Status:
FOR INFORMATION
Keyplan:
N
E L M Y NR A O D
THIS DRAWING
A R P L E
2 00 CH. 0 . 0
AD
A Y
CH. 0 . 0 3 00
RO
CH. 0 . 0 4 00
AM
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
CH. 6 00 0 .0
CH. 0 . 0 5 00
CA NH
M ATC HL N I E: 1 0D 1 - A DRG - EN G -0 0 . o 0 0 0 N . -0 4 0 0 8 1
A D
A D
D A O DR N E N E E R G
FI E LD
TH
S O
E LL O
.0 00 CH.
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION
O O D S T O C K
R O A D
A IG BN E RR A O D
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
PROPOSED SHAFT
PROPOSED TUNNEL
120.0m NOTES: EXISTING GROUND LEVEL 110.0m ACTON STORM TANKS DROP SHAFT 100.0m
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
90.0m
AD Y RO RUG B
PLAN
SCALE 1:1000
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
EL EVATI ON
80.0m
70.0m
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
50.0m
40.0m M ATCHL NE I
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 141.7m R 600.0m L 121.6m L 270.7m R 600.0m L 74.9m
Project Name:
THAMES TUNNEL
Purpose:
HORIZONTAL GEOMETRY
VERTICAL GEOMETRY
7 .0 49 1 7 .7 47 1 7 .1 46 1 7 .7 48 2 7 .4 47 2 7 .8 45 2 7 .1 48 4 7 .8 46 4 7 .3 49 0 7 .8 48 7 7 .0 48 0 7 .2 47 7 7 .4 46 0 7 .9 45 7 7 .5 49 9 7 .5 48 8 7 .4 48 3 7 .2 48 9 7 .1 47 3 7 .9 46 8 7 .6 46 9 7 .6 45 8 7 .5 45 3 7 .1 49 6 7 .5 47 6 7 .2 46 6 7 .4 49 5 7 .8 47 5 7 .5 46 5
PROPOSED INVERT
-0 2 -0 1
1 0 0
1 0 1
1 0 2
1 0 3
1 0 4
1 0 5
1 0 6
1 0 7
1 0 8
1 0 9
2 0 0
2 0 1
2 0 2
2 0 3
2 0 4
2 0 5
2 0 6
2 0 7
2 0 8
2 0 9
3 0 0
3 0 1
3 0 2
3 0 3
3 0 4
3 0 5
3 0 6
3 0 7
3 0 8
3 0 9
4 0 0
4 0 1
4 0 2
4 0 3
4 0 4
4 0 5
4 0 6
4 0 7
4 0 8
4 0 9
5 0 0
5 0 1
5 0 2
5 0 3
5 0 4
5 0 5
5 0 6
5 0 7
5 0 8
5 0 9
6 0 0
6 0 1
1 0
2 0
3 0
4 0
5 0
6 0
7 0
8 0
9 0
CHAINAGE
6 0 2
PROFILE
110-DA-GEN-00000-000480
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
Status:
FOR INFORMATION
R E S A D N R B N P E E DG
Keyplan:
THIS DRAWING
O D NR A M Y E L
CH. 0 0 0 1 0 .0
.0 9 00 CH. 0
CH. 1 0 1 0 .0 0
CH. 2 0 1 0 .0 0
0 .0 8 00 CH.
Y DWA LTA WE S E
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
0 .0 7 00 CH.
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE
R V N M A E S E EWA D Y
AD
RO
ER S
FL AN D
CHI W I S CK HI H G RO AD
120.0m
BATH ROAD
0 .0 6 00 CH.
THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
D A AN B R U H O G IS O O G R
CE LV EA LN DA V N E U E
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
BATH RO AD
110.0m
100.0m
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
O D RR A BN E A IG
PROPOSED SHAFT
PROPOSED TUNNEL
PLAN
SCALE 1:1000
NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
EL EVATI ON
80.0m
70.0m
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 282.2m R 600.0m L 144.1m
Project Name:
THAMES TUNNEL
Purpose:
HORIZONTAL GEOMETRY
VERTICAL GEOMETRY
7 .6 40 1 7 .0 39 1 7 .7 37 1 7 .3 40 2 7 .7 38 2 7 .4 37 2 7 .7 39 4 7 .1 38 4 7 .8 36 4 7 .9 40 0 7 .1 40 7 7 .3 39 0 7 .8 38 7 7 .0 38 0 7 .2 37 7 7 .4 36 0 7 .0 40 3 7 .8 39 8 7 .5 39 9 7 .5 38 8 7 .4 38 3 7 .2 38 9 7 .1 37 3 7 .9 36 8 7 .6 36 9 7 .4 40 6 7 .1 39 6 7 .5 37 6 7 .7 40 5 7 .4 39 5 7 .8 37 5 7 .5 36 5
1 0 0 0
1 1 0 0
1 2 0 0
1 3 0 0
1 4 0 0
1 5 0 0
1 6 0 0
1 7 0 0
1 8 0 0
1 9 0 0
1 0 1 0
1 1 1 0
1 2 1 0
1 3 1 0
1 4 1 0
1 5 1 0
1 6 1 0
1 7 1 0
1 8 1 0
1 9 1 0
1 0 2 0
1 1 2 0
1 2 2 0
1 3 2 0
1 4 2 0
6 0 0
6 0 1
6 0 2
6 0 3
6 0 4
6 0 5
6 0 6
6 0 7
6 0 8
6 0 9
7 0 0
7 0 1
7 0 2
7 0 3
7 0 4
7 0 5
7 0 6
7 0 7
7 0 8
7 0 9
8 0 0
8 0 1
8 0 2
8 0 3
8 0 4
8 0 5
8 0 6
8 0 7
8 0 8
8 0 9
9 0 0
9 0 1
9 0 2
9 0 3
9 0 4
9 0 5
9 0 6
9 0 7
9 0 8
9 0 9
PROFILE
110-DA-GEN-00000-000481
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
Status:
FOR INFORMATION
Keyplan:
N
. No 3 4 G. 0 8 DR - 0 0 : 0 NE 0 0 0 I 0 HL TC G EN M A AD 0 1 1
B R I T I S H
THIS DRAWING
GR OV E
GREAT W EST ROAD
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE
CH
E Y O TG A R D E N S
NUMBER 100019345
CH. 1 0 3 0 .0 0
00 0. 90 .1
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
MA 1 0 TCHL 1 I N DAD G EN E: RG . o -0 0 0 N . 0 00 0 4 0 8 1
C H. 1 0 4 0 .0 0
AD
N T E H E A R V O NR O D A
CH .0 00 1 0 . 8
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
CH. 1 0 5 0 .0 0
HR O
0 00 1 0 . CH. 7
CH. 6 0 0 1 0 .0
IW S IK C
HI G
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
CH
L CK M AL SW I CHI
PROPOSED SHAFT
BEV ERL EY R O AD
AR IE D AE L A V E N U E
MILLERS COURT
N T E H E A R V O NR O D A
PROPOSED TUNNEL
PLAN
SCALE 1:1000 CHI SW I CK M AL L GREAT W EST ROAD
CHI SW I CK HI GH ROAD
120.0m
NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
110.0m
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG
100.0m
THE TUNNEL.
EL EVATI ON
80.0m
70.0m
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 432.8m
Project Name:
VERTICAL GEOMETRY
7 .6 30 1 7 .0 29 1 7 .7 27 1 7 .6 31 2 7 .3 30 2 7 .7 28 2 7 .4 27 2 7 .0 31 4 7 .7 29 4 7 .1 28 4 7 .9 30 0 7 .1 30 7 7 .3 29 0 7 .8 28 7 7 .0 28 0 7 .2 27 7 7 .4 31 8 7 .3 31 3 7 .1 31 9 7 .0 30 3 7 .8 29 8 7 .5 29 9 7 .5 28 8 7 .4 28 3 7 .2 28 9 7 .4 30 6 7 .1 29 6 7 .5 27 6 7 .7 30 5 7 .4 29 5 7 .8 27 5
1 4 2 0
1 5 2 0
1 6 2 0
1 7 2 0
1 8 2 0
1 9 2 0
1 0 3 0
1 1 3 0
1 2 3 0
1 3 3 0
1 4 3 0
1 5 3 0
1 6 3 0
1 7 3 0
1 8 3 0
1 9 3 0
1 0 4 0
1 1 4 0
1 2 4 0
1 3 4 0
1 4 4 0
1 5 4 0
1 6 4 0
1 7 4 0
1 8 4 0
1 9 4 0
1 0 5 0
1 1 5 0
1 2 5 0
1 3 5 0
1 4 5 0
1 5 5 0
1 6 5 0
1 7 5 0
1 8 5 0
1 9 5 0
1 0 6 0
1 1 6 0
1 2 6 0
1 3 6 0
1 4 6 0
1 5 6 0
1 6 6 0
1 7 6 0
1 8 6 0
1 9 6 0
1 0 7 0
1 1 7 0
1 2 7 0
1 3 7 0
1 4 7 0
1 5 7 0
1 6 7 0
1 7 7 0
1 8 7 0
1 9 7 0
1 0 8 0
1 1 8 0
1 2 8 0
1 3 8 0
1 4 8 0
1 5 8 0
1 6 8 0
1 7 8 0
1 8 8 0
PROFILE
110-DA-GEN-00000-000482
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
N
Status:
FOR INFORMATION
Keyplan:
N
M 1 1 ATC 0 DA HL N GE I E N- : D 0 0 RG . 0 0 0- No 0 . 0 0 4 8 2
THIS DRAWING
SCHOOL
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
PLAYING FIELDS
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
IG RN N O TR AE O M C M SW D E R H M H O T A S F N IG OA T S XS E T E I A N B R I AN M
0 .0 4 0 2 0 CH.
C H. 1 9 0 00 .0
CH. 2 0 0 0 .0 0
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
0 .0 3 0 2 0 CH.
KEY:
0 2 0 .0 CH. 2 0
AD S RO L HI DA ST.
CH. 1 0 0 2 0 .0
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
PROPOSED SHAFT
A O D NR L A I I L L
PROPOSED TUNNEL
PLAYING FIELDS
A O D MR T A N H L G E
PLAN
SCALE 1:1000
120.0m NOTES: EXISTING GROUND LEVEL 110.0m MEAN HIGH WATER SPRINGS
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG 1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
100.0m
THE TUNNEL.
90.0m
BED OF RIVER
EL EVATI ON
80.0m
60.0m
10 m
100 m
50.0m
40.0m M ATCHL NE I
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 338.9m
Project Name:
VERTICAL GEOMETRY
7 .9 21 1 7 .6 20 1 7 .0 19 1 7 .6 21 2 7 .3 20 2 7 .7 18 2 7 .0 21 4 7 .7 19 4 7 .1 18 4 7 .2 22 0 7 .7 21 7 7 .9 20 0 7 .1 20 7 7 .3 19 0 7 .8 18 7 7 .4 21 8 7 .3 21 3 7 .1 21 9 7 .0 20 3 7 .8 19 8 7 .5 19 9 7 .5 18 8 7 .4 18 3 7 .2 18 9 7 .0 22 6 7 .4 20 6 7 .1 19 6 7 .3 22 5 7 .7 20 5 7 .4 19 5
1 8 8 0
1 9 8 0
1 0 9 0
1 1 9 0
1 2 9 0
1 3 9 0
1 4 9 0
1 5 9 0
1 6 9 0
1 7 9 0
1 8 9 0
1 9 9 0
2 0 0 0
2 1 0 0
2 2 0 0
2 3 0 0
2 4 0 0
2 5 0 0
2 6 0 0
2 7 0 0
2 8 0 0
2 9 0 0
2 0 1 0
2 1 1 0
2 2 1 0
2 3 1 0
2 4 1 0
2 5 1 0
2 6 1 0
2 7 1 0
2 8 1 0
2 9 1 0
2 0 2 0
2 1 2 0
2 2 2 0
2 3 2 0
2 4 2 0
2 5 2 0
2 6 2 0
2 7 2 0
2 8 2 0
2 9 2 0
2 0 3 0
2 1 3 0
2 2 3 0
2 3 3 0
2 4 3 0
2 5 3 0
2 6 3 0
2 7 3 0
2 8 3 0
2 9 3 0
2 0 4 0
2 1 4 0
2 2 4 0
2 3 4 0
2 4 4 0
2 5 4 0
2 6 4 0
2 7 4 0
2 8 4 0
2 9 4 0
2 0 5 0
2 1 5 0
2 2 5 0
PROFILE
110-DA-GEN-00000-000483
1:2000@ A3 1:1000@ A1
5 0
1 0 0
30.0m
1 0 5
2 0 m 0 m
N
Status:
HAMMERSMITH BRIDGE
Keyplan:
FOR INFORMATION
N
2 0 .0 CH. 8 0 0
THIS DRAWING
CH. 2 0 . 9 00 0
0 .0 7 0 2 0 CH.
. 0 3 0 00 .0
CH .0 00 0 6 2 .
R I V E R V I E W
ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
G A R D E N S
FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
C H. 31 00 . 00
11 M A 0- TC D A- HL I G EN NE - :D 00 R 00 G 0- .N 00 o. 04 85
RI VERVI EW GARDENS
CASTEL NAU
EL EVATI ON
80.0m
60.0m
10 m
100 m
50.0m
40.0m M ATCHL NE I
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
R 600.0m L 917.4m
Project Name:
THAMES TUNNEL
Purpose:
HORIZONTAL GEOMETRY
VERTICAL GEOMETRY
7 .9 11 1 7 .6 10 1 7 .0 09 1 7 .2 13 2 7 .6 11 2 7 .3 10 2 7 .6 12 4 7 .0 11 4 7 .7 09 4 7 .0 13 7 7 .2 12 0 7 .7 11 7 7 .9 10 0 7 .1 10 7 7 .3 09 0 7 .8 08 7 7 .9 12 3 7 .7 12 8 7 .4 12 9 7 .4 11 8 7 .3 11 3 7 .1 11 9 7 .0 10 3 7 .8 09 8 7 .5 09 9 7 .0 12 6 7 .4 10 6 7 .1 09 6 7 .3 12 5 7 .7 10 5 7 .4 09 5
2 1 5 0
2 2 5 0
2 3 5 0
2 4 5 0
2 5 5 0
2 6 5 0
2 7 5 0
2 8 5 0
2 9 5 0
2 0 6 0
2 1 6 0
2 2 6 0
2 3 6 0
2 4 6 0
2 5 6 0
2 6 6 0
2 7 6 0
2 8 6 0
2 9 6 0
2 0 7 0
2 1 7 0
2 2 7 0
2 3 7 0
2 4 7 0
2 5 7 0
2 6 7 0
2 7 7 0
2 8 7 0
2 9 7 0
2 0 8 0
2 1 8 0
2 2 8 0
2 3 8 0
2 4 8 0
2 5 8 0
2 6 8 0
2 7 8 0
2 8 8 0
2 9 8 0
2 0 9 0
2 1 9 0
2 2 9 0
2 3 9 0
2 4 9 0
2 5 9 0
2 6 9 0
2 7 9 0
2 8 9 0
2 9 9 0
3 0 0 0
3 1 0 0
3 2 0 0
3 3 0 0
3 4 0 0
3 5 0 0
3 6 0 0
3 7 0 0
3 8 0 0
3 9 0 0
3 0 1 0
3 1 1 0
3 2 1 0
3 3 1 0
3 4 1 0
3 5 1 0
PROFILE
110-DA-GEN-00000-000484
1:2000@ A3 1:1000@ A1
5 0
1 0 0
30.0m
1 0 5
2 0 m 0 m
CH .0 00 0 5 2 .
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
. No 3 G. 0 8 4 DR - 0 : 0 N 0 IE 0 0 HL - 0 0 N TC G M A A- E 0D 1 1
KEY:
C
C L A V E R I N G
H .3 2 00 . 00
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
D A O R M A H T N E L G
A V E N U E
PROPOSED SHAFT
PROPOSED TUNNEL
A R U N D E L T E R R A C E
PLAN
SCALE 1:1000
NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.