Professional Documents
Culture Documents
UWSHChp 16 Training&Operation
UWSHChp 16 Training&Operation
Objectives To ensure diver attendees understand the revised PQS training requirements and are prepared to conduct follow-on training for additional divers at their command. To review the changes made to Underwater Ship Husbandry Manual, Chapter 16, Cofferdams to ensure safe cofferdam application.
What are the steps of this procedure? Appendix D: Patch and Plug Installation Checksheet What are the reasons for each step? Appendix D: Patch and Plug Installation Checksheet What control/coordination is required? Control of watertight boundaries Coordination with Lead repair shop and other support activities
3
Work packages required for single or double valve protection applications (165.2.11).
11
13
14
17
18