SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Metal Doors and Windows Final Inspection SAIC-M-1051 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Doors Final Inspection

All operable hardware shall operate smoothly and all locking SAES-M-100
A1
mechanisms engage properly. (1997 UBC, Sec. 1003.3.1.8, .9 & .10) Sec. D

All accessories and other components of the assembly shall be present, SAES-M-100
A2
including screens and hardware. (1997 UBC, Sec. 1003.3.1.8, .9 & .10) Sec. D

Drainage holes shall be inspected for blockage and freed of any SAES-M-100
A3
obstruction to allow drainage. (1997 UBC, Sec. 1003.3.1.8, .9 & .10) Sec. D
Extenal frames to blast resistant doors shall be set in grooves on all
SAES-J-801
A4 sides to prevent doors and frames from being blown into the building in
Sec. 8.4.1
the event of explosion.
Manufacturer shall certify that blast resistant doors are designed to SAES-J-801
A5
withstand the design blast loading. Sec. 8.4.3
Blast resistant door shall have door closure and dust proof air stop SAES-J-801
A6
weather strips. Sec. 8.4.2
Door closer shall be selected to provide adequate closing capacity in SAES-J-801
A7
consideration of the building pressurization. Sec. 8.4.2

B Windows Final Inspection

All operable hardware shall operate smoothly and all locking SAES-M-100
B1
mechanisms engage properly. (1997 UBC, Sec. 2401.4.1 & 2401.4.2) Sec. D
All accessories and other components of the assembly shall be present,
SAES-M-100
B2 including screens and hardware.
Sec. D
(1997 UBC, Sec. 2401.4.1 & 2401.4.2)

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-M-100 -- Saudi Aramco Building Code, 29 January 2003

2- 1997 UBC -- Uniform Building Code, 1 January 1997

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Page 1 of 1