Professional Documents
Culture Documents
1 :
SUMMARY SCOPE OF WORK
(SOW)
SCOPE OF WORK
DISCIPLINE
Structure
TKP-A
1 Deck Strengthening at Cellar & Sea Deck
2 Removal of existing beams, bracing, handrails & gratings (CD)
3
Deck Extension - Panel 1, 2 & 3 c/w diagonal bracing, tubular supports, loose beams, gratings, handrails and
pipe coaming
4 Deck Extension - Panel 4 & 5 c/w diagonal bracing, tubular supports, gratings, and handrails
5 Sump Pump Deck Extension c/w tubular supports, gratings & handrails.
6 ABV Service Platform c/w tubular supports, ladder, gratings & handrails.
7 Drip pan (under Panel 1 & 2)
8 Removal of existing SDV Service Platform
Mechanical
Crude Launcher (L-1350), N2 Bank (A-5910), Chemical Transfer Pumps Skid (A-6811), Eyewash & Safety Shower
Station, Sump Pump Skid (A-6511), Sump Tank Skid (A-6500).
2 Chemical Injection Skids, A-6810A/B (CI,BI & SI) c/w injection DBB valves (SP-13505 / 13506 / 13507)
3 H2S Analyzer Skid (XA-1350) c/w sampling (SP-13508) & return line DBB valves (SP-13509)
4
Corrosion Coupon (SP-13504), Scale Corrosion Coupon (SP-13503), Bioprobe (SP-13502) & Sampling DBB Valve
(SP-13501)
5 Removal of existing Crude Launcher (L-008), CI Skid (AQ-4010), Biocide Storage Tank (T-6810), CI Storage Tank
(T-6820), Sump Pump (P-700)
Piping
1 Process, blowdown, vents & drains line for L-1350 c/w valves, bolting sets and pipe supports.
2 Process, vent, drains & chemical lines of A-6810A/B and A-6811c/w valves, bolting sets and pipe supports.
3 Vent & drain line of XA-1350 c/w bolting sets
4 Process, vent & drains lines of A-6510/65611 c/w valves, bolting sets and pipe supports.
5 Mechanical Installation of MOV-13504/13505 & ABV-1350
6 Removal of process, vents, & drains lines of L-008 & P-700
7 Removal of drains, vent & chemical line of AQ-4010/T-6810/T-6820
Instrument
Electrical
Power Cable (P-1000-K) run from existing LV Switchboard (TKQ-A/TKK-A bridge) to new DB-100 (TKK-A/TKP-A
bridge)
Cable run, glanding & termination at MOV-13504, MOV-13505, LCP-6810 & chemical injection pumps, H2S
Analyzer (XA-1350), LCP-6510, water cut meter and sump pump
Commissioning
and
Grounding (Earth Boss) for L-1350, A-5910, A-6810, MOV-13504/13505, XA-1350, A-6500, A-6511, cage ladder of
ABV service platform
Decommissioning 3 Commissioning of Sump Pump Tank, A-6500 & Sump Pump Skid, A-6511
4 Commissioning of Eyewash & Safety Shower Station
5 Commissioning of new lightings (floodlight, pole mounted fluorescent light & beam mounted fluorescent light)
6
Decommissioning of existing Crude Launcher L-008, Chemical Injection Skid AQ-4010, Biocide Storage Tank, T6810, CI Storage Tank T-6820, Sump Pump, P-700
ATTACHMENT NO. 2 :
HAZARDOUS AREA
CLASSIFICATION DIAGRAM
MECH/PIPING
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
Legend :
Hot Work Location
STRUCTURAL
Contractor: PRSB
Page 1 of 1
Platform:
TKP-A
Zone:
Platform
Scope
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
POST-SD
POST-SD
PRE-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
E&I
ATTACHMENT NO. 3 :
P&ID OF AFFECTED HOT
WORK AREA
ATTACHMENT NO. 4 :
SPADING PLAN
UNIT NO.
AREA
EQUIPMENT/TAG NO
JOB DESCRIPTION
Action
Prepared by
Department
Name
Contractor
Approved by
Reviewed By
FOM
EIC
OIM
PS
Mokhtar Ab Manap
Signature
Date
NO.
SP-001A
SP-002A
SB-001B
CV-001B
SB-002B
CV-002B
SB-003B
CV-003B
SP-004B
10
SB-001C
11
CV-001C
12
SB-002C
13
CV-002C
14
SB-003C
Location
16
17
P&ID NO.
Flange data
Line Class
Method of
Isolation
Size (in)
Rating
Face
Standard
Rating
Scaffold
Type
Insulation
P-0034
PL
150#
RF
SP
P-0034
PL
150#
RF
SP
P-0036 SH 1/2
600#
RF
SB
P-0036 SH 1/2
600#
RF
CV
P-0036 SH 1/2
600#
RF
SB
P-0036 SH 1/2
600#
RF
CV
P-0036 SH 2/2
600#
RF
SB
P-0036 SH 2/2
600#
RF
CV
P-0039
150#
RF
SP
P-0036 SH 2/2
PL
600#
RF
SB
P-0036 SH 2/2
PL
600#
RF
CV
P-0036 SH 2/2
PL
600#
RF
SB
P-0036 SH 2/2
PL
600#
RF
CV
P-0036 SH 2/2
600#
RF
SB
P-0036 SH 2/2
600#
RF
CV
SB-004C
P-0036 SH 2/2
PL
10
600#
RF
SB
CV-004C
P-0036 SH 2/2
PL
10
600#
RF
CV
15
CV-003C
CSR CONFIRM
CORRECT RATED
SPADE INSTALLED
Date
Initial
BOLT DATA
Size
Material
REINSTATEMENT GASKET
(Gasket Description)
Qty
Qty
UNIT NO.
AREA
EQUIPMENT/TAG NO
JOB DESCRIPTION
Action
Prepared by
Department
Contractor
Name
Approved by
Reviewed By
FOM
EIC
OIM
PS
Mokhtar Ab Manap
Signature
Date
NO.
18
19
20
Location
P&ID NO.
Flange data
Line Class
Method of
Isolation
Size (in)
Rating
Face
Standard
Rating
Scaffold
Type
Insulation
SP-005C
P-0038
PL
10
600#
RF
SP
CV-005C
P-0038
PL
10
600#
RF
CV
P-0038
PL
10
600#
RF
SP
P-0038
PL
10
600#
RF
CV
P-0036 SH 1/2
600#
RF
SB
P-0036 SH 1/2
600#
RF
CV
P-0036 SH 1/2
600#
RF
SB
P-0036 SH 1/2
600#
RF
CV
P-0040
600#
RF
SB
P-0040
600#
RF
SP
P-0040
600#
RF
RMV
P-0040
600#
RF
RMV
SP-006C
21
CV-006C
22
SB-001D
23
CV-001D
24
SB-002D
25
CV-002D
26
SB-003D
27
SP-004D
28
RMV-005D
29
RMV-001E
Remarks :
SB - Spectacle Blind
SP - Spade
BF - Blind Flange
DBB - Double Block & Bleed
RMV - Remove Spool
CV - Close Valve
CSR CONFIRM
CORRECT RATED
SPADE INSTALLED
Date
Initial
BOLT DATA
Size
Material
REINSTATEMENT GASKET
(Gasket Description)
Qty
Qty
SP-001A
SP-002A
SB-001B
CV-001B
CV-001D
SB-001D
SB-002B
CV-002B
CV-002D
SB-002D
CV-003C
SB-003C
SB-001B
CV-001B
SP-004B
SB-002B
SB-002C
CV-002B
CV-002C
SB-003B
CV-003B
SB-004C
CV-004C
SB-001C
CV-001C
SP-005C
CV-005C
SP-006C
CV-006C
SP-005C
CV-005C
CV-006C
SP-006C
SP-004B
RMV-001E
SB-003D
RMV-005D
SP-004D
ATTACHMENT NO.5 :
HOT WORK PERMIT FOR THE
JOB
ATTACHMENT NO. 6 :
JOB HAZARD ANALYSIS
ATTACHEMENT NO. 7 :
FIREWATCHER
CHECKLIST/CERTIFICATE
No.
1
Action Items
Flammable liquids, dust, lint and oil deposits
removed.
Firewatcher:
________________________
Name:
Date:
Yes
No
Remarks
37E_?
CERTIFICATE
50163
Awarded to
Held On
25ff lULY 2013
t\/
fMnlMFriiri6n niNi
E$iry oate:
ffil
CERTIFICATE
49875
Awarded to
LEO Il,'ItCHEAL ACHA
60102-52-591 7)
Held On
l9
JULY 2013
G.r