Status:
FOR INFORMATION
Keyplan:
THIS DRAWING
D A H M S O T O A R
ETT RO
AD
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
2 9 00 CH. 2 0 . 0
BUR D
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
2 8 00 CH. 2 0 . 0
2 7 00 CH. 2 0 . 0
M I L
E S U O H E
120.0m
BURDETT ROAD
CH. 2 0 2 3 00 .0
2 6 00 CH. 2 0 . 0
2 5 00 CH. 2 0 . 0
CH. 2 0 . 0 2 4 00
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
. No D I : RG . M ATCHL NE 1 -0 5 6 0 0 00 0 G N- 0 0 1 1 0 DA- E
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
T U C
C O MM E R CA IL R O A D
T E T O D DS R E
PROPOSED SHAFT
PROPOSED TUNNEL
PLAN
SCALE 1:1000
NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
110.0m
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
FOR CLARITY.
EL EVATI ON
80.0m
70.0m
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
Project Name:
VERTICAL GEOMETRY
4 .8 36 1 4 .9 34 1 4 .8 37 2 4 .3 37 2 4 .9 35 2 4 .4 35 2 4 .4 37 4 4 .9 36 4 4 .5 35 4 4 .0 35 4 4 .7 37 0 4 .5 37 7 4 .3 36 0 4 .8 35 0 4 .6 35 7 4 .4 34 0 4 .0 38 8 4 .1 37 9 4 .6 36 8 4 .4 36 3 4 .1 36 8 4 .2 35 9 4 .7 34 8 4 .5 34 3 4 .0 37 6 4 .5 36 6 4 .1 35 6 4 .6 34 6 4 .9 37 5 4 .0 36 5
2 2 0 2 8
2 2 0 2 9
2 3 0 2 0
2 3 0 2 1
2 3 0 2 2
2 3 0 2 3
2 3 0 2 4
2 3 0 2 5
2 3 0 2 6
2 3 0 2 7
2 3 0 2 8
2 3 0 2 9
2 4 0 2 0
2 4 0 2 1
2 4 0 2 2
2 4 0 2 3
2 4 0 2 4
2 4 0 2 5
2 4 0 2 6
2 4 0 2 7
2 4 0 2 8
2 4 0 2 9
2 5 0 2 0
2 5 0 2 1
2 5 0 2 2
2 5 0 2 3
2 5 0 2 4
2 5 0 2 5
2 5 0 2 6
2 5 0 2 7
2 5 0 2 8
2 5 0 2 9
2 6 0 2 0
2 6 0 2 1
2 6 0 2 2
2 6 0 2 3
2 6 0 2 4
2 6 0 2 5
2 6 0 2 6
2 6 0 2 7
2 6 0 2 8
2 6 0 2 9
2 7 0 2 0
2 7 0 2 1
2 7 0 2 2
2 7 0 2 3
2 7 0 2 4
2 7 0 2 5
2 7 0 2 6
2 7 0 2 7
2 7 0 2 8
2 7 0 2 9
2 8 0 2 0
2 8 0 2 1
2 8 0 2 2
2 8 0 2 3
2 8 0 2 4
2 8 0 2 5
2 8 0 2 6
2 8 0 2 7
2 8 0 2 8
2 8 0 2 9
2 9 0 2 0
2 9 0 2 1
2 9 0 2 2
PROFILE
110-DA-GEN-00000-000515
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
N
Status:
FOR INFORMATION
Keyplan:
N
THIS DRAWING
THOMAS ROAD
H WG O S R E A O D T E T
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
1 0 DA1 GEN- 0 0 - 0 5 7 0 0 00 0 1
120.0m
EL EVATI ON
80.0m
70.0m
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 1526.4m
Project Name:
VERTICAL GEOMETRY
4 .7 29 1 4 .2 29 1 4 .8 27 1 4 .3 28 2 4 .9 26 2 4 .4 26 2 4 .8 29 4 4 .4 28 4 4 .9 27 4 4 .5 26 4 4 .9 29 7 4 .7 28 0 4 .5 28 7 4 .3 27 0 4 .8 26 0 4 .6 26 7 4 .0 30 9 4 .5 29 9 4 .3 29 3 4 .0 29 8 4 .8 28 3 4 .1 28 9 4 .6 27 8 4 .4 27 3 4 .1 27 8 4 .2 26 9 4 .4 29 6 4 .0 28 6 4 .5 27 6 4 .9 28 5 4 .0 27 5
2 9 0 2 1
2 9 0 2 2
2 9 0 2 3
2 9 0 2 4
2 9 0 2 5
2 9 0 2 6
2 9 0 2 7
2 9 0 2 8
2 9 0 2 9
2 0 0 3 0
2 0 0 3 1
2 0 0 3 2
2 0 0 3 3
2 0 0 3 4
2 0 0 3 5
2 0 0 3 6
2 0 0 3 7
2 0 0 3 8
2 0 0 3 9
2 1 0 3 0
2 1 0 3 1
2 1 0 3 2
2 1 0 3 3
2 1 0 3 4
2 1 0 3 5
2 1 0 3 6
2 1 0 3 7
2 1 0 3 8
2 1 0 3 9
2 2 0 3 0
2 2 0 3 1
2 2 0 3 2
2 2 0 3 3
2 2 0 3 4
2 2 0 3 5
2 2 0 3 6
2 2 0 3 7
2 2 0 3 8
2 2 0 3 9
2 3 0 3 0
2 3 0 3 1
2 3 0 3 2
2 3 0 3 3
2 3 0 3 4
2 3 0 3 5
2 3 0 3 6
2 3 0 3 7
2 3 0 3 8
2 3 0 3 9
2 4 0 3 0
2 4 0 3 1
2 4 0 3 2
2 4 0 3 3
2 4 0 3 4
2 4 0 3 5
2 4 0 3 6
2 4 0 3 7
2 4 0 3 8
2 4 0 3 9
2 5 0 3 0
2 5 0 3 1
2 5 0 3 2
2 5 0 3 3
2 5 0 3 4
2 5 0 3 5
PROFILE
110-DA-GEN-00000-000516
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
CH. 2 0 . 0 2 9 00
Y B S N I A T S
D A O R
CH. 3 0 . 0 2 0 00
COTALL STREET
T REE H ST O RT ER N UPP
CH. 3 0 . 0 2 1 00
CH. 3 0 . 0 2 2 00
CH. 3 0 . 0 2 3 00
CH. 3 0 . 0 2 4 00
CH. 3 0 . 0 2 5 00
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
LIMEHOUSE CUT
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
PROPOSED SHAFT
T E T E SR ED IL F M R O B O
PROPOSED TUNNEL
PLAN
SCALE 1:1000
NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
FOR CLARITY.
N
Status:
FOR INFORMATION
Keyplan:
N
THIS DRAWING
OA D
VI OL ET R
D A O R R E T S E WC O T
CH
.0 00 0 2 4 2 .
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
.0 00 4 0 2 1 CH.
1 0 DA1 GEN- 0 0 - 0 5 6 0 0 00 0 1
AC H
AP PR O
ST RE ET
CH. 3 0 . 0 2 6 00
CH. 3 0 . 0 2 7 00
B R S U H WO DC O E L S O
CH. 3 0 . 0 2 8 00
CH. 3 0 . 0 2 9 00
2 0 00 CH. 4 0 . 0
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
. No G. 5 8 1 DR 0 : 0 -0 N IE 0 0 HL - 0 0 TC N 0 MA GE - A 0D 1 1
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
RT HE RN
UAMVAR STREET
ST RE ET
NO
I LL EN D
ER
TU N
NE L
PROPOSED SHAFT
TE VI O
PROPOSED TUNNEL
BL AC KW
AL L
PLAN
SCALE 1:1000 GILLENDER STREET BLACKWALL TUNNEL NORTHERN APPROACH NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
120.0m
VI ET ROAD OL
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
FOR CLARITY.
EL EVATI ON
80.0m
70.0m
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
Project Name:
VERTICAL GEOMETRY
4 .7 20 1 4 .2 20 1 4 .8 18 1 4 .3 18 1 4 .2 21 2 4 .3 19 2 4 .8 20 4 4 .9 18 4 4 .6 21 0 4 .4 21 7 4 .9 20 7 4 .7 19 0 4 .5 19 7 4 .0 19 7 4 .9 21 8 4 .7 21 3 4 .0 21 9 4 .5 20 9 4 .3 20 3 4 .0 20 8 4 .8 19 3 4 .1 19 9 4 .6 18 9 4 .4 18 3 4 .1 18 8 4 .4 20 6 4 .5 18 6 4 .8 21 5 4 .3 21 5 4 .9 19 5 4 .4 19 5
2 5 0 3 5
2 5 0 3 6
2 5 0 3 7
2 5 0 3 8
2 5 0 3 9
2 6 0 3 0
2 6 0 3 1
2 6 0 3 2
2 6 0 3 3
2 6 0 3 4
2 6 0 3 5
2 6 0 3 6
2 6 0 3 7
2 6 0 3 8
2 6 0 3 9
2 7 0 3 0
2 7 0 3 1
2 7 0 3 2
2 7 0 3 3
2 7 0 3 4
2 7 0 3 5
2 7 0 3 6
2 7 0 3 7
2 7 0 3 8
2 7 0 3 9
2 8 0 3 0
2 8 0 3 1
2 8 0 3 2
2 8 0 3 3
2 8 0 3 4
2 8 0 3 5
2 8 0 3 6
2 8 0 3 7
2 8 0 3 8
2 8 0 3 9
2 9 0 3 0
2 9 0 3 1
2 9 0 3 2
2 9 0 3 3
2 9 0 3 4
2 9 0 3 5
2 9 0 3 6
2 9 0 3 7
2 9 0 3 8
2 9 0 3 9
2 0 0 4 0
2 0 0 4 1
2 0 0 4 2
2 0 0 4 3
2 0 0 4 4
2 0 0 4 5
2 0 0 4 6
2 0 0 4 7
2 0 0 4 8
2 0 0 4 9
2 1 0 4 0
2 1 0 4 1
2 1 0 4 2
2 1 0 4 3
2 1 0 4 4
2 1 0 4 5
2 1 0 4 6
2 1 0 4 7
2 1 0 4 8
2 1 0 4 9
PROFILE
110-DA-GEN-00000-000517
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
120.0m
TW EL VETREE CRESCENT
N
L H E C N A N O U T R P L P L A A W N K R C E A H L T B R O N
CH. 4 0 . 0 2 2 00
Status:
FOR INFORMATION
Keyplan:
N
THIS DRAWING
T E E R T S R E D N E L L I
E S U O H E M I L
T U C
E E RL V IE R
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE
CH. 4 0 . 0 2 3 00
CH. 4 0 . 0 2 4 00
CH. 4 0 . 0 2 5 00
NUMBER 100019345
CH. 4 0 . 0 2 7 00 CH. 4 0 . 0 2 8 00
CH. 4 0 . 0 2 6 00
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
TW TR E LV E S E E
SCALE 1:1000 GILLENDER STREET LU DISTRICT / HAMMERSMITH & CITY RAILWAY
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
C R C S E
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
PLAN
N E T
EXISTING GROUND LEVEL
PROPOSED SHAFT
PROPOSED TUNNEL
NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG
THE TUNNEL.
EL EVATI ON
80.0m
70.0m
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 610.4m
Project Name:
VERTICAL GEOMETRY
4 .1 13 1 4 .7 11 1 4 .2 11 1 4 .6 13 2 4 .2 12 2 4 .3 10 2 4 .7 13 4 4 .2 13 4 4 .8 11 4 4 .8 13 7 4 .6 12 0 4 .1 12 0 4 .9 11 7 4 .7 10 0 4 .5 10 7 4 .4 13 9 4 .9 12 8 4 .7 12 3 4 .4 12 8 4 .5 11 9 4 .3 11 3 4 .0 11 8 4 .8 10 3 4 .1 10 9 4 .3 13 6 4 .8 12 6 4 .4 11 6 4 .3 12 5 4 .9 10 5 4 .4 10 5
2 1 0 4 9
2 2 0 4 0
2 2 0 4 1
2 2 0 4 2
2 2 0 4 3
2 2 0 4 4
2 2 0 4 5
2 2 0 4 6
2 2 0 4 7
2 2 0 4 8
2 2 0 4 9
2 3 0 4 0
2 3 0 4 1
2 3 0 4 2
2 3 0 4 3
2 3 0 4 4
2 3 0 4 5
2 3 0 4 6
2 3 0 4 7
2 3 0 4 8
2 3 0 4 9
2 4 0 4 0
2 4 0 4 1
2 4 0 4 2
2 4 0 4 3
2 4 0 4 4
2 4 0 4 5
2 4 0 4 6
2 4 0 4 7
2 4 0 4 8
2 4 0 4 9
2 5 0 4 0
2 5 0 4 1
2 5 0 4 2
2 5 0 4 3
2 5 0 4 4
2 5 0 4 5
2 5 0 4 6
2 5 0 4 7
2 5 0 4 8
2 5 0 4 9
2 6 0 4 0
2 6 0 4 1
2 6 0 4 2
2 6 0 4 3
2 6 0 4 4
2 6 0 4 5
2 6 0 4 6
2 6 0 4 7
2 6 0 4 8
2 6 0 4 9
2 7 0 4 0
2 7 0 4 1
2 7 0 4 2
2 7 0 4 3
2 7 0 4 4
2 7 0 4 5
2 7 0 4 6
2 7 0 4 7
2 7 0 4 8
2 7 0 4 9
2 8 0 4 0
2 8 0 4 1
2 8 0 4 2
2 8 0 4 3
PROFILE
110-DA-GEN-00000-000518
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
C H A N N E L S E A
R I V E R
HORIZONTAL GEOMETRY KEY:
L= R = LENGTH RADIUS OF CURVATURE
120.0m ABBEY MILLS PUMPING STATION SHAFT 110.0m PRESCOTT CHANNEL MEAN HIGH WATER SPRINGS
EL EVATI ON
80.0m
70.0m
40.0m M ATCHL NE I
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 155.2m L 55.0m
Project Name:
VERTICAL GEOMETRY
4 .1 04 1 4 .1 05 2 4 .6 04 2 4 .7 04 4 4 .2 04 4 4 .5 05 0 4 .0 05 0 4 .8 04 7 4 .6 05 3 4 .3 05 8 4 .4 04 9 4 .9 03 8 4 .7 05 6 4 .3 04 6 4 .2 05 5
2 8 0 4 3
2 8 0 4 4
2 8 0 4 5
2 8 0 4 6
2 8 0 4 7
2 8 0 4 8
2 8 0 4 9
2 9 0 4 0
2 9 0 4 1
2 9 0 4 2
2 9 0 4 3
2 9 0 4 4
2 9 0 4 5
2 9 0 4 6
2 9 0 4 7
2 9 0 4 8
2 9 0 4 9
2 0 0 5 0
2 0 0 5 1
2 0 0 5 2
2 0 0 5 3
2 0 0 5 4
2 0 0 5 5
2 0 0 5 6
2 0 0 5 7
2 0 0 5 8
2 0 0 5 9
2 1 0 5 0
2 1 0 5 1
2 1 0 5 2
2 1 0 5 3
2 1 0 5 4
PROFILE
110-DA-GEN-00000-000519
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
5 9 . . 1 1 4 4 1 5 2 . H C C
0 0 . 0 0 1 5 2 . H C
Status:
FOR INFORMATION
Keyplan:
N
O C S E R P
T T
L E N N A H C
THIS DRAWING
ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
0 .0 2 9 00 CH. 4
CH. 4 0 . 0 2 8 00
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
PROPOSED SHAFT
PROPOSED TUNNEL
PLAN
SCALE 1:1000 SHAFT F - LEE TUNNEL PROJECT BUILT BY OTHERS NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.