You are on page 1of 96

ATTACHMENT NO.

1 :
SUMMARY SCOPE OF WORK
(SOW)

SCOPE OF WORK
DISCIPLINE
Structure

TKP-A
1 Deck Strengthening at Cellar & Sea Deck
2 Removal of existing beams, bracing, handrails & gratings (CD)
3

Deck Extension - Panel 1, 2 & 3 c/w diagonal bracing, tubular supports, loose beams, gratings, handrails and
pipe coaming

4 Deck Extension - Panel 4 & 5 c/w diagonal bracing, tubular supports, gratings, and handrails
5 Sump Pump Deck Extension c/w tubular supports, gratings & handrails.
6 ABV Service Platform c/w tubular supports, ladder, gratings & handrails.
7 Drip pan (under Panel 1 & 2)
8 Removal of existing SDV Service Platform

Mechanical

Crude Launcher (L-1350), N2 Bank (A-5910), Chemical Transfer Pumps Skid (A-6811), Eyewash & Safety Shower
Station, Sump Pump Skid (A-6511), Sump Tank Skid (A-6500).

2 Chemical Injection Skids, A-6810A/B (CI,BI & SI) c/w injection DBB valves (SP-13505 / 13506 / 13507)
3 H2S Analyzer Skid (XA-1350) c/w sampling (SP-13508) & return line DBB valves (SP-13509)
4

Corrosion Coupon (SP-13504), Scale Corrosion Coupon (SP-13503), Bioprobe (SP-13502) & Sampling DBB Valve
(SP-13501)

5 Removal of existing Crude Launcher (L-008), CI Skid (AQ-4010), Biocide Storage Tank (T-6810), CI Storage Tank
(T-6820), Sump Pump (P-700)

Piping

1 Process, blowdown, vents & drains line for L-1350 c/w valves, bolting sets and pipe supports.
2 Process, vent, drains & chemical lines of A-6810A/B and A-6811c/w valves, bolting sets and pipe supports.
3 Vent & drain line of XA-1350 c/w bolting sets
4 Process, vent & drains lines of A-6510/65611 c/w valves, bolting sets and pipe supports.
5 Mechanical Installation of MOV-13504/13505 & ABV-1350
6 Removal of process, vents, & drains lines of L-008 & P-700
7 Removal of drains, vent & chemical line of AQ-4010/T-6810/T-6820

Instrument

Instrumentation for L-1350 : Pressure Gauges (PI-1350A/1350B/1351/1352),


Pig Signallers (XI-1350/1351), Pressure Pilots (PEL-1350/PEH-1350)

2 Electric Resistance Probe XCP-1350


3 Signal & air line tubing for LCP-6810 (A-6810)
4 New SR-1320A (c/w signal & air line tubings) for existing SDV-1320
5 LCP-1350 / ABV-1350 c/w signal & air line tubings
6 Air line tubing for H2S Analyzer, XA-1350
7 Signal line tubings for A-6500/LCP-6510
8 Injection Line of A-6810A/B (CI,BI & SI)
9 Fusible plugs for L-1350, A-6810, A-6811, XA-1350, ABV-1350, MOV-13504, MOV-13505, A-6500, A-6511
10 Removal of instrumentation for L-008

Electrical

1 Modification at L5-H, Main LV Switchboard (TKQ-A)


2 Modification at existing LV Switchboard (TKQ-A/TKK-A bridge)
3 Distribution Board, DB-1000 (TKK-A/TKP-A bridge) c/w cable glanding & termination
4

Power Cable (P-1000-K) run from existing LV Switchboard (TKQ-A/TKK-A bridge) to new DB-100 (TKK-A/TKP-A
bridge)

Cable run, glanding & termination at MOV-13504, MOV-13505, LCP-6810 & chemical injection pumps, H2S
Analyzer (XA-1350), LCP-6510, water cut meter and sump pump

6 New lightings c/w JB, cable run, glanding & termination at CD


7

Commissioning
and

Grounding (Earth Boss) for L-1350, A-5910, A-6810, MOV-13504/13505, XA-1350, A-6500, A-6511, cage ladder of
ABV service platform

1 Commissioning of Crude Launcher, L-1350 and H2S Analyzer, XA-1350


2 Commissioning of Chemical Injection Skid, A-6810A/6810B & Chemical Transfer Pump, A-6811

Decommissioning 3 Commissioning of Sump Pump Tank, A-6500 & Sump Pump Skid, A-6511
4 Commissioning of Eyewash & Safety Shower Station
5 Commissioning of new lightings (floodlight, pole mounted fluorescent light & beam mounted fluorescent light)
6

Decommissioning of existing Crude Launcher L-008, Chemical Injection Skid AQ-4010, Biocide Storage Tank, T6810, CI Storage Tank T-6820, Sump Pump, P-700

ATTACHMENT NO. 2 :
HAZARDOUS AREA
CLASSIFICATION DIAGRAM

MECH/PIPING

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

Legend :
Hot Work Location

STRUCTURAL

SUMMARY OF SCOPE OF WORK (SOW)


PETRA RESOURCES
SDN BHD
(172962-D)

Contractor: PRSB

Work Description : Structural scope of work for platform TKP-A

MAIN DECK ( ) CELLAR DECK (  ) BELOW CELLAR DECK (  )


OTHERS: SDV SERVICE PLATFORM (  ) SUMP DECK (  )
No
Scope of Work (SOW)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.

Installation of deck strengthening at Cellar Deck.


Removal of existing beams, grating panels & handrails at leg B1 (CD).
Removal of existing handrails at leg B2 (CD)
Install Panel 1 at CD
Install loose beams at Panel 1 (CD)
Install diagonal brace at at Truss Row '2' (leg B2)
Install Panel 2 at CD
Install loose beams at Panel 2 (CD)
Install diagonal brace at Truss Row '1' (leg B1)
Install Panel 3 at CD
Install diagonal braces at Truss Row 'B' (leg B2)
Install diagonal braces section A (Panel 3)
Install pipe coaming c/w deck plate at CD
Install handrails for Panel 1, 2, & 3
Demolish existing handrails at leg A2 (CD)
Install Panel 4 at CD
Install vertical braces section B (Panel 4)
Install vertical braces section C (Panel 4)
Install loose beams between Panel 3 and Panel 4 at CD
Install Panel 5 at CD
Install handrails for Panel 4 & 5
Install framing of SDV service platform below CD, leg B2
Install supporting tubular & braces of SDV service platform below CD, leg B2
Install vertical ladder of SDV service platform below CD, leg B2
Install handrails of SDV service platform below CD, leg B2
Install drip pan and associated members under Panel 1 & 2
Horizontal tubular strengthening at SD
Install horizontal tubular framings of sump deck extension
Install vertical columns (114.3 dia & 88.9 dia) of sump deck extension
Install top framings of sump deck extension
Install handrails of sump deck extension
Demolish existing service platform (SD) and vertical ladder at leg B1

Page 1 of 1

Platform:
TKP-A
Zone:
Platform

Scope

TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A
TKP-A

PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
PRE-SD
POST-SD
POST-SD
PRE-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD
POST-SD

E&I

ATTACHMENT NO. 3 :
P&ID OF AFFECTED HOT
WORK AREA

ATTACHMENT NO. 4 :
SPADING PLAN

TKP-A Turnaround (August 2015)

PHYSICAL ISOLATION LIST


ISOLATION ID.

UNIT NO.

AREA

EQUIPMENT/TAG NO
JOB DESCRIPTION
Action

Prepared by

Department
Name

Contractor

Approved by

Reviewed By
FOM

EIC

OIM

PS

Mokhtar Ab Manap

Signature
Date
NO.

March 26, 2015


ISOLATION TAG
NO.

SP-001A

SP-002A

SB-001B

CV-001B

SB-002B

CV-002B

SB-003B

CV-003B

SP-004B

10

SB-001C

11

CV-001C

12

SB-002C

13

CV-002C

14

SB-003C

Location

Upstream of V-300 (200-PL-0111101X/11432)

Inlet Line to V-300


1.Insert spade
2.Hotwork at TP-012

Upstream of V-300 (200-PL-0111101X/11432)

Inlet Line to V-300


1.Insert spade
2.Hotwork at TP-012

16

17

P&ID NO.

Flange data

Line Class

Method of
Isolation

Size (in)

Rating

Face

Standard
Rating

Scaffold
Type

Insulation

P-0034

PL

150#

RF

SP

P-0034

PL

150#

RF

SP

P-0036 SH 1/2

600#

RF

SB

P-0036 SH 1/2

600#

RF

CV

P-0036 SH 1/2

600#

RF

SB

P-0036 SH 1/2

600#

RF

CV

P-0036 SH 2/2

600#

RF

SB

P-0036 SH 2/2

600#

RF

CV

P-0039

150#

RF

SP

P-0036 SH 2/2

PL

600#

RF

SB

P-0036 SH 2/2

PL

600#

RF

CV

P-0036 SH 2/2

PL

600#

RF

SB

P-0036 SH 2/2

PL

600#

RF

CV

P-0036 SH 2/2

600#

RF

SB

P-0036 SH 2/2

600#

RF

CV

SB-004C

Bypass Line of L-008 (250-PL-101- Bypass Line of L-008


6101X)
1.Swing Spectacle Blind in swing
closed position.
2.Hotwork at TP-003/004

P-0036 SH 2/2

PL

10

600#

RF

SB

CV-004C

Bypass Line of L-008 (250-PL-101- Outlet of Liquid Metering Skid to


6101X)
Bypass Line of L-008
1.Close 10'' x 600# ball valve.
2.Hotwork at TP-003/004

P-0036 SH 2/2

PL

10

600#

RF

CV

Vent Line of R-005 to 50-V-0021101

Vent Line of R-005


1.To ensure the Spectacle Blind is in
swing closed position.
2.Hotwork at TP-001/002
Vent Line of R-005 to 50-V-002Vent Line of R-005
1101
1.To ensure the 2'' x 600# ball valve
is in closed position.
2.Hotwork at TP-001/002
Vent Line of R-006 to 50-V-002Vent Line of R-006
1101
1.To ensure the Spectacle Blind is in
swing closed position.
2.Hotwork at TP-001/002
Vent Line of R-006 to 50-V-002Vent Line of R-006
1101
1.To ensure the 2'' x 600# ball valve
is in closed position.
2.Hotwork at TP-001/002
Vent Line of L-008 to 50-V-002Vent Line of L-008
1101
1.To ensure the Spectacle Blind is in
swing closed position.
2.Hotwork at TP-001/002
Vent Line of L-008 to 50-V-002Vent Line of L-008
1101
1.To ensure the 2'' x 600# ball valve
is in closed position.
2.Hotwork at TP-001/002
50-V-002-1101X to Vent Header
Vents of Receivers and Launchers to
Atmospheric Vent Header.
1.Insert Spade
2.Hotwork at TP-001/002
Kicker Line of L-008 to 250-PL-101- Kicker Line of L-008
6101X
1.To ensure the Spectacle Blind is in
swing closed position.
2.Hotwork at TP-003/004
Kicker Line of L-008 to 250-PL-101- Kicker Line of L-008
6101X
1.To ensure the 6'' x 600# ball valve
is in closed position.
2.Hotwork at TP-003/004
Balance Line of L-008 to 250-PLBalance Line of L-008
101-6101X
1.To ensure the Spectacle Blind is in
swing closed position.
2.Hotwork at TP-003/004
Balance Line of L-008 to 250-PLBalance Line of L-008
101-6101X
1.To ensure the 2'' x 600# ball valve
is in closed position.
2.Hotwork at TP-003/004
80-D-007-1101X to 250-PL-101Closed Drain Line of 250-PL-1016101X
6101X
1.To ensure the Spectacle Blind is in
swing closed position.
2.Hotwork at TP-003/004
80-D-007-1101X to 250-PL-1016101X

15

Function & Remarks

CV-003C

Closed Drain Line of 250-PL-1016101X


1.To ensure the 3'' x 600# ball valve
is in closed position.
2.Hotwork at TP-003/004

CSR CONFIRM
CORRECT RATED
SPADE INSTALLED
Date
Initial

OPS CONFIRM SPADE


OPS CONFIRM SPADES
INSTALLED AT
REMOVED
CORRECT LOCATION
Date
Initial
Date
Initial

BOLT DATA
Size

Material

REINSTATEMENT GASKET
(Gasket Description)
Qty

Qty

TKP-A Turnaround (August 2015)

PHYSICAL ISOLATION LIST


ISOLATION ID.

UNIT NO.

AREA

EQUIPMENT/TAG NO
JOB DESCRIPTION
Action

Prepared by

Department

Contractor

Name

Approved by

Reviewed By
FOM

EIC

OIM

PS

Mokhtar Ab Manap

Signature
Date
NO.

18

19

20

March 26, 2015


ISOLATION TAG
NO.

Location

Function & Remarks

P&ID NO.

Flange data

Line Class

Method of
Isolation

Size (in)

Rating

Face

Standard
Rating

Scaffold
Type

Insulation

SP-005C

Liquid Metering Skid to Bypass


Outlet of Liquid Metering Skid to
Line of L-008 (250-PL-101-6101X) Bypass Line of L-008.
1.Insert spade.
2.Hotwork at TP-003/004

P-0038

PL

10

600#

RF

SP

CV-005C

Liquid Metering Skid to Bypass


Outlet of Liquid Metering Skid to
Line of L-008 (250-PL-101-6101X) Bypass Line of L-008
1.To ensure the 10'' x 600# ball valve
is in closed position.
2.Hotwork at TP-003/004

P-0038

PL

10

600#

RF

CV

P-0038

PL

10

600#

RF

SP

P-0038

PL

10

600#

RF

CV

P-0036 SH 1/2

600#

RF

SB

P-0036 SH 1/2

600#

RF

CV

P-0036 SH 1/2

600#

RF

SB

P-0036 SH 1/2

600#

RF

CV

P-0040

600#

RF

SB

P-0040

600#

RF

SP

P-0040

600#

RF

RMV

P-0040

600#

RF

RMV

SP-006C

21

CV-006C

22

SB-001D

23

CV-001D

24

SB-002D

25

CV-002D

26

SB-003D

27

SP-004D

28

RMV-005D

29

RMV-001E

Liquid Metering Skid to Bypass


Outlet of Liquid Metering Skid to
Line of L-008 (250-PL-101-6101X) Bypass Line of L-008.
1.Insert spade.
2.Hotwork at TP-003/004
Liquid Metering Skid to Bypass
Outlet of Liquid Metering Skid to
Line of L-008 (250-PL-101-6101X) Bypass Line of L-008.
1.Close 10'' x 600# ball valve.
2.Hotwork at TP-003/004
Closed Drain Line of R-005 to 80-D- Closed Drain Line of R-005.
006-1101X
1.To ensure the spectacle blind is in
swing closed position.
2.Hotwork at TP-016/017
Closed Drain Line of R-006 to 80-D- Closed Drain Line of R-005.
006-1101X
1.To ensure the 3'' x 600# ball valve
is in closed position.
2.Hotwork at TP-016/017
Closed Drain Line of R-006 to 80-D- Closed Drain Line of R-006.
006-1101X
1.To ensure the spectacle blind is in
swing closed position.
2.Hotwork at TP-016/017
Closed Drain Line of R-006 to 80-D- Closed Drain Line of R-006.
006-1101X
1.To ensure the 3'' x 600# ball valve
is in closed position.
2.Hotwork at TP-016/017
Closed Drain Line of Sump Pump, Closed Drain Line of P-700.
P-700 to Closed Drain Header
1.Swing spectacle blind to closed
position.
2.Hotwork at TP-016/017
Closed Drain Header (150-BD-004- Closed Drain Header.
1101X)
1.Insert spade.
2.Hotwork at TP-016/017
Closed Drain Header (150-BD-004- Closed Drain Header.
1101X)
1.Temporary swing open the affected
spool.
Open Drain Header (150-D-0081101)

Remarks :
SB - Spectacle Blind
SP - Spade
BF - Blind Flange
DBB - Double Block & Bleed
RMV - Remove Spool
CV - Close Valve

Open Drain Header.


1.Temporary swing open the affected
spool.

CSR CONFIRM
CORRECT RATED
SPADE INSTALLED
Date
Initial

OPS CONFIRM SPADE


OPS CONFIRM SPADES
INSTALLED AT
REMOVED
CORRECT LOCATION
Date
Initial
Date
Initial

BOLT DATA
Size

Material

REINSTATEMENT GASKET
(Gasket Description)
Qty

Qty

SP-001A

SP-002A

SB-001B
CV-001B

CV-001D

SB-001D
SB-002B
CV-002B

CV-002D
SB-002D

CV-003C
SB-003C
SB-001B
CV-001B
SP-004B
SB-002B

SB-002C

CV-002B

CV-002C
SB-003B
CV-003B
SB-004C
CV-004C
SB-001C
CV-001C

SP-005C
CV-005C
SP-006C
CV-006C

SP-005C

CV-005C
CV-006C

SP-006C

SP-004B

RMV-001E

SB-003D

RMV-005D

SP-004D

ATTACHMENT NO.5 :
HOT WORK PERMIT FOR THE
JOB

ATTACHMENT NO. 6 :
JOB HAZARD ANALYSIS

ATTACHEMENT NO. 7 :
FIREWATCHER
CHECKLIST/CERTIFICATE

FIRE WATCHER CHECKLIST

No.
1

Action Items
Flammable liquids, dust, lint and oil deposits
removed.

2 Explosive atmosphere in area eliminated.


3 Floor swept clean of combustibles.
4

Combustibles floor wet down, covered with fire


blankets.

5 All wall & floors opening covered.


Fire watch will be provided during and continuously
6 for 30 minutes after work, including during any
work breaks.
7 Fire watch is supplied with suitable extingushers.
8

Fire watch is trained in use of this equipment and in


sounding alarm.

Hot work area inspected 30 minutes after job


completed.

10 Fire watcher to wear identifiable vest ( Green )

Firewatcher:

________________________
Name:
Date:

Yes

No

Remarks

37E_?

.HR sroPrER NG^NG ANIANG (7312rs r3 5ae7)

For having successfully compleied

CERTIFICATE

50163

Awarded to

WEt LIONC (890914-13-5129)

For having successfully completed


FiREWATCHER COURSE

Held On
25ff lULY 2013

t\/

fMnlMFriiri6n niNi

E$iry oate:

24u JU|Y 2016

ffil

CERTIFICATE

49875

Awarded to
LEO Il,'ItCHEAL ACHA

60102-52-591 7)

For having successfully completed


FIRE WATCHER COURSE

Held On

l9

JULY 2013

G.r

You might also like