Professional Documents
Culture Documents
Welding Cost Estimator Pub
Welding Cost Estimator Pub
Cost Per Foot Description C+L Description $/ft x ft/hr Value $2.4427 Value $55.695
Description Consumables Wire .035 ER70S-6 wire weight Deposition Efficiency (spatter, stubs) $/lb lb/in %
3
Value $2.00 0.000275 98% $0.1000 32.00 0.53 $0.00 $0.01637 $0.00444 $0.02081 $0.2498 Value 12.000 350.000 0.008 5.78 Value $50.00 $0.00 $0.1827 $0.83 2.193 Value
Shielding gas $/ft 3 Shielding gas flow rate CFH ft /hr (CFH) Shielding gas flow rate CFM ft3/min incidentals cost/in (expand if necc) tips, liner etc Wire Cost per inch ((WFS/dep eff)x weight x $/lb)/TS Gas cost per inch Total Cost per inch Total Cost per foot (CFM x $/CF)/TS Wire+Gas+Incidental $/ft Description Travel speed travel speed IPM Wire feed speed WFS wire use per inch traveled Deposition rate Inch/Min Inch/Min lb/in lb/hr Description Labor and overhead (L) Labor + Overhead Post weld operations Labour Cost Per inch Cost per minute Labor + Overhead $/hr $/hr (L+O/60)/(TSxOF) $/min $/ft Description
Wedding Budget
Page 1 of 8
Consumables To Labor
Wedding Budget
Page 2 of 8
Consumables To Labor
Wedding Budget
Page 3 of 8
Description Consumables Wire 316L wire weight Shielding gas Shielding gas flow rate CFH Shielding gas flow rate CFM
3 3
Value $0.00000 0.000000 $0.1000 18.00 0.30 $0.00 $0.00000 $0.00254 $0.00254 $0.0305 Value 11.800 0.000 0.000 0.00 Value $25.00 $0.00 $0.1070 $0.42 1.284 Value
incidentals cost/in (expand if necc) tungsten,etc Wire Cost per inch (WFS x weight)/travel speed x price/lb Gas cost per inch flow rate x travel rate Total Cost per inch Wire+Gas+Incidental Total Cost per foot $/ft Description Travel speed travel speed IPM Wire use inches/inch wire use per inch traveled Deposition rate Inch/Min Inch/inch lb/in lb/hr Description Labor and overhead (L) Labor + Overhead Post weld operations Labour Cost Per inch Cost per minute Labor + Overhead $/hr $/hr (L+O/60)/(TSxOF) $/min $/ft Description Operating Factor
Wedding Budget
Page 4 of 8
33% 33% Value $0.00 $0.11 11.80 0.33 $0.11 1.3145 Value 24.0 150.0 18305 0.0025
Total Cost Consumables Labor + Overhead Travel Speed Operating Factor Total Cost per inch Total Cost Per Foot
cost per inch Cost Per inch Inches per minute Arc on time C+L $/FT Description
V A (VxAx60)/Travel S
Page 5 of 8
100%
Wedding Budget
Page 6 of 8
Distance In
7.25 17.25 23.13 19
minutes
0.60 1.57 1.80 1.80
IN/min
12.083 11.011 12.847 10.556
Distance In
17.75 18 20.25
Minutes
1.47 1.53 1.65
In/min
12.102 11.739 12.273