1 or 2 / SC – 3 or 4, and C – 2A or C – 2B for proper operational
synchronization.

9
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd

2. DUST EXTRACTION AND TREATMENT SYSTEM (DE-1 / DE-2)

Both Coal Handling Circuits shall work at a time or can work together.

Select the coal handling circuits, starting with Conveyor – 1A or Conveyor – 1B with option of
VGS and downstream conveyors. Start the ID Fan of respective DE system, viz. DE-1 or DE-
2 with inlet damper full open.
Start the Material Handling system, as selected for operation. Start the Recirculating Water
Pump. Check the valve GV-1, GV-3 and GV-4 is open with Bleed on. Also please check that
GV-7, Make up water is on. If level switch signals “LOW” – pump will stop.

Check the differential pressure on DPT, it shall be 180 mm WC approximately. To maintain


the differential pressure of 180 mm WC or as selected, the signal from DPIC shall operate the
electric motor for positional adjustment to keep the differential pressure constant.
Check the Valve GV-6 is open and GV-9 is closed.
Timer control valve (TCV) on slurry water disposal line will operate on TIME MODE, selected
for 30 min. interval and also interlocked with LS.
Check the following :
1. Pressure at Pump delivery line; PI
2. Temp. of dedusting air, TI
3. Limit switch (LS) – LAH/LAL - to PLC
4. Manual Damper (MD) of Fan Inlet and Balancing line is open
5. Vibration Alarm (VAH)
STOPPAGE of DE-1 and/or 2 shall be done by withdrawing the INITIATION signal (through PLC) to
the Material Handling Equipment.
Following sequence shall be followed :
a) ID Fan shall STOP after 5 min. of withdrawal of signal of MHS
b) Recirculating water pump shall stop after 2 min. of ID Fan
c) Timer control valve shall also stop along with pump

10
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd

3. SLURRY DISPOSAL
Slurry, as generated, from the operation of SCRUBBER shall be collected in
3
RECIRCULATION TANK (RT) of approx. 10 m cap. RT have two compartments. One
compartment is for suction of Recirculation Water Pump and the other compartment is for
Slurry Water, which needs to be periodically disposed off through TIMER CONTROL VALVE
(Y-103) on to SETTLING TANK, at ground level.
Function of SETTLING TANK is to give time for settlement of heavy dust of slurry water at
bottom and the water to flow at top.
The water with fine coal particles coalesced shall be drained out, by overflowing, to nearest
surface drain.
The slurry shall be removed from Settling Tank bottom, by scrapping it with shovel, manually,
once in a week,.
The slurry, as collected, shall be dried for reuse or mix with plant ash for further treatment.

11
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd

12
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd

13
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd

Clarification on Water Circulation Rate and Bleed Water quantity (Ref. pf. 4.0 of DBR – Pg. 4 of 15)

1.0 Water Circulation Rate:


Considering the Design Norms, as adopted by RIECO / CGS, approx. 9 GPM per
1000 CFM for dedusting volume flow rate shall be considered form
MULTISCRUB-C Scrubber, for Coal dust application with approx. max. of 7%
Solid contents in Slurry. This NORMS are in-house design norms based on
similar application.

Hence, it translates that 2 M3/Hr Water circulation rate of 1700 M3/Hr circulation
rate of 1700 M3/Hr dedusting volume flow rate need to be considered (MKS
system), which is equal to 1.2 M3/Hr per 1000 M3/Hr dedusting volume flow
rate.

Further to limit the 3% solid content in Recirculation Air qty. (being pumped), a
factor of 1.3 (In-house design norms) to be applied over. 1.2 M3/Hr water
circulation pumping rate, i.e. (1.2 x 1.3) = 1.56 M3/Hr (12 GPM/1000 CFM).

Hence, the minimum Water Circulation rate shall be

58300 x 1.56 = 90.9 say 90 M3/Hr


1000

2.0 Bleed Water Quantity:

Again for similar application, Bleed Water flow rate shall be 12% of Water
Circulation rate i.e., 90 x 0.12 = 10.8 M3/Hr. This NORMS are also In House
Design norms based on similar application.

3.0 Evaporation and Drift loss:

Evaporation and Drift loss, through Multiscrub, shall be considered as 3% based


on Mist Eliminator provided in Separator.

4.0 Make up Water:

Hence, Make Up Water quantity shall be sum of Bleed Water qty. and
Evaporation of Drift loss i.e., (11 + 3 ) = 14.0 M3/Hr.

14
NTPC Drawing no 0330-155-PVM-U-037 Rev 3
Customer: APCPL Contractor : TRF Ltd

BASIS OF CALCUATIONS FOR 3% SOLID CONTENT IN


RECIRCULATING WATER SYSTEM
Exhaust Air Vol. 58300 M3/Hr.
Dust Coal : 20 gm/M3
. . . Dust Qty. : 58300 x 20 = 1166 kg/hr.
1000
. . . Vol. Of dust qty. : 1166 kg/hr
3
600 kg/M
(Bulk density of Coal ~ 600 kg/M3 ) = 1.94 M3/Hr.
Water circulation rate for Spraying : 70 M3/Hr.
Ratio of Dust Load to Water Circulation : 2 : 70
.
. . 2.8%
. . . Bleed Water Qty.
Water flow rate Dust Percentage

1st hr. operation: 70 M3 2 M3 3%

2nd hr. operation: 70 M3 2 M3 3%

Hence, 2 M3 dust have to be removed, to keep to solid ratio limited to 3%. Pinch valve
operation of 5 min. for every 30 minutes. Remove approx. 3M3 slurry of which approx. solid
content is 50% i.e. 1.5 M3 solid is removed for every 30 minutes. Thus for 1 hour of
system, approximately 6M3 slurry with solid content of 3M3 is discharge to settling tank.
Hence, effectively less than 3% in recirculating water is maintained.

Further approximately 12% of pump flow rate is discharged as bleed off tapping approx. 11.0
M3 /Hr from Recirculating Tank, thus keeping the solid content well below 3% ie., 2.65%.
Considering 3% of recirculating water quantity ((90 M3 /Hr.) i.e. 2.7 M3 /Hr. and 11.0 M3
/Hr., make up water quantity of (11 + 2.7) = 13.7 ~ 14 M3 /Hr. Shall be augmented.

15
PRESSURE DROP CALCULATION FOR DE SYSTEM
DE-1 SYSTEM REV.:- 2
Zone Air Qty Dia Velocity St.Run Entry Bends (Deg) Equiv. Equiv. Total Loss Of Run 1VP Hood Damper Static Gov. Remark
(Cm/hr (MM (M/S) (M) (Deg) length length length per Suct Loss Press. Press
) of of (M) M (1.25V (0.25 VP) (WG) (WG)
entry bend P)
H1-D 4000 280 18.04 4.33 1-30° 2-90°,1-30° 2.80 14.72 21.85 1.10 24.04 24.04
H2-D 4000 280 18.04 0.50 0.50 1.10 0.55 0.55 24.04
H3-D 4000 280 18.04 2.96 1-30° 1-90°,1-60° 2.80 9.90 15.66 1.10 17.23 17.23
D-C 12000 485 18.04 8.47 1-30° 1-90°,1-60° 5.40 20.80 34.67 0.70 24.27 19.95 24.93 4.99 54.19 78.23
H7-B 14500 530 18.26 25.41 4-90°,1-60° 64.40 89.81 0.60 53.89 20.42 25.53 5.11 84.52 84.52
H1'-A 4000 280 18.04 5.07 1-30° 2-90°,1-30° 2.80 14.72 22.59 1.10 24.85 24.85
H2'-A 4000 280 18.04 1.10 1.10 1.10 1.21 1.21 24.85
H3'-A 4000 280 18.04 3.70 1-30° 1-90°,1-60° 2.80 9.90 16.40 1.10 18.04 18.04
A-B 12000 485 18.04 6.35 1-30° 1-90°,1-60° 5.40 20.80 32.55 0.70 22.79 19.95 24.93 4.99 52.70 70.74
B-C 26500 720 18.08 8.29 8.29 0.45 3.73 3.73 88.25
H8-E 14500 530 18.26 21.36 3-90°,1-60° 50.40 71.76 0.60 43.06 20.42 25.53 5.11 73.69 73.69 88.25+9.04=97.29
C-E 38500 870 17.99 4.13 1-30° 1-60° 11.00 15.00 30.13 0.30 9.04 9.04 UP TO E PR.DROP
97.29
E-SCRUB 53000 1020 18.02 51.08 3-90°,2-30°,2-45° 147.20 198.28 0.25 49.57 49.57 146.86 97.29+49.57=146.86

SCRUBBER 53000 180 326.86 SYS.+SCRUBBER


SCRUB-FAN 53000 1150 14.17 23.29 2-90° 66.00 89.29 0.15 13.39 13.39 340.25
FAN-STACK 53000 1170 13.69 49.97 1-45° 20.00 69.97 0.15 10.50
FAN (Vpi) 53000 1170 13.69 11.49
FAN STATIC PRESSURE@20°C =SP(O)-SP(I)-VP(I)
=10.50-(-340.25)-11.49
=339.26 mm of wg@20°c